You are on page 1of 4

RESUME

LENDON P. SELEM

Position Desired

WELDER/ GTAW-SMAW

:
:
:
:
:
:
:
:
:
:

Inoburan,
August 13, 1974
Inoburan,
37 y/o
Male
Married
Filipino
Roman Catholic
Mr. Ramon Selem (deceased)
Mrs. Anita P. Selem

PERSONAL DATA:
Provincial Address
Date of Birth
Place of Birth
Age
Sex
Civil status
Nationality
Religion
Fathers Name
Mothers Name

EDUCATIONAL BACKGROUND
Elementary School :
High School

Langtad Elementary School


1982-1988
Langtad National High School
1988-1992

EMPLOYMENT RECORDS

Name of Company
Project Assigned
Inclusive Date
Position Held

:
:
:
:

INTERNATIONAL PLANT SERVICES


Port Arthur Texas, U.S.A.
Dec. 2006 Nov. 25, 2011
GTAW/SMAW

JOB DESCRIPTION

Full welding 60 diameter carbon steel pipe, mainline of the geothermal power
plant.
Full welding all piping joints connection water chiller to separator.

Tie and pipe rock to new refinery to old refinery.


Full welding of spool in fabrication.
Maintenance/ welder/ mechanic.
Full welding a condenser cooler and steam piping, fuel gas connection
Full welding aluminum alloy 6 pipe and {SS} stainless steel piping.

Name of Company
Project Assigned
Inclusive Dates
Position Held

:
:
:
:

OLAYAN DESCON ENGINEERING CO.


K.S.A.
Sep. 19, 2003-Jan. 17, 2005
GTAW/SMAW

JOB DESCRIPTION:

Full welding of small bore and big bore stainless pipe


Full welding of steam piping
Fill welding of fabricated condenser/evaporator and others
Full welding of tie end from train 7 to train 8
Full welding of 24 diameter carbon steel pipe, form wheel head to
the mainline piping connection.
Full welding a 20 diameter heavy wall thickness on fabricated
area
Full welding 8 pipes aluminum into the mainline pipe

Name of Company
Project Assigned

:
:

Inclusive Dates
Position Held

:
:

DODSAL
NEA KHUFF Condensate Fractional Saudi
Aramco Ras Tanura Refinery
Sep. 28, 2002-Jul. 7, 2003
GTAW / SMAW

JOB DESCRIPTION:

Full welding (carbon steel) oil tank on fabricated area


Full welding condenser cooler going to header
Full welding 48 pipeline downhill or uphill

Destination of substation oil pump welding by pass of small bore line.

Name of Company
Project Assigned

:
:

Inclusive Dates

DOTANAH
MLNG TIGA PLANT, PROJECT
BINTULU, MALAYSIA
Aug. 20, 2001-May 2002

JOB DESCRIPTION:

Full welding 30 diameter carbon steel pipe, mainline of the Geothermal


Power Plant.
Full welding all piping points connection water chiller to separator.
Tie and pipe rock to new refinery to old refinery.
Full welding of spool in fabrication
Maintenance / welder / mechanic
Full welding a condenser cooler and steam piping, fuel gas connection.

Name of Company
Project Assigned
Inclusive Dates
Position Held

:
:
:
:

DAELIM
Formosa DAELIM
Jun. 18, 1999-Jun. 6, 2000
GTAW / SMAW

JOB DESCRIPTION:

Full welding (carbon steel) oil tank on fabricated area


Full welding condenser cooler going to header
Full welding 48 pipeline downhill or uphill
Destination of substation oil pump welding by pass of small bore line.

You might also like