You are on page 1of 240

Dalam bahasa Indonesia

Masukan Angka di sini #REF!


#REF! #REF!
1 Satu #REF!
2 Dua #REF!
3 Tiga #REF!
4 Empat #REF!
5 Lima #REF! #REF!
6 Enam
7 Tujuh
8 Delapan
9 Sembilan
10 Sepuluh #REF! #REF!
11 Sebelas
12 Dua belas
13 Tiga Belas
14 Empat Belas
15 Lima Belas #REF! #REF!
16 Enam Belas
17 Tujuh Belas
18 Delapan belas
19 Sembilan Belas
Puluh #REF! #REF!
Ratus #REF!
#REF!
Milyar
Juta
Ribu #REF!
#REF!
Terbilang :

#REF!

In English (RUPIAH

Enter number here 288,271,846.52


0 0
1 One 0 0
2 Two 0 0
3 Three 31 31
4 Four 31,333 333
5 Five 0
6 Six 0
7 Seven 0
8 Eight 0
9 Nine 3 #NAME?
10 Ten 0
11 Eleven 0
12 Twelve 0
13 Thirteen 31 #NAME?
14 Forteen 33 #NAME?
15 Fifteen 28,824,051,352 28824051352/100
16 Sixteen
17 Seventeen
18 Eighteen
19 Nineteen
20 Twenty
21 Twenty One
22 Twenty Two
23 Twenty Three
24 Twenty Four
25 Twenty Five
26 Twenty Six
27 Twenty Seven
28 Twenty Eight
29 Twenty Nine
30 Thirty
31 Thirty One
32 Thirty Two
33 Thirty Three
34 Thirty Four
35 Thirty Five
36 Thirty Six
37 Thirty Seven
38 Thirty Eight
39 Thirty Nine
40 Forty
41 Forty One
42 Forty Two
43 Forty Three
44 Forty Four
45 Forty Five
46 Forty Six
47 Forty Seven
48 Forty Eight
49 Forty Nine
50 Fifty
51 Fifty One
52 Fifty Two
53 Fifty Three
54 Fifty Four
55 Fifty Five
56 Fifty Six
57 Fifty Seven
58 Fifty Eight
59 Fifty Nine
60 Sixty
61 Sixty One
62 Sixty Two
63 Sixty Three
64 Sixty Four
65 Sixty Five
66 Sixty Six
67 Sixty Seven
68 Sixty Eight
69 Sixty Nine
70 Seventy
71 Seventy One
72 Seventy Two
73 Seventy Three
74 Seventy Four
75 Seventy Five
76 Seventy Six
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
80 Eighty
81 Eighty One
82 Eighty Two
83 Eighty Three
84 Eighty Four
85 Eighty Five
86 Eighty Six
87 Eighty Seven
88 Eighty Eight
89 Eighty Nine
90 Ninety
91 Ninety One
92 Ninety Two
93 Ninety Three
94 Ninety Four
95 Ninety Five
96 Ninety Six
97 Ninety Seven
98 Ninety Eight
99 Ninety Nine
Hundred

Thousand #NAME?
Rupiahs
28824051352/100 Rupiahs
in Words :

#NAME?
In English

Enter number here 31,333.00


0 0
1 One 0 0
2 Two 0 0
3 Three 31 31
4 Four 31,333 333
5 Five 0
6 Six 0
7 Seven 0
8 Eight 0
9 Nine 3 #NAME?
10 Ten 0
11 Eleven 0
12 Twelve 0
13 Thirteen 31 #NAME?
14 Forteen 33 #NAME?
15 Fifteen 0
16 Sixteen
17 Seventeen
18 Eighteen
19 Nineteen
20 Twenty
21 Twenty One
22 Twenty Two
23 Twenty Three
24 Twenty Four
25 Twenty Five
26 Twenty Six
27 Twenty Seven
28 Twenty Eight
29 Twenty Nine
30 Thirty
31 Thirty One
32 Thirty Two
33 Thirty Three
34 Thirty Four
35 Thirty Five
36 Thirty Six
37 Thirty Seven
38 Thirty Eight
39 Thirty Nine
40 Forty
41 Forty One
42 Forty Two
43 Forty Three
44 Forty Four
45 Forty Five
46 Forty Six
47 Forty Seven
48 Forty Eight
49 Forty Nine
50 Fifty
51 Fifty One
52 Fifty Two
53 Fifty Three
54 Fifty Four
55 Fifty Five
56 Fifty Six
57 Fifty Seven
58 Fifty Eight
59 Fifty Nine
60 Sixty
61 Sixty One
62 Sixty Two
63 Sixty Three
64 Sixty Four
65 Sixty Five
66 Sixty Six
67 Sixty Seven
68 Sixty Eight
69 Sixty Nine
70 Seventy
71 Seventy One
72 Seventy Two
73 Seventy Three
74 Seventy Four
75 Seventy Five
76 Seventy Six
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
80 Eighty
81 Eighty One
82 Eighty Two
83 Eighty Three
84 Eighty Four
85 Eighty Five
86 Eighty Six
87 Eighty Seven
88 Eighty Eight
89 Eighty Nine
90 Ninety
91 Ninety One
92 Ninety Two
93 Ninety Three
94 Ninety Four
95 Ninety Five
96 Ninety Six
97 Ninety Seven
98 Ninety Eight
99 Ninety Nine
Hundred

Thousand
Dollars
in Words :

Dollars

E:\bpn\[mg 4 5 6.xlsx]s (5)


LAPORAN MINGGUAN

MINGGU KE : V (Lima)
TANGGAL : 24-Jul
#REF!
30-Jul
BULAN : Juli 2016

PEKERJAAN :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN
JL. JEND. SUDIRMAN No. 310 SUKOHARJO
PERTANAHAN
ARJO
Nomor :
Lampiran : 1 ( Satu Berkas )
Perihal : Laporan Mingguan

Dengan Hormat,
Bersama ini kami sampaikan Laporan Mingguan tentang Kemajuan Pelaksanaan Pekerjaan / Fisik, Kekuatan Tenaga, Pengguna
Penggunaan Peralatan dan Laporan Harian untuk

Nama Paket : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO

Pereode Selesai ( % ) Target ( % )

### 1.387 0.130


s/d
###
Demikian untuk menjadikan periksa dan atas perhatiannya kami ucapkan terima kasih

PT.

Fauzi A
Tembusan disampaikan kepada Yth :
1. Pengawas Lapangan
2. Arsip
ga, Penggunaan Bahan,

KOHARJO

Keterangan

1.257
Diatas Rencana
PT. CHIMARDER

Fauzi Ardiawan Nugraha


Site Manager
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : 19 Juli 2016
WAKTU : 150 Hari NILAI FISIK
PELAKSANA : PT. CHIMARDER 777 PPN 10 %
MINGGU KE : V (Lima) JUMLAH TOTAL
PERIODE TGL. : Sunday, July 24, 2016 DIBULATKAN
s/d
Saturday, July 30, 2016
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013 0.100 ###
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231 3.600 ###
3 Sewa Scafolding 500.00 0.179 100.000 150.000 250.000
4 Air Kerja 5.00 0.026 1.000 0.250 1.250
5 Listrik Kerja 5.00 0.051 1.000 ###
-
0.500 105.700 150.250 255.950
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043 4.800 2.400 7.200
2 Pemindahan dan Pengembalian Furniture 32.00 0.057 6.400 3.200 9.600
3 Pemindahan dan Pengembalian Komputer 40.00 0.072 8.000 4.000 12.000
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043 4.800 2.400 7.200
5 Sewa Terpal untuk perlindungan 1.00 0.038 0.200 0.100 0.300
-
0.254 24.200 12.100 36.300
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131 160.162 160.162
2 Bongkaran Reng 1601.62 0.081
3 Bongkaran Konsol Beton 32.00 0.061
5 Pasang Reng Lama Kembali 85% 1361.37 0.370
6 Pasang Reng Baru 15% 240.24 0.186
7 Pasang Rangka Atap Baja Ringan 203.41 0.769
8 Pasang Genteng Onduvilla 1689.53 7.734
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367
10 Pasang Talang Jurai Dalam 48.11 0.215
11 Pasang Listplank Woodplank 437.67 0.168
12 Cat Woodplank 131.30 0.034
13 Pasang Atap Ondulin 115.50 0.529
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103
15 Pasang Topi Beton 21.50 0.019
16 Sewa alat bantu 1.00 0.051
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038
-
10.856 0.000 160.162 160.162
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 37.61 0.044 7.522 7.522 15.044
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026 0.260 0.130 0.390
- Urugan Pasir bawah Pondasi 3.62 0.012 0.724 0.363 1.087
- Pasangan Batu Belah 1:6 14.13 0.253
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
- Pondasi Footplat 2.29 0.252
- Kolom Beton 10.53 1.277
- Sloof Beton 0.31 0.031
- Sloof Beton 2.23 0.182
- Sloof Beton 2.45 0.199
- Balok Beton Lantai 4.88 0.496
- Balok Beton Lantai 0.83 0.086
- Balok Dag 4.88 0.496
- Balok Dag 0.83 0.086
- Plat Beton Lantai 5.61 0.513
- Plat Beton Dag 5.61 0.513
2.357
c Void Tengah -
- Bongkaran Rabat Beton 1.00 0.026 0.500 0.300 0.800
- Galian Tanah 22.24 0.026 4.448 15.568 20.016
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016 0.800 0.800
- Urugan Pasir bawah Pondasi 2.05 0.007
- Pasangan Batu Belah 1:6 6.76 0.121
- Pondasi Footplat 1.41 0.155 0.282 0.915 1.197
- Kolom Beton 3.96 0.480 0.792 0.396 1.188
- Sloof Beton 3.28 0.267
- Balok Beton 7.68 0.718
- Balok Beton 0.43 0.045
- Plat Beton Lantai 5.75 0.525
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026
- Penebalan Kolom Beton 1.00 0.051
- Balok Beton 5.28 0.493
- Balok Beton 0.25 0.026
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
- Plat Beton Lantai 4.42 0.404
- Listplang Beton 1.30 0.118
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128
- Balok Lateu 1.61 0.161
- Ring balk praktis 0.43 0.043
-
10.328 14.528 25.994 40.522
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540
2 Pas. Dinding Bata Merah 1:6 221.80 0.536
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458
4 Pas. Acian 97.40 0.060
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743
-
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673 26.979 80.938 107.917
2 Pas. Dinding Bata Merah 1:6 112.12 0.271
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827
4 Pas. Acian Dinding dan Beton 655.36 0.403
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850
-
12.570 26.979 80.938 107.917
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375
3 Pasangan Plit Granit 10x60 317.44 0.341
4 Pasangan Keramik Lantai Toilet 57.14 0.242
5 Pasangan Dinding Keramik Toilet 127.47 0.587
6 Pasangan Border Keramik KM/WC 66.35 0.068
7 Pasangan Granite Tile Tangga 35.59 0.210
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867
-
Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166 199.605 598.817 798.422
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889
3 Pasangan Plit Granit 10x60 264.60 0.284
4 Pasangan Keramik Lantai Toilet 61.95 0.263
5 Pasangan Dinding Keramik Toilet 86.29 0.397
6 Pasangan Border Keramik KM/WC 50.78 0.052
7 Pasang Lantai Karpet Vynil 80.49 0.412
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
-
13.321 199.605 598.817 798.422
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169
2 Buangan Bongkaran Plafond 1.00 0.026
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240 287.565 431.348 718.913
2 Buangan Bongkaran Plafond 1.00 0.038 0.200 0.100 0.300
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875
-
6.514 287.765 431.448 719.213
VIII. PEKERJAAN PINTU DAN JENDELA -
1 Bongkaran Kusen Eksisting 1.00 0.026
2 P1 5.00 0.648
3 P2 9.00 0.572
4 P3 4.00 0.277
5 P4 7.00 0.525
6 P5 9.00 0.621
7 P6 13.00 1.356
8 PS 2.00 0.044
9 PJ 1.00 0.146
10 J5 4.00 0.080
11 BV1 10.00 0.086
12 BV2 8.00 0.112
13 BV3 7.00 0.059
14 BV4 3.00 0.041
15 BV5 51.00 0.696
16 CW1 76.10 1.382
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
17 CW2 19.38 0.352
18 CW3 13.68 0.248
19 CW4 31.35 0.569
20 CW5 9.69 0.176
21 CW6 14.42 0.262
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576
2 Cat Dinding dan Beton 3226.14 1.338
3 Cat Plafond 2448.91 0.627
4 Cat Partisi 644.85 0.165
5 Cat Kayu untuk Kusen 187.01 0.168
-
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045
2 Pas. Closet Jongkok 4.00 0.036
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
7 Pasangan Kran Logam pada Toilet 5.00 0.003
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062
9 Pasangan Kaca Cermin 5 mm 3.00 0.019
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
6 Pasangan Kran Logam pada Toilet 4.00 0.002
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062
8 Pasangan Kaca Cermin 5 mm 3.00 0.019
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471
3 Railling Tangga 19.64 0.327
4 Letterbox Neon Sign 1.00 0.641
5 Railling Balustrade depan 4.70 0.090
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720
8 Waterprofing Coating 162.32 0.270
9 Stage pada Aula 15.00 0.250
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307
11 Rabat Beton T.10 cm 11.06 0.223
12 Baja Dudukan Bak Penjernih 110.11 0.070
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378
PP/LP-1 1.00 0.205
PP/LP-2 1.00 0.211
PP,AC-1 1.00 0.132
PP,AC-2 1.00 0.154
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096
Grounding elektronika max 1 ohm 1.00 0.090
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113
Jumlah pekerjaan Kabel Feeder -
IX. PEKERJAAN INSTALASI LISTRIK -
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915
Down Light E27 Ess 18 W 99.00 0.380
Roset E27 Ess 8 W 22.00 0.042
Stop kontak, 1ph. 16A (umum) 175.00 0.202
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021
Saklar tunggal 13.00 0.008
Saklar ganda 13.00 0.013
Saklar triple 2.00 0.003
Saklar hotel tunggal 1.00 0.001
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896
Down Light E27 Ess 18 W 161.00 0.619
Roset E27 Ess 8 W 16.00 0.031
Wall Lamp E27 Ess 18 W 5.00 0.038
Exit Lamp TL 10 W + baterai nicad 2.00 0.097
Stop kontak, 1ph. 16A (umum) 166.00 0.191
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027
Saklar tunggal 1.00 0.001
Saklar ganda 23.00 0.024
Saklar triple 4.00 0.005
Saklar hotel tunggal 8.00 0.011
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090
Lighting strike counter 1.00 0.064
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077
Cable Clamp, support dan accessories lainnya 1.00 0.038
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032
Material bantu 1.00 0.026
Ijin Depnaker 1.00 0.064
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090
Paging Mic 1.00 0.016
Remote Microphone w/Keypad Zone Selector 1.00 0.167
Evac Voice Announcement Board w/ CF card 1.00 0.234
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365
Graphic Equalizer, 2-Ch 1.00 0.154
Cabinet Rack 15U w/Acc 1.00 0.461
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080
Attenuator 5-30W 6.00 0.020
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109
Attenuator 5-30W 15.00 0.050
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224
Speaker Management 1.00 0.384
DVD/MP3/CD Player 1.00 0.017
Handheld Wireless Set 2.00 0.320
Dynamic Microphone + Kabel Mic 10m 2.00 0.059
Floor Stand Mic 2.00 0.020
Inlet Mic 2.00 0.018
Amplifier 2x250W 4.00 0.512
HX Series Speaker 2.00 0.269
Sub-woofer Speaker 2.00 0.205
Stage Speaker System 2.00 0.128
Headphone 1.00 0.045
Power Amplifier 240W 1.00 0.090
F-Series Box Speaker 2.00 0.051
Portable Flight Case Rack 1.00 0.115
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -

