Prepared By:
design
On this stage, it will be decide who would be a Project Manager, - Replacing the plants that un growth.
Assistant PM, field supervisor, etc and on how the Administration
standard procedural would be handled.
b. Project socialization to the local people. g. Maintenance and Watering period
This stage is to give well information to local people to get positive After the planting process all plant will be maintained by fertilizer, pesticiding
response and support by them and watering when never rain
c. Preparation of the temporary nursery and site office Fertilizing, pesticiding and watering will be done by manually (local people)
Temporary nursery is necessary to refresh the trees seedling after long and backed up by simple and temporary irrigation technology.
way travel from supplier nursery to location before planted. More people involve in this maintenance process would be better which is
Site office is necessary also to get well management and control to the mean more people get the job and get additional income as well.
project. h. Monitoring, training/ establishment and Supervision
d. Orientation and Site mapping All activities will be monitored and supervised by the team on achieved
During preparation of the temporary nursery and site office, orientation progress, workmanship, quality and budgeting.
and site mapping is able to be done. Training/ establishment is to increase the local people skill in planting, plants
This job is necessary to create work program. maintenance and also increasing the local people awareness regarding re
e. Provide and Purchase trees seedling forestation.
Providing and purchasing trees seedling are from some supplier that i. Evaluation
selected with criteria it has to good quality of trees seedling, it has the All program will be evaluated by the team on planting system or method,
best price and on time delivery. approaching system to the people and controlled the budget for improvement
All of this process would be transparency, well organized and tight on next program.
control. j. Reporting
f. Planting Reporting will be done on daily, weekly and monthly period, during completion
Plantation stage consist of some activities: time period.
- Clean up the row or lines of plantation from other unexpected plants,
grass and shrubs. Normally this clean up process using chemical 2. Selecting Plantation
material such as round up to get more effective. Learning to the past experience that illegal falling always took the trunk of trees
- Continued with setting the plantation lay out and stake out to ensure because of the trees is a kind of industry plantation such as teak, mahogany etc.
the position of plants. In this rehabilitation program, the plantation will be selected 60% industry
- Provide the inspection walkway. plantation such like teak, albania, pinus etc and 40% is productive plantation such
Inspection walk way is necessary on plantation stage or even in as fruits trees.
maintenance stage. If the people stolen the fruits, the tree itself is still remain and life which is the
- Excavation the soil to providing hole for planting the plants. environment quality will stay in good condition.
- Pick up the trees seedling from temporary nursery to plantation Consider to aforesaid, the trees will be selected as follow :
location. a. Industry Trees
- Planting the trees seedling - Jati ( Tectona Grandis )
- Sengon ( Albasia )
- Jatimas ( Tectona Grandis family ) ==== END OF SECTION ====
b. Productive Plantation
- Jambu mete ( cashew nuts/ gragus/ anacardium occidentale )
- Durian ( Durio zibethinus )
- Mangga ( Mango/ Mangifera Indica )
(Please check attachment F for plantation picture)
3. Plantation Program
Total completion time is 28 weeks and 16 weeks for maintenance period.
( Please see the Program as in attachment G for detail )
4. Cost Estimation
The expenses required for all this program totally is Rp. 34,094,824,680.00
or US $ 3,906,175.64 ( US$ 1 = Rp. 8,400.00 ) including maintenance period
( For detail see attachment H )
J. Attachment
1. Attachment A : Indonesia Archipelago
2. Attachment B : Province of West Nusa Tenggara
3. Attachment C : Map of Bima Regency
4. Attachment D : Critical Land in Pictures
5. Attachment E : Data of Total Critical area in Bima Regency
6. Attachment F : Selected trees in pictures
7. Attachment G : Rehabilitation/ Reforestation Program
8. Attachment H : Cost Plan