Item

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17

Descripcin

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS
ALCANTARILLA TMC 0 36"
ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"

4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00
7.01
7.02
8.00

ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)


CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS
MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL
CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE

8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE


RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

cripcin

SUBRASANTE EN ZONAS DE CORTE

L CONSIDERADO EN TRANSP.)
PIEZA)

PIEDRA MEDIANA

Und.

Metrado

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3
m
m
m

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89
1,010.20
296.50
94.90

0.15 M)
0
5
0

m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

GLB
m

1.00
60.00

A D<=1.00 KM
A D>1.00 KM
1.00 KM
00 KM

GURIDAD VIAL

IAL EXCEDENTE
MENTO

A DE ASFALTO Y CHANCADORA
DE MAQUINAS

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

Precio S/.
1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31
356.75
527.95
786.32

Parcial S/.
1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64
360,388.85
156,537.18
74,621.77

51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41
638,524.36
1,553.46

38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96
638,524.36
93,207.60
499,715.89

2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

PARTIDAS

OBRAS PRELIMINARES
EXPLANACIONES
PAVIMENTO
OBRAS DE ARTE Y DRENAJE
SEALIZACIN
TRANSPORTE
MEDIO AMBIENTE
VARIOS

MESES
1

MESES
7
8
9

10

11

12

13

14

15

PARTIDAS
OBRAS PRELIMINARES
EXPLANACIONES

1
616,006.03
50.21%
191,501.69

PAVIMENTO
OBRAS DE ARTE Y DRENAJE
TRANSPORTE

174,770.40

SEALIZACIN
VARIOS

48,782.13

MEDIO AMBIENTE

62,464.49

COSTO DIRECTO
GASTOS GENERALES 19.38%
UTILIDAD 10%
SUB TOTAL
IGV
TOTALES
AVANCE DE OBRA POR MES (%)
AVANCE DE OBRA ACUMULADO (%)

1,093,524.73
211,956.42
109,352.47
1,414,833.62
268,818.39
1,683,652.01
3.40%
3.40%

2
21,913.61
1.79%
383,003.37

383,003.37

383,003.37

383,003.37

1,083,828.19

1,083,828.19

1,083,828.19

362,380.53

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80

48,782.13

48,782.13

48,782.13

48,782.13

62,464.49

1,165,620.43
225,930.63
116,562.04
1,508,113.11
286,541.49
1,794,654.60
3.62%
7.01%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
15.25%

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
23.29%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
31.53%

MESES
8

383,003.37

383,003.37

383,003.37

383,003.37

1,083,828.19

1,083,828.19

1,083,828.19

1,083,828.19

724,761.05

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80

48,782.13

48,782.13

48,782.13

48,782.13

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
39.57%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
47.80%

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
55.85%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
64.08%

10

11

12

13

383,003.37
1,083,828.19

1,083,828.19

1,083,828.19

1,083,828.19

724,761.05

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80
139,237.69

48,782.13

48,782.13

48,782.13

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
72.12%

2,269,376.66
439,870.21
226,937.67
2,936,184.53
557,875.06
3,494,059.59
7.05%
79.17%

48,782.13
62,464.49

2,206,912.17
427,762.80
220,691.22
2,855,366.19
542,519.58
3,397,885.76
6.85%
86.02%

2,408,614.34
466,858.46
240,861.43
3,116,334.24
592,103.50
3,708,437.74
7.48%
93.50%

14

15
588,914.08 1,226,833.72
48.00%
3,638,532.02

541,914.10

###
8,334,752.08

349,540.80

174,770.40 4,893,571.20

139,237.69

139,237.69

417,713.07

48,782.13

48,782.13

731,731.95

62,464.49

499,715.92

1,079,474.71
209,233.12
107,947.47
1,396,655.30
265,364.51
1,662,019.81
3.35%
96.85%

1,014,168.78
###
196,574.96 6,242,614.84
101,416.88 3,220,687.38
1,312,160.62
###
249,310.52 7,917,333.53
1,561,471.14
###
3.15%
100.00%
100.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2

4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09

RELLENO DE ESTRUCTURAS
ALCANTARILLA TMC 0 36"
ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS

7.00
7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

VARIOS
MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL
CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m3
m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

8,958.89
1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45

RENDIMIENTO

PROGRAMADO
METRADO

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

42.31
356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

379,050.64
360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

731,731.96
638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

VALORIZACION ACTUAL
METRADO

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09
1,414,802.31
268,812.44
1,683,614.75

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

RIZACION ACTUAL
S/.

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

VALORIZACION ACUMULADO
METRADO
S/.

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

ACTUAL
%

SALDO POR VALORIZ


METRADO

50.21%
50.21%
50.21%

0.00
0.00
0.00

5.26%
5.26%
5.26%
5.26%
5.26%
5.26%

0.00
0.00
0.00
0.00
0.00
0.00

5.26%
5.26%
5.26%
5.26%

0.00
0.00
0.00
0.00

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

3.57%
3.57%
3.57%
3.57%
3.57%
3.57%

0.00
0.00
0.00
0.00
0.00
0.00

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09

1,414,802.31
268,812.44

1,414,802.31
268,812.44

1,683,614.75

1,683,614.75

6.67%
6.67%

0.00
0.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO POR VALORIZAR


S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49.79%
49.79%
49.79%

94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

96.43%
96.43%
96.43%
96.43%
96.43%
96.43%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

93.33%
93.33%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.02
0.57
0.04

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82

641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

21,913.61
21,038.28
782.84
92.50
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00

362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
METRADO

0.02
0.57
0.04

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84

0.07
4.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,165,620.44
116,562.04
225,897.24

9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

1,508,079.73
286,535.15
1,794,614.87

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

21,913.61
21,038.28
782.84
92.50
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

100.00%
100.00%
100.00%

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

10,418.87
14,616.87
1,376.17
10,980.03
2,744.90
11,870.37
8,751.88
10,433.49
3,561.11
458.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

637,919.64
612,438.11
22,788.94
2,692.59
574,505.06
355,018.95
48,968.68
210,921.46
33,014.38
9,882.03
37,275.73
14,956.67
219,486.11
45,684.79
130,418.60
42,199.18
1,183.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

ACTUAL
%

52.00%
52.00%
52.00%

15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
524,311.20
131,968.89
106,430.83
132,721.57
102,373.35
26,079.02
24,737.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97,564.26

4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
10.71%
10.71%
10.71%
10.71%
10.71%
10.71%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,165,620.44
116,562.04
225,897.24

0.13
8.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

85,136.58
12,427.68
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,259,145.18
225,914.52
437,822.34

1,508,079.73
286,535.15

2,922,882.03
555,347.59

1,794,614.87

3,478,229.62

13.33%
13.33%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

55,567.30
77,956.65
7,339.59
58,560.16
14,639.46
63,308.67
46,676.67
55,645.27
18,992.60
2,446.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,114.36
1,361.45
93.74
3,298.51
6,181.81
1,447.56
454.45
85,812.54
1,267.44
61.62
463.37
755.23
110.63
8,569.37

588,914.07
565,390.05
21,038.27
2,485.75
3,064,027.01
1,893,434.40
261,166.32
1,124,914.44
176,076.70
52,704.14
198,803.88
79,768.92
1,170,592.61
243,652.24
695,565.90
225,062.29
6,312.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,972,371.52
161,327.11
29,203.02
3,253.69
120,395.54
202,825.14
78,443.37
25,413.01
358,696.42
317,201.99
15,224.85
159,569.98
277,471.98
43,690.51
362,570.17

48.00%
48.00%
48.00%

84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%

966.28
283.61
90.77
709.99
25,579.40
2,821.74
2,135.91
1,015.83
1,040.22
46.75
141.63
30.19
610.83
266.34
4,584.61
1.72
28.70
28.70
28.70
17.22
27,853.91
3.83
31.09
20.09
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

344,719.77
149,731.21
71,377.34
36,528.87
3,071,574.35
279,549.70
168,203.15
123,311.13
110,606.32
402.56
14,037.16
1,252.79
3,939.88
4,333.41
1,280,251.98
27.15
13,394.56
392.56
156.68
271.52
3,342.47
179.25
107,560.25
31,940.67
4,369,259.99
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.13
206,146.21

95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
634,167.70

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

89.29%
89.29%
89.29%
89.29%
89.29%
89.29%

0.87
52.00
65,601.32
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.12
13.12
13.12
0.87
13.12

