QHSE PLAN

CLIENT

EMPOWER ENERGY SOLUTIONS


PROJECT CONTRACTOR
ISLANDTOWER ELECTROMECHANICAL LLC
PROJECT NAME
JUMEIRAH VILLAGE SOUTH DISTRICT COOLING
PLANT
Document Number: EMP/QHSE01/2016.Rev.01
Project reference: EMP-TR-0164-LOA-TP-NJM-EDQ-01
To: Contractor
Your submittal has been reviewed and given the approval or comment category as noted below. For details of our
comments, refer to the comments below / Attached

________________________________________________
______________________________________________________
______________________________________________________
COMMENTS:

Date

Rev Description

Island Tower
Prepared

22-08-16

QHSE Plan

10-9-16

QHSE Plan

August 16

Reviewed

Page 1 of 67

Empower
Checked

Approved

Qhse Rev 001

Table of Contents
1.

Company Profile
1.1. Introduction
1.2. Ethics

2.

Organization Chart
2.1. Project Organization Chart
2.2. Project Safety Organization Chart

3.

Definitions

4.

Management Responsibility
4.1. Management Commitment
4.2. Responsibility, Authority and Communication
4.2.1. Responsibility and Authority
4.2.2. Internal Communication

5.

QHSE Management System


5.1. QHSE Policy
5.2. Scope, Purpose and Implementation of QHSE System
5.3. Control of Documents & Records
5.4. Purchase and Store
5.5. Customer Relationship Management

6. HSE Management System


6.1. Health, Safety & Environmental Policy
6.2. HSE Objectives/Scope
6.3 HSE Management
6.3.1 Function
6.3.2. Composition of safety Committee
August 16

Page 2 of 67

Qhse Rev 001

6.3.3. Individual Responsibilities


6.4. HSE Aspect / Hazard and Risk / Impact Assessment
6.4.1. Process
6.4.1.1. Identification
6.4.1.2. Assessment and preparation of plan
6.5. General Safety Rules
6.6. Safety and Health Controls
6.7 Specific Construction Activities Requirements from mobilization to
demobilization, Legal Requirements and its Control measures
6.7.1 Plant and Equipment
6.7.2. Site Traffic requirements
6.7.3. Storage and Handling of Chemical Substances
6.7.4. Personal Protective Equipment and Clothing
6.7.5 Housekeeping
6.7.6 Electrical Safety
6.7.7 Fire Safety
6.7.8 Work at Height
6.7.9 Confined Space
6.7.10 Hot Work
6.7.11 Hoists & Lifting Equipment
6.7.12 Excavation
7. Emergency Preparedness
7.1. Fire emergency
7.2. Medical Emergency
7.3 Emergency Contact- Dubai

August 16

Page 3 of 67

Qhse Rev 001

8. Resource Management
8.1 Facility and Infrastructure Management
8.2 Human Resource & Training
8.2.1 Training procedures
9. Measurement, Analysis and Improvement Program
9.1. Measurement of Customer Satisfaction
9.2. Internal QHSE Audits
9.3. Measurement and Monitoring Of Processes
9.4. Measurement and Monitoring Of Services
9.5. Injuries, Incidents and Non- Conformities
9.6. Analysis of Data
9.7. Corrective & Preventive Actions
Annexure:
1.

Annexure: 1 - Method of Statements.


1.1. Flushing and Chemical Cleaning for Chilled Water System.
1.2. Hydrostatic Pressure Testing of GRP Pipelines.
1.3. Excavation and Backfilling for Buried Valve Pit.
1.4. GRP Piping.
1.5. Installation of HDPE Pipes and Fittings.
1.6. Installation of Buried Valve.
1.7. Cladding of Chilled Water Pipeline.

2.

Annexure: 2 - ITPS for Activities.


2.1. ITPS for Flushing of Chilled Water Piping work.
2.2. ITPS for Hydrostatic Pressure Testing.
2.3. ITPS for Excavation and Backfilling for Buried Valve Installation.
2.4. ITPS for Installation of GRP Chilled Water Pipe.

August 16

Page 4 of 67

Qhse Rev 001

2.5. ITPS for Installation of HDPE Pipes and Fittings.


2.6. ITPS for Installation of Buried Valve.
2.7. ITPS for Cladding of Chilled Water Pipeline.

3.

Annexure: 3 - OH&S Risk Assessment.


3.1.HSE&S Risk Assessment for Flushing of Chilled Water Pipe
3.2. HSE&S Risk Assessment for Hydrostatic and Pressure Testing of GRP

Pipelines.
3.3. HSE&S Risk Assessment for Excavation, Backfilling, Leveling and
Compaction.
3.4. HSE&S Risk Assessment for GRP Chilled Water piping.
3.5. HSE&S Risk Assessment for HDPE Pipes and Fittings.
3.6.HSE&S Risk Assessment for Installation of Buried Valve.
3.7. HSE&S Risk Assessment for Cladding of Chilled Water Pipeline.
4.

Annexure: 4 - Environmental Aspect Impact Analysis.

5.

Annexure: 5 - HSE Training Plan.

6.

Annexure: 6 - Traffic Management Plan

7.