Sukoharjo, 27 Ju
DISETUJUI : DIPERIKSA: DIBUAT OLE
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS PT. CHIMARDE
CV. SKETSA
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini

1 2 3 4 5 6 7 8 9

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO FAUZI ARDIAWAN N


NIP. 19740525 199403 1 003 Pengawas Lapangan Site Manag
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : 19 Juli 2016
WAKTU : 150 Hari NILAI FISIK
PELAKSANA : PT. CHIMARDER 777 PPN 10 %
MINGGU KE : V (Lima) JUMLAH TOTAL
PERIODE TGL. : Sunday, July 24, 2016 DIBULATKAN
s/d
Saturday, July 30, 2016
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013 0.100 ### 0.00
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231 3.600 ### 0.02
3 Sewa Scafolding 500.00 0.179 100.000 150.000 250.000 0.09
4 Air Kerja 5.00 0.026 1.000 0.250 1.250 0.00
5 Listrik Kerja 5.00 0.051 1.000 ### 0.01
-
0.500 105.700 150.250 255.950
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043 4.800 2.400 7.200 0.01
2 Pemindahan dan Pengembalian Furniture 32.00 0.057 6.400 3.200 9.600 0.01
3 Pemindahan dan Pengembalian Komputer 40.00 0.072 8.000 4.000 12.000 0.02
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043 4.800 2.400 7.200 0.01
5 Sewa Terpal untuk perlindungan 1.00 0.038 0.200 0.100 0.300 0.01
-
0.254 24.200 12.100 36.300
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131 160.162 160.162 0.01
2 Bongkaran Reng 1601.62 0.081 0.00
3 Bongkaran Konsol Beton 32.00 0.061 0.00
5 Pasang Reng Lama Kembali 85% 1361.37 0.370 0.00
6 Pasang Reng Baru 15% 240.24 0.186 0.00
7 Pasang Rangka Atap Baja Ringan 203.41 0.769 0.00
8 Pasang Genteng Onduvilla 1689.53 7.734 0.00
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367 0.00
10 Pasang Talang Jurai Dalam 48.11 0.215 0.00
11 Pasang Listplank Woodplank 437.67 0.168 0.00
12 Cat Woodplank 131.30 0.034 0.00
13 Pasang Atap Ondulin 115.50 0.529 0.00
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103 0.00
15 Pasang Topi Beton 21.50 0.019 0.00
16 Sewa alat bantu 1.00 0.051 0.00
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038 0.00
-
10.856 0.000 160.162 160.162
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951 0.00
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964 0.00
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026 0.00
- Galian Tanah 37.61 0.044 7.522 7.522 15.044 0.01
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017 0.00
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038 0.00
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026 0.260 0.130 0.390 0.00
- Urugan Pasir bawah Pondasi 3.62 0.012 0.724 0.363 1.087 0.00
- Pasangan Batu Belah 1:6 14.13 0.253 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
- Pondasi Footplat 2.29 0.252 0.00
- Kolom Beton 10.53 1.277 0.00
- Sloof Beton 0.31 0.031 0.00
- Sloof Beton 2.23 0.182 0.00
- Sloof Beton 2.45 0.199 0.00
- Balok Beton Lantai 4.88 0.496 0.00
- Balok Beton Lantai 0.83 0.086 0.00
- Balok Dag 4.88 0.496 0.00
- Balok Dag 0.83 0.086 0.00
- Plat Beton Lantai 5.61 0.513 0.00
- Plat Beton Dag 5.61 0.513 0.00
2.357
c Void Tengah -
- Bongkaran Rabat Beton 1.00 0.026 0.500 0.300 0.800 0.02
- Galian Tanah 22.24 0.026 4.448 15.568 20.016 0.02
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010 0.00
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022 0.00
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016 0.800 0.800 0.01
- Urugan Pasir bawah Pondasi 2.05 0.007 0.00
- Pasangan Batu Belah 1:6 6.76 0.121 0.00
- Pondasi Footplat 1.41 0.155 0.282 0.915 1.197 0.13
- Kolom Beton 3.96 0.480 0.792 0.396 1.188 0.14
- Sloof Beton 3.28 0.267 0.00
- Balok Beton 7.68 0.718 0.00
- Balok Beton 0.43 0.045 0.00
- Plat Beton Lantai 5.75 0.525 0.00
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026 0.00
- Penebalan Kolom Beton 1.00 0.051 0.00
- Balok Beton 5.28 0.493 0.00
- Balok Beton 0.25 0.026 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
- Plat Beton Lantai 4.42 0.404 0.00
- Listplang Beton 1.30 0.118 0.00
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128 0.00
- Balok Lateu 1.61 0.161 0.00
- Ring balk praktis 0.43 0.043 0.00
-
10.328 14.528 25.994 40.522
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540 0.00
2 Pas. Dinding Bata Merah 1:6 221.80 0.536 0.00
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458 0.00
4 Pas. Acian 97.40 0.060 0.00
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420 0.00
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028 0.00
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024 0.00
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743 0.00
-
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673 26.979 80.938 107.917 0.53
2 Pas. Dinding Bata Merah 1:6 112.12 0.271 0.00
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827 0.00
4 Pas. Acian Dinding dan Beton 655.36 0.403 0.00
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957 0.00
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066 0.00
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070 0.00
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644 0.00
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850 0.00
-
12.570 26.979 80.938 107.917
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095 0.00
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375 0.00
3 Pasangan Plit Granit 10x60 317.44 0.341 0.00
4 Pasangan Keramik Lantai Toilet 57.14 0.242 0.00
5 Pasangan Dinding Keramik Toilet 127.47 0.587 0.00
6 Pasangan Border Keramik KM/WC 66.35 0.068 0.00
7 Pasangan Granite Tile Tangga 35.59 0.210 0.00
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071 0.00
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867 0.00
-
Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166 199.605 598.817 798.422 0.13
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889 0.00
3 Pasangan Plit Granit 10x60 264.60 0.284 0.00
4 Pasangan Keramik Lantai Toilet 61.95 0.263 0.00
5 Pasangan Dinding Keramik Toilet 86.29 0.397 0.00
6 Pasangan Border Keramik KM/WC 50.78 0.052 0.00
7 Pasang Lantai Karpet Vynil 80.49 0.412 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
-
13.321 199.605 598.817 798.422
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169 0.00
2 Buangan Bongkaran Plafond 1.00 0.026 0.00
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221 0.00
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273 0.00
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240 287.565 431.348 718.913 0.12
2 Buangan Bongkaran Plafond 1.00 0.038 0.200 0.100 0.300 0.01
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672 0.00
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875 0.00
-
6.514 287.765 431.448 719.213
VIII. PEKERJAAN PINTU DAN JENDELA -
1 Bongkaran Kusen Eksisting 1.00 0.026 0.00
2 P1 5.00 0.648 0.00
3 P2 9.00 0.572 0.00
4 P3 4.00 0.277 0.00
5 P4 7.00 0.525 0.00
6 P5 9.00 0.621 0.00
7 P6 13.00 1.356 0.00
8 PS 2.00 0.044 0.00
9 PJ 1.00 0.146 0.00
10 J5 4.00 0.080 0.00
11 BV1 10.00 0.086 0.00
12 BV2 8.00 0.112 0.00
13 BV3 7.00 0.059 0.00
14 BV4 3.00 0.041 0.00
15 BV5 51.00 0.696 0.00
16 CW1 76.10 1.382 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
17 CW2 19.38 0.352 0.00
18 CW3 13.68 0.248 0.00
19 CW4 31.35 0.569 0.00
20 CW5 9.69 0.176 0.00
21 CW6 14.42 0.262 0.00
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184 0.00
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922 0.00
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538 0.00
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576 0.00
2 Cat Dinding dan Beton 3226.14 1.338 0.00
3 Cat Plafond 2448.91 0.627 0.00
4 Cat Partisi 644.85 0.165 0.00
5 Cat Kayu untuk Kusen 187.01 0.168 0.00
-
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045 0.00
2 Pas. Closet Jongkok 4.00 0.036 0.00
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165 0.00
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427 0.00
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031 0.00
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018 0.00
7 Pasangan Kran Logam pada Toilet 5.00 0.003 0.00
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062 0.00
9 Pasangan Kaca Cermin 5 mm 3.00 0.019 0.00
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182 0.00
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165 0.00
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031 0.00
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018 0.00
6 Pasangan Kran Logam pada Toilet 4.00 0.002 0.00
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062 0.00
8 Pasangan Kaca Cermin 5 mm 3.00 0.019 0.00
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720 0.00
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289 0.00
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471 0.00
3 Railling Tangga 19.64 0.327 0.00
4 Letterbox Neon Sign 1.00 0.641 0.00
5 Railling Balustrade depan 4.70 0.090 0.00
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035 0.00
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720 0.00
8 Waterprofing Coating 162.32 0.270 0.00
9 Stage pada Aula 15.00 0.250 0.00
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307 0.00
11 Rabat Beton T.10 cm 11.06 0.223 0.00
12 Baja Dudukan Bak Penjernih 110.11 0.070 0.00
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378 0.00
PP/LP-1 1.00 0.205 0.00
PP/LP-2 1.00 0.211 0.00
PP,AC-1 1.00 0.132 0.00
PP,AC-2 1.00 0.154 0.00
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096 0.00
Grounding elektronika max 1 ohm 1.00 0.090 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833 0.00
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038 0.00
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077 0.00
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042 0.00
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113 0.00
Jumlah pekerjaan Kabel Feeder -
IX. PEKERJAAN INSTALASI LISTRIK -
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574 0.00
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915 0.00
Down Light E27 Ess 18 W 99.00 0.380 0.00
Roset E27 Ess 8 W 22.00 0.042 0.00
Stop kontak, 1ph. 16A (umum) 175.00 0.202 0.00
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021 0.00
Saklar tunggal 13.00 0.008 0.00
Saklar ganda 13.00 0.013 0.00
Saklar triple 2.00 0.003 0.00
Saklar hotel tunggal 1.00 0.001 0.00
Saklar hotel ganda 2.00 0.003 0.00
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450 0.00
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872 0.00
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896 0.00
Down Light E27 Ess 18 W 161.00 0.619 0.00
Roset E27 Ess 8 W 16.00 0.031 0.00
Wall Lamp E27 Ess 18 W 5.00 0.038 0.00
Exit Lamp TL 10 W + baterai nicad 2.00 0.097 0.00
Stop kontak, 1ph. 16A (umum) 166.00 0.191 0.00
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027 0.00
Saklar tunggal 1.00 0.001 0.00
Saklar ganda 23.00 0.024 0.00
Saklar triple 4.00 0.005 0.00
Saklar hotel tunggal 8.00 0.011 0.00
Saklar hotel ganda 2.00 0.003 0.00
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450 0.00
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102 0.00
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359 0.00
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090 0.00
Lighting strike counter 1.00 0.064 0.00
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077 0.00
Cable Clamp, support dan accessories lainnya 1.00 0.038 0.00
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032 0.00
Material bantu 1.00 0.026 0.00
Ijin Depnaker 1.00 0.064 0.00
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058 0.00
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058 0.00
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090 0.00
Paging Mic 1.00 0.016 0.00
Remote Microphone w/Keypad Zone Selector 1.00 0.167 0.00
Evac Voice Announcement Board w/ CF card 1.00 0.234 0.00
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365 0.00
Graphic Equalizer, 2-Ch 1.00 0.154 0.00
Cabinet Rack 15U w/Acc 1.00 0.461 0.00
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080 0.00
Attenuator 5-30W 6.00 0.020 0.00
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128 0.00
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109 0.00
Attenuator 5-30W 15.00 0.050 0.00
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174 0.00
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224 0.00
Speaker Management 1.00 0.384 0.00
DVD/MP3/CD Player 1.00 0.017 0.00
Handheld Wireless Set 2.00 0.320 0.00
Dynamic Microphone + Kabel Mic 10m 2.00 0.059 0.00
Floor Stand Mic 2.00 0.020 0.00
Inlet Mic 2.00 0.018 0.00
Amplifier 2x250W 4.00 0.512 0.00
HX Series Speaker 2.00 0.269 0.00
Sub-woofer Speaker 2.00 0.205 0.00
Stage Speaker System 2.00 0.128 0.00
Headphone 1.00 0.045 0.00
Power Amplifier 240W 1.00 0.090 0.00
F-Series Box Speaker 2.00 0.051 0.00
Portable Flight Case Rack 1.00 0.115 0.00
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031 0.00
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058 0.00
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
1.38
Sukoharjo, 27 Ju
DISETUJUI : DIPERIKSA: DIBUAT OLE
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS PT. CHIMARDE
CV. SKETSA
VOLUME PEKERJAAN M' / M2 / M3 KEMAJUAN PEKERJAAN
KONTRAK AWAL CCO Bobot
NO. URAIAN PEKERJAAN s/d Minggu Dalam s/d Minggu Realisasi
VOLUME Bobot ( % ) VOLUME Bobot ( % ) Lalu Minggu Ini Ini (%)

