Professional Documents
Culture Documents
DCVModelling
DCVModelling
B
Demandcontrolventilation(DCV)isaventilationsystemcapabilitythatprovidesautomaticreductionofoutdoorairintake
belowdesignrateswhentheactualoccupancyofspacesservedbythesystemislessthandesignoccupancy.Inmost
commercialbuildingsventilationisprovidedtodealwithtwotypesofindoorpollution:odoursfrompeople,andoffgassing
frombuildingcomponentsandfurniture.Whenaspaceisvacant,ithasnopeoplepollutionsothepeoplerelatedventilation
rateisnotneeded.Manytypesofhighoccupancyspaces,suchasclassrooms,multipurposerooms,theatres,conference
rooms,orlobbieshaveventilationdesignedforahighpeakoccupancythatrarelyoccurs.
DemandcontrolledventilationhasthepotentialtoprovidesignificantHVACenergysavingsbyconditioningonlytheamount
ofventilationairnecessarytomaintaingoodindoorairquality.Itcanbeparticularlyeffectiveinbuildingsorzonesthathave
widelyvaryingoccupancy.
DCVismostsuccessfulwhenreducingventilationratesandsoreducingfanenergyusewhenmeetingthedemandsof
indoorairquality(IAQ).Itisnotnecessarilysosuccessful,inenergyterms,forhighdesigncoolingloads,sinceairflowswill
increaseabovetherequiredIAQminimumtomeetspacecoolingloads.Practically,thisislikelytomeanthatIAQdriven
DCVismosteffectiveinASHRAEclimatezones4andabove.
SchematicofatypicalDCVsystemfromDemandControlledVentilationandSustainabilitywithpermissionfromauthor
TomLawrenceandASHRAE.
SOSTMDCVIDB
ThissectionprovidesasummaryofthestepsrequiredtomodelanairsystemwithDCVoutdooraircontrolin
DesignBuilder.
1.MakesureyouareusingDetailedHVAC.
2.OntheOutdoorairsystemtaboftheAHUdialogundertheDemandControlledVentilationheader,switchon
Demandcontrolledventilation.RecirculationmustbeselectedontheAHUdialogtoenablethissetting.
3.SelecttheSystemoutdoorairmethod(VRP,IAQPetc).
4.EnsurethattheSimulateCO2concentrationoptionatsitelevelontheLocationtabundertheSiteDetails>Outdoor
AirCO2andContaminantsheadersisswitchedon.
5.IfoneoftheIAQPmethodsareselectedthentheCO2andcontaminantcontroloptionmustbesetontheHVAC
ZonedialogforatleastonezoneconnectedtotheAHU.CO2setpointsmustalsobeset.Thisisdoneonthe
ActivitytabundertheCO2/ContaminantSetpointsheaderiftheSimpleHVACactivitydataoptionisbeingusedoron
theHVACzonedialogifusingtheDetailedHVACactivitydataoption.
6.YoucancheckthesuccessoftheDCVcontrolinvariousways,forexample:
1.Usetheac/hdataforzonesandforthebuildingwithinDesignBuilder:
2.CheckCO2levelswithinselectedzonesusingtheResultsViewer.YoushouldfindthattheZoneAirCO2
Concentrationreportisautomaticallyincludedinthe.esooutputfilewhenDCVcontrolhasbeenspecified.
http://www.designbuilderusa.com/helpv4.7/Content/DCV.htm
1/2
11/17/2016
DCVModelling
http://www.designbuilderusa.com/helpv4.7/Content/DCV.htm
2/2