Annexure: 6 - Forms & Records Used

August 16

Page 5 of 67

Qhse Rev 001

1.COMPANY PROFILE
1.1Introduction
Privately owned Company based in Dubai United Arab Emirates was founded under
the able leadership of Mr. Sasikumar. ISLAND TOWER has become rapidly popular in
this highly booming market, credited to the immense sacrifices and hard work of its
entire staff and management.

ISLAND TOWER always believes that client satisfaction comes first, and thus dedicates
itself with vast amount of experience and highly qualified professionals to serve all the
needs of its clients.
1.2 Ethics

The ISLAND TOWER respects and abides by the laws of the countries in

which it operates.

The ISLAND TOWER respects and supports the cultural practices of the

citizens of the countries in which it operates, be they staff, customers, suppliers, officials
or ordinary members of the public.

The ISLAND TOWER values highly the diversity of its staff and their

willingness and capacity to work together to achieve common goals.

The ISLAND TOWER provides a work environment free of discrimination

and harassment based on age, ancestry, color, marital status, medical condition, mental
disability, physical disability, national origin, race, religion, sex, sexual orientation or
veteran status.

August 16

Page 6 of 67

Qhse Rev 001

2. ORGANIZATION CHART
2.1 PROJECT ORGANIZATION CHART

August 16

Page 7 of 67

Qhse Rev 001

2.2 PROJECT SAFETY ORGANIZATION CHART

PROJECT DIRECTOR
SASIKUMAR V M

PROJECT MANAGER
UNNIKRISHNA PILLAI

SAFETY ENGINEER
GIRISH SOMAN

SAFETY OFFICER
RAHUL R

SAFETY SUPERVISOR
PRASANNAKUMAR

FIRE WARDEN

FIRST AIDER

August 16

Page 8 of 67

Qhse Rev 001

3. DEFINITIONS
Company

Island Tower Electromechanical Works LLC

Client/Customer

EMPOWER

Project

Jumeirah Village South District Cooling Project.


(Testing, Commissioning and Maintenance, in the
Defects Liability Period, of Existing GPR Chilled Water
Piping Networks including Construction of Plot/ Buried
Valve Chambers at Jumeirah Village South Circle and
Triangle)

Quality, Health,
Safety
&
Environmental
System

The company structure, responsibilities, practices,


procedures, system processes and resources for
implementing Quality, Health, Safety & Environmental
(QHSE) Systems.

HSE Policy

A statement, endorsed by the companys senior


management, stating the intentions and principles of
actions regarding the health, safety & environmental
Systems, which gives rise to strategic and detailed
objectives.

Hazard

Anything that has potential to cause harm to people,


property or the environment.

System Audit

An independent, systematic and documented process of


objectively obtaining and evaluating verifiable evidence
to determine:

if the system conforms to the audit criteria.

if the system is implemented effectively.

if the system is suitable to achieve the Policy and


Objectives.
Near Miss

Any event which had the potential to cause injury,


damage or loss, but which was avoided by
circumstances

Incident

An event which has caused or could have caused injury,


illness and / or damage (loss) to assets, the environment,
company reputation or third parties.

Non-Conformance

A deviation from a requirement specified in the system.

August 16

Page 9 of 67

Qhse Rev 001

Practice

Accepted method or means of accomplishing stated


tasks.

Procedure

A written description of how a specific task should be


accomplished.

Program

A management tool for meeting an established objective


which is less comprehensive than a System. It is
composed of two steps, plan and implement. It usually
addresses issues that have either limited scope or
limited time frame.

Risk

The product of the probability that a specified


undesired event will occur and the severity of the
consequences of the event.

Accident

Any undesirable event giving rise to death, ill health,


injury, damage or other loss.

Safety

Safety encompasses the systems, programs, procedures


and practices required for the prevention of incidents.

Self-Assessment

A process whereby a check is carried out by a unit or


facility to determine how well its programs and
procedures satisfy legal requirements and conform with
the expectations of the IMS.

Shall, Will, Must

Means that the action mentioned is compulsory.

Training

A process which encompasses the steps necessary to


ensure that employees have the knowledge, skills and
values necessary to fulfil their, health, safety and
environmental responsibilities.

Note on gender

While the male gender has been used throughout the


Systems documents, he is to be read as he or she.

August 16

Page 10 of 67

Qhse Rev 001

4. MANAGEMENT ROLES & RESPONSIBILITIES


4.1 Management Commitment
ISLAND TOWERS Management has committed itself to establish and continually
improve the QHSE Management System on JVS DC project as described in section 5 of
this Manual.
4.2Responsibility, authority and communication
4.2.1Responsibility and authority
The responsibility, authority and the interrelation of all personnel who are engaged in
Testing, Commissioning and Maintenance of Existing GRP Chilled Water Piping
Networks including Construction of Plot/ Buried Valve pit in JVS DC have been defined
and documented as per ISO 9001:2008 standards. The same is extended to HSE plans
followed on the project by the EMPOWER. The responsibilities and authorities of the
key personnel are as follows,
Managing Director
Responsibilities and authorities relating to HSE management system:
Ensure communication of the Company HSE Policy on this project and ensure its
implementation and maintenance.
Authorize HSE system documentation and training plans followed on this project.
Ensure the HSE Management system is reviewed to ensure effectiveness in satisfying
the requirements of the standards, the objectives of the project and the clients
expectations.
Review and provide adequate resource requirements.
Develop the company business plan, marketing strategy and long term growth.
Safety Engineer (SE)
The Safety Engineer is ultimately responsible for ensuring implementation and
maintenance of the HSE System.
Responsibilities and authorities relating to HSE management system include:
Ensure the establishment of the HSE system in accordance with the International
Standards (ISO 9001:2008).
Manage the communication, reporting, review, monitoring and HSE training for
August 16