1 2 3 4 5 6 7 8 9 10

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO FAUZI ARDIAWAN N


NIP. 19740525 199403 1 003 Pengawas Lapangan Site Manag
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK

LAPORAN PEKERJAAN HARIAN

Hari Minggu
LAPORAN HARIAN Tanggal 24
Halaman Ke : 1 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager 1.00 Semen sak Alat Bantu unit 15.00 Pemindahan dan Pengembalin Berka
Pelaksana 1.00 Besi Beton kg Alat Ukur unit 1.00 Pemindahan dan Pengembalian Furn
Pembantu Pelaksana 1.00 Kawat Bendrat kg Alat Gali unit 30.00 Pemindahan dan Pengembalian Kom
Logistik 1.00 Paku kg Scafolding set 500.00 Pemindahan Pengembalian Alat dan
Mandor 2.00 Kayu Begesting m3 unit Bongkaran Genteng + Assesoris
Tukang 15.00 Batu Pecah 1/2 m3 unit Bongkaran Reng
Kepala Tukang 3.00 Batu Belah m3 unit Bongkaran Konsol Beton
Pekerja 20.00 Pasir m3 unit Pasang Reng Lama Kembali 85%
Sopir 1.00 Tanah urug m3 unit Pasang Reng Baru 15%
Penjaga 1.00 unit - Bongkaran Rabat Beton
unit - Galian Tanah
- unit - Urugan Tanah Kembali untuk penin
- unit - Pemadatan Urugan Tanah Kembali
- - Lantai Kerja Beton K.100 untuk pon
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK
LAPORAN PEKERJAAN HARIAN

Hari Senin
LAPORAN HARIAN Tanggal 25
Halaman Ke : 2 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - Bongkaran Rabat Beton
- - - - - - - - - unit - - Galian Tanah
- - - - - - - - - unit - - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - - Pemadatan Urugan Tanah Kembali
- - - - - - - - 1.00 - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK

LAPORAN PEKERJAAN HARIAN

Hari Selasa
LAPORAN HARIAN Tanggal 26
Halaman Ke : 3 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 - Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 - Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 - Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 - Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - - Bongkaran Rabat Beton
- - - - - - - - - unit - - - Galian Tanah
- - - - - - - - - unit - - - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - - - Pemadatan Urugan Tanah Kembali
- - - - - - - - 1.00 - - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - - Urugan Pasir bawah Pondasi
- - - - - - - - - - - Pasangan Batu Belah 1:6
- - - - - - - - - - - - -
-

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Hujan
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Hujan
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK

LAPORAN PEKERJAAN HARIAN

Hari Rabu
LAPORAN HARIAN Tanggal 27
Halaman Ke : 4 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 - Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 - Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 - Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 - Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - - Bongkaran Rabat Beton
- - - - - - - - - unit - - - Galian Tanah
- - - - - - - - - unit - - - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - - - Pemadatan Urugan Tanah Kembali
- - - - - - - - - - 1.00 - - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - - - - Urugan Pasir bawah Pondasi
- - - - - - - - - - - - - Pasangan Batu Belah 1:6
- - - - - - - - - - - - -
- - - - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK

LAPORAN PEKERJAAN HARIAN

Hari Kamis
LAPORAN HARIAN Tanggal 28
Halaman Ke : 5 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 - Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 - Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 - Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 - Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - - Bongkaran Rabat Beton
- - - - - - - - - unit - - - Galian Tanah
- - - - - - - - - unit - - - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - - - Pemadatan Urugan Tanah Kembali
- - - - - - - - - - 1.00 - - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - - - - Urugan Pasir bawah Pondasi
- - - - - - - - - - - - - Pasangan Batu Belah 1:6
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK
LAPORAN PEKERJAAN HARIAN

Hari Jumat
LAPORAN HARIAN Tanggal 29
Halaman Ke : 6 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00 Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - Bongkaran Rabat Beton
- - - - - - - - - unit - - Galian Tanah
- - - - - - - - - unit - - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - - Pemadatan Urugan Tanah Kembali
- - - - - - - - - - - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - - - Urugan Pasir bawah Pondasi
- - - - - - - - - - - - Pasangan Batu Belah 1:6
- - - - - - - - - - -
- - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Hujan
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUK

LAPORAN PEKERJAAN HARIAN

Hari Sabtu
LAPORAN HARIAN Tanggal 30
Halaman Ke : 7 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah Pekerjaan yang dilaksanakan hari ini
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00 Pemindahan dan Pengembalin Berka
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 Pemindahan dan Pengembalian Furn
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 Pemindahan dan Pengembalian Kom
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 Pemindahan Pengembalian Alat dan
Mandor - - 2.00 - Kayu Begesting m3 - - unit - Bongkaran Genteng + Assesoris
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - Bongkaran Reng
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - Bongkaran Konsol Beton
Pekerja - - 20.00 - Pasir m3 - - unit - Pasang Reng Lama Kembali 85%
Sopir - - 1.00 - Tanah urug m3 - - unit - Pasang Reng Baru 15%
Penjaga - - 1.00 - Beton K250 m3 - - unit - - Bongkaran Rabat Beton
- - - - - - - - - unit - Galian Tanah
- - - - - - - - - unit - Urugan Tanah Kembali untuk penin
- - - - - - - - - unit - Pemadatan Urugan Tanah Kembali
- - - - - - - - - - - Lantai Kerja Beton K.100 untuk pon
- - - - - - - - - - - Urugan Pasir bawah Pondasi
- - - - - - - - - - - - Pasangan Batu Belah 1:6
- - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00 EDIYANTO W
Pengawas
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas
engembalian Furniture
engembalian Komputer
mbalian Alat dan Peralatan
g + Assesoris

Kembali 85%

mbali untuk peninggian elevasi


n Tanah Kembali untuk peninggian elevasi
n K.100 untuk pondasi Footplat
ah Pondasi

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas
engembalian Furniture
engembalian Komputer
mbalian Alat dan Peralatan
g + Assesoris

Kembali 85%

mbali untuk peninggian elevasi


n Tanah Kembali untuk peninggian elevasi
n K.100 untuk pondasi Footplat
ah Pondasi

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas -
engembalian Furniture -
engembalian Komputer - -
embalian Alat dan Peralatan - -
g + Assesoris - -
- -
- -
a Kembali 85% - -
- -
- -
- -
mbali untuk peninggian elevasi - -
an Tanah Kembali untuk peninggian elevasi - -
n K.100 untuk pondasi Footplat - -
ah Pondasi - -
- -
- -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777
EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha
Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas -
engembalian Furniture -
engembalian Komputer - -
embalian Alat dan Peralatan - -
g + Assesoris - -
- -
- -
a Kembali 85% - -
- -
- -
- -
mbali untuk peninggian elevasi - -
an Tanah Kembali untuk peninggian elevasi - -
n K.100 untuk pondasi Footplat - -
ah Pondasi - -
- -
- -
- -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777
EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha
Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas -
engembalian Furniture -
engembalian Komputer - -
embalian Alat dan Peralatan - -
g + Assesoris - -
- -
- -
a Kembali 85% - -
- -
- -
- -
mbali untuk peninggian elevasi - -
an Tanah Kembali untuk peninggian elevasi - -
n K.100 untuk pondasi Footplat - -
ah Pondasi - -
- -
- -
- -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777
EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha
Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini Satuan Jumlah


engembalin Berkas
engembalian Furniture
engembalian Komputer
mbalian Alat dan Peralatan
g + Assesoris

Kembali 85%

mbali untuk peninggian elevasi


n Tanah Kembali untuk peninggian elevasi
n K.100 untuk pondasi Footplat
ah Pondasi

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
PATEN SUKOHARJO

Penyedia Jasa
PT. CHIMARDER 777

akan hari ini


engembalin Berkas
engembalian Furniture
engembalian Komputer
mbalian Alat dan Peralatan
g + Assesoris

Kembali 85%

mbali untuk peninggian elevasi


n Tanah Kembali untuk peninggian elevasi
n K.100 untuk pondasi Footplat
ah Pondasi

