ID: WP:032/1

Last update: December2005

N of copies 2

CHECK LIST FOR WORK PERMIT


Project: Tana Beles Housing Project
Employer: FDRE sugar corporation Block/Bill:
Contractor: ________-_______________. Axes:
Consultant: RBDCSWE Floor:
Location: Jawie/ VILLAG /
Document Referred: Bill of quantity, Inspection & drawings

Wall tile coverage inspection work (112)


Make a ()
C NC NA
Qualification of tiler....................................................................................................................
Location of item internal /External wall......................................................................................
Transverse/water absorption test ..............................................................................................
Type of tile material ceramic/ precast element etc.. ................................................................
Design of patterns .....................................................................................................................
Material approval slip and sample..............................................................................................
Colour of selected tile...............................................................................................................
Checking of approved sample with site delivers......................................................................
Size of tile and deviation one to the other ................................................................................
Thickness of tile.........................................................................................................................
Selection of equal sizes for placing...........................................................................................
Checking of surface nature to be covered ................................................................................
Maximum projection of tile from wall surface..........................................................................
Immersion of tiles in water before fixing ................................................................................
Checking of plumbing, corner angle etc. before placing...........................................................

Mix proportion of tile paste


Quality of adhesive
Availability of tile spacer
Cleaning and wetting of surfaces
Nature of tools
Cutting provision of uniform paste backings
Curing period of tiles surface
Application time of white cement/quantity/Unit weights
Protection measure of unnecessary spread of pasted/cement on Surfaces/adhesive
Plumbing/levelling/Linearity of wall surface
Tile condition at outlets of embedded element
Pressure test for embedded pipes

ID: WP:032/2

Additional Remarks

For the above items are fulfilled /not fulfilled ,the Contractor is hereby allowed
/refused to proceed tile working. The take-off sheet of this activity shall immediately be
signed upon completion.
For the Consultant For the Contractor

Name: Name:

Signature: Signature:

Date: Date:

C=conformed NC= not conformed NA= not applicable