553,387.78
80,779.92
437,251.40
188,275.79
3,635.62
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
17,065,991.69
1,706,599.17
3,307,389.19
22,079,980.05
4,195,196.21
26,275,176.26

86.67%
86.67%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

10,418.87
14,616.87
1,376.17
10,980.03
2,744.90
11,870.37
0.00
8,751.88
10,433.49
3,561.11
458.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

637,919.64
612,438.11
22,788.94
2,692.59
574,505.06
355,018.95
48,968.68
210,921.46
33,014.38
9,882.03
37,275.73
14,956.67
219,486.11
45,684.79
130,418.60
42,199.18
1,183.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
524,311.20
131,968.89
106,430.83
132,721.57
102,373.35
26,079.02
24,737.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97,564.26

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.13
8.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

85,136.58
12,427.68
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

17,364.78
24,361.45
2,293.62
18,300.05
4,574.83
19,783.96
14,586.46
17,389.15
5,935.19
764.56
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,924.69
185.65
12.78
449.80
842.97
197.39
61.97
11,701.71
172.83
8.40
63.19
102.99
15.09
1,168.55

637,919.64
612,438.11
22,788.94
2,692.59
957,508.43
591,698.24
81,614.47
351,535.76
55,023.97
16,470.04
62,126.21
24,927.79
365,810.19
76,141.32
217,364.34
70,331.96
1,972.56
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
1,087,141.58
21,999.15
3,982.23
443.68
16,417.57
27,657.97
10,696.82
3,465.41
48,913.15
43,254.82
2,076.12
21,759.54
37,837.09
5,957.80
49,441.39

ACTUAL
%

52.00%
52.00%
52.00%

26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

131.77
38.67
12.38
96.82
3,488.10
384.78
291.26
138.52
141.85
6.38
19.31
4.12
83.30
36.32
625.17
0.23
3.91
3.91
3.91
2.35
3,798.26
0.52
4.24
2.74
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47,007.24
20,417.89
9,733.27
4,981.21
418,851.05
38,120.41
22,936.79
16,815.15
15,082.68
54.89
1,914.16
170.84
537.26
590.92
174,579.82
3.70
1,826.53
53.53
21.37
37.03
455.79
24.44
14,667.31
4,355.55
873,852.00
219,948.16
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24

13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.39

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

17.86%
17.86%
17.86%
17.86%
17.86%
17.86%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.20
12.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.87
18,641.52
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00
4,273,605.57
427,360.56
828,224.76

3,431,649.28
652,013.36

5,529,190.89
1,050,546.27

4,083,662.65

6,579,737.15

44,558,357.04

20.00%
20.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

48,621.39
68,212.07
6,422.14
51,240.14
12,809.53
55,395.08
40,842.09
48,689.61
16,618.52
2,140.76
48,508.58
45,028.36
219,739.56
15,988.39
65,921.74
583,096.42
22,070.09
12,831.23
1,237.68
85.22
2,998.64
5,619.83
1,315.97
413.14
78,011.40
1,152.22
56.02
421.24
686.57
100.57
7,790.34

588,914.07
565,390.05
21,038.27
2,485.75
2,681,023.64
1,656,755.10
228,520.53
984,300.14
154,067.11
46,116.13
173,953.40
69,797.80
1,024,268.53
213,195.71
608,620.16
196,929.50
5,523.17
11,380,195.99
1,393,651.64
2,191,530.05
164,804.67
3,384,741.43
496,390.70
3,387,790.19
361,287.32
7,247,610.47
146,661.01
26,548.20
2,957.90
109,450.49
184,386.49
71,312.16
23,102.74
326,087.65
288,365.45
13,840.78
145,063.62
252,247.26
39,718.65
329,609.25

48.00%
48.00%
48.00%

73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%

878.43
257.83
82.52
645.44
23,254.00
2,565.22
1,941.74
923.48
945.65
42.50
128.76
27.44
555.30
242.13
4,167.83
1.57
26.09
26.09
26.09
15.65
25,321.74
3.48
28.26
18.26
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

313,381.61
136,119.28
64,888.49
33,208.07
2,792,340.32
254,136.09
152,911.96
112,101.03
100,551.20
365.96
12,761.06
1,138.90
3,581.71
3,939.46
1,163,865.43
24.68
12,176.87
356.87
142.43
246.83
3,038.61
162.96
97,782.04
29,036.97
4,019,719.19
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51

86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.57

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

82.14%
82.14%
82.14%
82.14%
82.14%
82.14%

0.80
48.00
56,229.70
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.49
74,566.08
374,786.91
161,379.25
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.32
39,375.00
4,617.79
6,390.00
56,250.00
26,288,721.77
2,628,872.18
5,094,754.28
34,012,348.23
6,462,346.16
40,474,694.39

80.00%
80.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

17,364.78
24,361.45
2,293.62
18,300.05
4,574.83
19,783.96
14,586.46
17,389.15
5,935.19
764.56
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,924.69
185.65
12.78
449.80
842.97
197.39
61.97
11,701.71
172.83
8.40
63.19
102.99
15.09
1,168.55

637,919.64
612,438.11
22,788.94
2,692.59
957,508.43
591,698.24
81,614.47
351,535.76
55,023.97
16,470.04
62,126.21
24,927.79
365,810.19
76,141.32
217,364.34
70,331.96
1,972.56
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
1,087,141.58
21,999.15
3,982.23
443.68
16,417.57
27,657.97
10,696.82
3,465.41
48,913.15
43,254.82
2,076.12
21,759.54
37,837.09
5,957.80
49,441.39

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

131.77
38.67
12.38
96.82
3,488.10
384.78
291.26
138.52
141.85
6.38
19.31
4.12
83.30
36.32
625.17
0.23
3.91
3.91
3.91
2.35
3,798.26
0.52
4.24
2.74
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

47,007.24
20,417.89
9,733.27
4,981.21
418,851.05
38,120.41
22,936.79
16,815.15
15,082.68
54.89
1,914.16
170.84
537.26
590.92
174,579.82
3.70
1,826.53
53.53
21.37
37.03
455.79
24.44
14,667.31
4,355.55
873,852.00
219,948.16
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.39

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.20
12.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.87
18,641.52
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

24,310.69
34,106.03
3,211.07
25,620.07
6,404.76
27,697.54
20,421.04
24,344.81
8,309.26
1,070.38
9,239.73
8,576.83
41,855.15
3,045.41
12,556.52
111,065.98
4,203.83
3,207.81
309.42
21.30
749.66
1,404.96
328.99
103.28
19,502.85
288.05
14.00
105.31
171.64
25.14
1,947.58

637,919.64
612,438.11
22,788.94
2,692.59
1,340,511.80
828,377.54
114,260.26
492,150.06
77,033.56
23,058.06
86,976.70
34,898.90
512,134.26
106,597.85
304,310.08
98,464.75
2,761.58
2,167,656.38
265,457.46
417,434.29
31,391.37
644,712.65
94,550.61
645,293.37
68,816.63
1,811,902.63
36,665.25
6,637.05
739.47
27,362.62
46,096.62
17,828.04
5,775.69
81,521.91
72,091.36
3,460.19
36,265.90
63,061.81
9,929.66
82,402.31

ACTUAL
%

52.00%
52.00%
52.00%

36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

219.61
64.46
20.63
161.36
5,813.50
641.30
485.43
230.87
236.41
10.63
32.19
6.86
138.83
60.53
1,041.96
0.39
6.52
6.52
6.52
3.91
6,330.43
0.87
7.07
4.57
16,863.50
192,510.54
35,595.82
202,433.18
4,377.77
38,480.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

78,345.40
34,029.82
16,222.12
8,302.02
698,085.08
63,534.02
38,227.99
28,025.26
25,137.80
91.49
3,190.26
284.73
895.43
984.87
290,966.36
6.17
3,044.22
89.22
35.61
61.71
759.65
40.74
24,445.51
7,259.24
1,223,392.80
307,927.42
248,338.59
309,683.66
238,871.16
60,851.04
57,720.94

21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.52

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.27
16.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.16
24,855.36
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00
6,738,592.13
673,859.21
1,305,939.15

