GANTT CHART OF RESEARCH ACTIVITIES

2014 2015 2016


Activities J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
3D Sketch of wooden house with finalised
standard dimensions

3D Model design in ProEngineer

Design of main structural sections of wooden house


and simulation in ANSYS

Analysing main structural parts of the house where


vibration control must be applied

Defining Inputs, outputs and parameters of the structural sections being


analysed

Defining state variables for the experiment and development of bond


diagrams

Development of the governing equations of the system

Coding equations in programming language and testing


2014 2015 2016
Milestone J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Designing the Semi-Adaptive Controller to fit to the


desired performance of the structural sections

Decelopment of wooden structural sections

Applying the MR Damper control system to the


wooden structural system and final assembly

Conducting the experiment and collecting data under


different vibrating frequencies

Response analysis of the structure during different


loadings and MR Dampers

Develop and design final control system for vibration


damping

Project completion and documentation

Whole Project duration

Each process duration


MR Damper

Load Cell
80 RM

Shaking Table
25000USD 80,800 RM
1500 USD 5000 RM

DC Linear Actuator
170 RM
Timber Wood
1300RM Per cubic meter - 5 cubic
metre
Isolator - shock isolating device
RM 350
Universal Column Section
A load cell is a transducer that is used to convert a force into an electrical signal. This conversion
changes the effective electrical resistance of the wire.

Capacities from 5 kg to 5 000 kg


Range of 16 different types
Application for scales from 0.5 kg to 3 000 kg
Stainless steel types with protection IP68/IP69K
Aluminium types with protection IP67
The type PC3H is a robust stainless steel high capacity single point load cell with a high performan

Sabah University only 1 in malaysia

An actuator is a type of motor for moving or controlling a mechanism or system. It is operated by

This is why a HoneyWood house helps you save up to five times more energy than a traditional bric

http://www.alibaba.com/trade/search?fsb=y&IndexArea=product_en&CatId=&SearchText=vibration
. The control system can be simple (a fixed mechanical or electronic system), software-based (e.g. a printer d

more quickly.
based (e.g. a printer driver, robot control system), or a human or other agent.
gather requirements
analyse
design
development
test
launch