1.1. Introduction
1.2. Different Modes of Transportation
1.3. Characteristics of Road Transportation
1.4. Highway Planning and Development in India
1.5. Summary
1.6. Self Assessment Questions
1.7. Books for Reference.
Aims / Objectives:
Transportation system is required for carrying passengers and goods from one place to
the other. The different modes of transport are Roads , Railways , Airways and Water ways.
Of all communications , highway or road is the nearest communication to man and is the
only means of transportation that offers to the whole community alike. Merits and demerits of
roads as a means of transport are presented.
Due to lack of rational and scientific planning road development in India has suffered
a major set back. This set back has become a major hurdle in Nations march towards
progress and prosperity. The government of India formed a Road Development Committee ,
under the chairman ship of Mr. M.R. Jayakar , in 1927 to examine the desirability of
developing the road system of India and the means by which such development could be
achieved. The committee submitted its report in 1928 which may be considered as a major
land mark in the planned development of roads in our country. The recommendations of the
Jayakar Committee and their impact on the planning and development of roads in modern
India have been explained.
1.1. Introduction:
Transportation contributes to the economic , industrial and cultural development of
any region or country. Transportation is also essential for strategic movement in emergency
for the defence of the country and to maintain better law and order. A study of the economic ,
industrial and cultural development of the advanced nations like the United State , United
Kingdom , Japan , Germany and others indicate that the progress and prosperity of any
CE409/16
country or nation may be linked up with the efficiency and adequacy of its transportation
systems.
1.2. Different Modes of Transport:
The three media surrounding us , Land , Water and Air , have been used effectively
for the development of transportation modes. Land has given scope for the development of
road and rail transport. Water and air have developed water ways and air ways. Water ways
include seas , rivers , canals and lakes for movement of ships and boats.
The choice of a transportation system depends upon (i) length of haul (ii) weight and
size of consignment (iii) traffic density (iv) nature of route and (v) quality of service.
1.3. Characteristics of Road Transport:
Some of the important characteristics of this mode of transport are as follows:
(i) Of all communications , road communication is the nearest to men.
(ii) Road transport is the only means of transport that offers itself to the whole community
alike.
(iii) Roads are used by various modes of transport , that is , by-cycles , rickshaws , animal
drawn carts and carriages , automobiles , etc. ; but railways , airways and waterways are used
by rolling stock , aeroplanes and by ships and boats respectively.
(iv) Construction and maintenance cost of roads is cheaper than that of railway tracks , docks
and harbours and airports.
(v) Stage Construction is feasible for roads.
(vi) Roads can be constructed to penetrate interior of any region and to connect villages. This
advantage becomes particularly evident when planning the communication system in hilly
regions and scarcely populated areas. Provision of railways in such areas become
uneconomical.
(vii) Road transport offers a complete freedom to the road users to transfer the vehicle from
one lane to another and from one road to another according to the need and convenience.
(viii) Road transport offers a flexible service , free from fixed schedules.
(ix) In particular for short distance travel and short hauls road transport saves time and is
economical.
(x) Road transport offers door to door service.
(xi) Road Transport has a high employment potential.
(xii) Road Transport causes parking problems of serious proportions in city streets.
(xiii) One of the serious disadvantages of road transport in its poor record of safety.
CE409/16
(xiv) Road transport has been one of the major causes of environmental pollution. Noise ,
fumes , vibrations , loss of aesthetics , ribbon development. Cluster of advertisements along
highways - are some of the ill-effects.
1.4.0. High-way Planning:
Planning is a pre-requisite for any development programme. This is particularly
necessary when long range comprehensive plans have to be drawn.
Before going to the stage of planning , one should fix up the main objectives of a
programme. Following are some of the main objectives of highway planning.
(i) To provide for efficient , safe , economical , comfortable and speedy movement of goods
and people.
(ii) To plan anticipated future developments.
(iii) To plan for a road system having maximum utility within available resources.
(iv) To phase the road development programme from financial considerations.
(v) To evolve a financial system.
1.4.1. Planning and Development in India:
The history of roads dates back to the period before the advent of recorded history.
The various civilisations of the world that are known for their excellence and attainments
have left traces of their art of road building.
In Mauryan age , considerable importance began to be attached to roads as trade ,
agriculture and cultural activities flourished. Rajapaths (main highways) and vanijapathas
(trade routes) were constructed. Kautilya , Prime minister of Emperor Chandragupta Maurya ,
laid down rules for the construction of roads for different types of traffic in his book
Arthashasthra. During the Pathan and Mughal periods , roads were greatly improved. Some
of the highways either built or maintained by Mughals and other rulers received great
appreciation from the foreign visitors who visited India during the reign. Roads were built
running from North-West to Eastern areas through Gangetic plains , linking also the coastal
and central parts. Later the fall of the Mughal empire led to scant attention to
communications ; and the conditions of the roads deteriorated considerably. At the beginning
of the British rule , roads were constructed by British Military Engineers on the remains of
old roads which existed. These roads connected important military and business centres.
Military maintenance of roads was not quite adequate and in 1865 Lord Dalhousie ,
the then Governor General , formed the public works department in more or less the same
form that exists today. Engineering Colleges were established to train civil engineers.
CE409/16
Important roads were provided with metalled beds and were bridged. Specifications were
formed for construction of roads. By the end of 19th century , these efforts resulted in the
establishment of a good system of trunk roads in the country. With the development of
railways (in the latter part of 19th century) a set back to the rapid development of roads
occurred. Government of India act 1919 put a further damper on road development as the
subject of roads was purely a provincial charge and central government remained concerned
with roads of strategic importance.
After world war I , motor vehicle traffic on roads increased. The existing roads were
not capable to withstand both bullock-cart traffic and motor vehicles. This demanded better
road network which can carry the mixed traffic. In November 1927 , Government of India
appointed a committee called the Road Development Committee under the chairmanship of
Mr. M.R. Jayakar. The committee , known popularly as the Jayakar committee was required
to:
(i) examine the desirability of developing the road system of India and the means by which
such development could be achieved.
(ii) examine the possibility , having regard to the distribution of functions between the centre
and state governments , of co-ordinating the activities of the different governing authorities in
the country by the formation of a central road board or otherwise.
1.4.2. Recommendations of Jayakar Committee: The committees report (1928) may be
considered as a major landmark in the planned development of roads in our country. The
most important recommendations made by the committee are:
(i) The road development in the country should be considered as a national interest as it has
become beyond the capacity of state governments and local bodies.
(ii) An extra tax should be levied on petrol from the road users to develop a road
development fund called Central Road Fund.
(iii) A semi-official technical body should be formed to pool the technical knowledge from
various parts of the country and to act as an advisory body on various aspects of roads.
(iv) A research organisation should be instituted to carry research and development work and
to be available for consultation.
Most of the recommendations of Jayakar committee were accepted by Government of
India and were implemented subsequently.
1.4.3. Central Road Fund: Following the recommendations of Jayakar Committee for
funding the roads , CENTRAL ROAD FUND was created in 1929 with additional duty
CE409/16
levied on petrol and was intended for road development. Twenty percent of the same will be
retained by the central government for meeting the expenses of road development of the
country and the remaining will be distributed among the states in the ratio of actual
consumption of petrol or revenue collected.
1.4.4. Indian Roads Congress (IRC): A semi-official technical body known as the Indian
Roads Congress (IRC) was formed in 1934 by the government of India. This , it may be
recalled , was one of the recommendations of the Jayakar Committee.
Now IRC is an active body of national importance controlling standardisation ,
specifications and recommendations as regards design and construction of roads and bridges.
The IRC publishes journals , research publications and standard specifications on various
aspects of Highway and Traffic engineering. The IRC works in collaboration with the Roads
wing of the Ministry of Shipping and Transportation , Government of India. It is responsible
for the various highway development plans of our country.
1.4.5. Motor Vehicles Act:
In-order to have control over the driver , vehicle ownership and vehicle operation on
roads , the Government of India broughtout for the first time the Motor Vehicles Act in 1939.
This act has been thoroughly revised in the year 1988.
1.4.6. Nagpur Conference:
At the initiative of IRC , a conference of the chief engineers of all states was held at
Nagpur in 1943 to finalise the road development plan for the country as a whole. This may be
considered as a landmark in the history of road development in India , as it was the first
attempt to prepare a co-ordinated road development programme in a comprehensive and
scientific manner. In this conference a 20 year plan , for the period 1943-63 , popularly
known as Nagpur Plan , was finalised. All roads were classified into five categories and a
target of 16 KM of road per 100 sq. km area of the country was aimed at.
1.4.7. Central Road-Research Institute (C.R.R.I):
One of the recommendations of the Jayakar Committee was to set up a central
organisation of research. Accordingly , an institute for carrying out research in various fields
of highway engineering , called the Central Road Research Institute (CRRI) was started at
New-Delhi in 1950. This institute is mainly engaged in applied research and offers technical
advice to state governments , other organisations and industries on various problems
concerning highways.
1.4.8. National Highway Act:
CE409/16
The National Highway Act was passed in the year 1956. According to this act , the
development and maintenance of National Highways is the responsibility of the Central
government. The Central government is empowered to declare any other highway as National
Highway or to omit any of the existing National Highway from the list.
1.4.9. Border Roads Development Board:
This board was set up in March 1960 under the chairmanship of the prime minister. A
General Reserve Engineering Force (GREF) consisting of unskilled and skilled labour ,
supervisors and engineers from all parts of India was raised. This organisation is to take up
construction of roads at high altitudes in extremely varied , difficult and hostile terrain under
unfavourable climatic conditions.
1.4.10. Second Road Development Plan (1961 81):
The second twenty year road development plan for the period 1961 - 81 was initiated
by the IRC and was finalised in 1959 and is also known as the Bombay Road Plan. The plan
gave due considerations to the developments those are taking place and developments that
have to take place in our country in various fields during the plan period. The target of road
length contemplated during this plan period was 32 per 100 Sq. Km of area covered.
Though the road length envisaged in this plan has been exceeded , the standards to
which these roads have been brought , leave scope for considerable improvement. The
position of rural roads is far from satisfactory , Constraint of resources have been the major
bottleneck for this state of affairs.
1.4.11. Highway Research Board:
Recognising the need for faster research on highway matters , the Indian Roads
Congress has established a Highway Research Board on October 24 , 1973. Its main
functions are to advise the government about the road research programme required for the
conditions prevailing in our country , correlate the research information from various
organisation in India and recommend priorities about various road research problems. It will
also obtain feedback of research findings and evaluate the same , collect and disseminate the
results of research.
1.4.12. National Transport Policy Committee (NTPC):
This committee was formed in the year 1978 to prepare a comprehensive national
transport policy for the country , keeping in view the objectives and priorities set out in the
Five Year Plans. This Committee submitted its report in 1980 and most of the
recommendations of the Committee have been accepted by Government of India. Some of the
CE409/16
CE409/16
(4) Because of economics better equipment will be deployed and a continuous flow of large
scale projects would be feasible with one executing agency handling National Highway
Projects.
1.5. Summary:
The basic function of a transportation system is to carry passengers and goods from
one place to another. Social , cultural and economic development of a region or country
depends upon its transportation system. An efficient transportation system is necessary for
maintaining law and order with in the country and for boarder security.
The different modes of transport are roads , railways , airways and waterways. Out of
these roads are the most popular and major means of transport and are considered as vital
means of communication.
The Jayakar Committees report may be considered as a major land mark in the
planned development of roads in our country. Various phases of planning and development of
highways in India , during the 20th century , have been dealt with in detail.
1.6. Self Assessment Questions:
(1) Briefly out line the historical development of highways in India.
(2) Discuss the merits and limitations of roads as transportation means.
(3) Write notes on
(a) Jayakar Committees Recommendations
(b) Indian Roads Congress
(c) National Transportation Policy Committees
(d) Objectives of highway planning.
CE409/16
TRANSPORTATION ENGINEERING
UNIT - 2
ROAD DEVELOPMENT PLANS OF INDIA
CONTENTS:
Aims / Objectives:
2.1. Introduction
2.2. Classification of Roads
2.3. Road Development plans
2.4. Rural Road Patterns
2.5. Master Plan Preparation
2.6. Summary
2.7. Self Assessment Questions
2.8. Reference
Aims / Objectives:
Highways have been universally recognised as vital means of transport every where.
Three long term plans have been drawn for the development of roads in India for the period
1943 to 2001. Important features of these three plans - Nagpur Plan , Bombay Plan and
Lucknow Plan have been explained. Classification of roads based on a rational basis is quite
essential for planning of highways in a region or country. Classification of roads based on
their location and importance , adopted in the Nagpur Plan , and the modified system of
classification of roads adopted in the third 20 year development plan have been discussed.
Road patterns generally adopted for rural roads have been included in all long term planning
programmes. Master Plans play a very important role. Various stages in the preparation of
master plans are also indicated in this unit.
2.1. Introduction:
Nagpur Plan is the first plan prepared in India on scientific principles , for the
development of highways for the period 1943 - 63. The targets of this plan have been
achieved by the end of the second five year plan i.e., by 1961. As such a perspective plan for
the period 1961 - 81 , known as Second Twenty Year Plan was drafted by the Roads wing
of Government of India. The roads in these two plans have been divided into five groups
based on their location and importance. Star and Grid pattern of roads have been adopted.
Transport planners realised that prosperity of the country takes place only when
transportation facilities are extended to rural and undeveloped areas. Further , aspects like
CE409/16
10
environmental protection , energy conservation and improvement in road safety have also to
be included because of the expected very high rate of growth of road traffic by the turn of this
century. The Lucknow plan for the period 1981 - 2001 has been drafted including all the
above aspects.
2.2. Classification of Roads:
Roads are classified based on a number of considerations , some of the important
consideration are ;
(a) Structural Behaviour:
Based on their structural behaviour roads are classified as Flexible pavements and
Rigid pavements. These are discussed in units 9 and 10.
(b) Material of Construction:
Based on the materials of construction roads are classified as Earth roads , Gravel
roads , Water Bound Macadam roads , Bituminous roads and Cement Concrete roads. These
are discussed in Units - 11 and
(c) Service Conditions:
Based on their service conditions during different seasons of a year , roads are divided
into two categories - all weather roads and fair weather roads.
(d) Traffic Volume or Load transported or Location and Function:
Classification systems based on the traffic volume or the load transported have been
arbitrarily fixed by different agencies and there is no common agreement regarding the limits
for each classification group. However , in the system based on location and function ,
different categories may be defined clearly.
The Nagpur plan and the Lunknow plan have classified the roads based on their
location and importance. In the Nagpur plan roads have been classified into five major
categories as follows:
(i) National Highways (NH) (ii) State Highways (SH) (iii) Major District Roads (MDR) (iv)
Other District Roads (ODR) and (v) Village Roads (VR).
The above system of classification of roads has been modified in the Lunknow plan
(1981 - 2001) and the roads in the country have been classified into three groups.
(i) Primary System: - This system consists of two categories of roads (a) Express ways and
National Highways (NH).
(ii) Secondary System:- The secondary system consists of two categories of roads , namely ,
State Highways (SH) , Major District Roads (MDR).
CE409/16
11
(iii) Tertiary System or rural roads:- This system includes Other District Roads (ODR) and
Village Roads (VR).
Each of the above categories are explained below.
2.2.1. Express Ways:
Express ways are separate class of highways with superior facilities and design
standards and are meant as through routes having very high volume of traffic. The express
ways are to be provided with divided carriage ways , controlled access , grade separations at
cross roads and fencing. These highways should permit only fast moving vehicles. Express
ways may be owned by the Central government or a State government depending on whether
the route is a national highway or state highway.
2.2.2. National Highways:
Main highways running through the length and breadth of India , connecting foreign
highways , capitals of large states , ports and including roads required for strategic
movements for the defence of India are classified as National Highways. They constitute the
frame on which the entire road communication system of the country based. They must give
uninterrupted road communication throughout the year and should be of fairly high grade
construction. All National Highways vest in the union Government of India as per the
National Highway Act 1956 and is the responsibility of the centre to develop and maintain
properly all national highways.
2.2.3. State Highways:
These highways are other main trunk or arterial roads of a state , connecting up with
the National Highways or highways of adjacent states and linking the district head quarters
and important cities within the state. The state highways are the main arteries of traffic within
a state. They are to be of the same standards as National Highways.
2.2.4. District Roads:
District roads are roads traversing each district serving areas of production and
marketing and connecting these with each other or with national and state highways or
railways or important navigational routes. They should be capable of taking road traffic into
the heart of rural areas throughout the year with only minor interruptions. District roads are
divided into two classes on the basis of traffic.
(i) Major District Roads (M.D.R) for higher order of traffic.
(ii) Other District Roads (O.D.R) for lower order of traffic.
2.2.5. Village Roads:
CE409/16
12
Village roads are roads connecting villages or groups of villages with each other and
to the nearest district , state or national highway or railway or navigational routes. They are in
essence roads from villages to a market or to a main route.
The road systems within the Urban areas are classified as Urban Roads and will
form a separate category of roads to be taken up by the respective urban authorities.
2.3. Long Term Road Plans:
Selient features of the three plans are presented briefly.
2.3.1. Nagpur Plan:
This is the first plan prepared on scientific principles for the development of highways
in India. At the initiative of the IRC , chief engineers of the various states met at Nagpur for
drafting a highway development plant for the period 1943-63. According to this plan the road
net work in the country was divided into five categories:
(i) National Highways (ii) State Highways (iii) Major District roads (iv) Other district roads
and (v) Village roads. Requirements of each of these categories of roads are given in article
2.2.
The target for the total length of the roads was fixed as 16 km per 100 Sq. Km of the
area covered. Based on Star and Grid pattern of road network two sets of formulae have
been developed. One for the total length of NH , SH and MDR and another for the length of
ODR and VR. These formulae have been developed taking into consideration the
geographical , agriculture and population conditions.
2.3.2. Second Twenty Year Road Plan:
The length of roads envisaged under the Nagpur plan was found to have been
achieved by the end of the second plan i.e., by 1961 , but the road system was deficient in
may respects. The changed economic , industrial and agricultural conditions in the country
warranted a review of the countrys rapidly growing economy. Accordingly roads wing of
Government of India received the situation and drafted a perspective plan for road
development for the period 1961 - 81 , known as second twenty year road plan.
Five different formulae based on the star and Grid pattern of roads have been
formulated for the five categories of roads proposed in Nagpur plan. The target of this plan
has been fixed as 32 km of total length of road per 100 Sq. km of area covered.
Comparison of Nagpur Road Plan and Second 20-Year Road Plan:
(i) The Nagpur plan has a target length of 16 km per 100 Sq. Km area covered where as the
second 20 year plan has double this length.
CE409/16
13
(ii) Nagpur road plan gives two formulae. One for total length of fast category of roads ,
namely N.H , S.H and M.D.R and the second formula for finding the total length of O.D.R.
and V.R. Hence it is not possible to get the road length for each category of the roads
separately. In the second 20 - year plan it is possible to find out the length of each category of
roads as five different formulae are available for the five different categories.
(iii) The Nagpur plan formulae for the road lengths divide the area into two categories Agricultural area and Non-Agricultural area. In the second road plan , the area is divided into
three categories - developed and agricultural area , semi-developed area and undeveloped and
uncultivated area.
(iv) In developing formulae for the different categories of roads in the Nagpur plan , villages
and towns are divided into six groups based on population. All towns with population greater
than 5000 , are grouped together. In the second 20 year plan , villages and towns have been
divided into nine different population groups. All towns with population greater than
1,00,000 are kept in one group.
(v) In Nagpur plan the length of railway track in the area was deducted from the total length
of road required. Such a deduction was not allowed in the second 20 year formulae , as it was
realised that the highway system should develop independently.
(vi) In the second 20 year plan , a development factor of 5% only is allowed where as in the
Nagpur plan this factor is 15%.
(vii) In the second 20 year road plan , provision was made for express highways. (Highways
provided for the movement of heavy volumes of motor traffic at higher speeds and have
atleast four lanes).
(viii) In general it may be said that the second 20 - year road plan has been developed on a
more rational and scientific basis than the Nagpur road plan.
CE409/16
14
CE409/16
15
II Secondary System:
(i) Length of State Highways (SH) in Km.
(a) By total area: S.H , Km = Area of the State in Sq . Km / 25
(b) By total number of towns and area in the state ,
SH , Km = 62.5 x no. of towns in the state -
area of state , sq . km
50
monotonously long sets flanked by dull blocks of buildings. It encourages an even spread of
traffic over the entire grid. It is easy for the through traffic to bypass a definite control area in
the middle of the grid. This pattern is not quite convenient from traffic operation point of
view.
CE409/16
16
CE409/16
17
(d) Compare the various alternate proposals of road system and determine the sequence in
which the master plan will be implemented.
In India , in the various development plans considered , targets for the lengths of
roads have been fixed based on population , area , number of towns , agricultural and
industrial growth. Similar system may be adopted in preparing master plan also.
2.6. Summary:
For the development of roads in our country , three long term plans have been drawn.
The first plan , popularly known as Nagpur plan , drawn for the period 1943 - 63 may be
considered as a land mark in the development of roads in our country.
Depending on the development of the area and population served , roads have been
divided into five groups - National Highways , State Highways , Major District Roads , Other
District Roads and Village Roads. A target of 16 Km of road for every 100 Sq.Km of area
covered was fixed for this plan period. As the targets of Nagpur plan could be achieved by
1961 , a second road development plan for the period 1961 to 1981 , also known as Bombay
plan , was formulated. The targets of this plan were double that of the Nagpur plan. In both of
these plans star and gird pattern of roads has been used for developing the formulae for the
different categories of roads proposed in the Nagpur Plan.
Both the Nagpur plan and Bombay plan have been hardly based on and evolved from
principles of transportation planning. The plan formulae for evolving the road length indicate
that greater length was apportioned for developed areas than for semi-developed or under
developed areas. The backwardness tended to be perpetuated rather than conditions of
communications and accessibility improved. Taking care of these short coming and keeping
in view the growth pattern envisaged in the various fields by the turn of the century , a third
road development plan for the period 1981-2001 has been prepared. Attention was paid while
drafting the plant to present the quality of environment , to improve road safety and to
conserve energy.
CE409/16
18
CE409/16
19
District Roads and Tertiary system or Rural roads which include other district roads and
village roads for the purpose of the Lucknow plan.
Road patterns adopted in rural roads have also been discussed in this unit. Data to be
collected and the various steps in the preparation of Master Plans for highway development
have also been dealt with in detail.
2.7. Self Assessment Questions:
1. Compare the I and II - 20 year Road development plans clearly bring out the deficiencies
in these two plans.
2. Discuss important aspects of Lucknow plan indicating how the total lengths of different
categories of roads can be calculated ?
3. Write notes on
(a) Rural Road Patterns
(b) Master plans for Roads
(c) Classification of Roads.
2.8. BOOKS FOR REFERENCE:
1. Bindra , S.P. (1977) - A course of Highway Engineering.
Dhanpath Rai & Sons , New Delhi.
2. Kadiyali L.R. (1984) - Principles and practice of Highway Engineering Khanna Tech. Publications , New Delhi.
3. Khanna , Dr. S.K., and Justo , Dr. CEG - Highway Engineering ,
New Chand and
Bros., Roorkee.
***
TRANSPORTATION ENGINEERING
UNIT - 3
HIGH WAY GEOMETRIC DESIGN - 1
CONTENTS:
AIMS / OBJECTIVES:
3.1. Introduction
3.2. Pavement Surface Characteristics
3.3. Width of Pavement or Carriage way
3.4. Right of way
3.5. Camber
CE409/16
20
CE409/16
21
In this unit , design aspects of the cross-sectional elements , sight distance and factors
affecting the horizontal alignment are considered.
Highway geometrics depend upon the topography , locality and type and intensity of
traffic for which the road is intended. Comprehensive design standards for roads have been
evolved after considerable thought by the Indian Roads Congress (IRC) and the Roads Wing
of Ministry of Transport (MOT).
3.2. PAVEMENT SURFACE CHARACTERISTICS:
The important surface characteristics of the pavement are friction , roughness , light
reflecting characteristics and drainage of surface water.
3.2.1. Friction:
The friction between the vehicle tyre and the pavement surface is a very important
factor. It affects the operating speed , distance requirements in stopping and accelerating
vehicles , and the force resisting centrifugal force while a vehicle negotiates a curve.
Important factors affecting the frictional resistance of the pavement surface are (i) The type
of road surface , (ii) condition of the pavement (iii) the type and condition of the tyre (iv) the
speed of vehicle (v) the extent of brake application and (vi) the load , and the tyre pressure.
Longitudinal friction comes into play when brakes are applied for stopping a vehicle
and it depends on the speed of the vehicle and the surface conditions of the pavement. I.R.C.
recommends the longitudinal friction coefficient values of 0.35 to 0.40 depending on the
speed. In the case of horizontal curve design , IRC recommended lateral coefficient of
friction of 0.15. This low value has been suggested for the worst possible surface condition
such as mud on pavement surface on horizontal curve with super -elevation (as it is essential
to prevent lateral skid).
3.2.2. Pavement Unevenness:
Pavement unevenness increases fuel consumption and operating cost of the vehicles ,
reduces the speed , safety and comfort of travel. Uneven surfaces increase fatigue and
accidents. As such pavement surfaces should be maintained as even as possible.
The pavement surface condition is measured by UNEVENNESS INDEX , which is
the cumulative vertical undulations of the road. It has been found from tests that it is
desirable to keep the unevenness index low and preferably less than 150 cm/km , for good
road surfaces of high speed highways. Values of more than 350 cm/km is considered very
uncomfortable even at a speed of 50 Kmph.
3.2.3. Light Reflecting Characteristics:
CE409/16
22
Night visibility very much depends upon the light reflecting characteristics of the
pavement. Light reflecting characteristics of the pavements are colour and surface condition
(dry or wet) of the pavement. The glare caused by the reflection of head lights is considerably
more on wet pavement surface than on a dry pavement. Though light coloured or white
pavement surface give good visibility at night , they produce glare and eye strain during
bright sunlight. Black top pavement surface on the otherhand provides very poor visibility at
nights , especially when the surface is wet.
3.3. WIDTH OF PAVEMENT OR CARRIAGE - WAY:
The pavement or carriage way width depends on the width of a traffic lane and
number of lanes. The carriage way width intended for one line of traffic movement may be
called traffic lane width. This lane width is determined on the basis of the width of the
vehicle and the minimum clearance to be provided for safety. When the side clearance is
increased (upto a certain limit) , there is an increase in the operating speed of the vehicle and
hence an increase in the capacity of a traffic lane. Keeping all these in view , a width of
3.75m is considered desirable for a road having single lane for vehicles of 2.50m width
(width of design vehicle). For pavements having two or more lanes , width of 3.5m per lane is
considered.
In the case of a single lane carriage way of width 3.75m a side clearance of 0.625m
would be obtained as shown in Fig 3.1 (A) and in the case of two lane pavement of width 7m,
a minimum clearance between two lanes of traffic would be 1.00m for standard vehicle as
shown in Fig 3.1 (B).
CE409/16
23
The number of lanes required in a highway depends on the predicted traffic volume
and the traffic capacity of one lane. In developing countries like India , the traffic is of mixed
nature consisting of both slow and fast moving vehicles between which there are wide
variations in speed. In such cases , it is common practice to express the traffic capacity in
terms of PASSENGER CAR UNITS (PCUS).
The weightage values for various classes of vehicles as recommended by the MOT
are given in Table 3.1. Factors affecting PCU are (i) average speed of the vehicle class ,
under the prevailing roadway and traffic conditions , (ii) average width and length of the
vehicle class , and (iii) average transverse gap and longitudinal gap between vehicles of the
same class in the speed range under consideration of a compact stream flow.
TABLE 3.1. PASSENGER CAR UNITS (PCU):
Sl.No.
Type of vehicle
PCU
(1)
Bicycle
0.5
(2)
0.75
(3)
1.0
(4)
Automobiles
1.0
(5)
Cycle Rickshaws
1.5
(6)
3.0
(7)
4.0 to 8.0
Technical group of the Ministry of Transport recommended the following criteria for
designing carriage way width used on highway capacity expressed in passenger car units.
(Table 3.2).
TABLE 3.2
Road Type
Sl.No.
Recommended Capacity
PCUS / day
1.
Upto 1000
shoulders
2.
eathen shoulders
4.
20,000 to 30,000
CE409/16
24
The traffic at a future data (end of design period) in PCU / day for design purposes is
generally computed by using the following formula:
A = P (1 + r)n + m
3.1
The width of carriage way for various classes of roads as standardised by the IRC are
given in Table 3.3.
Table 3.1. WIDTH OF CARRIAGE WAYS FOR VARIOUS CLASSES OF ROADS:
Sl.No
Class of Road
.
1.
Single lane
2.
7.0
3.
7.5
4.
5.5
important roads)
5.
3.5 / lane
CE409/16
25
The traffic separators may be in the form of pavement markings , physical dividers ,
or area separators. Pavement markings are the simplest of these. The mechanical separators
should be designed in such a manner that even if the wheels of a vehicle encroach , no part of
the vehicle body should be damaged.
Area separators may be medians , dividing islands or parkway strips dividing the two
directions of traffic flow , (fig 3.2). It is desirable to have a wide area separators of 8 to 14m
width. A minimum of 6m is required to reduce head light glare. The glare can be reduced in
narrow strips by planting trees or shrubs.
For medians desirable minimum width of 5.0m on a rural highway may be reduced to
3.0m where land is restricted. On long bridges the width of the median may be reduced upto
1.2 to 1.5m. The medians should preferably be of uniform width throughout. On urban
highways with 6 lanes or more , medians should invariably be provided ; absolute minimum
width being 1.2m and desirable minimum being 5.0m.
3.3.2. Kerbs:
Kerbs (curbs) indicate the boundary between the pavement and shoulder or sometimes
islands or footpaths or parking space. These are classified as barrier and mountable kerbs.
Barrier kerbs are designed to discourage ,
CE409/16
26
CE409/16
27
CE409/16
28
Roadway width , m:
Sl.No.
1.
2.
3.
4.
Road classification
Mountainous and
terrain
Steep terrain
12.0
6.25
12.0
8.80
9.0
4.75
9.0
----
(a) Single
7.5
4.75
9.0
----
7.5
4.00
Sl.
Road
No.
Classification
1.
Open areas
Built-up ares
Open areas
Built-up
areas
Normal
Range
Normal
Range
Normal
45
30-60
30
30-60
24
20
25
25-30
20
15-25
18
15
National and
Normal
State
Highways
2.
Major distric
Roads
3.
Other district
15
15-25
15
15-20
15
12
12
12-18
10
10-15
Roads
4.
Village Roads
Control line is a line which represents the nearest limits of future uncontrolled
building activity in relation to a road. This signifies that though building activity is not totally
banned between building line and control line , the nature of buildings permitted here are
controlled.
Current standards for building and control lines as per IRC are presented in Table 3.6.
CE409/16
29
Road
Open areas
Built-up areas
classification
Overall
Overall
Distance between
width
width
between
between
round boundary
building
control
(set-back) , m
lines , m
lines , m
Open areas
Built-up
areas
80
150
3 to 6
3 to 5
3 to 5
M.D.R
50
100
3 to 5
3 to 5
3 to 5
O.D.R.
25/30*
35
3 to 5
3 to 5
3 to 5
V.R.
25
30
3 to 5
3 to 5
3 to 5
Note: *If the land width is equal to the width between building lines indicated in this column
, the building lines should be set back 2.5m from the road land boundary.
3.5. CAMBER OR CROSS SLOPE:
Camber or cross - slope is the slope provided to the road surface in the transverse
direction to drain off rain water from the road surface. Usually camber is provided on straight
roads by raising the centre of the carriage way with respect to the edges forming a CROWN ,
or highest point on the centre line. At horizontal curves , the surface drainage is affected by
raising the outer edge of the pavement with respect to the inner edge while providing the
desired superelevation.
The rate of camber is usually designated by 1 in n which measures the transverse
slope in the ratio 1 vertical to n horizontal. Camber is also expressed as a percentage. If a
camber is Y% , the cross slope is Y in 100.
The rate of camber depends on:
(i) The type of pavement surface and (ii) the amount of rainfall.
The minimum camber needed to drain off surface water may be provided keeping in
view the type of pavement surface and the amount of rainfall in the locality. The values of
camber recommended by the I.R.C. are given in Table 3.7. A range of values are given with a
CE409/16
30
view that in localities with lesser rainfall , a flatter cross slope may be adopted and in places
of higher rainfall a steeper camber may be adopted.
Table 3.7. RECOMMENDED VALUES OF CAMBER (IRC):
Type of road surface
Sl. No.
1.
Concrete
and
high
type
bituminous surface
1 in 50 (2%) to 1 in 60 (1.7%)
2.
1 in 40 (2.5%) to 1 in 50 (2%)
3.
4.
Earth
1 in 33 (3%) to 1 in 40 (2.5%)
1 in 25 (4%) to 1 in 33 (3%)
The cross slope for shoulders should be 0.5% steeper than the cross slope of adjoining
pavement , subjected to a minimum of 3 percent: maximum value of 5.0% for earth
shoulders.
3.5.1. SHAPES OF CAMBER:
The camber is given a parabolic , elliptic or straight line shape. In parabolic or elliptic
shape the profile is flat at the middle and steeper towards the edges which is preferred by fast
moving vehicles as they have to cross the crown line during overtaking operations frequently.
When very flat slope is to be provided as in cement concrete pavements , straight line shape
of camber may be provided as shown in Fig 3.5. Some times a combined camber with
parabolic central portion and straight line at the edges (Fig 3.5) is preferred when animal
drawn vehicular traffic with steel tyres is heavy.
3.5.2. Camber Boards:
For providing the desired amount and shape of camber , camber boards or templates
are prepared with the specified camber. These are used to check the lateral profile of the
finished pavement during construction.
CE409/16
31
= 8.75 cm.
2
40
3.2
y in cm
50
0.1785
100
0.714
150
1.607
200
2.857
250
4.464
300
6.428
350
8.750
CE409/16
32
CE409/16
33
Stopping sight distance is the distance required by the driver of a vehicle travelling at
a given speed to bring the vehicle to stop after an object on the roadway becomes visible.
Because of the importance to safety all highways must be designed to provide minimum
stopping sight distance throughout their length. This is also called sometimes non-passing
sight distance.
The stopping distance is the sum of (i) the distance travelled by the vehicle during the
total reaction time known as LAG DISTANCE and (ii) the distance travelled by the vehicle
after the application of brakes , before coming to a dead stop position , known as the
BRAKING DISTANCE.
(i) Lag Distance:
The total reaction time of the driver is the time taken from the instance the object is
visible to the instant the brakes are effectively applied. The amount of time gap , total
Reaction time , depends on several factors.
Some traffic engineers have split the total reaction time into four parts based on
PIEV theory. According to this theory the total reaction time of the driver is split into the
following four parts.
(a) Perception time , is the time required to perceive an object or situation.
(b) Intellection time , is the time required for comparing the different thoughts , regrouping
and registering new situation.
(c) Emotion time is the time required during emotional sensation and disturbance , and
(d) Volition time is the time required for the final action.
It is possible that the driver may apply the brakes or take any avoiding action by the
reflexive action even without thinking. This is shown in Fig 3.6. Which illustrates the PIEV
process.
P - Perception
I - Intellection
E - Emotion
V - Volition.
The total reaction time depends upon the physical characteristics of the driver ,
psychological factors , environmental conditions , purpose of trip and speed of the vehicle.
CE409/16
34
3.3a
V 1000
t = 0.278 Vt
60 60
3.3b
A total reaction time of 2.5 seconds is recommended. As such under most situations ,
the lag distance , (metres)
= 2.5 v = 0.278 x 2.5 x V
(ii) Braking Distance:
Braking distance is obtained by equating the work done in stopping the vehicle to the
kinetic energy of motion.
Case (a):
Let the vehicle move on an ascending gradient of +n% . The forces acting against
motion and helping to stop the vehicle are
(i) Frictional force F acting down the gradient.
(ii) The component of gravity of the vehicle W , acting parallel to the surface and acting
downwards and equal to W sin
= W tan
= Wn / 100.
Figure
The frictional force F = f.W. Where f is the coefficient of friction (longitudinal).
CE409/16
35
If l is the braking distance then the work done in stopping the vehicle = F. l +
Wnl
100
= (f + n / 100) Wl.
The kinetic energy at the design speed v , m / sec will be =
1 2 1
mv =
(W/g) v2 (g
2
2
1
(W / g) v2
2
3.4a
Case (b):
In a descending gradient of -n% , the braking distance l increases as the component
of gravity now opposes the braking force. Hence , the braking distance may be obtained from
the equation.
l = v2 / 2g (f - n / 100)
3.4b
Case (c):
On a level surface n = 0 , then the braking distance may be obtained from the equation
l = v2 / 2gf
3.4c
v2
v2
l=
=
2g ( f n / 100) 2g( f 0.01 n )
3.4d
v2
S.D. (m) = vt +
2g ( f 0.01 n )
3.5a
Since the total reaction time is taken as 2.5 seconds and V is the design speed in Kmph ,
equation , 3.5a , may be written as
S.D (metres) = 0.278 Vt +
(0.278 V )2
2 9.81 ( f 0.01 n )
= 0.278 Vt +
V2
(254 ( f 0.01 n)
3.5b
CE409/16
36
Throughout the above analysis , it was assumed that the brakes are quite effective ,
i.e., of 100% efficiency. If the efficiency of the brakes is only n% , then
V2
S.D (metres) = 0.278 Vt +
254 ( f .01 n) .01 n
3.5c
The coefficient of friction f depends upon a number of factors like the type and
condition of the pavement surface , tyres and speed of the vehicle The IRC recommended the
following values of f based on the speed of vehicles.
Table 3.8. Recommended values of Coefficient of Friction:
Speed in Kmph
20-30
40
50
60
65
80
100
0.40
0.38
0.37
0.36
0.36
0.35
0.35
The minimum sight distance should be equal to the stopping distance in one way
traffic lanes and also in two - way traffic roads when there are more than one lane of traffic.
In roads with restricted width , in single lane roads , when two-way movement of traffic is
permitted , the minimum sight distance should be equal to TWICE the stopping distance to
enable both the vehicles coming from opposite directions to stop. The Stopping Distance
should invariably be provided throughout the length of the road and hence this is also known
as Absolute Minimum Sight Distance.
Worked Example:
3.2. Calculate the minimum stopping sight -distance on a highway at a descending gradient of
6%. Design speed may be taken as 80 kmph. If the road is single lane one , with two way
traffic , what is the sight distance to be provided ?
Solution:
Total reaction time may be taken as 2.5 sec.
For the speed of 80 kmph , f = 0.35 (from Table 3.8). Minimum stopping sight
distance on a descending gradient is
V2
= 0.278 Vt +
254( f 0.01 n )
80 2
= 0.278 80 2.5 +
= 142.5m.
254 (0.35 0.01 6)
As there is two way traffic in a single lane , minimum sight distance = 2 (stopping
sight distance).
= 2 142.5 = 285 m.
CE409/16
37
CE409/16
38
3.6
(ii) From position A2 , the vehicle A starts accelerating , shifts to the adjoining lane ,
overtakes the vehicle B , and shifts back to its original lane ahead of B in position A3 . The
distance between the positions A2 and A3 is taken as d2 .
From the geometry of the figure d2 = b + 2s where s is the spacing to be maintained
between the vehicles and is given by the formula.
s = (0.7 vb + 6) metres
3.7
Let the time taken by vehicle A to overtake vehicle B be T sec. During this time the
vehicle A moves from A2 to A3 over a distance of d2 and the vehicle B , moves from B1 to B2
over a distance b.
Then b = vb . T (metres) since vb is the speed of vehicle B.
Thus d2 = vb T + 2s (from the geometry , fig 3.7)
3.8.
