Instruction Manual

SF6 circuit--breaker
GL315X
With spring operating mechanisms
FK3--5

Administrator
AHT

07--2007
E AREVA

First issue
10--01--2007

Compiled by
J. Bossu

Approved by
O. Grejon

D1378EN/01
1/8

Content

Instruction Manual
This page is intentionally blank.

07--2007
E AREVA

D1378EN/01
2/8

Content

Instruction Manual
Safety
Product safety sheets

Annexes

Technical data
Technical characteristics

L10--048EN/02

Description and operation


General description of the circuit--breaker

L12--030EN/02

Description of the interrupting chambers

L12--105EN/02

Pole operation (interrupting principle)

L13--005EN/02

Operating device

L14--006EN/02

SF6 gas monitoring

L20--001EN/06

Packaging - Shipping and storage


Packaging -- Identification -- Storage

07--2007
E AREVA

L22--006EN/03

D1378EN/01
3/8

Content

Instruction Manual
Installation
Erection general instructions

L30--002EN/01

Tightening torques

L31--001EN/01

Erection general procedures

L31--003EN/01

Checking for presence of nitrogen (N2) in pole parts

L31--064EN/01

The installation procedure (advised), developed


below, imposes a lifting equipment with the following
characteristics :
NOTE : If it is impossible to obtain the advocated lifting equipment, one complementary installation procedure is supplied in annexes.

3,000 daN)
(minimum)
H+2m
H
H+1m

Support--frame assembly

L31--135EN/01

Column -- chambers coupling

L31--713EN/01

Tipping down the pole of the circuit--breaker


and vacuum operation

L31--721EN/02

Installing terminals with preparation of contact


surfaces

L31--731EN/02

Installing stress--shields on the interrupting


chambers

L31--751EN/03

Lifting and positionning the pole

L31--761EN/03

Installing the operating device

L31--794EN/01

Continued on next page.

07--2007
E AREVA

D1378EN/01
4/8

Content

Instruction Manual
Installation, continued
Connection the vacuum pump

L31--853EN/02

Vacuum operation

L31--881EN/02

Calculation of the SF6 gas filling pressure for using


the pressure gauge (tool)

L31--901EN/03

Pre--filling with SF6 gas at 0.05 MPa

L31--951EN/02

Filling with SF6 gas

L32--007EN/03

Pre--commissioning inspections

L34--011EN/02

Maintenance plan

L51--004EN/04

Electrical wear limits

L51--053EN/02

Electrical contact densimeter threshold inspection

L51--108EN/02

Intervention on the operating device

L51--304EN/03

Commissioning

Maintenance

07--2007
E AREVA

D1378EN/01
5/8

Content

Instruction Manual
Annexes
Instructions on the handling of used SF6 gas and
decomposition products

L51--400EN/01

Tooling and accessories

L60--017EN/02

Product safety sheets

Acceptance criteria

07--2007
E AREVA

PS0000/A

CA 103 271/3/005

D1378EN/01
6/8

Content

Instruction Manual
Complementary installation procedure
3,000 daN)
(minimum)

The complementary installation procedure, developed below, imposes a lifting equipment with the following characteristics :

H+2m

Support--frame assembly

L31--136EN/01

Lifting and positionning the pole

L31--200EN/03

Installing terminals with preparation of contact


surfaces

L31--501EN/02

Installing stress--shields on the interrupting


chambers

L31--651EN/03

Column -- chambers coupling

L31--714EN/01

Installing the operating device

L31--794EN/01

Installation, continued

07--2007
E AREVA

D1378EN/01
7/8

Content

Instruction Manual
This page is intentionally blank.