BOUSTEAD BUILDING AND MATERIAL SDN BHD

A
AWC

Sub. Date: to P.T.

M&E EQUIPMENT AND MATERIAL SUBMISSION TRACKING LIST

Received Date: date receive approved dwgs

APPROVED
APPROVED WITH COMMENTS

in A4 size

REJECTED

in A3 size
Hard Copy / Qty

sub. date

sub. date

Size

Received Date

11kV HT Panel & Compoment

MAR/SECM/NT/001/16

31.5.2016

31.5.2016

1.6.2016

8.8.2016

Battery Charger

MAR/SECM/NT/002/16

9.6.2016

9.6.2016

10.6.2016

8.8.2016

Cast Resin Trasformer

MAR/SECM/NT/003/16

31.5.2016

31.5.2016

1.6.2016

8.8.2016

Main Switch Board

MAR/SECM/NT/004/16

27.6.2016

13.6.2016

15.6.2016

8.8.2016

Cable Lug

MAR/SECM/NT/005/16

9.6.2016

9.6.2016

10.6.2016

8.8.2016

Generator

MAR/SECM/NT/006/16

31.5.2016

31.5.2016

1.6.2016

8.8.2016

Generator Alternator

MAR/SECM/NT/007/16

31.5.2016

31.5.2016

1.6.2016

8.8.2016

Busduct

MAR/SECM/NT/008/16

7.10.2016

14.10.2016

24.10.2016

Intelligent Modular Cabling System

MAR/SECM/NT/009/16

18.7.2016

18.7.2016

4.8.2016

8.8.2016

10

Flush Floor & Under Floor System

MAR/SECM/NT/010/16

25.2.2016

25.2.2016

29.2.2016

8.8.2016

11

Underfloor upvc trunking

MAR/SECM/NT/011/16

2.3.2016

2.3.2016

4.3.2016

8.8.2016

12

Wire Mesh Tray

MAR/SECM/NT/012/16

4.7.2016

23.8.2016

30.9.2016

13

Trunking & Ladder

MAR/SECM/NT/013/16

27.6.2016

23.8.2016

30.9.2016

14

Upvc Conduit & Accessories

MAR/SECM/NT/014/16

24.5.2016

24.5.2016

25.5.2016

15

GI Conduit

MAR/SECM/NT/015/16

27.6.2016

1.7.2016

30.9.2016

16

GI Conduit Accessories

MAR/SECM/NT/016/16

27.6.2016

1.7.2016

30.9.2016

17

HT Cable 11kV

MAR/SECM/NT/017/16

4.7.2016

23.8.2016

30.9.2016

18

LV Cable 600/1000V

MAR/SECM/NT/018/16

27.6.2016

6.9.2016

5.10.2016

19

Switch & Socket

MAR/SECM/NT/019/16

27.6.2016

23.6.2016

28.6.2016

20

Lightning & Earthing Component

MAR/SECM/NT/020/16

27.6.2016

1.7.2016

4.7.2016

ITEM

TITLED

NO ref

Approval Date

2/B

Approval
Date

Received Date

3/C

Approval Date

Received
Date

4/D

Approval
Date

Status

sub. date

Status

sub. date

Status

TARGET SUBM.
DATE

Status

Issue Date / Revision


Received
Date

AO

A1

ELECTRICAL

/
/

8.8.2016

8.8.2016

/
/

A3

A4

sub. date
0

Approval Date

Received Date

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

21

Motion Sensor L202A

MAR/SECM/NT/021/16

14.10.2016

21.10.2016

22

Photocell Sensor L202B

MAR/SECM/NT/022/16

14.10.2016

7.10.2016

/
/

Light Fittings
23

L12-C-2 - 1 x 54W T5 2 x 2 Fluorescent

MAR/SECM/NT/023/16

14.10.2016

25.11.16

24

L3 - 1 x 54W T5 Fluorescent Fitting

MAR/SECM/NT/024/16

14.10.2016

25.11.16

25

L4 - 1 x 54W T5 Fluorescent Fitting

MAR/SECM/NT/025/16

14.10.2016

25.11.16

26

L5 - 2 x 54W T5 Fluorescent Fitting

MAR/SECM/NT/026/16

14.10.2016

25.11.16

27

L18 - 1 x 8.5W LED Light

MAR/SECM/NT/027/16

14.10.2016

25.11.16

28

L19 - 1 x 8.5W LED Light c/w battery

MAR/SECM/NT/028/16

14.10.2016

25.11.16

29

L9 - 1 x 7W LED Down Light

MAR/SECM/NT/029/16

14.10.2016

25.11.16

30

L10 - Recessed Square Down Light

MAR/SECM/NT/030/16

14.10.2016

25.11.16

31

L108 - 1 x 35W Down Light

MAR/SECM/NT/031/16

14.10.2016

25.11.16

32

L181 - 1 x 150W Metal Halide

MAR/SECM/NT/032/16

14.10.2016

25.11.16

33

L86 - Keluar Sign

MAR/SECM/NT/033/16

20.6.2016

13.6.2016

15.6.2016

8.8.2016

34

L16 - Recessed Emergency Light

MAR/SECM/NT/034/16

20.6.2016

13.6.2016

15.6.2016

8.8.2016

35

L17 - Surface Emergency Light

MAR/SECM/NT/035/16

20.6.2016

13.6.2016

15.6.2016

8.8.2016

36

L89

MAR/SECM/NT/036/16

8.8.2016

1.7.2016

4.8.2016

8.8.2016

37

Fireseal

MAR/SECM/NT/037/16

9.6.2016

9.6.2016

10.6.2016

8.8.2016

38

Fireman Switch

MAR/SECM/NT/038/16

27.6.2016

23.6.2016

28.6.2016

8.8.2016

39

Main Switch Board Component

MAR/SECM/NT/039/16

27.6.2016

23.6.2016

28.6.2016

8.8.2016

40

Isolator - 20A SPN & 30A TPN

MAR/SECM/NT/040/16

27.6.2016

23.6.2016

28.6.2016

8.8.2016

41

Isolator - 100A TPN

MAR/SECM/NT/041/16

27.6.2016

23.6.2016

28.6.2016

8.8.2016

42

Acoustic Door

MAR/SECM/NT/044/16

43

Generator Battery

MAR/SECM/NT/045/16

5-Oct-16

44

I-MOS Diamond Services box sample board

5-Oct-16

45

Lightning & Earthing Component Sample Board

MAR/SECM/NT/047/16

7-Oct-16

Wire Mesh Tray (Sample Board)