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
LAPORAN MINGGUAN

MINGGU KE : 6
TANGGAL : ###
s/d
###
BULAN : Juli

PEKERJAAN :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABU
N

AHAN KABUPATEN SUKOHARJO


Nomor :
Lampiran : 1 ( Satu Berkas )
Perihal : Laporan Mingguan

Dengan Hormat,
Bersama ini kami sampaikan Laporan Mingguan tentang Kemajuan Pelaksanaan Pekerjaan / Fisik, Kekuatan Tenaga, Pengguna
Penggunaan Peralatan dan Laporan Harian untuk

Nama Paket : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJ

Pereode Selesai ( % ) Target ( % )

### 3.335 1.303


s/d
###
Demikian untuk menjadikan periksa dan atas perhatiannya kami ucapkan terima kasih

Tembusan disampaikan kepada Yth :


1. Pengawas Lapangan
2. Arsip
n Tenaga, Penggunaan Bahan,

PATEN SUKOHARJO

Keterangan

2.032
PT. CHIMARDER

IR. SUTONO, MT
Pelaksana
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : 1 Juli 2016
WAKTU : 150 Hari
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 6
PERIODE TGL. : Sunday, July 31, 2016
s/d
Saturday, August 06, 2016
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231
3 Sewa Scafolding 500.00 0.179
4 Air Kerja 5.00 0.026
5 Listrik Kerja 5.00 0.051
-
0.500
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043
2 Pemindahan dan Pengembalian Furniture 32.00 0.057
3 Pemindahan dan Pengembalian Komputer 40.00 0.072
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043
5 Sewa Terpal untuk perlindungan 1.00 0.038
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
0.254
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131
2 Bongkaran Reng 1601.62 0.081
3 Bongkaran Konsol Beton 32.00 0.061
5 Pasang Reng Lama Kembali 85% 1361.37 0.370
6 Pasang Reng Baru 15% 240.24 0.186
7 Pasang Rangka Atap Baja Ringan 203.41 0.769
8 Pasang Genteng Onduvilla 1689.53 7.734
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367
10 Pasang Talang Jurai Dalam 48.11 0.215
11 Pasang Listplank Woodplank 437.67 0.168
12 Cat Woodplank 131.30 0.034
13 Pasang Atap Ondulin 115.50 0.529
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103
15 Pasang Topi Beton 21.50 0.019
16 Sewa alat bantu 1.00 0.051
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038
-
10.856
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 37.61 0.044
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Urugan Pasir bawah Pondasi 3.62 0.012
- Pasangan Batu Belah 1:6 14.13 0.253
- Pondasi Footplat 2.29 0.252
- Kolom Beton 10.53 1.277
- Sloof Beton 0.31 0.031
- Sloof Beton 2.23 0.182
- Sloof Beton 2.45 0.199
- Balok Beton Lantai 4.88 0.496
- Balok Beton Lantai 0.83 0.086
- Balok Dag 4.88 0.496
- Balok Dag 0.83 0.086
- Plat Beton Lantai 5.61 0.513
- Plat Beton Dag 5.61 0.513
2.357
c Void Tengah -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 22.24 0.026
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016
- Urugan Pasir bawah Pondasi 2.05 0.007
- Pasangan Batu Belah 1:6 6.76 0.121
- Pondasi Footplat 1.41 0.155
- Kolom Beton 3.96 0.480
- Sloof Beton 3.28 0.267
- Balok Beton 7.68 0.718
- Balok Beton 0.43 0.045
- Plat Beton Lantai 5.75 0.525
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Penebalan Kolom Beton 1.00 0.051
- Balok Beton 5.28 0.493
- Balok Beton 0.25 0.026
- Plat Beton Lantai 4.42 0.404
- Listplang Beton 1.30 0.118
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128
- Balok Lateu 1.61 0.161
- Ring balk praktis 0.43 0.043
-
10.328
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540
2 Pas. Dinding Bata Merah 1:6 221.80 0.536
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458
4 Pas. Acian 97.40 0.060
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673
2 Pas. Dinding Bata Merah 1:6 112.12 0.271
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827
4 Pas. Acian Dinding dan Beton 655.36 0.403
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850
-
12.570
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375
3 Pasangan Plit Granit 10x60 317.44 0.341
4 Pasangan Keramik Lantai Toilet 57.14 0.242
5 Pasangan Dinding Keramik Toilet 127.47 0.587
6 Pasangan Border Keramik KM/WC 66.35 0.068
7 Pasangan Granite Tile Tangga 35.59 0.210
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867

Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889
3 Pasangan Plit Granit 10x60 264.60 0.284
4 Pasangan Keramik Lantai Toilet 61.95 0.263
5 Pasangan Dinding Keramik Toilet 86.29 0.397
6 Pasangan Border Keramik KM/WC 50.78 0.052
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
7 Pasang Lantai Karpet Vynil 80.49 0.412
-
13.321
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169
2 Buangan Bongkaran Plafond 1.00 0.026
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240
2 Buangan Bongkaran Plafond 1.00 0.038
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875
-
6.514
VIII. PEKERJAAN PINTU DAN JENDELA -
1 Bongkaran Kusen Eksisting 1.00 0.026
2 P1 5.00 0.648
3 P2 9.00 0.572
4 P3 4.00 0.277
5 P4 7.00 0.525
6 P5 9.00 0.621
7 P6 13.00 1.356
8 PS 2.00 0.044
9 PJ 1.00 0.146
10 J5 4.00 0.080
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
11 BV1 10.00 0.086
12 BV2 8.00 0.112
13 BV3 7.00 0.059
14 BV4 3.00 0.041
15 BV5 51.00 0.696
16 CW1 76.10 1.382
17 CW2 19.38 0.352
18 CW3 13.68 0.248
19 CW4 31.35 0.569
20 CW5 9.69 0.176
21 CW6 14.42 0.262
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576
2 Cat Dinding dan Beton 3226.14 1.338
3 Cat Plafond 2448.91 0.627
4 Cat Partisi 644.85 0.165
5 Cat Kayu untuk Kusen 187.01 0.168
-
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045
2 Pas. Closet Jongkok 4.00 0.036
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
7 Pasangan Kran Logam pada Toilet 5.00 0.003
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062
9 Pasangan Kaca Cermin 5 mm 3.00 0.019
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
6 Pasangan Kran Logam pada Toilet 4.00 0.002
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062
8 Pasangan Kaca Cermin 5 mm 3.00 0.019
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471
3 Railling Tangga 19.64 0.327
4 Letterbox Neon Sign 1.00 0.641
5 Railling Balustrade depan 4.70 0.090
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720
8 Waterprofing Coating 162.32 0.270
9 Stage pada Aula 15.00 0.250
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307
11 Rabat Beton T.10 cm 11.06 0.223
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
12 Baja Dudukan Bak Penjernih 110.11 0.070
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378
PP/LP-1 1.00 0.205
PP/LP-2 1.00 0.211
PP,AC-1 1.00 0.132
PP,AC-2 1.00 0.154
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096
Grounding elektronika max 1 ohm 1.00 0.090
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113
Jumlah pekerjaan Kabel Feeder -
IX. PEKERJAAN INSTALASI LISTRIK -
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915
Down Light E27 Ess 18 W 99.00 0.380
Roset E27 Ess 8 W 22.00 0.042
Stop kontak, 1ph. 16A (umum) 175.00 0.202
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021
Saklar tunggal 13.00 0.008
Saklar ganda 13.00 0.013
Saklar triple 2.00 0.003
Saklar hotel tunggal 1.00 0.001
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896
Down Light E27 Ess 18 W 161.00 0.619
Roset E27 Ess 8 W 16.00 0.031
Wall Lamp E27 Ess 18 W 5.00 0.038
Exit Lamp TL 10 W + baterai nicad 2.00 0.097
Stop kontak, 1ph. 16A (umum) 166.00 0.191
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027
Saklar tunggal 1.00 0.001
Saklar ganda 23.00 0.024
Saklar triple 4.00 0.005
Saklar hotel tunggal 8.00 0.011
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090
Lighting strike counter 1.00 0.064
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077
Cable Clamp, support dan accessories lainnya 1.00 0.038
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032
Material bantu 1.00 0.026
Ijin Depnaker 1.00 0.064
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090
Paging Mic 1.00 0.016
Remote Microphone w/Keypad Zone Selector 1.00 0.167
Evac Voice Announcement Board w/ CF card 1.00 0.234
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365
Graphic Equalizer, 2-Ch 1.00 0.154
Cabinet Rack 15U w/Acc 1.00 0.461
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080
Attenuator 5-30W 6.00 0.020
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109
Attenuator 5-30W 15.00 0.050
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224
Speaker Management 1.00 0.384
DVD/MP3/CD Player 1.00 0.017
Handheld Wireless Set 2.00 0.320
Dynamic Microphone + Kabel Mic 10m 2.00 0.059
Floor Stand Mic 2.00 0.020
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Inlet Mic 2.00 0.018
Amplifier 2x250W 4.00 0.512
HX Series Speaker 2.00 0.269
Sub-woofer Speaker 2.00 0.205
Stage Speaker System 2.00 0.128
Headphone 1.00 0.045
Power Amplifier 240W 1.00 0.090
F-Series Box Speaker 2.00 0.051
Portable Flight Case Rack 1.00 0.115
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. SKETSA

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO


NIP. 19740525 199403 1 003 Pengawas Lapangan
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : 1 Juli 2016
WAKTU : 150 Hari
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 6
PERIODE TGL. : Sunday, July 31, 2016
s/d
Saturday, August 06, 2016
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231
3 Sewa Scafolding 500.00 0.179
4 Air Kerja 5.00 0.026
5 Listrik Kerja 5.00 0.051
-
0.500
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043
2 Pemindahan dan Pengembalian Furniture 32.00 0.057
3 Pemindahan dan Pengembalian Komputer 40.00 0.072
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043
5 Sewa Terpal untuk perlindungan 1.00 0.038
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
0.254
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131
2 Bongkaran Reng 1601.62 0.081
3 Bongkaran Konsol Beton 32.00 0.061
5 Pasang Reng Lama Kembali 85% 1361.37 0.370
6 Pasang Reng Baru 15% 240.24 0.186
7 Pasang Rangka Atap Baja Ringan 203.41 0.769
8 Pasang Genteng Onduvilla 1689.53 7.734
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367
10 Pasang Talang Jurai Dalam 48.11 0.215
11 Pasang Listplank Woodplank 437.67 0.168
12 Cat Woodplank 131.30 0.034
13 Pasang Atap Ondulin 115.50 0.529
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103
15 Pasang Topi Beton 21.50 0.019
16 Sewa alat bantu 1.00 0.051
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038
-
10.856
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 37.61 0.044
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Urugan Pasir bawah Pondasi 3.62 0.012
- Pasangan Batu Belah 1:6 14.13 0.253
- Pondasi Footplat 2.29 0.252
- Kolom Beton 10.53 1.277
- Sloof Beton 0.31 0.031
- Sloof Beton 2.23 0.182
- Sloof Beton 2.45 0.199
- Balok Beton Lantai 4.88 0.496
- Balok Beton Lantai 0.83 0.086
- Balok Dag 4.88 0.496
- Balok Dag 0.83 0.086
- Plat Beton Lantai 5.61 0.513
- Plat Beton Dag 5.61 0.513
2.357
c Void Tengah -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 22.24 0.026
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016
- Urugan Pasir bawah Pondasi 2.05 0.007
- Pasangan Batu Belah 1:6 6.76 0.121
- Pondasi Footplat 1.41 0.155
- Kolom Beton 3.96 0.480
- Sloof Beton 3.28 0.267
- Balok Beton 7.68 0.718
- Balok Beton 0.43 0.045
- Plat Beton Lantai 5.75 0.525
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Penebalan Kolom Beton 1.00 0.051
- Balok Beton 5.28 0.493
- Balok Beton 0.25 0.026
- Plat Beton Lantai 4.42 0.404
- Listplang Beton 1.30 0.118
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128
- Balok Lateu 1.61 0.161
- Ring balk praktis 0.43 0.043
-
10.328
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540
2 Pas. Dinding Bata Merah 1:6 221.80 0.536
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458
4 Pas. Acian 97.40 0.060
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673
2 Pas. Dinding Bata Merah 1:6 112.12 0.271
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827
4 Pas. Acian Dinding dan Beton 655.36 0.403
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850
-
12.570
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375
3 Pasangan Plit Granit 10x60 317.44 0.341
4 Pasangan Keramik Lantai Toilet 57.14 0.242
5 Pasangan Dinding Keramik Toilet 127.47 0.587
6 Pasangan Border Keramik KM/WC 66.35 0.068
7 Pasangan Granite Tile Tangga 35.59 0.210
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867

Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889
3 Pasangan Plit Granit 10x60 264.60 0.284
4 Pasangan Keramik Lantai Toilet 61.95 0.263
5 Pasangan Dinding Keramik Toilet 86.29 0.397
6 Pasangan Border Keramik KM/WC 50.78 0.052
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
7 Pasang Lantai Karpet Vynil 80.49 0.412
-
13.321
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169
2 Buangan Bongkaran Plafond 1.00 0.026
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240
2 Buangan Bongkaran Plafond 1.00 0.038
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875
-
6.514
VIII. PEKERJAAN PINTU DAN JENDELA -
1 Bongkaran Kusen Eksisting 1.00 0.026
2 P1 5.00 0.648
3 P2 9.00 0.572
4 P3 4.00 0.277
5 P4 7.00 0.525
6 P5 9.00 0.621
7 P6 13.00 1.356
8 PS 2.00 0.044
9 PJ 1.00 0.146
10 J5 4.00 0.080
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
11 BV1 10.00 0.086
12 BV2 8.00 0.112
13 BV3 7.00 0.059
14 BV4 3.00 0.041
15 BV5 51.00 0.696
16 CW1 76.10 1.382
17 CW2 19.38 0.352
18 CW3 13.68 0.248
19 CW4 31.35 0.569
20 CW5 9.69 0.176
21 CW6 14.42 0.262
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576
2 Cat Dinding dan Beton 3226.14 1.338
3 Cat Plafond 2448.91 0.627
4 Cat Partisi 644.85 0.165
5 Cat Kayu untuk Kusen 187.01 0.168
-
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045
2 Pas. Closet Jongkok 4.00 0.036
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
7 Pasangan Kran Logam pada Toilet 5.00 0.003
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062
9 Pasangan Kaca Cermin 5 mm 3.00 0.019
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
6 Pasangan Kran Logam pada Toilet 4.00 0.002
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062
8 Pasangan Kaca Cermin 5 mm 3.00 0.019
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471
3 Railling Tangga 19.64 0.327
4 Letterbox Neon Sign 1.00 0.641
5 Railling Balustrade depan 4.70 0.090
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720
8 Waterprofing Coating 162.32 0.270
9 Stage pada Aula 15.00 0.250
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307
11 Rabat Beton T.10 cm 11.06 0.223
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
12 Baja Dudukan Bak Penjernih 110.11 0.070
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378
PP/LP-1 1.00 0.205
PP/LP-2 1.00 0.211
PP,AC-1 1.00 0.132
PP,AC-2 1.00 0.154
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096
Grounding elektronika max 1 ohm 1.00 0.090
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113
Jumlah pekerjaan Kabel Feeder -
IX. PEKERJAAN INSTALASI LISTRIK -
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915
Down Light E27 Ess 18 W 99.00 0.380
Roset E27 Ess 8 W 22.00 0.042
Stop kontak, 1ph. 16A (umum) 175.00 0.202
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021
Saklar tunggal 13.00 0.008
Saklar ganda 13.00 0.013
Saklar triple 2.00 0.003
Saklar hotel tunggal 1.00 0.001
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896
Down Light E27 Ess 18 W 161.00 0.619
Roset E27 Ess 8 W 16.00 0.031
Wall Lamp E27 Ess 18 W 5.00 0.038
Exit Lamp TL 10 W + baterai nicad 2.00 0.097
Stop kontak, 1ph. 16A (umum) 166.00 0.191
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027
Saklar tunggal 1.00 0.001
Saklar ganda 23.00 0.024
Saklar triple 4.00 0.005
Saklar hotel tunggal 8.00 0.011
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090
Lighting strike counter 1.00 0.064
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077
Cable Clamp, support dan accessories lainnya 1.00 0.038
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032
Material bantu 1.00 0.026
Ijin Depnaker 1.00 0.064
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090
Paging Mic 1.00 0.016
Remote Microphone w/Keypad Zone Selector 1.00 0.167
Evac Voice Announcement Board w/ CF card 1.00 0.234
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365
Graphic Equalizer, 2-Ch 1.00 0.154
Cabinet Rack 15U w/Acc 1.00 0.461
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080
Attenuator 5-30W 6.00 0.020
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109
Attenuator 5-30W 15.00 0.050
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224
Speaker Management 1.00 0.384
DVD/MP3/CD Player 1.00 0.017
Handheld Wireless Set 2.00 0.320
Dynamic Microphone + Kabel Mic 10m 2.00 0.059
Floor Stand Mic 2.00 0.020
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Inlet Mic 2.00 0.018
Amplifier 2x250W 4.00 0.512
HX Series Speaker 2.00 0.269
Sub-woofer Speaker 2.00 0.205
Stage Speaker System 2.00 0.128
Headphone 1.00 0.045
Power Amplifier 240W 1.00 0.090
F-Series Box Speaker 2.00 0.051
Portable Flight Case Rack 1.00 0.115
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. SKETSA

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO


NIP. 19740525 199403 1 003 Pengawas Lapangan
PEMBANGUNAN RENOVASI GEDUNG KANTOR PER

LAPORAN PEKERJAAN HA

Hari Minggu
LAPORAN HARIAN Tanggal 31
Halaman Ke : 1 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager 1.00 Semen sak Alat Bantu unit 15.00
Pelaksana 1.00 Besi Beton kg Alat Ukur unit 1.00
Pembantu Pelaksana 1.00 Kawat Bendrat kg Alat Gali unit 30.00
Logistik 1.00 Paku kg Scafolding set 500.00
Mandor 2.00 Kayu Begesting m3 unit
Tukang 15.00 Batu Pecah 1/2 m3 unit
Kepala Tukang 3.00 Batu Belah m3 unit
Pekerja 20.00 Pasir m3 unit
Sopir 1.00 Tanah urug m3 unit
Penjaga 1.00 unit
unit
- unit
- unit
-

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN
LAPORAN PEKERJAAN HA
Hari Senin
LAPORAN HARIAN Tanggal 1
Halaman Ke : 2 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - 1.00
- - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN
LAPORAN PEKERJAAN HA

Hari Selasa
LAPORAN HARIAN Tanggal 2
Halaman Ke : 3 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - 1.00
- - - - - - - - -
- - - - - - - - -
- - - - - - - - - - -
-

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Hujan
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Hujan
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN

LAPORAN PEKERJAAN HA

Hari Rabu
LAPORAN HARIAN Tanggal 3
Halaman Ke : 4 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - - 1.00
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN

LAPORAN PEKERJAAN HA

Hari Kamis
LAPORAN HARIAN Tanggal 4
Halaman Ke : 5 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - - 1.00
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - -
Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN


LAPORAN PEKERJAAN HA

Hari Jumat
LAPORAN HARIAN Tanggal 5
Halaman Ke : 6 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Cerah
Kerja Malam : Jam 16.00-18.00 Malam : Hujan
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTAN

LAPORAN PEKERJAAN HA

Hari Sabtu
LAPORAN HARIAN Tanggal 6
Halaman Ke : 7 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KAB
Jumlah Halaman : 7 Agustus
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit
- - - - - - - - - unit
- - - - - - - - - unit
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi : Cerah
Siang : Cerah
Sore : Hujan
Kerja Malam : Jam 16.00-18.00 Malam : Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
NTOR PERTANAHAN KABUPATEN SUKOHARJO

RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


Pemindahan dan Pengembalin Berkas
Pemindahan dan Pengembalian Furniture
Pemindahan dan Pengembalian Komputer
Pemindahan Pengembalian Alat dan Peralatan
Bongkaran Genteng + Assesoris
Bongkaran Reng
Bongkaran Konsol Beton
Pasang Reng Lama Kembali 85%
Pasang Reng Baru 15%
- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
R PERTANAHAN KABUPATEN SUKOHARJO
RJAAN HARIAN
Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


Pemindahan dan Pengembalin Berkas
Pemindahan dan Pengembalian Furniture
Pemindahan dan Pengembalian Komputer
Pemindahan Pengembalian Alat dan Peralatan
Bongkaran Genteng + Assesoris
Bongkaran Reng
Bongkaran Konsol Beton
Pasang Reng Lama Kembali 85%
Pasang Reng Baru 15%
- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
R PERTANAHAN KABUPATEN SUKOHARJO
RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Pemindahan dan Pengembalin Berkas -
- Pemindahan dan Pengembalian Furniture -
- Pemindahan dan Pengembalian Komputer - -
- Pemindahan Pengembalian Alat dan Peralatan - -
- Bongkaran Genteng + Assesoris - -
- Bongkaran Reng - -
- Bongkaran Konsol Beton - -
- Pasang Reng Lama Kembali 85% - -
- Pasang Reng Baru 15% - -
- - Bongkaran Rabat Beton - -
- - Galian Tanah - -
- - Urugan Tanah Kembali untuk peninggian elevasi - -
- - Pemadatan Urugan Tanah Kembali untuk peninggian elevasi - -
- - Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- - Urugan Pasir bawah Pondasi - -
- - Pasangan Batu Belah 1:6 - -
- - - -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
R PERTANAHAN KABUPATEN SUKOHARJO

RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Pemindahan dan Pengembalin Berkas -
- Pemindahan dan Pengembalian Furniture -
- Pemindahan dan Pengembalian Komputer - -
- Pemindahan Pengembalian Alat dan Peralatan - -
- Bongkaran Genteng + Assesoris - -
- Bongkaran Reng - -
- Bongkaran Konsol Beton - -
- Pasang Reng Lama Kembali 85% - -
- Pasang Reng Baru 15% - -
- - Bongkaran Rabat Beton - -
- - Galian Tanah - -
- - Urugan Tanah Kembali untuk peninggian elevasi - -
- - Pemadatan Urugan Tanah Kembali untuk peninggian elevasi - -
- - Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- - Urugan Pasir bawah Pondasi - -
- - Pasangan Batu Belah 1:6 - -
- - - -
- - - -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
R PERTANAHAN KABUPATEN SUKOHARJO

RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Pemindahan dan Pengembalin Berkas -
- Pemindahan dan Pengembalian Furniture -
- Pemindahan dan Pengembalian Komputer - -
- Pemindahan Pengembalian Alat dan Peralatan - -
- Bongkaran Genteng + Assesoris - -
- Bongkaran Reng - -
- Bongkaran Konsol Beton - -
- Pasang Reng Lama Kembali 85% - -
- Pasang Reng Baru 15% - -
- - Bongkaran Rabat Beton - -
- - Galian Tanah - -
- - Urugan Tanah Kembali untuk peninggian elevasi - -
- - Pemadatan Urugan Tanah Kembali untuk peninggian elevasi - -
- - Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- - Urugan Pasir bawah Pondasi - -
- - Pasangan Batu Belah 1:6 - -
- - - -
- - - -
Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager

R PERTANAHAN KABUPATEN SUKOHARJO


RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini Satuan Jumlah


Pemindahan dan Pengembalin Berkas
Pemindahan dan Pengembalian Furniture
Pemindahan dan Pengembalian Komputer
Pemindahan Pengembalian Alat dan Peralatan
Bongkaran Genteng + Assesoris
Bongkaran Reng
Bongkaran Konsol Beton
Pasang Reng Lama Kembali 85%
Pasang Reng Baru 15%
- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6
Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777
EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha
Pengawas Lapangan Site Manager

R PERTANAHAN KABUPATEN SUKOHARJO

RJAAN HARIAN

Penyedia Jasa
RTANAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


Pemindahan dan Pengembalin Berkas
Pemindahan dan Pengembalian Furniture
Pemindahan dan Pengembalian Komputer
Pemindahan Pengembalian Alat dan Peralatan
Bongkaran Genteng + Assesoris
Bongkaran Reng
Bongkaran Konsol Beton
Pasang Reng Lama Kembali 85%
Pasang Reng Baru 15%
- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6
Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
LAPORAN MINGGUAN

MINGGU KE : 4
TANGGAL : 17-Jul
s/d
23-Jul
BULAN : Juli 2016

PEKERJAAN :
PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKA
SURAKARTA
Nomor :
Lampiran : 1 ( Satu Berkas )
Perihal : Laporan Mingguan

Dengan Hormat,
Bersama ini kami sampaikan Laporan Mingguan tentang Kemajuan Pelaksanaan Pekerjaan / Fisik, Kekuatan Tenaga, Pengguna
Penggunaan Peralatan dan Laporan Harian untuk

Nama Paket : PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKARTA

Pereode Selesai ( % ) Target ( % )

### 0.511 #REF!


s/d
###
Demikian untuk menjadikan periksa dan atas perhatiannya kami ucapkan terima kasih

PT.