3.9
Tsec =
1
aT2
2
4s / a
where s = (0.7 vb + b)
Hence d2 = vbT + 2s
3.10
from equation 3.7.
3.10.
CE409/16
39
(iii) During the reaction Time T seconds , the on coming vehicle travelling with a speed of v
m / sec covers a distance d3 given by
d3 = v T metres
3.11
3.12a
3.12b
14.4S / A
V Kmph
v m / sec.
A Kmph / sec.
a m / sec2
25
6.93
5.00
1.41
30
8.34
4.80
1.30
40
11.10
4.45
1.24
50
13.80
4.00
1.11
60
18.00
3.28
0.92
80
22.20
2.56
0.72
100
27.80
1.92
0.53
In case the speed of the overtaken vehicle is not given , Vb may be assumed as (V 16) kmph or vb = (v - 4.5) m / sec.
At overtaking sections the minimum overtaking sight distance should be (d1 + d2 + d3)
when two way traffic exists. On divided highways , the overtaking sight distance need be
only (d1 + d2) as in one way movements as no vehicle is expected to come from the opposite
direction.
The IRC suggests that , on divided highways with four or more lanes , it is not
necessary to provide usual overtaking sight distance ; however the sight distance in such
highways should be more than the stopping sight distance.
3.7.2. Effect of Grades on Overtaking Sight Distance:
CE409/16
40
Appreciable grades in the road , both ascending as well as descending , increase the
sight distance required for safe overtaking. On up grades , the acceleration of the overtaking
vehicle will be less and hence the passing will be difficult , but the overtaken vehicle may
also decelerate in steep ascending gradients and compensate to some extent the passing sight
distance requirement.
In down grades though it is easier for the overtaking vehicles to accelerate and pass ;
the overtaken vehicle may also accelerate and cover greater distance b during the overtaking
time.
Therefore , the overtaking sight distance , at both ascending and descending grades
are taken as equal to that at level stretch. However , at grades , it is desirable to provide
overtaking sight distance more than that required at level.
3.7.3. Overtaking Zones:
It is desirable to construct highways such that the length of the road visible ahead at
every point is sufficient for safe overtaking. This is seldom practicable and there may be
stretches where the safe over taking distance cannot be provided. In such zones where
overtaking is not possible , sign posts should be installed indicating Overtaking Prohibited
before such restricted zones start. But the overtaking opportunity for vehicles moving at
design speed should be given at frequent intervals. These zones which are meant for
overtaking are called Overtaking Zones.
Fig 3.8 shows an overtaking zone. The minimum length of the zone is to be 3 times
the overtaking sight distance. It is desirable to keep the length of the zone as five times the
overtaking sight distance. At these sections , there should be sufficient pavement width for
safe overtaking operations. The beginning and end of these zones should be indicated well
ahead by installing suitable sign boards.
CE409/16
41
14.4S / A
14.4 14 / 3.6
= 7.48 sec.
Distance covered during the reaction time , d1 = 0.28 Vbt = 0.28 40 2 = 22.4 m.
Distance covered during the overtaking period = d2 = b + 2S = 0.28 Vb T + 2S
= 0.28 40 7.48 + 2 14 = 111.76 m.
Distance travelled by the oncoming vehicle during T sec.
= 0.28 VT = 0.28 60 7.48 = 125.67.
Case 1: Over taking sight distance in case of two way Traffic road
= d1 + d2 + d3 = 22.40 + 111.76 + 126.67 = 259.83 or 260m.
Case 2: When there is only one way traffic , OSD =
= d1 + d2 = 22.4 + 111.76 = 134.16 or say 135m.
Case 3: Length of overtaking zone - minimum = 3 260 = 780m
Length of overtaking zone - desirable = 5 260 = 1300m.
CE409/16
42
Sign posts SP1 and SP2 should be kept 260m ahead of the beginning and end of the
zone. (Refer to Fig 3.8).
3.8. SIGHT DISTANCE AT INTERSECTIONS:
In planning highway intersections , it is essential to provide sufficient corner sight
distance to allow an approaching vehicle
intersection. The sight line is obstructed by the presence of a structure or other objects at the
corner of the intersection. Sufficient right of way should be acquired at intersections to allow
unobstructed line of sight. The driver should be able to see the vehicle approaching the
intersection from the cross road in sufficient time before , to provide for total reaction time
and change the speed of the vehicle.
The design of sight distance at intersections may be based on three possible
conditions:
CE409/16
43
stopping sight distance. At signalled intersections the above three requirements are not
applicable.
3.9. SIGHT DISTANCE - MISCELLANEOUS:
The following criteria are also taken in fixing up sight distance.
3.9.1. Intermediate Sight Distance:
This is defined as twice the stopping sight distance. When overtaking sight distance
cannot be provided , intermediate sight distance is provided to give limited overtaking
opportunities to the fast moving vehicles. This is also some times called Meeting Sight
Distance.
3.9.2. Head - Light Sight Distance:
This is the distance visible to a driver during night driving under the illumination of
the vehicle head light. This is used for design of valley curves.
3.10. CRITERIA FOR SIGHT DISTANCE REQUIREMENTS:
Throughout the length of the highway , the absolute minimum sight distance required
which is equal to the stopping sight distance should be provided. On horizontal curves , the
obstruction on the inner side of the curve should be cleared up , to provide the absolute
minimum sight distance. At uncontrolled intersections sufficient clearance to the sight line
may be given to provide stopping sight distance.
Overtaking facilities have to be provided in highway alignment at frequent intervals.
At such sections liberal overtaking sight distance should be provided. At sections of the road
where the requirements of overtaking sight distance cannot be provided , as far as possible
intermediate sight distance equal to twice the stopping sight distance may be provided. On
sharp horizontal curves , where overtaking sight distance requirements cannot be satisfied ,
overtaking should be prohibited by regulatory signs.
3.11. HORIZONTAL ALIGNMENT DESIGN:
Important factors that affect the control and design of horizontal alignment are:
3.11.1. Controlling Factors:
(i) Alignment should be as uni-directional as possible , but it should be consistent with the
topographical features of the area and should follow the natural contours of the country. This
is desirable from the construction , maintenance and aesthetic point of view. At the same time
the number of curves to be provided should be the minimum. Passing sight distance should be
provided all along the road as far as possible.
CE409/16
44
(ii) Use of maximum radii of curvatures should be made for the prescribed design speeds
since this leads to uniform speeds and greater safety.
(iii) Sharp curves should be avoided and consistency in the design should be maintained as
far as possible.
(iv) Reverse curves and compound curves which create difficulties to the driver to control the
vehicle should be avoided as far as possible.
(v) Sites for bridges and rail - road crossings must be carefully selected , and curved
approaches to such crossings must be avoided.
3.11.2. Design Factors:
The following factors affect the design of the horizontal alignment.
(i) Design speed of the highway
(ii) Superelevation
(iii) Radius of the horizontal curve
(iv) Extra widening of pavement on the curve
(v) Length of transition curves
(vi) Gradients , and
(vii) Vertical curves.
3.12. DESIGN SPEED OF THE HIGHWAY:
The main factor which effects the geometric design of various elements of a highway
is the design speed. The design speeds of the roads depends upon (i) the class of the road and
(ii) the terrain. The terrains have been classified as follows , based on the cross-slope of the
country.
TABLE 3.10. TERRAIN CLASSIFICATION:
Terrain classification
Plain
0 - 10
Rolling
10 - 25
Mountainous
25 - 60
Steep
Greater than 60
The design speed (ruling and minimum standardised by the I.R.C for different classes
of roads on different terrains are presented in Table 3.11. Speed restrictions when warranted
due to safety considerations on highways should be specified by exhibiting proper regulatory
signs.
TABLE 3.11. DESIGN SPEEDS:
CE409/16
45
Design speed in Kmph for various terrains
Road Classifications
Plain
Ruling
Rolling
Min
Ruling
Mountainous
Min
Rulin
Min
g
National
and
Steep
Rulin Min
g
State
Highways
100
80
80
65
50
40
40
30
80
65
65
50
40
30
30
20
65
50
50
40
30
25
25
20
Village Roads
50
40
40
35
25
20
25
20
3.13. SUMMARY:
Geometric design of a highway deals with the dimensions of highway features such as
alignment , slopes , widths , sight distances etc. These elements should be designed on
scientific basis to provide maximum efficiency to traffic operations with safety , comfort and
economy.
Pavement surface characteristics like friction , unevenness , light reflecting properties
and drainage of surface water influence the design of a highway geometry.
The width of a pavement on carriage way depends on the number of lanes and the
width of one traffic lane. The IRC recommends a width of 3.5m per lane in a multiple lane
highway. number of lanes to be provided depends on the total intensity of traffic and the
capacity of each lane. When mixed traffic exists , the capacity of highway is expressed in
terms of Passenger Car Units (PCU). The weightage values for various classes of vehicles
have been specified by the IRC and MOT.
In order to prevent head on collision between vehicles moving in opposite directions
in adjacent lanes of multiple lane roads , traffic separators are provided. In such highways ,
the road width depends on the pavement width and width of traffic separators, if any. The
traffic separators may be in the form of pavement markings , physical dividers or area
separators.
Width of land to be acquired along the highway alignment , Land width or Right of
way Width , depends on the importance of the road and possible future expansion. The IRC
has specified the land widths for various classes of roads.
Camber or Cross - slope is the transverse slope provided to the road surface to drain
off the rain water. This camber to be provided depends on the type of road surface and the
amount of rainfall in the region.
CE409/16
46
Sufficient length of highway should be visible to the driver ahead for safe and
efficient driving. Three types of sight distances are considered in the geometric design of
highways.
Stopping sight distance or absolute minimum sight distance is the distance required to
stop a vehicle moving at design speed before coming into collision with another moving or
stationary object. For safe overtaking operation , sufficient length of the road should be
visible to the driver ahead throughout the length of the road. This is called overtaking sight
distance. Where such overtaking opportunities are not available Overtaking Zones are
provided at frequent intervals along the length of the road to facilitate overtaking. For
vehicles entering uncontrolled intersections safe sight distances should be provided.
Criteria for sight distance requirements on highways has been presented based on the
IRC standards.
Important factors that affect the design of horizontal alignment of a highway have
been presented.
3.14. SELF ASSESSMENT QUESTIONS:
(1) Define the terms: (i) Sight Distance (ii) Passing Sight Distance and (iii) Stopping Sight
Distance.
(2) Explain briefly how the sight distance affects the design and construction of a highway.
(3) Why is straight line camber provided for concrete roads.
(4) What do you understand by (i) Right of way and (ii) Road camber.
(5) What are the factors that affect the lane width and the number of lanes to be provided for
a straight highway ?
(6) Design the overtaking sight distance for a national highway of two lane width with two
way traffic. Design speed may be assumed as 100 kmph. All other data may be assumed.
ANS : 760.
(7) Calculate the stopping sight distance for a road for which the design speed is 60 kmph.
Brake efficiency is 40%.
ANS. : 141 M.
(8) Write Notes on
(i) Kerbs (ii) Traffic separators (iii) Overtaking Zones and (iv) Sight distance at uncontrolled
intersections.
3.15. BOOKS OF REFERENCE:
CE409/16
47
(1) Bindra , S.P. (1977) - A course in Highway Engineering , Dhanpath Rai and Sons , New Delhi.
(2) Kadiyali , L.R. (1984) - Principles and Practice of Highway Engineering , Khanna Tech.
Publications , New Delhi.
(3) Khanna , Dr. S.K. and Justo , Dr. C.E.G. - (1991) - Highway Engineering , Nem Chand
and Bros., Roorkee.
(4) Ribbon Development along Highways and its prevention , special Report 15 , the IRC ,
New - Delhi , (1974).
(5) Recommended Practice for Sight Distance on Rural Highways , The IRC , New-Delhi ,
1976.
***
TRANSPORTATION ENGINEERING
UNIT - 4
HIGH-WAY GEOMETRIC DESIGN - II
CONTENTS:
Aims / Objectives:
4.1. Introduction
4.2. Superelevation
4.3. Radius of Horizontal Curve
4.4. Extra Widening of Pavement on Curves
4.5. Transition curves
4.6. Set-back distance on horizontal Curves
4.7. Gradients
4.8. Vertical Curves - Summit curves
4.9. Vertical curves - Valley curves
4.10. Self Assessment Questions
4.11. Summary
4.12. References.
Aims / Objectives:
Design of horizontal curvature of a highway is the most important feature as it
influences the efficiency and safety of the highway. The maximum comfortable speed on a
horizontal curve is primarily dependent upon the radius of the curve and super elevation of
CE409/16
48
the carriage way. Other factors that affect the vehicle safety and speed on the horizontal
curves are extra carriage way widths , presence of transition curves and provision of
sufficient sight distance. Design principles of these features in a horizontal alignment are
presented.
Vertical alignment of a highway consists of two elements: gradients and vertical
curve. In order to have smooth and safe movement of traffic , the changes in the gradients
have to be smoothened out by vertical curves. Design principles of these elements are
discussed.
4.1. INTRODUCTION:
Many a time it may not be possible to have a straight alignment to a highway and
changes in direction have to be incorporated. This may be due to the obligatory points that
decide the alignment of the highway or due to the necessity of breaking the monotony or
driving and keeping the driver alert. In order to have smooth vehicle movements on the roads
, the changes in the straight direction should be smoothened out by the horizontal curves. The
alignment should enable consistant , safe and smooth movement of vehicles operating at the
design speeds. Various factors that affect the design of horizontal alignment are discussed.
The vertical profile of a road will have level stretches as well as slopes or gradients.
The changes in gradients have to be smoothened by means of vertical curves in order to have
smooth and safe flow of traffic. Two types of vertical curves are met with in a vertical
alignment. The design principles of the vertical curves - Summit and Sag or Valley curves are
also presented in the following paragraphs.
4.2. SUPER ELEVATION:
In order to counteract the affects of centrifugal force on the vehicle the highway is
super-elevated on curves. The effects of centrifufal forces on the vehicles are discussed.
4.2.1. Centrifugal Force:
When a vehicle travels around a curve of constant radius R(metres) , at a constant
speed of v metres / sec., it experiences a horizontal outward force through its centre of
gravity , known as Centrifugal Force and is given by the equation.
P = Wv2 / R g
where P = Centrifugal Force in Kg.
W = Weight of vehicle , Kg.
V = Speed of vehicle m / sec
R = Radius of circular curve , m.
4.1
CE409/16
49
P / W = v2 / Rg
4.2
(B) OVERTURNING
P = Wv / Rg = f.W
or
4.3
v2 / Rg = f
CE409/16
or
50
P / W = b / 2h
4.4
CE409/16
51
e = NL / ML = tan .
In practice , the value of e will not exceed 7% or 0.07.
Hence e = tan
, sin
= NL / MN = E / B
where E is the total super elevated height of outer edge , e is the super elevation ratio
and B is width of the pavement on curve.
4.2.3. Analysis of Super-elevation:
The forces acting on the vehicle , moving on a super elevated circular curve of radius
R meters with a speed of v m / sec. or V kmph are as follows (Fig 4.3)
or
P(cos
= W sin
+ FA + FB
= W sin
+ f (RA + RB)
= W sin
+ f (W cos
- f sin ) = W (sin
+ P sin ).
+ f cos )
, we get
CE409/16
52
P / W = (tan
+ f) / (1 - f tan ).
The value of f , the coefficient of lateral friction , is taken as 0.15 for design purposes.
The value of transverse slope Tan
is
less than 0.01. Thus the value of (1 - f tan ) in the above equation is equal to 0.99 and may
be approximated to 1.
Therefore P/W = tan
+f=e+f
4.6
4.7
127 f . R
CE409/16
53
4.8
(ii) If the calculated value of e is less than 0.07 , the value so obtained is provided. If the
value of e , calculated as per (i) exceeds 1 / 15 or 0.07 , then provide the maximum super
elevation equal to 0.07 , and proceed to the following step.
(iii) Check the coefficient of friction developed for the maximum value of e = 0.07, using the
equation.
f = (v2 / Rg - 0.07) = (V2 / 127 R - 0.07)
4.9
If the value of f thus calculated is less than 0.15 , the super elevation is safe for the
design speed. If not calculate the restricted speed as given in step (iv).
(iv) The allowable speed (va m / sec or Va kmph) on the curve is calculated by considering
the design coefficient of lateral friction and the maximum super elevation from the equation.
e + f = 0.07 + 0.15 = 0.22 = va2 / Rg = Va2 / 127 R
4.10
If Va is greater than V , the design is adquate and e = 0.07 is provided. If not , that is
Va < V , the design speed is restricted to Va , and appropriate caution and speed limit signs
are provided.
As it is not desirable to restrict the speed on
conditions permit , it is better to re-align the curve with longer radius so that the design speed
could be maintained.
4.2.6. Methods of Providing Super elevation:
The road cross-section at the straight portion is cambered with crown at the centre of
the pavement and sloping downwards the edge. But the cross-section in the circular portion
of the road is super-elevated with uniform tilt sloping down from the outer edge of the
pavement upto the inner edge. Thus , the curved camber section at the straight before the start
of the transition curve should be changed to a single cross-slope equal to the desired
superelevation at the beginning of the circular curve. This change may be conveniently
attained at a gradual and uniform rate throughout the transition length of the horizontal curve.
(Fig 4.4). This is done in two stages: (i) the camber is neutralised gradually till the road has
one straight line slope from the outer to inner edge (ii) then the straight slope is gradually
CE409/16
54
increased till the designed superelevation is attained. After the outer edge is raised to be in
one straight line as shown in Fig 4.4 c , the calculated super elevation is given in one of the
two ways shown in Fig 4.4 d1 or d2 . In d1 the desired superelevation E is attained by raising
the outer edge revolving about the inner edge. In Fig 4.4 d2 , the desired superelevation is
attained by raising the outer edge by E / 2 and depressing the inner edge by E / 2. The later is
preferred since the grade of the centre line remains the same. The first case is preferred in
dead flat country , where the second method cannot be adopted for fear of taking the inner
edge in cutting and consequent trouble of drainage.
R=
v2
V2
=
0.22 g 127 0.22
V2
/ Rg =
127 R
CE409/16
55
4.11
It is likely that the standard design speeds are raised in years to come and it is not
desirable to adopt the radius of the curve given by equation 4.11. The radius of the curve to
be adopted for design should be higher than the minimum radius. The Ruling Minimum
Radius for which the curves have to be designed is given by
Rruling = v2ruling / 0.22 g = V2ruling / (127 0.22)
4.12
Values of Vruling and Vmin as recommended by the IRC for various classes of roads are
presented in Table 3.11.
4.4. Extra Widening of Pavement on curves:
The widening of pavement at horizontal curves is required (a) For mechanical reasons
and (b) For psychological reasons.
(a) Mechanical Widening - On curves the vehicles occupy a greater width because the rear
wheels track inside the front wheels as shown in Fig 4.5. This is sometimes called OFF
TRACKING . The extra width to be provided on curves to account for the off tracking due
to rigidity of wheel base is called mechanical widening Wm , and may be calculated as
follows.
R2
l2
R2 - l 2 = (R - Wm)2
R2 - l 2 = (R - Wm)2
l2
CE409/16
56
4.13
(b) Widening due to psychological reasons - Widening of pavement is required on curves for
the following reasons:
(i) On curves drivers have difficulty in steering the vehicles to keep to the centre line of the
lane.
(ii) Drivers have psychological shyness to drive close to the edges of the pavement on curves.
An emperical formula has been recommended by the IRC for finding the additional
widening Wps for psychological reasons , which is dependent on the design speed and the
radius of the curve and is given by
Wps = V / 9.5
4.14
4.15
CE409/16
57
(i) To introduce gradually the centrifugal force between the tangent point and the beginning
of the circular curve , avoiding sudden jerk on the vehicle.
(ii) To enable the driver turn the steering gradually for his own comfort and security.
(iii) To enable gradual introduction of designed superelevation and extra widening of
pavement at the start of the ciruclar curve.
4.16
CE409/16
58
4.17
that is the minimum and maximum values of C are limited to 0.5 and 0.8 respectively.
(b) Rate of introduction of super-elevation:
This has already been discussed in article 4.2.6.
If the pavement is rotated about the inner edge , the length of transition curve (Ls) is given by
LS = E N = eN (W + We)
4.18
If the pavement is rotated about the centre line , length of transiton curve (Ls) is given by
Ls = EN / 2 = eN / 2 (W + We)
4.19
4.20
4.21
The length of the transition curve for design should be highest of the three values
considered in a , b and c.
When the radius of the circular curve is very large transition curve need not
necessarily be provided. Such radii for various design speeds have been specified by the IRC.
The circular curve gets shifted in position due to the introduction of the trransition
curves at both the ends. The shift S of the circular curve is given by
S = L2S / 24 R
4.6. Set-back Distance on Horizontal Curves:
4.22
CE409/16
59
The clear distance or set-back distance m (fig 4.7) required from the centre line of a
horizontal curve to an obstruction on the inner side of the curve to provide adequate sight
distance depend upon the following factors:
(i) required sight distance
(ii) radius of horizontal curve
(iii) Length of curve
Let be the angle subtended by the arc length equal to the required sight distance
S at the centre of the horizontal curve. Then
= 180S / RT degress.
Fig 4.7
The distance from the obstruction to the centre is R cos
/ 2.
Then the set back distance CD = m required from the centre line is given by
m = R - R cos
/2
4.23
In the case of wide roads with two or more lanes if d is the distance between the
centre line of the road and the centre line of the inside line in metres , the sight distance is
measured along the middle of the inner side lane and the set back distance m1 is given by
m = R - (R - d) cos
where
= 180S /
/2
4.24
(R - d) degress
4.25
The IRC has suggested equation 4.24 for finding the set back distance required at
horizontal curves. The clearance of obstruction upto the set back distance is important when
there is a cut slope on the inside of the horizontal cuve.
Worked example 4.1 illustrates complete design of the horizontal alignment.
Worked Example:
CE409/16
60
4.1: A national highway is passing through a plain terrain. Design all the geometric features
of the curve assuming suitable data. Also specify the minimum set back distance from the
centre line or the two lane highway on the inner side of the curve upto which the buildings etc
., obstructing the vision should not be constructed so that the overtaking sight distance is
available through out the circular curve. Assume the length of the circular curve greater than
overtaking sight distance.
Solution:
The various geometric elements to be designed are:
(i) Ruling minimum radius (ii) Super elevation (iii) Extra widening (iv) Length of transition
curve (v) Overtaking sight distance and set back distance.
Data assumed:
For National Highway through Plain Terrain
Ruling speed = 100 kmph ; No. of lanes 2
Width of pavement = 7m
Speed of overtaking vehicle = (100 - 16) = 94 kmph
For overtaking reaction time of driver = 2 sec.
(i) Ruling minimum radius = V2 / 127 (a + f) = 1002 / 127 (0.07 + 0.15) = 357.9 m or say
360m.
(ii) Super elevation Design:
Super elevation is designed for 75% of the design speed.
e = (0.75 V)2 / 127 R = (0.75 x 100)2 / 127 x 360 = 0.123
as the value of e is greater than 0.07 , it is restricted to 0.07 and check for friction is made
f = V2 / 127 R-e = 1002 / 127 x 360 - 0.07 = 0.149
As this value of f is less than 0.15 , superelevation of 0.07 may be provided.
(iii) Extra -width of pavement to be provided
We = nl2 / 2R + V / 9.5
CE409/16
61
14.4S / A
= 13.02
/ 2 = 180 762 / 2
CE409/16
62
Gradient is the rate of rise or fall along the length of the road with respect to the
horizontal. A rising or ascending gradient is designated by plus (+) sign while a descending
gradient by negative (-) sign. Gradient is expressed as a ratio of 1 in n (one unit of vertical to
n units of horizontal) and some times as a percentage that is n in 100. The angle which
measured the change of direction at the intersection of two grades is called the Deviation
Angle and is represented by N , and is equal to the algebraic difference between the two
grades. In Fig 4.8 , the deviation angle N =
DBC =
BAC +
Where n1 is the ascending gradient of AB and (-n2) is the descending gradient of BC.
CE409/16
63
Every limiting gradient should be followed by a stretch of road having a very small gradient
or levelled ground. In hilly areas these gradients are very common. Recommended values of
limiting gradients of roads in differenct terrains are as presented in Table 4.1.
4.7.3. Exceptional Gradient:
Exceptional gradients are steeper than limiting gradients and have to be provided only
under unavoidable circumstances. However the excceptional gradient should be strictly
limited only for short stretches not exceeding about 100 metres at a stretches. Recommended
values of this gradient for different terrains are also presented in Table 4.1.
Table 4.1. Gradients For Roads in Different Terrains:
Terrain
Gradient in percent
Ruling
Limiting
Exceptional
1. Plane or Rolling
3.3 (1 in 30)
5.0 (1 in 20)
6.7 (1 in 15)
5.0 (1 in 20)
6.0 (1 in 16.7)
7.0 (1 in 14.3)
6.0 (1 in 16.7)
7.0 (1 in 14.3)
8.0 (1 in 12.5)
CE409/16
64
exceed the resistance due to the maximum value of the gradient specified. The gradient in
such cases is slightly reduced so that the vehicle may deal with resistance offered by the
curve and grade effectively. This reduction in gradient is called Grade Compensation and is
calculated from the following formula.
Grade compensation , (percent) = (30 + R/R)
4.26
CE409/16
65
4.27
where N is the deviation angle and L is the length of the curve x and y are the coordinates of any point P on the curve.
CE409/16
66
While designing the length of the parabolic summit curve , it is necessary to consider
both the stopping sight distance (SSD) and overtaking sight distance (OSD) separately. These
two cases are discussed.
(a) Length of Summit Curve for Stopping Sight Distance (SSD):
Two cases are to be considered in deciding the length.
(i) When the length of the curve is greater then the stopping sight distance (L > SSD).
(ii) When the length of the cuve is less than the stopping sight distance (L < SSD).
Case (i) When (L > SSD):
The general equation for the length of the parabolic curve is given by
L = NS2 / (
Here
2H + 2h )2
4.28
get ,
L = NS2 / 4.4
4.29
2H + 2h )2 / N
4.30
4.31
Knowing the stopping sight distance S , the length of summit curve may be obtained
using any one of the two appropriate formulae (4.29) or (4.31).
(b) Length of Summit Curve for Safe Overtaking Sight Distance (OSD) or Intermediate
Sight Distance (ISD):
Under this consideration also two cases have to be considered in deciding the length
of the summit curve. They are:
(i) When the length of the curve is greater than the Overtaking Sight Distance (L > OSD) or
Intermediate Sight Distance (L > ISD).
(ii) When the length of the curve is less than the Overtaking or Intermediate Sight Distance
(L < OSD) or (L < ISD).
CE409/16
67
4.32
4.33
N = Angle of deviation.
The length of the vertical summit curve in calculated knowing the overtaking sight
distance / intermediate sight distance using the appropriate formulae out of the equaltion 4.32
or 4.33.
4.9. Valley or Sag Curves:
A vertical curve having concavity upwards is called a valley curve. Some of the cases
where valley curves are formed are illustrated in Fig 4.11. At valley curves the centrifugal
force acts downwards and add to the weight of the vehicle. For gradual development of
centrifugal force the best shape of the valley curve is a transition curve.
CE409/16
68
Whereas in the case of summit curves the most important factor is the length of the
curve necessary for safety , there are at least four widely accepted criteria for determining the
minimum length of the valley curves.
They are:
(i) the vehicle head light sight distance. (British Practice)
(ii) the motorists comfort (Indian Practice).
(iii) drainage control , and
(iv) general aesthetic considerations.
4.9.1. Length of the Valley Curve:
Length of the vally transition curve is designed based on two criteria:
(i) the allowable rate of change of centrifugal acceleration.
and
The higher of the two values is adopted. Usually the second criteria of head light sight
distance is higher and therefore governs the design.
Case (a) Length of valley curve based on the allowable rate of change of centrifugal
acceleration.
CE409/16
69
But L = 2 LS
L = Length of valley curve = 2 (Nv3 / C)1/2
Here
4.34
and
for C and V in equation 4.34 , 0.6 m / sec3 and v = 0.278 V respectively , we get
L metres = 0.38 (NV3)1/2
4.35
Case (b) Length of valley curve for Head Light Sight Distance - In this , two cases are
considered. They are:
(i) Length of valley curve (L) greater than the stopping sight distance (S): L > SSD.
(ii) Length of valley curve (L) Less than the stopping sight distance (S): L < SSD.
Case (i) when L > S:
L = NS2 / (1.5 + 0.035S)
4.36
(1.5 + 0.035S )
4.37
Worked Examples:
4.2 A valley curve is to be designed for the following conditions. A descending gradient of 1
in 25 meets an ascending gradient of 1 in 30. Calculate length of the valley curve for a design
speed of 100 kmph for both comfort and head light sight distance.
Solution:
Angle of deviation N = - 1 / 25 - 1 / 30 = - 11 / 150
Case (i) Length of valleys curve based on motorists comfort.
L = 0.38 (NV3) 1/2 = 0.38 (11 / 150 1003)1/2 = 102.9m.
Case (ii) Head light sight distance.
Stopping sight distance = 0.278 Vt +
V2
254 f
CE409/16
70
NS 2
11/ 150 168 2
= 300.6 m.
L=
=
(1.5 + 0.035S ) (1.5 + 0.035 168)
Hence length of valley curve = 310 m (Answer).
Example 4.3: An ascending gradient of 1 in 60 meets a descending gradient of 1 in 40. A
vertical curve is to be designed for a speed of 80 kmph so as to have a stopping sight distance
of 150m and an overtaking sight distance of 500m. Due to the site conditions the length of the
vertical curve is to be restricted to 500m.
Solution:
N=
1
1
1
+
=
60 40 24
Case (i) when the length of the curve is > stopping site distance.
L = NS2 / 4.4 = 1 / 24 1502 / 4.4 = 213m
As the length of the curve 213m > stopping sight distance of 150 m , the assumption
is O.K. As the length of curve is less than the prescribed value , it may be adopted.
Case (ii) Overtaking sight distance consideration.
In this case , L > OSD , need not be considered as the overtaking sight distance is
given as 500 and the length of the curve is to be restricted to 500m.
When L < OSD
L = 2S - 9.6 / N = 2 500 - 9.6 / 1/ 24 = 770m.
As this length is greater than OSD , the assumption is not correct.
Case (iii): To provide for limited opportunities of overtaking , intermediate sight distance = 2
SSD may be considered.
When L > ISD
2
L = NS / 9.6 = 1/24
300 2
9.6
= 388m.
As this length is less than 500m , the length of summit curve may be fixed as 388m ,
giving limited opportunities of overtaking.
4.10. Self Assessment Questions:
(1) What are the effects of centrifugal force on a vehicle moving along a horizontal curve ?
Why roads are superelevated on curves ?
(2) In the design procedure for super-elevation , for calculating e , only 75% of the design
speed is considered. Why ?
(3) On curves of large radius , roads are not superelevated. Why ?
CE409/16
71
(4) Calculate the safe driving speed on a curve with radius 200m. (the super elevation = 0.07
and coefficient of friction = 0.15) is the curve meeting the standards of M.D.R in plain
terrain.
(Ans: Speed = 74.75 kmph., No.)
(5) While aligning a hill road with a ruling gradient of 5% , a horizontal curve of radius 100m
is ecountered. Find the compensated gradient at the curve.
(Ans: 4.25%)
(6) A vertical summit curve has a deviation angle of 0.045. Design a summit curve to have a
passing sight distance of 500m for the following conditions.
(i) Length greater than passing sight distance and
(ii) Length less than passing sight distance.
(Ans: 1172m).
(7) A descending gradient 1 in 25 meets an ascending gradient of 1 in 30. Calculate the length
of valley curve for a design speed of 60 kmph.
(Ans: 47.5m).
4.11. Summary:
A well designed horizontal alignment of a highway should permit consistent , safe and
smooth movement of vehicles operating at the design speed. The elements of a horizontal
alignment are superelevation , radius of horizontal curve , widening of pavement on curves
and transition curves. A detailed design procedure of these elements is discussed.
On Horizontal curves roads are superelevated , that is , the outer edge of the pavement
is raised over the inner edge to counteract the effect of the centirfugal force. Considering the
mixed traffic conditions existing on our highways , a maximum rate of superelevation of 7%
has been recommonded by the IRC. Maximum amount of coefficient of lateral friction
suggested is 0.15.
Considering the off tracking effect of the wheels of a vehicle and the psychological
reasons of the driver , the pavement width is increased on horizontal curves. This extra width
to be provided is a function of the design speed , length of wheel base , number of lanes of
traffic and the radius of the horizontal curve.
Transition curves are used in the horizontal alignment between , the straight portion
and circular curve to facilitate the introduction of super elevation and extra widening of the
pavement at a uniform rate to provide a smooth and confrortable movement of the vehicles.
The length of the transition curve is based on (i) the rate of introduction of superelevation (ii)
CE409/16
72
permissible rate of change of radial acceleration and (iii) minimum length as per the IRC
formula. Length of transition curve to be adopted should be the highest of these three values.
To provide adequate sight distance on curves , obstructions have to be set back from
the centre line of the road by a certain distance. This distance depends on the sight distance
considered -stopping sight distance or overtaking sight distance.
Vertical alignment of a highway consists of gradients and curves along the profile of
the road. The changes in the grades in the vertical alignment are smoothened by providing
vertical curves. While designing the vertical alingment of the highway , it must be ensured
that minimum stopping sight distance requirement is met with.
Gradients in the roads should not be very steep. Steep gradients not only make
difficult for the vehicles to climb over them but also increase the operational cost of the
vehicles. As easy gradients as possible have to be laid , provided the earth work is not
unnecessarily increased. Gradients are classified into four classes - Ruling Gradient ,
Limiting Gradient , Exceptional Gradient and Minimum Gradient. The IRC has specified
limiting values for these gradients based on the terrain classification.
If a horizontal curve is also located on an ascending gradient steeper than 4% , the
gradient has to be reduced so that the vehicles may deal with resistance offered by the curve
and grade effectively. This reduction in gradient is called Grade Compensation.
Vertical curves may be either , summit curves or valley curves. Summit curves have
convexity upwards and parabolic. The only problem in the design of summut curves is to
provide adequate sight distance.
Valley curves have concavity upwards and are designed as transition curves. Cubic
parabolic is the preferred shape of vertical valley curves. There are four widely accepted
criteria for designing the minimum length of the valley curve. They are
(i) the vehicle head light distance
(ii) the motorist comfort ,
(iii) drainage control , and
(iv) aesthetic considerations.
4.12. References:
1. Bindra , S.P - )1977). A Course in Highway Engineering.
Dhanpath Rai and Sons , Delhi.
CE409/16
73
2. Kadiyali , L.R. (1984) - Principles and Practice of Highway Engineering , Khanna Tech
Publications , New-Delhi.
3. Khanna , Dr. S.K. and Justo , Dr. C.E.G (1991) - Highway Engineering . Neem Chand
and Brothers , Roorkee.
***
TRANSPORTATION ENGINEERING
UNIT - 5
TRAFFIC ENGINEERING - I
CONTENTS:
Aims / Objectives
5.1. Introduction
5.2. Scope of Traffic Engineering
5.3. Traffic Studies
5.4. Traffic Volume Studies
5.5. Speed Studies
5.6. Speed and Delay Studies
5.7. Origin and Destination Studies
5.8. Traffic Capacity
5.9. Road Accidents
5.10. Self Assessment Questions
5.11. Summary
5.12. References
AIMS / OBJECTIVES:
The fundamental objective of traffic engineering is to achieve safe , free , rapid and
efficient flow of traffic. Factual studies of traffic operations provide the foundation for
developing methods for improvement , in general , and for solving specific traffic problems.
Traffic volume , speed , speed and delay , origin and destination , capacity and accident
studies which form the basis for traffic data are presented in this unit.
5.1. INTRODUCTION:
Traffic engineering is a comparatively new branch of engineering , and has grown
with the increase in traffic in recent years. As vehicular traffic began to increase , the
congestion on streets began to hamper the safe and efficient movement of traffic. More and
CE409/16
74
more accidents were caused and serious problems of parking and environmental pollution
began to be felt. If was therefore necessary to give increasing attention to the operational
characteristics of highway transportation.
Traffic engineering is the science of measuring traffic and travel , the study of the
basic laws relating to traffic flow and generation and application of this knowledge to
professional practice of planning , designing and operating traffic systems to achieve safe and
efficient movement of persons and goods.
Highway engineering and traffic engineering are related subjects and the latter may be
considered to be an off-shot of the former. However , now-a-days traffic engineering has
been recognised as a specialised branch.
5.2. Scope of Traffic Engineering:
Traffic engineering may be considered as a special technique in highway design and
control of traffic. Traffic engineering deals with the direction and control of vehicular traffic
and pedestrians on existing highways. The planning , design and operation of all devices that
aid in the highway safety and free flow of traffic fall within the scope of this subject.
Traffic characteristics are quite complex and mainly dependent upon the
characteristics of the road user and the vehicle and require particular attention. The factors
which affect the characteristics of road user are physical , mental , psychological and
environmental. Vehicle size , power , speed and braking system effect the vehicular
performance on the road and need special attention. Apart from these , the various studies to
be carried out include volume , speed , speed and delay , origin and destination , capacity ,
parking and accident studies.
Various aspects that are covered under traffic operations are regulations , control and
warrants for application controls. Regulations may be in the form of laws and ordinances or
other traffic regulating measures such as speed limit , parking restrictions etc.,. Installation of
traffic control devices like signs , signals and islands are the most common measures to
regulate and control traffic. Actual adoption of traffic management measures such as traffic
regulations and control need adequate attention.
Enforcement of traffic regulations and education of the masses towards a proper traffic
behaviour are akin to Traffic Engineering and these three things are some times designated
as the three E -S of traffic safety.
5.3. TRAFFIC STUDIES:
CE409/16
75
Traffic studies are carried out to collect factual data regarding traffic operations.
These studies help in deciding the geometric design features and traffic control for safe and
efficient traffic movements. These studies are also known as Traffic Surveys or Traffic
Census. The following traffic studies are discussed in the following pages.
(i) Traffic Volume studies
(ii) Speed studies
(iii) Speed and Delay studies
(iv) Origin and Destination studies (0 - D studies)
(v) Traffic Capacity studies and
(vi) Accident studies
5.4. TRAFFIC VOLUME STUDIES:
The term Traffic Flow and Traffic Volume are used interchangeably to define the
number of vehicles that pass a given point on the highway in a given period of time. It is this
information that is of most value to the highway planner. When the traffic is composed of a
number of types of vehicles , mixed traffic , it is the normal practice to convert the flow into
Equivalent Passenger Car Units (PCUS) by using the specified equivalency factors. The
flow is then expressed as PCUS per hour or per day.
A complete traffic volume study includes the classified volume study by recording the
volume of various types and classes of traffic , the distribution by direction and by turning
movement per unit time.
The objects and uses of traffic volume studies are given below:
(i) Relative importance of roads may be fixed in deciding the priority for improvement and
expansion.
(ii) Helps to evaluate the existing facilities and plan new facilities in regard to traffic
operation and control.
(iii) Helps in the analysis of traffic trends and patterns.
(iv) Classified volume study helps in structural design of pavements and geometric design of
roads ; design of side walks , pedestrian crossings etc.,
(v) Helps in planning regulatory measures.
(vi) Turning traffic studies are useful in design of road intersections , light signal timings and
other control measures.
CE409/16
76
The volume of traffic flow varies from time to time , hour to hour in a day , day to day
in a week , and week to week in a year. Hence if a true picture is to be obtained , the hourly
traffic volume should be known with daily and seasonal variation pattern.
5.4.1. COUNTING OF TRAFFIC VOLUME:
Traffic volume counts are made either by mechanical counters or manually.