MAR/SECM/NT/048/16

18-Oct-16

20-Oct-16

27-Sep-16

SAMPLE BOARD
42

Upvc Conduit & Accessories

MAR/SECM/NT/042/16

22.8.2016

30.9.2016

43

GI Conduit & Accessories

MAR/SECM/NT/043/16

22.8.2016

30.9.2016

A3

A4

sub. date
0

Approval Date

Received Date

sub. date
2/B

ELV SERVICES
1

Fireman Intercom System

SECM/MAR/ELV/001/16

1.11.2016

5.9.16

Public Address System

SECM/MAR/ELV/002/16

1.11.2016

5.9.16

SMATV System

SECM/MAR/ELV/003/16

1.11.2016

5.9.16

Telephone System

SECM/MAR/ELV/004/16

1.11.2016

5.9.16

CCTV System

SECM/MAR/ELV/005/16

1.11.2016

5.9.16

Parking Guidance System

SECM/MAR/ELV/006/16

1.11.2016

5.9.16

Backbone System

SECM/MAR/ELV/007/16

1.11.2016

5.9.16

7.10.2016

Card Access System

SECM/MAR/ELV/008/16

1.11.2016

5.9.16

7.10.2016

Voice Recording System

SECM/MAR/ELV/009/16

14.10.2016

14.10.16

7.10.2016

FIRE FIGHTING SERVICES


Addressable Fire Alarm System
Fire Alarm Panel
Standby Battery
Alarm Bell
Manual Breakglass
Heat Detector
Smoke Detector
Interface Unit
trunking
Conduit
Cables

25/8/2016

13/10/2016

19/10/16
19/10/16
25/8/2016
25/8/2016
25/8/2016
25/8/2016

13/10/2016
13/10/2016
13/10/2016
13/10/2016

13/10/2016

10/8/2016
10/8/2016

20.9.2016

13/10/2016

AWC

20.9.2016

13/10/2016

AWC

20.9.2016

13/10/2016

20.9.2016

13/10/2016

Automatic Sprinkler & Wet Riser System


Sprinkler System
Electrical Sprinkler Pump Set
Jockey Pump

25/8/2016
25/8/2016

31.10.06

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date
0

Sprinkler Head
Sprinkler Pump Control Panel
Pipe Fitting
Non-Return Valve
Pressure Reducing Valve
Sprinkler Piping
Pressure Switch
Globe Valve

18/10/2016
25/8/2016
18/10/2016

Approval Date

10.11.16
20.9.2016

Received Date

sub. date
2/B

A
13/10/2016

AWC

14.11.16

18/10/2016
18/10/2016
10/8/2016

10.11.16

18/10/2016
18/10/2016

Wet Riser System


Landing Valve

18/8/2016

20.9.2016

13/10/2016

Hose

18/8/2016

20.9.2016

13/10/2016

Spray Nozzle

18/8/2016

20.9.2016

13/10/2016

Pipe and Fittings


Mechanical Coupling

18/10/2016
18/10/2016

10.11.16
14.11.16

Hose Reel System


Electrical Hose Reel Pump Set

25/8/2016

20.9.2016

13/10/2016

Hose Reel

18/8/2016

20.9.2016

13/10/2016

AWC

Hose Reel Drum

18/8/2016

20.9.2016

13/10/2016

AWC

Hose Reel Nozzle

18/8/2016

20.9.2016

13/10/2016

AWC

20.9.2016

13/10/2016

AWC

Pipe Fitting
Non-Return Valves
Strainers
Globe Valve
Pressure Switch
Flow Switch
Pipe

18/10/2016
18/10/2016
18/10/2016
18/10/2016
18/10/2016
18/10/2016
10/8/2016

31.10.16

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date

Approval Date

20.9.2016

13/10/2016

AWC

20.9.2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

11/10/2016

13/10/2016

Received Date

Inert Gas / Clean Agent Suppression System


Clean Agent System

25/10/2016

Gas Control Panel

25/8/2016

14.11.16

Portable Fire Extinguishers


9 kg Dry Powder Fire Extinguisher

18/8/2016

4.5 kg CO2 Fire Extinguisher

18/8/2016

20.9.2016

ACMV
PIPING/DUCTWORK
1

Chilled Water Piping

BBM/PCE/NUCLEUS/ACMV/009

8/17/2016

10/8/2016

Condenser Water Piping

BBM/PCE/NUCLEUS/ACMV/010

8/17/2016

10/8/2016

Drain Water Piping

BBM/PCE/NUCLEUS/ACMV/011

8/17/2016

10/8/2016

Galvanised Steel Sheet and Coil

BBM/PCE/NUCLEUS/ACMV/001

8/10/2016

10/8/2016

Fire Rated Duct

28/11/2016

Under Floor Fabric Duct

28/11/2016

Aluminium Foil

BBM/PCE/NUCLEUS/ACMV/003

8/10/2016

10/8/2016

Perforated Aluminium Foil

BBM/PCE/NUCLEUS/ACMV/004

8/10/2016

10/8/2016

Figerglass (Internal & External Insulation)

BBM/PCE/NUCLEUS/ACMV/002

8/10/2016

10/8/2016

10

Insulated Flexible Ductworks

BBM/PCE/NUCLEUS/ACMV/005

8/10/2016

10/8/2016

11

Rockwool Insulation

BBM/PCE/NUCLEUS/ACMV/006

8/10/2016

10/8/2016

12

Copper Pipe

13

Close Cell Insulation

BBM/PCE/NUCLEUS/ACMV/012

8/10/2016

10/8/2016

14

Adhesive

BBM/PCE/NUCLEUS/ACMV/007

8/10/2016

10/8/2016

15

Duct Sealant

BBM/PCE/NUCLEUS/ACMV/008

8/10/2016

10/8/2016

16

Solvent Cement (PVC Glue)

BBM/PCE/NUCLEUS/ACMV/013

8/10/2016

10/8/2016

28/11/2016

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date
0

EQUIPMENT
1

Water Cooled Centrifugal Chiller

28/11/2016

Air Handling Unit (AHU)

28/11/2016

Fan Coil Unit (FCU)

28/11/2016

Heat Exchanger

28/11/2016

Air Cooled Split Unit (ACSU)

28/11/2016

Cooling Tower

28/11/2016

Vertical In-Line Pump

28/11/2016

ERV

28/11/2016

Pre-Air Handling Unit (PAHU)

28/11/2016

GRILLE/DIFFUSER/DAMPER
1

Constant Flow Controller

26/10/2016

Swirl Diffuser

26/10/2017

Floor Diffuser

26/10/2018

Linear Diffuser

26/10/2019

21.10.2016

Single and Double Deflection

26/10/2020

21.10.2016

External Louvre

26/10/2021

21.10.2016

Louvre Grille

26/10/2022

21.10.2016

Plenum Box

26/10/2023

21.10.2016

Non Return Damper (NRD)

26/10/2024

21.10.2016

10

Motorised Smoke Damper (MSD)

26/10/2025

21.10.2016

11

Motorised Fire Damper (MFD)

26/10/2026

21.10.2016

12

Curtain Type Fire Damper (FD)

26/10/2027

21.10.2016

13

Damper Actuator

26/10/2028

21.10.2016

FANS
1

Axial Fan

26/11/2016

Centrifugal In Line Fan

26/11/2016

Propeller Fan

26/11/2016

SWSI Centrifugal Fan

26/11/2016

Cabinet Inline Fan

26/11/2016

MISC

21.10.2016

Approval Date

Received Date

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date
0

Chemical Water Treatment System

26/11/2016

Temperature Sensor

26/11/2016

Kitchen Hood

26/11/2016

Fire Seal

Spring Isolator

BBM/PCE/NUCLEUS/ACMV/014

10/26/2016

10/8/2016

26/11/2016

VALVE

1
2
3
4
5
6
7
8
9
10
11
12

Flexible Rubber Joint

20/11/2016

Screwed Type Flexible Rubber Joint

20/11/2016

Butterfly Valve

20/11/2016

General Pressure Gauge (GP Series)

20/11/2016

Thermometer

20/11/2016

Cast Iron Y-Strainer

20/11/2016

Cast Iron Dual Door Check Valve

20/11/2016

Brass Y-strainer

20/11/2016

Brass Ball Valve

20/11/2016

Brass Gate Valve

20/11/2016

Automatic Air Vent

20/11/2016

Automatic Balancing Control On/Off Valve

20/11/2016

ELECTRICAL FOR ACMV


1

Air Circuit Breaker

BBM/PCE/NUCLEUS/ACMV/015

10/19/2016

24/8/2016

Mouled Case Circuit Breaker

BBM/PCE/NUCLEUS/ACMV/016

10/19/2016

24/8/2016

Miniature Circuit Breaker

BBM/PCE/NUCLEUS/ACMV/017

10/19/2016

24/8/2016

Earth Leakage Circuit Breaker

BBM/PCE/NUCLEUS/ACMV/018

10/19/2016

24/8/2016

Contactor

BBM/PCE/NUCLEUS/ACMV/019

10/19/2016

24/8/2016

Thermal Overload Relay

BBM/PCE/NUCLEUS/ACMV/020

10/19/2016

24/8/2016

Combined Overcurrent and Earth Fault Relay

BBM/PCE/NUCLEUS/ACMV/021

10/19/2016

24/8/2016

Earth Leakage Relay

BBM/PCE/NUCLEUS/ACMV/022

10/19/2016

24/8/2016

Approval Date

Received Date

11/10/2016

13/10/2016

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date
0

Power Factor Regulator

BBM/PCE/NUCLEUS/ACMV/023

10/19/2016

24/8/2016

10

Ammeter/Voltmeter

BBM/PCE/NUCLEUS/ACMV/027

10/19/2016

24/8/2016

11

Run/Trip Indicating Light (LED)