Page 11 of 67

Qhse Rev 001

Construction of Plot/ Buried Valve pit and chemical flushing of existing chilled water
network., as well as complying with all legal and regulatory requirements of Dubai
Municipality/UAE Government.
Valuate and Report on the performance of the HSE plan on JVS DC project.
Organize Management Review meetings.
Establish and co-ordinate the internal HSE audit plans, actions and follow-up .
Review, control, authorizes and distributes HSE system documentation followed on
the project.
Reports to the Managing Director and co-ordinates with others managers for matters
related to Health & Safety and Environment.
Prepare any Corrective Action and Non-conformance Reports on safety culture
followed by the company staffs throughout the project.
Prepare Company HSE Statistics and overall HSEperformance of the company
throughout the project.
Ensures incident & near miss reporting and investigation procedures are followed up
by the appropriate corrective & preventive action.
Liaises with external agencies, government authorities and interested parties
concerning relevant HSE system issues.
Ensures appropriate monitoring of HSE-related issues is carried out to minimise risk /
impact and achieve compliance with the relevant statutory requirements.
Internal Auditors
Responsibilities and authorities relating to HSE system:
Prepare and plan for HSE Systems audits.
Conduct the internal audits and prepare Non Conformity Reports and Audit Report.
Discuss the results of these audits with the relevant section head audited and agree the
corrective actions required and their completion dates.
Carry out follow up audits.
Report to the Safety Engineer/MR.

August 16

Page 12 of 67

Qhse Rev 001

4.2.2Internal Communication
The company has defined and implemented processes for communication of QHSE requirements, objectives and
accomplishments throughout the project.

Management
Review / Continuous
Improvement

Monitor / Feedback

HSE Policy and Objectives


Client Enquiry

Delivery

Input
Statutory, regulatory and
customers requirements

Final services comply with


statutory, regulatory &
customer requirements

Quotation
Inspection
Order confirmation

Tools & Facilities

Outputs

Project work

Communication Tools
Good infrastructure
Qualified employee
Resources
Knowledge
Process method
Training
Good experience

Support Process
Financial Controller /
Administration
HR

Drawings

Work instructions & procedure


HSE Procedures & Work Instr.
Job Description
Regulatory and Statutory

Performance
Criteria/Monitoring
Cycle Time
Number of solved and
unsolved complaints
Productivity
Waste reduction
Number of nonconformities
Market share
Health, safety &
environmental parameters

Page 13 of 67

5.2 SCOPE, PURPOSE AND IMPLEMENTATION


a)

Purpose

ISLAND TOWER Management developed and implemented the Quality, Health, Safety and
Environment System described in this manual to help the organization demonstrate its ability to
consistently provide the services and operate with increased effectiveness and efficiency with
the overall aim of enhancing customer/ client satisfaction.
b) Scope,
The scope of this system covers activities related to Testing, Commissioning and Maintenance,
in the Defects Liability Period, of Existing GRP Chilled Water Piping Networks including
Construction of Plot/ Buried Valve Chambers at Jumeirah Village South Circle and Triangle.
c) Implementation
The processes contributing to overall service can be broadly enumerated as below.
a) Control of Documents & Records
b) Purchase and store
c) Resource management
d) HSE Management
e) Project Management
f) Measurement, Analysis and Improvement program
The procedures are documented to ensure that activities, conditions and tasks affecting quality,
health, safety and environmental protection are planned, organized, executed, reviewed and
improved through the project.
5.3 CONTROL OF DOCUMENTS & RECORDS
The Company has established and maintained procedures for the control of all documentation
relating to the QHSE System.

August 2016

Page 15 of 67

Safety rev 001

The periods for maintenance of system records are detailed in procedures. The procedures also
define the methods for disposal of system records after prescribed retention periods are carried
out.

PROCEDURE
i.

Documents records for the successful completion of testing and commissioning of


existing GRP chilled water piping and construction of plot/Buried valve pit shall be
approved & issued by authorized document controller.

ii.

QSR (Quality SystemReports)& QSD (Quality System Documents) for this project will
be prepared as per Master list of documents (ISO 9001:2008 standards). Before issue,
issue details are recorded in the Issue control register.

iii.

The pertinent issues of appropriate documents/ records will be kept in the site office (at
JVC and JVT)

iv.

All important documents such as Contract Agreements, Lease Deeds etc and the related
working files shall be under the custody of respective Heads of Departments at our
main office (at Al Quisais,Dubai,)

v.

Any documents of external origin retained for the operation of the organization
including legal register shall be recorded in the Documents of External Origin by the
MR.

vi.

The inward & outward of documents (letters, magazines etc) are recorded in inward &
outward registers respectively.

vii.

