RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
JUNGLE CLEARANCE
1 Cutting of trunks
120 18.1
Sqm
101.00
4.04
105.04
120 18.1
Sqm
0.8712
0.03
0.91
120 17.8
Sqm
4.38
0.18
4.56
5 2.1
Cum
84.00
3.36
87.36
5 2.2
Cum
118.00
4.72
122.72
5 2.3
Cum
101.00
4.04
105.04
5 2.4
Cum
152.00
6.08
158.08
5 2.5
Cum
311.00
12.44
323.44
5 2.6
Cum
473.00
18.92
491.92
6 2.10
Cum
68.00
2.72
70.72
6 2.11
Cum
41.00
1.64
42.64
6 2.12
Cum
136.00
5.44
141.44
6 2.15
Cum
1062.00
42.48
1104.48
7 2.21
Cum
6.75
0.27
7.02
7 2.22
Cum
11.85
0.47
12.32
12 4.2
Cum
3401.00
136.04
3537.04
12 4.3
Cum
3125.00
125.00
3250.00
12 4.5
Cum
4433.00
177.32
4610.32
EARTH WORK
III
CONCRETE WORKS
16 P. C. C. 1:3:6
17 P. C. C. 1:4:8
18 P. C. C. 1:1.5:3
using
using
using
40 mm Metal
40 mm Metal
20 mm Metal
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
19 P. C. C. 1:2:4
using
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
20 mm Metal
12 4.6
Cum
4024.00
160.96
4184.96
12 4.7
Cum
3473.00
138.92
3611.92
12 4.11
Cum
4489.00
179.56
4668.56
13 4.12
Cum
4087.00
163.48
4250.48
13 4.17
Cum
4489.00
179.56
4668.56
13 4.19
Sqm
352.00
14.08
366.08
14 4.28
Sqm
141.00
5.64
146.64
14 4.29
Sqm
207.00
8.28
215.28
14 4.31
Sqm
172.00
6.88
178.88
15 4.32
Sqm
214.00
8.56
222.56
15 4.33
Sqm
535.00
21.40
556.40
15 4.34
Sqm
153.00
6.12
159.12
15 4.35
Sqm
202.00
8.08
210.08
15 4.36
Sqm
422.00
16.88
438.88
20 P. C. C. 1:3:6
21 R. C. C. 1:1.5:3
22 R. C. C. 1:2:4
23 R. C. C. 1:1.5:3
24 R. C. C. Chajja
IV
using
using
using
using
M -20
20 mm Metal
20 mm Metal
20 mm Metal
20 mm Metal
7.50 Cmsthick
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Chajja/Facia/Drops
34 Centering, shuttering, strutting, propping for
removal of form of work
for stairs
(excluding
landing)
except
spiral
staircase
Staircase
V
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
15 4.37
Sqm
159.00
6.36
165.36
15 4.38
Sqm
296.00
11.84
307.84
16 4.46
Kg
50.03
2.00
52.03
40 7.21
Kgs
80.00
3.20
83.20
235 36.58
Rmt
4020.00
160.80
4180.80
21 5.3
Cum
1748.00
69.92
1817.92
26 6.6
Cum
3681.00
147.24
3828.24
27 6.14
Cum
3048.00
121.92
3169.92
VI
MASONRY WORKS
38 UCR Masonry
CM
1:6
CM
39 Brick Masonry
Non Modular C -50
1:6
CM
40 Brick Masonry
Modular C -35
1:6
41 Brick Masonry
CM
Modular Paritionwall
1:4
C -35
28 6.25
Cum
400.00
16.00
416.00
42 Brick Masonry
CM
Modular Paritionwall
1:4
C -50
28 6.26
Cum
494.00
19.76
513.76
43 Brick Masonry
CM
Modular Paritionwall
1:4
C -35
28 6.27
Sqm
389.00
15.56
404.56
30 7.1
Sqm
2873.00
114.92
2987.92
31 7.7
Sqm
2580.00
103.20
2683.20
31 7.9
Kgs
63.00
2.52
65.52
32 7.10
Sqm
2852.00
114.08
2966.08
32 7.11
Sqm
2749.00
109.96
2858.96
33 7.14
Sqm
3582.00
143.28
3725.28
VII
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
Sqm
4329.00
173.16
4502.16
36 7.20
Sqm
4619.00
184.76
4803.76
45 9.12
Cum
41364.00
1654.56
43018.56