BBM/PCE/NUCLEUS/ACMV/029

10/19/2016

24/8/2016

12

Starts/Stop Push Button

BBM/PCE/NUCLEUS/ACMV/030

10/19/2016

24/8/2016

13

Selector Switch

BBM/PCE/NUCLEUS/ACMV/028

10/19/2016

24/8/2016

14

Timer Delay

BBM/PCE/NUCLEUS/ACMV/032

10/19/2016

24/8/2016

15

Control Relay

BBM/PCE/NUCLEUS/ACMV/031

10/19/2016

24/8/2016

16

Auto Transformer

BBM/PCE/NUCLEUS/ACMV/025

10/19/2016

24/8/2016

17

Current Transformer

BBM/PCE/NUCLEUS/ACMV/026

10/19/2016

24/8/2016

18

Capacitor Bank

BBM/PCE/NUCLEUS/ACMV/024

10/19/2016

24/8/2016

19

Cables Trunking

BBM/PCE/NUCLEUS/ACMV/036

10/19/2016

24/8/2016

20

G.I Conduit

BBM/PCE/NUCLEUS/ACMV/037

10/19/2016

24/8/2016

21

PVC Cables

BBM/PCE/NUCLEUS/ACMV/033

10/19/2016

24/8/2016

22

FR Cables

BBM/PCE/NUCLEUS/ACMV/034

10/19/2016

24/8/2016

23

Cables Tray

BBM/PCE/NUCLEUS/ACMV/035

10/19/2016

24/8/2016

24

Accessories

BBM/PCE/NUCLEUS/ACMV/038

10/19/2016

24/8/2016

25

Soft Starter

10/19/2016

SAMPLE BOARD
1

Electrical For ACMV

28/10/2016

Ducting, Insulation, Duct Bracket

28/10/2016

Piping Above ground & Condenser, Insulation,


Pipe Bracket, Accessories

28/10/2016

Diffuser / Grille

11/11/2016

PLUMBING

Approval Date

Received Date

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

sub. date
0

PRESSED STEEL HOT DIPPED GALVANISED


WATER TANK

10/10/2016

VARIABLE SPEED PUMP

10/10/2016

SUBMERSIBLE PUMP

10/10/2016

POB PIPE AND FITTING

10/10/2016

BBB PIPE AND FITTING

10/10/2016

STAINLESS STEEL PIPE

10/10/2016

2
3
4
5
6
10/10/2016
7
BIOMATIC GREASE INTERCEPTOR

10/10/2016

C/W AUTOMATIC DOSING TANK

10/10/2016

DOMESTIC WATER METER / DIGITAL WATER


METER

10/10/2016

GATE VALVE

10/10/2016

Y-STRAINER

10/10/2016

BRASS BALL VALVE

10/10/2016

BUTTERFLY VALVE

10/10/2016

CHECK VALVE

10/10/2016

8
9
10
11
12
13
14
15

UPDATED ON 17/10/2016

Approval Date

Received Date

sub. date
2/B

Approval
Date

Received Date

Hard Copy / Qty


sub. date
3/C

Approval Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

NO ref

Status

TITLED

Status

Issue Date / Revision


ITEM

Received
Date

Size
AO

A1

A3

A4

BOUSTEAD BUILDING AND MATERIALS SDN BHD

A
AWC

Sub. Date: to P.T.