All Incoming Mail/ Courier are received at the reception desk. The reception desk shall
segregate the same Department-wise and register the particulars of all mail couriers &
dispatched to the concerned department.

5.4

PURCHASE AND STORE

In purchasing materials, equipment and services, the Company attaches critical importance to
evaluation and selection of subcontractors / suppliers, communication of requirements to
subcontractors / suppliers, receiving inspection and verification of purchased products.
The procedure has been established which ensures that:

Only subcontractors/suppliers included in the Approved List from EMPOWER are used
in this project.

August 2016

Page 16 of 67

Safety rev 001

The performance of approved subcontractors/suppliers is monitored, evaluated and


recorded.

Purchasing documents clearly and completely describe ordered products and the HSE
requirements.

Purchase documents are reviewed and approved prior to release.

No incoming material is used until approved by receiving inspection. Certificates of conformity


are a requirement of the purchasing document as the case may be.
Environmental requirements are included in material requisitions and the environmental policy
is communicated to subcontractors.
The relevant operational control procedures are communicated to suppliers and contractors
wherever necessary.
PROCEDURE
a) Purchase
i. Department in charges will prepare a Purchase Requisition Form (PRF) and submit to
purchase in charge for approval.
ii. PRF must contain details like name of the required products, quantity required, etc.
iii. After getting PRF the purchase department will collect quotations from approved
vendors.
iv. After negotiation with the vendors, considering the quality and other criteria like
previous history, promptness in supply, credit period etc the purchase department will
submit a proposal with all the information to the purchase committee.
v. Purchase department will issue Purchase Order (LPO) in the prescribed format. Original
PO will send to the vendor and copy of the same will be given to Admin and keep one
copy with the purchase department.
vi. On receipt of products along with vendors delivery challan/ Invoice/ Bill, the
Department in-charge shall co-relate the same with relevant purchase requisition.
vii. A preliminary quality checking like item, quantity, number of packages/ items,
condition of packing, external appearance, test reports etc. shall be carried out by the incharge before acceptance.
viii. The results of receiving inspection shall be recorded on the Purchase Inspection Register
i.e. accepted/ rejected/ quarantined etc.

August 2016

Page 17 of 67

Safety rev 001

ix. If any product found defective by in-charge, this should be intimated to Purchase incharge. The product should be returned to the vendor with an intimation letter regarding
the issue and this should be remarked in purchase inspection register.
b) Stock verification
Stock register of each product to be maintained by the purchase in charge and this shall be
verified randomly.

5.4

MANAGEMENT REVIEW MEETING:

Management Review meetings are carried out two times per year in order to ensure the QHSE
Systems continuing suitability, adequacy and effectiveness in satisfying the Standards, and in
meeting the Customers requirements.
The Safety Engineer/MR maintains minutes of the meeting and shall ensure the same is
distributed to all key functions and communicate the status of the effectiveness of the HSE
System to the organization as a whole.
The Top Management team consisting of Managing Director, Safety Engineer, and other dept.
Agenda and minutes of management review meeting are prepared and circulated to all the
concerned persons
5.5

Customer Relationship

The Company has defined methods to analyze& monitor client/customer satisfaction of services
delivered. The information collected through Feedback forms is used for analysis of data for
ensuring customer satisfaction and continuous improvement. The results of such review are
submitted for Management Review and subsequent action.

August 2016

Page 18 of 67

Safety rev 001

6.2 HSE OBJECTIVE/SCOPE


A set of objectives and targets for the project according to the scope of work from EMPOWER,
(i.e. Flushing of existing GRP chilled water piping network including construction of
plot/buried valve pit). These shall be reviewed in case of any significant change in the
operation, such as addition of new service, equipment etc. This shall be done on an annual
basis.
The following inputs will be considered for setting objectives:

HSE Policy

Legal and other requirements

List of significant HSE aspects / hazards and risk / impact

Operational and business requirements

Financial and technological options

PROJECT HSE OBJECTIVE


Carry out the chemical flushing activities of existing GRP line and with no personal or
property damage and environmental impact. Construction of plot/buried valve pit with
complete safety to ensure zero accidents in construction period and future.
PROJECT HSE TARGET
ZERO hazard to environment and working personnel throughout the project Jumeirah Village
South DistrictCooling.
6.3 HSE Management
6.3.1 Function
From the site management, safety personnel and subcontractors, a Site Safety Committee will
be set up to carry out the following functions:
1. Discuss safety policies and recommend adoption of these by management.
2. Identify unsafe conditions and practices and determine their remedies.
3. Work to obtain results by having its management approved recommendations put into
practice.
4. Convey safety messages to the committee members.
August 2016

Page 20 of 67

Safety rev 001

5. Arouse and maintain the interest of employees/ workers and convince them that their
cooperation is needed to prevent accidents.
6. Provide an opportunity for free discussion of accident problems and preventive measures.
7. Initiate safety promotion schemes and set targets for safety improvement campaigns.
6.3.2 Composition of Safety Committee
The Site Safety Committee is to comprise:
1. Project Manager (Chairman)
2. Safety Engineer
3. Safety officer
4. Safety Supervisor