3,350,832.73
636,658.22

8,718,390.50
1,656,494.19

3,987,490.94

10,374,884.69

39,897,664.22

26.67%
26.67%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

41,675.48
58,467.49
5,504.69
43,920.12
10,979.60
47,481.50
35,007.51
41,733.95
14,244.45
1,834.94
43,888.72
40,739.94
198,811.99
14,465.68
59,643.48
527,563.43
19,968.17
11,548.11
1,113.91
76.70
2,698.78
5,057.84
1,184.37
371.83
70,210.26
1,037.00
50.42
379.12
617.92
90.52
7,011.31

588,914.07
565,390.05
21,038.27
2,485.75
2,298,020.27
1,420,075.81
195,874.74
843,685.83
132,057.53
39,528.11
149,102.91
59,826.69
877,944.46
182,739.18
521,674.42
168,796.71
4,734.14
10,296,367.80
1,260,922.91
1,982,812.90
149,108.99
3,062,385.10
449,115.39
3,065,143.50
326,879.01
6,522,849.42
131,994.91
23,893.38
2,662.11
98,505.44
165,947.84
64,180.94
20,792.47
293,478.89
259,528.90
12,456.70
130,557.25
227,022.53
35,746.78
296,648.32

48.00%
48.00%
48.00%

63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%

790.59
232.04
74.27
580.90
20,928.60
2,308.70
1,747.57
831.13
851.09
38.25
115.88
24.70
499.77
217.92
3,751.04
1.41
23.48
23.48
23.48
14.09
22,789.57
3.13
25.43
16.43
50,590.48
577,531.61
106,787.47
607,299.55
13,133.32
115,441.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

282,043.45
122,507.35
58,399.64
29,887.26
2,513,106.28
228,722.48
137,620.76
100,890.92
90,496.08
329.37
11,484.95
1,025.01
3,223.54
3,545.52
1,047,478.89
22.22
10,959.18
321.18
128.19
222.15
2,734.75
146.66
88,003.84
26,133.28
3,670,178.39
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81

78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.44

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

0.73
44.00
56,229.70
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.20
68,352.24
374,786.91
161,379.25
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.32
39,375.00
4,617.79
6,390.00
56,250.00
23,324,019.32
2,332,401.93
4,520,194.94
30,176,616.20
5,733,557.08
35,910,173.28

73.33%
73.33%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

24,310.69
34,106.03
3,211.07
25,620.07
6,404.76
27,697.54
20,421.04
24,344.81
8,309.26
1,070.38
9,239.73
8,576.83
41,855.15
3,045.41
12,556.52
111,065.98
4,203.83
3,207.81
309.42
21.30
749.66
1,404.96
328.99
103.28
19,502.85
288.05
14.00
105.31
171.64
25.14
1,947.58

637,919.64
612,438.11
22,788.94
2,692.59
1,340,511.80
828,377.54
114,260.26
492,150.06
77,033.56
23,058.06
86,976.70
34,898.90
512,134.26
106,597.85
304,310.08
98,464.75
2,761.58
2,167,656.38
265,457.46
417,434.29
31,391.37
644,712.65
94,550.61
645,293.37
68,816.63
1,811,902.63
36,665.25
6,637.05
739.47
27,362.62
46,096.62
17,828.04
5,775.69
81,521.91
72,091.36
3,460.19
36,265.90
63,061.81
9,929.66
82,402.31

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

219.61
64.46
20.63
161.36
5,813.50
641.30
485.43
230.87
236.41
10.63
32.19
6.86
138.83
60.53
1,041.96
0.39
6.52
6.52
6.52
3.91
6,330.43
0.87
7.07
4.57
16,863.50
192,510.54
35,595.82
202,433.18
4,377.77
38,480.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

78,345.40
34,029.82
16,222.12
8,302.02
698,085.08
63,534.02
38,227.99
28,025.26
25,137.80
91.49
3,190.26
284.73
895.43
984.87
290,966.36
6.17
3,044.22
89.22
35.61
61.71
759.65
40.74
24,445.51
7,259.24
1,223,392.80
307,927.42
248,338.59
309,683.66
238,871.16
60,851.04
57,720.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.52

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.27
16.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.16
24,855.36
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

31,256.61
43,850.61
4,128.52
32,940.09
8,234.70
35,611.12
26,255.63
31,300.46
10,683.34
1,376.20
13,859.60
12,865.24
62,782.73
4,568.11
18,834.78
166,598.98
6,305.74
4,490.93
433.19
29.83
1,049.53
1,966.94
460.59
144.60
27,303.99
403.28
19.61
147.44
240.30
35.20
2,726.62

637,919.64
612,438.11
22,788.94
2,692.59
1,723,515.17
1,065,056.84
146,906.05
632,764.36
99,043.14
29,646.08
111,827.18
44,870.02
658,458.33
137,054.38
391,255.81
126,597.53
3,550.61
3,251,484.57
398,186.18
626,151.44
47,087.05
967,068.98
141,825.91
967,940.05
103,224.95
2,536,663.68
51,331.36
9,291.87
1,035.26
38,307.67
64,535.27
24,959.25
8,085.96
114,130.68
100,927.91
4,844.27
50,772.27
88,286.54
13,901.53
115,363.24

ACTUAL
%

52.00%
52.00%
52.00%

47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

307.45
90.24
28.88
225.91
8,138.90
897.83
679.61
323.22
330.98
14.88
45.06
9.61
194.36
84.75
1,458.74
0.55
9.13
9.13
9.13
5.48
8,862.61
1.22
9.89
6.39
21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

109,683.56
47,641.75
22,710.97
11,622.82
977,319.12
88,947.63
53,519.19
39,235.36
35,192.92
128.09
4,466.37
398.62
1,253.60
1,378.81
407,352.90
8.64
4,261.90
124.90
49.85
86.39
1,063.51
57.03
34,223.72
10,162.94
1,572,933.60
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63

30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.65

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

32.14%
32.14%
32.14%
32.14%
32.14%
32.14%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.33
20.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

212,841.45
31,069.20
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
9,515,901.14
951,590.11
1,844,181.64

3,431,649.28
652,013.36

12,311,672.89
2,339,217.85

4,083,662.65

14,650,890.74

36,487,203.45

33.33%
33.33%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

34,729.56
48,722.91
4,587.24
36,600.10
9,149.66
39,567.92
29,172.92
34,778.30
11,870.37
1,529.12
39,268.85
36,451.53
177,884.41
12,942.98
53,365.22
472,030.43
17,866.26
10,264.99
990.14
68.17
2,398.91
4,495.86
1,052.77
330.51
62,409.12
921.77
44.81
336.99
549.26
80.46
6,232.27

588,914.07
565,390.05
21,038.27
2,485.75
1,915,016.90
1,183,396.51
163,228.95
703,071.53
110,047.94
32,940.09
124,252.43
49,855.57
731,620.39
152,282.65
434,728.69
140,663.93
3,945.12
9,212,539.61
1,128,194.19
1,774,095.75
133,413.31
2,740,028.77
401,840.09
2,742,496.82
292,470.69
5,798,088.37
117,328.81
21,238.56
2,366.32
87,560.39
147,509.19
57,049.72
18,482.19
260,870.12
230,692.36
11,072.62
116,050.89
201,797.80
31,774.92
263,687.40

48.00%
48.00%
48.00%

52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

702.75
206.26
66.02
516.35
18,603.20
2,052.17
1,553.39
738.78
756.52
34.00
103.01
21.95
444.24
193.70
3,334.26
1.25
20.87
20.87
20.87
12.52
20,257.39
2.78
22.61
14.61
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

250,705.29
108,895.43
51,910.80
26,566.45
2,233,872.25
203,308.87
122,329.56
89,680.82
80,440.96
292.77
10,208.85
911.12
2,865.37
3,151.57
931,092.35
19.75
9,741.50
285.50
113.95
197.47
2,430.89
130.37
78,225.63
23,229.58
3,320,637.59
835,802.99
674,061.90
840,569.92
648,364.56
165,167.10
156,671.12

69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.31

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

67.86%
67.86%
67.86%
67.86%
67.86%
67.86%

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.37
9.37
9.37
0.62
9.37

425,682.91
62,138.40
312,322.42
134,482.71
2,596.87
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
21,046,426.20
2,104,642.62
4,078,797.40
27,229,866.22
5,173,674.58
32,403,540.80

