CONTRACTNUMBER
CONSTRUCTIBILITY CONTROLDOCUMENT
TITLE AND LOCATION
STATUS DATE RECEIVED DATE REVIEWED REVIEWEDBY (Name, Code h Tel. No.)
lOO%/FINAL
.
REVIEW OF PLANS AND SPECIFICATIONS PRIOR TO BIDDING
ITEM lYESIN b/Al REMARKS
1.. Correct Bid Item uording and correct annotation on drawings
!. Multiple Bid Items correct?
3. Bidding place address correct?
1p. Plan Issue Office address E telephone number correct?
; i. Correct telephone number for bid inquiries
i i. Pre-bid Site Visitation (Verify telephone number) I I 1
I. 1
I. Adequacy of Genera! Intention E General Description paragraphs I
3. Adequate time for completion
3. Contract cJmp!etion dates compatible with phasing/sequencing schedule? I
10. Provision of liquidated damages for multiple completion dates
I I I
20
VI
.
CHECKADEQUACYOF PLANS AND SPECIFICATIONS FOR THE FOLLOWINGCRITICAL ITEMS
Shoring requirements
Deuatering requirements
lest pile requirements
Asbestos Removal Procedure
Case Work
Kitchen Cabinets
Raised Floor Svstems
Hardware
Pre-ttanufactured Buildings
Substations
Hotor Control Centers
Medical and Dental Equipment
Elevators
Boilers
Refrigeration Units
Pumps
Heating and Air conditioning
Motor Controllers
Computer Installation
EMCS Requirements
RF1 Shielding
Other Comments/Remarks:
REVERSESIDE