HOTEL DESIGN GUIDE

SBI - PRELIMENARY DESIGN

A. THE GEOGRAPHIC CRITERIA


As the main segments of customers are very different from each other
(individuals, groups, business, holiday, long and short stay), several locations
are possible: Town center, edge of town, business district, tourist site, etc.
these will all have an influence on the design of the hotel and the architecture
of the building.
The choice of a town and of a development site must satisfy the basic hotel
rule, that a suitable market must exist or must be about to exist:

Is there a potential market (at least 3 segments)?

What type of market (seasonal, segmentation, type of stay, frequency


of stay)?

How will guests gain access to the site?

What will be the main attractions of the hotel?

Is it possible to build a big enough building on the site?

Do main services exist or can they be provided?

What are the constraints from neighboring buildings and from the
environment?
The choice of layout must naturally take into consideration all matters in
connection with security and control over risks:

Access to emergency services

Danger of flooding

Risk of avalanches or landslides

Risk of earthquakes / Tsunami

Risk of cyclones

Atmospheric pollution
Visibility is a major element to be taken into consideration: Swiss-Belinn must
not be a building "enclosed" within a district but must, on the contrary, be an
outstanding or independent building. The notion of space is absolutely basic.
The construction of a hotel at the edge of a town must maintain large areas of
open ground.

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

Apart from that, there are no absolute criteria for the selection of a site or of
an existing building, but, above all, common sense and a certain amount of
intuition must be used.
The environment must be considered, but making allowance for the fact that,
by its very existence, the hotel will modify and enhance this environment,
constitute an area of attraction and will contribute to its expansion. Obviously,
areas which are considered to be dangerous or an unfavorable or unhealthy
environment should be avoided.
Whenever possible, for new buildings, it is desirable to provide a layout on the
site which retains possibilities for extension to the guest bedrooms and to the
public areas.
B.

INTRODUCTION SWISS-BELINN

CLASSIFICATION
Economy, 3-star Classification
CONCEPT

Convenient location in primary, secondary and tertiary cities


Contemporary style architecture
Contemporary interior design and furnishings
F&B BaReLo all-in-one concept (Bar, Restaurant and Lounge)
Appropriate technology
Limited recreational facilities (Gym and swimming pool)
Environmentally adapted
A practical hotel accommodation alternative for the fast moving frequent
traveler

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

DESIGN CONCEPT

Contemporary & functional style

Acoustic comfort throughout the hotel

Sound and light system ensuring the right ambience at all times

High-Speed Wi-Fi throughout all public areas and guest rooms


(Bandwidth = minimum 2 mbps)

Environmentally adapted

Art decoration to be functional, can be repetitive

Fully integrated access & facilities for the disabled

CCTV surveillance system throughout public areas and backof-the-house


ARRIVAL

Building faade to be well presented

Well maintained green areas surrounding the hotel

Ample car parking, covered (where applicable and possible) and secure
LOBBY

Functional lobby, welcoming arrival experience


Modern reception facility, counter style
Seating areas with sofas, chairs and low tables
Lobby convenience store / gift shop (optional)
Easy accessible and key-card operated guests only elevators
Ladies & gents restrooms including one unisex physically challenged
toilet

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

GUEST ROOMS

Guest room size of 24 - 28 m2, including bathroom

Two key areas: bedroom and bathroom

Bedroom area:
Floor: carpet
Ceiling height: Minimum 2.8m
Wall finish: wallpaper

Foyer area:
Floor: hard floor
Ceiling height: Minimum 2.4m
Wall finish: wallpaper

Three points bathroom: shower, vanity & toilet

Bathroom size minimum 5 m2

Retractable clothes line in bathroom

Individually controlled air-conditioning

Appropriate audio visual, IT and telecommunications technology,


including
interactive LED television (minimum 42 inches)

Mini Bar (for small selection of food & beverages)

Coffee & tea making facilities

In-room safe with minimum 15 laptop capacity

Hairdryer near mirror in bathroom (power socket must be water-proof)

All power outlets must be universal


CONFERENCING AND MEETING FACILITIES
(Depending on hotel positioning and market demand)

Conferencing and banqueting facilities, including ballroom, break-out


rooms,
board rooms, pre-function area, dispense bar, cloak room, ladies & gents
restrooms, audio visual control room, combined with the latest audio
visual,
IT and telecommunications technology and daylight provided as much as
possible
LEISURE FACILITIES

Fitness center including welcome area, exercise room(s), ladies & gents
changing rooms and secure access for guests

Swimming pool, including pool side showers, contemporary pool furniture


and ladies & gents changing rooms (could be shared with fitness center)

Kids swimming pool with shaded section

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

GENERAL PRINCIPLE OF ARCHITECTURAL


The architectural section was incorporated into the design guide as reference to
both the architects and interior designers prior to the planning and design of the
building or part of the building complex.
It shows more detailed information on the minimum standards acceptable to the
owners and the group. This also supplements SBI's technical and consultancy
services guideline.
C.