(a) Mechanical counters: These automatically record the total number of vehicles crossing a
section of a road in a desired period. These recorders are capable of recording impulses
caused by the traffic movements on a pneumatic nose placed across a roadway or by
electrically operated counters. In some cases , the impulses caused by vehicles of light weight
, and in particular pedestrians traffic , may not be enough to actuate the counter. Other
methods of working of the mechanical detectors are by photo-electric cells , magnetic
detectors and radar detectors.
The main advantage of these counters is that they can work throughout the day and
night for the desired period , recording the total hourly volume , which may not be practicable
in manual counting. The main drawback in this method of traffic count is that it is not
possible to get the traffic volumes of various classes of traffic in the stream and the details of
turning movements.
(b) Manual Counts: This methods employs a field team to record traffic volume on the
prescribed sheets. By this method it is possible to obtain data which cannot be collected by
mechanical counters , such as vehicle classification , turning movements , and counts where
the loading conditions or number of occupants are required. However , it is not practicable to
have manual count for all the 24 hours of the day and on all the days in a year. Hence resort is
made to statistical sampling techniques to arrive at the peak hourly volumes as well as the
average daily traffic volume.
TABLE - 5.1 MODEL ENUMERATORS FORM:
Location of Junction:
Road Classification
Name of Approach
Kilometreage:
Data
Route No.
Hour of Starting
Hour of Ending
District
State
Vehicle
Left Turning
Straight
Category
Right
Turning
Enume Total
PCU
Enu
Grand Total
PCU
Total PCU
CE409/16
77
ration
me
me
ration
ration
A specimen enumerators form (Table 5.1) is shown below. The data may be recorded
conveniently by five dash system whereby vertical strokes are encountered for the first four
vehicles , followed by an oblique stroke for the fifth vehicle so as to depict a total of five.
5.4.2. Presentation of Traffic Volume Data:
The date collected during the traffic volume studies are sorted out and are presented in
any of the following forms depending upon the requirements.
(i) Variation charts showing hourly , daily and seasonal variations of the traffic are prepared.
These help in deciding the facilities and regulations needed during peak traffic periods.
(ii) Trend charts show the volume trends over a period of years and are useful for planning
future expansion , design and regulations.
(iii) Annual Average Daily Traffic (AADT or ADT) - Numerically , the ADT is the total
annual volume of traffic divided by the number of days in the year. The ADT is readily
obtained where continuous counts of traffic are available. ADT volumes are useful in the
economic study of highways and also in the design of structural elements of the road.
(iv) Traffic Flow Maps along the routes and volume flow diagram at intersections as shown
in Fig 5.1 are drawn. These help to find the traffic volume distribution at a glance and for the
intersection design.
CE409/16
78
CE409/16
79
5.1
It is to be noted that running time excludes that part of the journey time when the
vehicle suffers delay. Journey Speed or Overall Travel Speed is the distance between two
points divided by the total time taken by the vehicle to complete the journey , including all
delays incurred on the route. Thus ,
Journey Speed =
Distance
Total Journey Time (including delay)
Average Speed is the average of the spot speeds of all vehicles passing a given
point on the highway.
There are two definitions for the average of a series of spot speed measurements ,
namely , space-mean speed and time - mean speed.
CE409/16
80
Space mean Speed represents the average speed of vehicles in a certain road length
at any time. This is obtained from the observed travel time of the vehicles over a relatively
long stretch of the road. Space mean speed (Vs) is calculated from:
n
Vs = 3.6 d . n /
k =1
ti
5.3
Time -mean speed represents the speed distribution of vehicles at a point on the road
way and it is the average of instantaneous speeds of observed vehicles at the spot. Time mean
speed (Vt) is calculated from:
n
Vt =
i =1
Vi / n
5.4
CE409/16
81
point and the second observer then starts a stop watch. The second observer stops the stop
watch when he observes the same vehicle passing the reference point. From these
observations the speed (kmph) is calculated. The dis-advantage with this method is that it
involves the reaction time of the two individual observers.
(ii) Enoscope Method: A simple device called (ENOSCOPE) is used for spot speed studies.
It is nothing but a mirror box supported on a tripod stand. In its simplest principle , the
observer is stationed on one side of the road , and starts a stop watch when a vehicle crosses
that section. An Enoscope is placed at a convenient distance say 50 metres in such a way
CE409/16
82
kmph
Vehicles
From the results presented in Table 5.2 , cumulative speed distribution curve (Fig 5.4)
and frequency distribution curve of spot speeds (Fig 5.5) are plotted.
The cumulative curve (Fig 5.4) is most useful in determining the speed above or
below at which certain percentage of vehicles are travelling.
Medium speed is the middle or 50% percentile speed. At this speed there are as
many vehicles going faster as there are going slower.
The 85 percentile speed is the speed below which 85 percentile of vehicles are being
driven. This is the speed at which motorists drive considering the safety condition of the
highway. This speed is adopted for the Safe speed limit at the zone . The 98 percentile
speed is taken for geometric design of the highway The 15 percentile speed is the speed
value which should be utilised as the minimum speed on the highway. It has been found that
vehicles travelling below this value on high speed roads are potential accident hazards.
Model speed is obtained from the frequency distribution curve (Fig 5.5) and is the speed at
which the greatest number of vehicles travel.
(ii) Mathematical Analysis: In this analysis the arithmetic mean or average speed is
computed from frequency distribution table by multiplying the number of vehicles in each
CE409/16
83
speed class by the mean speed of that class , summing up this amount and dividing this total
by the total number of vehicles observed. Mathematically it is expressed as.
x=
where
n
i =1
fi
xi / n
5.5
th
x I is the average speed of the i speed interval.
CE409/16
84
The methods used are (i) Floating car method (ii) Elevated observer method and (iii)
Licence plate method.
(i) Floating Car Method: A test car is allowed to float with traffic. The test car should
overtake as many vehicles as possible. An observer is seated in the floating car with two stop
watches. One of the stop watches is used to record the times at various control points. The
other stop watch is used to find the individual delays. The times , locations and causes of
these delays are recorded by another observer on a suitable tabular form or by voice
recording equipment. In this method the detailed information is obtained concerning all
phases of speed and delay.
(ii) Elevated Observer Method: Observers are stationed at elevated points such as high
buildings from which a considerable length of road may be observed. Observers select
vehicles at random and record time , locations and causes of delay. It is difficult to secure
suitable points for observation all along the routes to be studied.
(iii) Licence Plate Method: Investigators stationed at control points along the route enter on
a time control basis the licence plate numbers of passing vehicles of selected sample. From
the office computations , travel time of each vehicle can be found. But the method does not
give important information such as causes of delays and the duration and number of delays
within the test section.
5.7. ORIGIN AND DESTINATION (O - D) STUDIES:
These studies are carried out to collect factual information about desired lines of
travel with a view to provide the most effective transportation system for the traffic. The
purpose of this study is to get answers to the following questions.
(i) Why people travel ?
(Purpose of trip)
These studies are most essential in planning new highway facilities and in improving
some of the existing systems.
CE409/16
85
If this study , for example , indicates a high percentage of through traffic , a by-pass
can be considered. This survey also helps in solving zonal as well as regional traffic
problems. The uses of this study may be summarised as follows:
(i) To provide wide and better roads (express ways) along the maximum desired lines of
travel.
(ii) To plan by - passes and establish preferential routes for various types of traffic.
(iii) To plan public transportation systems in cities.
(iv) To evaluate the existing facilities and plan for an improvement or new facilities as the
case may be , and
(v) To fix dimensions and design standards for road bridges etc.,
5.7.1. METHOD OF COLLECTING O - D DATA:
Some of the popular methods of collecting O and D data are as follows:
(i) Road side Interviews with Drivers: Trained personal are stationed at pre-selected
stations. The vehicles are stopped and each driver is asked to answer the following questions
(sample questions are only given).
(a) Origin
(b) Destination
(c) Purpose of Trip
(d) Route selected to reach the destination
(e) Location of stops and purposes.
(f) Also note is made of the type of vehicles and
(g) number of passengers in the vehicles.
This method is quick , but the main drawbacks of this method are wastage of time of
traffic , possibility of traffic congestion and possible resentment from the road users.
(ii) Post-Card Survey - When the traffic is heavy and cannot be stopped long enough for
interviews , prepaid business reply Post Cards with return address and on which a
questionnaire to be filled in , along with a request to answer them and also the purpose of the
study are distributed to the drivers as they pass the station. The stations can be located where
the vehicles have to proceed slowly as at toll gates. A return of 10% or less is considered too
small. Return of well planned studies range from 25-50%. Further if the questionnaire is not
answered properly , the information hence compiled may not reflect the true picture.
CE409/16
86
(iii) Home Interviews: In this method about 10% of the population is interviewed by trained
personnel. On the basis of the interview travel data are compiled and used for carrying out
necessary improvements and planning new strategy.
(iv) Work-Place Interviews: In this method the place of interview is shifted to the work
place so that time and manpower required for conducting the survey may be minimised. Trip
particulars could be collected from many employees at one instant.
5.7.2. PRESENTATION OF O - D DATA:
Two methods of presentation of O - D survey data O - D Matrix method and Desire
line chart method are discussed.
(i) O - D Matrix: This is the most convenient form , in which the origin zones and
destinations are presented as a matrix. (Fig 5.6). The horizontal axis of the matrix represents
the destination zones and the vertical axis of the matrix represents the origin zones. The zones
may be further classified into internal and external zones , if the survey covers both internal
and external zones. The number of trips are entered in the cells of the matrix. In this (Fig 5.6)
t2-3 represents the number of trips originating in zone 2 and terminating in zone - 3.
(ii) Desire - Line Chart: This is the most popular pictorial line representation by means of
desire line chart. In this chart the trips between any pair of zones are represented by a straight
line connecting the controids of the two zones and having a width drawn to a suitable scale to
represent the actual volume of traffic. A typical desire - line chart is shown in Fig 5.7.
CE409/16
87
5.6
The highest traffic density will occur when the vehicles are practically at a stand still
on a given route and in this case the traffic volume will approach zero.
(iii) Traffic Capacity is defined as the number of vehicles passing a point on a highway in a
unit period of time. In other words it is the ability of a road way to accommodate traffic
volume. It is expressed as vehicles per hour per lane or road way.
Capacity and volume are measures of traffic flow and have the same units. Volume,
represents an actual rate of flow and responds to variation in traffic demand where as
capacity indicates the maximum rate of flow with a certain level of service characteristics that
can be carried by the road way.
CE409/16
88
(iv) Basic Capacity is the theoretical capacity of a lane or a road way. Two roads having the
same physical features will have the same basic capacity irrespective of traffic conditions , as
they are assumed ideal.
(v) Possible Capacity: This is defined as the maximum number of vehicles that can pass on a
lane or roadway during one hour under prevailing roadway and traffic conditions. This
capacity is generally much lower than the basic capacity of the road way as the prevailing
road way and traffic conditions and seldom ideal. Under the worst road way and traffic
conditions , the possible capacity of the road way may approach zero. When the prevailing
roadway and traffic conditions approach the ideal conditions , the possible capacity would
approach the basic capacity. Thus the possible capacity varies from zero to basic capacity.
(vi) Practical Capacity or Design Capacity: This is the maximum number of vehicles that can
pass a given point on a lane or road way during one hour without traffic density being so
great as to cause unreasonable delay , hazard or restrictions to the drivers freedom to
manoeuvres under the prevailing road way and traffic conditions. It is the practical capacity
that is of primary interest to the designer.
5.8.1. DETERMINATION OF BASIC CAPACITY:
Basic capacity of a single lane may be obtained from the relation
C = 1000V / S
5.7
5.8
5.9
Theoretical capacity may also be obtained if the minimum time head way (Ht)
seconds is known. The time interval between the passage of successive vehicles moving in
the same line and measured from head to head as they pass a point on the road is known as
the time head way. It has been observed that with the increase in speed of the traffic stream ,
CE409/16
89
the time head way decreases and after reaching a minimum value (Ht) at an optimum speed ,
starts increasing (Fig 5.8). The maximum theoretical capacity is then given by
C = 3600 / Ht where C is the capacity per hour
5.10
CE409/16
90
The practical capacity of a traffic lane is affected by factors like lane width , lateral
clearance , width of shoulders , commercial vehicles , alignment , presence of intersections ,
stream speed , number of lanes of traffic movement , driver characteristics and composition
of traffic etc.,. The practical capacity values suggested by the IRC for the purposes of design
of different types of roads in rural areas are given in Table 5.3.
Table 5.3 Capacity of Roads in Rural Areas:
Type of Road
1000
2500
5000
10000
20000 to 30000
CE409/16
91
The road accidents may be caused due to a combination of several reasons and seldom
due to a particular reason. Hence it is often not possible to pin-point a particular single cause
of an accident. However , it has been established that there are four basic elements involved
in traffic accidents.
(i) The road users (ii) the vehicles (iii) the road and its condition and (iv) miscellaneous
factors. These factors are discussed.
(i) Road User: The road users responsible for the accident may be the driver of one or more
vehicles involved , pedestrians or the passengers. Accidents may occur due to the mistakes ,
carelessness and deliberate actions of the road users. Excessive speed and rash driving ,
carelessness , violation of rules and regulations , failure to see and understand the traffic
situation , sign or signal , temporary effects due to fatigue , sleep or alcohol on the part of the
driver may lead to accidents. By violating regulations and by careless use of the carriage way
meant from vehicular traffic , pedestrians are responsible for road acceidents. Alighting or
getting into moving vehicles by the passengers may be also lead to accidents.
(ii) Vehicle: Vehicle defects such as failure of brakes , steering system , tyre bursts or
lighting system and any other defects in the vehicle may lead to road accidients.
(iii) Road Conditions: Surface conditions of the road like slippery surface , pot holes and
other defects have been responsible for road accidents. Defective geometric design of the
highway , improper lighting and improper traffic control devices also have been responsible
for road accidents.
(iv) Miscellaneous Factors: Un favourable weather conditions , stray animals on the road ,
badly located advertisement boards or service stations etc ., may also lead to road accidents.
5.9.2. ACCIDENT STUDIES AND RECORDS:
The usefulness of an accurate and comprehensive system of collection and recording
accident data cannot be over emphasized. Such data serves to identify the spots prone to
accidents and to suggest means of overcoming the deficiancies that lead to accidents.
The various phases in accidient studies are collection of accident data , preparation of
reports , location files and diagrams and the application of the above records for suggesting
preventive measures.
(i) Collection of Accident data: This is the first step involved in accident studies. Standard
forms are available for this purpose. Some of the details to be collected are date and time of
accident , classification of accident , location , primary causes , cost of accident , nature of
accident etc.
CE409/16
92
(ii) Accident Reports: The accident data collected as given above is furnished in the form of
a report with all facts which might be useful in the subsequent analysis. The accidents should
be reported to the police authorities who would take legal action especially in more serious
accidents involving injuries , casualities , or severe damage to property.
(iii) Accident Records: These include all particulars of the accident , location and other
details. These records are maintained by means of location files , spot maps , condition and
collision diagrams.
(a) Location Files: These are useful to identify locations of high accident incidence and to
keep a check on the places. These files should be maintained by each police station for the
respective jurisdiction.
(b) Spot Maps: These show the accident spots. Pins or symbols are used on these maps. The
common legend used for spot maps are as given below.
(c) Condition Diagrams: A condition diagram is a drawing showing all important physical
condtions of an accident location to be studied.
CE409/16
93
, are most useful to compare the accident pattern before and after the remedial measured have
been effected.
5.9.3. ACCIDENT PREVENTION:
The variious measures to decrease the accident rates may be divided into three
groups:
(i) Engineering (ii) Enforcement and (iii) Education
(i) Engineering - Engineering measures for prevention of accidents include.
(a) Proper design (geometric) of streets and highways.
(b) Before and after studies of preventive measures to study their efficiency
(c) Road lighting , and
(d) Maintenance of vehicular defects.
(ii) Enforcement - The various enforcement measures include:
(a) Speed zoning
(b) Traffic laws and ordinances
(c) Traffic signals
(d) Traffic markings
(e) Channelization
(f) Pedestrian control
(g) Control of parking
CE409/16
94
CE409/16
95
3. Distinguish among the following - Traffic volume , Traffic capacity , basic capacity ,
possible capacity and practical capacity.
4. How do you arrive at the following speeds ? (a) Safe speed (b) Speed for geometric design
of highway elements.
5.11. SUMMARY:
Traffic engineering deals with the improvement of traffic performance to achieve
efficient , free , safe and rapid flow of traffic. To achieve these objectives a number of studies
have to be carried out to collect data regarding the traffic operations. These traffic studies are
known as Traffic Surveys or Traffic Census.
Some of the important traffic studies that are carried out are traffic volume studies ,
speed studies , speed and dealy studies , origin and destination studies , capacity studies and
traffic accident studies.
Main objectives , popular methods of carrying out these traffic studies , presentation
and analysis of the data obtained have been explained under each group.
5.12. REFERENCES:
1. Kadiyali , L.R. (1978). Traffic Engineering and Transport Planning , Khanna Publishers ,
Delhi.
2. Kadiyali , L.R. (1984) - Principles and Practice of Highway Engineering Khanna Tech.
Publishers , Delhi.
3. Khanna , Dr. S.K and Justo , Dr. C.E.G - (1991) - Highway Engineering , Nimchand and
Bro., Roorkee.
4. OFlaherty , C.A. - (1974) - Highways - Vo12 , Highways and Traffic - Edward Arnold ,
London.
***
TRANSPORTATION ENGINEERING
UNIT - 6
TRAFFIC ENGINEERING - II
CONTENTS:
AIMS / OBJECTIVES
6.1. Introduction.
6.2 Traffic Regulation Measures
6.3. Traffic Control Devices
CE409/16
96
CE409/16
97
surveys , accident studies , driver records etc., are necessary for developing effective methods
of traffic regulations. Some of the traffic regulatory measures are discussed.
6.2.1. CONTROL OF BOTH DRIVER AND VEHICLE:
This is achieved by control of vehicle ownership , vehicle inspection , vehicles size ,
vehicle weight , vehicle registration , route permit and driving licences.
6.2.2. ENFORCEMENT OF BASIC GENERAL RULES:
Certain basic general rules are laid down for road use and conduct. Non-compliance
of these rules is an offence. In this regard , certain regulations are imposed on the vehicle
speed , overtaking and passing , turning and stopping , parking on roads etc. In India , traffic
flow regulation is Keep to left. Over taking should always be done from the right side. The
traffic flow in traffic round abouts and other control islands should be regulated in a
clockwise direction.
6.2.3. ONE-WAY STREETS:
To ensure smooth flow of traffic in congested streets one way system of traffic flow
should be enforced. One way street system reduces delay to the vehicle and improves the
facility of traffic movement. It increases the capacity of a street , permits higher operating
speeds and results in a reduction in the number of accidents. However , the severity of an
accident , if any , may be more. It also results in economic savings due to lowering of
motorists journey time and lessening need for police control. Such regulations are possible
only when there is a network of roads connecting two bigger roads so that the additional
distance to be travelled by some vehicles through these one way streets is not much.
CE409/16
98
These traffic signs should be backed by law in order to make them useful and
effective. These are divided into the following three types:
(a) Danger signs , also know as Warning Signs.
(b) Signs giving definite instructions also known as Regulatory signs. These are further
divided into (i) Prohibitory Signs and (ii) Mandatory Signs and
(c) Information Signs.
(a) Danger Signs or Warning Signs or Cautionary Signs:
Danger signs are used when it is deemed necessary to warn traffic of existing or
potentially hazardous conditions on or adjacent to a highway or street. The use of warning
signs should be kept to a minimum , because their unnecessary use tends to bread disrespect
for all signs. The warning signs recommended by the IRC are illustrated in Fig 6.1. The side
of the triangle is 900mm for a standard size and 600 mm for a reduced size. These signs have
a red border and the symbols indicated there in are in black colour against a white back
ground.
(b) Regulatory signs: These signs are intended to inform the highway users of traffic laws or
regulations. These are of two types:
(i) Prohibitory Signs: These signs given definite negative instructions prohibiting the
motorist from making particular manoeuvres. eg: over taking prohibited , one-way traffic ,
waiting restrictions , restrictions on dimensions , speed of vehicle etc. These are of circular
shape , with a dia. of 600mm for signs of the standard size and 400mm for reduced size. The
signs have a red border. The colour of the background is white for speed control and blue for
other signs. The symbols are black in colour on white background and white in colour on
blue background. These signs are illustrated in Fig 6.2.
(ii) Mandatory Signs are part of regulatory signs and are intended to convey definite positive
instructions when it is desired that motorists take some positive action. The two important
mandatory signs are the STOP sign and YIELD or GIVE WAY sign Fig. 6.3. The stop sign
requires all the vehicles to come to a halt before the stop line. Stop sign is an octagon with a
white border and a red background , the side of the octagon being either 900 mm or 600 mm.
It shall be used in combination with a definition plate carrying the message STOP.
CE409/16
99
CE409/16
100
CE409/16
101
THE YIELD or GIVE WAY sign (Fig 6.3) is a downward pointing equilateral
triangle having a red border and a white background. The side of the equilateral triangle is
either 900 mm or 600 mm. It shall be used in combination with a definition plate carrying the
message GIVEWAY. This sign is used to assign right-of way to traffic on certain
approaches to an intersection. Vehicles controlled by a YIELD sign need stop only when
necessary to avoid interference with other traffic.
(c) Informatory Signs: These signs are intended to guide the road user and to give such
information as may be of interest during travel. An informatory sign is made of a rectangular
board of specified size. The common informatory signs used are Road Junction approach ,
End of speed limit; and Parking Sign.
CE409/16
102
CE409/16
103
CE409/16
104
the left hand side of the road and are illuminated in such a way that they are visible from a
distance 0.4 km under normal atmospheric conditions. Based on their operating principles
and functions traffic signals are classified into the following groups.
CE409/16
105
(i) Centre line , (ii) Traffic lane lines , (iii) No overtaking zone markings , (iv) Obstruction
approach markings. (v) Stop lines , (vi) Pedestrian crossings (vii) Cyclist crossings , (viii)
Route direction indications (ix) Word messages (x) parking space limits , (xi) Bus stops etc.
In general solid lines are restrictive in nature and it is an offence to cross or straddle
such a line. Broken lines are permissive in character , and vehicles can cross such a line
provided this can be done with safety. All carriage markings except those intended for
parking restrictions are made in white colour. Yellow paint is used for markings intended for
parking restrictions and continuous centre and barrier line markings.
(b) Kerb Markings: These may indicate certain regulations like parking regulations. To
increase the visibility from a long distance kerbs of all islands are normally painted with
alternate black and white stripes.
(c) Object Markings: Obstructions on or near the road way are hazardous and hence should
be marked properly. Typical obstructions are supports for bridges , signs and signals , level
crossings , narrow bridges , culvert head walls etc. Obstructions in the carriage way are
marked by alternate black and white stripes , sloping down at an angle of 450 towards the side
of the obstruction on which traffic passes. When the vertical clearance of an under pass is less
than the prescribed minimum , the clearance is marked by vertical stripes alternatively black
and white.
(d) Reflector Unit Markings: These are used as hazard markers and guide markers for safe
driving during night. Hazard markers reflecting yellow light should be visible from a long
distance of about 150 metres.
6.3.4. TRAFFIC ISLANDS:
Traffic islands are raised areas constructed within the roadway to establish physical
channels through which vehicular traffic may be guided. Traffic islands may be classified
based on their functions as (i) Division Islands , (ii) Channelising Islands and (iii) Rotaries.
Division islands have been dealt with already (Art 3.3) , channelising islands and
rotaries are discussed in article 6.4.
6.4. ROAD INTERSECTION DESIGN:
Road intersections can be either Intersections at grade or Level or Grade separated
intersections. In the case of at grade or level intersections approaching roads meet at one
level , but in the case of grade separated intersections , intersecting roads are separated in
level by passing one road over or below the other.
6.4.1. AT GRADE INTERSECTIONS:
CE409/16
106
In the case of at grade intersections , traffic have to perform through , turning and
crossing movements. As such , intersections are points of traffic hazards which effect safety ,
speed , efficiency , capacity and cost of operation of the road. Hence design of road
intersection is vital for improving road system and to avoid possibilities of road accidents.
Along with vehicular traffic , pedestrian traffic has to be tackled at the road intersections.
CE409/16
107
CE409/16
108
CE409/16
109
stopping at road intersection is eliminated. All the traffic streams merge into a common
stream around the centre island and then diverge out to the desired , radiation road. On rotary
, crossing conflicts are completely eliminated (See Fig 6.11).
Design Factors of Rotary:
In designing a rotary the following elements are considered.
(i) Design speed: As the vehicles approach the rotary with reduced speed , rotaries on Indian
roads are designed for a speed of 40 kmph in rural areas and for a speed of 30 kmph in urban
areas.
CE409/16
110
of the import roads. Turbine shape forces reduction in speed of vehicles and enables speeding
up of vehicles going out. At night the head light glow is a limitation of the design.
6.1
where f is the coefficient of friction taken as 0.43 and 0.47 for speeds (V) of 40 and 30 kmph
respectively after allowing a factor of safety of 1.5.
(iv) Weaving Angle and Weaving Distance: The angle between the paths of vehicles
entering the rotary from a particular radiating road and that of another vehicle leaving the
rotary on an adjacent road is known as weaving angle (Fig 6.11). The value of the weaving
angle should be kept small , but not less than 150 .
Vehicles entering the rotary from a road and leaving towards another radiating road
have to first merge into one way traffic flow in the roatary roadway around the central island
and than weave out to diverge from the flow to the required road outlet. The weaving
operation including merging and diverging can take place between two channelising islands
of adjacent intersecting legs ; and the length of the roadway is known as Weaving length
CE409/16
111
(Fig 6.11). The recommended values of minimum weaving lengths are 45 m and 30 m for
speeds of 40 kmph and 30 kmph respectively. The maximum weaving length may be taken as
twice the above minimum recommended weaving length.
(v) Width of Rotary Road Way: The minimum width of the roadway between the edge of
the central island and adjoining kerb is the effective width of the rotary or of the weaving
section and this by and large determines the capacity of the rotary.
The width of non-weaving section e2 of the rotary should be equal to the widest single
entry to the rotary and should generally be less than the width of weaving section. The width
W of the weaving section of the rotary should be one traffic lane wider than the mean width
of entry (e1) and nonweaving section (e2). That is
W = (e1 + e2) / 2 + 3.5 m
6.2
(vi) Channelising Islands: These should be provided at the entrance and exit of the rotary to
prevent undesirable weaving and turning and to reduce the area of conflict. These islands also
help in forcing the vehicles to reduce their speed to the design speed of the rotary and to serve
as a convenient place foe erecting traffic signs and as a pedestrian refuge. They have kerbs of
15 to 21 cm high.
(viii) Sight Distance and Grade: The sight distance at the rotary should be as large as
possible and in no case less than the safe stopping sight distance for the design speed. It is
preferable to locate a rotary on level ground. It may also be located on the area which is on a
single plane , with the slope not exceeding 1 in 50 with the horizontal.
(viii) Lighting: The minimum lighting required is one each on the edge of the central island
facing each radiating road (points A in Fig 6.11). Additional lights B may be provided when
the central island is larger than 60m dia. Lights C may also be provided near the entrance
curves if the pedestrians are large in number.
(ix) Traffic signs: The standard traffic (warning) sings indicating the presence of rotary
intersection should be installed at all approaching roads. At night a red reflect or red light is
placed at about one metre above the road level on the nose of each directional island and on
the kerb of the central island and channelising islands are marked by alternating black and
white stripes to improve visibility.
(x) Provision for Cyclists and Pedestrians: Pedestrians cause hindrance to the free flow of
vehicular traffic. As such they should be isolated from the vehicular traffic using rotary by
providing subways or overbridge , though they prove to be costly.
CE409/16
112
CE409/16
113
Semidirect ramp allows diverging to left , but merging is from the right side. In the indirect
method of interchange ramp , diverging and merging is from the left. In this case , there are
less hazards than diverging from right and merging from right. But the distance to be
traversed in the indirect interchange is more. Gradient on ramps should be limited to 4 to 6
percent.
CE409/16
114
under-bridge it is known as an Under Pass. Choice of over pass or underpass depends on the
topography , vertical alignment , drainage , economy and preferential aspects for one of the
highways. An overpass gives drivers less feeling of restriction and confinement and less
problems of drainage. On the other hand an underpass may be more advantageous where the
major road can be built close to the existing ground surface. An overpass allows for stage
construction where as in the case of under pass there is no possibility of stage construction.
6.5.2. INTERCHANGES:
Grade separated intersection with complete interchange facilities is essential to
develop a highway with full control of access. Some of the types of interchanges are shown
in Fig 6.14. Of all these complete clover leaf fulfils all the requirements of turning traffic
involving simplest traffic manoeuvres , namely , diverging to the left and merging from the
left by providing four indirect ramps.
CE409/16
115
6.7. SUMMARY:
For safe operation of traffic on a highway adequate regulations and controls have to
be imposed on the traffic. Regulatory measures include methods like imposing control on
both the vehicle and driver , enforcing certain basic rules for road use and conduct and
introduction of one-way system of traffic flow in congested streets. The various aids used to
control , regulate and guide the traffic are known as Traffic Control Devices. These include
traffic signs and signals , road markings , traffic islands and rotaries. Various aspects of these
traffic control devices such as classification , location and design principles have been dealt
with in detail.
Road intersections can be either intersections at-grade (Level) or grade-separated
intersections. In the case of at-grade intersections approaching roads meet at on a level ; but
in the case of grade separated intersections , intersecting roads are separated in level by
passing one road over or below the other by means of a bridge.
At grade intersections the traffic movements are quite complex and effect safety ,
speed , efficiently and capacity of operation of the road. Hence design of a road intersection
is vital for improving the road system and for avoiding possibilities of accidents. This is
achieved by reducing the conflicting points to a minimum by judicious design and location of
various types of traffic islands. Rotary intersections are the safest type of all the at-grade
intersections where crossing conflicts are completely eliminated. These have highest traffic
handling capacity also.
Grade separated intersection may be an over pass or an underpass. In the case of an
overpass the major highway is taken above the level of another by means of an overbridge
and an embankment. On the other hand , if the major highway is taken depressing it below
the ground level to cross another road by an underbridge , it is called an under pass. Choice of
overpass or underpass depends on the topography , vertical alignment , drainage , economy ,
and preferential aspects for one of the highways. Transfer of routes at a grade separation is
effected by means of ramps. Interchange ramps may be classified as direct , semi-direct or indirect. The indirect ramps are to be preferred as the traffic movements are less hazardous as
the diverging and merging of traffic is from the left. Complete clover leaf fulfils all the
requirements of turning traffic.
6.8. BOOKS OF REFERENCE:
1. Kadiyali , L.R. (1978) - Traffic Engineering and Transport Planning - Khanna
Publications , Delhi.
CE409/16
116
2. Khanna , Dr. S.K. and Justo , Dr. C.E.G. - (1991) Highway Engineering , Nem Chand
and Bros , Roorkes.
3. O Flaherty , C.A. (1974) - Highways - Vol - 1 , Highways and Traffic - Edward Arnold
, London.
4. IRC: 65 - (1976) - Recommended Practice For Traffic Rotaries.
***
TRANSPORTATION ENGINEERING
HIGHWAY MATERIALS - I
UNIT - 7
SUB-GRADE SOIL AND MINERAL AGGREGATES
CONTENTS:
Aims / Objectives
7.1. Introduction
7.2. Sub-grade soil
7.3. Mineral Aggregate
7.4. Summary
7.5. Self Assessment Questions
7.6. References
AIMS / OBJECTIVES:
A variety of materials are used in the construction of highway and air field
pavements. These materials include soil , aggregates , bituminous materials and cement. A
number of tests have to be carried out on these materials to determine their strength
characteristics and also their suitability for road construction. Some of the important tests
specified for the sub-grade soil and mineral aggregates are discussed.
7.1. INTRODUCTION:
Soil is the foundation material for all highways , whether it be in the form of
undisturbed in-situ sub-grade materials or transported and reworked embankment material. In
addition to the highway pavement itself , the flanking shoulders as well are very often
composed of the soil. Thus the soil plays the most important role in the highway construction
and it is axiomatic that the highway engineer should have a thorough understanding of soils
and how they behave.
CE409/16
117
Mineral aggregates are the basic materials of highway pavement construction. Not
only do they support the stresses occurring within the pavement , but in addition the
aggregates in the road surface must resist wear due to abrasion by traffic as well as the direct
weathering effects of natural elements. Therefore the properties of the aggregates are also of
considerable significance to the highway engineer.
7.2. SUB-GRADE SOIL:
Sub-grade soil provides support to the pavement from beneath and as such the subgrade should possess sufficient stability under adverse climate and loading conditions. Soil
when used in embankment construction , in addition to stability , should be incompressible.
Soil is used as a binding material also. Compacted soil and stabilised soil are often used in
sub-base or base-course of highway pavement. As such , soil is one of the principal highway
materials.
7.2.1. Classification of Soils: The purpose of soil classification is to arrange various types of
soils into groups according to their engineering properties and various other characteristics.
Soils possessing similar characteristics can be placed in the same group. For general
engineering purposes soils may be classified by the following systems.
1. Particle size classification
2. Textural classification
3. Highway Research Board (HRB) classification , and
4. Unified soil classification and I.S. Soil classification.
The unified soil classification system and I.S. soil classification system are based on
both grain size analysis and plasticity properties of the soil and are applicable to any use. The
I.S. (1498 - 1970) presents classification and identification of soils for general engineering
purposes. Characteristics of soil pertinent to roads and air fields also have been discussed.
The student is required to refer to the course material in Soil Mechanics for further details.
Highway Research Board (HRB) system of classification of soils finds direct
application in the design of flexible pavements. The course grained soils are divided into
three groups A - 1 , A - 2 , A - 3 , based on the gravel and sand content. Fine-grained soils are
divided into four groups - A - 4 , A - 5 , A - 6 and A - 7. In order to classify the fine grained
soils within one group and for judging their suitability as subgrade materials , an indexing
system has been developed and is termed as GROUP INDEX. Group Index is a function of
CE409/16
118
percentage material passing 0.075 mm mesh sieve , liquid limit and plasticity index of the
soil and is given by
Group Index (G.I) = 0.2a + 0.005 ac + 0.01 bd
7.1
where
a = that portion of the material passing 0.075 mm mesh sieve , greater than 35 and not
exceeding 75 percent (expressed as a whole number from 0 to 40)
b = that portion of the material passing 0.075 mm mesh sieve , grater than 15 and not
exceeding 55%. (expressed as a whole number for 0 to 40).
c = that value of liquid limit in excess of 40 and less than 60 (expressed as a whole
number 0 - 20).
d = that value of the plasticity index exceeding 10 and not more than 30 (expressed as
a whole number between 0 to 20).
According to this formula , the minimum possible value of group index is zero and the
maximum value is twenty. Higher the value of group index poorer is the soil as a sub-grade
material.
Table 7.1. H.R.B. Classification
Group
A-1
A-3
A-2
A-4
A-5
A-6
classifi
A7
cation
Group
0-4max.
8max
12max
16max
Index
20m
ax
Usual
Stone
Fine sand
Silty &
SILTY SOIL
signific
fragements ,
clayey
ant
gravel and
gravel &
materia
sand
sand
CLAYE
Y SOIL
l
General
Excellent
to good
Fair to poor
rating
as subgrade
General
Generally
materials
35% or
Silt clay.
materials
Classifi
less passing
75micron
sieve
35%passing
75
cation
(More
than
micron sieve)
CE409/16
119
Worked Example:
7.1. On a sieve analysis it has been found that the soil contains 55% of materials passing
0.075 mm , the liquid and plastic limits are 40% and 25% respectively. Find out the group
index.
Solution: a = 55 - 35 = 20
b = 55 - 15 = 40
c = 40 - 40 = 0
d = (40 - 25) - 10 = 15
G.I. = 0.2 (20) + 0.005 (20) (0) + 0.01 (40) (15) = 10.
7.2.1. Soil Compaction: Compaction is the process by which the dry density of the soil is
increased. The compaction process may be accomplished by rolling , tamping or vibration.
Increase in the dry density of a soil results in the increase of its strength and bearing capacity
, decreases the tendency of the soil to settle under repeated loads and brings about decrease in
the permeability of the soil. The dry density of the soil is a measure of its degree of
compaction. The degree of compaction of the soil depends on (i) moisture content of the soil
(ii) the amount of compactive effort and (iii) the nature of soil.
For a given soil and compactive effort , dry density increases with moisture content
upto a particular value and then with further increase in moisture content , the dry density
decreases. This moisture content at which maximum dry density is attained is called
Optimum moisture content (OMC) and the corresponding dry density is called the
Maximum Dry Density (MDD). For a given soil , the O.M.C. decreases an M.D.D.
increases with an increase in the compactive effort.
CE409/16
120
To aid field compaction of soils two types of tests are carried out in the laboratory I.S. - Light compaction test or I.S. Heavy compaction test. The student may refer to the
course material in Soil Mechanics for further details.
The tests used to evaluate the strength properties of soils may be divided into three
groups:
(i) Shear Tests: These tests are carried out to determine the shear parameters cohesion (C)
and angel of internal friction ( ) of a soil. Some of the commonly known laboratory shear
tests are direct shear test , traiaxail shear test and unconfined compression test. Vane shear
tests are carried out on soft soil samples either in the laboratory or on in-situ soil in the field.
For further details reference may be made to the course material in soil mechanics.
(ii) Bearing Tests: These tests are loading tests carried out on the sub-grade soils in -situ with
a load bearing plate to evaluate the sub-grade power of the sub-grade for use in flexible
pavement design or to determine the modulus of sub-grade reaction of the soil for use in rigid
pavement design.
(iii) Penetration Tests are small scale bearing tests in which the size of the loaded area is
relatively much smaller and ratio of the penetration to size of loaded area is much greater
than the ratios in bearing tests. These tests are carried out either in the laboratory or in the
field. The California Bearing Ratio Test (CBR) is the commonly used penetration test.
The bearing and penetration tests are presented here.
7.2.3. Bearing Tests: These are in-situ loading tests used to determine the following:(i) Determination of modulus of sub-grade reaction
(ii) Determination of modulus of deformation
(iii) Determination of bearing capacity of the sub-grade and
(iv) Evaluation of existing surface or base of a pavement.
While conducting the test the conditions of the soil in the test area ought to be those
which are likely to exist when the subgrade has reached a state of relative equilibrium
subsequent to construction of the road. In case of natural soils the top 25cm of the soil before
testing is removed.
The apparatus consists of a set of pates of diameter 75 cm , 60 cm , 45 cm and 30 cm
(or square plates of these sizes) , equipment to apply a load to the plate and instruments to
measure the load and settlement of the plate. Generally load is transmitted to the plate by a
hydraulic jack acting against a reaction. A datum frame whose supports rest on the ground at
CE409/16
121
points unaffected by the settlement of the plate is used for the measurement of settlement of
the plate (Fig 7.2).
The bearing plate is placed on the test area and before starting the test a seating load
equivalent to a pressure of 0.07 kg / cm2 is applied and released after a few seconds. For
finding modulus of sub-grade reaction a 75 cm size plate and for evaluating the existing
surface or base courses 30 cm size plate is to be used. A load sufficient to cause
approximately a 0.25 cm settlement is applied and when there is no perceptible increase in
settlement or in the case of clayey soils when the rate of increase of settlement is less than
0.025 mm / minute , the average of dial gauge readings is noted. At the same time the load is
also noted.