46 9.16
Sqm
2030.00
81.20
2111.20
46 9.18
Sqm
2474.00
98.96
2572.96
46 9.19
Sqm
1925.00
77.00
2002.00
46 9.21
Sqm
2328.00
93.12
2421.12
52 9.84
Sqm
205.00
8.20
213.20
52 9.85
Sqm
2000.00
80.00
2080.00
54 9.94
Sqm
3000.00
120.00
3120.00
60 9.100
Sqm
625.00
25.00
650.00
233 36.16
Sqm
548.00
21.92
569.92
41 8.3
Sqm
290.00
11.60
301.60
41 8.8
Rmt
227.00
9.08
236.08
42 8.15
Rmt
322.00
12.88
334.88
42 8.19
Rmt
421.00
16.84
437.84
53 Fully panelled
Mathi / Nandi wooden
shutters, for doors
54 Fully panelled Honne wooden shutters, for
doors
55 Fully panelled Nandi wooden shutters, for
doors
56 Fully panelled Honne wooden shutters, for
doors
VIII
ROOFING
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
IX FLOORING
66 Heavy duty Cobble stone 75 mm thick
88 14.7
Sqm
557.00
22.28
579.28
89 14.10
Sqm
310.00
12.40
322.40
89 14.14
Sqm
1589.00
63.56
1652.56
89 14.15
Sqm
656.00
26.24
682.24
90 14.16
Sqm
763.00
30.52
793.52
90 14.17
Sqm
692.00
27.68
719.68
93 14.36.2
Sqm
540.00
21.60
561.60
94 14.45
Sqm
830.00
33.20
863.20
94 14.47.2
Sqm
2007.00
80.28
2087.28
1:4
97 15.10
Sqm
91.00
3.64
94.64
1:4
97 15.13
Sqm
103.00
4.12
107.12
77 Ceiling Plaster
12 mm
in CM
1:3
98 15.21
Sqm
109.00
4.36
113.36
1:3
97 15.15
Sqm
138.00
5.52
143.52
1:4
98 15.16
Sqm
122.00
4.88
126.88
Sqm
8.15
0.33
8.48
99 15.33
Sqm
14.25
0.57
14.82
101 15.49
Sqm
44.00
1.76
45.76
101 15.49.2
Sqm
2.55
0.10
2.65
101 15.51.2
Sqm
60.00
2.40
62.40
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
102 15.53.1
Sqm
31.00
1.24
32.24
102 15.53.2
Sqm
50.00
2.00
52.00
103 15.60.1
Sqm
76.00
3.04
79.04
57 10.30
Sqm
531.00
21.24
552.24
234 36.33
No.
960.00
60 11.1
Rmt
190.00
7.60
197.60
60 11.2
Rmt
306.00
12.24
318.24
60 11.10
Rmt
148.00
5.92
153.92
60 11.11
Rmt
250.00
10.00
260.00
61 11.37
No.
8425.00
337.00
8762.00
62 11.38
No.
12589.00
503.56
13092.56
63 11.50
No.
4666.00
186.64
4852.64
67 12.2
No.
3131.00
125.24
3256.24
67 12.3
No.
874.00
34.96
908.96
67 12.4
No.
1441.00
57.64
1498.64
67 12.5
No.
3740.00
149.60
3889.60
67 12.6
No.
3621.00
144.84
3765.84
2156.00
86.24
2242.24
1813.00
72.52
1885.52
XI
960.00
SANITORY WORKS
100 mm dia
150 mm dia
100 mm dia
150 mm dia
No.
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
70 12.33
No.
2596.00
103.84
2699.84
71 12.40
No.
578.00
23.12
601.12
71 12.45
No.
717.00
28.68
745.68
71 12.46
No.
656.00
26.24
682.24
77 12.111.2
No.
250.00
10.00
260.00
77 12.113.2
No.
270.00
10.80
280.80
71 12.47
Rmt
579.00
23.16
602.16
71 12.48
Rmt
503.00
20.12
523.12
71 12.50
Rmt
415.00
16.60
431.60
71 12.53
No.
377.00
15.08
392.08
79 13.1
Rmt
120.00
4.80
124.80
79 13.2
Rmt
149.00
5.96
154.96
79 13.3
Rmt
208.00
8.32
216.32
79 13.4
Rmt
227.00
9.08
236.08
79 13.5
Rmt
299.00
11.96
310.96
80 13.23
No.
138.00
5.52
143.52
80 13.24
No.
172.00
6.88
178.88
80 13.33
No.
383.00
15.32
398.32
81 13.34
No.