66.67%
66.67%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

31,256.61
43,850.61
4,128.52
32,940.09
8,234.70
35,611.12
26,255.63
31,300.46
10,683.34
1,376.20
13,859.60
12,865.24
62,782.73
4,568.11
18,834.78
166,598.98
6,305.74
4,490.93
433.19
29.83
1,049.53
1,966.94
460.59
144.60
27,303.99
403.28
19.61
147.44
240.30
35.20
2,726.62

637,919.64
612,438.11
22,788.94
2,692.59
1,723,515.17
1,065,056.84
146,906.05
632,764.36
99,043.14
29,646.08
111,827.18
44,870.02
658,458.33
137,054.38
391,255.81
126,597.53
3,550.61
3,251,484.57
398,186.18
626,151.44
47,087.05
967,068.98
141,825.91
967,940.05
103,224.95
2,536,663.68
51,331.36
9,291.87
1,035.26
38,307.67
64,535.27
24,959.25
8,085.96
114,130.68
100,927.91
4,844.27
50,772.27
88,286.54
13,901.53
115,363.24

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

307.45
90.24
28.88
225.91
8,138.90
897.83
679.61
323.22
330.98
14.88
45.06
9.61
194.36
84.75
1,458.74
0.55
9.13
9.13
9.13
5.48
8,862.61
1.22
9.89
6.39
21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

109,683.56
47,641.75
22,710.97
11,622.82
977,319.12
88,947.63
53,519.19
39,235.36
35,192.92
128.09
4,466.37
398.62
1,253.60
1,378.81
407,352.90
8.64
4,261.90
124.90
49.85
86.39
1,063.51
57.03
34,223.72
10,162.94
1,572,933.60
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.65

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.33
20.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

212,841.45
31,069.20
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

38,202.52
53,595.20
5,045.97
40,260.11
10,064.63
43,524.71
32,090.21
38,256.12
13,057.41
1,682.03
18,479.46
17,153.66
83,710.31
6,090.81
25,113.04
222,131.97
8,407.65
5,774.06
556.96
38.35
1,349.39
2,528.92
592.18
185.91
35,105.13
518.50
25.21
189.56
308.96
45.26
3,505.65

637,919.64
612,438.11
22,788.94
2,692.59
2,106,518.54
1,301,736.13
179,551.84
773,378.67
121,052.73
36,234.10
136,677.67
54,841.13
804,782.41
167,510.91
478,201.55
154,730.32
4,339.63
4,335,312.76
530,914.91
834,868.59
62,782.73
1,289,425.31
189,101.22
1,290,586.74
137,633.27
3,261,424.73
65,997.46
11,946.69
1,331.05
49,252.72
82,973.92
32,090.47
10,396.23
146,739.44
129,764.45
6,228.35
65,278.63
113,511.27
17,873.39
148,324.16

ACTUAL
%

52.00%
52.00%
52.00%

57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

395.30
116.02
37.13
290.45
10,464.30
1,154.35
873.78
415.57
425.54
19.13
57.94
12.35
249.89
108.96
1,875.52
0.70
11.74
11.74
11.74
7.04
11,394.78
1.57
12.72
8.22
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

141,021.72
61,253.68
29,199.82
14,943.63
1,256,553.15
114,361.24
68,810.38
50,445.46
45,248.04
164.68
5,742.48
512.51
1,611.77
1,772.76
523,739.45
11.11
5,479.59
160.59
64.10
111.08
1,367.37
73.33
44,001.92
13,066.64
1,922,474.40
483,885.94
390,246.36
486,645.75
375,368.96
95,623.06
90,704.33

39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.78

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

39.29%
39.29%
39.29%
39.29%
39.29%
39.29%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

255,409.74
37,283.04
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
11,918,423.21
1,191,842.32
2,309,790.42

3,350,832.73
636,658.22

15,420,055.95
2,929,810.63

3,987,490.94

18,349,866.58

31,922,682.34

40.00%
40.00%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

27,783.65
38,978.32
3,669.79
29,280.08
7,319.73
31,654.33
23,338.34
27,822.64
9,496.30
1,223.29
34,648.99
32,163.11
156,956.83
11,420.28
47,086.96
416,497.44
15,764.35
8,981.86
866.37
59.65
2,099.05
3,933.88
921.18
289.20
54,607.98
806.55
39.21
294.87
480.60
70.40
5,453.24

588,914.07
565,390.05
21,038.27
2,485.75
1,532,013.53
946,717.21
130,583.16
562,457.23
88,038.35
26,352.07
99,401.94
39,884.46
585,296.31
121,826.12
347,782.95
112,531.14
3,156.10
8,128,711.42
995,465.46
1,565,378.61
117,717.62
2,417,672.45
354,564.78
2,419,850.13
258,062.37
5,073,327.32
102,662.71
18,583.74
2,070.53
76,615.34
129,070.55
49,918.51
16,171.92
228,261.36
201,855.81
9,688.54
101,544.53
176,573.08
27,803.05
230,726.47

48.00%
48.00%
48.00%

42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%

614.90
180.48
57.77
451.81
16,277.80
1,795.65
1,359.22
646.43
661.96
29.75
90.13
19.21
388.71
169.49
2,917.48
1.10
18.26
18.26
18.26
10.96
17,725.22
2.43
19.78
12.78
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

219,367.13
95,283.50
45,421.95
23,245.65
1,954,638.22
177,895.26
107,038.37
78,470.72
70,385.84
256.17
8,932.74
797.23
2,507.20
2,757.62
814,705.80
17.28
8,523.81
249.81
99.70
172.78
2,127.03
114.07
68,447.43
20,325.88
2,971,096.79
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42

60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.18

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

60.71%
60.71%
60.71%
60.71%
60.71%
60.71%

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.37
9.37
9.37
0.62
9.37

383,114.62
55,924.56
312,322.42
134,482.71
2,596.87
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
18,144,188.24
1,814,418.82
3,516,343.68
23,474,950.75
4,460,240.64
27,935,191.39

60.00%
60.00%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

38,202.52
53,595.20
5,045.97
40,260.11
10,064.63
43,524.71
32,090.21
38,256.12
13,057.41
1,682.03
18,479.46
17,153.66
83,710.31
6,090.81
25,113.04
222,131.97
8,407.65
5,774.06
556.96
38.35
1,349.39
2,528.92
592.18
185.91
35,105.13
518.50
25.21
189.56
308.96
45.26
3,505.65

637,919.64
612,438.11
22,788.94
2,692.59
2,106,518.54
1,301,736.13
179,551.84
773,378.67
121,052.73
36,234.10
136,677.67
54,841.13
804,782.41
167,510.91
478,201.55
154,730.32
4,339.63
4,335,312.76
530,914.91
834,868.59
62,782.73
1,289,425.31
189,101.22
1,290,586.74
137,633.27
3,261,424.73
65,997.46
11,946.69
1,331.05
49,252.72
82,973.92
32,090.47
10,396.23
146,739.44
129,764.45
6,228.35
65,278.63
113,511.27
17,873.39
148,324.16

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

395.30
116.02
37.13
290.45
10,464.30
1,154.35
873.78
415.57
425.54
19.13
57.94
12.35
249.89
108.96
1,875.52
0.70
11.74
11.74
11.74
7.04
11,394.78
1.57
12.72
8.22
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

141,021.72
61,253.68
29,199.82
14,943.63
1,256,553.15
114,361.24
68,810.38
50,445.46
45,248.04
164.68
5,742.48
512.51
1,611.77
1,772.76
523,739.45
11.11
5,479.59
160.59
64.10
111.08
1,367.37
73.33
44,001.92
13,066.64
1,922,474.40
483,885.94
390,246.36
486,645.75
375,368.96
95,623.06
90,704.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.78

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

255,409.74
37,283.04
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

45,148.43
63,339.78
5,963.41
47,580.13
11,894.56
51,438.29
37,924.80
45,211.78
15,431.49
1,987.85
23,099.33
21,442.07
104,637.89
7,613.52
31,391.30
277,664.96
10,509.57
7,057.18
680.72
46.87
1,649.25
3,090.90
723.78
227.23
42,906.27
633.72
30.81
231.68
377.62
55.32
4,284.69

637,919.64
612,438.11
22,788.94
2,692.59
2,489,521.91
1,538,415.43
212,197.63
913,992.97
143,062.32
42,822.12
161,528.15
64,812.25
951,106.48
197,967.44
565,147.28
182,863.10
5,128.65
5,419,140.95
663,643.64
1,043,585.74
78,478.42
1,611,781.63
236,376.52
1,613,233.42
172,041.58
3,986,185.78
80,663.56
14,601.51
1,626.84
60,197.77
101,412.57
39,221.69
12,706.51
179,348.21
158,601.00
7,612.43
79,784.99
138,735.99
21,845.26
181,285.09

