You are on page 1of 4

PROJECT MANAGEMENT

part 1-Bogad
a)introduction
-terang outline proposal

b)Background
- general overview untuk project kita - location - cameron highlands/ tanah tinggi di Sabah
- what is green campus
- what is standard facilities for a university campus
- general overview of renewable energy
- code of conduct for a building

Part 2-Kayathri
a)Problem statement
- problem statement of our project
- problem in university design
- example: the cost of project is expensive
- the current university is not green enough

b)Flowchart -flowchart of our project


-starting from designing campus layout until we completed the project
1. choosing the campus layout
2. construction of the campus
3. installing power services
4. deciding renewable energy to take place
5. installing the communication system
6. design the security system for the university
7. consideration of the public security, environmental, social and cultural
consideration
8. expecting and calculating the financial expenses and implplication

c) Gannt Chart
-milestone to produce project report
include:1. proposal submission
2. literature review
3. concept generation 1
4. concept generation 2
5. concept generation 3
6. data collection
7. task completion
8. final report compilation
9. slide preparation
10. oral presentation
11. FINAL REPORT OF OVERALL DESIGN

d) Task for each team member

Part 3-Azrul
a) Objectives

-objectives of project
-to design campus layout
-to design power system of university campus
-to design communication system
-to design the security system
-to apply knowledge of renewable energy in the new building

b) Scope of Projects
-initial concept design
-designing campus layout ; size, location, number of rooms, hall, academic and
no-academics room, facilities
-designing power services ; transformer size, switch gear, power consumption,
earthing system
-communication system ; wifi internet access, telephone, PA system, billboard
-security system ; ID access, biometric access for higher confidential part, CCTV,
alarms, guard
-renewable energy ; photovoltaic, rain collector, energy saving appliances, wind
turbine, *solar roof
-

Part 4-Dous
a) Initial costing
- costing based on initial design
- rough estimation of every system design
b) Expected outcome
- predict waht will be asked
- market analysis on fees, income of university and expenses
- proposed desgin is suitable or not?
- challenges to be face in realizing this plan such as the (highlands, renewable
energy problem)

Part5-Satari

a) Methodology
- brief statement on how we realize this project.
1. Start by approaching on how we choose the suitable place to build a university
2. We divided the project to different project leader
3. case study on green campus, renewable energy
4. regulations and code of conducts of building that need to be follow while
designing
5. how we complete the project, meeting, finding the help from professional etc.

b) Conclusion
-summary of all

Notes:
1.12pt Times new Roman Single Space Maximum 10 pages
2.Part 3 ngan part 4 kena work together sebab dia cam berkaitan
3.Esok kalau bole meeting? malam pon ok.
4. bole rujuk file yang satari bagi (COMPLETE PROJECT PROPOSAL)

You might also like