You are on page 1of 8

Final Acceptance Test (FAT) for

SEKOLAH

1GovUC Project

1GovUC FAT Script

Page 1

Revision and Signoff Sheet

Document information
1GovUC Final Acceptance Test for
SEKOLAH

Document name and


location:

Document ownership
Division/Unit

Contact person

E-mail address

Version control
VersionDate

Name and position

Reason for update

0.1

25/12/12

Rozainal Amri

Initial draft for


review/discussion

0.2

27/12/12

Rozainal Amri

Revised Content

0.3

27/12/12

Viknez

Revised Content

0.4

27/12/12

Viknez

Revised Content

0.5

27/12/12

Rozainal Amri

Final Revision

0.6

06/01/13

Rozainal Amri

Updated Final Version

0.7

08/05/13

Farid Wajdi

Simplified Version

1.0

20/09/13

Farid Wajdi

Test Plan Summary added,


doc title renamed

Firdaus Mat Nayan

Lync IM testing added.


Change Lync Voice and
Video call testing to
optional.

1.1

18/10/14

1GovUC FAT Script

Page 2

Table of Contents
1 Test Plan Summary...............................................................4
1.1

Test Plan........................................................................................................ 4

1.2

Test Environment Specification.....................................................................4

1.3

The Test Teams............................................................................................. 5

1.4

Resources..................................................................................................... 5

2 Microsoft Outlook Web Access (OWA).....................................6


2.1

Microsoft OWA Functionality.........................................................................6

2.2

FAT Sign-off for MS Outlook Web Access.......................................................8

1GovUC FAT Script

Page 3

1 Test Plan Summary


This document describes the test environments characteristics and
configuration under which the implementation, installation, configuration and
migration of the 1GovUC Exchange 2010 will be tested. It contains the
description of the methods and tools employed, the preparation tasks required,
the steps to follow to conduct each test and the results to expect. It ensures
that the testing process will be conducted in a thorough and organized manner
to enable the team to determine that the proposed solution is stable and meets
1GovUCs requirements. Detailed test cases are provided to allow the team to
ensure that the solution functionality validates all the requirements expressed in
the Vision & Scope document.

1.1 Test Plan


This Test Plan Document details the test approach and actual test steps that
must be performed to ensure that the designed solution can deliver what it was
designed to do. The Test Plan Document will also help identify compatibility
issues, if any, that might arise due to the actual configuration that will be
deployed in the environment.
Each item in the Test Plan Document is derived from the Vision/Scope document
where features and functionality were discussed, documented and finally
accepted as being what the solution must be able to deliver in the end.
A Test Team will be established that will be responsible for the actual test
execution of each of the Test Cases. Furthermore, the tests will be conducted in
the lab environment where full simulations can take place without hindering
business operations.
It is important for the Test Team to establish and maintain the test environment
as if it were a live environment. Adequate testing of the designs can only be
performed in a test environment that is representative of the live environment.
This Test Plan Document will be performed during project execution. This will
ensure that the features, capabilities and high-availability options identified in
the project scope are working as expected by Customer.

1.2 Test Environment Specification


The test environment for this FAT will be done on the Production environment.
Adequate testing of the MS OWA will be performed.

1GovUC FAT Script

Page 4

1.3 The Test Teams


The Testing Team is responsible for:

Establishing and maintaining the test environment


Developing of the overall Test Plan and test cases
Executing the detailed test cases
Evaluating test results
Ensuring proper documentation of tests
Owning the test environment and all of its processes

The Test Team will develop and perform all the test scenarios based on their
operational experience and on 1GOVUCs requirements to verify the functionality
of the new environment.

1.4 Resources
The TM test team will be composed of the following members:
Resource Name

1GovUC FAT Script

Position

Technology

Page 5

2 Microsoft Outlook Web Access (OWA)


2.1 Microsoft OWA Functionality
Expected Results

N
O.
1.

1.
1

1.
2

Tests

Pas
s

To Create& Send a New Message


1. Click the New Message button at top
screen.
2. Enter the e-mail address(es) in the To:
box
3. Enter the Subject of the message in
the Subject box.
4. Enter the text of your message in the
text box.
5. Click the Send button.

E-mail is sent out to recipient without a


bounce back from the Exchange Server.
Refer to test case 1.1 to 1.2 for expected
results.

Case 1: Send to 1GOVUC user


1. Refer the steps at item 1.
2. Enter the e-mail address in the To:
fat1@mampu.gov.my
3. Click Send and confirm the message is
shown inside the Sent Items.

Confirm at fat1@mampu.gov.my mailbox to


receive all emails from pilot users.

Case 2: Send to external (internet)


user
1. Refer the steps at item 1.
2. Enter the e-mail address(es) in the To:
1govuctest@vads.com
3. Click Send and confirm the message is

Confirm at 1govuctest@vads.com mailbox to


receive all emails from pilot users.

1GovUC FAT Script

Results

fat1@mampu.gov.my to reply back email to


all pilot users recipient.

1govuctest@vads.com or to reply back email


to all pilot users recipient.
Page 6

Fail

Remarks

Expected Results
N
O.

2.

shown inside the Sent Items.


Tests

To Open/Receive a Message

Remarks

Message can be viewed via OWA.

Click a message to view it.

2.
1

Case 1: Confirm receive message


from 1GOVUC user
1. Refer the steps at item 2.
2. Check at Inbox to confirm received
email from fat1@mampu.gov.my.
3. Double-click the message to open it.

Confirm to receive email from


fat1@mampu.gov.my.

2.
2

Case 2: Confirm receive message


from external (internet) user
1. Refer the steps at item 2.
2. Check at Inbox to confirm received
email from 1govuctest@vads.com.
3. Double-click the message to open it.

Confirm to receive email from


1govuctest@vads.com

1GovUC FAT Script

Results

Page 7

2.2 FAT Sign-off for MS Outlook Web Access


Upon completion of testing, MAMPU is to verify if he/she confirms all the FAT
component has been executed successfully.

FAT Sign-off for Microsoft OWA


Tested by (SEKOLAH)

Verified by (MAMPU/Telekom
Malaysia)

Name:

Name:

Designation:

Designation:

School:
Date:

1GovUC FAT Script

Date:

Page 8