ACTUAL
%

52.00%
52.00%
52.00%

68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

483.14
141.80
45.39
354.99
12,789.70
1,410.87
1,067.96
507.91
520.11
23.38
70.82
15.09
305.42
133.17
2,292.30
0.86
14.35
14.35
14.35
8.61
13,926.96
1.91
15.54
10.04
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

172,359.89
74,865.61
35,688.67
18,264.44
1,535,787.18
139,774.85
84,101.58
61,655.56
55,303.16
201.28
7,018.58
626.40
1,969.94
2,166.70
640,125.99
13.58
6,697.28
196.28
78.34
135.76
1,671.23
89.63
53,780.12
15,970.34
2,272,015.20
571,865.21
461,200.25
575,126.79
443,617.86
113,009.07
107,196.03

47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.91

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

46.43%
46.43%
46.43%
46.43%
46.43%
46.43%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.03
43,496.88
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00
14,758,196.71
1,475,819.67
2,860,138.52

3,431,649.28
652,013.36

19,094,154.90
3,627,889.43

4,083,662.65

22,722,044.34

28,416,049.86

46.67%
46.67%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

20,837.74
29,233.74
2,752.35
21,960.06
5,489.80
23,740.75
17,503.75
20,866.98
7,122.22
917.47
30,029.12
27,874.70
136,029.25
9,897.57
40,808.70
360,964.45
13,662.43
7,698.74
742.61
51.13
1,799.19
3,371.90
789.58
247.88
46,806.84
691.33
33.61
252.75
411.94
60.34
4,674.20

588,914.07
565,390.05
21,038.27
2,485.75
1,149,010.16
710,037.92
97,937.37
421,842.92
66,028.76
19,764.05
74,551.46
29,913.35
438,972.24
91,369.59
260,837.22
84,398.36
2,367.07
7,044,883.23
862,736.73
1,356,661.46
102,021.94
2,095,316.12
307,289.48
2,097,203.45
223,654.06
4,348,566.27
87,996.61
15,928.92
1,774.74
65,670.29
110,631.90
42,787.29
13,861.64
195,652.59
173,019.27
8,304.47
87,038.17
151,348.35
23,831.19
197,765.55

48.00%
48.00%
48.00%

31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%

527.06
154.70
49.51
387.27
13,952.40
1,539.13
1,165.04
554.09
567.39
25.50
77.25
16.47
333.18
145.28
2,500.70
0.94
15.65
15.65
15.65
9.39
15,193.04
2.09
16.96
10.96
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

188,028.96
81,671.57
38,933.10
19,924.84
1,675,404.19
152,481.65
91,747.17
67,260.62
60,330.72
219.58
7,656.64
683.34
2,149.03
2,363.68
698,319.26
14.81
7,306.12
214.12
85.46
148.10
1,823.17
97.77
58,669.23
17,422.18
2,621,555.99
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72

52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.05

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

53.57%
53.57%
53.57%
53.57%
53.57%
53.57%

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.33
49,710.72
249,857.93
107,586.16
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.52
4,260.00
37,500.00
15,804,130.63
1,580,413.06
3,062,840.52
20,447,384.21
3,885,003.00
24,332,387.21

53.33%
53.33%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

45,148.43
63,339.78
5,963.41
47,580.13
11,894.56
51,438.29
0.00
37,924.80
45,211.78
15,431.49
1,987.85
23,099.33
21,442.07
104,637.89
7,613.52
31,391.30
277,664.96
10,509.57
7,057.18
680.72
46.87
1,649.25
3,090.90
723.78
227.23
42,906.27
633.72
30.81
231.68
377.62
55.32
4,284.69

637,919.64
612,438.11
22,788.94
2,692.59
2,489,521.91
1,538,415.43
212,197.63
913,992.97
143,062.32
42,822.12
161,528.15
64,812.25
951,106.48
197,967.44
565,147.28
182,863.10
5,128.65
5,419,140.95
663,643.64
1,043,585.74
78,478.42
1,611,781.63
236,376.52
1,613,233.42
172,041.58
3,986,185.78
80,663.56
14,601.51
1,626.84
60,197.77
101,412.57
39,221.69
12,706.51
179,348.21
158,601.00
7,612.43
79,784.99
138,735.99
21,845.26
181,285.09

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

483.14
141.80
45.39
354.99
12,789.70
1,410.87
1,067.96
507.91
520.11
23.38
70.82
15.09
305.42
133.17
2,292.30
0.86
14.35
14.35
14.35
8.61
13,926.96
1.91
15.54
10.04
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

172,359.89
74,865.61
35,688.67
18,264.44
1,535,787.18
139,774.85
84,101.58
61,655.56
55,303.16
201.28
7,018.58
626.40
1,969.94
2,166.70
640,125.99
13.58
6,697.28
196.28
78.34
135.76
1,671.23
89.63
53,780.12
15,970.34
2,272,015.20
571,865.21
461,200.25
575,126.79
443,617.86
113,009.07
107,196.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.91

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.03
43,496.88
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

52,094.34
73,084.36
6,880.86
54,900.15
13,724.49
59,351.87
43,759.38
52,167.44
17,805.56
2,293.67
27,719.19
25,730.49
125,565.46
9,136.22
37,669.57
333,197.95
12,611.48
8,340.30
804.49
55.39
1,949.12
3,652.89
855.38
268.54
50,707.41
748.94
36.41
273.81
446.27
65.37
5,063.72

637,919.64
612,438.11
22,788.94
2,692.59
2,872,525.28
1,775,094.72
244,843.42
1,054,607.27
165,071.91
49,410.13
186,378.64
74,783.36
1,097,430.56
228,423.97
652,093.02
210,995.89
5,917.68
6,502,969.14
796,372.37
1,252,302.88
94,174.10
1,934,137.96
283,651.83
1,935,880.11
206,449.90
4,710,946.83
95,329.66
17,256.33
1,922.63
71,142.82
119,851.22
46,352.90
15,016.78
211,956.97
187,437.54
8,996.51
94,291.35
163,960.72
25,817.12
214,246.01

ACTUAL
%

52.00%
52.00%
52.00%

78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

570.98
167.59
53.64
419.54
15,115.10
1,667.39
1,262.13
600.26
614.67
27.63
83.69
17.84
360.95
157.38
2,709.09
1.02
16.96
16.96
16.96
10.17
16,459.13
2.26
18.37
11.87
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

203,698.05
88,477.53
42,177.52
21,585.24
1,815,021.22
165,188.46
99,392.77
72,865.67
65,358.28
237.88
8,294.69
740.29
2,328.11
2,560.65
756,512.54
16.04
7,914.97
231.97
92.58
160.44
1,975.10
105.92
63,558.33
18,874.03
2,621,556.00
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72

56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.04

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

53.57%
53.57%
53.57%
53.57%
53.57%
53.57%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.32
49,710.72
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00
17,098,254.29
1,709,825.43
3,313,641.68

3,350,832.73
636,658.22

22,121,721.40
4,203,127.07

3,987,490.94

26,324,848.47

23,947,700.45

53.33%
53.33%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

13,891.83
19,489.16
1,834.90
14,640.04
3,659.87
15,827.17
11,669.17
13,911.32
4,748.15
611.65
25,409.26
23,586.28
115,101.68
8,374.87
34,530.43
305,431.46
11,560.52
6,415.62
618.84
42.61
1,499.32
2,809.91
657.98
206.57
39,005.70
576.11
28.01
210.62
343.29
50.29
3,895.17

588,914.07
565,390.05
21,038.27
2,485.75
766,006.79
473,358.62
65,291.58
281,228.62
44,019.18
13,176.04
49,700.97
19,942.23
292,648.16
60,913.06
173,891.48
56,265.57
1,578.05
5,961,055.04
730,008.00
1,147,944.31
86,326.26
1,772,959.79
260,014.17
1,774,556.76
189,245.74
3,623,805.22
73,330.51
13,274.10
1,478.95
54,725.24
92,193.25
35,656.08
11,551.37
163,043.83
144,182.72
6,920.39
72,531.81
126,123.63
19,859.32
164,804.62

