SCOPE OF WORK/SUPPLY

GENERAL CIVIL
COKE HANDLING SYSTEM
PACKAGE
BPCL-IREP

SECTION: C-1.7
A307-0ID16-47-SOW-7000
Rev. 3
Page 7 of 13

considering geotechnical recommendations, however enclosed EIL standard drawing


with bid shows minimum sections.
Extent of heavy duty RCC pavement shall be ascertained by the contractor and heavy
duty pavement shall be designed/ provided for required crane weight or any other
heavier crane proposed to be used by the contractor for erection and maintenance.
Hard stand for erection of heavy equipments by cranes shall be ascertained by the
contractor & provided as required. Hard stand required for the erection of heavy
equipment shall be designed as per erection loads by the contractor.
Based on soil data, the hard stand required for erection of heavy equipments to be
designed and provided as per equipment erection philosophy/type of cranes to be
used inside and outside the battery limit. Dismantling of hard stand if required, as per
directions of Engineer-in-Charge / representative of Owner. Disposal of unserviceable
material within BPCL property limit (old refinery & DHDS area).
Refer to Document A307-OID-16-48-SOW-0002 FOR FLOORING within Stock pile
dome area.
2.7

DRINKING WATER SYSTEM


Distribution network of Drinking water system for coke handling areas/ buildings,
safety shower & eye wash or any other places required in the EPC scope limit, hookup with valve, matching flange, fittings and valve pit from tapping point connected
with the main drinking water network as per scope limit drawing enclosed with this
bid package. Any boosting pump required to enhance the drinking water pressure is
in EPC contractors scope. The minimum pressure available in the drinking water
network is 2.5 kg/cm2g (approximate) at hook-up. However exact pressure will be
confirmed during detailed engineering
Designed, supply of all materials, construction, testing and commissioning of drinking
water system shall be provided in the coke handling area and buildings (control
room/substation) to meet the drinking water requirements. The drinking water system
shall supply water to all buildings, drinking water posts etc. including to safety shower
/ eyewash. The drinking water shall be tapped from the tapping point available (tie-in
coordinate shown is tentative, tie-in coordinate will be finalized during detail
engineering) as shown in the scope drawing including hook-up and provide drinking
water posts, piping, fittings, all accessories, design, testing & commissioning as per
relevant IS codes & specifications. A minimum dia of 2 (exact size of pipes to be
ascertained by contractor) drinking water header to safety shower & eyewash units
shall be provided. The drinking water lines in all buildings shall be concealed. All
above ground drinking water header shall be insulated.
Individual buildings shall be provided with HDPE water storage tank (minimum 1000
litres) on roof of the building as per IS:12701. Water supply for drinking water system
is to be taken from the WDK line as shown in dwg no. A307-OID-16-43-7000.

2.8

SAFETY SHOWER & EYE WASH


Contractor shall provide combined safety shower (SS) and eyewash (EW) units.as per
attached specifications at various places within scope limit where either caustic or

Format No. EIL 1641-1924 Rev. 1


Page 3122 of 3134

Copyright EIL All rights reserved