Fig 7.2. SET UP FOR PLATE LOAD TEST Fig 7.3. LOAD - SETTLEMENT CURVE
The load is again increased so as to have an additional settlement of approximately
0.25 mm. This procedure is repeated till the settlement reaches 1.75. A plot is made between
the bearing pressure of the sub-grade soil and its mean settlement. (Fig 7.3). From this the
modulus of sub-grade reaction (K) is taken as the slope of the line passing though the origin
and the point on the curve corresponding to 0.125 cm. settlement , i.e.,
K = p / 0.125 kg / cm2 / cm or kg / cm3
7.2
In order to determine the modulus of sub-grade reaction quickly , the U.S. Corps of
Engineers have suggested to apply a load to produce a pressure of 0.7 kg/cm2 in 10 seconds
after seating the plate as before and held until there is no increase in settlement or in the case
of clayey soil until the rate of settlement is less than 0.05mm per minute. If
is the average
kg / cm3
7.3
CE409/16
122
In case standard plate of 75 cm dia is not used , the modulus of sub-grade reaction can
be obtained from
K = K1 a1 / a
7.4
Where K1 is the modulus of sub-grade reaction corresponding to the field test carried out with
plate of area a1 and a is the area of the standard plate of 75 cm dia.
7.2.4. C.B.R. Test:
This test is developed by California Division of Highway. C.B.R. test is carried out on
a compacted soil in a mould 15 cm in dia and 17.5 cm height. (Fig 7.4). The loading plunger
is 50 cm dia. Briefly the test consists of causing the plunger penetrate a pavement material at
1.25 mm/minute. The material is compacted to its maximum dry density or field density at
the optimum moisture centent or the filed moisture condition. A displacer disk , 5 cm thick
placed in the mould during compaction enables a specimen of 12.5 cm deep to be obtained.
The test specimens should be prepared by static compaction , but if not possible , dynamic
method may be used as an alternative.
The load penetration curve (Fig 7.5) is plotted. When the curve is concave upwards
initially due to surface irregularities , correction is applied by drawing tangent to the curve at
the point of maximum curvature and shifting the origin to the point where the tangent meets
the horizontal axis. The test loads for 2.5mm. and 5mm (correction values) penetration are
recorded. The C.B.R. (percent) =
Load carried by specimen at defined penetration level
100
Load carried by standard crushed stone at the above penetration level
7.5
Standard load values on crushed stones for 2.5 mm and 5mm penetration are 1370 kg and
2055 kg respectively. C.B.R. values are determined at 2.5 mm and 5 mm penetration and
greater to the two values is termed as CBR value for design purposes.
To simulate worst moisture condition of the field , specimens are kept submerged in
water for 96 hours before testing. Sufficient surcharge weight equal to the actual or estimated
weight of the pavement are placed on the top of the specimen before testing. The minimum
surcharge weight kept is 4.5 kg.
The CBR test is essentially an arbitrary strength test and hence the test procedure is to
be strictly followed for getting dependable results.
7.3. STONE AGGREGATES:
Based on the strength property , the coarse aggregates used in pavement construction
may be divided as hard aggregates and soft aggregates. Generally for the wearing course of
CE409/16
123
superior pavement types hard aggregates are preferred to resist crushing effect due to heavy
loads of traffic and to resist weathering conditions. In the case of low-cost road construction
or for use in the lower layers of pavement , soft aggregates can also be used. The soft
aggregates include moorum , kankar , laterite , brick-aggregates and slag.
CE409/16
124
CE409/16
125
the stability due to interlocking of rounded particles is less. In such construction , angular
particles are preferred.
(vi) Adhesion with bitumen: Aggregates used in bituminous pavements should have less
affinity with water when compared with bituminous materials. Otherwise the bituminous
coating of aggregates will be stripped off in the presence of water.
In order to decide the suitability of the road stones for use in construction , the
following tests are carried out.
(a) Crushing test
(b) Abrasion test or Attrition test
(c) Impact test
(d) Soundness test
(e) Shape test
(f) Specific gravity and water absorption test
(g) Bitumen adhesion test.
These tests are discussed in the following pages:
7.3.2. Aggregate Crushing Tests:
CE409/16
126
The apparatus for the test is shown in Fig 7.6. Dry aggregate passing 12.5 mm I.S.
sieve and retained on 10mm I.S. sieve is placed in the mould in three layers and each layer is
tamped 25 times by the tamping rod. The weight of the sample taken is determined (W1).
Plunger is placed on the top of the specimen and a load of 40 tonnes is applied at a rate of 4
tonnes / minute by the compression machine. Then the crushed material is sieved through
2.36 mm I.S. sieve. The weight of the material which passes this sieve is equal to W2 . Then
Aggregate crushing value
=
100
7.6
Strong aggregates given low crushing value. The aggregate crushing value for good
quality aggregates to be used in base course shall not exceed 45% and the value for surface
course shall be within 30%.
7.3.3. Abrasion Tests:
Abrasion tests are carried out to test the hardness property of road aggregates. The
abrasion tests on aggregates may be carried out using any one of the following methods.
(i) Los -Angeles Abrasion Test
(ii) Deval Abrasion Test and
(iii) Dorry Abrasion Test.
The Los - Angeles -abrasion test is more dependable because (a) the rubbing and
pounding action in the test simulate field conditions better and (b) correlation of Los-Angeles
value with field performance and specifications of the test have been established. Hence this
test only is discussed here.
The machine consists of a hollow cylinder of 70 cm dia and length 50 cm and
mounted so as to rotate about its horizontal axis. The machine rotates at a speed of 33 rpm.
Aggregate of the specified grading and specified weight together with cast iron spheres of
about 4.8 cm dia and weighing about 390 to 445 gms is fed into the machine. The number
and weight of spheres to be used as abrasive charges have been specified based on the
grading of the aggregate sample. The
CE409/16
127
7.7
As per I.S.S , Los-Angeles Abrasion value acceptable for good aggregate to be used
for cement concrete roads is 16%. For bituminous mixes this value can be upto 30% and for
bituminous macadam construction this wear value can be upto 50%.
7.3.4. Devals Attrition Tests:
The principle of the test is to allow the sample of aggregate specimen to tumble over
in a rattler. The machine (Fig 7.8) consists of two hollow cylinders of diameter 20cm and
length 34 cm mounted in such away that the cylinders rotate about a horizontal. Specified
quantity of dry aggregate specimen (4 to 5.5 kg) , of any of the specified gradings is placed in
a cylinder. Two tests may be carried out simultaneously. The material is sieved on 1.7 mm
I.S. Sieve and the weight of material passing is determined and is expressed as the percentage
of the original weight of the sample and is reported as attrition value.
CE409/16
128
In the case of Devals abrasion test the abrasive charges consisting of 6 cast iron
spheres of about 4.8 cm dia and total weight of 2500 gms is placed along with the specimen ,
test is run for 10,000 revolutions and percentage wear is calculated.
7.8
Impact value less than 10% is considered exceptionally strong , 10 - 20% strong , 2030% satisfactory for road surfacing. The aggregate impact value should not normally exceed
30% for aggregates to be used in wearing course: for base course this value should not be
more than 45%.
CE409/16
129
CE409/16
130
index is calculated as the total weight of material passing the various gauges expressed as a
percentage of the total weight of the sample gauged. It has been reported by various agencies
that the flakiness index of aggregates suitable for road construction should be less than 15%
and in no case greater than 25%.
(b) Elongation Index: It is the percentage by weight of particles whose greatest length is 1.8
times their mean dimension. The sample of aggregate to be tested is sieved through a set of
sieves and then the individual particles from the fractions are passed through opening on
metal length gauge. The elongation index is calculated as the total weight of material retained
on the length gauge expressed as the total weight of the sample gauged. Generally the
aggregate used in road construction should have elongation values less than 15%.
(c) Angularity Number: It is the amount of the percentage of voids that exceeds 33% when
an aggregate is compacted in a specified manner in a standard metal cylinder. Generally the
angularity number for aggregates to be used in road construction should be between 0 to 11.
7.3.8. Specific Gravity and Water Absorption Test:
For determining the specific gravity , the test sample of aggregate is soaked in
distilled water for 24 hours. Later it is weighed in water. After this it is surface dried and
weighed in air. The sample is again weighed in air after oven drying for 24 hours at 1000 1100 C. The specific gravity is calculated by dividing the weight of oven dry sample in air by
the difference between the saturated sample weights in air and in water. Generally the
specific gravity of aggregate varies from 2.6. to 2.9.
For determining the water absorption , the aggregate sample is soaked in distilled
water for 24 hours. Later it is surface dried and weighted in air , and then oven dried for 24
hours at 100 - 1100 C , weighed in air again. The water absorption is expressed as a
percentage of water absorbed in terms of the oven dry weight of aggregates. The water
absorption value of aggregates used in road construction range from less than 0.1% to about
2% for material used in road surfacing , while values upto 4% may be accepted in base course
construction.
7.3.9. Bitumen Adhension Test:
Bitumen and tar adhere well to all normal types of road aggregates provided they are
dry and free from dust. Two problems are observed due to the presence of water. First in the
presence of water it is not possible to coat the aggregates with a bituminous binder. This
problem can be dealt with by drying the aggregates , and by increasing the mixing
temperature. Second problem is stripping of binder from coated aggregate due to the presence
CE409/16
131
of water. The stripping is due to the fact that some aggregates have greater affinity towards
water than with bitumen and this displacement depends on the physico-chemical forces acting
on them. Those aggregates which are electro - negative (Silica common constituent of
igneous rocks) and water liking are called HYDROPHILIC. Basic aggregates like limestones
have dislike for water and greater attraction to bitumen as they have positive surface charges.
These aggregates are called HYDROPHOBIC.
It is important to know the type of charge of aggregates used in bituminous
construction. Now bitumen is also available as cationic (positive) and anionic (negative) and
hence a suitable selection may be made depending on the aggregates available. Cationic (+)
bitumen may be selected for electronegative aggregate and anionic (-) bitumen for
electropositive aggregate.
Several laboratory tests have been developed to ascertain the amount of stripping. Out
of these the static immersion test is quite simple and easy to conduct. In this test , aggregate
coated with bitumen is kept immersed in water maintained at 400 C for 24 hours and the
degree of stripping which may take place is evaluated. The result of the test is expressed in
percent of stone surface that has stripped off. The IRC has specified maximum stripping
value of aggregates as 25% for bituminous surface dressing and penetration macadam etc.
7.4. SUMMARY:
The two basic highway materials , namely , soil and mineral aggregates are
considered in this lesson.
Soil is the foundation material for all highways. In addition , the highway pavement
itself is very often composed of compacted soil and stabilised soil. Therefore , an adequate
knowledge of the properties of soil is essential for proper design and construction of roads
and air field runways.
Generally , unified soil classification system or I.S. soil classification system or
Highway Research Board (HRB) system of soil classification are adopted for classifying soils
for highway purposes. The unified soil classification system and I.S. classification system of
soils are based on both grain size analysis and plasticity properties of the soil and are
applicable to any use. HRB system of soil classification finds direct application in the design
of flexible pavements. In this system coarse grained soils are divided into three groups. A - 1
, A - 2 , and A - 3 based on sand and gravel contents. Fine grained soils are divided into four
groups - A - 4 , A - 5 , A - 6 and A - 7. In order to determine the suitability of these soils as
sub-grade materials , an indexing system has been developed and is called as Group Index.
CE409/16
132
The Group Index is a function of material finer than 75 micron size , liquid limit and
plasticity index. The range of group index for any soil is between zero and twenty. Higher the
value of the group Index of a soil , poorer is the quality of soil as a sub-grade material.
The engineering behaviour of a soil mass is influenced by the presence of water and
dry density. For a given soil and energy of compaction , there is a particular moisture content
at which the dry density of the soil attains a maximum value. This particular moisture content
is called the Optimum Moisture Content (OMC) and the corresponding dry density is called
the Maximum Dry Density (MDD). Soil to be used in pavement construction has to be
compacted at this moisture content - OMC to get maximum benefits.
A number of tests are conducted on soil for evaluating their strength properties.
Among these tests results of the California Bearing Ratio (CBR) test and the plate bearing
test find direct application in the design of flexible and rigid pavements respectively.
Mineral aggregates are the basic materials of a pavement structure and it is the prime
material used in the pavement construction. Aggregate primarily bearing stresses occurring
on the roads due to wheel loads have to resist wear due to abrasive action of traffic as well as
the effects of weathering agents. Cubical , angular or rounded aggregates are preferred in
road construction as they satisfy almost all the requirements of a good road aggregate. The
percentage of elongated and flakly particles should not exceed 15 , in a road aggregate as the
presence of these particles adversely effect the strength and workability of paving mixtures.
Further aggregates used in bituminous pavements should have greater affinity towards
bitumen than towards water. Basic aggregates line lime stone have dislike for water and
greater attraction to bitumen and are known as Hydrophobic aggregates. These aggregates
have positive surface charge. Silica aggregates have negative surface charges , are waterliking and are called hydrophilic. It is important to know the type of surface charge of
aggregates used in bituminous construction. Now bitumen is available as cationic or anionic
and hence a suitable selection may be made depending on the aggregate available.
7.5. SELF ASSESSMENT QUESTIONS:
(1) Explain Group Index and its significance in soil classification.
(2) What are the limitations of the CBR Test and Plate Load Test.
(3) List standard physical tests to which road metal will be subjected in order to ascertain its
suitability. State the minimum standard requirements for each test.
(4) What are the most important three tests to be carried out to assess the suitability for road
aggregates used in the surface course of a W.B.M. road construction.
CE409/16
133
7.6. REFERENCES:
(1) Kerbs , D.K. and Walker , R.D. (1974) - Highway Materials , McGraw - Hills Book
Company , New York.
(2) Khanna , Dr. S.K. and Justo , Dr. C.E.J. (1991) - Highway Engineering , Namachand and
Bros , Roorkee.
(3) O Flaherty , C.A. (1974) - Highways , volume 2 , Highway Engineering - Edward
Arnold.
(4) (- 1969) , Soil Mechanics for Road Engineers , H.M.SO. Publication.
***
TRANSPORTATION ENGINEERING
HIGHWAY MATERIALS - II
UNIT - 8
BITUMINOUS MATERIALS
CONTENTS:
8.1. Introduction
8.2. Bitumen
8.3. Road Tar
8.4. Comparison of Bitumen and Tar
8.5. Requirements of Bitumen
8.6. Tests on Bitumen
8.7. Tests on Road Tar
8.8 Summary
8.9. Self - Assessment Questions
8.10. References
Aims / Objectives:
A variety of bituminous products are used as binders. Standard tests specified for
determining the suitability of a bitumen for road construction are presented along with the
requirements of each test.
8.1. Introduction:
Bituminous materials are very commonly used in highway construction because of
their binding and water proofing properties. Bituminous materials used in ancient times were
CE409/16
134
of natural origin obtained from lakes. The greatest proportion of bitumen used in road
construction today is obtained from crude petroleum oil by fractional distillation process.
Bitumen is a hydro-carbon material of either natural or pyrogenous origin found in
gaseous , liquid , semi-solid or solid form and is completely soluble in carbon - di - sulphide.
Bitumen is made up of colloidal hydro-carbon materials consisting of asphaltenes resins and
oils. When the bitumen contains some inert material of minerals , it is sometimes called
ASPHALT. Asphalt is found in lakes of Trinidad (West Indies) and Bermidez (Venezulla)
and in the rocks of Switzerland , France and Spain.
Bituminous materials used in highway construction may be broadly divided as (i)
Bitumen and (ii) Tar.
Tar is a viscous liquid obtained when natural organic materials such as wood and coal
are destructively distilled in the absence of air.
8.2. Bitumen:
Bitumens artificially produced by the industrial refining of crude petroleum are
known under a number of names such as residual bitumens , straight run bitumens , steamrefined bitumens and refinery bitumens. The components of a petroleum crude are shown in
Fig 8.1.
CE409/16
135
These straight run bitumens vary in consistency from semi-solid to semi-liquid at the
room temperature. These bitumens are classified according to their hardness as indicated by
the penetration test.
The straight run bitumens range have to be heated to get the correct consistency for
use in road construction. There may be instances , however , it may be neither desirable nor
necessary to use a hard bitumen , and preference may be given to use of liquid binders such
as the cut - back bitumen or bituminous emulsions.
8.2.1. Cut-back bitumen:
Cut-backs differ from straight run bitumens in that the bitumen is dissolved in a liquid
solvent which makes it suitable for direct application and manipulation in road construction.
After a cut back has been spread on the particles it is intended to bind , the solvent will
evaporate and leave behind the cementitous bitumen to tie the particles together. The
character and behaviour of a cut-back bitumen in any particular situation is largely dependent
on the character and amount of solvent present. The more volatile the solvent , shorter is the
curing period necessary after using the cut-back before the cohesive properties of the binder
are utilised.
CE409/16
136
As indicated in Fig 8.2 , cut-back may be divided into three main types depending on
the type of solvent used to dilute the bitumen. These are commonly designated as Slow
Curing (SC) , Medium Curing (MC) , and Rapid Curing -cut - back (RC).
(a) Slow - Curing Cut-backs: These require a relatively long time for curing and the binding
strength is developed correspondingly slowly. For this reason these cut backs are best used
with densegraded aggregates which provide a strong interlocking frame work and do not
require immediate cementing action from the binder S.C. cut backs are also used in soil
aggregate roads in warm climates in order to keep the dry soil particles from creating a dust
nuisance.
(b) Medium Curing Cut-back: These cut backs have good aggregate coating properties , so
they are very useful when fine-graded and dusty materials are incorporated in the road
surface and for bituminous stabilisation of soils.
(c) Rapid Curing Cut-back: Since the constituents of these cut backs quickly evaporate
these are used when a quick change-back to the residual semi-solid binding agent is desired.
The volatility of the distillate , that is , it has a relatively low flash point , can render their use
hazardous when they are used in road construction.
The grade of the cut-back or its viscosity is designated by a figure which follows the
initials ; as an example RC - 2 means that it is a rapid curing cut-back of grade 2. Suffix
nemericals 0 , 1 , 2 , 3 , 4 and 5 designate progressively thick or more viscous cutbacks as the
numbers increase. This number indicates definite viscosity irrespective of the type of cutback ; that is RC - 3 , MC - 3 and SC - 3 all have the same initial viscosity. ISI has specified
the viscosity values of different grades of bitumen in seconds (standard tar viscometer). The
new designations for grades of cut back bitumen , as per the U.S. practice , are based on
Kinematic viscosities of the mixtures at 600 in CENTISTOKES.
8.2.2. Bituminous Emulsions:
A bitumen emulsion is a liquid product in which a substantial amount of bitumen is
suspended in a finally divided condition in an aqueous medium stabilised by means of one or
more suitable materials. Usually bitumen or refined tar is broken up into fine globules and is
kept in suspension in water. A small proportion of an emulsifier , (soaps , surface - active
agents and colloidal powders) is used to facilitate the formation of dispersion and to keep the
dispersed binder in suspension. Half to one percent emulsifier by weight of finished emulsion
are usually taken for preparing normal road emulsions. The bitumen / tar content of
CE409/16
137
emulsions range from 40 to 60% and the remaining portion being water. The penetration
values of these bituminous emulsions are usually between 190 - 320.
When the emulsion is applied on the road , it breaks down and the binder starts
binding the aggregates , though the full binding power develops slowly as and when the water
evaporates. Emulsions are used in bituminous road construction especially in maintenance
and patch repair works. The main advantage of an emulsion is that it can be used in wet
weather even when it is raining. Emulsions are also used in soil-stabilisation works.
8.3 Road Tar:
Tar is the viscous liquid obtained when the natural organic material such as wood and
coal are carbonised or destructively distilled in the absence of air. Based on the material from
which tar is derived , it is referred to as wood tar or coal tar ; the later is more widely used for
road work because of its superiority.
There are five grades of road tars namely , RT - 1 , RT - 2 , RT - 3 , RT - 4 and RT - 5
based on their viscosity and other properties. RT - 1 is used for surface painting under
exceptionally cold weather as it has very low viscosity. RT - 2 is recommended for standard
surface painting ; RT - 3 may be used for surface painting , renewal coats and premixing
chips for top course and light carpets ; RT - 4 is generally used for premixing tar macadam in
base course. For grouting purposes RT - 5 may be adopted.
8.4. Comparison of Bitumen and Tar:
(i) Both binders appear black to dark brown in colour.
(ii) Bitumens respond less readily than tars , to small changes in temperature.
(iii) Tar may be overheated and spoiled more easily than bitumens ; but is much easier , to
get tar out of road tanker.
(iv) Tar tends to penetrate more easily into open road surfaces.
(v) Bitumen is less brittle at low temperatures , this is because it contains higher percentage
of free carbon.
(vi) Tar is not susceptible to dissolving action of petroleum solvents or distillates. In parking
places , where petrol and oil are likely to spill from vehicles , a tar surfacing may have longer
life than a bitumen one.
(vii) The chemical constituents of tar and bitumen are quite different. Tar is produced by the
destructive distillation of coal or wood , but bitumen is a petroleum product.
(viii) Tar coats aggregates more easily and retains it better in presence of water than bitumen.
But the tar is considered to have much inferior weather resisting property.
CE409/16
138
(ix) Bitumen is soluble in carbon disulphide and in carbon tetrachloride ; but tar in soluble
only in toluene.
(x) The free carbon content is more in tar as seen from the solubility test.
8.5. Requirements of Bitumen:
The desirable properties of bitumen depend on the mix type and the construction.
General requirements of bitumens to be used in road construction are:
(i) The viscosity of bitumen at the time of mixing and compaction should be adequate. This is
achieved by heating the bitumen and aggregates prior to mixing or by the use of cut-backs or
emulsions of suitable grade.
(ii) The bituminous material should not be highly temperature susceptible. During the hottest
weather of the region the bituminous mix should not become too soft or unstable. During cold
weather the mix should not become too hard and brittle causing cracking of the surface. The
material should be durable.
(iii) In the presence of water the bitumen should not strip off from the aggregates. There
should be adequate affinity and adhesion between bitumen and aggregate used in the mix.
8.6. Tests on Bitumen:
Bitumen as already discussed is available in various types and grades. I.S.I. and other
agencies have suggested a number of tests to determine the behaviour and suitability of
bitumens and cutbacks. These tests include penetration test , ductility test , softening point
test and viscosity test. For classifying the bitumen and studying the performance of
bituminous pavements the ductility and penetration tests are essential. The other tests like
softening point and flash and fire point tests are more important to guide the paving
technologists during field operations.
8.6.1. Penetration Test:
The penetration test determines the hardness or softness of bitumen by measuring the
depth in tenths of a millimetre to which a standard loaded needle will penetrate vertically in
five seconds. The sample is maintained at a temperature of 250 C. The needle assembly
weights 100 gms. The concept of penetration test is shown in fig 8.3. The mean value of three
measurements is reported as penetration value. It may be noted that the penetration value is
largely influenced by any inaccuracy as regards pouring temperature , size of needle , weight
placed on the needle and the test temperature.
The bitumen grade is specified in terms of the penetration value. 80 - 100 or 80 / 100
grade bitumen means the penetration value of the bitumen is in the range of 80-100 at
CE409/16
139
standard test conditions. The penetration test is applied almost exclusively to bitumen. As
road tars are soft , the test cannot be carried out on these materials. All other tests are used for
tars , cut-backs and emulsions.
CE409/16
140
The ductility values of bitumen vary from 5 to over 100 for different bitumen grades.
It is desirable that the ductility value of bitumen is not less than 50 , for satisfactory
performance.
8.6.3. Viscosity Test:
Viscosity is inverse of fluidity. It is a measure of resistance to flow. Furol viscosity
test is conducted on liquid bitumens (cut-backs , Tars and Emulsions). In this test , time in
seconds is noted for 50ml. of the liquid bitumen at specified temperature to flow through an
orifice of specified size. Higher the viscosity of the liquid , more will be the time required to
flow out. For tar tests , orifice of 10mm is specified and is called tar visco meter.
CE409/16
141
bitumen grade , there is an optimum value of viscosity. Bituminous binders of low viscosity
simply lubricate the aggregate particles instead of providing a uniform thin film for binding
action. Similarly high viscosity does not allow full compaction and resulting mix exhibits
heterogeneous character and thus low stability values.
8.6.4. Float Test:
Bitumens which are more viscous cannot be tested either by Fural viscosity test or by
penetration test. Such bituminous materials can be tested for consistency by float test.
CE409/16
142
The softening point of various bitumen grades used in pavings jobs vary between
350C to 700C.
8.6.6. Flash point and Fire point Test:
This test give an indication of the critical temperature at and above which suitable
precautions should be taken to eliminate fire hazards during heating of bitumen. The
definition of flash and fire points as given by ISI are as follows:
CE409/16
143
For bituminous materials used in road pavements , the closed cup flash point should
not be less than 1750 C.
CE409/16
144
a percentage of original sample. This percentage should not exceed by one. When solvent
used is carbon tetra chloride and if black carbonaceous residue left is over 0.5% the bitumen
is considered as CRACKED. The minimum proportion of bitumen soluble in Carbon - disulphide is specified as 99 percent.
8.7. Tests on Road Tar:
The following tests may be carried out on road tars.
(i) Specific gravity test
(ii) Equiviscous Temperature (EVT)
(iii) Viscosity by standard tar viscometer
(iv) Softening point test
(v) Float test
(vi) Insoluble matter in percent by weight in Toluene.
(vii) Amount of phenols by volume
(viii) Naphthalene percent by weight
(ix) Water content
Properties of five grades of road tar as required by I.S.I. are presented in Table 8.1.
Table 8.1. Properties and Requirements of Road Tars
Sl. No.
Property
1.
Softening Point
2.
3.
RT - 2
RT - 3
RT - 4
RT - 5
---
---
---
---
45-50
1.16 -
1.16 -
1.18 -
1.18 -
1.18 -
1.26
1.26
1.28
1.28
1.28
37 - 41
43 - 48
53 - 57
63 - 67
35
40
45
55
---
33-35
30-55
35 - 60
40 - 60
---
Equi-viscous Temperature 32 - 36
range 0C (EVT)
4.
8.8. Summary:
Bituminous materials are very commonly used in highway construction because of
their binding and their water proofing properties. Bituminous materials used in road
construction may be broadly classified as bitumen and tar. The greatest proportion of bitumen
CE409/16
145
used in road construction today is obtained from crude petroleum by fractional distillation
process. Where as tar is obtained by destructive distillation of wood and coal. Based on the
material from which tar is derived it is known as wood tar or coal tar , the latter being used
more widely for road construction because of its superiority.
In order to get the best performance from
construction , the viscosity of bitumen at the time of mixing and compection should be
adequate. This is achieved by heating the bitumen prior to mixing or by the use of liquid
bitumens like cut-backs or emulsions of proper grade.
Cut backs are obtained by dissolving bitumen in liquid solvents like volatile and nonvolatile oils , kerosene and gasoline. Based on the volatility of the solvent , cut-backs are
classified as slow curing (SC) , Medium Curing (MC) and Rapid Curing (RC). Grade of cut
back or viscosity is designated by numericals - 0 , 1 , 2 , 3, 4 and 5 , which follow the initials
(example RC - 2 , MC - 3 etc.). The more viscous the cut-back is , higher is the number.
A bitumen emulsion is also a liquid product in which a substantial amount of bitumen
is suspended in a finely divided state in an aqueous medium stabilised by means of one or
more suitable stabilisers. Emulsions are of use specially in maintenance and path repair works
as they can be used in wet weather , even when it is raining.
Road tars are available in five grades and are designated as RT - 1 , RT - 2 , RT - 3 ,
RT - 4 and RT - 5 . Just like the cut backs , more viscous tars are represented by higher
numbers.
Though tar coats aggregates more easily and retains it better , even in the presence of
water than bitumen , is preferred in the modern road construction because of its superior
resistance against weathering and lower susceptibility to temperature changes than tar.
A number of tests have been suggested to determine the behaviour and suitability of
these bituminous materials used in road construction. For classifying the bitumens and
studying the performance of bituminous pavements , penetration test , ductility test , viscosity
test and float test are quite useful. Softening point test and flash and fire point tests are
important to guide the paving technologists during field operations.
8.9. Self Assessment Questions:
1. When do you use float test in preference to orifice viscometer for determining the viscosity
of bitumens ?
2. Distinguish between road emulsions and cut-backs
CE409/16
146
3. What are the different types of bituminous materials used in road construction under what
circumstances each of these materials is preferred.
8.10. References:
1. Kerbs , D.K and Walker , R.D. (1974) - Highway Materials , McGraw-Hill Book Company
, New - York.
2. Khanna , Dr.S.K and Justo , Dr. C.E.G (1991) - Highway Engineering , New Chand &
Bros. Roorkee.
3. O Flaherty , C.A. (1974) - Highways , Volume - 2 , Highway Engineering Edward
Arnold.
4. Bituminous Materials in Road Construction , HMSO , London.
***
TRANSPORTATION ENGINEERING
UNIT-9
DESIGN OF HIGHWAY PAVEMENTS - FLEXIBLE
CONTENTS
Aims/Objectives
Introduction
9.1
Design Factors
9.2
9.3
9.4
9.5
Self-assessment questions
9.6
Summary
9.7
References
AIMS/OBJECTIVES:
The main function of any pavement - highway or airport is to carry heavy wheel loads
and to transfer the same over a wide area of the underlying sub-grade soil permitting the
deformations within the elastic or allowable range. The design of pavements involves a study
of soils and paving materials , their behaviour under load and the design of a pavement to
carry that load under all climatic conditions. Factors affecting the design of pavements in
CE409/16
147
general are presented. Group Index and California Bearing Ratio methods of design of
flexible pavement design are discussed.
INTRODUCTION:
Pavements may be divided into two categories. The first, the flexible pavement,
consists of a relatively thin wearing surface built over a base course and sub-base course, and
they rest upon the compacted sub-grade. In contrast, rigid pavements are made up of cement
concrete and may or may not have base course between the pavement and the sub-grade (Fig.
9.1). The thickness of the flexible pavement is meant to include all components of the
pavement above the compacted sub-grade. Thus, the sub-base, base and wearing surface are
the structural components of the pavement. In contrast, in the case of rigid pavement, the
concrete, exclusive of the base is, referred to as the pavement.
A COMPONENTS OF FLEXIBLE PAVEMENT
a major portion of the structural capacity is supplied by the slab itself . The major factor
considered in the design of rigid pavements is the structural strength of concrete. For this
reason, minor variations in sub-grade strength have little influence upon the structural
capacity of the pavement. The rigid pavements are analysed and streses are evaluated based
on elastic plate resting over elastic or viscous foundation.
CE409/16
148
Base courses are used under rigid pavements for various reasons, including (i) control
of pumping, (ii) control of frost action, (iii) drainage, (iv) control of shrink and swell of subgrade and (v) expedition of construction.
Flexible pavements are those which have low or negligible flexural strength, and are
rather flexible in their structural action under loads. The flexible pavement layers reflect the
deformation of the lower layers on to the surface layers.
The load-carrying capacity of flexible pavements is brought about by the loaddistributing characteristics of the Layered system. These pavements consist of a series of
layers, with the highest quality material at or near the surface, Hence, the strength of a
flexible pavement is a result of building up thick layers and thereby distributing the load over
the sub-grade, rather than by the bending action of a slab. The thickness design of the
pavement is influenced by the strength of the sub-grade.
Sub-base courses of flexible pavements are generally made up of cheap, locally
available materials, whereas the base courses are higher quality processed materials. In most
cases the base course consists of crushed stone and in some instances, may contain
bituminous concrete/Empirical and Semi-empirical design methods are used.
As shown in fig. 9.1 base courses are constructed to some distance beyond the edge of
the wearing course (atleast 30 cm). This is done to make certain that the loads applied at the
edge of the pavement will be supported by the under lying layers.
9.1 DESIGN FACTORS:
Pavement design consists of two broad categories - (1) design of the paving mixture
and (2) structural design of the pavement components. Factors affecting the structural design
of pavement components are only discussed here.
The various factors are
i)
ii)
iii)
Climatic variations.
CE409/16
149
b)
c)
Repetition of loads.
a) Maximum wheel load and its distribution: The IRC has specified 8170 kg. (18000 lbs)
as the maximum legal axle load with a maximum equivalent single wheel load of 4085 kg.
The pressures of wheels are controlled by allowable load per centimetre width of the tyre.
Generally, the wheel load is assmed to be distributed over a circular area. But by
measurement of the imprints, of tyres with different load and inflation pressures it is seen that
the contact areas in many cases are elliptical in shape. Contact pressure is defined as
Contact pressure =
Wheel load
Contact area
(9.1)
Since in the majority of problems, circular the imprints are assumed, the radius of
contact area is as follow:
/p
(9.2)
where
Yet another term is also used with reference to tyre pressure - The Inflation pressure.
Theoretically, tyre pressure and inflation pressure mean exactly the same. The relation ship
between the tyre pressure and contact pressure are shown in Fig. 9.2. The contact pressure is
found to be more than the tyre pressure when the tyre pressure is less than 7 kg/cm2 and it is
vice-versa when the tyre pressure exceeds this value. Rigidity factor is defined as the ratio of
contact pressure to tyre pressure. The value of rigidity factor is 1.0 for average tyre pressures
of 7 kg/cm2, higher that unity for lower tyre pressures and less than unity for tyre pressures
higher than 7 kg/cm2. This rigidity factor depends upon the degree of tension developed in
the walls of the tyres. However, practically all these terms mean the same.
CE409/16
150
p 1 -
Where z
(a
+ z2
3/ 2
(9.3)
Using the above equation the variation of vertical stress with depth is plotted in fig.
9.3.
CE409/16
151
Fig. 9.3. Vertical Stress Distribution
As seen from the fig. 9.3, the influence of the tyre pressure is predominating in the
upper layers. At a greater depth the effect of tyre pressure diminishes and the total load
exhibits a considerable influence on the vertical stress magnitudes. Tyre pressures of high
magnitude therefore demand high quality of materials in upper layers of pavements. As such,
very hard and strong aggregates have to be used for the wearing surface of the pavements
used by steel tyre wheeled bullock carts, because of the very high stresses on the pavement
surfaces.
The total depth of the pavement is influenced by the Total Wheel load and not by the
tyre pressure.
b)
Wheel Load Configuration: Since the wheel load should not exceed the permissible
legal wheel load (4085 kg as per IRC), to keep the maximum wheel load within the specified
limits, and to carry greater load, it may be necessary to provide dual wheel assembly to the
rear axles of the loaded vehicles. In doing so, the effect on the pavement through a dual
wheel assembly is obviously not equal to two times the load on any one wheel. The stress
distribution below a dual wheel assembly is shown in fig. 9.4.
Upto the depth of d/2 each wheel load P acts independently and after this point the
stresses induced due to each load overlap. At a depth of 2s and more the stresses induced in
the pavement sub-grade may be considered as due to the influence of both the wheels since
overlap area is quite considerable. Hence due to dual wheels total stress at any depth, greater
than 2s may be considered to be equivalent to a single wheel load carrying 2P load. For
calculating the stress at any depth between d/2 and 2s the concept of `Equivalent Single
Wheel Load- (ESWL) is used. Equivalent single wheel loads may be calculated either on the
basis of equivalent deflection or stress. Mostly equivalent deflection criteria is adopted as it is
more reliable.
CE409/16
152
Fig. 9.4 Stress Distribution due to Dual Wheels
result in not only the elastic deformation but also accumulated plastic deformations which in
turn may lead to pavement failure. The repeated load application also causes breaking down
of base course aggregate materials. Similarly the kneading action of traffic may cause
working upwards of the soil materials in sub-base or sub-grade. As per the finding of
AASHO Road Test, for a given axle load, the pavement thickness required to provide a given
terminal level of service is proportional to the Logarithm of the number of receptions of the
axle load.
9.1.2 Strength Characteristics of Pavement Materials:
For design purposes, it is required that various pavement materials are assigned
strength parameters suitable to the redesign methods employed. Various materials used in the
sub-base and base courses are evaluated by different tests. The general strength values
evaluated are (i) CBR value and (ii) Elastic Modulli.
9.1.3 Climatic Variations:
The climatic variations cause the following effects: (i) Variation in moisture
condition, (ii) Frost action and (iii) Variation in temperature. The pavement performance is
very much affected by the variation in moisture and the frost. This is mainly because of the
variations in stability and volume of the sub-grade soil due to these two effects. Variation in
temperature generally affects pavement materials like bituminous mixes and cement concrete
9.2 Pavement Components and their Functions:
The structure of a flexible pavement (fig. 9.1) mainly consists of (a) soil sub-grade,
(b) sub-base course, (c) base course and (d) wearning course.
9.2.1 Sub-grade:
CE409/16
153
This is the natural layer of soil prepared to receive the layers of pavement materials
placed over it. The loads on the pavement are ultimately received by the soil sub-grade for
dispersion to the soil mass. The pressure transmitted on the top of the sub-grade soil should
be within the limits, that is, should not cause excessive stress condition or should not cause
excessive deformation beyond the elastic limit. The soil subgrade is evaluated by one of the
following tests - C.B.R, Triaxial compression test or plate bearing test.
ii
iii)
iv)
v)
Available finance.
9.4
CE409/16
154
Upto 1970, there was no standard for pavement design and a number of empirical and
semi-empirical methods were being used for determination of pavement thickness. The IRC
in 1970 has brought out (IRC: 37 - 1970).These guide lines have been revised in 1984 (IRC:
37 - 1984).
The design of flexible pavements is normally based on Group Index Method and
California Bearing Ratio method are only discussed here.
9.4.1 Group Index Method:
This method is due to D.J.Steele (1945). The ground index of a soil, which depends
on the percentage fines, liquid limit and plasticity index, is believed to rate the sub-grade soil,
and hence indicates the pavement thickness needed to protect the sub-grade. This method
classifies the traffic into the following three categories.
Traffice Intensity
Light
less than 50
Medium
50 to 300
Heavy
over 300
The sub-grade soil has been rated based on the group index. The higher the group
index value, weaker is the soil sub-grade and for constant value of traffice volume, the
greater would be the thickness requirements.
To design the pavement thickness by this method, first group index of the soil is
found. The anticipated traffic is estimated and designated as light, medium or heavy as per
the above table or as indicated in fig. 9.5a. The appropriate design curves are chosen from fig.
9.5 b. and the total thickness of pavement and thickness of surface and base courses are found
based on the group index value of the sub-grade soil.
CE409/16
155
CE409/16
156
1)
60%
2)
Liquid Limit
40%
3)
Plastic limit
22%
Solution:
Plasticity Index
40-22 = 18
60
35
25
60
15
45
40
40
18
10
G.I
8.2 or say 8.
Traffice volume 250 vehicles comes under medium category, From Fig. 9.5, for a
group Index of 8. Combined thickness of base, sub-base and surface is 40 cm.
Thickness of selected sub-base only = 18 cm.
Thickness of base only
= 8 cm
CE409/16
157
In 1928, California Division of Highways developed this method of design. CBR tests
were conducted by the California state highway department on existing layers including subgrade, Sub-base and base course. Based on the extensive data collected on pavements which
behaved satisfactorily and those which failed, an empirical design chart was developed
correlating the CBR value and the pavement thickness. The basis of the CBR design chart is
that a material with a given CBR requires a certain thickness of pavement layer as a cover. A
higher load needs a thicker pavement layer to protect the sub-grade.
The Indian Road congress has developed a design chart (fig. 9.6) for use in our
country. Different curves have been given based on different volumes of traffic.
