You are on page 1of 6

PT Perusahaan Gas

Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

Page 1 of 6

EMPLOYER

: PT PERUSAHAAN GAS NEGARA (PERSERO) TBK

PROJECT TITLE

: UPGRADING TANGSI OFFTAKE STATION PROJECT (CP 11A)

CONTRACT NO.

: 053500.PK/HK.02/PMO/2015

17/09/2015

Issued for Review

REV.

DATE

DESCRIPTION

IST

WHA

JM

PRP'D

CHK'D

APV'D
PMC

NK

PGN

PT Perusahaan Gas
Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

REVISION HISTORICAL SHEET


Rev.

Date

Page

Description

17/09/2015

All

Issued for Review

Page 2 of 6

PT Perusahaan Gas
Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

Page 3 of 6

TABLE OF CONTENT
TABLE OF CONTENT.......................................................................................................... 3
1. PURPOSE..................................................................................................................... 4
2. SCOPE.......................................................................................................................... 4
3. DEFINITIONS................................................................................................................ 4
4. TECHNICAL BID EVALUATION FOR GAS FILTER WITH QOC..................................4
5. ATTACHMENT.............................................................................................................. 5
ATTACHMENT 1 TBE FOR GAS FILTER WITH QOC......................................................6

PT Perusahaan Gas
Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

Page 4 of 6

1.

PURPOSE
The purpose of this document is to Evaluate the Vendor Technical Bid to be used by
the CONTRACTOR for Upgrading Tangsi Offtake Station Project (CP11A) for
Perusahaan Gas Negara (Persero) Tbk. (PGN).

2.

SCOPE
This document covers all the Evaluate the Vendor Technical Bid in the execution of the
PROJECT.

3.

DEFINITIONS
EMPLOYER
PMC

CONTRACTOR

PROJECT

4.

: PT Perusahaan Gas Negara (Persero) Tbk


: PT Petrotechindo Utama (PTU), a company
appointed by EMPLOYER to carry out the duties
assigned to him as Project Management
Consultant in the Contract Package No. 11A
(Upgrading Tangsi offtake Station Project).
: PT Nindya Karya (Persero), a company appointed
by EMPLOYER to perform the detailed design,
procurement and construction for Contract
Package No. 11A (Upgrading Tangsi offtake
Station Project).
: Upgrading Tangsi Offtake Station Project
(CP11A)

TECHNICAL BID EVALUATION FOR GAS FILTER WITH QOC


The Technical Bid Evaluation for Gas Filter with QOC is attached on this document.
A. List of Vendor
- PT Samudra Teknindo Hydraumatic
B. Evaluation Criteria
Vendor evaluation is based on criteria bellow:
- Specification and datasheet (PGNs requirement)
- Delivery time
- Working experience / Reference

PT Perusahaan Gas
Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

Page 5 of 6

C. Evaluation Result and Recommendations


Based on the result of vendor evaluation, we suggest PT Samudra Teknindo
Hydraumatic as vendor who have give engineering support with these
classifications:
1. Ranking
:A
2. Acceptability
:A

5.

ATTACHMENT
Attachment 1

Technical Bid Evaluation for Gas Filter with QOC

PT Perusahaan Gas
Negara (Persero) Tbk

PT Petrotechindo
Utama

PT Nindya Karya
(Persero)

TBE for Gas Filter with QOC


Document No.

Rev.

CP11A-NK-3275-PT-TE-020-A4

Page 6 of 6

ATTACHMENT 1 TBE FOR GAS FILTER WITH QOC

You might also like