M&E DRAWING TRACKING LIST

Received Date: date receive approved dwgs

APPROVED
APPROVED WITH COMMENTS

in A4 size

REJECTED

in A3 size

sub. date

sub. date

Approval
Date

sub. date

Approval
Date

Received
Date

sub. date

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Received
Date

Hard Copy / Qty


Size

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received Date

SECM-NT-ELV-FI-001-00

SECM-NT-ELV-FI-002-00

FIREMAN INTERCOM SYSTEM BASEMENT 3 FLOOR PLAN

4-Nov-16

SECM-NT-ELV-FI-003-00

FIREMAN INTERCOM SYSTEM BASEMENT 2 FLOOR PLAN

4-Nov-16

SECM-NT-ELV-FI-004-00

FIREMAN INTERCOM SYSTEM BASEMENT 1 FLOOR PLAN

4-Nov-16

SECM-NT-ELV-FI-005-00

FIREMAN INTERCOM SYSTEM LOWER GROUND FLOOR PLAN

4-Nov-16

SECM-NT-ELV-FI-006-00

FIREMAN INTERCOM SYSTEM GROUND FLOOR PLAN

20.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-FI-007-00

FIREMAN INTERCOM SYSTEM LEVEL 1 FLOOR PLAN

27.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-FI-008-00

FIREMAN INTERCOM SYSTEM LEVEL 2 FLOOR PLAN

4.7.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-FI-009-00

FIREMAN INTERCOM SYSTEM LEVEL 3 ~ 23 FLOOR PLAN

11.7.2016

18.7.2016

4.8.2016

8.8.2016

11

SECM-NT-ELV-FI-011-00

FIREMAN INTERCOM SYSTEM SCHEMATIC DIAGRAM

21.10.2016

4.11.2016

Approval Date

2/B

Received Date

3/C

4/D

AO

A1

ELECTRICAL AND ELV SERVICES


Fireman Intercom System
4-Nov-16

Public Address System


1

SECM-NT-ELV-PA-001-00

PUBLIC ADDRESS SYSTEM BASEMENT 4 FLOOR PLAN

SECM-NT-ELV-PA-002-00

PUBLIC ADDRESS SYSTEM BASEMENT 3 FLOOR PLAN

SECM-NT-ELV-PA-003-00

PUBLIC ADDRESS SYSTEM BASEMENT 2 FLOOR PLAN

21.10.2016

SECM-NT-ELV-PA-004-00

PUBLIC ADDRESS SYSTEM BASEMENT 1 FLOOR PLAN

21.10.2016

SECM-NT-ELV-PA-005-00

PUBLIC ADDRESS SYSTEM LOWER GROUND FLOOR PLAN

21.10.2016

SECM-NT-ELV-PA-006-00

PUBLIC ADDRESS SYSTEM GROUND FLOOR PLAN

20.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-PA-007-00

PUBLIC ADDRESS SYSTEM LEVEL 1 FLOOR PLAN

27.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-PA-008-00

PUBLIC ADDRESS SYSTEM LEVEL 2 FLOOR PLAN

4.7.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-PA-009-00

PUBLIC ADDRESS SYSTEM LEVEL 3,4,9,10,14,15,16,20,21 & 22 FLOOR PLAN

11.7.2016

18.7.2016

4.8.2016

8.8.2016

A3

A4

sub. date

18.7.2016

18.7.2016

5.9.2016

10

SECM-NT-ELV-PA-010-00

PUBLIC ADDRESS SYSTEM LEVEL 5,6,7,8,11,12,13,17,18,19 & 23 FLOOR


PLAN

11

SECM-NT-ELV-PA-011-00

PUBLIC ADDRESS SYSTEM SCHEMATIC DIAGRAM

25.7.2016

sub. date

Approval
Date

sub. date

Approval
Date

Received
Date

sub. date

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Received
Date

Hard Copy / Qty


Size

Approval Date

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received Date

4.8.2016

8.8.2016

2/B

Received Date

3/C

4/D

AO

A1

CCTV System
1

SECM-NT-ELV-CCTV-001-00

CCTV SYSTEM BASEMENT 4 FLOOR PLAN

21.10.2016

SECM-NT-ELV-CCTV-002-00

CCTV SYSTEM BASEMENT 3 FLOOR PLAN

21.10.2016

SECM-NT-ELV-CCTV-003-00

CCTV SYSTEM BASEMENT 2 FLOOR PLAN

21.10.2016

SECM-NT-ELV-CCTV-004-00

CCTV SYSTEM BASEMENT 1 FLOOR PLAN

21.10.2016

SECM-NT-ELV-CCTV-005-00

CCTV SYSTEM LOWER GROUND FLOOR PLAN

21.10.2016

SECM-NT-ELV-CCTV-006-00

CCTV SYSTEM GROUND FLOOR PLAN

20.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-CCTV-007-00

CCTV SYSTEM LEVEL 1 FLOOR PLAN

27.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-CCTV-008-00

CCTV SYSTEM LEVEL 2 FLOOR PLAN

4.7.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-CCTV-009-00

CCTV SYSTEM LEVEL 3 ~ 23 FLOOR PLAN

11.7.2016

18.7.2016

4.8.2016

8.8.2016

10

SECM-NT-ELV-CCTV-010-00

CCTV SYSTEM SCHEMATIC DIAGRAM

18.7.2016

6.9.2016

Telephone System
1

SECM-NT-ELV-TL-001-00

TELEPHONE SYSTEM LOWER GROUND FLOOR PLAN

21.10.2016

SECM-NT-ELV-TL-002-00

TELEPHONE SYSTEM GROUND FLOOR PLAN

21.10.2016

SECM-NT-ELV-TL-003-00

TELEPHONE SYSTEM LEVEL 1 FLOOR PLAN

21.10.2016

SECM-NT-ELV-TL-004-00

TELEPHONE SYSTEM LEVEL FROM 2 ~ 23 FLOOR PLAN

21.10.2016

SECM-NT-ELV-TL-005-00

TELEPHONE SYSTEM SCHEMATIC DIAGRAM

21.10.2016

SMATV System

A3

A4

sub. date

sub. date

Approval
Date

sub. date

Approval
Date

Received
Date

sub. date

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Received
Date

Hard Copy / Qty


Size

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received Date

SECM-NT-ELV-SMATV-001-00

SMATV SYSTEM LOWER GROUND FLOOR PLAN

21.10.2016

SECM-NT-ELV-SMATV-002-00

SMATV SYSTEM GROUND FLOOR PLAN

20.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-SMATV-003-00

SMATV SYSTEM LEVEL 1 FLOOR PLAN

27.6.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-SMATV-004-00

SMATV SYSTEM LEVEL FROM 2 ~ 23 FLOOR PLAN

11.7.2016

18.7.2016

4.8.2016

8.8.2016

SECM-NT-ELV-SMATV-005-00

SMATV SYSTEM SCHEMATIC DIAGRAM

21.10.2016

Approval Date

Parking Guidance System


1

SECM-NT-ELV-PG-001-00

PARKING GUIDANCE SYSTEM BASEMENT 4 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-002-00

PARKING GUIDANCE SYSTEM BASEMENT 4 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-003-00

PARKING GUIDANCE SYSTEM BASEMENT 2 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-004-00

PARKING GUIDANCE SYSTEM BASEMENT 1 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-005-00

PARKING GUIDANCE SYSTEM LOWER GROUND FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-006-00

PARKING GUIDANCE SYSTEM GROUND FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELV-PG-007-00

PARKING GUIDANCE SYSTEM SCHEMATIC DIAGRAM

21.10.2016

3.11.2016

SECM-NT-ELV-PG-008-00

PARKING BARRIER GATE SYSTEM SCHEMATIC DIAGRAM

21.10.2016

3.11.2016

Lighting System
1

SECM-NT-ELEC-LT-001-00

LIGHTING SYSTEM BASEMENT 4 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-LT-002-00

LIGHTING SYSTEM BASEMENT 3 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-LT-003-00

LIGHTING SYSTEM BASEMENT 2 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-LT-004-00

LIGHTING SYSTEM BASEMENT 1 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-LT-005-00

LIGHTING SYSTEM LOWER GROUND FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-LT-006-00

LIGHTING SYSTEM GROUND FLOOR PLAN

14.10.2016

21.10.16

SECM-NT-ELEC-LT-007-00

LIGHTING SYSTEM LEVEL 1 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELEC-LT-008-00

LIGHTING SYSTEM LEVEL 2 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELEC-LT-009-00