Basic Design Concept

D.

General openness to be visible and felt


Very residential appeal and comfort
Garden view if possible from majority of internal areas
Outside / inside or vice-versa overall design relationship direction
Clear distinction of circulation routes, and
Clear separation of front and back of the house areas.

MODULE SIZE AND DIMENSION CONFIGURATION


D.1.

Lobby size minimum 200 m2


Lobby ceiling minimum 2 storeys high
Public and Physically Challenged toilets minimum total size 50 m2
Reception desk: 4-5 meter long
Staff service area / behind counter wide 1.2 m

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

D.2. Guest Room

Room size 24 28 m2
Room module approx. 4000 mm x 7000 mm (including Bathroom size
approx. 5 m2)
Bathroom with 3-fixtures (shower, vanity, toilet)
Bedroom ceiling height 3000 mm
Bed size 1800 mm x 2000 mm for double bed and 1200 mm x 2000
mm for twin beds
Room foyer and bathroom ceiling height 2400 mm
Guest rooms foyer width minimum 1500 mm
Door size: minimum 900mm width, 2100mm height and 45mm thick
Guest room equipment:
TV LED minimum 42 inches
Absorption system mini-refrigerator, low noise
Telephone set
Safe Deposit 15 Lap top size
RFID door lock system
Coffee maker
Multi-media hub in all suite rooms
Guest rooms corridor width minimum 1800 mm
Guest rooms corridor minimum ceiling height 2400 mm
Guest rooms corridor finish floor is carpet
Noise level maximum 40 dB (inside the guest room)
Guest lift lobby wide minimum 3000 mm
Number of guest lifts:
Up to 150 room keys: 2 lifts
150 300 room keys: 3 lifts
300 room keys plus: 4 lifts

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

D.3. Ballroom Function rooms (Dependent on hotel positioning)


Ballroom minimum size 800m2
Meeting room total size minimum 500m2
Pre-function size minimum 28% from total function room size
Banquet store minimum 12% from total function room size
Public toilets: one for every 50 guests
Service corridor minimum 3000 mm
Minimum clear ceiling height in relation to function room size:
250 m2: 4m
450 m2: 5m
700 m2: 5.5m
1000m2: 6.5m
Above 1000 m2: 7m
Movable partition standard STC 52 55
Kitchen size minimum 30% of the venue size
D.4. BOTH Back-of-the-house
Depending on hotel capacity and facilities
BOTH corridor minimum width 1800 mm
Service lift lobby width minimum 2.5 m
Number of service lifts: 1 for 100 room keys
Office ceiling height minimum 2400 mm
D.5. Hotel Facilities
BaReLo (Bar, Restaurant & Lounge)
Restaurant size:
Room keys x 1.2 (average guest per room) x 2 m2 (per person)
Kitchen size:
30% of restaurant area
Fitness center size minimum 80 m2
Swimming pool size 0.5 m2 x Room keys, minimum 120 m2
Main pool depth maximum 1200 mm; minimum 3 drains
Kids pool depth maximum 600 mm

SBI Indonesia Region Project team


30 September 2015

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

E.

FINISHING MATERIAL
E.1 PUBLIC AREAS

FACILITY

FLOOR

DOORS /
WINDOWS

WALL

CEILING

M/E
Air-Conditioning
(fresh air for
resorts), sprinkler
system, smoke
detectors, CCTV,
sound system,
lighting dimmer
control, internet
access, power
outlets
Air-Conditioning,
sprinkler system,
smoke detectors,
CCTV, sound
system, lighting
dimmer control

as per interior
designer

Restaurant

Carpet
axminster
80/20 sitting
area

Granite /
Wall paper

Gypsum board
- Paint

Fitness
center

Rubber type
flooring or
parquet
flooring as
specified by
gym
consultant.
Carpet or
mats beneath
free weight
area.
Niro Granite
tiles - Natural
type