Fig. 9.6
Studies carried out by the U.S. Corps of Engineers have shown that there exists a
relationship between the pavement thickness, wheel load, tyre pressure and CBR value of the
sub-grade within a range of 10 to 12%. It is possible therefore, to extend the CBR design
curves for various loading condition using the expression.
t =
1.75
1
P
CBR
p
175
. P
A
CBR
1/2
1/ 2
(9.4)
CE409/16
158
Where t
Pavement thickness; cm
Wheel load, kg
CBR
Pavement Thickness Determination: For this, soaked CBR value of the sub-grade soil and
C.B.R. values of other materials to be used in each layer is a pre-requisite. Depending upon
the anticipated traffic intensity appropriate design curve is chosen from fig. 9.6. Sub-grade
layer is the bottom most layer in the flexible pavement. Hence according to the CBR value
(soaked) of the sub-grade and the curve chosen based on intensity of traffic read the required
pavement thickness from the design chart 9.6. This will give the required cover over the subgrade to protect it. Sub-base layer is laid over the sub-grade. Now according to the CBR
value of sub-base material and using the same design curve, the thickness of pavement
required above the sub-base course is obtained again from the fig. 9.6. The thickness of subbase is obtained by deducting the thickness of cover required over sub-base from the
thickness of cover required over the sub-grade. Similarly thickness of the other subsequent
layers may be determined. The method is illustrated in the worked out example 9.2.
IRC Recommendations: Some of the important recommendations of the IRC for the CBR
method of design (IRC: 37-1970) are given below:
1. CBR test should be performed on remoulded soil and not on insitu- soil. The specimens
should be prepared by static compaction where-ever possible and otherwise by dynamic
compaction.
2. For design of new roads sub-grade sample should be compacted at O.M.C. to I.S. light
compaction density, when suitable equipment is available in the field for compaction to this
density. Otherwise the soil sample may be compacted to the dry density desired to be
achieved in the field. In the case of old existing roads, samples should be compacted to the
field density of the sub-grade soil at the field moisture content (F.M.C.)
3. Soil sample may kept soaked in water for 96 hours in the case of new-constrictions before
CBR test is made on them. But in cases of areas where rain fall is less than 50 cm and water
table is also quite deep, it is not essential to soak the test sample.
4. At least three samples should be tested before assigning CBR value of a particular soil. If the
variation in the CBR values in the three tests is beyond the specified limits as least six test
CE409/16
159
specimen should be tested and average value should be assigned as CBR value. Limits of
variation are as follows.
5.
10
Top 50 cm thickness of sub-grade should be compacted to such an extent that 95 to 100% I.S.
light compaction (Proctor) density is achieved.
6.
Thin layers of bituminous wearing course upto a thickness of 2.5 cm should not be
considered towards the total thickness of the pavement since they do not increase the
structural strength of the pavement.
7.
Traffic intensity per day on the road pavement has been divided into seven categories ranging
from A to G as shown in fig.9.6. Traffic is considered in terms of vehicles having laiden
weight exceeding 3 tonnes.
8.
To estimate the value of traffic at the end of life span of the pavement, IRC recommends the
following expression.
A = P(1+r)n+10
where A
(9.5)
completion of construction.
Worked Example :
9.2. Soil sub-grade sample was obtained from the site of a road project and the CBR
value was determined as 4%. It is further desired to use the following materials for different
pavement layers.
i)
Compacted sub-grade
7% CBR
ii)
20% CBR
iii)
95% CBR
CE409/16
iv)
160
5 cm.
The traffic survey revealed the ADR of commercial vehicles as 1200. The annual
growth of traffic is found to be 8%. The pavement construction is to be completed in three
years after the last traffic census.
a)
Design the pavement section using the CBR method as recommended by the
IRC.
b)
c)
Discuss the limitations of the CBR method of pavement design in the light of the
above results.
Solution :
Design traffic A
P(1+r)n+10
Curve F in the chart 9.6 includes this traffic range. Hence is the design curve.
The thickness of material above different layers of different CBR values are obtained
from fig.9.6 as follows.
Sub-grade soil
4% CBR
55 cm
Compacted sub-grade
7% CBR
40 cm
20% CBR
21 cm
95% CBR
8 cm
80% CBR
8 cm.
The designed pavement section for cases (a) and (b) are shown in fig.
CASE -A
CE409/16
161
CASE -B
Discussion :
The CBR methods has one serious dis-advantage. It may be seen that the total
thickness of construction remains the same, that is 55 cm, though the pavement component
layers in cases (a) and (b) are of different materials with different CBR values. The thickness
of construction over compacted soil of CBR value 7% is the same in both the cases equal to
40 cm, though in one case poorly graded gravel of CBR 20% is used where as in the second
case, it has been replaced by well graded gravel of CBR value 95%.
The CBR method of pavement design gives the total thickness requirement of the
pavement above a sub-grade and this value of thickness would remain the same irrespective
of the quality of materials used in the component layers.
Equivalency Factors:
Bound type of bases have superior load spreading properties and therefore a certain
reduction in the overall pavement thickenss could be permitted. Well constructed bituminous
macadam base will be considered of twice the strength of water bound macadam road. For
other bound type of base courses like lean concrete, lime pozzolona concrete and soil cement,
the equivalency factor may be taken as 1.5. Corresponding reduction in thickness may be
made.
9.4.3. C.B.R. Method of Pavement Design Based on Cumulative Standard Axle Load.
(IRC : 37 - 1984) : In the C.B.R. method of design discussed so far, the traffic is considered
in units of heavy vehicles (laden weight greater than 3 tonnes) per day in both directions
irrespective of whether the design is for a two lane or a dual carriage way. However, it has
been recognised by the field engineers and research workers alike that other factors like
repetition of axle loads, distribution of traffic over the pavement width (depending on the
CE409/16
162
number of lanes) type of terrain andenvironmental factors affect considerably the thickness
of pavement. Accordingly the I.R.C. has revised the method of design of flexible pavements.
In the revised method, two entirely different apporaches have been given for arriving
at the total thickness of pavement based on traffic intensity. The two approaches are
discussed in the following paragraphs.
a)
Design procedure when the Traffic Intensity is less than 1500 Commercial Vehicles /
Design procedure when the Traffic Intensity is more than 1500 Vehicles / day - The
NS =
365 A (1 +
)x
1F
9.6
CE409/16
163
design.
r
For the value of the designed cumulative number of standard axles (NS) total
thickness of pavement may be arrived at for the CBR value of the sub-grade referring to Fig.
9.7. Thickness of component layers - surface course, Granular base course and sub-base
CE409/16
164
course, and their requirements, based on the value of NS has been recommended by IRC (IRC
: 37 - 1984).
9.5. Self Assessment Questions :
1. Explain Flexible and Rigid pavements and bring out the points of difference.
2. What is ESWL? Explain the concept in determination of the equivalent load.
3. What is the basis on which thickness of pavement is determined based on Group Index
method ? What are the limitations of this method?
4. Explain the merits and demerits of the CBR method of flexible pavement design.
5. The CBR value of sub-grade soil is 5%. Calculate the thickness of pavement required
given that the wheel load is 4082 kg and tyre pressure is 7kg/cm2 using the U.S. Corps of
Engineers Formula.
12.6. SUMMARY :
Based on their structural behaviours, pavements may be divided into two classes -1)
Flexible pavements and 2) Rigid pavements. The term flexible pavement is associated with
those pavements which reflect the deformation of the sub-grade and subsequent layers on to
the surface. The design of flexible pavements is based on the load distribution characteristics
of the component layers. The rigid pavements, because of its rigidity and high modulus of
elasticity, tend to distribute the load over a relatively large area of soil. thus a major portion
of the structural capacity is supplied by the slab itself.
Various factors to be considered for the design of pavements are (i) Design wheel
load (ii) Strength characteristics of pavement materials and (iii) climatic variations, have been
discussed.
Design of flexible pavements based on (i) the Group Index Method and (ii) the C.B.R.
method are only explained in this unit.
The group index of a soil is believed to rate the sub-grade soil and hence indicates the
pavement thickness needed to protect the sub-grade. This method of design also takes into
account the traffic intensity in arriving at the thickness of pavement.
The IRC (IRC: 37-1970) recommends a design method based on the CBR values of the
pavement material with a given CBR value requires a certain thickness of pavement layer as
a cover. A higher load needs a thicker pavement layer to protect the sub-grade. Design charts
CE409/16
165
are prepared by the IRC relating the thickness of construction required and the CBR value of
the pavement material based on the traffic intensity. For the seven groups A to G of traffic,
seven curves are available in the design chart. The traffic intensity to be taken into account
for design purpose in terms of the number of vehicles per day exceeding 3 tonees laden
weight at the end of design period which is normally taken as 10 years. Design of Flexible
pavements based on the cumulative number of standard axle (IRC : 37 - 1984) is also
explained.
12.7. REFERENCES :
1. IRC : 37 - 1970 ; Guide Lines for Design of Flexible Pavements.
2. IRC : 37 - 1984 ; Guide Lines for Design of Flexible Pavements.
3. Khanna, Dr.S.K. and Justo, C.E.J. (1984) - Highway Engineering, Nemchand and Bros.,
Roorkee
4. Ramana Sastry, Dr. M.V.B.R. and Gopal M.S.P., - Computer Oriented Design For
Flexible Pavements - Indian Highways - June, 1987.
Yoder, E.J. and Witczak (1975) - Principles of pavement Design - John Wiley and Sons,
INC., New - York..
***
TRANSPORTATION ENGINEERING
UNIT - 10
RIGID PAVEMENT DESIGN
CONTENTS :
Aims / Objectives
10.1.
Introduction
10.2.
10.3.
10.4.
Combination of Stresses
10.5.
IRC Recommendations
10.6.
CE409/16
10.7.
Self-assessment Questions
10.8.
Summary
10.9.
References
166
AIMS / OBJECTIVES :
Stresses are set up in concrete road slab by loading, by changes in temperature and
moisture content and by other causes. Methods of calculation of these stresses and the design
principles of concrete road slabs based on the IRC recommendations are presented. Joints are
provided in concrete pavements to allow for movements of the slabs due to changes in
temperature and moisture content. Considerations for the spacing of these joints are also
discussed.
10.1.
INTRODUCTION :
Stresses are set up in a concrete road slab by loading, by changes in temperature and
moisture content, and other causes. The worst combination of stress - producing failure
conditions have to be considered for design of these slabs. Since concrete is very much
weaker in tension than in compression, only maximum tensile stresses need be considered.
As such cement concrete pavement should be designed and controlled on the basis of flexural
strength of concrete of 4000 KN / m2 (40 kg / cm2).
The stresses due to loads and due to changes in temperature are of the same order of
magnitude and are considerably grater than those due to changes in moisture content. The
stresses caused by the resistance of the sub-grade to expansion and contraction produced by
change in temperature and moisture content are relatively smaller in short slabs, but may be
more important in long slabs. The stresses caused by dilatency of the sub-grade are small and
need not usually be considered.
Joints are provided in concrete roads to allow for expansion, contraction and warping
of the slabs caused by the changes in the temperature and moisture content of the concrete.
They are also necessary to allow for the break in construction at the end of days work and to
allow the road to be laid in lanes of convenient width. The number of joints should be kept to
a minimum compatible with the above requirements, because the construction of joints
involves a considerable amount of extra work and is liable to interfere with smooth progress
of concreting. The design of various types of joints is also considered.
10.2.
CE409/16
167
Several theories have been developed on the occurrence of stresses in concrete slabs
resting on a uniform bed. The most commonly used method of calculation of the stresses in a
slab is due to Westergaurd. The theory applies to slabs of finite extent, and expressions are
derived for stresses due to loading at the interior, edges and corners of the slabs. Westergaurd
assumed that the concrete slab is homogeneous and has uniform elastic properties, and that
the reaction of the sub-grade (p) is vertical and proportional to the deflection ( ). In other
words he assumed that the support given to the slab is similar to that given by a dense fluid
and hence that the sub-grade has no shear strength. Then according to Westergaurds
assumption p = K where K is defined as the modulus of sub-grade reaction. The modulus
of sub-grade reaction is also referred to as Spring constant and as the dense liquid
constant. The modulus of sub-grade reaction is determined by means of the plate load test
using a plate of 75 cm dia or square. The modules of sub-grade is the stress per unit
deflection and the units are KN/m3 (Kg/cm3).
10.2.1. Critical Load Positions :
Westergaurd considered stresses produced by three conditions of loading (i) loading
at positions away from the edges (interior loading) (ii) loading at the edges (but away from
the corners) and (iii) loading at the corners. These positions are shown in Fig. 10.1.
Westergaard also assumed that the wheel load is uniformly distributed over a circular area of
contact in the case of interior and corner loading and over a semi-circular area of contact in
the case of edge loading. The position and direction of the tensile stresses for each of critical
positions of the loading are as follows.
a)
Loading at the interior - at the bottom of the slab and of the same magnitude in all
directions.
b)
Loading at the edge-at the bottom on the slab parallel to the edge. (Another smaller
tensile stress will occur at the top of the slab at right angles to the edge).
c)
angle.
Loading at the corner - at the top of the slab parallel to the bisector of the corner
CE409/16
168
Interior Loading :
Si = 0.316 P / h2 (4 log10 (l / b) + 1.069)
b)
Edge Loading :
Se = 0.572 P / h2 (4 log10 (l / b) + 0.359)
c)
10.1
10.2
Corner Loading :
Sc = 3 / h
a 2 /c
l
0.6
10.3
Here,
Si, Se and Sc = maximum stress for interior, edge and corner loading, respectively,
kg/cm2.
h = slab thickness, cm
P = wheel load, kg
a = radius of contact area (wheel load distribution) cm.
l = radius of relative stiffness, cm.
b = radius of resisting section, cm.
The terms radius of relative stiffness and radius of resisting section are explained
below.
Radius of Relative Stiffness - The pressure deformation characteristics of a cement
concrete slab is a function of the relative stiffness of slab to that of the sub-grade. According
to Wester gaard the radius of relative stiffness is given by the following equation :
CE409/16
l=
169
Eh 3
12 1 2 k
10.4
1.6 a 2 + h 2
10.5
CE409/16
170
The stress coefficients Qi and Qe for interior and edge loading are given in Table 10.1
for various values of l/b. The values of Qc for corner loading are given in Table 10.2.
10.2.4. FORMULAE RECOMMENDED BY THE I.R.C. :
The I.R.C. recommends the following two formulae for analysis of load stresses at the
edge and corner regions and for the design of rigid pavements.
1.
10.8
(a
2 /1
1.2
10.9
Eh 3
12 1 2 k
1/ 4
3 10 18
5
2.
12 1 015
6
.
= 70.6cm
CE409/16
=
171
1.6a 2 + h 2
0.675 15
= 14.4 cm.
3.
4.
0..572
0.572 p
4 log10 (l / b) + 0.359] =
5100
[
2
h
182
= 4 log10
5.
70.6
+ 0.359 = 28.54 kg / cm2
14.0
Sc = 3P/h2 1
15 2
0.6
70.6
= 24.27 kg/cm2
2.
Qi
Qe
l/b
Qi
Qe
1.0
0.34
0.41
2.0
1.48
2.23
1.5
0.56
0.61
8.5
1.52
2.33
2.0
0.72
0.89
9.0
1.55
2.39
2.5
0.85
1.12
9.5
1.58
2.44
3.0
0.94
1.30
10.0
1.6
2.49
CE409/16
172
3.5
1.02
1.45
10.5
1.63
2.54
4.0
1.10
1.58
11.0
1.66
2.59
4.5
1.17
1.78
11.5
1.68
2.63
5.0
1.22
1.81
12.0
1.71
2.68
6.0
1.33
1.99
13.0
1.75
2.75
6.5
1.38
2.07
13.5
1.77
2.80
7.0
1.41
2.14
14.0
1.79
2.83
7.5
1.45
2.21
14.5
1.81
2.86
8.0
1.48
2.27
15.0
1.83
2.90
15 2
= 0.300, Qc = 154
. from Table 10.2
70.6
2 /1 =
Qc
2
#
Qc
2
#
Qc
2
#
0.00
3.00
0.25
1.86
0.40
1.27
0.05
2.50
0.25
1.69
0.45
1.14
0.10
2.25
0.30
1.54
0.50
1.02
CE409/16
173
0.15
2.04
0.35
1.40
0.55
0.90
0.20
1.86
0.40
1.27
0.60
0.79
through the slab which may cause the slab to warp; such warping may be wholly or partly
restrained by the weight of the slab and by the reactions of dowel bars and other load transfer
devices in the joint (2) changes in the mean temperature of the slab causing it to expand or
contract; this movement may be wholly or partly restrained by the frictional resistance of the
sub-grade and the resistance of the joints. These two effects are considered separately here.
10.3.1. WARPING STRESSES : Whenever the top and bottom surfaces of a concrete
pavement simultaneously possess different temperatures the slab tends to warp downward or
upward : but the weight of the slab restrains the warping resulting in warping stresses. This
differential temperature is due to the thickness of the slab because of which the bottom
surface reacts to the change more slowly than top.
If Tp and Tb are the temperatures at the top and bottom of the slab, then the mean
temperature would be 1/2 (Tp+Tb) = t, say. If the slab has no restraint, then the unit elongation
of the top fibers and also unit contraction of the bottom fibers due to relative temperature
condition, each would be equal to E
t/2 where
CE409/16
Sti =
174
E t C x + C y
2
1 2
10.10
The warping stresses at the edge and corner regions of the concrete pavement are :
Ste = Cx
and
Stc =
E t
Cy E t
or =
(which ever is higher)
2
2
E t
a /1
3(1 )
10.11
10.12
Where Sti, Ste and Stc are the warping stresses at the interior, edge and corner positions of the
slab in kg/cm2.
t = temperature differential between the top and bottom of the slab in degree C,
C = (Tp+Tb)/2
Cx = Coefficient based on Lx/1 in desired direction
Cy = Coefficient based on Ly/1 at right angle to the above direction
Lx and Ly are the dimensions of the slab considering along x and y directions of the
length and width of the slab. Other terms are as defined earlier.
The values of the warping stress Coefficients Cx and Cy for cement concrete
pavements are taken from the chart developed by Bradbury and presented in Fig. 10.2.
10.3.2. FRICTIONAL STRESSES :
Due to uniform temperature rise and fall in the concrete slab, there is an overall
expansion and contraction of the slab respectively. Since the slab is in contact with soil subgrade, the slab movements are restrained due to the friction between the bottom layer of the
pavement and the soil layers. This frictional resistance therefore tends to prevent the
movement thereby induce frictional stresses in the bottom fiber of the road slab. Stresses in
the slab due to this phenomenon vary with slab length. In short slab, stress induced due to this
is negligibly small where as in long slabs, which would under go movements of more than
0.15cm, considerable amount of frictional stresses develop.
Frictional resistance due to sub-grade restraint,
Sf =
here
WLF
2 104
10.13
CE409/16
175
f = Coefficient of sub-grade restraint (about 1.5).
L = Length of slab in metres.
10.4.
COMBINED STRESSES :
It is necessary to consider the conditions under which the various stresses in cement
concrete pavements would combine to given the most critical combinations (i) During
summer at mid-day when the slab tends to curl down, then the critical combination of stresses
for the interior and edge region becomes.
= Wheel load stress + Temperature warping stress - Sub-grade restraint stress
(ii)
10.14
During winter at mid-day when the slab tends to curl down, the critical combination
10.15
In case of corner region the critical combination of stresses exits when the slab curls
10.16
For the interior and edge regions, since the temperature differential during winter is of
lower magnitude than in summer, the critical combination of stresses, therefore, are higher in
summer than in winter and become as the design criteria for the conditions in our country.
WORKED EXAMPLE
10.2
Calculate the combined load and temperature stress for the longitudinal end condition
CE409/16
176
SOLUTION :
Since a/h = 15/20 = 0.75 is less than 1.724
Radius of resisting section = b =
1.6 a 2 + h 2
0.675h
0.675 20
= 14.0 cm
Stress developed due to edge loading
Se =
0.572 p
[4 log10 ( l / b) + 0.359]
h2
Eh 3
Radius of relative stiffness =1=
12 1 +2 k
1/ 4
1/ 4
3.0 10 20
5
= 60.8cm
12 1 015
. 2 15
60.8
+ 0.359 = 24.0 kg/cm2
14.0
t/2
Frictional stress =W L F/2 104 = (2400 4.5 1.5) / (2 104) = 0.81 kg/cm2
small, since the slab is a short slab and hence neglected. Combined stress = load stress +
warping stress
= 24.0 + 27.54 - 0.81 = 50.73 kg/cm2
Corner region Sc = 3P/h2 1
(a
2 /l
= 3 5100/202 1
0 .6
(15
2 / 60.8
0 .6
= 28.0Kg / cm2
CE409/16
177
a /l
[(
I.R.C. RECOMMENDATIONS :
CE409/16
178
Maximum spacing
Joint
metres
1)Expansion
140
Joints
Remarks
90
2) Contrac-
120
50-60
4.5
tion Joint
10.6.
joints may be conveniently classified into four groups - expansion joints, contraction joints,
warping joints, and construction joints. Longitudinal joints are required in concrete roads
more than 4.5 m wide to allow for transverse warping and to allow for uneven settlement of
the sub-grade.
10.6.1. SPACING OF EXPANSION JOINTS :
The width of the gap in the expansion joint depends upon the length of slab.
Expansion joint spacing is designed based on the maximum temperature variations expected
and width of the joint. Dowel bars are provided at expansion joints for load transfer form one
slab to the other. It is recommended not to have a gap more than 2.5 cm for an expansion
joint. If $ is the maximum expansion in a slab of length Le with a temperature rise from t1 to
t2 in degrees centigrade, then the spacing of the expansion joints is given by
CE409/16
179
$1
Le(metres) =
100 C ( t 2
t1 )
10.17
2Sc
104
Wf
10.18
Here
LC = spacing between the contraction joints, m.
f = Coefficient of friction (1.5)
W = Unit weight of slab, kg/m3 (2400 kg/m3)
Sc = Allowable stress in tension in cement concrete.
10.6.3. WARPING JOINTS :
If expansion and contraction joints are properly designed and constructed there is no
need of providing warping joints in addition.
Construction aspects of these joints are discussed n Unit No.12.
10.7.
1)
Find out the spacing of expansion and contraction joints given the following data.
Expansion gap. 2.5 cm.
CE409/16
180
Explain the terms (a) Modulus of sub-grade reaction (b) Radius of relative stiffness
10.8.
SUMMARY :
Stresses are set up in concrete road slabs by wheel loading and by changes in
temperature. The wheel load stresses are calculated for three critical load positions, namely,
interior, edge and corner positions of the road slab, based on Westergaurds theory. The
equations given by Estergaurd require considerable amount of trails in their solution, if the
slab thickness has to be determined. Bradbury suggested a simplified procedure in terms of
stress coefficients. The IRC considers the edge and corner loading positions only and
recommends the use of Westergaurds edge load formula modified by Teller and Sutherland
and the Westergaurd corner load formula modified by Kelley for calculating these stresses.
Temperature tends to produce two types of stresses in a concrete road slab. They are
warping stresses and frictional stresses. Whenever the top and bottom surfaces of a concrete
pavement simultaneously possess different temperatures, the slabs tends to warp downwards
or upwards inducing warping stresses. These warping stresses are calculated by the equations
developed by Bradbury. The increase or decrease of pavement average temperature causes
expansion or contraction of pavement slab. When these movements are restrained frictional
stresses are developed in the slabs. For designing the pavement slab critical combination of
these stresses have to be obtained. For Indian conditions, critical combination of tresses take
place on a summer mid-day at the edges.
CE409/16
181
Joints are provided in concrete roads to allow for the movements of the slab due to
changes in temperature and moisture content, but the number of joints should be a minimum.
This lesson discusses spacing of expansion and contraction joints.
10.9.
REFERENCES :
1. Bindra, S.P. (1977) - A Course in High Way Engineering - Dhanpathy Rai and Sons,
Delhi.
2. Khanna, Dr. S.K. and Justo, Dr. C.E.G. (1991) - Highway Engineering - Nem Chand and
Bros, Roorkee.
3.
***
TRANSPORTATION ENGINEERING
UNIT - 11
CONSTRUCTION OF FLEXIBLE PAVEMENTS
CONTENTS :
Aims / Objectives
11.1.
Introduction
11.2.
Earth Roads
11.3.
Gravel Roads
11.4.
11.5.
11.6.
11.7.
11.8.
Surface Treatments
11.9.
CE409/16
182
Materials required, principles of construction of and equipment and plants needed for
the construction of earth, gravel, water bound Macadam (WBM) and different types of
bituminous roads are presented in this lesson. Proper maintenance of a road is a must for
realising the best serviceability throughout its life. Usual causes of damage and maintenance
methods of each type of the above roads are also discussed in detail.
11.1.
INTRODUCTION :
In our country there is need to construct wide net work of roads to meet the large
demand of transportation expansion. Since funds available for the construction of large
mileage of roads are also quite meager, it is necessary to have roads which cost less not only
from the construction point of view, but also from the maintenance considerations. Such
types of roads are popularly known as Low-cost Roads. These Low-cost road should be
amenable for stage construction. Making improvement to the existing roads according to the
traffic needs is called Stage Construction or Phased development of the roads. Earth
roads, gravel roads and the water bound Macadam (W.B.M.) roads fall under this category.
Bituminous or tar roads , which are popularly known as Black Top Roads in which
bitumen or tar and mineral aggregates are used are also quite popular in our country. Roads
are constructed with varying aggregate sizes and compositions and with different types of
bituminous binders. Hence there are varying techniques of their construction.
Materials used, their requirements and specifications, equipment and plant needed and
construction procedure for each of the above types of flexible pavements are presented in
detail.
A well designed and constructed road must be maintained well in order to reduce the
operation cost and increase the serviceability of the pavement. A detailed note on the
maintenance aspects of each type of construction is also included.
11.2.
EARTH ROADS :
An earth road is the lowest form of the surface. It is the first stage in the development
of a road which is to be further developed as increasing traffic requires. These roads are
generally dusty and form ruts quickly thereby destroying the road crown. The camber
provided to the earth roads is very steep and ranges between 1 in 25 (4.0%) to 1 in 33. (3%)
in order to drain off rain water quickly.
11.2.1. MATERIALS : Soils of the following properties are considered satisfactory for
constructing earth roads.
Base course
Wearing course
CE409/16
183
Clay content
5%
10-18%
Silt content
9-32%
5-15%
Sand content
60-80%
65-80%
Liquid Limit
25%
35%
plasticity Index
6%
4 to 10%
Highly expansive clays exhibiting marked swell and shrinkage properties should not
be used. The different construction operations are briefly discussed below,
11.2.2. CONSTRUCTION OPERATIONS : The soil survey is carried out and suitable
borrow pits are located. The trees, shrubs, grass, roots and other organic matter including top
soil are removed before excavating the earth for construction.
The centre line and road edges are marked on the ground along the alignment, by
driving wooden pegs. Reference pegs are also driven to help in following the desired vertical
profile of the road during construction.
The sub-grade is then prepared by cleaning the site, excavating and construction of
fills to bring the road to the desired grade and shaping the sub-grade to the desired camber.
The site clearance may be carried out manually using appliances like spade, pick and hand
shovel. Mechanical equipment like dozer, scraper and ripper may also be used for the
purpose. Construction of fills and excavation of cuts to bring the road to the desired profile
may also be done either manually or using excavation, hauling and compaction equipment.
The borrowed soil is balanced, if necessary and dumped on the prepared sub-grade
and water is added, if necessary to bring it to the optimum moisture content. Then the soil is
rolled in layers such that the compacted thickness of each layer does not exceed 10cm. The
type of roller for compaction is decided based on soil type, desired amount of compaction,
and availability of equipment. At least 95% of dry density of I.S. light compaction is
considered desirable. The camber of the finished pavements surface is checked and corrected,
if necessary.
The compacted earth road will be opened to traffic after it is allowed to dry out for a
few days.
11.2.3. TREATED EARTH ROADS : The earth roads can be improved considerably by
treatment with bituminous material or calcium chloride. Clayey and silty soil roads which are
extremely dusty in dry weather and soften readily in wet weather can be treated by
application of bituminous materials. Calcium chloride when used to treat the earth roads,
keeps them slightly damp by absorbing moisture from the air. It has been observed that
CE409/16
184
calcium chloride as a dust palliative is only effective when relative humidity of the
atmosphere is above 31%.
11.3.
GRAVEL ROADS :
These roads consist of a carriage way constructed with gravels. These roads are fairly
resistant and are suitable to cater an average dial traffic between 350 to 400 vehicles. The
carriage way of this type of road is provided with a camber ranging between 1 in 33 (3.0%) to
1 in 40 (2.5%).
11.3.1. MATERIALS : Hard variety of crushed stone or gravel of specified gradation is
used. Rounded stones and river gravel are not preferred as there is poor interlocking.
Gravel to be used for construction is stacked along the sides of the proposed road.
CE409/16
185
from time to time using a template. A few days after the final rolling, the road is opened for
traffic.
11.4.
(1)
(2)
(3)
Formation of cross-ruts along the surface after the monsoons due to surface water.
The dust nuisance may be reduced by frequent sprinkling of water or by use of dust
palliatives like calcium chloride. periodical maintenance by spreading moist soil along ruts
and reshaping the camber is necessary.
11.5.
material. Macadam construction means the base course is made of crushed or broken
aggregates bound together by the action of rolling. Water bound macadam construction
should consist of clean, crushed broken aggregates mechanically interlocked by rolling and
bound together with screenings and binding material where necessary with water, laid on a
prepared sub-grade, sub-base, of an existing pavement as the case may be. Generally,
W.B.M. is constructed in thickness ranging from 8 c.m. to 30 c.m. The camber provided is 1
in 33 (3.0%) to 1 in 40 (2.5%).
When used as surface course WBM gets deteriorated rapidly under mixed traffic
condition and so this construction is used as base course and is covered with either
bituminous surfacing or cement concrete surfacing.
11.5.1. MATERIALS : The materials required for WBM roads are coarse aggregates,
screenings and filler material. The crushed or broken stones should be hard and durable and
free from excess of flaky, elongated, soft and disintegrated particles and dirt. The aggregates
should meet the following requirements.
Los-Angeles abrasion value (500 revolutions ) 40% max.
Flaking Index
15 % max.
CE409/16
Grading No.
186
Size range mm.
Percentage by weight
passing the sieve
1.
90-40
100
80
63
40
20
100
65-85
25-60
0-15
0-5
2.
63 to 40
80
63
50
40
20
100
90-100
30-70
0-15
0-5
3.
50-20
63
100
50
95-100
40
35-70
20
0-10
10
0-5
The screening and other filler materials used to fill up the voids in the coarse
aggregate should meet the grading requirements given in Table No. 11.2.
Table 11.2.
Grading Requirements For Screenings Used in W.B.M. Construction
Type of screening
Sieve size mm
10 mm (for gradings 2 or 3)
100
10.0
90-100
4.75
10-30
0.15
0-8
10.0
100
4.75
85-100
0.15
10-30
Filler material should contain sufficient clay content to prevent revelling of the surface course
of W.B.M layers. Hence it is recommended that the plasticity index of filler material may be
upto 9.
11.5.2. CONSTRUCTION PROCEDURE : Materials of the required grading for
construction are stacked on the road side.
CE409/16
187
The site is cleared and either a trench is cut to the required camber or earth bunds are
made in order to provide the required confinement to the loose aggregates for compaction by
rolling. The weak spots are corrected and rolled before the coarse aggregates are placed. On
clay sub-grades a blanket of granular material like sand is spread to a thickness of about 10
cm.
The coarse aggregates are spread upon the prepared surface from the stock piles such
that the required profile is obtained. The thickness of each layer should be such that the
compacted thickness normally doesnt exceed 7.5cm. The aggregates are spread evenly to the
required profile by using templates placed across the road about 6m apart. The surface is
checked from time to time ensuring proper grade and camber.
After spreading the aggregates, the same are compacted to a full width by rolling. For
this purpose, a three wheel power roller of 6 to 10 tonnes capacity or tandem roller or
equivalent vibratory roller is used. The rolling is done at edges with roller running forward
and backward, until the edges are firmly compacted. Then the roller is moved from the edges
to the centre, parallel to the centre line such that sufficient overlapping is there.
After the coarse aggregates are thoroughly keyed and set by rolling, the screenings are
spread uniformly to fill the interstices. Dry rolling and brooming is carried out. After dry
rolling, the surface is sprinkled with water; swept and rolled. Hand brooms are used to place
the wet screenings into the voids.
The filler material with plasticity index not more than 9 is applied in two successive
thin layers. After the application, the surface is sprinkled with water. the slurry is allowed to
fill up the voids. Rolling is then done.
The road section is allowed to dry overnight and a layer of sand or earth about 6 mm
thick is speed on the surface, lightly sprinkled with water and rolled.
The shoulders are formed to the same cross slope of the pavement and compacted by
rolling. The traffic is allowed on the WBM when the road is properly dried and set.
11.6.
conditions. In dry weather dust is formed and during rains mud is formed. The steel tired
bullock carts cause severe wear and tear to the WBM surface. The fast moving vehicles raise
dust in dry weather and churn up the mud in wet conditions. Due to the combined effects of
the traffic and the rain water, washing away of the soil binder from the surface takes place,
CE409/16
188
resulting in the stone aggregates protruding out or getting loose from the surface layer. Pot
holes and ruts are formed in weak spots.
To prevent the aggregates from getting loosened from the surface course, thin layer of
moist soil binder is spread on the surface, particularly after the monsoon. Dust nuisance can
be effectively prevented by providing a bituminous surface dressing course over the WBM
pavement. Temporary measures include spraying of dust palliatives are taken.
Pot holes and ruts formed should be patched up,. The patch repair work is carried out
by first cutting out to a rectangular shape the defective area to remove the stones unto the
effected depth. Then with the coarse aggregates of the same size, the patch is filled up and
compacted well by ramming, such that the patches area is abut 1cm above the general
pavement surface. This allows for further compaction of this patched portion, under traffic.
Wet soil binder is then applied on the surface of the patched area to fill up the interstices and
the surface is rammed again.
11.7.
II)
III)
IV)
Bituminous pavements are also classified on the basis of mixing and construction
Bitumen and tar require heating to bring them to a proper viscosity for their use. Then
the construction technique is termed as HOT MIX METHOD. Cut backs and emulsions
when used are applied cold and the technique is known as COLD MIX.
CE409/16
11.8.
189
SURFACE TREATMENTS :
These are the works carried out to alter the qualities of a wearing surfaces. The
CE409/16
190
For good surface dressing, the base course is well prepared to its profile and is made
free from pot holes and ruts. The base course should be made free from all dust, loose soil
etc. The aggregates should be exposed to a depth of 1.25cm, but at the same time should not
be loosened. This is done by the use of wire brushes and final dusting is done with jute bags.
On the prepared surface using a mechanical sprayer or pouring can, uniform spraying
of prime coat is done. Then the bituminous binder is sprayed uniformly at a specified rate,
care is taken that excessive binder is not applied to localized areas as this would cause
bleeding. After the application of the binder, the cover material of sonte chips is spread to
cover the surface uniformly and rolled with a 6 to 8 tonnes tandem roller. Rolling is done
from the edges proceeding towards the centre longitudinally with over lapping not less than
1/3 of the roller tread. Rolling is continued until the particles are firmly interlocked. This is
the final rolling if the surface dressing is in single coat. If the second coat is applied, then the
rolling is done again after the treatment is done for the second coat.
The surface is checked for its cross - slope and the road section is opened to traffic
after 24 hours.
11.8.4. SEAL COAT :
Seal coat is usually recommended as a final cover over certain bituminous surfaces
which are not impervious. They are open graded bituminous constructions which include
grouted macadam, bitumen bound macadam and premixed carpet. Seal coat is also provided
over an existing bituminous pavement which is worn-out. Seal coat is thus a single coat
surface dressing which is usually applied over the exiting black top surfaces to seal the
surfacing against ingress of water, to develop skid resistance texture and to enliven an
existing weathered surface.
Surface treatments are shown in Fig. 11.2.
CE409/16
191
In penetration macadam construction, the bitumen is sprayed after the aggregates are
spread and compacted in dry state. The bitumen penetrates into the voids from the surface of
the compacted aggregates, thus filling up a part of the voids and binding some stone
aggregates together. Depending upon the quantity of bitumen spread, and the extent of
penetration it is called Full-Grout when the bitumen penetrates to the full depth of
compacted aggregates and Semi-Grout when it penetrates upto half the depth. Full grout is
adopted in regions of heavy rainfall and semi-grout is adopted in regions of moderate rain fall
and traffic, results in an open graded structure, its use is some times recommended for base
course construction only.
11.9.1. CONSTRUCTION PROCEDURE :
The construction of a penetration macadam is recommended for thickness of 5cm and
7.5cm. The materials used are as a specified below:
a)
BITUMEN/TAR : IRC recommends to use any grade of bitumen from 80-100, 60-70
and 30-40; Road tars, RT-4 and RT-5 could also be used. The quantity of bitumen required
depends on the depth of penetration of bitumen into the compacted aggregate layer desired.
b)
following values.
Los - Angeles abrasion value
40% max.
30% max.
Flakiness index
25% max.
25% max.
The gradings of aggregates as recommended by the IRC are given below in table 11.3
and Table 11.4.
Plant and Equipment : Various equipment needed are bitumen heating device,
bitumen distributors, aggregate spreader, and roller for compaction.
Construction Steps :
The underlying course is prepared and conditioned to uniform grade. The surface is
lightly scarified, brushed and prime or tack coat is applied.
Table 11.3 Grading of Coarse Aggregates for penetration Macadam
Percentage passing sieve size mm.
Compacted Thickness
50
63
--
mm
75
100
CE409/16
192
50
100
--
38
--
35 - 70
25
35 - 70
--
19
--
12
0 - 15
0 - 15
--
--
--
4.75
--
--
2.36
0-5
0-5
Compacted Thickness
mm
50
75
25
--
100
19
100
12
35 - 70
35 - 70
--
--
0 - 15
4.75
0 - 15
--
2.36
0 - 15
0-5
CE409/16
193
In this group of methods, the aggregate and the binder are pre-mixed prior to placing
and spreading the mix. Each aggregate particle gets coated with uniform thickness of binder
film. Another advantage associated with the premix construction is the increased stability of
the mix. In the premix, the aggregate gradation is carefully selected to give a dense mass
possessing minimum voids.
This method includes bituminous macadam. bituminous carpet, bituminous concrete,
sheet asphalt and mastic asphalt. Construction techniques of these pavements are explained.
11.10.1. BITUMEN BOUND MACADAM :
This bitumen bound macadam, also some times called bituminous macadam, is a
premix immediately laid after mixing and then compacted. It is an open graded construction
suitable only as a base course. When this layer is exposed as a surface course, at least a seal
coat is necessary. This is laid in finished thickness of 5cm or 7.5cm.
MATERIALS :
a)
emulsions can also be used in cold mix construction technique. The binder content used
varies from 3.0 to 4.5% by weight of the mix.
b)
AGGREGATES :
Aggregates used are of low porosity fulfilling the following requirements for base
course.
Los-Angeles abrasion value
50% max.
35% max.
Flakiness index
15% max.
25% max.
The IRC specifies the following grading of aggregates for base course construction.
Percentage passing
sieve size, mm
50
I
75
II
II
63
--
--
100
100
50
100
100
--
90-100
40
--
90-100
35-70
35-65
CE409/16
c)
194
25
25-70
50-80
--
20-40
20
--
--
0-15
--
12
0-15
10-30
--
5-20
10
--
--
---
--
4.75
--
--
--
--
2.36
0-5
--
0-5
--
0.075
0-3
0-5
0-3
0-5
STABILITY REQUIREMENT :
Satisfactory requirements of bituminous mix are specified in terms of Marshall
stability and flow values. A Marshall stability value of 200 kg is recommended for light and
medium traffic, where as a value of 300 kg is recommended for heavy and very heavy
traffic. Flow value should be between 10-40 in terms of 0.1 mm units.
PLANTS AND EQUIPEMENTS :
Various plants and equipment required for the job include : sprayer, mechanical or
improvised hand mixer, spreader and roller.
CONSTRUCTION STEPS :
The underlying course is prepared and conditioned to uniform grade. The surface is
lightly scarified, brushed and tack coat or prime coat of thin layer of bitumen binder is
applied on the existing layer either using the sprayer or a pouring can.
The bitumen binder, and aggregates as per recommended grading are separately
heated to the specified temperature and are then placed in the mixer chosen for the job and
mixed thoroughly to get a homogenous mixture. The mixture is then conveyed to the site,
placed on the desired location and is spread with rakes to a predetermined thickness. The
camber of the profile is checked with a template. It may also be noted that the compacting
temperature also influences the strength characteristics of the resultant pavement structure. It
is therefore required that a minimum time is spent between the placement of the mix and the
rolling operations.
Soon after the spreading of the mix rolling is done with 8 to 10 tonnes tandem roller.
The rolling is commenced from the edges of the pavement and proceeded towards the centre
and uniform overlapping is provided. The roller wheels should be kept damp to avoid the
bituminous material form sticking to the wheels. The pavement surface should be checked for
longitudinal and cross profile.
11.10.2. BITUMINOUS CARPET :
CE409/16
195
Bituminous carpet is a premix prepared from stone chips of 10mm to 12mm size, sand
and bitumen binder. The thickness of such a carpet may vary form 2cm to 2.5cm . The
construction is usually recommended for a surface course layer. The carpet is finally covered
with a seal coat.
MATERIALS REQUIRED :
a)
BITUMEN / TAR :
The bitumen binder of 80-100 grade or road tar of grade RT-3 is used.
b)
STONE CHIPS :
For the carpet of 2cm thick the stone chips of 12mm and 10mm nominal size are
required. The stone chips should be angular, clean, hard, tough and durable. Medium coarse
sand passing 1.7mm sieve and retained on 1.18mm sieve, which is clean, hard and durable is
also required.
The aggregate fulfilling the following requirements are selected.
Los-Angeles abrasion value
35% max.
30% max.
Flakiness index
30% max.
25% max.
EQUIPMENT :
Various equipment and plants required for the job include Sprayer, mixer, spreader
and roller.
CONSTRUCTION STEPS:
The underlying course is prepared and conditioned to uniform grade. The surface is
lightly scarified, brushed cleaned and tack coat or prime coat is applied on the existing layer
either using the sprayer or a pouring can. The tack coat or prime coat is applied just before
spreading the pre-mix.
The aggregates and bitumen are heated separately upto the required temperature and
then mixed into a thorough and homogeneous mixture in a mixer - mechanical or improvised
hand mixer. The pre-mix is taken out and carried to the site for spreading and rolling. The
spreading is done with suitable rakers. The cross profile of the laid material is checked with
suitable templates.
Soon after the spreading of the mix, rolling is done with a 6 to 9 tonnes tandem or
pneumatic roller. At one operation 15 metre of the premix is laid and rolled. the roller wheels
CE409/16
196
should be kept damp to avoid the bituminous material from sticking to wheels. The rolling is
done until there is no further movement of aggregates in the mix layer.
In areas of low rainfall, a premixed - sand seal coat is applied over the carpet. In areas
of high rainfall (over 125cm per year) a liquid seal is sprayed and covered with a layer of
chippings applied over the carpet. The stone chips are of 6mm size. This layer is rolled by a
light tandem roller to give a smooth finished surface. After the application of seal coat, the
pavement so constructed is opened to traffic after a period of 24 hours.
11.10.3. BITUMINOUS CONCRETE :
The bituminous concrete is the highest quality of construction in the group of black
top surfaces This is a carefully proportioned mixture of coarse aggregate, fine aggregate and
mineral filler coated with bitumen binder. In this both the aggregates and the bituminous
binder are heated to the required temperature prior to mixing. The mixes are properly
designed to satisfy the design requirement of stability and durability. Mineral filler is used to
fill up the voids in the fine aggregate and consists of inert materials (Lower than 600 micron
sieve) stone-dust, cement, hydrated lime, fly ash or other non-plastic materials.
MATERIALS REQUIRED :
a)
AGGREGATES :
Aggregates used for bituminous concrete should satisfy the following gradation
requirements.
Percent by Weight
Limit I
Limit II
20.0
--
100
12.50
100
80 - 100
10.00
80 - 100
70 - 90
4.75
55 - 75
50 - 70
2.36
35 - 50
35 - 50
CE409/16
197
0.60
18 - 29
18 - 29
0.30
13 - 23
13 - 23
0.15
8 - 16
8 - 16
0.075
4-0
4 - 10
40% max.
30% max.
Flakiness index
25% max.
25% max.
b)
BITUMEN :
The grade of bitumen depends upon the climatic conditions of a given region.
However grades 30-40, 60-70 or 80-100 are usually recommended for use. The binder
content used ranges form 5.0 to 7.5% by weight of the mix. The exact binder content required
depends upon the results of Marshall test carried out in a laboratory.
c)
STABILITY REQUIREMENTS :
The requirements of the mix based on the traffic intensity are presented in Table 11.7.
Table 11.7. Requirements of Bituminous Concrete
Requirements
Traffic
Heavy
Medium
Light
Stability, Kg(min).
340
227
227
20-40
20-45
20-50
Voids in mix %
3-5
3-5
3-5
Number of compaction
75
50
35
CE409/16
198
The premix is prepared in a hot mix plant. The hot mixed material is collected form
the mixer by the transporters, carried to the location and is spread by mechanical paver. The
camber and the thickness of the layer are accurately verified. The control of temperature
during mixing and compaction are of great significance in the strength of the resulting
pavement structure.
Soon after the spreading of mix by paver, the surface should be thoroughly compacted
by rolling with a set or rollers moving at a speed not more than 5 kmph. The initial rolling is
done by 8 to 12 tonnes roller and intermediate rolling is done with a fixed wheel pneumatic
roller of 15-30 tonnes having a tyre pressure of 7 kg/cm2. The wheels of the roller are kept
damp wit water. The number of passes required depends on the thickness of the layer. In
warm weather rolling on the next day helps to increase the density if the initial rolling was
not adequate.
QUALITY CONTROL :
The various field controls include (i) aggregate grading control (ii) binder grade
control (iii) temperature control for aggregates and (iv) temperature control for mix during
mixing and compaction. It is recommended that at least one test for the above quality controls
must be carried out for every 100 tones of mix discharged by plant. The field density should
be checked for every 1000m2 of compacted surface.
11.10.4. SHEET ASPHALT OR ROLLED ASPHALT :
Sheet Asphalt contains high percentage of mortar consisting of sand, filler and
bitumen and is quite dense and impervious. The characteristics of durability, imperviousness
and load transmission are excellent in the sheet asphalt. It has been observed that the elastic
modulus of this layer is equivalent to that of cement concrete under transient stress. This
sheet asphalt is used only in wearing courses.
11.10.5. MASTIC ASPHALT :
This is superior to the other types of surfacing because of its ability to take up very
heavy shear stress without deformation. This is hence recommended for very heavy traffic
cities and placed where the braking and accelerating stresses are very heavy - bus stops and
roundabouts. This is a mixture of bitumen, fine aggregate and filler in suitable proportions
which yield avoidless and impermeable mass. The filler, bitumen binder and fine aggregate
are taken in suitable proportions and they are heated in sequence, and cooked at a temperature
of 2000C; then mastic asphalt has a consistency that it can flow. At this temperature the
mastic asphalt is spread to thickness between 2.5cm to 5cm. On cooling it hardens to a
CE409/16
199
semisolid or solid state. No rolling is required. Mastic asphalt has not found any importance
in our country because of its high cost and non-availability of the grade of asphalt required.
11.11. MAINTENANCE OF BITUMINOUS SURFACES :
Maintenance works of bituminous surfacing mainly consists of (i) Patch repairs, (ii)
Pot hole repairs (iii) Surface treatments and (iv) Resurfacing. These are briefly discussed
here.
11.11.1. PATCH REPAIRS :
Inadequate or defective binding material causes removal of aggregates during
monsoons. Patching may be done on affected isolated areas or sections using a cold premix.
11.11.2. POT HOLES :
Pot holes are cut to rectangular shape and the affected materials in the section is
removed until sound material is encountered. The excavated holes are cleaned and applied
with primer. A premixed material is placed in the sections. The material so placed in the Pot
holes is well compacted by ramming to avoid any raveling. The finished level of the patches
is kept slightly above the original level to allow for subsequent compaction under traffic.
Generally cut-back or emulsion is used as binder.
11.11.3. SURFACE TREATMENT :
Excess of bitumen in the surface material bleeds and the pavement becomes slippery.
Corrugations or rutting or shoving develop in such pavement surfaces. Blotting material such
as stone chips of maximum size 1.25mm or coarse sand is spread and rolled to develop
permanent bond between the existing surface and the new materials.
The binders in the black top surface also get oxidized due to aging. This develops
minute cracks in the pavement surface. Such pavements surfaces are applied with a renewal
coat or seal coat. It may be necessary to apply more than one layer of surface treatments, if
the surface has been seriously damaged.
11.11.4. RE SURFACING :
When the pavement surface is totally worn out and develops a poor riding surface, it
may be economical to provide an additional surface course on the existing surface.
11.12. SELF-ASSESSMENT QUESTIONS :
1.
2.
Specify the materials required for the construction of WBM roads. Give also a
CE409/16
200
a)
b)
c)
4.
Give a detailed specification for a two coat surface dressing over an existing WBM
road.
11.12. SUMMARY :
Earth and gravel roads are the lowest type of roads used in our country and may be
used successfully when the traffic intensity is between 30 to 200 tonnes per day. The usual
damages needing frequent maintenance of these roads are formation of dust and formation of
longitudinal and cross ruts. Materials and their requirements, construction and maintenance
aspects of these roads are presented in detail.
Another type of construction that is popular in our country is the Water Bound
Macadam (WBM) road. Water bound macadam construction consist of clean crushed coarse
aggregate mechanically inter locked by rolling and the voids in which are filled with
screenings and binding material with the aid of water on a prepared sub-grade, sub-base or
base of an existing pavement as the case may be. In the case of WBM roads the damage is
caused by the removal of the binding material from the surface resulting in pot holes and ruts.
Construction and maintenance aspects of the WBM roads in discussed in detail.
Bituminous roads when properly constructed maintained and used, have long and
economic lives. Based on the methods of construction these pavements are classified as
surface treatments, grouted or penetration macadam and premix types.
The following aspects of construction are discussed under each category of the black
top roads.
MATERIALS USED :
a)
Bitumen / Tar
Grades
b)
Aggregates
c)
d)
Construction procedure
Maintenance works of bituminous surfacing mainly consists of patch repairs, pot hole
repairs, surface treatments and resurfacing. Important aspects of these have been discussed.
11.14. REFERENCES :
CE409/16
201
1. Bindra, S.P. (1977) - A Course in High Way Engineering - Dhanpathy Rai and Sons,
Delhi.
2. Khanna, Dr. S.K. and Justo, Dr. C.E.G. (1991) - Highway Engineering - Nem Chand and
Bros, Roorkee.
3.
CONTENTS :
Aims / Objectives :
12.1.
Introduction
12.2.
12.3.
Construction of Joints
12.4.
12.5.
12.6.
12.7.
Summary
12.8.
Reference
AIMS / OBJECTIVES :
Cement concrete pavements are very much preferred because they provide an
excellent riding surface and have much longer life than any other type of construction. These
merits of cement concrete pavements can be realised only when they are well designed,
constructed and maintained. Design of rigid pavements is already dealt with. In this lesson,
methods of construction and maintenance of concrete roads are explained.
12.1.
INTRODUCTION :
Cement concrete roads are very high standard roads which are the costliest of all other
types of roads. They provide excellent riding surface and pleasing appearance. Though
initially the cement concrete roads are very costly, because of their long span of life,
excellent riding surface and negligible maintenance cost, these roads prove to be cheaper than
the bituminous roads. The cement concrete material exhibits its characteristics which can be
CE409/16
202
predicted by theory and as such a structure made using this material can well be designed on
a rational basis. This indirectly saves cost as the resultant structure gives an excellent
performance.
A few of the draw backs of the cement concrete pavements are :
1)
The transversal and longitudinal joints which are unavoidable in construction are
planes of weakness; they also delay the construction and increase the cost of maintenance of
these roads. As such, the number of joints should be a minimum.
2)
A minimum period of 28 days curing is required before the cement concrete pavement
Cement concrete pavements require very high initial investment and are not suitable
(ii)
(iii)
aggregates as 18 to 25mm is laid on the prepared sub - grade and the aggregates are dry
rolled. A grout made of coarse sand cement and water is applied on the surface and is allowed
to seep through the aggregate matrix. The technique can be compared with bituminous
grouted or penetration type construction.
In Rolled Concrete Layer, a lean mix of aggregate, sand, cement and water is
prepared and laid on the prepared sub-grade or sub-base course. Then the surface is rolled by
a Tandem Roller. The rolling should be completed before the final setting time of cement.
Curing is done as per conventional methods.
The cement grout layer and rolled concrete layer are suitable for base course only.
However the cement concrete slabs serve as both base and surface courses. Construction of
cement concrete slab pavements includes (i) construction of pavement slab and (ii) design
and placement of joints.
12.2.
CE409/16
(a)
203
succession having the next bay to follow up after a time lapse of one week when normal
cement is used and atleast two days later, in the case of rapid hardening cement. In this
method of construction, the bays are constructed in x.y,z etc leaving gaps of bay x, y and z
(Fig. 12.1).
(ii)
DISADVANTAGES :
(i)
Larger number of transverse joints are to be provided, and this increases the cost of
During rainy season, Iran water may get collected in the incomplete bays.
(iii)
Needs traffic diversion during construction because the construction is spread over the
x, y, z etc. (Fig. 12.1) without any break. The construction joints are however provided at
the end of the days work. The main dis-advantage of this method is the difficulty of providing
joints. This method is still preferred because during construction half the traffic lane width
could be utilised by the diverted traffic.
CE409/16
12.2.
204
cement, coarse - aggregate, fine aggregate and water. For joints materials required are dowel
bars, joint filler and sealer.
a)
CEMENT :
Ordinary portland cement is generally used. When the road has to be opened for
COARSE AGGREGATE :
Good quality aggregates should be used and should be free from harmful materials
such as iron, pyrites, coal, mica, clay, alkali, organic impurities etc., It is always desireable to
use round gravel aggregates. The largest size of aggregate in a mix should not exceed one
quarter of the thickness of the slab. The best combination of strength and workability is to be
obtained. The physical requirements of aggregates suitable for cement concrete construction
are as follows :
Aggregate crushing value
30% (max.)
30% (max.)
16% (max.)
(c)
FINE AGGREGATE :
Natural sand should be preferred as fine aggregate, though crushed stone may be
used.
(d)
12.2.2. EQUIPMENT :
CE409/16
205
The equipment needed for the construction of concrete slabs are for batching, mixing,
placing, finishing and curing the concrete pavement. These are explained under construction
steps for cement concrete pavement slab.
12.2.3. CONSTRUCTION STEPS FOR CEMENT CONCRETE PAVEMENT SLAB :
The concrete pavement construction should be done only during dry weather where
the temperature is between 4 to 400C. The various construction stages involved are described
below :
a)
be graded and compacted to obtain a smooth hard surface. In case the cement concrete
pavement is to be laid on the sub-grade, then it should be dressed to the required profile and
cross-section. Generally the sub-grade or sub-base is prepared to a width of atleast 30cm
beyond the edge of the pavement to be constructed. The minimum value of the modules of
sub-grade reaction obtained with a plate bearing test should be 5.54kg/cm3 for the foundation
material.
b)
warped after having been in contact with wet concrete on very few occasions. Present trend
is, therefore, to use steel forms at least of 3m, length, except on curves of less than 45m
radius where shorter sections are used. These steel forms are of M.S. channel and of depth
equal to the thickness of the pavements. When set to grade, the maximum deviation of the top
surface of any section from a straight line is not exceeded by 3 mm.
c)
weight - batching plant and placed into the hopper. The cement may be measured by bag, the
weight of which is taken 50 kg.
The mixing of concrete should be done in a power driven batch mixer to ensure
uniform distribution of materials throughout the mass. The minimum mixing time should be
fixed in relation to the mixer type and capacity. The workability of concrete should be
checked by performing slump test.
d)
between the form work in such a manner as to avoid seggregation and uneven compaction.
CE409/16
206
The concrete should not be dropped from a height greater than 90 cm and should be deposited
within 20 minutes from the time of discharge from the mixer.
e)
COMPACTION :
The concrete should be compacted fully using vibrating screed and / or internal
vibrators or hand tampers, known as Hand Tamping Beam (Fig. 12.2). Compaction should
be so controlled as to prevent excess mortar working on to the top due to over-compaction.
Any low or high spots should be made good by adding or removing concrete. The slab should
be tested for trueness.
longitudinal float is held in a position parallel to the carriage way centre line and passed
gradually from one side to the other. After this, the excess water gets disappeared, the slab
surface is tested for its grade and level with straight edge (Fig. 12.4).
CE409/16
207
FINISHING :
Soon after correcting the surface for profile and just before the concrete becomes
hard, the surface should be finished by belting , brooming and edging. For belting, short
strokes are applied with a two-ply canvas belt (Fig. 12.5) transversely to the pavement
surface. Brooming is always done perpendicular to the centre line of the pavement. The
edging tools are used to carefully finish the edges.
Fig. 12.5
h)
CURING :
The initial curing is started soon after the finished pavement surface is able to take the
weight of wet jute mats without leaving any marks thereon. The mats are thoroughly
saturated with water and should extend beyond the pavement edges at least by 0.5m. The
initial curing should be continued for a period of 24 hours.
CE409/16
208
During final curing after the removal of the mats, wet earth is banked in the form of a
soil berms. A layer of sandy soil is spread and is kept thoroughly saturated with water for 14
days. In places where water is scarce or pavement is on a steep gradient, impervious
membrane curing method should be used.
The concrete pavement is generally opened to the traffic after 28 days of curing.
12.3.
JOINTS IN PAVEMENTS:
Joints are provided in concrete roads to allow for expansion, contraction and warping
of the slab caused by the changes of temperature and moisture content. They are also
necessary to allow for the break in construction at the end of the day and to allow the road to
be laid in lanes of convenient width. Design of spacing of various types of joins is dealt with
n detail in article 10.5. Construction aspects of these joints is discussed here.
12.3.1. REQUIREMENTS OF A GOOD JOINT :
1. A joint must be water - proof at all times
2. A joint should not permit ingress of stone grits.
3. Joint must be permitted to move freely at all times.
4. A joint should not detract from the riding quality of a carriage way.
5. A joint should interfere as little as possible in concreting.
6. A joint should not be cause of an expected structural weakness in a pavement.
12.3.2. EXPANSION JOINTS :
These joints are provided to allow for the expansion of slabs due to rise in slab
temperature above the construction temperature of the cement concrete. Expansion joints also
permit the construction of slabs. These joints are provided in our country at an interval of 18
to 21 metres. A typical expansion joint is shown in Fig. 12.6. The approximate gap width for
this joint is from 2.0 to 2.5 cm.
It may be stated that the break in the continuity of a slab forming a joint adds a
weaker plane in the cement concrete pavement. The stresses induced due to the wheel loads
at such joints are of very high order at the edges and corner regions. In order to strengthen
these locations load transfer devices are used.
CE409/16
209
CE409/16
210
Granite
7.5
Limestone
7.5
Gravel
a) Calcareous
7.5
b) Siliceous
4.5
Slag
4.5
A) Dummy Joint
B) Construction Joint with Dowel Bow
Fig. 12.7. Construction Joints
12.3.4. WARPING JOINTS OR HINGED JOINTS :
These joints are provided to relieve the stresses induced due to warping. These joints
are rarely needed if the suitably designed expansion and contraction joints are provided to
prevent cracking. Longitudinal joints with tie bars are in this class of joint.
12.3.5. LONGITUDINAL JOINTS :
CE409/16
211
These joints are provided in wide cement concrete pavements to prevent longitudinal
cracking. They are provided with the bars and these bars help to maintain the two slabs at the
same level. They are not designed to transfer load from one slab to the other. These tie bars
are generally 75 cm long and spaced at 60cm apart. Their sizes depend upon the traffic
intensity, that is, 25mm, 20mm, and 12.5 mm diameter bars are used for very heavy, heavy
and medium traffic intensity respectively. IRC recommends to use plain butt or butt with tie
bar (Fig. 12.8) type of joints.
a) Plain Butt Joint
b) Butt Joint with Tie - bar.
Fig. 12.8. Longitudinal joints
12.3.6. ARRANGEMENT OF JOINTS :
Arrangement of transverse joints are as follows :
a)
Staggered arrangement
b)
c)
Skew arrangement
Fig. 12.9. shows these arrangements. It is observed that where transverse joints are
arranged staggered on either side of the longitudinal joint as shown in fig. 12.9A, sympathetic
cracks are often formed in line with transverse joints. It is recommended to provide joints
across the longitudinal joint in the same transverse alignment as shown in Fig. 12.9.B.
It is always attempted to avoid the skew alignment of the joints, but in some typical
layouts at intersections it may be required to provide skew arrangements. At places where
these arrangements cannot be avoided, the acute corners so formed are strengthened with
reinforcement as shown in Fig. 12.10.
CE409/16
212
b) Uniform Joint
c) Skew Arrangement
Fig. 12.9. Arrangement of Joints
CE409/16
12.4.
213
the adjacent slab and the top of joints are sealed using a sealer to prevent infiltration of water.
12.4.1. JOINT FILLER :
Joint fillers should be compressible, elastic and durable. Various types of joint filler
materials usually used are soft wood, impregnated fibre board and cork or cork bound with
bitumen. These pre-formed fillers are made from fibres of soft board, fibre board, coir fibre,
or cork. It is required that the performed strips of these materials are properly bonded
together with bitumen. The bitumen content specified by the IRC is 35% by weight. Various
properties required for the satisfactory filler materials are as follows : (As per IRC)
a)
COMPRESSION :
The pressure required to compress the specimen to 50% of its original thickness
should be between 7 to 53 kg/cm2. Loss of weight should not be more than 3%.
b)
RECOVERY :
At the end of three cycles of load application, specimen should recover by at least 70
percent.
EXTENSION : When compressed to 50% the extension of one edge, should not be
more than 6.5mm where other edges are rest ran.
12.4.2. JOINT SEALER :
For effective sealing of the joint for a long period, it is essential that the sealing
compound possess the following properties:
a)
b)
c)
d)
Durability.
Different types of sealing compounds are in use. Bitumen is used either along or with
mineral filler as a sealing compound. Rubber - bitumen compounds are also used for this
purpose. Air blown bitumens are also used with advantage, as they are less susceptible to the
temperature changes.
12.5.
CE409/16
214
A well designed and constructed cement concrete road requires very little
maintenance. Main defects in this type of road is the formation of cracks. It is therefore,
necessary to examine the cracks and causes ascertained before any remedial measure is
adopted.
12.5.1 TREATMENT OF CRACKS :
As fine cracks do not harm the pavements, they may be left without any treatment. If
the cracks are wide enough to allow infiltration of water, grit etc., they should be attended
immediately to avoid further damage to the pavement.
The cracks are thoroughly cleaned of all dirt and any other loose particles. This is
done by using a sharp tool and blowing with air blower. The surface is then applied with a
coat of kerosene to facilitate the bond of the sealing material. The cracks are then filled with
suitable grade of bitumen in liquid form. The sealing material is provided 3 mm extra over
the height required. Sand is spread over it.
12.5.2. MAINTENANCE OF JOINTS :
The joints are the weakest spots and the efficiency of the pavement would be
determined by the proper functionings of joints. Large number of failure are observed at or
near the joints. Care should be taken to see that filler and sealer materials are in-tact in the
joints. In the event the joints have lost or damaged, either filler or sealer material or both, the
replacement is immediately done. Vertical edges of the joint are also very essential as
inclined faces get very seriously damaged.
12.6.
1. In narrow lanes cement concrete pavements are used. Can you justify this practice ?
2. Contraction joints are provided at closer spacing than Expansion joints in concrete
pavements, Why?
3. a) Compare alternate bay and continuous bay methods of construction of cement
concrete roads.
b) With the aid of neat sketches show the different types of joints and their positions .
12.7.
SUMMARY :
Cement concrete pavements are preferred because of their excellent riding surface,
very high life and little maintenance. Construction of concrete slab pavements include
CE409/16
215
construction of pavement itself and design and placement of the joints. There are two
methods of construction of cement concrete slab pavements: alternate bay method and
continuous bay method. Each method of construction has its applications and limitations.
Steps involved in the construction of pavement slabs are dealt with in detail. The efficiency
of a cement concrete pavement is largely determined by the spacing and efficient functioning
of the various joints. Usual spacing of the joints and constructional details of different types
of joints are presented in detail.
A well designed and constructed cement concrete road requires very little
maintenance. Maintenance of cement concrete roads include treatment of cracks and
maintenance of joints.
12.8. REFERENCES :
1. Bindra, S.P. (1977) - A Course in High Way Engineering - Dhanpathy Rai and Sons,
Delhi.
2. Khanna, Dr. S.K. and Justo, Dr. C.E.G. (1991) - Highway Engineering - Nem Chand and
Bros, Roorkee.
3.
Aims / Objectives :
13.1.
Introduction
13.2.
Mechanical Stabilisation
13.3.
Soil-Cement Stabilisation
13.4.
Soil-Lime stabilisation
13.5.
Bituminous Stabilisation
13.6.
Summary
13.7.
Self-Assessment Questions
13.8.
References
AIMS / OBJECTIVES :
CE409/16
216
Soil stabilization means the improvement of the stability or bearing power of the soil
by the use of compaction, proportioning and/ or the addition of suitable admixtures or
stabilisers. Roads which are constructed using these techniques are called Stabilized Roads
and are gaining popularity in developing countries because of their susceptibility for stage
construction. In this chapter, common methods of stabilisation of road beds like mechanical
stabilisation in which soil and aggregate are proportioned to get a dense mixture and methods
in which admixtures like cement, lime and bituminous materials are used to improve the
stability of locally available soil are discussed.
13.1. INTRODUCTION :
In the construction of roads, cost of construction can be brought down by selecting
locally available aggregates and soil, and correctly proportioning them for maximum density.
If such a soil - aggregate mixture is adequately compacted to get a mechanically stable layer,
the process is Mechanical Stabilisation.
If the locally available soil is very poor and can not withstand the expected traffic
loads, it can be improved through compaction after the addition of an inexpensive admixture,
the stabilising Agent. A number of stabilising agents have been used in highway
construction. The more important of these may be classified as cementing agents, modifiers
or water proofing agents. The more common cementing agents are Portland cement, lime and
lime fly ash mixtures. They act through the formation of cementitious compounds that more
or less permanently bind together individual particles or aggregates of particles. Lime is also
a powerful soil modifier that serves to decrease the plasticity, reduce water content and
increase workability of wet clay prior to compaction. Bitumen is used as a water proofing
agent as well as a cementing compound.
Stabilising agents are selected according to the type of soil, stability problem at hand
and the economics of their use.
13.2. MECHANICAL STABILISATION :
When a granular structure, such as a road base or surfacing has the property of
resistance to lateral displacement under load, it is said to be Mechanically Stable. In
mechanically stabilized soils, the resistance is provided by the natural forces of cohesion and
internal friction in the soil. Cohesion is mainly associated with the silt and clay content of the
material while internal friction is a characteristic of coarser particles. Mechanical stabilization
is still the stabilization method that is most widely used in road construction throughout the
CE409/16
217
world. Its popularity is based on the fact that it makes possible maximum usage of locally
available materials in highway construction. In this process, aggregates and soils are properly
proportioned and the resulting mixture is adequately compacted to get a stable layer.
Factors affecting mechanical stabilisation of soil-aggregate stabilisation include the
following .
a)
b)
c)
Compaction.
CE409/16
218
---- (13.1)
Where p = percent by weight of the total mixture passing any given sieve size.
d = aperture size of that sieve.
CE409/16
and
219
76.0
100
38.1
85-100
9.52
45-100
4.76
25-85
0.6000
8-45
0.075
0-10
The clay content of soil-aggregate stabilised road - base must be very carefully
controlled. Where as in surface course, a non-porous layer is required inorder to prevent
water infiltration, the very opposite is normally true in a road base. Plasticity characteristics
specified for binder soil have already been discussed.
13.2.3. Blending Soils and Aggregate :
In some localities deposits of naturally occurring soils will be found which meet the
soil - aggregate specifications. More often than not, however, two or more soils will have to
be blended in proper proportions to produce mixtures meeting these requirements. Methods
for determining the proportions to blend are still essentially by trail and error. They involve
either estimating trail gradations, preparing test mixtures and testing for gradation and
plasticity, or else estimating the proportions which gives the desired plasticity index,
preparing trail mixtures, and testing them for gradation and plasticity. Some of the more
commonly used guide-procedures for blending soils are discussed below.
a) Proportioning of Materials by Rothfutchs Method :
This method may be used when a number of materials have to be mixed together for
obtaining a desired gradation. The actual procedure will be apparent from the following
example. First the design gradation is decided based on the recommended grain size
CE409/16
220
(Fig.13.2). The vertical ordinates of the rectangle are graduated for percentages from 0 to 100
on a linear scale. The horizontal scale for sieve aperture size is graduated by drawing for each
sieve size a vertical line that intersects the diagonal at a point where the ordinate equals the
percentage passing that sieve, (i.e.,) 100 percent for 25 mm sieve, 92% for 20mm sieve and
so on.
(ii)
The size distribution of the aggregates to be mixed (Table 13.2 columns 4, 5, and 6
are plotted on this scale of sieve size (Fig.13.2) giving the lines BAO (Crusher run BFE
(Sand) and OG (silty clay).
(iii)
The nearest straight line to these size distributions are drawn with the aid of a
transparent straight edge, by the minimum balanced areas. They are the dotted lines CO,
BO and OG (the last being coincident with the actual size distribution).
(iv)
The opposite ends of these lines are joined, giving the chain lines CD and BG (In this
case, the later coincides with the 0.075 mm sieve size ordinates). The points where these lines
cross the required size- distribution line are marked by the circles L and M. The proportions
in which these three aggregates should be mixed are obtained from each difference between
the ordinates of these points, and are shown on the right hand side of Fig. 13.2.
CE409/16
221
The particle-size distribution that will result form mixing the aggregates in these
proportions is given in column 7 of Table 13.2. The size distribution obtained is within the
limits (column-3).
b)
100 S B ( p p B )
SB (p p B ) SA (p p A )
---- (13.2)
b = 100-a
Where a
pA
pB
SA
SB
Example of Rothfutchs Method for Proportioning Mixture of Aggregate (See Fig. 13.2).
Percentage passing
I S Sieve
size mm
Required size
Aggregates available
Mixture
distribution.
Limits
37% A
Average
(A)
(B)
(C)
Crushed
Sand
Silty Clay
45% B
18% C
stone
25
100
100
95
--
--
98
20
85-100
92
70
--
--
89
10
65-100
82
21
--
--
71
CE409/16
222
4.75
55-85
70
11
100
--
67
2.00
40-70
55
85
--
58
0.6
25-45
35
55
--
43
0.075
10-25
18
Trace
Nil
100
18
(ii)
The materials are mixed in the desired proportions as per the design. Generally the
(iv)
The wet mix is spread to the desired grade and compacted by rollers. Rolling is started
form the edges, and with adequate longitudinal overlap, it is continued upto the center.
Rolling is continued till adequate compaction is achieved.
(v)
Field control tests are to check moisture content and density after compaction.
(vi)
The Stabilized road is opened to traffic often the compacted layer hardens by
drying.
CE409/16
223
aggregates like kankar, brick bats laterite etc. The soil and aggregate are mixed in 2:1 ratio
and I.R.C. standardized the procedure of construction.
Mehras Method of Stabilization :
Base course material consists of compacted soil with sand content (of size less than
0.425 mm and greater than 0.075 mm) being not less than 50% and plasticity index 5 to 7.
Wearing course material consists of brick aggregates and soil mixed in the ration 1:2.
The sand content (of size less than o.425 mm and greater than 0.075 mm) in the soil should
not be less 33% and plasticity index 9.5 to 12.5. However, when bituminous surface
treatment is desired, the plasticity index is limited to 8-10.
The Mehras Method of conduction is briefly as follows :
(i)
Soil is collected from approved borrow pits and stacked on road side.
(ii)
Water is added upto OMC, and soil is mixed and spread to desired camber and grade.
(iii)
11 1/2 cm thick loose base course material is spread and rolled by 8 tonnes
power roller to a compacted thickness of 7 1/2 cm.
(iv)
Surface course material (brick aggregate + soil in the ratio 1:2) mixed with
adequate water is spread to 11 1/2 cm loose thickness and the layer is rolled by 8
tonnes power roller to a compacted thickness of about 7 1/2 cm.
(v)
After rolling, the surface is watered and left over night. The surface is again
rolled and finished.
(vi)
The road is closed to traffic for four to five days and kept sprinkled with water. For
next few days only rubber tired traffic is allowed and after about 2 weeks the road is
opened to all traffic.
This method of constriction can carry 50 tonnes per day of mixed traffic in places
with light rainfall. With bituminous surface treatment the road can give satisfactory service
upto about 200 tonnes per day even in places with heavy rainfall.
13.3. SOIL-CEMENT STABILISATION :
Of all the methods of soil stabilization now in use, that which utilizes cement as the
stabilizing agent is second only to mechanical stabilization in importance and usage,. Factors
which have helped to make use of portland cement so popular as a soil stabilizer in nearly
every other country in the world, are as follows :
(i)
CE409/16
(ii)
224
(iii)
Use of cement generally involves less care and control than may other method of
stabilisation.
(iv)
More information is generally available on cement treated soil mixtures than on other
types of soil stabilisation.
(v)
distinguish among these so that he will know how and when each may be used most
advantageously.
13.3.1. Types of Cement - Treated Soil Mixtures :
a)
Soil-Cement :
In this, sufficient cement is added to the soil to harden it and the moisture content of
the mixture is adequate for compaction purposes and hydrating the cement. This soil -cement
mixture should be capable of meeting the particular criteria resulting to strength or durability.
Most-important applications of soil-cement are as sub-base or/and base course in road ways
and parking areas, airport runways, taxiways and aprons. Soil-cement is not used in road
surfacings as it has poor resistance to abrasion. Another super-imposed material, eg.: a
concrete pavement or bituminous surfacing must be used to protect it from wheels of traffic.
b)
brings about a decrease in liquid limit and an increase in plastic limit with a corresponding
decrease in plasticity index. The increase in plastic limit is accompanied by a corresponding
increase in optimum moisture content. Situations which indicate the use of modified soil
include construction over wet plastic sub-grades.
c)
produce a mortar like consistency at the time of mixing and placing. This is used primarily as
an erosion control material for lining on the sides of ditches and canals. In general, these
CE409/16
225
mixtures require about 4% or more cement than soil-cement mixture in order to meet the
same criteria.
Type of soil
(b)
(c)
Water content
(d)
Degree of mixing
(e)
Compaction
(f)
Curing and
(g)
Chemical additives.
is now practice (in India and Britain) to specify the desired stabilities of soil-cement mixtures
CE409/16
226
in terms of minimum unconfined strength and not in terms of cement content. However in
U.S. the desired cement content is normally selected to meet durability requirements.
(c)
Water Content :
Water is necessary in soil-cement mixture in order to hydrate the cement, to improve
the workability and to facilitate compaction. This water should be relatively clean and free
from harmful amounts of alkalies, acids or organic matter.
mixtures it is important to realise that the optinum moisture for maximum density is not the
same as that for strength. In general, the optimum moisture content for maximum strength
tends to be on the dry side of optimum for maximum density for sandy soils and on the wet
side for clayey soils. The location of optimum value for strength is dependent not only on the
amount of clay present in the soil, but also on the type of clay mineral.
(d)
Degree of Mixing :
High mixing efficiencies will result in lower cement content in order to achieve a
given soil-cement field strength. Increasing the moist mixing time and/or delaying
compaction after ending the moist mixing, generally results in an increase in the optimum
moisture content for maximum dry unit weight of soil-cement mixture, while its durability
and unconfined compressive strength are decreased. For these reasons, many specifications
place an upper limit on the length of the time between when moisture is added to the mixture
and when compaction is completed. This upper limit of time is about 2 hours as per many
specifications.
(e)
Compaction :
Higher amount of compaction results in increased strength and durability.
(f)
Curing :
The soil cement must be moist - cured during the initial stages of its life so that
moisture sufficient to meet the hydration needs of cement can be maintained in the mix.
Higher strength is obtained at higher curing temperatures.
(g)
Chemical Additives :
Laboratory studies have shown that when trace chemicals like sodium carbonate,
sodium silicate, calcium chloride etc., have been used as additives to soil-cement moistures,
dramatic improvements in strengths can be obtained. It is a common practice to premix a
small quantity of lime with highly plastic soils to facilitate pulverization. It has been reported
CE409/16
227
that a significant reduction in cement content, without loss of long-term strength, could be
obtained by adding fly-ash to the cement-soil mixture.
13.3.4. Design of Soil-Cement Mix :
There are various mix design methods: The most commonly known being British and
P.C.A. Methods.
(a)
British Method :
In this method, design is based on the unconfined compressive strength of 5 cm dia
and 10 cm long specimens cured for seven days. The cement content corresponding to a
strength of 17.5 Kg/cm2 (Fig.13.3.) is taken as design cement content for base courses of
highway pavements with light to medium traffic. However for heavy traffic, a higher strength
of 28 to 35 kg/cm2 may be adopted.
Fig. 13.3. Compressive strength (7-days) and max. Dry Density at different Cement
Contents.
(b)
P.C.A. Method :
In this, the design criterion is based on durability of the soil-cement specimens to
withstand the specified wet-dry and freeze-thaw cycles, Durability is decided based on
resistance to loss in weight due to brushing the surface, volume change and moisture content
during the specified durability cycles.
13.3.5. Construction Method :
The following three methods are used for construction of stabilized soil roads.
CE409/16
(a)
Mix-in-place method.
(b)
(c)
228
Preparation of sub-grade.
(ii)
(iii)
(iv)
(v)
(vi)
between old and new work should be laid carefully. Following field control tests have to be
carried out to control the quality of the work.
(i)
Cement-content test
(ii)
(iii)
finished surface.
13.4. SOIL - LIME STABILISATION :
Lime as a soil additive, brings several beneficial changes to soil containing silt and
clay particles. The use of lime in construction of high ways is not new. Romans used
pozzonlana with lime for improving its cementing action and used in their roads about 2000
years ago. As in the case of soil-cement, soil-lime is not suitable for the surface courses of
pavements because of its very poor resistance to abrasion and impact. This process has
gained popularity now-a-days in view of its simplicity, efficiency and economy.
13.4.1. Mechanism of Stabilisation :
When lime is mixed with plastic soil, three stages of reaction can be recongnised.
CE409/16
(i)
229
An early stage that occurs within a few minutes to an hour and is marked by a
of pazzolanic reactions and the formation of new compounds over a period as long as several
years, and
(iii)
A third stage in which lime reacts with carbon-dioxide from the atmosphere and form
carbonates of calcium and magnesium. These carbonates are weak cements and the strength
gain due to carbonation is minimal in comparison with detrimental effects resulting from it.
The first stage may be identified as soil modification or amelioration effects, the
second as soil cementation or pozzolanic reactions and the third stage as carbonation. Both
the first two stages are important to stabilization process, since for wet, plastic sub-grade soils
it is the modification that yields proper soil conditions for the mixing and compaction
necessary for good cementation.
13.4.2. Factors Affecting Soil-Lime Stabilisation :
(a)
Soil :
Clayey and silty soils benefit from the addition of lime. As the gain in strength of soil-
lime system is mainly due to pozzolanic reactions that take place between lime and certain
clay minerals a certain minimum clay fraction in the soil is always looked for. It is suggested
that soils for soil-lime stabilisation should contain atleast 15% material passings 0.425 mm
sieve size and should have plasticity index of atleast 10.