546.00
21.84
567.84
81 13.35
No.
784.00
31.36
815.36
81 13.36
No.
987.00
39.48
1026.48
15 mm dia
20 mm dia
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
20 mm dia
81 13.41
No.
396.00
15.84
411.84
81 13.42
No.
526.00
21.04
547.04
81 13.51
No.
544.00
21.76
565.76
82 13.69
Rmt
157.00
6.28
163.28
82 13.70
Rmt
197.00
7.88
204.88
82 13.78
No.
6048.00
241.92
6289.92
234 36.44
Rmt
7.00
0.28
7.28
235 36.45
Cum
312.00
12.48
324.48
235 36.47
Sqm
100.00
4.00
104.00
235 36.48
Cum
100.00
4.00
104.00
235 36.51
Sqm
17.00
0.68
17.68
235 36.52
Sqm
13.00
0.52
13.52
235 36.53
Sqm
33.00
1.32
34.32
25 mm dia
150 mm dia
XIII
DISMANTLING
BOREWELL
RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.
PWD SR-DWDCIRCLE
P.No. I.No.
Name of work
Unit
* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%
Total
40 4
Rmt
Rmt
97.50
69.50
3.90
2.78
101.40
72.28
89
89
89
89
Rmt
Rmt
Rmt
Rmt
215.00
270.00
320.00
350.00
8.60
10.80
12.80
14.00
223.60
280.80
332.80
364.00
91 1 (a & b) Rmt
91 1 (a & b) Rmt
91 1 (a & b) Rmt
32.25
64.50
81.00
1.29
2.58
3.24
33.54
67.08
84.24
91 3
Nos.
13.00
0.52
13.52
93 8
Nos.
6058.00
242.32
6300.32
40 4
1
1
1
1
ESTIMATION
FOR
CONSTRUCTION
OF
CONCRETE ROAD
AT
DHARWAD
Consultants :
DHARWAD
PH : (0836) 2747308, FAX NO: 91-836-2796241
e-mail : aminbhavihegde@sify.com
e-mail : info@ahcepl.com
web site : www.ahcepl.com
Description
Amount
Rs
CONSTRUCTION OF CD WORK
ESTIMATION
S.N
o.
I
Description
No.
Qty.
Unit
Rate
Amount
Head wall
PIPE
1
1
2
1
1.70
7.50
0.90
1.00
1.5
1.5
4.59
11.25
15.84 Cum
#REF!
#REF!
0.59 Cum
#REF!
#REF!
7.92 Cum
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1200.00
9,000.00
1.50
0.80
0.15
0.36
PIPE
1.50
1.00
0.15
0.23
Cum
15.84
0.5
1.50
7.50
0.80
0.60
0.15
0.3
1
1
2
1
0.36
1.35
1.71 Cum
5 KSRB 4 - 9.2 : Providing TMT steel reinforcement for R.C.C. work
including straightening, cutting, bending, hooking, placing in
position, lapping and / or welding wherever required, tying with
binding wire and anchoring to the adjoining members wherever
necessary complete as per design (laps and wastage shall not be
measured and paid) cost of materials, labour, HOM of machinery
complete as per specifications. (Specification No. KBS 4.6.3)
3.12
20.00 kg/cum
62.40
62.40 Kg
7.50
7.50
7.50 m
1
1
2
2
1.50
1.50
0.60
0.45
0.6
1
1.08
1.35
S.N
o.
Description
No.
1.50
0.23
Qty.
Unit
0.69
3.12 Cum
Rate
Amount
5000.00
15600.00
#REF!
#REF!
Head wall
PCC
1
1
2
2
4.20
7.5
2.7
0.15
22.68
2.25
24.93 Sqm
Total
G. Total
#REF!
#REF!
825m
BILL OF QUANTITIES
Sl.N
o.
Description
Qty.
Unit
1 Detailed survey of existing road including chaining , levelling with cross section at
25m intervals & closing survey each days work, fixing bench marks, painting, taking
trail pits & submission of road cross sections , L-sections quantity statements in
computerised prints in five copies in proper files & all type of compliance required
by the engineer in charge.