Tempered
glass

Gypsum board
- Paint

As per
interior
designer

Gypsum board
- Paint

Air Conditioning,
Fresh air,
sprinklers system,
smoke detectors,
CCTV, Sound
system, Dimmers
control, power
outlets

Wooden door
(fire rated)

Mosaic tiles

Mosaic
tiles

Gypsum
board, water
resistance Paint for
indoor ceiling

Pool lamps,
Sound system

as per interior
designer

Spa

Outdoor
swimming
pool

SBI Indonesia Region Project team


30 September 2015

REMARKS

Glass door

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
FACILITY

FLOOR

WALL

Indoor
swimming
pool

Mosaic tiles

Mosaic
tiles

Swimming
pool terrace

Tile - Natural
type ( anti
slip )

Public
Toilets

Niro Granite

Finishing
layer
cement Paint
Niro
Granite

E.2
FACILITY

CEILING
Gypsum
board, water
resistance Paint
Gypsum
board, water
resistance Paint
Gypsum
board, water
resistance Paint

M/E

DOORS /
WINDOWS

Pool lamps,
Sound system

as per interior
designer

Pool lamps,
Sound system

as per interior
designer

Air-conditioning,
exhaust fans,
sprinkler system,
smoke detectors,
power outlets,
public address
system

as per interior
designer

REMARKS

Toto - Grohe

LOBBY
FLOOR

WALL

CEILING

M/E

Drop off
area

Floor
hardener
(heavy duty)

Granite /
Natural
stone

As per
architecture
designer

CCTV system,
paging system

Entrance

Marble

Marble /
Granite

Gypsum board
- Paint

CCTV system

Lobby

Marble

Marble /
Granite

Gypsum board
- Paint

Air-Conditioning
(fresh air for
resorts), sprinkler
system, smoke
detectors, CCTV,
sound system,
lighting dimmer
control

SBI Indonesia Region Project team


30 September 2015

DOORS /
WINDOWS

REMARKS

Automatic
sliding door plus
one single
swing glass
door - tempered

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
FACILITY
Lobby
lounge

FLOOR

WALL

Marble mix
carpet
axminster
80 / 20

Marble /
Granite

Grand stair
case
Lift landing

Marble
Marble

Back office Front office

Homogeneous tiles

Reception
desk

Marble

Public toilets

Niro Granite

Disabled
toilets

Niro Granite

As per
interior
designer
Marble /
Granite
Finishing
layer
cement Paint
As per
interior
designer
Niro
Granite

Niro
Granite

SBI Indonesia Region Project team


30 September 2015

CEILING

M/E

Gypsum board
- Paint

Air-Conditioning
(fresh air for
resorts), sprinkler
system, smoke
detectors, CCTV,
sound system,
lighting dimmer
control
Air conditioning

Gypsum board
- Paint
Gypsum board
- Paint
Gypsum board
- Paint

DOORS /
WINDOWS

REMARKS

Air conditioning
T 5 TL Lighting,
Air conditioning,
power outlets

Wooden door
(fire rated)

Gypsum board
- Paint

Air conditioning,
power outlets

as per interior
designer

Gypsum board
water
resistance Paint
Gypsum board
water
resistance Paint

Air conditioning
and Exhaust

as per interior
designer

Toto - Grohe

Air Conditioning
and Exhaust,
Infrared sensor
for lighting and
water taps

Wooden door
(fire rated)

Toto - Grohe

10

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

E.3 GUEST ROOMS GENERAL


FACILITY

FLOOR

WALL

CEILING

M/E

Emergency
stairs

Screed
Painted and
Step nosing

Finishing
layer
cement Paint

Concrete
exposed Paint

Pressurized fans
and emergency
lamps

Lobby lift
landing

Marble

Wall paper

Gypsum board
- Paint

Guest room
corridors

Carpet
axminster
80/20

Wall paper

Gypsum board
- Paint

Housekeeping
pantries

Tiles

Finishing
layer
cement Paint

Gypsum board
- Paint

Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
T 5 TL lighting ,
Exhaust fan

Wall paper

Gypsum board
Paint

Homogeneous
tiles
Homogeneous
tiles

Aluminium
panels (white
colour)
Aluminium
panels (white
colour)

STANDARD ROOMS
Bedroom
Carpet
axminster
80/20

Bathroom

Bathroom
Shower

Homogeneous tiles
(anti slippery)
Homogeneous tiles
(anti slippery)

SBI Indonesia Region Project team


30 September 2015

DOORS /
WINDOWS

REMARKS

Metal fire door (fire


rated) with push
bar door lock and
alarm system
(BAS)