Ase
Tembusan disampaikan kepada Yth :
1. Pengawas Lapangan
2. Arsip
ga, Penggunaan Bahan,

Keterangan

#REF!
Diatas Rencana
PT. CHIMARDER

Asep Susanto, ST
Pelaksana
REKAPITULASI LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKARTA


LOKASI : SURAKARTA
SUMBER DANA : APBN Tahun Anggaran 2015
MULAI : 10 Juni 2015
SELESAI : 5 Desember 2015
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 4
PERIODE TGL. : 42568
s/d
42574
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME

1 2 3 4 5

### #REF! #REF! #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME

1 2 3 4 5

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. INTEGRITA

KUSUMA WIJAYANTO, S.E.,M.M. MOCH. SURANTO, ST


NIP. 19771028 200112 1 005 Team Leader
REKAPITULASI LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKARTA


LOKASI : SURAKARTA
SUMBER DANA : APBN Tahun Anggaran 2015
MULAI : 10 Juni 2015
SELESAI : 5 Desember 2015
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 4
PERIODE TGL. : 42568
s/d
42574
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF! #REF! #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. INTEGRITA

KUSUMA WIJAYANTO, S.E.,M.M. MOCH. SURANTO, ST


NIP. 19771028 200112 1 005 Team Leader
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : Friday, July 01, 2016
WAKTU : 150 Hari
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 4
PERIODE TGL. : Sunday, July 17, 2016
s/d
Saturday, July 23, 2016
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231
3 Sewa Scafolding 500.00 0.179
4 Air Kerja 5.00 0.026
5 Listrik Kerja 5.00 0.051
-
0.500
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043
2 Pemindahan dan Pengembalian Furniture 32.00 0.057
3 Pemindahan dan Pengembalian Komputer 40.00 0.072
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043
5 Sewa Terpal untuk perlindungan 1.00 0.038
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
-
0.254
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131
2 Bongkaran Reng 1601.62 0.081
3 Bongkaran Konsol Beton 32.00 0.061
5 Pasang Reng Lama Kembali 85% 1361.37 0.370
6 Pasang Reng Baru 15% 240.24 0.186
7 Pasang Rangka Atap Baja Ringan 203.41 0.769
8 Pasang Genteng Onduvilla 1689.53 7.734
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367
10 Pasang Talang Jurai Dalam 48.11 0.215
11 Pasang Listplank Woodplank 437.67 0.168
12 Cat Woodplank 131.30 0.034
13 Pasang Atap Ondulin 115.50 0.529
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103
15 Pasang Topi Beton 21.50 0.019
16 Sewa alat bantu 1.00 0.051
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038
-
10.856
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 37.61 0.044
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026
- Urugan Pasir bawah Pondasi 3.62 0.012
- Pasangan Batu Belah 1:6 14.13 0.253
- Pondasi Footplat 2.29 0.252
- Kolom Beton 10.53 1.277
- Sloof Beton 0.31 0.031
- Sloof Beton 2.23 0.182
- Sloof Beton 2.45 0.199
- Balok Beton Lantai 4.88 0.496
- Balok Beton Lantai 0.83 0.086
- Balok Dag 4.88 0.496
- Balok Dag 0.83 0.086
- Plat Beton Lantai 5.61 0.513
- Plat Beton Dag 5.61 0.513
2.357
c Void Tengah -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 22.24 0.026
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016
- Urugan Pasir bawah Pondasi 2.05 0.007
- Pasangan Batu Belah 1:6 6.76 0.121
- Pondasi Footplat 1.41 0.155
- Kolom Beton 3.96 0.480
- Sloof Beton 3.28 0.267
- Balok Beton 7.68 0.718
- Balok Beton 0.43 0.045
- Plat Beton Lantai 5.75 0.525
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026
- Penebalan Kolom Beton 1.00 0.051
- Balok Beton 5.28 0.493
- Balok Beton 0.25 0.026
- Plat Beton Lantai 4.42 0.404
- Listplang Beton 1.30 0.118
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128
- Balok Lateu 1.61 0.161
- Ring balk praktis 0.43 0.043
-
10.328
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
2 Pas. Dinding Bata Merah 1:6 221.80 0.536
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458
4 Pas. Acian 97.40 0.060
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743
-
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673
2 Pas. Dinding Bata Merah 1:6 112.12 0.271
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827
4 Pas. Acian Dinding dan Beton 655.36 0.403
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850
-
12.570
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375
3 Pasangan Plit Granit 10x60 317.44 0.341
4 Pasangan Keramik Lantai Toilet 57.14 0.242
5 Pasangan Dinding Keramik Toilet 127.47 0.587
6 Pasangan Border Keramik KM/WC 66.35 0.068
7 Pasangan Granite Tile Tangga 35.59 0.210
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
-
Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889
3 Pasangan Plit Granit 10x60 264.60 0.284
4 Pasangan Keramik Lantai Toilet 61.95 0.263
5 Pasangan Dinding Keramik Toilet 86.29 0.397
6 Pasangan Border Keramik KM/WC 50.78 0.052
7 Pasang Lantai Karpet Vynil 80.49 0.412
-
13.321
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169
2 Buangan Bongkaran Plafond 1.00 0.026
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240
2 Buangan Bongkaran Plafond 1.00 0.038
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875
-
6.514
VIII. PEKERJAAN PINTU DAN JENDELA -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
1 Bongkaran Kusen Eksisting 1.00 0.026
2 P1 5.00 0.648
3 P2 9.00 0.572
4 P3 4.00 0.277
5 P4 7.00 0.525
6 P5 9.00 0.621
7 P6 13.00 1.356
8 PS 2.00 0.044
9 PJ 1.00 0.146
10 J5 4.00 0.080
11 BV1 10.00 0.086
12 BV2 8.00 0.112
13 BV3 7.00 0.059
14 BV4 3.00 0.041
15 BV5 51.00 0.696
16 CW1 76.10 1.382
17 CW2 19.38 0.352
18 CW3 13.68 0.248
19 CW4 31.35 0.569
20 CW5 9.69 0.176
21 CW6 14.42 0.262
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576
2 Cat Dinding dan Beton 3226.14 1.338
3 Cat Plafond 2448.91 0.627
4 Cat Partisi 644.85 0.165
5 Cat Kayu untuk Kusen 187.01 0.168
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045
2 Pas. Closet Jongkok 4.00 0.036
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
7 Pasangan Kran Logam pada Toilet 5.00 0.003
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062
9 Pasangan Kaca Cermin 5 mm 3.00 0.019
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
6 Pasangan Kran Logam pada Toilet 4.00 0.002
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062
8 Pasangan Kaca Cermin 5 mm 3.00 0.019
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471
3 Railling Tangga 19.64 0.327
4 Letterbox Neon Sign 1.00 0.641
5 Railling Balustrade depan 4.70 0.090
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720
8 Waterprofing Coating 162.32 0.270
9 Stage pada Aula 15.00 0.250
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307
11 Rabat Beton T.10 cm 11.06 0.223
12 Baja Dudukan Bak Penjernih 110.11 0.070
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378
PP/LP-1 1.00 0.205
PP/LP-2 1.00 0.211
PP,AC-1 1.00 0.132
PP,AC-2 1.00 0.154
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096
Grounding elektronika max 1 ohm 1.00 0.090
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113
Jumlah pekerjaan Kabel Feeder -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
IX. PEKERJAAN INSTALASI LISTRIK -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915
Down Light E27 Ess 18 W 99.00 0.380
Roset E27 Ess 8 W 22.00 0.042
Stop kontak, 1ph. 16A (umum) 175.00 0.202
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021
Saklar tunggal 13.00 0.008
Saklar ganda 13.00 0.013
Saklar triple 2.00 0.003
Saklar hotel tunggal 1.00 0.001
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896
Down Light E27 Ess 18 W 161.00 0.619
Roset E27 Ess 8 W 16.00 0.031
Wall Lamp E27 Ess 18 W 5.00 0.038
Exit Lamp TL 10 W + baterai nicad 2.00 0.097
Stop kontak, 1ph. 16A (umum) 166.00 0.191
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027
Saklar tunggal 1.00 0.001
Saklar ganda 23.00 0.024
Saklar triple 4.00 0.005
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Saklar hotel tunggal 8.00 0.011
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090
Lighting strike counter 1.00 0.064
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077
Cable Clamp, support dan accessories lainnya 1.00 0.038
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032
Material bantu 1.00 0.026
Ijin Depnaker 1.00 0.064
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090
Paging Mic 1.00 0.016
Remote Microphone w/Keypad Zone Selector 1.00 0.167
Evac Voice Announcement Board w/ CF card 1.00 0.234
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365
Graphic Equalizer, 2-Ch 1.00 0.154
Cabinet Rack 15U w/Acc 1.00 0.461
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080
Attenuator 5-30W 6.00 0.020
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109
Attenuator 5-30W 15.00 0.050
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224
Speaker Management 1.00 0.384
DVD/MP3/CD Player 1.00 0.017
Handheld Wireless Set 2.00 0.320
Dynamic Microphone + Kabel Mic 10m 2.00 0.059
Floor Stand Mic 2.00 0.020
Inlet Mic 2.00 0.018
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Amplifier 2x250W 4.00 0.512
HX Series Speaker 2.00 0.269
Sub-woofer Speaker 2.00 0.205
Stage Speaker System 2.00 0.128
Headphone 1.00 0.045
Power Amplifier 240W 1.00 0.090
F-Series Box Speaker 2.00 0.051
Portable Flight Case Rack 1.00 0.115
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. SKETSA

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO


NIP. 19740525 199403 1 003 Pengawas Lapangan
LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUPATEN SUKOHARJO