48.00%
48.00%
48.00%

21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%

439.22
128.91
41.26
322.72
11,627.00
1,282.61
970.87
461.74
472.83
21.25
64.38
13.72
277.65
121.07
2,083.91
0.78
13.04
13.04
13.04
7.83
12,660.87
1.74
14.13
9.13
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

156,690.80
68,059.64
32,444.25
16,604.03
1,396,170.15
127,068.04
76,455.98
56,050.51
50,275.60
182.98
6,380.53
569.45
1,790.86
1,969.73
581,932.71
12.34
6,088.43
178.43
71.22
123.42
1,519.30
81.48
48,891.02
14,518.49
2,272,015.19
571,865.21
461,200.24
575,126.79
443,617.86
113,009.07
107,196.03

43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.92

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

46.43%
46.43%
46.43%
46.43%
46.43%
46.43%

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.04
43,496.88
249,857.93
107,586.16
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.52
4,260.00
37,500.00
12,964,357.16
1,296,435.72
2,512,492.42
16,773,285.30
3,186,924.21
19,960,209.50

46.67%
46.67%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

52,094.34
73,084.36
6,880.86
54,900.15
13,724.49
59,351.87
43,759.38
52,167.44
17,805.56
2,293.67
27,719.19
25,730.49
125,565.46
9,136.22
37,669.57
333,197.95
12,611.48
8,340.30
804.49
55.39
1,949.12
3,652.89
855.38
268.54
50,707.41
748.94
36.41
273.81
446.27
65.37
5,063.72

637,919.64
612,438.11
22,788.94
2,692.59
2,872,525.28
1,775,094.72
244,843.42
1,054,607.27
165,071.91
49,410.13
186,378.64
74,783.36
1,097,430.56
228,423.97
652,093.02
210,995.89
5,917.68
6,502,969.14
796,372.37
1,252,302.88
94,174.10
1,934,137.96
283,651.83
1,935,880.11
206,449.90
4,710,946.83
95,329.66
17,256.33
1,922.63
71,142.82
119,851.22
46,352.90
15,016.78
211,956.97
187,437.54
8,996.51
94,291.35
163,960.72
25,817.12
214,246.01

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

570.98
167.59
53.64
419.54
15,115.10
1,667.39
1,262.13
600.26
614.67
27.63
83.69
17.84
360.95
157.38
2,709.09
1.02
16.96
16.96
16.96
10.17
16,459.13
2.26
18.37
11.87
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

203,698.05
88,477.53
42,177.52
21,585.24
1,815,021.22
165,188.46
99,392.77
72,865.67
65,358.28
237.88
8,294.69
740.29
2,328.11
2,560.65
756,512.54
16.04
7,914.97
231.97
92.58
160.44
1,975.10
105.92
63,558.33
18,874.03
2,621,556.00
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.04

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.32
49,710.72
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
32,339.06
30,018.90
146,493.04
10,658.92
43,947.83
388,730.95
14,713.39
9,623.43
928.26
63.91
2,248.98
4,214.87
986.97
309.85
58,508.55
864.16
42.01
315.93
514.93
75.43
5,842.75

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
7,586,797.33
929,101.09
1,461,020.03
109,869.78
2,256,494.28
330,927.13
2,258,526.79
240,858.22
5,435,707.88
109,995.76
19,911.15
2,218.42
82,087.87
138,289.87
53,484.12
17,327.06
244,565.74
216,274.09
10,380.58
108,797.71
189,185.44
29,788.99
247,206.94

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

658.83
193.37
61.89
484.08
17,440.50
1,923.91
1,456.30
692.61
709.24
31.88
96.57
20.58
416.48
181.60
3,125.87
1.17
19.57
19.57
19.57
11.74
18,991.30
2.61
21.20
13.70
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

235,036.21
102,089.46
48,666.37
24,906.05
2,094,255.25
190,602.07
114,683.97
84,075.77
75,413.40
274.47
9,570.79
854.18
2,686.28
2,954.60
872,899.08
18.51
9,132.65
267.65
106.83
185.13
2,278.96
122.22
73,336.53
21,777.73
2,971,096.80
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42

65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.17

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

60.71%
60.71%
60.71%
60.71%
60.71%
60.71%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

383,114.61
55,924.56
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
20,000,492.28
2,000,049.23
3,876,095.40

3,431,649.28
652,013.36

25,876,636.91
4,916,561.01

4,083,662.65

30,793,197.93

20,344,896.27

60.00%
60.00%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
20,789.39
19,297.87
94,174.10
6,852.17
28,252.17
249,898.46
9,458.61
5,132.49
495.07
34.09
1,199.46
2,247.93
526.39
165.26
31,204.56
460.89
22.41
168.50
274.63
40.23
3,116.14

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
4,877,226.85
597,279.27
939,227.16
70,630.57
1,450,603.47
212,738.87
1,451,910.08
154,837.42
2,899,044.17
58,664.40
10,619.28
1,183.16
43,780.19
73,754.60
28,524.86
9,241.10
130,435.06
115,346.18
5,536.31
58,025.45
100,898.90
15,887.46
131,843.70

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%

351.37
103.13
33.01
258.18
9,301.60
1,026.09
776.70
369.39
378.26
17.00
51.50
10.98
222.12
96.85
1,667.13
0.63
10.43
10.43
10.43
6.26
10,128.70
1.39
11.30
7.30
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

125,352.64
54,447.71
25,955.40
13,283.23
1,116,936.12
101,654.43
61,164.78
44,840.41
40,220.48
146.38
5,104.42
455.56
1,432.69
1,575.78
465,546.17
9.87
4,870.75
142.75
56.97
98.73
1,215.44
65.18
39,112.82
11,614.79
1,922,474.39
483,885.94
390,246.36
486,645.74
375,368.96
95,623.06
90,704.33

34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.79

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

39.29%
39.29%
39.29%
39.29%
39.29%
39.29%

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.62
5.62
5.62
0.37
5.62

255,409.75
37,283.04
187,393.44
80,689.62
1,558.12
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
10,561,835.06
1,056,183.51
2,046,883.63
13,664,902.20
2,596,331.42
16,261,233.62

40.00%
40.00%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
32,339.06
30,018.90
146,493.04
10,658.92
43,947.83
388,730.95
14,713.39
9,623.43
928.26
63.91
2,248.98
4,214.87
986.97
309.85
58,508.55
864.16
42.01
315.93
514.93
75.43
5,842.75

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
7,586,797.33
929,101.09
1,461,020.03
109,869.78
2,256,494.28
330,927.13
2,258,526.79
240,858.22
5,435,707.88
109,995.76
19,911.15
2,218.42
82,087.87
138,289.87
53,484.12
17,327.06
244,565.74
216,274.09
10,380.58
108,797.71
189,185.44
29,788.99
247,206.94

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

658.83
193.37
61.89
484.08
17,440.50
1,923.91
1,456.30
692.61
709.24
31.88
96.57
20.58
416.48
181.60
3,125.87
1.17
19.57
19.57
19.57
11.74
18,991.30
2.61
21.20
13.70
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

235,036.21
102,089.46
48,666.37
24,906.05
2,094,255.25
190,602.07
114,683.97
84,075.77
75,413.40
274.47
9,570.79
854.18
2,686.28
2,954.60
872,899.08
18.51
9,132.65
267.65
106.83
185.13
2,278.96
122.22
73,336.53
21,777.73
2,971,096.80
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.17

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

383,114.61
55,924.56
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04
55,428.55
66,078.76
22,553.71
2,905.32
36,958.92
34,307.32
167,420.62
12,181.63
50,226.09
444,263.94
16,815.30
10,906.55
1,052.03
72.43
2,548.85
4,776.85
1,118.57
351.17
66,309.69
979.38
47.61
358.06
583.59
85.49
6,621.79

637,919.64
612,438.11
22,788.94
2,692.59
3,638,532.02
2,248,453.32
310,135.00
1,335,835.88
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.70
289,337.03
825,984.49
267,261.46
7,495.73
8,670,625.52
1,061,829.82
1,669,737.18
125,565.46
2,578,850.61
378,202.43
2,581,173.48
275,266.53
6,160,468.93
124,661.86
22,565.97
2,514.21
93,032.91
156,728.52
60,615.33
19,637.33
277,174.51
245,110.63
11,764.66
123,304.07
214,410.17
33,760.85
280,167.86