Metal fire door (fire


rated) according
local fire codes

Wooden door (fire


rated) 110 cm wide
with stainless steel
protection on the
bottom

Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Exhaust fan

Solid wooden door


(fire rated) with
peep hole

Solid wooden door


(sliding door)

Toto
Grohe

Exhaust fan,
water proof
ceiling lamps

Tempered Glass

Toto
Grohe

11

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
JUNIOR SUITES
FACILITY

FLOOR

WALL

CEILING

M/E

Living room

Hard floor /
Marble

Wall paper

Gypsum board
- Paint

Bedroom

Carpet
axminster
80/20psum
board Paint

Wall paper

Gypsum board
paint

Bathroom

Homogeneous tiles
(anti slippery)
Homogeneous tiles
(anti slippery)

Homogeneous
tiles
Homogeneous
tiles

Aluminium
panels
(white colour)
Aluminium
panels
(white colour)

Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Exhaust fan,
power outlets

Hard floor /
Marble

Wall paper

Gypsum board
Paint

Bedroom

Carpet
axminster
80/20

Wall paper

Gypsum board
paint

Bathroom
Shower

Homogeneous tiles
(anti slippery)
Homogeneous tiles
(anti slippery)

Homogeneous
tiles
Homogeneous
tiles

Aluminum
panels (white
colour)
Aluminum
panles (white
colour)

Bathroom
Shower
SUITES
Living room

Bathtub

SBI Indonesia Region Project team


30 September 2015

DOORS /
WINDOWS
Solid wooden door
(fire rated) with
peep hole

REMARKS

Solid wooden door

Solid wooden door


(sliding door)

Toto
Grohe

Exhaust fan,
water proof
ceiling lamp

Tempered Glass

Toto
Grohe

Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Exhaust fan,
water proof
ceiling lamp
Exhaust fan

Solid wooden door


(fire rated) with
peep hole

Solid wooden door

Tempered Glass

Toto
Grohe
Toto
Grohe

12

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
PRESIDENTIAL SUITE
FACILITY

FLOOR

WALL

CEILING

M/E
Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Air Conditioning,
sprinkler system,
smoke detectors,
internet access,
public address
system,
telephone &
universal power
outlets
Exhaust fan,
universal power
outlets
Exhaust fan,
water proof
ceiling lamps
Exhaust fan

Living room

Marble

Wall paper

Gypsum board
Paint

Bedroom

Carpet
axminster
80/20

Wall paper

Gypsum board
Paint

Bathroom

Marble

Marble

Bathroom
Shower

Marble

Marble

Bathtub

Marble

Marble

Aluminum
panels (white
colour)
Aluminum
panels (white
colour)
Aluminum
panels (white
colour)

DOORS /
WINDOWS
Solid wooden door
(fire rated) with
peep hole

REMARKS

Solid wooden door

Solid wooden door


(sliding door)

Toto
Grohe

Tempered Glass

Toto
Grohe
Toto
Grohe

E.4 FUNCTION FACILITIES


FACILITY
Ballroom

FLOOR
Carpet
axminster
80/20

WALL
Padded
wall Interior
wall
(sound
proof)

SBI Indonesia Region Project team


30 September 2015

CEILING

M/E

Gypsum board
- Paint

Air Conditioning,
sprinklers
system, smoke
detectors, CCTV,
internet access,
sound system,
Lighting dimmer
control,
telephone, data &
power outlets,
smoke extract
fans

DOORS /
WINDOWS

REMARKS

as per interior
designer

13

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

DOORS /
WINDOWS

FACILITY

FLOOR

WALL

CEILING

M/E

Meeting
Rooms

Carpet
axminster
80/20

Padded
wall Interior
wall
(sound
proof)

Gypsum board
- Paint

Pre
Function

Marble

As per
interior
designer

Gypsum board
- Paint

Public
Toilets

Niro Granite

Niro
Granite

Gypsum board
water
resistance Paint

Furniture
store

Epoxy resin
floor (anti
slippery)

Finishing
layer
cement Paint

Gypsum board
- Paint

Air Conditioning,
Fresh air,
sprinklers
system, smoke
detectors, CCTV,
Internet access,
Sound system,
Dimmers control,
telephone, data
and power outlets
Air Conditioning,
sprinklers
system, smoke
detectors, CCTV,
internet access,
sound system,
Lighting dimmer
control,
telephone, data &
power outlets,
smoke extract
fans
Air Conditioning,
exhaust fan,
sprinkler system,
smoke detectors,
power outlets,
public address
system
T 5 TL Lighting,
fresh air and
exhaust fan

