NAVFACENGCOM

*
CONTRACTNUMBER
CONSTRUCTIBILITY CONTROLDOCUMENT
TITLE AND LOCATION

A-E NAME EIC (Name, Code & Tel. No.)

STATUS DATE RECEIVED DATE REVIEWED REVIEWEDBY (Name, Code h Tel. No.)
lOO%/FINAL
.
REVIEW OF PLANS AND SPECIFICATIONS PRIOR TO BIDDING
ITEM lYESIN b/Al REMARKS
1.. Correct Bid Item uording and correct annotation on drawings
!. Multiple Bid Items correct?
3. Bidding place address correct?
1p. Plan Issue Office address E telephone number correct?
; i. Correct telephone number for bid inquiries
i i. Pre-bid Site Visitation (Verify telephone number) I I 1
I. 1
I. Adequacy of Genera! Intention E General Description paragraphs I
3. Adequate time for completion
3. Contract cJmp!etion dates compatible with phasing/sequencing schedule? I
10. Provision of liquidated damages for multiple completion dates

I I I

Availability of temporary utilities . Point of connections indicated? I


Estimated pile iengths specified for bidding purposes?
Sheet Piling requirements clearly specified? I
Adequate testing and sampling requirements !

20
VI

REVIEW OF PLANS AND SPECIFICATIONS PRIOR TO BIDDING


ITEM IYES INO IN/A I REMARKS
Masonry building inspection requirements specified?
Verify ceiling heights at major duct intersection
Roof insulating materials storage requirements specified?
Roofing plans and specifications compatible?
Special roofing inspection and warranty required?
Door, window, light locations, etc. are consistent on all drawings
Verifv kevino reouirements
Painting and Color Schedule requirements specified?
Adequate requirements for 0 E M Manuals and training of
activitv oersonnel
Requirements for start-up and turnover procedures of electrical
and mechanical equipment
Verify adequacy of space provided for conduits, ductuorks,

.
CHECKADEQUACYOF PLANS AND SPECIFICATIONS FOR THE FOLLOWINGCRITICAL ITEMS
Shoring requirements
Deuatering requirements
lest pile requirements
Asbestos Removal Procedure
Case Work
Kitchen Cabinets
Raised Floor Svstems
Hardware
Pre-ttanufactured Buildings
Substations
Hotor Control Centers
Medical and Dental Equipment
Elevators
Boilers
Refrigeration Units
Pumps
Heating and Air conditioning
Motor Controllers
Computer Installation
EMCS Requirements
RF1 Shielding

Other Comments/Remarks: