Professional Documents
Culture Documents
Item
Descripcin
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
OBRAS PROVISIONALES
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS
CAMPAMENTO, ALMACEN, OFICINA.
CARTEL DE OBRA 4.00 x 3.00 m. (02)
CAMINOS DE ACCESO - MEJORAMIENTO DE TROCHA CARROZABLE
DEMOLICIONES DE CONCRETO EN ESTRUCTURAS EXISTENTES
03.00.00
03.01.00
03.01.01
03.01.02
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.03.00
03.03.02
03.03.03
03.04.00
03.04.01
03.04.02
03.05.00
03.05.01
CANAL
TRABAJOS PRELIMINARES
ROCE Y LIMPIEZA DE TERRENO (CANAL)
TRAZO NIVELACION EN CANALES
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
EXCAVACION EN ROCA FIJA
PERFILADO DE TALUDES DE CORTE
REFINE, NIVELACION Y COMPACTACION DE TALUD Y FONDO DE CANAL
RELLENO COMPACTADO DE PLATAFORMA
LASTRADO CAMINO DE SERVICIO e=0.2 (3.00 X 3.17 KM)
ELIMINACION DE MATERIAL EXCEDENTE A D=5 KM
OBRAS DE CONCRETO
CONCRETO F'C=210 KG/CM2 CANAL TRAPEZOIDAL
ACERO DE REFUERZO FY=4200 KG/CM2 EN CANAL TRAPEZOIDAL
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOF. CANAL TRAPEZOIDAL
FABRICACION Y COLOCACION DE CERCHAS
JUNTAS
JUNTAS ELASTOMETRICAS
COSTO DIRECTO
GASTOS GENERALES (11%)
UTILIDAD (8%)
SUB TOTAL
IGV (19%)
--------------------------------------------------TOTAL
SON : UN MILLON NOVECIENTOS SETENTA MIL TRESCIENTOS SESENTISEIS Y 57/100 NUEVOS SOLES
Unidad
GLB
M2
M2
KM
M3
Metrado
Precio
Parcial
Subtotal
Total
APORTE FIP
APORTE UE
12700.00
15173.60
3989.02
22659.84
6286.42
0.00
576.00
0.00
1047.46
0.00
6,552.21
4140.00
2412.20
0.00
0.00
49,982.90
10,382.20
20,338.77
9,882.18
18,601.80
130,205.39
134,845.80
60,632.47
434,871.51
49982.91
10382.20
20338.77
9882.18
18601.80
130205.38
38649.30
60632.48
0.00
0.00
0.00
0.00
0.00
0.00
96196.50
0.00
256.40
3.59
536,881.09
70,190.75
744,262.78
390173.12
70190.76
146707.98
0.00
3,206.40
1,860.00
26.92
16.56
86,316.29
30,801.60
117,117.89
86316.29
30801.61
0.00
0.00
8,176.00
2.91
23,792.16
23,792.16
23792.16
0.00
1,112,045.11
153,054.39
111,312.28
1,376,411.78
261,518.23
-------------------1,637,930.01
279,358.45
0.00
0.00
279,358.45
53,078.11
-------------------332,436.56
1.00
80.00
24.00
2.50
91.20
12,700.00
196.87
166.21
9,482.92
68.93
12,700.00
15,749.60
3,989.04
23,707.30
6,286.42
M2
KM
9,000.00
4.40
0.46
548.23
4,140.00
2,412.21
M3
M3
M3
M
M2
M3
M2
M3
13,619.32
1,824.64
1,192.89
3,542.00
17,716.00
7,084.08
8,550.78
5,640.23
3.67
5.69
17.05
2.79
1.05
18.38
15.77
10.75
M3
KG
2,093.92
19,551.74
M2
UND
M
62,432.36
1,391,403.56
153,054.39
111,312.28
1,655,770.23
314,596.34
-------------------1,970,366.57