REMARKS

as per interior
designer

as per interior
designer

as per interior
designer

Toto Grohe

Wooden door (fire


rated) with
stainless steel
protection on the
bottom

E.5 Back Of The House (BOH)


FACILITY

FLOOR

WALL

CEILING

M /E

DOORS /
WINDOWS

Loading
dock/delivery
area

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

Finishing layer
cement - Paint

Concrete
exposed

T 5 TL Lighting,
water outlets and
power outlets

Rolling shutter
with lock

Loading
dock

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

Finishing layer
cement - Paint

Concrete
exposed

T 5 TL Lighting,
water outlets and
power outlets

Rolling shutter
with lock

SBI Indonesia Region Project team


30 September 2015

REMARKS

14

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

FACILITY
Dry garbage

FLOOR

WALL

CEILING

Tiles, anti
slippery
Tiles, anti
slippery

Tiles

Recyclable
garbage
Receiving
office

Tiles, anti
slippery
Tiles

Tiles

Security
office

Tiles

Finishing layer
cement - Paint

Gypsum
board Paint

Human
Resources
office

Tiles

Finishing layer
cement - Paint

Gypsum
board Paint

Accounting
Office

Tiles

Finishing layer
cement - Paint

Gypsum
board Paint

Canteen

Tiles

Finishing layer
cement - Paint

Gypsum
board Paint

House
Keeping

Tiles

Finishing layer
cement - Paint

Gypsum
board Paint

T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection

General
Store

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

Finishing layer
cement - Paint

Gypsum
board Paint

T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection

Wet garbage

Tiles

Finishing layer
cement - Paint

SBI Indonesia Region Project team


30 September 2015

Concrete
exposed
Concrete
exposed

M/E

Concrete
exposed
Gypsum
board Paint

T 5 TL Lighting
T 5 TL Lighting,
Air conditioning,
water outlets and
floor drain
T 5 TL Lighting
T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection
T 5 TL Lighting,
air conditioning,
power outlets,
internet
connection, CCTV
monitors, fire
alarm main
control, lift
supervisory panel
T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection
T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection
T 5 TL Lighting,
Air conditioning,
power outlets, TV
channel

DOORS /
WINDOWS
Rolling shutter
with lock
Rolling shutter
with lock

REMARKS

Rolling shutter
with lock
Wooden door
with half glass

Wooden door
with half glass

Wooden door
with half glass

Wooden door
with half glass

Wooden door
with half glass,
covered
stainless steel
protection on
the bottom
Wooden door
with half glass,
covered
stainless steel
protection on
the bottom
Rolling shutter
with lock

15

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
FACILITY

FLOOR

WALL

M/E
T 5 TL Lighting,
Air conditioning,
fresh air and
exhaust, fire
suppression
system, heat
detectors and
sprinklers, floor
drainage, cold
and hot water,
gas supply, gas
leak detector and
power outlets,
internet
connection
T 5 TL Lighting,
Air conditioning,
fresh air and
exhaust, fire
fighting system,
heat detectors
and sprinklers,
floor drainage,
cold and hot
water, and power
outlets, internet
connection
T 5 TL Lighting,
Air conditioning,
power outlets,
internet
connection

Wooden door
with half glass,
covered
stainless steel
protection on
the bottom

T 5 TL Lighting,
Air conditioning,
power outlets,
fresh air and
exhaust

Wooden door
(fire rated)

Kitchen

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

Full, white tiles

Tiled metal
ceiling - fire
proof, as
per safety
requirement

Laundry

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

White tiles 1.2 m


AFL

Concrete
exposed

Engineering

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

finishing layer
cement - Paint

Concrete
exposed

Service
corridor

Tiles, anti
slippery

Finishing layer
cement - Paint
(1.2 m angle
protector)

Gypsum
board Paint

SBI Indonesia Region Project team


30 September 2015

DOORS /
WINDOWS

CEILING

REMARKS

Metal door - fire


rated

Metal door (fire


rated)

16

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
FACILITY

FLOOR

WALL

CEILING

M/E

DOORS /
WINDOWS

Lockers

Tiles

Tiles

Gypsum
board Paint

T 5 TL Lighting,
Air conditioning,
power outlets,
fresh air and
exhaust

Wooden door
with half glass,
covered
stainless steel
protection on
the bottom

Locker toilet
- shower
area

Tiles, anti
slippery

Tiles

Tiles, anti
slippery

Finishing layer
cement - Paint
(1.2 m angle
protector)