ACTUAL
%

SALDO POR VALOR


METRADO

52.00%
52.00%
52.00%

0.48
15.25
0.96

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

16,169.53
15,009.45
73,246.52
5,329.46
21,973.91
194,365.47
7,356.70

73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%

3,849.37
371.30
25.57
899.59
1,685.95
394.79
123.94
23,403.42
345.67
16.81
126.37
205.97
30.17
2,337.10

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

746.67
219.15
70.14
548.63
19,765.90
2,180.43
1,650.48
784.96
803.80
36.13
109.44
23.33
472.01
205.81
3,542.65
1.33
22.17
22.17
22.17
13.30
21,523.48
2.96
24.02
15.52
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

266,374.37
115,701.39
55,155.22
28,226.86
2,373,489.28
216,015.67
129,975.16
95,285.87
85,468.52
311.07
10,846.90
968.07
3,044.46
3,348.54
989,285.62
20.98
10,350.34
303.34
121.07
209.81
2,582.82
138.51
83,114.74
24,681.43
3,320,637.60
835,802.99
674,061.90
840,569.92
648,364.57
165,167.10
156,671.12

73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%

263.53
77.35
24.76
193.63
6,976.20
769.57
582.52
277.04
283.70
12.75
38.63
8.23
166.59
72.64
1,250.35
0.47
7.83
7.83
7.83
4.70
7,596.52
1.04
8.48
5.48

67.86%
67.86%
67.86%
67.86%
67.86%
67.86%

21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.30

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

425,682.90
62,138.40
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
22,278,085.37
2,227,808.54
4,317,492.94

3,350,832.73
636,658.22

28,823,386.85
5,476,443.50

3,987,490.94

34,299,830.35

15,972,718.56

66.67%
66.67%

0.33
20.00

62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.62
5.62
5.62
0.37
5.62

SALDO POR VALORIZAR


S/.

588,914.07
565,390.05
21,038.27
2,485.75
0.05
0.03
0.00
0.02
0.00
0.00
0.00
0.00
0.02
0.00
0.01
0.00
0.00
3,793,398.66
464,550.55
730,510.02
54,934.89
1,128,247.14
165,463.57
1,129,263.40
120,429.11
2,174,283.12
43,998.30
7,964.46
887.37
32,835.15
55,315.95
21,393.65
6,930.82
97,826.29
86,509.63
4,152.23
43,519.08
75,674.18
11,915.59
98,882.77

48.00%
48.00%
48.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%

94,014.48
40,835.78
19,466.55
9,962.42
837,702.09
76,240.83
45,873.59
33,630.31
30,165.36
109.79
3,828.32
341.67
1,074.51
1,181.84
349,159.63
7.41
3,653.06
107.06
42.73
74.05
911.58
48.89
29,334.61
8,711.09
1,572,933.59
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63

26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.66

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

32.14%
32.14%
32.14%
32.14%
32.14%
32.14%

212,841.46
31,069.20
187,393.44
80,689.62
1,558.12
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
7,784,526.08
778,452.61
1,508,641.15
10,071,619.85
1,913,607.77
11,985,227.62

33.33%
33.33%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
36,958.92
34,307.32
167,420.62
12,181.63
50,226.09
444,263.94
16,815.30
10,906.55
1,052.03
72.43
2,548.85
4,776.85
1,118.57
351.17
66,309.69
979.38
47.61
358.06
583.59
85.49
6,621.79

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
8,670,625.52
1,061,829.82
1,669,737.18
125,565.46
2,578,850.61
378,202.43
2,581,173.48
275,266.53
6,160,468.93
124,661.86
22,565.97
2,514.21
93,032.91
156,728.52
60,615.33
19,637.33
277,174.51
245,110.63
11,764.66
123,304.07
214,410.17
33,760.85
280,167.86

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

746.67
219.15
70.14
548.63
19,765.90
2,180.43
1,650.48
784.96
803.80
36.13
109.44
23.33
472.01
205.81
3,542.65
1.33
22.17
22.17
22.17
13.30
21,523.48
2.96
24.02
15.52
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

266,374.37
115,701.39
55,155.22
28,226.86
2,373,489.28
216,015.67
129,975.16
95,285.87
85,468.52
311.07
10,846.90
968.07
3,044.46
3,348.54
989,285.62
20.98
10,350.34
303.34
121.07
209.81
2,582.82
138.51
83,114.74
24,681.43
3,320,637.60
835,802.99
674,061.90
840,569.92
648,364.57
165,167.10
156,671.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.30

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,269,376.66
226,937.67
439,805.20
2,936,119.52
557,862.71
3,493,982.23

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

425,682.90
62,138.40
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
41,578.79
38,595.73
188,348.20
13,704.33
56,504.35
499,796.93
18,917.22
12,189.67
1,175.79
80.96
2,848.71
5,338.83
1,250.17
392.48
74,110.83
1,094.61
53.22
400.18
652.25
95.55
7,400.82

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
9,754,453.71
1,194,558.55
1,878,454.33
141,261.15
2,901,206.94
425,477.74
2,903,820.16
309,674.85
6,885,229.98
139,327.96
25,220.79
2,810.00
103,977.96
175,167.17
67,746.55
21,947.60
309,783.27
273,947.18
13,148.74
137,810.44
239,634.89
37,732.72
313,128.79

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

834.51
244.93
78.40
613.17
22,091.30
2,436.96
1,844.65
877.30
898.37
40.38
122.32
26.07
527.54
230.02
3,959.43
1.49
24.78
24.78
24.78
14.87
24,055.65
3.30
26.85
17.35
50,590.49
577,531.61
106,787.47
607,299.55
13,133.32
115,441.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

297,712.53
129,313.32
61,644.07
31,547.66
2,652,723.31
241,429.28
145,266.36
106,495.98
95,523.64
347.66
12,123.01
1,081.96
3,402.63
3,742.49
1,105,672.17
23.45
11,568.03
339.03
135.31
234.49
2,886.68
154.81
92,892.94
27,585.13
3,670,178.40
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81

82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.43

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,269,376.66
226,937.67
439,805.20

0.73
44.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.19
68,352.24
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00
21,221,252.46
2,122,125.25
4,112,678.73

2,936,119.52
557,862.71

27,456,056.43
5,216,650.72

3,493,982.23

32,672,707.15

12,273,742.61

73.33%
73.33%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
11,549.66
10,721.04
52,318.94
3,806.76
15,695.65
138,832.48
5,254.78
2,566.25
247.54
17.04
599.73
1,123.97
263.19
82.63
15,602.28
230.44
11.20
84.25
137.31
20.11
1,558.07

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
2,709,570.47
331,821.82
521,792.87
39,239.21
805,890.82
118,188.26
806,616.71
86,020.79
1,449,522.07
29,332.20
5,309.64
591.58
21,890.10
36,877.30
14,262.43
4,620.55
65,217.53
57,673.09
2,768.16
29,012.72
50,449.45
7,943.73
65,921.85

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%

175.69
51.57
16.50
129.09
4,650.80
513.04
388.35
184.70
189.13
8.50
25.75
5.49
111.06
48.43
833.57
0.31
5.22
5.22
5.22
3.13
5,064.35
0.70
5.65
3.65
16,863.49
192,510.54
35,595.82
202,433.18
4,377.77
38,480.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

62,676.32
27,223.86
12,977.70
6,641.61
558,468.05
50,827.22
30,582.39
22,420.20
20,110.24
73.19
2,552.21
227.78
716.34
787.89
232,773.08
4.94
2,435.37
71.37
28.49
49.37
607.72
32.59
19,556.41
5,807.39
1,223,392.79
307,927.42
248,338.59
309,683.65
238,871.15
60,851.04
57,720.94

17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.53

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

0.27
16.00
18,743.23
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.17
24,855.36
124,928.95
53,793.07
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.77
13,125.00
1,539.26
2,130.00
18,750.00
5,702,542.82
570,254.28
1,105,152.80
7,377,949.90
1,401,810.48
8,779,760.38

26.67%
26.67%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
41,578.79
38,595.73
188,348.20
13,704.33
56,504.35
499,796.93
18,917.22
12,189.67
1,175.79
80.96
2,848.71
5,338.83
1,250.17
392.48
74,110.83
1,094.61
53.22
400.18
652.25
95.55
7,400.82