LOKASI : SUKOHARJO
SUMBER DANA : Th. 2016
MULAI : Friday, July 01, 2016
WAKTU : 150 Hari
PELAKSANA : PT. CHIMARDER 777
MINGGU KE : 4
PERIODE TGL. : Sunday, July 17, 2016
s/d
Saturday, July 23, 2016
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 0.013
2 Sewa Gudang Semen dan Alat-alat 36.00 0.231
3 Sewa Scafolding 500.00 0.179
4 Air Kerja 5.00 0.026
5 Listrik Kerja 5.00 0.051
-
0.500
II. PEKERJAAN BONGKARAN, PEMINDAHAN DAN PENGAMANAN BARANG -
1 Pemindahan dan Pengembalin Berkas 24.00 0.043
2 Pemindahan dan Pengembalian Furniture 32.00 0.057
3 Pemindahan dan Pengembalian Komputer 40.00 0.072
4 Pemindahan Pengembalian Alat dan Peralatan 24.00 0.043
5 Sewa Terpal untuk perlindungan 1.00 0.038
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
-
0.254
III. PEKERJAAN RENOVASI ATAP -
1 Bongkaran Genteng + Assesoris 1601.62 0.131
2 Bongkaran Reng 1601.62 0.081
3 Bongkaran Konsol Beton 32.00 0.061
5 Pasang Reng Lama Kembali 85% 1361.37 0.370
6 Pasang Reng Baru 15% 240.24 0.186
7 Pasang Rangka Atap Baja Ringan 203.41 0.769
8 Pasang Genteng Onduvilla 1689.53 7.734
9 Pasang Bubungan Genteng Onduvilla 189.71 0.367
10 Pasang Talang Jurai Dalam 48.11 0.215
11 Pasang Listplank Woodplank 437.67 0.168
12 Cat Woodplank 131.30 0.034
13 Pasang Atap Ondulin 115.50 0.529
14 Pasang atap polykarbonat rangka hollo 4x4 32.03 0.103
15 Pasang Topi Beton 21.50 0.019
16 Sewa alat bantu 1.00 0.051
17 Kalsiboard Rangka hollow penutup sisi atap 12.24 0.038
-
10.856
IV. PEKERJAAN STRUKTUR BETON -
a Rangka Besi Penutup Void -
- Pasang Besi Profil 1495.36 0.951
- Pasang Plat Besi Boerdes tebal 2.3 mm 1516.62 0.964
-
b Selasar Penghubung -
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 37.61 0.044
- Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.017
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 45.13 0.038
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Lantai Kerja Beton K.100 untuk pondasi Footplat 1.30 0.026
- Urugan Pasir bawah Pondasi 3.62 0.012
- Pasangan Batu Belah 1:6 14.13 0.253
- Pondasi Footplat 2.29 0.252
- Kolom Beton 10.53 1.277
- Sloof Beton 0.31 0.031
- Sloof Beton 2.23 0.182
- Sloof Beton 2.45 0.199
- Balok Beton Lantai 4.88 0.496
- Balok Beton Lantai 0.83 0.086
- Balok Dag 4.88 0.496
- Balok Dag 0.83 0.086
- Plat Beton Lantai 5.61 0.513
- Plat Beton Dag 5.61 0.513
2.357
c Void Tengah -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
- Bongkaran Rabat Beton 1.00 0.026
- Galian Tanah 22.24 0.026
- Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.010
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi 26.69 0.022
- Lantai Kerja Beton K.100 untuk pondasi Footplat 0.80 0.016
- Urugan Pasir bawah Pondasi 2.05 0.007
- Pasangan Batu Belah 1:6 6.76 0.121
- Pondasi Footplat 1.41 0.155
- Kolom Beton 3.96 0.480
- Sloof Beton 3.28 0.267
- Balok Beton 7.68 0.718
- Balok Beton 0.43 0.045
- Plat Beton Lantai 5.75 0.525
0.863
d Kanopy -
- Bongkaran Konstruksi 1.00 0.026
- Penebalan Kolom Beton 1.00 0.051
- Balok Beton 5.28 0.493
- Balok Beton 0.25 0.026
- Plat Beton Lantai 4.42 0.404
- Listplang Beton 1.30 0.118
-
e Struktur Praktis -
- Kolom Praktis 1.28 0.128
- Balok Lateu 1.61 0.161
- Ring balk praktis 0.43 0.043
-
10.328
V. PEKERJAAN PASANGAN DAN DINDING -
Lantai 1 -
1 Bongkaran dan Buangan Pasangan Dinding 108.2999 0.540
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
2 Pas. Dinding Bata Merah 1:6 221.80 0.536
3 Pas. Plesteran Dinding Bata 1:6 443.60 0.458
4 Pas. Acian 97.40 0.060
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 104.14 0.420
6 Plin Alumunium t. 10 cm pada partisi Gysump 73.06 0.028
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 55.89 1.024
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 44.63 0.743
-
Lantai 2 -
1 Bongkaran dan Buangan Pasangan Dinding 134.8962 0.673
2 Pas. Dinding Bata Merah 1:6 112.12 0.271
3 Pas. Plesteran Dinding Bata dan Beton 1:6 800.24 0.827
4 Pas. Acian Dinding dan Beton 655.36 0.403
5 Pas. Partisi Gypsum tb. 9 mm, rk C75 Baja Ringan 237.19 0.957
6 Plin Alumunium t. 10 cm pada partisi Gypsump 171.93 0.066
7 Pas. Partisi Kaca + Rangka + Assesoris + Stiker Sandblast 222.20 4.070
8 Pasangan Sekat Multiplek double T. 1,8 mm rangka metalstud Finish HPL 50.27 0.644
9 Pasangan Partisi Kaca Rangka Alumunium (PRK) 82.92 0.850
-
12.570
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING -
Lantai 1 -
1 Bongkaran Lantai Keramik & Buangan 571.95 0.095
2 Pasangan Granit Tile 60x60 Cerah 571.95 3.375
3 Pasangan Plit Granit 10x60 317.44 0.341
4 Pasangan Keramik Lantai Toilet 57.14 0.242
5 Pasangan Dinding Keramik Toilet 127.47 0.587
6 Pasangan Border Keramik KM/WC 66.35 0.068
7 Pasangan Granite Tile Tangga 35.59 0.210
8 Pasangan Stepnozing Granite Tile Tangga 66.46 0.071
9 Pasang Lantai Batu Granit warna Cerah 51.78 0.867
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
-
Lantai 2 -
1 Bongkaran Lantai Keramik & Buangan 998.03 0.166
2 Pasangan Granit Tile 60x60 Cerah 998.03 5.889
3 Pasangan Plit Granit 10x60 264.60 0.284
4 Pasangan Keramik Lantai Toilet 61.95 0.263
5 Pasangan Dinding Keramik Toilet 86.29 0.397
6 Pasangan Border Keramik KM/WC 50.78 0.052
7 Pasang Lantai Karpet Vynil 80.49 0.412
-
13.321
VII. PEKERJAAN PLAFOND -
Lantai 1 -
1 Bongkaran Plafond Eksisting 1011.08 0.169
2 Buangan Bongkaran Plafond 1.00 0.026
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 900.35 2.221
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 110.73 0.273
Lantai 2 -
1 Bongkaran Plafond Eksisting 1437.83 0.240
2 Buangan Bongkaran Plafond 1.00 0.038
3 Pas. Gypsumboard 9 mm Jayaboard, Rangka Hollow Galvalum 1083.21 2.672
4 Pas. Kalsiboard 6 mm, Kalsi, Rangka Hollow Galvalum 354.61 0.875
-
6.514
VIII. PEKERJAAN PINTU DAN JENDELA -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
1 Bongkaran Kusen Eksisting 1.00 0.026
2 P1 5.00 0.648
3 P2 9.00 0.572
4 P3 4.00 0.277
5 P4 7.00 0.525
6 P5 9.00 0.621
7 P6 13.00 1.356
8 PS 2.00 0.044
9 PJ 1.00 0.146
10 J5 4.00 0.080
11 BV1 10.00 0.086
12 BV2 8.00 0.112
13 BV3 7.00 0.059
14 BV4 3.00 0.041
15 BV5 51.00 0.696
16 CW1 76.10 1.382
17 CW2 19.38 0.352
18 CW3 13.68 0.248
19 CW4 31.35 0.569
20 CW5 9.69 0.176
21 CW6 14.42 0.262
22 Rangka Dudukan CW (partisi double kalsiboard rangka metal furing 45.54 0.184
23 Pintu Kaca Tempered 12 mm Frameless, Tunggal, Assesoris Stainless 10.00 0.922
24 Pintu Kaca Tempered 12 mm Frameless, Double, Assesoris Stainless 3.00 0.538
IX. PEKERJAAN PENGECATAN -
1 Kupasan Cat Eksisting 2437.54 0.576
2 Cat Dinding dan Beton 3226.14 1.338
3 Cat Plafond 2448.91 0.627
4 Cat Partisi 644.85 0.165
5 Cat Kayu untuk Kusen 187.01 0.168
-
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
2.873
X. PEKERJAAN SANITAIR -
Lantai 1 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 1.00 0.045
2 Pas. Closet Jongkok 4.00 0.036
3 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm 2.00 0.165
4 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
5 Pasangan Shower Spray Chrome Toilet 5.00 0.031
6 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
7 Pasangan Kran Logam pada Toilet 5.00 0.003
8 Pasangan Floor Drain, Stainless Steel 5.00 0.062
9 Pasangan Kaca Cermin 5 mm 3.00 0.019
-
Lantai 2 -
1 Pas. Closet Duduk Dual Flush 4,5/3 Ltr 4.00 0.182
2 Pas. Urinoir, Moslem Type Size: 330 x 310 x 605 mm, 2.00 0.165
3 Pas. Wastafel Meja Oval + Meja Batu Granite 5.00 0.427
4 Pasangan Shower Spray Chrome Toilet 5.00 0.031
5 Pasangan Kran Chrome pada Washtafel (push type) 5.00 0.018
6 Pasangan Kran Logam pada Toilet 4.00 0.002
7 Pasangan Floor Drain, Stainless Steel 5.00 0.062
8 Pasangan Kaca Cermin 5 mm 3.00 0.019
9 Pastisi Cubicle Toilet Rangka & Fitting Stainless Steel, Sekat kaca tempered 30.52 1.720
-
3.432
XI. PEKERJAAN LAIN LAIN -
1 Pasangan Wallpaper dinding 123.84 0.289
2 Pasang Backdrop MDF 9 mm rangka Hollow galvanis 4x4 Finish HPL + assesor 40.82 0.471
3 Railling Tangga 19.64 0.327
4 Letterbox Neon Sign 1.00 0.641
5 Railling Balustrade depan 4.70 0.090
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
6 Rangka Baja untuk Dudukan ACP penutup tangga 55.12 0.035
7 Pasangan Alumunium Composite Panel (ACP) pada Tampak 278.48 4.720
8 Waterprofing Coating 162.32 0.270
9 Stage pada Aula 15.00 0.250
10 Kanopy Kaca + Assesoris + Finishing 1.00 0.307
11 Rabat Beton T.10 cm 11.06 0.223
12 Baja Dudukan Bak Penjernih 110.11 0.070
-
7.693
-
XII. PEKERJAAN PANEL TEGANGAN RENDAH -
SDP-1 1.00 0.378
PP/LP-1 1.00 0.205
PP/LP-2 1.00 0.211
PP,AC-1 1.00 0.132
PP,AC-2 1.00 0.154
Grounding elektrikal max 2 ohm (SDP) 1.00 0.096
Grounding elektronika max 1 ohm 1.00 0.090
Jumlah pekerjaan Panel -
XIII. PEKERJAAN KABEL FEEDER -
Kabel dari Power Existing ke SDP : -
NYY 4x120mm2 + BC 95mm2 50.00 0.833
Kabel dari SDP ke PP/LP-1 : -
NYY 4x25mm2 + BC 16mm2 10.00 0.038
Kabel dari SDP ke PP/LP-2 : -
NYY 4x25mm2 + BC 16mm2 20.00 0.077
Kabel dari SDP ke PP.AC-1 : -
NYY 4x25mm2 + BC 16mm2 11.00 0.042
Kabel dari SDP ke PP.AC-2 : -
NYY 4x35mm2 + BC 25mm2 21.00 0.113
Jumlah pekerjaan Kabel Feeder -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
IX. PEKERJAAN INSTALASI LISTRIK -
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Pengadaan ,pemasangan, kabel,konduit -
lampu, rak,bobokan, penggantung, klem -
armature, perapihan, training dan tes commissioning -
-
LANTAI 1 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 121.00 0.574
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 193.00 0.915
Down Light E27 Ess 18 W 99.00 0.380
Roset E27 Ess 8 W 22.00 0.042
Stop kontak, 1ph. 16A (umum) 175.00 0.202
Stop kontak, 1ph. 16A, 3 kaki (AC) 18.00 0.021
Saklar tunggal 13.00 0.008
Saklar ganda 13.00 0.013
Saklar triple 2.00 0.003
Saklar hotel tunggal 1.00 0.001
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
-
LANTAI 2 -
Titik lampu,kabel NYM 3x2,5mm2 dalam conduit 20mm2 184.00 0.872
Titik stop kontak,kabel NYM 3x2,5mm2 dalam conduit 20mm2 189.00 0.896
Down Light E27 Ess 18 W 161.00 0.619
Roset E27 Ess 8 W 16.00 0.031
Wall Lamp E27 Ess 18 W 5.00 0.038
Exit Lamp TL 10 W + baterai nicad 2.00 0.097
Stop kontak, 1ph. 16A (umum) 166.00 0.191
Stop kontak, 1ph. 16A, 3 kaki (AC) 23.00 0.027
Saklar tunggal 1.00 0.001
Saklar ganda 23.00 0.024
Saklar triple 4.00 0.005
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Saklar hotel tunggal 8.00 0.011
Saklar hotel ganda 2.00 0.003
Kabel tray 400x100 mm berikut fitting, dan accessories lainnya 54.00 0.450
Pengadaan fire extinguisher 5 kg (dry chamical) 4.00 0.102
Jumlah pekerjaan Instalasi Listrik -
X PEKERJAAAN PENANGKAL PETIR -
Air Terminal Electro Static (non radio aktif), Radius Proteksi min 60 Meter, 1.00 0.359
berikut tiang dan accessories -
Obstruction Light led 5 w 1.00 0.090
Lighting strike counter 1.00 0.064
Conductor Cable, NYY 1x70 mm2 dalam conduit 30.00 0.077
Cable Clamp, support dan accessories lainnya 1.00 0.038
Bak Kontrol berikut grounding max 1 ohm 1.00 0.032
Material bantu 1.00 0.026
Ijin Depnaker 1.00 0.064
Jumlah pekerjaan Penangkal Petir -
-
XI PEKERJAAN TELEPON & WIFI -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Telepon & Wifi -
-
XII PEKERJAAN CCTV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
Jumlah pekerjaan Cctv -
-
XIII PEKERJAAN TATA SUARA -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -
-
XIV PUBLIC ADDRESS SYSTEM -
PERALATAN UTAMA -
CD/MMC/USB player with FM Tunner 1.00 0.090
Paging Mic 1.00 0.016
Remote Microphone w/Keypad Zone Selector 1.00 0.167
Evac Voice Announcement Board w/ CF card 1.00 0.234
240W System Amplifier with Chime and 5Ch. Selector 1.00 0.365
Graphic Equalizer, 2-Ch 1.00 0.154
Cabinet Rack 15U w/Acc 1.00 0.461
LANTAI 1 -
Ceiling Speaker 3W 25.00 0.080
Attenuator 5-30W 6.00 0.020
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 25.00 0.128
LANTAI 2 -
Ceiling Speaker 3W 34.00 0.109
Attenuator 5-30W 15.00 0.050
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 34.00 0.174
-
XV RUANG AULA -
Analog Mixer With Effect 1.00 0.224
Speaker Management 1.00 0.384
DVD/MP3/CD Player 1.00 0.017
Handheld Wireless Set 2.00 0.320
Dynamic Microphone + Kabel Mic 10m 2.00 0.059
Floor Stand Mic 2.00 0.020
Inlet Mic 2.00 0.018
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
Amplifier 2x250W 4.00 0.512
HX Series Speaker 2.00 0.269
Sub-woofer Speaker 2.00 0.205
Stage Speaker System 2.00 0.128
Headphone 1.00 0.045
Power Amplifier 240W 1.00 0.090
F-Series Box Speaker 2.00 0.051
Portable Flight Case Rack 1.00 0.115
Instalasi speaker kabel NYMHY 3x1.5mm2 dalam pipa conduit 20 mm2 6.00 0.031
Jumlah pekerjaan Tata Suara -
-
XVI PEKERJAAN MATV -
Pembongkaran instalasi existing dan pemasangan kembali instalasi, berfung 1.00 0.058
dengan baik sesuai dengan kondisi semula, pekerjaan sudsh termasuk, -
peralatan dan material bantu yg dibutuhkan dan tes commissioning -