6.3.3 Individual Responsibility for Safety


Project Manager
Main responsibilities are to:
a) Know and understand the Island Tower Electromechanical LLC Policy and the
responsibility of safety allocated to each level of staff within the project
b) Know and understand the requirements of the relevant legislation and how they apply to
the project.
c) Advise Management on:
1. Preventing injury to personnel and damage to plant and equipment.
2. Further improvement in existing sound working methods
3. Legal requirement affecting safety, health and welfare.
4. Provision and use of protective clothing and equipment.
5. Potential hazards on new contracts before work starts and on the site safety
organization.
6. Feedback on new policy or procedures adopted.
7. Methods of safe working arising from new developments.
d) Coordinate with the Officers of the Occupational Safety and Health Authority and ensure
that their requirements are met
e) Ensure that all levels of staff receive adequate and appropriate training

August 2016

Page 21 of 67

Safety rev 001

f) Institute proper reporting, investigation and costing of injury, damage and loss; promote
action to prelude recurrence and initiate analysis to discover trends
g) Make adequate Security arrangements to ensure the security of all personnel, plant,
equipment and resources
h) Make adequate provision for Welfare arrangements, including the requisite facilities for
the number of employees on site
i) Set a good personal example

Safety Officer
Main responsibilities include:
a)

Knowledge of all the basic hazards and risks encountered in work activities.

b)

The measures required to minimise the above.

c)

Supervision of Health and Safety issues including:


1. Supervisors responsibility for General Safety and Health
2. Principles of Accident Prevention
3. General Safe Working Procedures
4. Knowledge of Risk Assessment Procedure
5. Knowledge of Health and Safety Systems
6. Scaffolding Safety General Hazard Spotting
7. General Introduction to Working with Hazardous Chemicals
8. Electricity Hazard Spotting
9. General House Keeping Principals

d)

Set a good personal example.

e)

Ensure that work, once started, is carried out as planned and in accordance with the
Occupational Safety and Health Legislation regulations and codes of practice.

Site Engineer
Main responsibilities are to:
a) Organise the site so that work is carried out to the required standard with minimum risk to
men, equipment and materials
b) Know the requirements of the Project Safety Plan and Regulations and other relevant
legislation and how it applies to the project.
August 2016

Page 22 of 67

Safety rev 001

c) Ensure that all plant sent to site is safe and fully efficient, is guarded and equipped with
safety devices and is tested in accordance with the Project Safety Plans.
d) Make certain that all operations and maintenance personnel are only employed for that
which they have been thoroughly trained.
e) Check that all repair and maintenance work carried out on site is in a proper manner and that
emergency repairs are dealt with properly as soon as possible. Call the attention of site
management to the need for dangerous plant to be put out of service.
f) Check that hired plant is safe and that, where appropriate, copies of current test certificates
are available and kept on site with the machine.
g) Give all Foremen and leading hands precise instructions on their responsibilities for proper
working methods; see that they do not require or permit men to take unnecessary risk.
h) Arrange delivery and stacking of materials to avoid risks by double handling; position plant
effectively; ensure that the electricity supply is installed and maintained without endangering
men and equipment.
i) Plan and maintain a clean tidy site, so far as is reasonably practicable.
j) Implement arrangements with subcontractors and other contractors on site to avoid any
confusion about areas of responsibility.
k) Make sure that suitable protective clothing is available and used.
l) Ensure that a qualified first-aider and all items of first-aid equipment as required by the
Project Safety Plan are available and their location known to employees.
m) Cooperate with the Project Safety Representatives and act on his recommendations.
o) Set a good personal example.

Foremen
Main responsibilities are to:
a) Be familiar with the Project Safety Plan regulations applicable to the work on which their
gangs are engaged and insist that those Regulations are observed.
b) Incorporate Job Safety Analysis in routine orders and see that they are obeyed.
August 2016

Page 23 of 67

Safety rev 001

c) Restrain men from taking unnecessary risks ensuring employees are educated and trained.
d) Ensure that new employees learn to take safety precautions. - Transmit safety knowledge
and company message to his fellow workers.
e) Commend operatives who, by action or initiative, eliminate hazards.
f) Discourage horseplay and reprimand those who consistently fail to consider their own well
being and that of others around them.
g) Report defects in plant or equipments.
h) Set a good personal example.
Workers
Main responsibilities are to:
a) Use the correct tools and equipment for the job; use safety equipment and protective
clothing supplied, e.g. roof ladders, safety helmets, safety shoes, safety harness, goggles, etc.
b) Keep all tools in good working condition according to standard.
c) Report to supervisor, defects in plant or equipment.
d) Develop a personal concern for safety for themselves and for others, particularly
newcomers and young people.
e) Avoid improvising which entails unnecessary risk.
f) Inform new employees of known hazards and run Induction Training first day.
g) Refrain from horseplay and the abuse of welfare facilities.
h) Suggest ways of eliminating hazards.

August 2016

Page 24 of 67

Safety rev 001

Subcontractors
a)

Subcontractors are required to comply with the requirements of the Project Safety

Plan throughout their duration on site.

Confirmation of their understanding of the

requirements and intentions to comply with the Project Safety Plan are gained at the sub
contract start-up meeting.
b)

Site safety meetings are held to review sub-contractors safety performance and

agree actions to be taken to ensure safe working methods are adopted. Each subcontractor
is required to appoint a representative to attend the monthly H&S meeting for the period
they are on site.
c)

Subcontractors are involved in the safety training and awareness program for the

Project.