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
9,754,453.71
1,194,558.55
1,878,454.33
141,261.15
2,901,206.94
425,477.74
2,903,820.16
309,674.85
6,885,229.98
139,327.96
25,220.79
2,810.00
103,977.96
175,167.17
67,746.55
21,947.60
309,783.27
273,947.18
13,148.74
137,810.44
239,634.89
37,732.72
313,128.79

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

834.51
244.93
78.40
613.17
22,091.30
2,436.96
1,844.65
877.30
898.37
40.38
122.32
26.07
527.54
230.02
3,959.43
1.49
24.78
24.78
24.78
14.87
24,055.65
3.30
26.85
17.35
50,590.49
577,531.61
106,787.47
607,299.55
13,133.32
115,441.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

297,712.53
129,313.32
61,644.07
31,547.66
2,652,723.31
241,429.28
145,266.36
106,495.98
95,523.64
347.66
12,123.01
1,081.96
3,402.63
3,742.49
1,105,672.17
23.45
11,568.03
339.03
135.31
234.49
2,886.68
154.81
92,892.94
27,585.13
3,670,178.40
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.43

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,206,912.17
220,691.22
427,699.58
2,855,302.97
542,507.56
3,397,810.53

0.73
44.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.19
68,352.24
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
46,198.65
42,884.15
209,275.77
15,227.03
62,782.61
555,329.92
21,019.13
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
10,838,281.90
1,327,287.28
2,087,171.47
156,956.83
3,223,563.26
472,753.04
3,226,466.85
344,083.17
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,019,719.20
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.56

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

82.14%
82.14%
82.14%
82.14%
82.14%
82.14%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,206,912.17
220,691.22
427,699.58

0.80
48.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.48
74,566.08
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00
23,053,377.69
2,305,337.77
4,467,744.60

2,855,302.97
542,507.56

29,826,460.06
5,667,027.41

3,397,810.53

35,493,487.47

8,587,417.02

80.00%
80.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
6,929.80
6,432.62
31,391.37
2,284.06
9,417.39
83,299.49
3,152.87
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
1,625,742.28
199,093.09
313,075.72
23,543.52
483,534.49
70,912.96
483,970.03
51,612.47
724,761.02
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.76
28,836.54
1,384.08
14,506.36
25,224.72
3,971.86
32,960.92

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31,338.16
13,611.93
6,488.85
3,320.81
279,234.02
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
873,851.99
219,948.15
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.40

8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
17.86%
17.86%
17.86%
17.86%
17.86%
17.86%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.20
12.00
18,743.23
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.88
18,641.52
124,928.95
53,793.07
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.77
13,125.00
1,539.26
2,130.00
18,750.00
3,370,701.70
337,070.17
653,241.99
4,361,013.86
828,592.63
5,189,606.49

20.00%
20.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
46,198.65
42,884.15
209,275.77
15,227.03
62,782.61
555,329.92
21,019.13
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
10,838,281.90
1,327,287.28
2,087,171.47
156,956.83
3,223,563.26
472,753.04
3,226,466.85
344,083.17
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,019,719.20
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.56

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,408,614.35
240,861.44
466,789.46
3,116,265.25
592,090.40
3,708,355.64

0.80
48.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.48
74,566.08
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
634,167.69

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
89.29%
89.29%
89.29%
89.29%
89.29%
89.29%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,408,614.35
240,861.44
466,789.46

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
25,836,778.98
2,583,677.90
5,007,167.77

3,116,265.25
592,090.40

33,427,624.64
6,351,248.68

3,708,355.64

39,778,873.33

6,025,070.06

86.67%
86.67%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
541,914.09
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
73.33
14.67
0.00
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
524,311.19
131,968.89
106,430.82
132,721.57
102,373.35
26,079.02
24,737.54
278,475.37
50,985.00
12,040.60
215,449.77
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
97,564.27

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10.71%
10.71%
10.71%
10.71%
10.71%
10.71%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%

0.13
8.00
9,371.61
187.50
3,750.00
1.25
1,875.00
500.00
1.87
1.87
1.87
0.12
1.87

85,136.59
12,427.68
62,464.46
26,896.53
519.37
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,504,729.36
150,472.94
291,616.55
1,946,818.84
369,895.58
2,316,714.42

13.33%
13.33%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
541,914.10
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
634,167.69

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,079,474.72
107,947.47
209,202.20
1,396,624.39
265,358.63
1,661,983.03

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
541,914.10
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
12,464,024.19
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

ACTUAL
%

SALDO POR VALOR


METRADO

52.00%
52.00%
52.00%

0.48
15.25
0.96

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58

89.47%
89.47%
89.47%
89.47%

5,834.58
6,955.66
2,374.07
305.82

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
65,044.91
742,540.65
137,298.17
780,813.70
16,885.69
148,425.27
73.33
14.67
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,718,800.80
1,187,720.05
957,877.43
1,194,494.10
921,360.17
234,711.15
222,637.90
278,475.38
50,985.00
12,040.60
215,449.78
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
682,949.82

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83

96.43%
96.43%
96.43%
96.43%
96.43%
96.43%

2,409.07
27,501.50
5,085.12
28,919.03
625.40
5,497.23

0.67
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%

36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,079,474.72
107,947.47
209,202.20

0.93
56.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

595,956.06
86,993.76
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
18,144,250.19
1,814,425.02
3,516,355.69

1,396,624.39
265,358.63

23,475,030.90
4,460,255.87

1,661,983.03

27,935,286.77

2,220,542.81

93.33%
93.33%

0.07
4.00

87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

9,371.61
187.50
3,750.00
1.25
1,875.00
500.00
1.87
1.87
1.87
0.12
1.87

SALDO POR VALORIZAR


S/.

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
(0.01)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
724,761.02
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.76
28,836.54
1,384.08
14,506.36
25,224.72
3,971.86
32,960.92

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.02
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
174,770.39
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.68
25,492.50
6,020.30
107,724.88
4,000.07
5,991.63
2,078.49
957.90
54,462.50
27,574.80
10,809.54
1,302.39
547.57
48,782.14

8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
3.57%
3.57%
3.57%
3.57%
3.57%
3.57%

0.33
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%

42,568.30
6,213.84
62,464.46
26,896.53
519.37
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
362,790.21
36,279.02
70,308.74
469,377.97
89,181.81
558,559.79

6.67%
6.67%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.48
15.25
0.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

588,914.08
565,390.06
21,038.27
2,485.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

VALORIZACION ACTUAL
METRADO

0.48
15.25
0.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
73.33
14.67
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
278,475.38
50,985.00
12,040.60
215,449.78
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
634,167.69

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,014,168.79
101,416.88
196,545.91
1,312,131.58
249,305.00
1,561,436.58

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

RIZACION ACTUAL
S/.

588,914.08
565,390.06
21,038.27
2,485.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACUMULADO
METRADO
S/.

1.00
31.76
2.00

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

1,226,833.72
1,177,828.17
43,827.21
5,178.34
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

ACTUAL
%

SALDO POR VALOR


METRADO

100.00%
0.00
0.00
0.00
89.47%
6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
95.65%
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
62,635.84
715,039.14
132,213.06
751,894.68
16,260.30
142,928.04
110.00
22.00
20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,544,030.40
1,143,730.41
922,400.49
1,150,253.58
887,235.72
226,018.14
214,392.05
417,713.07
76,477.50
18,060.90
323,174.67
12,000.20
17,974.89
6,235.46
2,873.70
163,387.52
82,724.40
32,428.63
3,907.17
1,642.70
682,949.82

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92.86%
4,818.14
55,003.01
10,170.23
57,838.05
1,250.79
10,994.46
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93.33%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,014,168.79
101,416.88
196,545.91

0.93
56.00
74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

595,956.06
86,993.76
499,715.92
215,172.35
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
30,883,633.75
3,088,363.38
5,985,248.22

1,312,131.58
249,305.00

39,957,245.35
7,591,876.62

1,561,436.58

47,549,121.96

0.07
4.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.89%

95.89%

SALDO POR VALORIZAR


S/.

-0.01
-0.01
0.00
0.00
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
541,914.09
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%

10.53%

4.35%

0.00%

0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.79
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.14

7.14%

0.00%

6.67%

42,568.30
6,213.84
-0.03
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,323,240.37
132,324.04
256,443.98

0.00%

4.11%

1,712,008.39
325,281.59
2,037,289.99

4.11%

You might also like