T 5 TL Lighting,
Air conditioning,
power outlets,
fresh air and
exhaust
T 5 TL Lighting,
Air conditioning,
fresh air and
exhaust

Cubicle doors

Service lift
landing

Gypsum
board,
water
resistance Paint
Gypsum
board Paint

Lift machine
room

Epoxy resin
floor (anti
slippery),
thickness
5000 micron

Finishing layer
cement - Paint

Concrete
exposed

T 5 TL Lighting,
Air conditioning,
exhaust

Metal door - fire


rated

Pump room

Floor
Hardener

Finishing layer
cement - Paint

Concrete
exposed
- Paint

T 5 TL Lighting,
fresh air and
exhaust, floor
drainage

Metal door - fire


rated

Ground
water tank

Tiles

Full white tiles

Concrete
exposed
- Paint

T 5 TL Lighting,
fresh air and
exhaust, floor
drainage

Manhole

Sewage
treatment
plant
(STP)

Tiles

Concrete
exposed

Concrete
exposed
- Paint

T 5 TL Lighting,
fresh air and
exhaust, floor
drainage

Metal door - fire


rated

Parking area

Screed

Finishing layer
cement - Paint

Concrete
exposed
- Paint

T 5 TL Lighting,
fresh air and
exhaust, heat
detectors, hydrant
and sprinklers
system, public
address system

SBI Indonesia Region Project team


30 September 2015

REMARKS

Toto Grohe Amstad

Wooden door
(fire rated) with
stainless steel
protection on
the bottom

17

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN
FACILITY

FLOOR

WALL

CEILING

Ramp

Screed

Finishing layer
cement - Paint

Concrete
exposed
- Paint

Emergency
stairs

Screed
painted and
step nosing
for safety

Finishing layer
cement - Paint

Concrete
exposed
- Paint

M/E
T 5 TL Lighting,
fresh air and
exhaust, paging
system
Pressurized fans
and emergency
lamps

DOORS /
WINDOWS

REMARKS

Metal fire door


with push bar
door lock and
alarm system
(BAS)

E.6 Roof
FACILITY

FLOOR

Roof Floor

Screed
Double water
proofing

Emergency
stairs

Screed
painted and
Step nosing

WALL

M/E

DOORS /
WINDOWS

REMARKS

Metal fire door


with push bar
door lock and
alarm system
(BAS)
Finishing layer
cement - Paint

SBI Indonesia Region Project team


30 September 2015

CEILING

Concrete
exposed
- Paint

Emergency
Lamps and
pressurized fans

Metal fire door


with push bar
door lock and
alarm system
(BAS)

18

HOTEL DESIGN GUIDE


SBI - PRELIMENARY DESIGN

F. FIRE LIFE SAFETY


To meet SBI standards, all hotels must incorporate six basic requirements:
Construction materials, fire and smoke compartmentation which
prevent the rapid spread of smoke and fire.
A variety of means for detecting smoke or fire problems, including their
specific location, which immediately alert hotel management to an
emergency.
A means of advising hotel occupants as to the course of action they
must take in the event of a fire emergency.
Firefighting systems, including sprinkler protection systems, hydrants,
hose reels,
Firefighting system for special and specific applications as well as
portable extinguishers and the like.
Means of minimizing risk to hotel occupants by providing suitable
signage, protected means of escape, smoke control, emergency exit
lighting and the like.
Fully enclosed stairs as may be used for fire escapes shall incorporate stair
pressurization systems and smoke extractor.
As a minimum standard, which sets the framework for fire protection and
smoke control, the following codes and standards shall apply:
Legally adopted standards and codes of practice applicable to the
area or country within which the hotel is located.
Additional codes and standards as advised by the Project Manager,
as may apply due to contractual arrangements for the financing of the
Project.
Current NFPA 101 (National Fire Protection Association), where
standards identified above are less than NFPA 101 requirements.
Minimum requirements:
Full Addressable Fire Alarm System.
Evacuation speaker system:
Guest Rooms
Corridors
Public Areas
Back of the House
Hydrants and hose reels, Sprinkler system and Fire extinguishers.
Pressurized fans and Smoke extractor
Kitchen hood Fire Suppression system
Gas Leak Detector
CCTV
Emergency Light and Exit signage

SBI Indonesia Region Project team


30 September 2015