6.4 HSE Aspect / Hazard and Risk / Impact Assessment


Identification & evaluation of health, safety & environmental aspects/hazards and their
associated risks / impacts are performed by various functions whose activities are
relevant to HSE Systems under the guidance of the HSE Manager/MR and Department
Managers.
A list of significant HSE aspects/hazards & associated risk/impact will be maintained and
this list will be reviewed and updated as per the procedure for identification & evaluation
of aspect, impact/hazard and risk assessment.
6.4.1 Process
6.4.1.1 Identification
The following non-exhaustive list of events should be treated as an emergency:

Serious Injury

Natural disasters

Spill of or exposure to any potentially hazardous substances (e.g. chemical, or


biological materials).

August 2016

Fire and/or explosion


Page 25 of 67

Safety rev 001

Adverse weather conditions (storm /sandstorm)

Power outage / water leak

Any additional emergencies will be added during any review process as identified.

6.4.1.2 Assessment & Preparation of Plan


The QHSE Department shall be responsible for the preparation of environmental impact
assessment and risk management during the execution of flushing activities and civil
construction activities. Detailed impact assessment for the project attached as Annexure
4.

August 2016

Page 26 of 67

Safety rev 001

6.5 SAFETY RULES OF ISLAND TOWER ELECTROMECHANICAL LLC


Safety practices are effective means of preventing accidents. All personnel, subcontractor
personnel and visitors are obliged to comply with the following safe practices and are as
follows:

Follow the standard operating procedures as per method statement from


EMPOWER.

Practice good housekeeping. Do not leave tools / materials / scraps in your


workplace. Keep your workplace clean and tidy.

Wear the appropriate work clothing and personal protective equipment for your job.

Work permits are required for certain specific jobs.

Locate machines, benches, work areas in such a way to allow free movement.

Adequate and suitable firefighting equipment must be provided for all hot works or
areas where combustible or flammable material and Know the exact location of
firefighting equipment to be stored.

Standard emergency kit and first aid equipment must be provided and readily
available at all times.

Smoking is only allowed in designated smoking area. No Smoking signs and all
other warning signs exhibited shall be followed strictly.

All incidents causing injury / damages or not, shall be reported to the site engineer /
supervisor.

Drivers and operators must obey all speed limits and other traffic rules and
regulations at project site.

Intoxicating drugs or beverages are forbidden in workplace.

No visitor / client shall be allowed inside hazardous workplace without supervision.

Check that tools and equipment are in safe condition. Use tools and equipment
correctly.

Do not oil / attend repairs on a machines or equipment while running /energised.

Use and place ladders and stepladders in safe condition.

Poisonous / dangerous chemicals must never be kept in unauthorised bottles / cans.

August 2016

Page 27 of 67

Safety rev 001

Do not clean your hand with solvents such as gasoline, thinner, Use prescribed
cleansing agents.

Wash your hand before eating. Personal hygiene is very important.

6.6 SAFETY & HEALTH CONTROLS

Safety Inspections are scheduled by the QA/QC and Safety Engineer for the Project
and conducted by assigned Supervisors
a)

Tour the individual worksite, observing work critically in terms of what is being done

and the safety or physical conditions.


b)

Specific inspections will be carried out as per the Inspection Test plan (ITP) approved

by EMPOWER (Annexure 2) for each specific activities coming under flushing of GRP
pipes and construction of valve pit.
c)

Completed Inspection forms and follow-up Safety Inspection forms will be submitted

to Project Manager and Safety Engineer and QA/QC who will review them and take action
on any outstanding issues.
A Safety Reward Scheme operates on the Project as follows:
The Project will be split into areas and those areas who record the best results recorded on
the Safety Inspection form and who are judged by the Project Manager to have worked
safely will be eligible for Safety Certificates and Safety Vouchers up to a value of Dhs 100
per man.
6.7.

Specific

Construction

Activities

Requirements

from

mobilization

to

demobilization and Control measures


6.7.1Plant & Equipment, its Control Measures
The purpose of this section is to detail the safety system practices to provide an acceptable
standard of plant safety on the project with Island Tower Electromechanical LLC. Once
the contract is awarded the work activities will be identified. Subsequently the plant and
equipment to be provided and utilised during the project will be identified. A register of all
machineries, tools and equipment on site will be maintained.