LIGHTING SYSTEM LEVEL 3,4,9,10,14,15,16,20,21 & 22 FLOOR PLAN

21.10.2016

3.11.2016

10

SECM-NT-ELEC-LT-010-00

LIGHTING SYSTEM LEVEL 5,6,7,8,11,12,13,17,18,19 & 23 FLOOR PLAN

21.10.2016

11

SECM-NT-ELEC-LT-011-00

LIGHTING SYSTEM LEVEL 24 M&E CHILLER PLAN

21.10.2016

12

SECM-NT-ELEC-LT-012-00

LIGHTING SYSTEM LEVEL ROOF FLOOR PLAN

21.10.2016

13

SECM-NT-ELEC-LT-013-00

LIGHTING LAYOUT LEVEL 23

21.10.2016

2/B

Received Date

3/C

4/D

AO

A1

A3

A4

14

SECM-NT-ELEC-LT-014-00

LIGHTING LAYOUT LEVEL 23

21.10.2016

15

SECM-NT-ELEC-LT-015-00

LIGHTING LAYOUT LEVEL (GONDOLA & ROOF LEVEL)

21.10.2016

sub. date
0

Approval Date

Power Supply System


1

SECM-NT-ELEC-PW-001-00

POWER SUPPLY SYSTEM BASEMENT 4 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-PW-002-00

POWER SUPPLY SYSTEM SYSTEM BASEMENT 3 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-PW-003-00

POWER SUPPLY SYSTEM BASEMENT 2 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-PW-004-00

POWER SUPPLY SYSTEM BASEMENT 1 FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-PW-005-00

POWER SUPPLY SYSTEM LOWER GROUND FLOOR PLAN

14.10.2016

13.10.16

24.10.16

SECM-NT-ELEC-PW-006-00

POWER SUPPLY SYSTEM GROUND FLOOR PLAN

14.10.2016

21.10.16

SECM-NT-ELEC-PW-007-00

POWER SUPPLY SYSTEM LEVEL 1 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELEC-PW-008-00

POWER SUPPLY SYSTEM LEVEL 2 FLOOR PLAN

21.10.2016

3.11.2016

SECM-NT-ELEC-PW-009-00

POWER SUPPLY SYSTEM LEVEL 3,4,9,10,14,15,16,20,21 & 22 FLOOR PLAN

21.10.2016

3.11.2016

10

SECM-NT-ELEC-PW-010-00

POWER SUPPLY SYSTEM LEVEL 5,6,7,8,11,12,13,17,18,19 & 23 FLOOR PLAN

21.10.2016

11

SECM-NT-ELEC-PW-011-00

LIGHTING SYSTEM LEVEL 24 M&E CHILLER PLAN

21.10.2016

12

SECM-NT-ELEC-PW-012-00

LIGHTING SYSTEM LEVEL ROOF FLOOR PLAN

21.10.2016

13

SECM-NT-E-P-013

POWER LAYOUT LEVEL 23

21.10.2016

14

SECM-NT-E-P-014

POWER LAYOUT LEVEL 24

21.10.2016

15

SECM-NT-E-P-015

POWER LAYOUT LEVEL (GONDOLA & ROOF LEVEL)

21.10.2016

Schematic Diagram
1

SECM-NT-ELEC-SCH-001-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 4

28-Oct-16

SECM-NT-ELEC-SCH-002-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 3 - 1

28-Oct-16

Received Date

sub. date
2/B

Approval
Date

Received Date

sub. date
3/C

Approval
Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

SECM-NT-ELEC-SCH-003-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 3- 2

28-Oct-16

SECM-NT-ELEC-SCH-004-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 2 - 1

28-Oct-16

SECM-NT-ELEC-SCH-005-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 2- 2

28-Oct-16

SECM-NT-ELEC-SCH-006-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 1- 1

28-Oct-16

SECM-NT-ELEC-SCH-007-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR BASEMENT 1- 2

28-Oct-16

SECM-NT-ELEC-SCH-008-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR LOWER GROUND

28-Oct-16

SECM-NT-ELEC-SCH-009-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR LOWER GROUND

28-Oct-16

10

SECM-NT-ELEC-SCH-010-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR GROUND FLOOR

28-Oct-16

11

SECM-NT-ELEC-SCH-011-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR LEVEL 1

28-Oct-16

12

SECM-NT-ELEC-SCH-012-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR FOR LEVEL 2 UNTIL 10 & 24

28-Oct-16

13

SECM-NT-ELEC-SCH-013-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR LEVEL 11 UNTIL 23