0.825
km
4125.00
m3
2062.50
m3
1856.25
m3
618.75
412.50
412.50
m3
m3
m3
618.75
m3
1031.25
m3
2 Excavation for roadway in soil using including loading in truck for carrying of cut
earth to embankment site with all lifts and lead upto 1000 meters as per relevant
clauses of section 300
3 Compacting Original Ground Supporting sub grade Loosening of the ground
upto a level of 500 mm below the sub grade level, watered, graded and compacted in
layers to meet requirement of table 300 - 2 for sub grade construction
4 Construction of approved murum sub grade with Material Obtained from
Borrow Pits (Construction of embankment with approved material / selected soil
having C. B. R. > 5 (unless specified otherwise in the contract) obtained from borrow
pits with all lifts and leads, transporting to site, spreading, grading to required slope
and compacting to meet requirement of table 300 - 2)
Rate
Amount
Description
Qty.
Unit
Rate
8 Providing TMT steel reinforcement for R.C.C. work including straightening, cutting,
bending, hooking, placing in position, lapping and / or welding wherever required,
tying with binding wire and anchoring to the adjoining members wherever necessary
complete as per design (laps and wastage shall not be measured and paid) cost of
materials, labour, HOM of machinery complete as per specifications.
20625.00 Kg
Total
Say Rs
Amount
BILL OF QUANTITIES
S.No
.
1
Description
Qty.
Unit
Excavation for roadway in soil using including loading in truck for carrying of cut
earth to embankment site with all lifts and lead upto 1000 meters as per relevant
clauses of section 300
2062.50 Cum
4 Providing and laying in position plain cement concrete of mix 1:3:6 (M - 10) using 40
mm and down size graded granite/Trap/Basalt metal, machine mixed, concrete laid in
layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth,
including cost of all materials,labour, HOM of machinery, curing complete as per
specifications.
140.25 Cum
5 Providing and laying in position reinforced cement concrete of nominal mix 1:1.5:3
(M - 20) with 20 mm and down size graded metal, machine mixed, concrete laid in
layers not exceeding 15 cms. thick, vibrated for all works in foundation plinth and
ground floor level for roof slab, staircase, lintels, retaining walls, return walls, walls
(any thickness) including attached plasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, plain window
cills, fillets etc., including cost of all materials,labour, HOM of machinery, curing
complete as per specifications.
508.64 Cum
6 Providing TMT steel reinforcement for R.C.C. work including straightening, cutting,
14531.45 Kg
7 Providing and removing centering, shuttering, strutting, propping etc., and removal of
form work for Gutters for mass concreting including cost of all materials, labour
complete as per specification.
6517.50
Total
G. Total
###
Rate
Amount
750 M
BILL OF QUANTITIES
S.N
Description
o.
1 Excavation for roadway in soil using including loading in truck for
carrying of cut earth to embankment site with all lifts and lead upto 1000
meters as per relevant clauses of section 300
Qty.
Unit
1125.00 Cum
2 Construction of Embankment / sub grade with Material Obtained from
Borrow Pits (Construction of embankment with approved material / selected
soil having C. B. R. > 5 (unless specified otherwise in the contract) obtained
from borrow pits with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting to meet requirement of table 300 2)
202.50 Cum
3 Filling available excavated earth (excluding rock)in sides of foundations up
to plinth in layers not exceeding 20cm in depth,compacting each deposited
layer by raming after watering with lead up to 0M the lift up to 1.5M
including cost of all materials,labour complete as per specifications.
281.25 Cum
4 Providing and laying in position plain cement concrete of mix 1:3:6 (M - 10)
using 40 mm and down size graded granite/Trap/Basalt metal, machine
mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted,
in foundation and plinth, including cost of all materials,labour, HOM of
machinery, curing complete as per specifications.
67.50 Cum
5 Providing and laying in position reinforced cement concrete of nominal
mix 1:1.5:3 (M - 20) with 20 mm and down size graded metal, machine
mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all
works in foundation plinth and ground floor level for roof slab, staircase,
lintels, retaining walls, return walls, walls (any thickness) including attached
plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or
lacing courses, parapets, coping, bed blocks, plain window cills, fillets etc.,
including cost of all materials,labour, HOM of machinery, curing complete as
per specifications.
220.50 Cum
6 Providing TMT steel reinforcement for R.C.C. work including straightening,
cutting, bending, hooking, placing in position, lapping and / or welding
wherever required, tying with binding wire and anchoring to the adjoining
members wherever necessary complete as per design (laps and wastage shall
not be measured and paid) cost of materials, labour, HOM of machinery
complete as per specifications.
20392.75 Kg
7 Providing and removing centering, shuttering, strutting, propping etc., and
removal of form work for Gutters for mass concreting including cost of all
materials, labour complete as per specification.
3300.00 Sqm
Total
G. Total
Rate
Amount
S.N
o.
Rate
Amount