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. SKETSA

SOERYANTARA ADHI SASANA., S.SIT EDIYANTO WICAKSONO


NIP. 19740525 199403 1 003 Pengawas Lapangan
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN

LAPORAN PEKERJAAN HARIAN

Hari Minggu
LAPORAN HARIAN Tanggal 17
Halaman Ke : 1 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager 1.00 Semen sak Alat Bantu unit 15.00
Pelaksana 1.00 Besi Beton kg Alat Ukur unit 1.00
Pembantu Pelaksana 1.00 Kawat Bendrat kg Alat Gali unit 30.00
Logistik 1.00 Paku kg Scafolding set 500.00
Mandor 2.00 Kayu Begesting m3 unit
Tukang 15.00 Batu Pecah 1/2 m3 unit
Kepala Tukang 3.00 Batu Belah m3 unit
Pekerja 20.00 Pasir m3 unit
Sopir 1.00 Tanah urug m3 unit
Penjaga 1.00 unit
unit
- unit
- unit
-

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Hujan
Kerja Malam : Jam 16.00-18.00 Malam :Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN
LAPORAN PEKERJAAN HARIAN

Hari Senin
LAPORAN HARIAN Tanggal 18
Halaman Ke : 2 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - 1.00
- - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Cerah
Kerja Malam : Jam 16.00-18.00 Malam :Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN

LAPORAN PEKERJAAN HARIAN

Hari Selasa
LAPORAN HARIAN Tanggal 19
Halaman Ke : 3 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 -
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 -
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 -
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 -
Mandor - - 2.00 - Kayu Begesting m3 - - unit - -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - -
Pekerja - - 20.00 - Pasir m3 - - unit - -
Sopir - - 1.00 - Tanah urug m3 - - unit - -
Penjaga - - 1.00 - Beton K250 m3 - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - 1.00 -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - - -
-
Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Hujan
Sore :Hujan
Kerja Malam : Jam 16.00-18.00 Malam :Hujan
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN

LAPORAN PEKERJAAN HARIAN

Hari Rabu
LAPORAN HARIAN Tanggal 20
Halaman Ke : 4 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 -
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 -
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 -
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 -
Mandor - - 2.00 - Kayu Begesting m3 - - unit - -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - -
Pekerja - - 20.00 - Pasir m3 - - unit - -
Sopir - - 1.00 - Tanah urug m3 - - unit - -
Penjaga - - 1.00 - Beton K250 m3 - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - - 1.00 -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Hujan
Kerja Malam : Jam 16.00-18.00 Malam :Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN

LAPORAN PEKERJAAN HARIAN

Hari Kamis
LAPORAN HARIAN Tanggal 21
Halaman Ke : 5 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 15.00 -
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00 -
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00 -
Logistik - - 1.00 - Paku kg - Scafolding set 500.00 -
Mandor - - 2.00 - Kayu Begesting m3 - - unit - -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit - -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit - -
Pekerja - - 20.00 - Pasir m3 - - unit - -
Sopir - - 1.00 - Tanah urug m3 - - unit - -
Penjaga - - 1.00 - Beton K250 m3 - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - unit - -
- - - - - - - - - - 1.00 -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Cerah
Kerja Malam : Jam 16.00-18.00 Malam :Cerah
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :

PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN


LAPORAN PEKERJAAN HARIAN

Hari Jumat
LAPORAN HARIAN Tanggal 22
Halaman Ke : 6 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - unit -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Cerah
Kerja Malam : Jam 16.00-18.00 Malam :Hujan
Jam 19.00-22.00

Hari Sepenuhnya dapat dipergunakan untuk bekerja


Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN

LAPORAN PEKERJAAN HARIAN

Hari Sabtu
LAPORAN HARIAN Tanggal 23
Halaman Ke : 7 Bulan : Paket Pekerjaan PEMBANGUNAN RENOVASI GEDUNG KANTOR PERTANAHAN KABUP
Jumlah Halaman : 7 Juli
Tenaga Kerja Pengadaan Bahan Pengadaan Alat
Keahlian Siang Malam Jenis Bahan Sat Jumlah Jenis Alat Sat Jumlah
Site Manager - - 1.00 - Semen sak - Alat Bantu unit 20.00
Pelaksana - - 1.00 - Besi Beton kg - Alat Ukur unit 1.00
Pembantu Pelaksa - - 1.00 - Kawat Bendrat kg - Alat Gali unit 30.00
Logistik - - 1.00 - Paku kg - Scafolding set 500.00
Mandor - - 2.00 - Kayu Begesting m3 - - unit -
Tukang - - 15.00 - Batu Pecah 1/2 m3 - - unit -
Kepala Tukang - - 3.00 - Batu Belah m3 - - unit -
Pekerja - - 20.00 - Pasir m3 - - unit -
Sopir - - 1.00 - Tanah urug m3 - - unit -
Penjaga - - 1.00 - Beton K250 m3 - - unit -
- - - - - - - - - unit
- - - - - - - - - unit
- - - - - - - - - unit
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

Kerja Siang : Jam : 08.00 s/d 12.00 Instruksi / Catatan Pengawas Keadaan Cuaca
Jam : 13.00 s/d 16.00 Pagi :Cerah
Siang Cerah
Sore :Hujan
Kerja Malam : Jam 16.00-18.00 Malam :Cerah
Jam 19.00-22.00
Hari Sepenuhnya dapat dipergunakan untuk bekerja
Hari Sebagian tidak dapat dipergunakan untuk bekerja oleh karena :
TANAHAN KABUPATEN SUKOHARJO

HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
TANAHAN KABUPATEN SUKOHARJO
HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777
EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha
Pengawas Lapangan Site Manager

TANAHAN KABUPATEN SUKOHARJO

HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton -
- Galian Tanah -
- Urugan Tanah Kembali untuk peninggian elevasi - -
- Pemadatan Urugan Tanah Kembali untuk peninggian - -
- Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- Urugan Pasir bawah Pondasi - -
- Pasangan Batu Belah 1:6 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

-
Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager

TANAHAN KABUPATEN SUKOHARJO

HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJOPT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton -
- Galian Tanah -
- Urugan Tanah Kembali untuk peninggian elevasi - -
- Pemadatan Urugan Tanah Kembali untuk peninggian - -
- Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- Urugan Pasir bawah Pondasi - -
- Pasangan Batu Belah 1:6 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager

TANAHAN KABUPATEN SUKOHARJO

HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton -
- Galian Tanah -
- Urugan Tanah Kembali untuk peninggian elevasi - -
- Pemadatan Urugan Tanah Kembali untuk peninggian - -
- Lantai Kerja Beton K.100 untuk pondasi Footplat - -
- Urugan Pasir bawah Pondasi - -
- Pasangan Batu Belah 1:6 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager

TANAHAN KABUPATEN SUKOHARJO


HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777
Pekerjaan yang dilaksanakan hari ini Satuan Jumlah
- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
TANAHAN KABUPATEN SUKOHARJO

HARIAN

Penyedia Jasa
NAHAN KABUPATEN SUKOHARJO PT. CHIMARDER 777

Pekerjaan yang dilaksanakan hari ini


- Bongkaran Rabat Beton
- Galian Tanah
- Urugan Tanah Kembali untuk peninggian elevasi
- Pemadatan Urugan Tanah Kembali untuk peninggian elevasi
- Lantai Kerja Beton K.100 untuk pondasi Footplat
- Urugan Pasir bawah Pondasi
- Pasangan Batu Belah 1:6

Diperiksa : Dibuat :
CV. SKETSA PT. CHIMARDER 777

EDIYANTO WICAKSONO Fauzi Ardiawan Nugraha


Pengawas Lapangan Site Manager
LAPORAN BULANAN

BULAN : PERTAMA
PEREODE : 10 JUNI S/D 5 JULI 2015

PEKERJAAN :
PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKA
ULI 2015

SURAKARTA
LAPORAN BULANAN

PEKERJAAN : PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKARTA


LOKASI : SURAKARTA
SUMBER DANA : APBN Tahun Anggaran 2015
MULAI : 10 Juni 2015
SELESAI : 6 Desember 2015
PELAKSANA : PT. CHIMARDER 777
BULAN KE : PERTAMA
PERIODE TGL. : 10 Juni
s/d
5 Juli
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
### #REF! #REF! #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!

### #REF!

#REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

#REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

#REF!

#REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
### #REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN
VOLUME Bobot ( % ) VOLUME Bobot ( % )

1 2 3 4 5 6

### #REF!

### #REF!

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. INTEGRITA

KUSUMA WIJAYANTO, S.E.,M.M. MOCH. SURANTO, ST


NIP. 19771028 200112 1 005 Team Leader
LAPORAN BULANAN

PEKERJAAN : PEMBANGUNAN GEDUNG PENDIDIKAN IAIN SURAKARTA


LOKASI : SURAKARTA
SUMBER DANA : APBN Tahun Anggaran 2015
MULAI : 10 Juni 2015
SELESAI : 6 Desember 2015
PELAKSANA : PT. CHIMARDER 777
BULAN KE : PERTAMA
PERIODE TGL. : 10 Juni
s/d
5 Juli
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
### #REF! #REF! #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!

### #REF!

#REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

#REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

#REF!

#REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
### #REF!

### #REF!

### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

#REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
### #REF!
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6
VOLUME PEKERJAAN M' / M2 / M3
KONTRAK AWAL CCO
NO. URAIAN PEKERJAAN s/d
VOLUME Bobot ( % ) VOLUME Bobot ( % ) L

1 2 3 4 5 6

### #REF!

### #REF!

DISETUJUI : DIPERIKSA:
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
CV. INTEGRITA

KUSUMA WIJAYANTO, S.E.,M.M. MOCH. SURANTO, ST


NIP. 19771028 200112 1 005 Team Leader

You might also like