(b)
Lime :
Limes can be divided into two categories: Quick limes and Hydrated Limes. After
long curing periods both types of lime produce almost the same effect. However, quick limes
are found to be more effective than hydrates limes. But quick lime has a tendency to cause
skin burns of unprotected workmen and hence need careful handling and protection.
Hydrated lime is, therefore, commonly used in stabilisation jobs.
(c)
increase in the optimum moisture content (fig. 13.4). Further, it is observed that an increase
CE409/16
230
on the type of soil, brand and amount of lime moulding moisture content and compactive
effort. It is also reported that specimens cured at higher temperature resulted in higher
strengths. Because of the great influence of temperature on the strength obtained, it is highly
recommended that any soil-lime-stabilisation work should be donein early part of summer.
13.4.3. Effect of Lime on Strength Characteristics :
The addition of lime to soils up-grades them for use as an engineering material to
support loads. The strength of soil lime mixture in terms of unconfined compressive strength
or soaked C.B.R. values, for any given curing period and temperature, increases with lime
content upto an optimum value of lime, and then with further increase with lime content the
strength decreases (Fig.13.4).
CE409/16
231
materials in this respect. Chemical additives like sodium metasilicate, sodium hydroxide and
sodium sulphate are also found to be useful additives.
13.4.5. Design of Soil-Lime Mix :
C.B.R. of lime-soil mixtures has been adopted as strength Criteria in our country.
Samples for C.B.R. test are prepared with varying percentages of lime at maximum dry
density and optimum moisture content corresponding to I.S. light compaction. The specimens
are then cured for 3 days and then soaked for four days in water before testing them for
C.B.R. value. No minimum CBR values are laid down. However, for base courses and
subbase course minimum values of C.B.R. of 80 and 20 are suggested.
13.4.6. Construction Method :
The soil to be stabilised scarified. Fresh stocks of lime (Hydrated or quick) are stored
near the site. It is desirable that lime is made available in the form of fine powder.
The equipment needed are for scarifying, pulverising, mixing (in-situ) and
compaction.
Construction Steps :
(i)
Preparation of sub-grade.
(ii)
(iii)
(iv)
Allowing the mixture to age for about a day for preconditioning the soil, and re-
(vi)
(vii)
Curing- The soil-lime is protected from drying out and allowed to moist curing.
(viii) Carrying of field control tests - checking moisture content at the time of
compacting and checking the density soon after compaction.
13.5. SOIL-BITUMEN STABILISATION :
Bituminous materials have been first used for modern stabilisation work as dust
palliative on natural soil roads in Southern California in 1898. Since then, bituminous
materials have been used extensively for stabilisation of soils; however, at present time, use
of bituminous stabilised soils is limited to light trafficked roadways in dry areas, where
mineral aggregates are very scarce.
CE409/16
232
strength to such cohesionless materials as loose beach, river dune or other types of clean
sand. Penetration grade bituminous or road tars, cut backs (rapid or medium curing) with low
viscosity or emulsions are the commonly used binders.
(b)
good frictional characteristics, but has little cohesion. The function of the added bituminous
material is to act both as binding and water proofing agent.
(c)
cohesive fine grained soils. Soils that can be satisfactorily stabilised in this way should not
have more than 30% passing 0.075 mm sieve, liquid limits less than 30 and plasticity index
CE409/16
233
less than 18. Soils of greater plasticity can not be used because of the difficulties experienced
in dispersing bitumen throughout the system.
(d)
stable, well compacted and well drained. The bituminous material, thus applied, penetrates
downwards under the force of gravity and protects the under lying material from deleterious
effects brought about by changes in moisture content and minimizes dust nuisance.
13.5.4. Factors Affecting Properties Of Soil - Bituminous Mixtures :
Important factors that affect properties of soil-bituminous mixtures are discussed
below :
(a)
Soil :
The particle size, shape and gradation of the soil influence the properties of soil-
bitumen mixes. A small proportion of fines in the soil is preferred, though high clay content
is not desirable.
(b)
different grades give different stability values for a soil. The highest grade that can be mixed
with the soil at the time of construction should be preferred. The type of cut-back is also
chosen depending on the climatic conditions. Emulsions give slightly inferior results than
cut-backs.
(c)
Amount of Bitumen :
Increasing proportion of bitumen caused a decrease in the maximum dry density of
soil-bitumen. The stability increases with an increase in bitumen constant upto an optimum
value and further increase in bitumen content resulting in a decrease in the strength. Water
absorption decreases with increase in bitumen content, though a slight increase may be noted
for very low bitumen contents if the specimens are soaked for long period, such as 28 days.
The optimum bitumen content for maximum stability generally ranges from 4 to 6% by
CE409/16
234
Mixing :
Improved type of mixing with low mixing period may be preferred. In order to make
mixing possible and to disperse bitumen in fine particles, it is necessary to first mix soil with
water before adding the cut-back.
(e)
Compaction :
Better the compaction, higher will be the stability and resistance to water absorption.
The compaction characteristics and the properties of the resulting mix depend on the
compacting moisture content and temperature, aeration of the mix before compacting and the
amount and type of compaction.
(f)
Curing :
By curing soil-bitumen, the water and the volatile (of the solvent used in cut-backs
and emulsions) are allowed to evaporate there by allowing the bitumen to be effective to
impart the binding and water proofing actions. The curing period required to achieve desired
stability and loss-in weight would depend on curing temperature and relative humidity.
(g)
Additives :
Sometimes plastic soils have been pretreated with lime or cement to overcome mixing
CE409/16
235
4.75 mm
Sieve
<50%
Passing
0.425 mm
Sieve
35-100%
Passing
0.075 mm
Sieve
10-50%
Liquid Limit
<40%
Plasticity Index
<18%
Plants and Equipment - The plants and equipment needed are for scarifying, pulverising,
mixing and compaction.
Construction Steps :
(i)
(ii)
(iii)
Cut-back or emulsion is now added and the moist soil, is remixed for proper
distribution of bitumen.
(iv)
(v)
(vi)
(b)
(c)
13.6. SUMMARY:
A stabilised surface may be defined as the surface which has been prepared with
locally available material with or without the use of admixture and compacted so as not to
allow it to loose its stability or bearing power under traffic.
Soil stabilisation methods for high way purposes may be divided into the following
groups.
(i)
Mechanical Stabilisation.
CE409/16
(ii)
Cement Stabilisation.
(iii)
(iv)
Bituminous Stabilisation.
236
When a granular structure, such as a road base or surfacing has the property of
resistance to lateral deformation under load, it is said to be mechanically stable. A good
mechanically stable base or surfacing usually consists of a mixture of coarse aggregate
(gravel, crushed stone, slag), fine aggregate (natural or crushed stone, sand etc.), silt and clay,
correctly proportioned and fully compacted. The use of correctly proportioned materials is of
particular importance in the construction of low-cost roads and in fact is the principle of
Mechanical Stabilisation. Methods of proportioning locally available materials to satisfy
requirements of the grading are explained.
A method of low-cost road construction in which soft aggregates like bricks-bats,
kankar, laterite etc., are used has been developed by Professor Mehra. In this method,
popularly known as Mehras Method of Stabilisation, soil and aggregates are mixed in the
ratio 2:1 and IRC standardised the procedure of construction.
The importance and usage of cement stabilization is next to the mechanical
stabilisation. Most important applications of soil-cement are as sub-base or/and base course
in roads. Soil-cement is not used in road surfacings as it has a poor resistance to abrasion.
The properties and durability of soil-cement depends upon gradation, plasticity, specific
surface, organic matter and sulphate content of the soil. Normally an increase in cement
content produces material of better quality. High mixing efficiency and good compaction are
essential to obtain a material of high quality. When certain chemicals like sodium carbonate,
sodium silicate, calcium chloride are added in small amount dramatic improvement in
strength have been obtained. The suitability of a soil for processing with cement is
determined either by the unconfined compressive strength tests or by durability tests.
Lime stabilized soils are generally used as sub base for high type pavements and bases
for low and intermediate types of pavements. Hydrated or quick lime is used in stabilisation
work. Lime is found to be quite effective in stabilizing silty clayey soils. Important factors
affecting soil-lime properties are type and nature of soils, amount and type of lime, degree of
compaction, curing and chemical additives. Beyond an optimum lime content, the strength of
soil-lime mixes decrease with an increase in the lime-content. It has been found that strength
of soil-lime mix with addition of materials like cement, fly ash and surkhe and trace
CE409/16
237
chemicals like sodium hydroxide, sodium meta silicate and sodium sulphate. So far there is
not standard method for design of soil-lime mix. Generally the amount of lime required is
based on the unconfined compressive strength or the C.B.R. test criteria.
Bituminous stabilization may be used for the construction of sub-base, base or surface
courses of roads. Bituminous materials used for stabilization work are cut-backs and
emulsions. These materials when added to soil impart cohesion or binding action and reduce
water absorption. In the case of soil-bitumen mixes, as in the case of soil-lime mixes, the
stability of the mix-increases with bitumen content upto an optimum limit, and any, further
increase in bitumen content results in a decrease in the strength of the mix. It has been found
that optimum binder content generally varies from 4 to 6% by weight of soil. Higher amount
of compaction renders higher stability and resistance of water absorption. The curing period
depends upon the curing temperature and relative humidity. Portland cement, lime and antistripping agents like phospherous pentoxide (P2O5) are used as additives in soil-bitumen
construction to improve the effectiveness of the mixture. Design of bituminous stabilization
mix is based on the C.B.R. test and modified Hubbard Field test.
After presenting each method of stabilization, the various operations involved in the
costruction of stabilised roads utilising the particular technique, are dealt with.
13.7. SELF - ASSESSMENT QUESTIONS :
(1)
(2)
Mechanical Stabilisation.
(b)
(c)
(d)
Black cotton soils are highly clayey soils susceptible for large volume changes in
moisture content. What is the method of stabilisation you recommend in areas covered with
such soils ? Why ?
13.8. REFERENCES :
1. Bindra, S.P. (1977) - A course in Highway Engineering, Chanpat Rai and Sons, Delhi.
2. Kerbs, R.D.S.Walker, R.D. (1971) - Highway Materials, McGraw Hill Book Company,
New-Yark.
CE409/16
238
3. Khanna, Dr. S.K. and Justo, Dr.C.E.G. (1941) - Highway Engineering Nemchand and
Brothers, Roorkela.
4. O Flaharty, C.A. (1974) . Highway. Vol.2, Highway Engineering, Edward Arnold,
London.
5. Ramana Sastry, Dr. M.V.B.R. (1985) - Soil Stabilisation and Ground Improvement
Techniques - Lecture notes ISTF Summer School on Foundations in Difficult Sub-Soil
Conditions - JNTU Engineering College, Kakinada.
6.
7.
(1976), State of the Art: Lime Stabilisation, IRC Special Report - I, Indian
Roads Congress, New Delhi.
8.
Introduction
14.2.
14.3.
14.4.
14.5.
14.6.
Highway Finance
14.7.
Summary
14.8.
14.9.
References
AIMS/OBJECTIVES :
CE409/16
239
For financing a highway development programme the various alternatives for the
entire highway scheme are to be compared and the best alternative, consistent with maximum
possible economy, is to be selected. The philosophy of highway economics is that the highest
possible ratio of the utility to the cost should be secured. Different procedures available for
carrying out economic studies are discussed. Methods of raising or providing funds for
highway projects are also presented under Highway Financing.
14.1. INTRODUCTION :
Improved highway facilities provide various benefits to the community. With
improved highways, transportation network improves and the travel time and accidents are
minimized. Cost of land adjoining new or improved highway improvements, should be
analysed and summed up to determine its economic viability. The engineering economy is
defined as getting the most in the long run for the amount spent on the engineering project.
Any proposal for a new or an improvement of road should be weighed by comparing benefits
expected or to be derived and cost of the proposed road work.
For economic analysis of the proposed highway project, following factors will have to
be carefully examined.
i) The annual cost of owning and operating highway facility.
ii) The annual cost of motor vehicle operations on that facility and
iii) The value of other economic benefits.
The sum of annual cost of maintenance of highway and the cost of operating motor
vehicles is called the transportation cost. To determine this, several factors which effect
highway cost and vehicle operation cost have to be analysed. The ultimate aim is to achieve
the minimum cost of transportation of the road when all costs are taken into consideration
and at the same time providing adequate and safe conditions to the road user.
14.2. HIGHWAY USERS BENEFITS :
Highway provides varied benefits to the commuters. These benefits can be
categorised as
i)
ii)
Non-tangible benefits.
CE409/16
240
Tangible benefits are also called quantifiable, primary or direct benefits. These
include the factors and their consequences which can be readily converted to monetary
values, such as :
i)
ii)
iii)
iv)
vehicle tax, passenger and goods tax, excise and customs duties on
vehicles and spare parts etc.
ii)
iii)
iv)
v)
vi)
vii)
ii)
CE409/16
241
b)
c)
d)
e)
f)
The annual first cost is computed by dividing the total first cost by the useful life of
the highway anticipated under the existing and future traffic conditions.
14.3.2. Vehicle Operation Cost :
This is comprised of running cost and ownership cost.
a)
b)
Fuel cost
ii)
Oil cost
iii)
Lubrication cost
iv)
v)
vi)
Depreciation cost
License fee
ii)
Registration fee
iii)
Insurance fee
iv)
Rent of garage
Further the vehicle operation cost is also affected by factors like the average vehicle
operation cost, fixed cost of the vehicles, accident costs and travel time costs. The average
vehicle operation cost depends on factors like (i) Location of the road (ii) gradient and (iii)
type of surface.
The average annual highway cost for a road system may be summed by the formula.
Ca = H + T + M + Cr
---- (14.1)
CE409/16
242
Cr = P.
Where Cr
(1 + i) n
= P (CRP)
---- (14.2)
interest i.
P
CRF
i(1 + i)
(1 + i) n
At the end of the service life of a road pavement, some of the items could be assigned
some salvage value. However the salvage value of some other item may be negligible.
The average annual capital cost Cr for a project considering salvage value may be
estimated by the use of the formula
Cr = (C-Vs)
i(1 + i)
(1 + i) n
+ i Vs
---- (14.3)
CE409/16
243
(i)
(ii)
(iii)
Benefit-cost method.
O+A M
100
( P)
Where O
---- (14.4)
The alternative which promises the highest rate of return of investment is adopted.
14.4.3. Benefit-Cost Ratio Method :
In this analysis the annual benefits are compared with the increase in annual cost.
Benefit - Cost Ratio
=
= (R-R1)/(H1-H)
where R
---- (14.5)
R1
H1
CE409/16
244
In order to justify the proposed improvement, the ratio should be greater than 1.0.
High priority schemes usually have ratio of 3 or 4 or even more.
The following worked out examples illustrate the principles of these methods.
14.5. WORKED EXAMPLES :
14.5.1. The following data relates to a WBM Road surface and cement concrete road
surface. Calculate the total annual cost and find out which is the best solution.
Life of pavement may be taken as 30 years.
Data
WBM surface
Length of Road
15 Km
15 Km
Rs. 20,000/Year
Rs. 50,000/Year
Rate of Interest
5%
5%
Maintenance cost
Rs. 300/Km/Year
Rs. 80/Km/Year
Operating cost
Rs. 0.40/Vehicle km
Rs. 0.25/Vehicle Km
AADT
100 Vehicles
100 Vehicles
SOLUTION :
I) Annual cost of capital recovery
i(1 + i)
Cc = (C-Vs)
(1 + i) n
+ Vs i
i(1 + i)
(1 + i) n
0.05(1 + 0.05)
105
. 30
30
0.05(1 + 0.05)
105
. 30
30
----- (14.2)
CE409/16
245
New Road
Old Road
Rs. 83,000/-
Rs. 96.000/-
2.00
2.10
Rs. 8,000/-
Rs. 8,000/-
Assume the cost of new proposed road is Rs. 3,00,000/- and the maintenance cost is expected
to be Rs. 4,000/-.
SOLUTION :
i)
Total annual cost of the new road = 83,000 2 = 1,66,000/Total annual cost of the old road = 96,000 2.10 = 2,01,600/Saving annual cost due to improvement
= 2,01,600 - 1,66,000 = Rs. 35,6000.00
ii)
Cost of accidents on old road = 5 8,000 = Rs. 40,000/Cost of accidents on new road = 2 8,000 = Rs. 16,000/Saving in cost of accident
= Rs. 24,000/-
CE409/16
246
20 crores
Repayment
5 crores
Net benefit
15 crores
= 5 crores
CE409/16
247
In credit financing system, the payment for highway improvement is made from
borrowed money, say from the World Bank, the Asian Development Bank, Credit bonds etc.,
and the borrowed amount along with interest is repaid from future income.
14.7. SUMMARY :
Engineering economy may be defined as getting the most, in long term, for the
amount spent on an engineering project. Thus any new proposal for highway improvement or
development should be justified in terms of the cost incurred and the benefits derived. The
Highway Tranportation Cost, that is, the total amount spent on the highway, consist of annual
cost of highway and vehicle operation cost.
Benefits derived from a highway project may be included under two groups -Tangible
benefits and Non-tangible benefits. The philosophy of highway economic studies- Annual
Cost method, Rate of Return method and Benefit-Cost ratio method have been explained. The
lowest annual cost, the highest rate of return and the highest benefit-cost ratio are the
principles respectively for the economic justification of a project based on these methods.
Two methods of raising highway finances, namely, pay as you go and credit financing
system have been explained.
14.8. SELF ASSESSMENT QUESTIONS :
1. Distinguish between quantifiable and non-quantifiable benefits derived from highway
projects.
2. Explain the basic principles on which various economic analysis methods of highway
projects are developed.
3. Write notes on Highway Finance.
14.9. REFERENCES :
1. Bindra, S.P. (1977) - A course in Highway Engineering - Dhanpat Rai and Sons, NewDelhi.
2. Khanna, Dr.S.K. and Justo, C.E.G. (1991) - Highway Engineering - Nemchand Brothers,
Roorkee.
***
TRANSPORTATION ENGINEERING
UNIT-15
AIR PORTS
CE409/16
248
CONTENTS :
Aims & Objectives
15.1.
Introduction
15.2.
Historical Development
15.3.
15.4.
15.5.
Self-Assessment Questions
15.6.
Summary
15.7.
References
Rapidity : Aviation maintains the highest speed. Designs have been finalised for
supersonic jets.
CE409/16
(2)
249
Continuous journey : This mode of transport is continuous over land and water
Accessibility : Air transport has the unique ability to open up any region that is
Operating expenses : The operating expenses are generally very high including the
cost of aircraft, traffic control system etc. This mode of transport accommodates very few
travellers and small cargo which have to bear high expenses for unit weight.
(2)
CE409/16
250
services and Indian Airlines to operate all domestic and short range international services and
regional routes to adjacent countries, viz., Pakistan, Bangladesh, Srilanka and Nepal.
Air India celebrated its entry into the jet age by starting Boeing 707 services to
London and to New York in the year 1960. Daily Boeing services were inaugurated by the
Indian Airlines in the year 1971. The country for domestic flights is divided into four flight
information regions with centers at Delhi, Bombay, Madras and Calcutta. Realizing the
potential and importance of air transport and tourism, the Government of India created in the
year 1963, the Ministry of Tourism and Civil Aviation.
The National Air Port Authority (NAA) manages the civilian airports in the country
and provides the air traffic services throughout the country. Domestic services in India are
managed by the Indian Air Lines (IA), with Vayudoot providing some short haul services.
The main function of Pavan Hans formed in 1985, is to provide helicopter services to Oil
Industry.
The Government of India has formed an autonomous corporation, The Helicopter
Corporation of India (HCI), in 1986 in order to meet the requirements of helicopters purely
for civil transport needs, where the nature of the terrain or other special reasons do not permit
the use of other modes of transport. Because of the prohibitive cost of transport by
helicopters, its use is extremely limited even in highly developed countries. A number of
private airlines are also operating on the domestic routes. The Government of India
announced air tax policy in 1985 to allow resident and non-resident Indians to start air taxis
services within the country.
The International Air port Authority of India (IAAI) operates the five major
metropolitan airports, namely, Bombay Delhi, Calcutta, Madras and Trivandrum. IAAI also
takes up construction and consultancy work overseas.
The regulatory and licensing functions, bilateral issues, approval of tariffs / schedules
etc., are entrusted to the Director General of Civil Aviation (DGC A).
15.3. MAJOR INTERNATIONAL ORGANISATIONS :
15.3.1. International Civil Aviation Organisation (ICAO) :
The nations of the world have established the ICAO to serve as the medium through
which the necessary international understanding and agreement between nations in all the
technical, economic and legal field is achieved to carry the international services quite
efficiently. This was created in 1944 and is now a specialized agency in relationship with the
CE409/16
251
united Nations. Its head quarters is in Montreal and regional offices at Bangkok, Dakar,
Lima, Mexico City, Paris and Nairobi. ICAO provides the machinery for the achievement of
international cooperation in air.
15.3.2 Federal Aviation Administration (FAA) :
The Federal Aviation Administration (established in 1958 and known till 1968 as the
Federal Aviation Agency) functioning under the Department of Commerce of USA,
develops, directs and fosters the coordination of a national system of air ports and directs
their federal airport programme. The various standards and standards of FAA are widely
adopted in airport planning and design in our country and else where.
15.4. CLASSIFICATION OF AIR PORTS :
15.4.1. Functional Classification :
In India, airports can be classified broadly as military and civil airports. There are also
some privately owned air strips. These airports are divided into categories based on their
importance. They are :
(1) International Air Ports : These are five in number and are located at Bombay (Sahara)
Delhi (Indira Gandhi) Calcutta (Subhas Chandra Bose), Madras (Anna) and Trivandrum.
(2) Major Aerodromes
Eg. Rajahmundry.
CE409/16
252
3. the apron where planes park for embarking and disembarking of passengers and loading
and unloading of cargo.
4. the terminal building which forms an interface between the air and ground side, and
where passengers and their baggage are processed.
5. the hangars where aircraft can be given shatter and maintenance, and
6. air traffic control facilities, eg. Control tower, guidance systems, lighting systems etc.
A general layout of an air port is given below.
CE409/16
253
Civil Aviation Organisation (ICAO), Federal Aviation Agency (FAA) and International
Airport Authority of India (IAAI). Domestic flights are under the control of National Airport
Authority (NAA). A general layout of an airport given provides a clear picture and
understanding of the functions of the major components of an airport.
15.8.
REFERENCES :
1. Khanna, S.K., Arora, M.G. and Jain S.S., (1990) - Airport Planning & Design
Nemchand Bros, Roorkee.
2. Rangwala S.C., and Rangwala P.S., (1992) - Air Port Planning - Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata Mc Graw-Hill Publishing Co., Ltd., New
Delhi.
4. Shegal S.G., and Bhanot, K.L., (1980) - A Text Book of Highway Engineering & Air
Ports; S.Chand & Co., New-Delhi.
***
TRANSPORTATION ENGINEERING
UNIT-16
AIR PORTS
Aims / Objectives
16.1.
Introduction
16.2.
CE409/16
254
characteristics of an aircraft are affected by the type of propulsion and thrust generating
medium. Accordingly aircrafts may be categorised as piston engine, turbo-props, turbo-jets
and turbo-fans. Some of the important characteristics of an aircraft which will decide the
landing and ground facilities required for their handling and service are discussed in the
following paragraphs.
CE409/16
255
influences the size of the hangars, the size of the parking aprons as well as taxiway side
clearances. Typical dimension for some modern air crafts are shown in Table 16.1.
CE409/16
256
Fig. 16.1. Aircraft dimensions-definition figure
Table 16.1. Characteristics of Principal Transport Aircrafts
Manu-
Model
Wing
Length
Maxi-
Distan
Wheel
Minim
Maxim
Maxim
Maxim
Type
No.of
No. of
Main
facture
destina
span
(m)
mum
ce
base
um
um
um
um
of
engine
wheels
gear
tion
(m)
height
betwee
(m)
turning
gross
landing passen
engine
in main dimens
(m)
n main
radius
take
weight
ger
gears
(m)
off Wt.
(kg)
capacit
(m)
Dougla DC-6
(kg)
gear
ions
(cm)
y (No)
35.25
30.50
8.72
7.40
9.35
21.60
44,000
6,400
72
Piston
75
36.00
37.85
10.87
5.60
15.90
20.67
84,000
60,500
110
Turbo
53.7
s
Convai
880
jet
Vicker
Viscou
nt 802
Bristol
Britani
28.10
24.55
8.02
7.15
7.45
21.00
29,300
26,600
48
head
47.5
75
prop
42.67
37.27
11.20
9.30
10.57
--
75,000
58,600
138
a 300
Lock
Turbo
118
1 lectra 29.70
Turbo
prop
34.37
9.2
9.35
11.10
19.52
52,700
48,500
74
Turbo
prop
120
4
39.8
CE409/16
Boeing
707-
257
39.25
43.35
11.47
6.62
15.70
30.30
112800 79,500
179
707-
39.25
43.35
11.47
6.62
15.70
30.30
116200 81,000
179
120 B
Boeing
707-
707-
42.72
45.87
11.60
6.62
17.70
32.70
187000 90,000
189
720
Turbo
Turbo
42.72
45.87
11.60
6.62
17.70
32.70
143000 94,800
189
Turbo
40.85
11.42
6.57
15.20
29.70
92,800
75,000
140
Turbo
720B
39.25
40.85
11.42
6.57
15.20
29.70
100000 75,000
140
Turbo
727
32.52
30.22
10.12
6.05
15.85
21.05
64,500
59,500
114
Turbo
jet
85
140
78
125
prop
Boeing
85
140
prop
Boeing
85
140
Prop
39.25
85
140
jet
320 B
Boeing
prop
320
Boeing
Jet
120
Boeing
Turbo
78
125
87.5
CE406/1
258
The purpose of wing of an aircraft is to support the machine in the air when the
engine has given the necessary forward speed. The cross-section of the wing of an aeroplane
in of cambered aerofoil shape as shown in fig.16.2.
CE406/1
259
There is a certain minimum radius with which the air-craft can take a turn in space.
This radius depends upon the type of aircraft, airtraffic volume, and weather conditions. The
minimum turning radius for small general aviation aircrafts under VFR (Visual flight
Regulation) conditions is as large as 80 km.
Two nearby airports should be separated from each other by an adequate distance so
that the aircrafts simultaneously landing on them do not interfere with each other. If the
desirable spacing between the airports cannot be provided, the landing and take-off of
aircrafts in each airport have to be timed so as to avoid collision. This will obviously reduce
the capacity of each airport.
16.2.5. Speed of Aircraft :
Presently, the reference datum for speed of aircraft is the speed of sound (1194 kmph
at 0C and 1263 kmph at 300C ) defined as Mach 1. Most of the modern military air crafts are
supersonic (having a speed greater than that of the sound) having a Mach Number greater
than one, where as a majority of transport aircrafts are subsonic, having, Mach number less
than one. The speed referred to in these cases is the true air speed and not ground speed.
Airports serving high speed aircrafts will have a greater frequency of operations and more
facilities for peak hour passenger flow. The larger dimensions of supersonic aircrafts will also
affect the planning and design of airports.
16.2.6. Capacity :
The passenger and cargo capacity, as well as the fuel capacity, have a direct influence
on the facilities required in the terminal building , cargo handling system and fuel-storage
system. The passenger capacity of some modern aircrafts is given in Table 16.1.
16.2.7. Aircraft Weight and Wheel Configuration :
Aircraft weight influences the length as well as the thickness of the runway. The
different components of weight of an aircraft are as follows.
1. Operating Empty Weight comprises of its basic weight including the crew, their
baggage and supplies, the necessary service equipment for flight and other items of
equipment considered an integral part of a particular air plane configuration. It does not
include pay load and fuel.
2. Pay Load is used to describe the load that earns the revenue meaning there by, the
weight of passengers, mail and cargo.
CE406/1
260
3. Maximum-Zero Fuel Weight is defined as the weight above which all additional weight
is in the form of fuel only. It is specified to limit the moments (while in flight) at the junction
of the wing and fuselage.
4. Trip Fuel weight is the weight of the fuel carried for a particular trip and depends on
factors like pay load, attitude of flight, speed of aircrafts distance to be traveled, atmospheric
conditions etc.,
5. Reserve Fuel Weight is the weight of fuel required to meet any emergency and depends
on trip length, traffic conditions, location of alternate airport in the event of emergency
landing etc.
6. Maximum Gross - Take Off Weight is the maximum load which the aircraft is certified
to carry during take off and the air port pavements are designed for this load.
7. Maximum Structural Landing Weight is the maximum gross take off weight less the
weight of trip fuel.
8. Maximum Ramp Weight is the maximum weight authorized for ground manoeuver
(taxing) certified by government regulations.
Typical weights for some modern aircrafts are presented in table 16.1. Table 16.2.
presents the distribution of aircraft weights based on the range of travel.
Table 16.2 Distribution of aircraft Weight
(as a percent of total weight)
Item
Aircraft Type
Short Range
Operating empty
Weight
Payload
Trip fuel
Fuel reverse
Total :
Medium Range
Long Range
66
59
44
24
6
4
16
21
4
10
40
6
100
100
100
The aircraft while it is on the ground is supported by the tricycle under carriage
system. The principal functions of the under carriage system is to absorb landing shocks and
to enable the aircraft to manoeuver in the ground. Two sets of wheels are provided for the
aircraft to move on the ground and to carry the entire weight of the aircraft. The major
portion of the total load (about 90%) is carried by two main gears which are provided in the
fuselage or in the wings near the junction of fuselage and wings. The remaining part of very
CE406/1
261
small portion of the load is carried by the wheels provided at the nose or tail of the aircraft
known as nose or tail gear respectively. The tail wheel arrangement is not preferred in the
modern aircrafts because in the event of powerful wind, the aircraft may lift off the ground or
be pushed backwards even when the aircraft is parked as this position keeps the nose up and
the wings are at greater angle of incidence.
The main reason of using multiple wheel arrangement is to distribute the aircraft load
over a large area of the pavement and thus reduce the pavement thickness. Basic wheel
configurations are shown in Fig. 16.3.
16.2.9. Noises :
The aircrafts make lot of noise during landing and take off. More disturbance is
caused during take off than during landing. The problem is more severe in the case of jet
CE406/1
262
aircrafts than with conventional engine. As far as possible, the runway should be so oriented
that there is no urban development in the area under the approach flight path of the aircraft.
16.2.10. Jet Blast :
The turbo-jet and turbo-prop aircrafts eject hot exhaust gases at 2 relatively high
velocities. The velocity of jet blast may be as high as 300 kmph and it may even cause
inconvenience to the passenger boarding the aircraft. Bituminous pavements are adversely
affected by the heat and blast from the jet aircrafts. In cement concrete pavements sealing
material at the joints will be affected, Blast Fences of different types are available to divert
the smoke ejected by the engine.
16.3. SELF-ASSESSMENT QUESTIONS :
1. What are the aircraft characteristics that influence the design of airports.
2. Write notes
a) Wheel configuration of aicrafts
b) Aircraft weight.
16.4. SUMMARY :
Influence of aircraft characteristics on the design and planning of air ports is
discussed in detail. Aircraft dimensions, length of the fuselage, the wing-span and the height
influence the size of the hangars, the parking aprons as well a taxiway side clearance.
Minimum Turing radius of an aircraft effects the geometric design of taxiways and positions
of the aircraft on the aprons. Minimum distance between two neighbouring airports should be
not less than two times the minimum circling radius of the largest aircraft utilizing facilities
of these airports. Aircraft speed and capacity influence the design of terminal area. Aircraft
weight influences the length as well as the thickness of runway. Structural design of taxiways
and aprons is very much dependent of the weight of aircraft. Considerations have to be given
to the nuisance of noise while orienting runways. Approach flight paths should not be above
urban development areas. Jet blasts effect the surface of bituminous pavements and as such
concrete pavements have to be preferred.
16.5. REFERENCES :
1. Khanna, S.K., Arora, M.G., and Jain S.S., (1990) - Airport Planning & Design
Nemchand Bros, Roorkee.
CE406/1
263
2. Rangwala S.C., and Rangwala P.S., (1992) - Air Port Planning- Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata McGraw-Hill Publishing Co., Ltd., NewDelhi.
4. Shegal S.G., and Bhanot, K.L., (1980) - A Text Book of Highway Engineering & Air
Ports; S.Chand & Co., New-Delhi.
***
TRANSPORTATION ENGINEERING
UNIT - 17
AIRPORT PLANNING
Aims / Objectives
17.1.
Introduction
17.2.
Regional Planning
17.3.
17.4.
17.5.
17.6.
Runway Orientation
17.7.
Airport Obstructions
17.8.
Zoning Laws
17.9.
17.10. Summary
17.11. References
AIMS / OBJECTIVES :
The planning of an airport is a complex process. In this chapter the general aspects of
airport planning are considered.
17.1.
INTRODUCTION :
The planning of an airport is not a simple process. As a matter of fact, it is such a
complex process that the analysis of one activity without regard to the effect on other
activities may not provide acceptable solutions. This is due to the fact that an airport
encompasses wide range of activities which have different and conflicting requirements. yet
CE406/1
264
these activities are interdependent so that a single activity may limit the capacity of the entire
complex. In this chapter various factors to be considered in the selection of site and planning
of an airport are presented.
There has been a radical development in the nature of air transport and considerable
improvements in the aircrafts themselves. The airport planned has to satisfy not only the need
of the present aircraft, but also the needs of the aircraft which may emerge in, say, 10 years.
This needs more intensive study and fore-thought on the part of the planner planning an
airport as compared to other modes of transport.
17.2.
REGIONAL PLANNING :
In the past, the airport planning was made by keeping the local aviation requirement
only in view. But this concept has changed in the recent times. The airport system plan has
not only to satisfy the local needs of aviation, but at the same time, it should be seen that it
fits into the overall development of the entire region or country. If future air planning has to
achieve useful results, it has to be founded on guidelines established on the basis of
comprehensive airport system and master plans. Planning on regional basis would also enable
to implement Zoning Laws in the areas where new airports are needed in the near future.
Regional planning is being done by the Civil Aviation Organisation in Collaboration
with various state governments. The regional plan usually provides the following
information:
1. Approximate locations of the airport in the national plan.
2. Classification of airports
3. Location of strips, and
4. Routes of air travel.
The following data is to be collected for a scientific and sound planning on a regional
basis.
17.3.
1. Population growth of the area to be served and the character of the population based on
the income groups and activities and trends and needs of the people towards saving of
travel time.
2. Topographical and geographical features of the area.
CE406/1
265
3. Distance, population and economic character of the adjoining areas having air service
should be studied.
4. Characteristics of future air traffic in terms of passengers, cargo, mail etc. and the
airtraffic volume.
Before deciding to go in for a new airport, full consideration should be given to the
possibility of improving the existing airport capacity so as to meet the future traffic demand.
If this can not be done, a new air-port has to be planned. Before thinking of a site for a new
airport, the following information Concerning the new airport is collected.
(i)
(ii)
The present and future types of aircraft which may use the airport.
(iii)
Facilities to be provided.
Based on this information classification of the future airport, geometric standards of
approaches, runways and taxiways are determined. Thus the planner gets an idea of the
approximate land size required for developing a new airport.
17.4.
airport.
1.
Regional plan - The site selected should fit well into the regional plan.
2.
Airport use - The selection of site depends upon the use of an airport - Civilian or
military operations. Civilian airports may be used for military operation during emergencies.
Therefore, the site selected should be such that it provides natural protection to the area from
air raids.
3.
proximity to other Airports - The site selected should be such that it is away from the
existing nearby neighboring air port by a distance more than twice the circling radius of the
largest type aircraft expected at the airport.
4.
Ground Accessibility - The site should be so selected that it is readily accessible to the
users. The door to door time should normally not exceed 30 minutes. Availability of public
transportation facilities further qualifies the suitability of the site.
5.
ideal site for an airport because of (a) less obstruction in the approach end turning zones (b)
natural drainage (c) more uniform wind, and better visibility due to less fog.
CE406/1
6.
266
obstructions. Any existing obstructions have to be removed at any cost. The future growth of
undesirable structures is controlled by the zoning laws.
7.
Visibility - The site selected should be free from visibility reducing conditions, such
as fog, smoke and haze, Fog settles down in valleys and smoke and haze nuisance exists at
sites nearer to industrial area. Therefore trend of future development of industrial area also
should be studied.
8.
Wind - Runway is so oriented that landing and take off is done by heading into the
wind. The site selected should be located in the wind ward direction of the city so that
minimum smoke from the industry is blown over the site. As such wind data, over a
minimum period of five years, should be collected.
9.
Noise Nuisance - Noise nuisance is more with jet-engine aircrafts than with the
propulsion type of aircrafts. The site selected should be such that the landing and take off
paths of the aircrafts passover the land which is free from residential or industrial
development. Some times a buffer zone may have to be provided between the take off end
of the runway and a nearby residential area. If the buffer zone cannot be provided some
acoustical barrier may have to be provided.
If the runway along the prevailing wind direction is oriented such that the flight path
is over a highly developed residential and industrial area, then the noise nuisance may be
reduced by constructing another runway at right angles to the previous direction, if the area is
found scarcely populated. This runway, called preferential Runway (Fig.17.1) may be used
as long as the cross-wind components is within the permissible limits.
CE406/1
267
Fig. 17.1. Preferential Runways for Noise Abatement
10.
Grading, drainage and soil characteristics - Grading and drainage play an important
role in the construction and maintenance of airports. The cost of drainage and grading can
often be reduced by selecting a site with favourable soil conditions. The most desirable type
of soil for airport construction is one with reasonable amount of coarse grained soil combined
with a suitable natural binder.
11.
of the airport, larger area should be acquired initially and a master plan has to be prepared.
Zoning ordinances should be implemented to prevent growth of undesirable structures in the
area.
12.
supply, sewer, electricity, telephone from the town etc., should be considered.
13.
economical, when both initial and ultimate stages are considered, should be preferred.
17.5.
The following surveys have to be carried out at the site of proposed airport
a)
Traffic Survey
b)
Meteorological Survey
c)
Topographical Survey
d)
Soil Survey
e)
f)
Material Survey
The surveys mentioned above help in the preparation of the following drawings for
b)
Obstruction map showing safe approach zones and turning zones for the aircraft.
c)
d)
CE406/1
17.6.
268
RUNWAY ORIENTATION :
Runway is oriented usually in the direction of the prevailing winds. The aircraft takes
off and lands in a direction opposite to the direction of winds (i.e.,) the head-wind-direction.
During take-off, this provides great lift on the wings and the aircraft rises above the ground
much easier and in a much shorter length of the runway. During landing, the head wind
provides a further braking effect and the aircraft comes to a stop in a smaller length of the
runway.
17.6.1. CROSS -WIND COMPONENT AND WIND COVERAGE : Wind, throughout the
year may not be blowing along the direction of the center line of the runway. During some
period the wind may be making a certain angle ( ) with the central line of the runway. If V is
the velocity of the wind, the component of the velocity perpendicular to the center line of the
runway - V sin
is called the CROSS WIND COMPONENT. For safe landing and take-off
of aircraft, the cross-wind component should be within certain limits as specified below.
Small air-craft
15 Kmph
Mixed traffic
25 Kmph
Big Aircraft
35 Kmph
The percentage of time in a year during which the cross-wind component remain
within the limits specified above is called WIND COVERAGE. According to FAA, the
runway handling mixed air-traffic should be so planned that for 95 percent of the time in a
year, the permissible cross-wind component doesnt exceed 25 kmph. For busy airports the
wind converge may be increased to as much as 98 percent to 100 percent.