August 2016

Page 28 of 67

Safety rev 001

The scope applies to any plant and equipment, which is used to within Jumeirah Village
South District Cooling Projectworksite by the employees, contractor or visitors
Legal Requirements:
Dubai Municipality, Code of construction safety practice#Chapter14
The plant and equipment used for the purpose this project byIsland Tower
Electromechanical LLC are temporary pumps, Excavation equipment, Back filters,
generators, different types of lifting equipments like chain blocks, lifting pad, webbing
sling etc.
Control of Plant and Equipment:
a) A register shall be maintained for all rolling stocks detailing:
-

Plant Name, Model, Registration & Serial number;

Manufacturer & Year of manufacture;

Certification status.

b) The Safety Engineer will ensure that only approved machineries, tools and
equipmentare utilized for the operations and the plant shall be operated as specified by the
Manufacturers Instructions/ Manuals ensuring:
-

Machineries, Tools and equipment is equipped with approved rear end markings

Each item of machinery is equipped with approved firefighting equipment

Personnel are qualified/ licensed to operate the plant

Load ratings are marked on plant and they are within specified limits to prevent

overloading
-

Plant is operated with respect to specified speed limits

Plant is operated under the supervision of a competent and authorized person

Plant is operated in accordance with manufacturers or owners requirements;

August 2016

Page 29 of 67

Safety rev 001

6.7.2Site Traffic Requirements and Control Measures


The purpose of this section is to give advice and guidance to ensure that the traffic
movement at the Jumeirah Village South District Cooling Project worksite is carried out
safely and the scope applies to any vehicle or piece of mobile equipment, which is used at
Jumeirah Village South District Cooling Project worksite by the employees of Island Tower
Electromechanical LLC, Sub contractor or visitors at the worksite.
Legal Requirements: Dubai Municipality, Code of construction safety practice#Chapter 20 article 20.1.1,
20.1.2, 20.1.3, 20.1.4, 20-2-1, 20-3-1
The wide range of vehicles used for this project are cars, vans, heavy goods trucks (water
tankers) etc, as well as less common vehicles and plants.
The potential hazards and risks associated with the use of such vehicles are collision
between the vehicles, collision between the vehicle and the people, people and materials
falling from the vehicles causing injury or even fatality.
All persons required to drive a vehicle on the site must have a current drivers license
endorsed for the type of vehicle they are required to drive as per the Dubai Municipality
code of practice.
This shall be monitored by Safety Officer.
Vehicles and Equipment refer to Client Specifications and requirements as follows:
All vehicles will require a security pass to enter the required site or area as stipulated in the
site documents
All vehicles and equipment must be inspected prior to mobilization on site and then daily
by the driver or operator as per daily inspection check list.
-

Weekly Vehicle Inspection report - motor vehicles under 2 tonne

Weekly Heavy Vehicle Inspection report - motor vehicles over 2 tonne

Monthly Plant & Equipment Safety Checklist - classified plant and equipment and
plant and equipment over 2 tonne

August 2016

Page 30 of 67

Safety rev 001

The regular operator of each vehicle will complete the inspection checklist and then
forward the completed forms to the Project Safety Representative. The Project Safety
Representative will keep a register of all vehicle and equipment checklists.
All 4WD light vehicles are to be fitted with a roll bar and all station wagons must have a
parcel barrier fitted between the rear section of the vehicle and the used seat.
Access and Public Safety around the Work Site
a) All project personnel to ensure that safe access must continually monitor work areas
adjacent to public thoroughfares and egress is maintained at all times.
b)

Entry and exit to and from the work sites shall only be via designated routes, which

will be clearly sign posted as per the traffic management plan.


c)

Security fencing erected around the work site must be maintained in good condition

and gates allowing entry/exit to the work site must be kept locked when not in use to
prevent unauthorized access by the public.

6.7.3STORAGE AND HANDLING OF CHEMICAL SUBSTANCE


The purpose and scope of this section is to identify all the chemical substance used in the
Jumeirah Village South District Cooling Project worksite by Island Tower
Elecromechanical LLC and to eliminate or reduce exposure to them as low as reasonably
practicable.
Legal Requirement: Dubai Municipality, Code of construction safety practice#Chapter 18 article 18.1,
18.2.3.2, 18.2.3.3, 18.3
The different types of chemicals used for this project at different stages of flushing are:

HYDREX 2331

HYDREX 5208

HYDREX 2856

HYDREX 7310

August 2016

Page 31 of 67

Safety rev 001

The potential hazards and risks they may be caused due to its uncontrolled exposure may
result Potential Health Effects like Non irritating to slight transient irritation to skin and
eyes, but no permanent damage, upon heating to high temperatures, or mechanical actions
which may produce vapors or mists, inhalation of product may cause irritation of the
breathing passages.
Particular considerations must be given to the safety of the occupants of the site to ensure
the risks associated with the use of hazardous substances are minimized, no hazardous
substance will be brought on site without approval from EMPOWER. Its subsequent use
will be subject to appropriate controls to ensure personnel know how to use the substance
safely and only use the substance with the correct PPE for the flushing stage of the project.
It is mandatory that before any substance likely to affect the health or safety of persons is
brought to the site, a Material Safety Data Sheet (MSDS) shall be provided at least seven
days prior to the product arrival and a copy maintained at the following locations:
-

Project Safety Manager/ Officers office

At the site first aid facility

At the place of storage of the hazardous substance

Control Measure for Storing and Handling Chemical Substances


Whenever chemicals are to be used on Jumeirah Village South District Cooling Project
worksite by Island Tower Elecromechanical LLC, appropriate control procedures must be
adopted. A practical procedure is recommended for site management as follow:
a)

Store and handle such chemical safely. Observe statutory requirements for storage,

i.e. Dangerous Goods Regulations and the Factories and Industrial Undertakings
(Dangerous Substances) Regulations.
b)

