CONTRACTOR

RATHOA HARYAM BRIDGE ACROSS RESRVOIR


CHANNEL ON MIRPUR ISLAMGHAR ROAD

Summary of Tests Performed in the Project Lab (Mirpur


No of tests performed upto Nov 2015
Name of Test

Previous

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Coarse Aggregate
Gradation

480

33

18

16

30

20

22

16

18

12

Soundness

34

Specific Gravity

169

10

10

Abrasion

214

12

10

10

17

10

Flat and Elongated

98

Unit Weight

179

12

16

10

15

Petro graphic Analysis

Fine Aggregate
Gradation

290

18

10

10

17

14

15

10

11

Soundness

33

Specific Gravity

89

Sand Equivalent

128

10

11

Unit Weight

81

Petro graphic Analysis

Proctor

Field Density Test

38

No of Cylinders prepared and tested


Activity
Working Piles
Concrete Class
A3
Piles Cap
Concrete Class
A2
Pier
concrete class
A2

Previous
Cylinder Casted

Mar
24

7 Days

1517

28 Days

1517

Apr

May

Jun

Jul

156

87

Tested
Cylinder Casted

12

804

66

7 Days

402

33

28 Days

402

33

Tested
Cylinder Casted

2636

268

158

256

300

7 Days

1310

112

73

144

141

29

28 Days

1304

44

56

138

132

135

Tested
228

7 Days

114

28 Days

114

Tested
Cylinder Casted

Concrete Class
D2
Girder,deck slab,dia phragm

Feb

3034

Cylinder Casted

Lean concrete

Jan

3 Days

535

3
158

201

248

124

128

23

Concrete Class
D2
Girder,deck slab,dia phragm
Foot path

Tested

Transom
Concrete Class
A2

62

65

94

48

45

57

51

14 Days

110

21

33

78

48

18

27

47

28 Days

179

53

42

99

89

45

66

60

84

60

196

30

12

24

7 Days

98

12

12

28 Days

98

15

Cylinder Casted

296

7 Days

148

32

32

28 Days

148

12

42

Tested

Cement

246

Cylinder Casted
Tested

Concrete Class
A1
Precast Slab

7 Days

12

Setting Time

81

Mortar Cube

179

12

Chemical Analysis

Each Heat of steel delivered at project steel yard was tested at commercial laboratories to confirm the following parameters:
Nominal Dia, X Sectional area, Unit Weight, Yield Strength, Ultimate Strength, Elongation and Bending.

STEEL DELIVERED AT PROJECT STEEL YARD (TONS)


Previous(2014)

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

7672.2

190.72

355.28

543.5

127.56

50

100

100

100

30

STRESSING CABLE DELIVERED AT PROJECT (TONS)


Previous(2014)

Jan

Feb

Mar

Apr

200

50.00

50

110

50

S.L.T

May

Jun
25

Jul

Aug

Sep

24.990

25.04

Lab Tech
ME
NAZAR FAROOQ

CONSULTANT

RVOIR

AD

(Mirpur)

Oct

Nov

Dec

Total

29

22

24

740

50

242

13

10

330

149

12

10

12

301
1

16

13

13

445

49

139

205

154
1
4
38

Aug

Sep

Oct

Nov

Dec

Total
3058
1529
1529
870
435
435

12

3630

1815
1809
234
117
117

140
3

96

66
3

105

138

2182
56

42

43

15

33

63

864

18

27

15

27

33

502

33

52

30

27

45

820

268

133
131

116

44

612

50

44

306

39

59

306

145

263
7

D (TONS)
Oct

Nov

Dec

Total

50

150

50

9519.26

Nov

Dec

Total

75

75

685.03

T (TONS)
Oct

Tech

SYED BILAL GHAZI

CONTRACTOR

RATHOA HARYAM BRIDGE ACROSS RESRVOIR


CHANNEL ON MIRPUR ISLAMGHAR ROAD

Summary of Tests Performed in the Project Lab (Mirpur


No of tests performed upto May 2016
Name of Test

Previous

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Coarse Aggregate
Gradation

740

25

27

31

26

29

Soundness

50

Specific Gravity

242

10

18

Abrasion

330

11

10

13

18

11

Flat and Elongated

149

Unit Weight

301

13

14

12

14

14

Petro graphic Analysis

Fine Aggregate
Gradation

445

13

12

13

11

12

Soundness

49

Specific Gravity

139

Sand Equivalent

205

Unit Weight

154

Proctor

Field Density Test

38

Petro graphic Analysis

No of Cylinders prepared and tested


Activity
Working Piles
Concrete Class
A3
Piles Cap
Concrete Class
A2
Pier
concrete class
A2

Previous

Mar

Apr

3058

54

138

7 Days

1529

24

72

28 Days

1529

Cylinder Casted

Cylinder Casted

May

36

60

870

7 Days

435

28 Days

435

Tested
Cylinder Casted

3630

12

24

114

53

7 Days

1815

24

52

28 Days

1809

30

56

20

177

122

102

105

Tested
234

7 Days

117

28 Days

117

Tested
Cylinder Casted

Concrete Class
D2
Girder,deck slab,dia phragm

Feb

Tested

Cylinder Casted

Lean concrete

Jan

3 Days

2182
56

144

Jun

Jul

Concrete Class
D2
Girder,deck slab,dia phragm
Foot path

7 Days

864

65

88

73

14 Days

502

33

28 Days

820

47

81

46

43

51

Cylinder Casted

268

12

12

18

7 Days

133

28 Days

131

12

18

Cylinder Casted

612

12

7 Days

306

28 Days

306

Tested

Transom
Concrete Class
A2

Tested

Concrete Class
A1
Precast Slab

Tested

Cement

45

Setting Time

145

10

12

Mortar Cube

263

Chemical Analysis

57

Each Heat of steel delivered at project steel yard was tested at commercial laboratories to confirm the following parameters:
Nominal Dia, X Sectional area, Unit Weight, Yield Strength, Ultimate Strength, Elongation and Bending.

STEEL DELIVERED AT PROJECT STEEL YARD (TONS)


Previous(2015)

Jan

Feb

Mar

Apr

May

9519.262

150.0

120.00

314.21

146.558

50

Jun

Jul

Aug

Sep

STRESSING CABLE DELIVERED AT PROJECT (TONS)


Previous(2015)

Jan

Feb

Mar

Apr

May

685

50.00

25

25

25

25

S.L.T

Jun

Jul

Aug

Sep

Lab Tech
ME
NAZAR FAROOQ

CONSULTANT

RVOIR

AD

(Mirpur)

Oct

Nov

Dec

Total

878
58
289
393
178
368
1

506
57
162
246
188
-

38

Aug

Sep

Oct

Nov

Dec

Total
3250
1625
1625
870
435
435
3833
1904
1924
234
117
117
2832
59

1192
547
1088
322
166
173
630
311
309
181
287
7

D (TONS)
Oct

Nov

Dec

Total
10300.03

T (TONS)
Oct

Nov

Dec

Total
835.00

Tech

SYED BILAL GHAZI