28-Oct-16

14

SECM-NT-ELEC-SCH-014-00

DB SCHEMATIC SINGLE LINE DIAGRAM FOR LEVEL 24 & 25

28-Oct-16

15

SECM-NT-ELEC-SCH-015-00

COM DB SCHEMATIC SINGLE LINE DIAGRAM FOR TOWER GF & LEVEL 1

28-Oct-16

16

SECM-NT-ELEC-SCH-016-00

COM DB SCHEMATIC SINGLE LINE DIAGRAM FOR TOWER LEVEL 2 ~ 23

28-Oct-16

17

SECM-NT-ELEC-SCH-017-00

COM DB SCHEMATIC SINGLE LINE DIAGRAM FOR ANNEX LEVEL GF ~ 2

28-Oct-16

18

SECM-NT-ELEC-SCH-018-00

LV MAIN SCHEMATIC DIAGRAM NO.1

28-Oct-16

19

SECM-NT-ELEC-SCH-019-00

LV MAIN SCHEMATIC DIAGRAM NO.2

28-Oct-16

sub. date
0

Approval Date

Infra System
1

SECM-NT-ELEC-INFRA-001-00

COMPOUND LIGHTING LAYOUT

21.10.2016

SECM-NT-ELEC-INFRA-002-00

11KV TNB SSU ROOM

21.10.2016

Detail Installation
1

SECM-NT-ELEC-DT-001-00

SWICTHGEAR DETAIL INSTALLATION LAYOUT

30.12.2016

4.8.16

SECM-NT-ELEC-DT-002-00

TRANSFORMER DETAIL INSTALLATION LAYOUT

30.12.2016

4.8.16

Received Date

sub. date
2/B

Approval
Date

Received Date

sub. date
3/C

Approval
Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

sub. date
0

Approval Date

10.10.16

30.12.2016

SECM-NT-ELEC-DT-003-00

MSB DETAIL INSTALLATION LAYOUT

SECM-NT-ELEC-DT-004-00

GENERATOR DETAIL INSTALLATION LAYOUT

SECM-NT-ELEC-DT-005-00

I-MOS ( Intelligent Modular System ) DETAIL INSTALLATION FOR LIGHTING

30.12.2016

SECM-NT-ELEC-DT-006-00

I-MOS ( Intelligent Modular System ) DETAIL INSTALLATION FOR POWER

30.12.2016

9-Sep-16

Received Date

sub. date
2/B

Approval
Date

Received Date

sub. date
3/C

Approval
Date

Received
Date

sub. date
4/D

Approval
Date

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

BOUSTEAD BUILDING AND MATERIALS SDN BHD


A

AWC

APPROVED

APPROVED WITH COMMENT

#
in A4
size

Received Date: date receive approved


dwgs

M&E DRAWING TRACKING LIST

REJECTED

sub. date
0

Approval
Date

Received Date

sub. date
2/B

Approval
Date

sub. date Approval


Received Date
Date
3/C

Received sub. date Approval


Date
Date
4/D

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

in A3
size
Hard Copy / Qty
Size

AO

A1

FIRE FIGHTING SYSTEM


1

ZSB/NT/M/FF/SD/001

Basement 4 Floor Plan

11.8.2016

11.8.2016

30.9.2016

ZSB/NT/M/FF/SD/002

Basement 3 Floor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/003

Basement 2 Floor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/004

Basement 1 Floor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/005

Lower Ground Foor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/006

Ground Floor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/007

1st Floor Plan

11.8.2016

13.9.2016

30.9.2016

AWC

ZSB/NT/M/FF/SD/008

2nd Floor Plan

11.8.2016

11.8.2016

30.9.2016

ZSB/NT/M/FF/SD/009

3rd Floor Plan

11.8.2016

11.8.2016

30.9.2016

AWC

10

ZSB/NT/M/FF/SD/010

4th, 9th & 10th Floor Plan

11.8.2016

11.8.2016

30.9.2016

11

ZSB/NT/M/FF/SD/011

5th Floor Plan

18/8/2016

11.8.2016

30.9.2016

12

ZSB/NT/M/FF/SD/012

6th & 7th Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

13

ZSB/NT/M/FF/SD/013

8th Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

14

ZSB/NT/M/FF/SD/014

11th & 17 Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

15

ZSB/NT/M/FF/SD/015

12th, 13th, 18th & 19th Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

16

ZSB/NT/M/FF/SD/016

14th & 20th Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

17

ZSB/NT/M/FF/SD/017

15th, 16th, 21st & 22th Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

18

ZSB/NT/M/FF/SD/018

23rd Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

19

ZSB/NT/M/FF/SD/019

Roof Floor Plan

18/8/2016

18/8/2016

30.9.2016

AWC

20

ZSB/NT/M/FF/SD/020

Addressable of Analogue Fire Alarm & Detection Panel

25/8/2016

18/8/2016

30.9.2016

AWC

A3

A4

sub. date
0

Approval
Date

Received Date

sub. date
2/B

Approval
Date

sub. date Approval


Received Date
Date
3/C

Received sub. date Approval


Date
Date
4/D

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

21

ZSB/NT/M/FF/SD/021

Schematic of Hose Reel Piping Layout

25/8/2016

18/8/2016

30.9.2016

AWC

22

ZSB/NT/M/FF/SD/022

Schematic of Sprinkler Piping Layout

25/8/2016

18/8/2016

30.9.2016

AWC

23

ZSB/NT/M/FF/SD/023

Schematic of Wet Riser Piping Layout

25/8/2016

18/8/2016

30.9.2016

AWC

ACMV SYSTEM
1

ACMV SYSTEM -List of Drawing

PCE-NT-SD-ACMV-001-R0

29/8/2016

ACMV SYSTEM - Legend & General Note

PCE-NT-SD-ACMV-002-R0

29/8/2016

ACMV SYSTEM -Site Plan

PCE-NT-SD-ACMV-003-R0

29/8/2016

ACMV SYSTEM- Basement 4

PCE-NT-SD-ACMV-004-R0

15/8/2016

24.8.2016

29.9.2016

AWC

30.9.2016

ACMV SYSTEM- Basement 3

PCE-NT-SD-ACMV-005-R0

15/8/2016

24.8.2016

29.9.2016

AWC

30.9.2016

ACMV SYSTEM- Basement 2

PCE-NT-SD-ACMV-006-R0

29/8/2016

7.9.2016

29.9.2016

AWC

30.9.2016

ACMV SYSTEM- Basement 1

PCE-NT-SD-ACMV-007-R0

29/8/2016

7.9.2016

29.9.2016

AWC

30.9.2016

ACMV SYSTEM- Lower Ground Floor

PCE-NT-SD-ACMV-008-R0

9/9/2016

14.10.2016

ACMV SYSTEM- Ground Floor & AHU Mezzanine


Floor

PCE-NT-SD-ACMV-009-R0

9/9/2016

14.10.2016

10

ACMV SYSTEM- Level 1

PCE-NT-SD-ACMV-010-R0

19/9/2016

11

ACMV SYSTEM- Level 2

PCE-NT-SD-ACMV-011-R0

19/9/2016

12

ACMV SYSTEM- Level 3

PCE-NT-SD-ACMV-012-R0

3/10/2016

13

ACMV SYSTEM- Level 4 (Repeat for Level 9 & 10)