WIND - ROSE DIAGRAM : For fixing up the orientation of the runway, a wind-rose
diagram is drawn from the wind data collected at the site of the airport. The wind data should
usually be collected at least for a period of 5 years and preferably for a period of 10 years, so
as to obtain an average data with sufficient accuracy. Wind-rose diagrams can be plotted in
two ways.
Type 1:
Type 2:
CE406/1
269
Table 17.1. Wind Data*
Wind
Total in each
direction
direction
percent
6.4 - 25 kmph
25 - 40 kmph
40 - 60 kmph
7.4
2.7
0.2
10.3
NNE
5.7
2.1
0.3
8.1
NE
2.4
0.9
0.6
3.9
ENE
1.2
0.4
0.2
1.8
0.8
0.2
0.0
1.0
ESE
0.3
0.1
0.0
0.4
SE
4.3
2.8
0.0
7.1
SSE
5.5
3.2
0.0
8.7
9.7
4.6
0.0
14.3
SSW
6.3
3.2
0.5
10.0
SW
3.6
1.8
0.3
5.7
WSW
1.0
0.5
0.1
1.6
0.4
0.1
0.0
0.5
WNW
0.2
0.1
0.0
0.3
NW
5.3
1.9
0.0
7.2
NNW
4.0
1.3
0.3
5.6
Total per cent = 86.5
CE406/1
270
wind. From table 17.1, it is observed that the total percentage of time in an year during which
wind from the north direction is 10.3 percent. This value is plotted along the North direction.
Similarly other values plotted along with the respective directions. All plotted points are then
joined by straight lines as shown in Fig. 17.2. The resulting diagram (shown in the figure) is
known as the wind-rose diagram. The best direction of runway is usually along the direction
of the longest line on the wind rose diagram. In Fig. 17.2. the best orientation of the runway
is, thus, along the N-S direction.
CE406/1
271
It may be noted that this wind rose diagram does not account for the effect of cross wind component.
17.7.
AIRPORT OBSTRUCTIONS :
An aircraft while landing or taking-off loses or gains height gradually along an
inclined path called the glide - path. It is, therefore, necessary that wide areas on either side
of a runway must be kept clear of any obstruction. Obstructions for safe air navigations are
broadly divided into two categories.
(1)
Objects exceeding their limits on the ground in the approach and turning zones.
(2)
17.7.1. APPROACH AND TURNING ZONES : Wide areas on either side of a particular
runway which must be kept clear of obstructions are called approach areas or approach zones
(Fig. 17.3). The centre line of the approach area coincides with the centre line of the runway.
This area on the ground is trepe zoidal in shape with its width increasing from the runway
end outwards.
CE406/1
272
approach surface. The tips of obstructions, natural or man made, shall be well below this
approach surface.
The most critical portion of the approach area is its inner most portion known as
Clear Zone. It is also shown in fig. 17.3. It should be preferably a level area and except for
fences, ditches and other minor obstructions, all other major obstructions should be removed
form the clear zone.
The Turning Zone is the area of airport other than the approach area and it is
intended for turning operations of the aircraft in case of emergencies like failure of engine or
trouble in smooth working of aircraft experienced at the start of take off. In such cases, the
pilot takes a turn and comes in line with runway before landing. The aircraft operates at a
considerably low height in the turning zone and it therefore becomes absolutely necessary to
make this zone free from any obstructions. Some of the standards specified by the ICAO for
the various surfaces indicated above are presented in Table 17.2.
17.7.2. IMAGINARY SURFACES : The imaginary surfaces are the established surfaces
(Fig. 17.4) in relation to the airport and to each runway above which no obstruction should
project. The size of the imaginary surfaces depends on the category of each runway and on
the type of approach planned for that runway. The location of these imaginary surfaces is
referred with respect to the Air Port Reference Point (ARP). The ARP represents the
geographical location of an airport, that is, the geometric centre of the landing area. The types
of imaginary surfaces are :
Table 17.2. Standards By ICAO for Various Zones : (Refer to Fig. 17.3)
Sl.No.
Surface
Runway Code
A
1.
Approach Area /
zone length (m)
when the lnading
CE406/1
273
is
a) Instrumental
b) Non Instrumental
2.
3.
15000
3000
15000
3000
15000
3000
---2500
---1600
300
525
750
300
525
750
300
525
750
-----
-----
150
270
600
150
270
600
150
270
600
75
135
300
75
135
300
2
2.5
2
2.5
2
3.3
--4.0
--5.0
CE406/1
b)
274
Transitional Surfaces - These have a slope of 14.3% (IV:7H) for A, B and C types of
airports and 2% for D and E types of airports and extend upwards from the edges of runway
safety area and intersects the approach surface and inner horizontal surface.
c)
above the established elevation of the runway. The radius of this surface with respect to ARP
is 4000m for AB and C types and 2500 for D and E types of airports.
d)
Conical Surface - This surface extends upwards and outwards from the periphery of
inner horizontal surface. This is an inclined surface. As per the ICAO, the specifications for
the conical surfaces are as follows.
Slope (for all types of airports)
5%
Height
(I)
(II)
e)
Instrument Approach
For A, B Class
100 m
C Class
75 m
100 m
C Class
75 m
D Class
55 m
E Class
35 m
Outer Horizontal Surface (OHS) - This surface is not proposed for aerodromes with
runways of length less than 900 m. It is circular in plan with centre located at ARP. The
height of OHS is 150m above the established elevation of the airport. The OHS shall extend
upto 9900 m from the ARP, when the length of the longest runway is less than 1500m and
upto 15,000 m from ARP when the length of the longest runway extend beyond 1500m. The
constructions protruding above this surface shall not be permitted.
17.8.
ZONING LAWS :
These refer to the enactment of legislation for a restricted development of the area
surrounding the airport so that no structure protrudes above the approach surface, and thus
causes a hazard to the safe air navigation, especially in the approach areas. Different
maximum construction heights may be permitted in different zones depending on the distance
of a particular locality form the airport and depending also upon whether the locality is within
CE406/1
275
the approach zone or away form it. Zoning is considered to be the most effective method of
protecting the interests of both the airport and those of the owners of the land surrounding it.
The use of land for manufacture of certain items which may result is smoke, nuisance,
obnoxious odour may also be controlled by zoning laws. A zoning ordinance shall not be
oppressive, unreasonable, but shall promote general welfare of public, their health, safety,
morals and comfort.
17.9.
1. Bring out the factors that need consideration for selection of site of an airport. Discuss the
critical issues involved.
2. Why is it necessary to plan airports on regional basis ?
3. Explain the step by step procedure you will follow for developing an existing airport for
the increased air traffic anticipated.
4. Explain the procedure of Orienting the runway.
5. Explain the significance of the following in an airport planning.
a) Approach zone & approach surface.
b) Clear zone
c) Imaginary Surfaces
d) Zoning Laws.
17.10. SUMMARY :
Aviation is the most dynamic industry and its forecast is quite complex. As such,
airport planning requires more intensive study and forethought as compared to planning of
other modes of transport. Airport planning including airport administration, has to be done on
a regional basis; otherwise it would seriously impair the effective air traffic services of the
country. Data to be collected for upgrading an existing airport to meet the demands of
increased traffic or for location of a new airport has been dealt with in detial.
A number of factors have to be studied critically while selecting a suitable site for an
airport, depending upon the class of airport. Factors that have to be considered in the
selection of site for a major airport have been discussed.
An aircraft lands and takes-off in the head wind direction. The wind data collected at
the site of the airport helps in drawing the Wind Rose diagram. Procedure for drawing the
CE406/1
276
wind rose diagram and orientation of runway for obtaining maximum wind coverage has also
been presented in this chapter.
The site selected for an airport should be such that, it doesnt obstruct safe landing
and take-off of aircrafts. Air-crafts while landing and taking off loses or gains height
gradually along an inclined path called the glide path. Further, to permit various
manoeuvers of aircraft for safe navigation. Large areas around the airport have to be free
from obstructions or the heights of obstructions have to be limited depending on their
distance form the airport. The various standards specified by the ICAO or the FAA are
discussed.
The forming of suitable laws is an essential part of an airport master plan and they are
to be implemented as soon as the final selection of the airport site is made. The zoning is
considered to be the most effective method for achieving excellent results from the
functioning of the airport. The airports are involved in two types of zoning, namely, height
zoning and land use zoning.
17.11. REFERENCES :
1. Khanna, S.K., Arora, M.G., and Jain S.S., (1990) - Airpot Planning & Design Nemchand
Bros, Roorkee.
2. Rangwala S.C., and Rangwala P.S., (1992) - Air port planning - Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata McGraw - Hill Publishing Co., Ltd.,
New-Delhi.
4. Shegal S.G., and Bhanot, K.L., (1980) - A Text Book of Highway Engineering & Air
Ports; S. Chand & Co., New - Delhi.
***
TRANSPORTATION ENGINEERING
UNIT - 18
RUNWAY AND TAXIWAY DESIGN AND PRINCIPLES OF AIRPORT DRAINAGE
Aims / Objectives
18.1.
Introduction
18.2.
CE406/1
277
Taxiway
Airport Drainage
18.6.
Summary
18.7.
References
AIMS / OBJECTIVES :
Runway and Taxiway geometrics as per ICAO and FAA standards have been
presented and discussed. Corrections to be applied for arriving at the length of runway at the
actual site of construction, for the elevation, temperature and gradient over the basic runway
length have been explained by working out problems. Special features of airport drainage and
methods of providing surface and sub-surface drainage are also included.
18.1.
INTRODUCTION :
In this chapter, runway and taxiway geometrics as per the standards of ICAO and
FAA have been presented and discussed. In these standards the length of the runway given is
the basic runway length. It is the length of the runway under certain standard assumed
conditions at the airport. As the conditions at the actual site of construction will be far
different from the assumed conditions, corrections have to be applied, for any change in
elevation, temperature and gradient to the basic runway length to arrive at the actual runway
length. The capacity of an airport depends on the number of runways and their configuration,
apart from many other factors. Airport drainage is one of the most important aspects of
airport construction and maintenance. If the runoff is not quickly drained off from the
runways/taxiways/aprons it is hazardous for both the take off as well as the landing of the
aircraft, but adversely influences the pavement performance and life.
18.2.
CE406/1
278
reduces. This in turn reduces the lift on the wings, and the aircraft requires a longer length of
runway to achieve the necessary lift. ICAO recommends that the basic runway length should
be increased at the rate of 7 percent per 300m rise in elevation above the mean sea level.
(ii)
has the same effect as that of the increase in elevation. Airport reference temperature (ART)
is defined as the monthly mean of average daily temperature (Ta) for the hottest month of the
year plus one third the difference of this mean temperature and the monthly mean of the
maximum daily temperature (Tm) of the same month of the year.
Thus ART = Ta +
Tm Ta
3
CE406/1
279
ICAO recommends that the basic runway length after having been corrected for elevation
should be further increased at the rate of 1 percent for every 10C rise of airport reference
temperature above the standard atmospheric temperature at that elevation.
Std. Atmospheric temperature at the elevation of airport. = 150C - 0.0065 elevation
of airport above M.S.L. in metres.
(iii)
TEMPERATURE : As per the ICAO, if the total correction for elevation plus temperature
exceeds 35 percent of basic runway length, these corrections should be further checked up by
conducting specific studies at the site by model tests.
(iv)
of energy and much longer length of runway is required to attain the desired ground speed.
The F.A.A. recommends that runway length after having been corrected for elevation and
temperature should further be increased at the rate of 20% for every one percent of effective
gradient. Effective gradient or average grade is defined as the maximum difference in
elevation between the highest and the lowest points of runway divided by the total length of
the runway.
18.1.
WORKED EXAMPLE :
Obtain the length of runway given the following data.
1620 m
270 m
43.720c
26.320C
100
300
600
800
Elevation (m)
100
101.0
99.0
101.40
101.80
SOLUTION :
Airport reference temperature = 26.32 + (43.72 - 26.32) 1/3 = 32.120C.
Std. temperature at the elevation of airport = 150 - 0.0065 270 = 13.150C.
Rise of Airport Temp above the standard temp = (32.12 - 13.15) = 18.970C.
Effective gradient
CE406/1
280
CORRECTIONS :
1)
Elevation correction =
7
270
1620
= 102 m
100
300
2)
1
18.97 = 326.7 m
100
3)
types
Runway pavement
Maximum
width m
Longitudinal grade %
Max.
Min.
---
2100
45
1.5
2099
1500
45
1.5
1490
900
30
1.5
899
750
22.5
2.0
749
600
18
2.0
CE406/1
281
1.
45,000
8.5
2.
34,000
7.0
3.
27,000
7.0
4.
20,000
7.0
5.
13,000
6.0
6.
7,000
5.0
7.
2,000
2.5
Runway Length : To obtain the actual length of runway, corrections for elevation,
temperature and gradient are applied to the basic runway length (Table 18.1) as explained in
the example 18.1.
ii.
Runway Width : The width of runway for different types of airports vary from 45m to
18m (Table 18.1). The airtraffic is more concentrated in the central 24m width of the runway.
Further, the outer most machine of a large jet aircraft using the airport should not extend off
the pavement to shoulders. This is because the shoulder is usually of loose or stabilised soil
etc., which is likely to get into the engine and damage it. The outer board engines of large jet
transport aircraft are at about 13.5m from the longitudinal axis of the aircraft. As such a
pavement width of 45m will provide adequate protection to the engine from shoulder material
during normal operations.
iii.
CE406/1
282
150 m
D, E types of Airports
78 m
Instrumental landing
A, B types of Airports
300 m
In the length direction, the landing strip extends by 60 m beyond the runway at both the ends.
Typical cross - section of runway for the Instrument Landing System (ILS) of approach is
shown in Fig. 18.2.
1.5%
2.0%
Minimum limit
0.50%
CE406/1
283
2.5%
(b)
Beyond 75 m
5.0%
v.
Longitudinal and effective gradient : The ICAO recommends the following maximum
values
For longitudinal gradient :
A, B and C types of airports
1.5%
D and E
2.0%
1.0%
2.0%
vi.
restricts the sight distance and may also cause premature lift off of the aircraft during take off
operations. Too many changes in the gradients over a small length of the runway can also
restrict the sight distance and increase the length of the runway. Thus not only the changes in
grade, but also the distance between such changes, are to be kept within the tolerable limits.
The changes in gradients should be smoothened by vertical curves.
The ICAOs recommendations are as follows :
a)
b)
A&B
0.10
0.20
D&E
0.40
Min. distance m.
300 absolute numerical value
of change in slope
150
CE406/1
284
D&E
vii.
49.5
Sight distance : The longitudinal gradient of runways is quite gentle and hence there
will be no restriction to sight distance. The problem arises when two runways or a runway
and taxiway intersect with each other. The ICAO recommends as follows L
a)
In the case of A, B and C types of airports any two points 3m above the surface of
runway should be mutually visible from a distance equal to 1/2 runway length.
b)
For D and E types there should be unobstructed line of sight from any point 3m above
the runway to another point 2.1m above the runway within a distance of at least one half the
length of the runway.
CE406/1
285
The airport capacity depends upon the runway configuration. The pattern of runways to be
adopted at the site of an airport depends on the volume of the air traffic to be handled,
environmental conditions and availability of suitable approaches. The basic patterns of
runways are shown in Fig. 18.3. The actual runway pattern may consist of combination of
two or more number of basic patterns.
Fig. 18.3. Runway Patterns
The capacities of the different patterns are as follows :
1.
Single runway : The capacity of this simplest pattern under VIR conditions may be a
maximum of 45 to 60 operations per hour. Under IFR conditions, its capacity reduces to 20 to
40 operations.
CE406/1
2.
286
Parallel Runways : The capacity of this pattern depends on the lateral spacing
between the two runways, the weather conditions and the navigational aids available at the
airport.
When the lateral spacing between the runways is 900 m landing and take off (but not
simultaneous landing) can be done on the two runways independently. This pattern permits
100 operations and about 80 operations per hour under VFR and IFR conditions respectively.
If the runways are located as close as 210m, the capacities under VFR and IFR conditions
reduce to 75 to 25 operations per hour and 40 to 45 operations per hour respectively.
If parallel runways are staggered and the terminal area is located in between the two
runways, the taxiway distances to and from the terminal area are reduced. The present trend
for large airports is towards parallel staggered runways which are located about 1500 m apart
so that they are capable of being used simultaneously.
3.
particular direction does not provide the required coverage. When the cross wind components
on each runway are favourable for use of both the runways, the capacity depends upon the
direction of landing and take off, the lateral separation of the glide paths of the aircrafts and
the intersection point of runways. The capacity will be maximum when the intersection point
is near the runway ends.
4.
Non - Intersecting runways : The capacity depends upon the wind conditions and
visibility. When the flight paths are divergent the capacity may be of the order of 80 to 110
operations per hour. If the flight paths are convergent the capacity reduces to 66 to 80
operations per hour.
18.3.
TAXIWAYS :
Taxiways link the various elements of an airport, e.g., runways with aprons and
hangars to provide for a safe and expeditious surface movement of aircraft. The taxiway
system should enable smooth flow, minimizing crossing of runways or other taxiways.
Provision of well-designed exit taxiways increases the runway capacity. Taxiways include
exit and entrance taxiways, parallel and dual parallel taxiways, by pass taxiways, apron
taxiways and others. It is preferable that the entire taxiway system be visible from the
airtraffic control tower. The following conditions decide the layout of taxiways.
1.
Taxiways should be so adjusted that the aircraft that have just landed and are taxing
towards the apron, do not interfere with aricrafts taxing for take off.
CE406/1
2.
287
At busy airports, taxiways should be located at various points along the runway so
that the landing aircraft leaves the runway as early as possible and keeps it clear for use by
other aircraft. Such taxiways are called Exit taxi ways.
3.
The route for taxiway should be so selected that it provides the shortest practicable
5.
Exit taxiways should be designed for high turn off speeds. This will reduce the
runway occupancy time of aricraft and thus increases the airport capacity.
18.3.1. GEOMETRIC DESIGN STANDARDS : The speed of aircraft on taxiway is much
lower than its speed on a runway during the landing and take off. Thus the design standards
of taxiways are not as rigid as they are for runway. Geometric design standards of taxiways
as per the ICAO are presented in Table 18.3. A cross - section of a taxiway is shown in Fig.
18.4.
CE406/1
288
Fillets are provided at the junction or intersection of two or more number of traffic
ways eg., runways, taxiways or apron. If adequate fillets are not provided, one of the main
gears of an aircraft, is likely to go off the pavement on to the shoulder. As a guide the ICAO
recommends that the radius of the fillet should not be less than the width of taxiway.
Table 18.3 Taxiway Geometric Standards (As per ICAO)
Airport
Taxiway
Max. long.
Min.
Max. rate
Sight
classifica-
width m
gradeint %
Trans.
of change
distance
Gradient %
of long
tion
Safety area
grade per
30 m%
A
22.50
1.50
1.50
1.0 Surface of
Turfed or
22.50
1.50
1.50
paved
15.00
3.00
1.50
9.90
3.00
2.00
7.50
3.00
2.00
1.0 taxiway
must be
1.0
visible
1.2
from 3 m
1.2
height for
shoulders
are no
mandatory
but are
distance of
suggested
300 m for
if need
ABC types
exists
and a
distance of
249 m be
visible
from 2.1 m
for D and
E types
From the view point of safety, the two parallel taxiways should be separated by an
adequate distance from each other. The separation distance known as Separation Clearance
depends on the type of airport, the wing span of the aircraft and the navigational aids
available at the airport. The traffic ways should also be spirited sufficiently from the adjacent
obstructions, e.g., buildings. The ICAO has given recommendations for separation clearances
also.
CE406/1
289
2.
3.
Diversion of water inflow from the neighbor hood away from the airport.
The drainage of airport complex has certain special features on account of which the
designing of drainage system becomes quite complicated. The main features are :
1.
2.
3.
CE406/1
4.
5.
6.
290
A contour map of the airport site and lands adjacent to it including the natural courses,
A layout of the entire airport with phases of development including all particulars of
drainage system.
3.
Rainfall data
4.
5.
6.
7.
18.4.1. SURFACE DRAINAGE : It is necessary to select a design storm for which the
drainage system should be designed. FAA recommends a design storm which is probable
once in five years. However, it is also necessary to check with 10 or 15 year storm in order to
assess the interruption to operations that will arise. The amount of run off may then be
obtained by the following equation (as per PAA).
Q = 0.01 CIA.
Q = run-off from a given drainage basin, m3 / hour
C = Coefficient of run-off. For the entire drainage area consisting of surfaces with
different infiltrate characteristic the run off coefficient is the weighted average one.
I = Intensity of rain fall in cm / hr, and
A = drainage area, m2
The time of concentration is the time taken by water in reaching the inlet of the drain
from the farthest point. The pipe lines then are designed to carry (i) discharge computed for
the time taken for the overland travel of water coming into the inlet, and (ii) the contribution
of dischrage from the other inlets carrying water to join the stream.
CE406/1
291
Fig. 18.6. Typical runway Drainage system - (d) Detailed cross - section of an inlet
structure
Fig. 18.7. Typical runway drainage system - (c) Detailed Cross - section of subgrade
drain
CE406/1
292
is shown in Fig. 18.7. Now-a-days geotextiles are being increasingly used for drainage
purposes.
18.5.
1. What do you understand by the term basic runway length? Explain the procedure of
determining the actual runway length required at a particular site.
2. Summarize the various runway geometric as recommended by the ICAO.
3. The length of a runway at sea level, standard atmosphere conditions and zero gradient is
1500m. The airport site is at an elevation of 900m, and the ariport reference temperature is
200C. If the proposed runway has an effective gradient of 0.20 percent, determine the actual
runway length required at the site. Draw a neat sketch of the safety area and cross - section of
the runway for this runway as per standard specifications.
4. Present a detailed discussion on Runway Capacity.
5. Discuss in detail the taxiway geometrics.
6. Explain the necessity and special characteristics of airport drainage.
18.6. SUMMARY :
In this chapter the design details of three important elements in an airport have been
presented in detail. They are the geometric design aspects of runways and taxiways, and the
design of the system for drainage of an airport. The relevant design standards for the
geometrics of different elements of runway and taxiway, as per the ICAO and the FAA have
been discussed in detail. Basic runway length arrived based on the performance
characteristics of aircraft has to be corrected for elevation, temperature and effective gradient
of runway at the location of the airport. These aspects have been explained by a worked
example.
The capacity of an airport depends on the configuration of runways. Different
configurations of runways normally adopted and the factors affecting their capacity have
been discussed.
The airport drainage has unusual requirements and is considered to be a complex
design problem. Its special characteristics, data to be collected for design of drainage system
and methods of providing surface and sub-surface drainage have been presented.
18.7.
REFERENCES :
CE406/1
293
1. Khanna, S.K., Arora, M.G., and Jain S.S., (1990) - Airpot Planning & Design Nemchand
Bros, Roorkee.
2. Rangwala S.C., and Rangwala P.S., (1992) - Air port planning - Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata McGraw - Hill Publishing Co., Ltd.,
New-Delhi.
4. Shegal S.G., and Bhanot, K.L., (1980) - A Text Book of Highway Engineering & Air
Ports; S. Chand & Co., New - Delhi.
***
TRANSPORTATION ENGINEERING - AIR PORTS
UNIT - 19
AIRPORT TERMINAL AREA
Aims and Objectives
19.1.
Introduction
19.2.
Terminal Building
19.3.
Apron
19.4.
19.5.
Hangar
19.6.
Blast Fences
19.7.
19.8.
Summary
19.9.
References
Aims/Objectives :
Terminal area of an airport, is the portion other than landing area which includes
terminal and operational buildings, vehicle parking area, aircraft service hangars etc. The
functions of each of the elements, their location and requirements and interrelationship
between the various elements is the topic of discussion in this chapter.
19.1.
INTRODUCTION :
The key elements of an airport are the runway system, the taxiway system and the
terminal area. The terminal area includes the terminal and operational buildings, vehicle
CE406/1
294
parking area, aircraft service hangars, aprons etc. The terminal and operational buildings
usually house all managerial and operational activities for the air craft. Congestion and
inconvenience to the airport users may be avoided by carefully planning vehicular circulation
and parking system. The terminal area should be connected to taxiways for a quick get away
of the landing aircraft and for the aircraft to proceed for runway ends by the shortest route.
Holding aprons or warm-up pads are usually provided at busy airports to allow for aircraft to
queue in these, for take - off or to get to a gate. High energy jet exhaust causes
inconvenience, discomfort and even injury to the passengers boarding the aircraft, if they are
exposed to jet exhaust. They may also cause damage to the airport equipment, structures and
to the pavements. These damaging effects of jet blasts may be reduced by properly selecting
and designing blast fences. Functions of each of the main elements, considerations in their
location and basic design principles are presented in this chapter.
19.2.
TERMINAL BUILDING :
The airport terminal building or buildings should provide adequate facilities for all
passengers arriving and departing from the aircraft and accommodation for airline and
administrative personnel. The building or buildings should include provisions for services
such as booking offices, offices of the management, passport and customs, restaurant,
watcher bureau, book and magazine stalls, public communication system, waiting and bath
rooms. At the exit, land transportation facilities such as transit buses, taxies etc., must be
available.
If the aircraft control tower is needed at the airport, it is usually located on the roof of
the administrative building. Typical layout of an airport terminal building is shown in Fig.
19.1. All the buildings (including hangars and shops) must be positioned with respect to
runways and taxiways so that the necessary manoeuvaring of planes, after landing and before
takeoff is kept at a minimum.
The apron provides a connection between the terminal buildings and the airfield. The
number of gates required for an airport can be obtained from the number of flights expected
during a peak hour. The average times necessary for the aircraft to remain at the gate position
range from 30 minutes for a dogmatic flight to 60 minutes or international flight. Hence, the
number of gate positions is equal to the design aircraft volume (vehicles/hour) divided by the
mean time of aircraft at the gate (hour/vehicles).
19.3.
APRON :
CE406/1
295
It is a paved area for parking of aircrafts and loading of passengers and cargo. It is
usually located close to the terminal building or hangars. The size of the apron depends upon
the (i) size of loading area required for each type of aircraft as gate position, (ii) number of
get positions and aircraft parking system. Depending on the volume of traffic and the size of
the airport and the cargo handled by it, a single apron for all these facilities or separate one
for each one of these purposes may be provided.
CE406/1
296
planes using it. Final check up of the aircraft may be done on these aprons. The size of the
pad is large enough so that when an aircraft is unable to take off because of some defect,
another one ready to take off is able to pass it with adequate clearance. These aprons, are
designed to accommodate three or four aircrafts of the biggest size to be handled by the
airport.
With a view of relieving congestion on major airports, some times aprons are
provided for fueling. Such an apron is timed as Fueling Apron.
According to the ICAO, slopes on aprons should be sufficient to prevent
accumulation of water on the surface of the apron, but should be kept as low as possible.
The apron and terminal area should be so situated that they are equidistant from the
ends and as far as possible to the centre of the runways so that taxing distance is cutdown to a
minimum and is the same whichever of the two ends of the runway is used. This ideal may
seldom be achieved in practice because it may usually involve expensive road or rail access is
not affected by the present or future expansion of the airport. In general terminal area and
apron are situated where access is not affected by the present or future runway clearances and
some adjustments by way of increase in taxing distance is therefore accepted.
19.4.
angle nose in (Fig. 19.2.a) the nose out or angle nose out (Fig. 19.2.b) or the parallel (Fig.
19.2.c).
CE406/1
297
CE406/1
298
Frontal system : It is very simple and economical system. But its use is limited only to
Open apron system: In this system, the aircrafts are parked in rows and adopted when
the aircrafts are large in number. Passengers have to walk long distance to reach the aircraft
parked in the outer most rows, and exposed to weather, hot blasts and noise.
(iii)
Finger system: In this system the aircrafts are parked on either side of a finger
(straight, Y-shaped, T-shaped) projecting from the terminal building. The finger itself may be
a fenced walk or an enclosed structure. If enclosed, it provides adequate protection to the
passengers from weather, noise, fumes etc.
(iv)
Satellite system : Satellites are small buildings located on the apron. Aircrafts are
parked around the satellite buildings which are connected to the main terminal building by
underground tunnels. This system is used at the International airport of Los-Angeles. In this
system less turning is required to manoeuver the aircraft in and out of the gate position. The
major draw back of this system is the large construction cost.
19.5.
HANGAR :
CE406/1
299
BLAST FENCES :
Blast Fences are used to deflect and dissipate the energy of high velocity jet exhaust.
Various types of blast fences are available. Metal and Concrete blast fences have been used.
U.S. Crops of Engineers have observed that curved fences perform better than a flat plate
fence or a flat louvered concrete fence. At runway ends and other places where full thrust is
applied, fences of 2.5m to 3.0m heights give satisfactory performances.
Blast protection may also be obtained by other methods. Any obstruction, natural or
man made, will afford some measures of protection, Hedges, bushes, and trees help to reduce
noise to a great extent. Tall and thick hedges may deflect and dissipate high velocity exhaust
energy. Natural terrain may also be used with advantage Rolling terrain may not be able to
dissipate the blast rapidly, but the steep hills may be able to do so.
Heat is also associated with jet wake exhaust. But the temperature dissipates more
rapidly with distance than the velocity. Further, the working personnel, equipment and
structures normally do not occupy the areas where the upper limit of the heat are generated
during the jet operations.
19.7.
1.
What do you understand by terminal area? What facilities are provided in this area?
2.
Discuss the requirements of a site for terminal building. Mention also the facilities to
CE406/1
3.
300
What are the different systems of aircraft parking ? Explain the suitability of each
system.
4.
19.8.
SUMMARY :
This chapter presented the various elements of the terminal area of an airport. The
terminal usually refers to a building mainly, used for passengers airline and administration
facilities. Its layout is such as to offer the enplaning passengers, the convenient and direct
access from the street side of the building, through the booking and waiting rooms, to the
aircraft loading positions on the apron. Deploying passengers are also provided with direct
route from the aircraft to the baggage claim counter and then to the vehicle platform (street
side). Control tower, weather bureau and other operational services may also be provided in
this building. The correct placement of the terminal building with respect to the runways and
loading aprons result in a more rational approach for the airport development.
Apron is a paved area for parking aircraft for embarking and disembarking
of
passengers and loading and the unloading of cargo. It is usually located close to the terminal
building or hangars. In busy airports, aprons may be provided at the end of runways for the
aircraft to wait, if necessary, before take off. These are known as warming up pads or holding
aprons.
The basic parking configurations of aircrafts are (a) nose - in or angled nose in (b)
Nose out or angle nose out and (c) Parallel system. The merits and demerits of each of these
systems have been discussed. Aircrafts can be grouped adjacent to terminal building in
various ways - Frontal system, Open apron system, Finger system and Satellite system. these
parking systems have been illustrated and discussed.
Servicing, Overhauling, and repairing facilities are provided to aircraft in hangars.
These are located close to the terminal building and holding aprons. Adequate lighting and
ventilation inside the hangar are of prime importance.
Blast fences are used, wherever necessary to dissipate the energy of high velocity jet
exhaust. It was found that curved fences are quite effective in the dissipation of jet exhaust
energy.
19.9.
REFERENCES :
1. Khanna, S.K. Arrora, M.G., and Jain S.S., (1990) - Airport Planning and Design
Nemchand Bros., Roorkee.
CE406/1
301
2. Rangwala S.C., and Rangwala P.S., (1992) - Air Port Planning - Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata McGraw - Hill Publishing Co., Ltd.,
New-Delhi
4. Shegal S.G., and Bhanot, K.L, (1980) - A Text Book of Highway Engineering & Air
Ports; S.Chand & Co., New - Delhi.
***
TRANSPORTATION ENGINEERING - AIR PORTS
UNIT - 20
VISUAL AIDS AND INSTRUMENT LANDING SYSTEM
Aims / Objectives
20.1.
Introduction
20.2.
Airport Lighting
20.5.
CE406/1
20.6.
Summary
20.7.
References
302
AIMS / OBJECTIVES :
To a pilot who navigates a plane at a considerable height and at an appreciable
distance, it is essential that the pilot is able to identify the runway and taxiway, and other
allied structures in an appropriate manner so that safe landing can be made both during day
and night. The various aids available for this purpose are discussed in this chapter. One of the
most widely used systems of landing namely, Instrument Landing System is presented here.
20.1
INTRODUCTION :
For safe landing and take-off of aircraft, runway threshold, edges and centre line
should clearly be visible to the pilot both during day and night and under bad and good
weather conditions. The pilot must be able to identify taxiways, exit taxiways, aprons and
other allied structures also. For this purpose runways, taxiways and other allied structures
have essentially to be marked in an appropriate manner to make them easily understandable
and detectable by the pilot. Any marking in bright paint identifiable during the day or
provision of night lights (white or coloured) which helps the pilot in locating the airport or in
marking a safe landing or take off are termed Visual Aids.
In most of the modern airports, the landing of aircraft is aided by using a number of
instruments, popularly known as instrument Landing System (ILS).
20.2.
a)
Runway markings
b)
Taxiway markings
c)
d)
Apron markings
e)
f)
20.2.1. RUNWAY MARKINGS : All runway markings are white in colour and are of the
following types :
1. Runway threshold marking
2. Runway touch down zone or landing zone marking
CE406/1
303
Runway number indicates the magnetic azimuth of the runway measured clockwise
from North direction. The marking is given to the nearest of 100. Thus the east end of the
east-west runway is marked with number 9, similarly at the west end, the marking is as 27. If
these are two or more number of panel runways, they are marked as follows :
a)
b)
CE406/1
c)
304
L, LC, RC, R
inclined to runway
Taxiway
CE406/1
305
Certain guide lines are marked in yellow, on the apron to help the pilot in
manoeuvering the aircraft on the apron. Usually the guide line is painted to indicate the path
of the nose gear of most critical aircraft. The smaller aircraft can also use the same path and
manoeuver without difficulty.
CE406/1
306
are gable roof shaped with a pitch of atleast 1:1. This enhances the visibility of the segmented
circle. In most cases the panels are painted in white. The wind direction indicator is in the
form of a cone as shown in fig. 20.5. For its visibility the wind direction indicator is
illuminated as shown.
Landing direction indicator is in the form of a Tee or Tetrahedron and is placed at the
centre of the segmented. Circle as shown in Fig. 20.6. This indicates the direction of the
active runway of the airport.
20.3.
CE406/1
307
20.3.1. ROTATING BEACON : This beacon rotates at a speed of six RPM projecting
horizontal beams of green and clear light, 1800 apart. It indicates the approximate location of
airport. The beacon is mounted higher than any surrounding obstruction.
20.3.2. CODE BEACON : The beacon is mounted high enough so that its beam clears all
obstructions. It is provided with two 500 Watt bulbs with a green colour screen. It
continuously flashes a Morse code signal designating the airport.
20.3.3. BOUNDARY LIGHTS : The entire landing area of the airport is provided by the
boundary lights spaced approximately 90m apart. They are mounted approximately 0.75m
above the ground. Red marker lights are used to show harardous zones.
20.3.4. APPROACH LIGHTING : While approaching the runway for landing, the approach
lights are the only elements of guidance to the pilot for safe landing. These are extended upto
900m ahead of runway threshold. The approach lighting system accepted by the ICAO is
shown in fig. 20.7. The transverse bars each 4.2m wide and located at 30m intervals along the
extended centre line of runway, give suitable information to the pilot of the angle of roll. At
300m from the threshold, a cross bar 30m wide is provided to serve as a distance marker and
to provide further horizontal references. Approach lights are normally mounted on pedestals
of varying height. Some military airports require that approach lights, within 300m of the
runway threshold, must be nearly flush with the graded approach zone.
20.3.5. THRESHOLD LIGHTING : This consists of terminating bar red lights placed at
60m from threshold indicating the end of the approach lighting. The threshold wing bars,
placed at 30m ahead of the runway serve as distant marker. The threshold, itself is lighted
with continuous line of green lights extending across the entire width of the runway. The
lights may be elevated or of the semi-flush type.
CE406/1
308
20.3.6. RUNWAY LIGHTING : After crossing the threshold, the pilot completes a touch
down and then rolls the aircraft on the runway. The lighting pattern is illustrated in Fig. 20.8.
As the pilot crosses the threshold and is about to touch the runway, he finds the central area
of the runway excessively dark. To eliminate this black hole effect, a narrow gauge pattern
lighting is provided to light the central position of the runway. In this system, shown in Fig.
20.8, groups of high intensity lights are placed 18m apart and on either side of the centre line
of runway upto a distance of 140m from the threshold. Beyond this distance closely spaced
lights are placed along the centre line which extend upto the other end of the runway. All the
lights on the runway are white in colour. The lights inside the runway are of the flush type
and those on the runway edges are elevated type.
TAXIWAY LIGHTING :
CE406/1
309
to facilitate their clear identification. All taxiway side lights are coloured blue and usually
project not more than 0.32m above the pavement surface.
b)
Landing aids.
CE406/1
310
Localiser antenna
b)
c)
CE406/1
311
The guide slope antenna indicates to the pilot the correct angle of descent to the
runway. This is also a VOR transmitter which transmits signals in the horizontal plane. This
glide slope antenna is provided on one side of the runway as shown in Fig. 20.10.
As the aircraft passes over the outer and middle markers, the pilot receives a high
pitched steady tone and also finds a visual indication in the cock pit. These are small radio
transmitters and these markers define the specific distance of the aircraft along the localiser
course. As the aircraft crosses over the middle marker, the pilot changes over from the
instrumental to the visual flight system. Now the approaching and runway lighting assist the
pilot in visual landing.
The Microwave Landing System (MLS), is expected to take over the landing
operations of an aircraft by about the end of century.
20.5.
1. By means of a neat sketch explain the runway - marking system as per ICAO.
2. Show the approach lighting system for a class - A Airport.
3. Explain how the landing of an aircraft is effected by ILS.
20.6.
SUMMARY :
For the safe landing and take off of aircrafts in an airport, a number of aids are
provided in the airport so that the pilot will be able to identify the runways, taxiways and
other pertinent structures not only during the day, but also in the night under all conditions of
weather. These are known as Visual Aids.
To aid landing and take off during the day, various elements of the airport are marked
in different colour paints. Runway threshold, landing zone, edge strip, centre line and number
are marked in white paint. All the taxiway markings, runway and taxiway shoulder markings
and apron markings are made in Yellow paint.
For flight operations during night lighting system is provided. Approach lights
provide necessary guidance to the pilot is illustrated. The approaching lighting system
accepted by the ICAO is illustrated. The identification of runway threshold has an important
bearing on the landing of aircraft. For this reason, the area near the runway threshold is given
special lighting consideration. The narrow-gauge pattern of lights help the pilot to precisely
touch the runway. The centre line of the runway may be identified easily by the runway
lighting system. Runway lighting system consists of white coloured lights.
CE406/1
312
Taxiway lighting system is so designed that they cannot be confused with the runway.
All taxiways side lights are coloured blue and usually project more than 0.32m above the
pavement surface. The centre line lights on exit taxiways are of green colour. Other elements
of the airport like aprons, hangars, wind and landing directions are properly illuminated.
Rotating Beacon and Code Beacon help in identifying the airport location and
designation.
Instrument Landing System (ILS) aids flight operations when the visibility is
inadequate during night time or due to cloudy or foggy weather. Instrument approach and
landing procedure has been illustrated and briefly explained.
20.7.
REFERENCES :
1. Khanna, S.K., Arora, M.G., and Jain S.S., (1990) - Airpot Planning & Design Nemchand
Bros, Roorkee.
2. Rangwala S.C., and Rangwala P.S., (1992) - Air port planning - Charotar Publishing
House, Anand.
3. Rao, G.V., (1992) - Air Port Engineering Tata McGraw - Hill Publishing Co., Ltd.,
New-Delhi.
4. Shegal S.G., and Bhanot, K.L., (1980) - A Text Book of Highway Engineering & Air
Ports; S. Chand & Co., New - Delhi.
***