PCE-NT-SD-ACMV-013-R0

3/10/2016

14

ACMV SYSTEM- Level 5

PCE-NT-SD-ACMV-014-R0

10/10/2016

15

ACMV SYSTEM- Level 6 (Repeat for Level 7)

PCE-NT-SD-ACMV-015-R0

10/10/2016

16

ACMV SYSTEM- Level 8

PCE-NT-SD-ACMV-016-R0

17/10/2016

17

ACMV SYSTEM- Level 11 (Repeat for Level 17)

PCE-NT-SD-ACMV-017-R0

17/10/2016

18

ACMV SYSTEM- Level 12 (Repeat for Level 13, 18 &


19)

PCE-NT-SD-ACMV-018-R0

24/10/2016

19

ACMV SYSTEM- Level 14 (Repeat for Level 20)

PCE-NT-SD-ACMV-019-R0

24/10/2016

20

ACMV SYSTEM- Level 15 (Repeat for Level 16, 21 &


22)

PCE-NT-SD-ACMV-020-R0

7/11/2016

A3

A4

21

ACMV SYSTEM- Level 23

PCE-NT-SD-ACMV-021-R0

7/11/2016

22

ACMV SYSTEM- Level 24 (Mechanical Floor)

PCE-NT-SD-ACMV-022-R0

14/11/2016

23

ACMV SYSTEM- Roof Floor

PCE-NT-SD-ACMV-023-R0

14/11/2016

24

ACMV SYSTEM- Chilled Water Piping Schematic 1

PCE-NT-SD-ACMV-024-R0

3/10/2016

25

ACMV SYSTEM- Chilled Water Piping Schematic 2

PCE-NT-SD-ACMV-025-R0

3/10/2016

26

ACMV SYSTEM- Schematic for Ventilation System

PCE-NT-SD-ACMV-026-R0

9/9/2016

27

ACMV SYSTEM- Typical Detail 1

PCE-NT-SD-ACMV-027-R0

19/9/2016

28

ACMV SYSTEM- Typical Detail 2

PCE-NT-SD-ACMV-028-R0

19/9/2016

29

ACMV SYSTEM- Typical Detail 3

PCE-NT-SD-ACMV-029-R0

19/9/2016

30

ACMV SYSTEM- Typical Detail 4

PCE-NT-SD-ACMV-030-R0

19/9/2016

31

ACMV SYSTEM- Typical Detail 5

PCE-NT-SD-ACMV-031-R0

19/9/2016

32

ACMV SYSTEM-Schedule of Equipment

PCE-NT-SD-ACMV-032-R0

21/10/2016

sub. date
0

Approval
Date

COLD WATER PLUMBING SYSTEM


1

NSBHSB/NT/M/CW-00

LIST OF DRAWING

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-01

BASEMENT 4 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-02

BASEMENT 3 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-03

BASEMENT 2 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-04

BASEMENT 1 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-05

LOWER GROUND FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-06

GROUND FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-07

1ST FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/CW-08

TYPICAL FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

Received Date

sub. date
2/B

Approval
Date

sub. date Approval


Received Date
Date
3/C

Received sub. date Approval


Date
Date
4/D

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

sub. date
0

Approval
Date

10

NSBHSB/NT/M/CW-09

LEVEL 23RD FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

11

NSBHSB/NT/M/CW-10

LEVEL 24TH FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

12

NSBHSB/NT/M/CW-11

DRAGRAMMATIC-1

10/8/2016

11.8.2016

30.9.2016

13

NSBHSB/NT/M/CW-12

DRAGRAMMATIC-2

10/8/2016

11.8.2016

30.9.2016

14

NSBHSB/NT/M/CW-13

STANDARD DETAIL 1

10/8/2016

11.8.2016

30.9.2016

15

NSBHSB/NT/M/CW-14

STANDARD DETAIL 2

10/8/2016

11.8.2016

30.9.2016

16

NSBHSB/NT/M/CW-15

TYPICAL FLOOR PLAN (4TH ,9TH & 10)

10/8/2016

11.8.2016

30.9.2016

SANITARY PLUMBING SYSTEM


1

NSBHSB/NT/M/SAN-00

LIST OF DRAWING

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN01

BASEMENT 4 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN02

BASEMENT 3 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN03

BASEMENT 2 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN04

BASEMENT 1 FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN05

LOWER GROUND FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN06

GROUND FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN07

1ST FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

NSBHSB/NT/M/SAN08

2ND FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

10

NSBHSB/NT/M/SAN09

3RD FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

11

NSBHSB/NT/M/SAN10

TYPICAL FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

12

NSBHSB/NT/M/SAN11

MECHANICAL FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

13

NSBHSB/NT/M/SAN12

ROOF FLOOR PLAN

10/8/2016

11.8.2016

30.9.2016

UPDATED : 13/10/2016

3
4
5
6
7
8
9

Received Date

sub. date
2/B

Approval
Date

sub. date Approval


Received Date
Date
3/C

Received sub. date Approval


Date
Date
4/D

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

sub. date
0

Approval
Date

Received Date

sub. date
2/B

Approval
Date

sub. date Approval


Received Date
Date
3/C

Received sub. date Approval


Date
Date
4/D

Status

TARGET SUBM.
DATE

Status

DWG TITLED

Status

DWG NO.

Status

Issue Date / Revision


ITEM

Received
Date

Hard Copy / Qty


Size
AO

A1

A3

A4

COORDINATION DRAWING
ITEM