Identify the chemicals used for the purpose of the flushing during the course of the

project.
c) Check that all containers are correctly labeled.
e) Assess the hazards and formulate the precautions to be taken from the labels or from a
separate MSDS. (Material Safety Data Sheet)

August 2016

Page 32 of 67

Safety rev 001

f) Obtain all necessary facilities for protecting operations and fire protection.
g)

Give information and provide training on both hazards and precaution to


store men, operators, and any others involved.

h) During operations, check that all precautions are being taken.


i) Make sure all protective equipment is being worn and used correctly.
j) Check the use of correct disposal procedure. It should be stored separately and labeled
correctly.
6.7.4Personal Protective Equipment and Clothing (PPE)
The purpose and scope of this section is to allow the right type of PPE or clothing to be
chosen, the different hazards in the workplace need to be considered carefully for
theJumeirah Village South District Cooling Project worksite. This will enable as
assessment to be made of which types of PPE or clothing are suitable to protect against the
hazard and for the job to be done.
The definition of Personal Protective Equipment is very broad and covers all protective
equipment such as helmets, footwear, clothing, overalls, gloves, reflective jackets and
safety harnesses. Ordinary working clothes or clothing provided which is not specifically
designed to protect the health and safety of the wearer is not within the definition.
Legal Requirement: Dubai Municipality, Code of construction safety practice Chapter4.2, 4.2.1, 4.2.2,
4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.2.7, 4.2.8
Different types of Personal Protective Equipment that should be used for this project are as
follows: a) Eyes
Hazards: chemical or metal splash; dust; projectiles; gas and vapors; radiation.
Choice: spectacles; goggles; face -screens.

August 2016

Page 33 of 67

Safety rev 001

b) Head and Neck


Hazards: impact from falling or flying objects; risk of head bumping;hair entanglement.
Choice: helmets; bump caps; hats; cape hoods; skull-caps.
c) Hand Protection
Hand gloves must be used in jobs likely to cause injury to hands. Gloves must be used near
moving machinery parts. PVC / rubber gloves must be used when handling chemicals /
sewerage. Select and use the gloves suitable for the jobs
d) Fall Protection
Hazards: Fall from height.
Choice: Safety belts with lifeline must be worn when hazards of falling from height exist
or when entering and exiting the Isolated Valve Chamber through the ladder. Select the
proper safety belt and use it. Safety belts shall be examined periodically. Defective and worn out
safety belts must never be used. Rescue safety belts with Safety harness / lifeline must be worn
when an employee is working in a confined space. When using ladders, a fall arrest advice
connected to body harness must be used.

e) Foot Protection
Hazard:-Impact from falling or flying objects
Choice: - Standard safety boots with metal toe caps must be worn by all personnel on
operational areas and in places where foot injury could occur. Ordinary leather or rubber
shoes including slippers / sandals must never be allowed in operational areas or in places
where risk of foot injury exist.
Control Measures
All PPE is to be maintained, replaced, or cleaned as appropriate & necessary information,
instruction and training shall be given to those required to use it.
The minimum PPE requirements for this site will be:

August 2016

Heavy duty hard hat

Company livery uniform


Page 34 of 67

Safety rev 001

Safety boots or shoes

High visibility vest/ tabard/ jacket with retro reflective panels

6.7.5 Housekeeping
Good housekeeping is an important part of our Companys safety program and it is the
first line of defence against accident/injury. Its everyone job to maintain higher standards
of awareness. Keeping the work area clean and tidy will eliminate most of the accidents
and fire hazards. The co-operation of all employees is required to keep the workplace safe.
Legal requirement: Dubai Municipality, Code of construction safety practice #Chapter 3.2
The different rules for maintaining good standard of housekeeping atJumeirah Village
South District Cooling Project worksite are as follows:

The co-operation of all employees is required to keep the workplace safe.

Obstruction free passageway, exits must be maintained at all times.

Work areas shall be clean and tidy with no accumulation of scrap, rubbish or waste
material.

Any spillage, oil or greasy liquid shall be cleaned immediately; oily rags shall be
disposed of in a metal container with lid.

Tools and materials should be stowed away when not in use kept clear from the
edges of benches, walkway, and stairs, scaffolding and work platforms.

Eating is allowed only at designated places.

Toilets and washing facilities must be kept in good sanitary conditions.

Keep change room clean and clothes and apparels inside lockers.

Keep all cleaning equipment in proper place when not in use.

6.7.6 Electrical Safety on System and Equipments


The purpose of this section is that to ensure that the procedures are in place to
prevent electrocution and or fires resulting from the electrical equipment or connections
and the scope of this section is to specify the process of Lock out - Tag out as a means to

August 2016

Page 35 of 67

Safety rev 001

suitably control the risks associated with the inadvertent energizing of any electrical system
during the project course at Jumeirah Village South District Cooling by Island Tower
Elecromechanical
Legal Requirement: Dubai Municipality, Code of construction safety practice #Chapter16 article 16.2,
16.3, 16.4, 16.5
Safe practices detailed below should be observed strictly:

A proper work permit with electrical isolation / de-isolation must be obtained before
doing electrical works in any restricted area. The established procedures will be
followed strictly.

A non-conductive safety helmet, rubber mats, safety gloves, electrical safety shoes
shall be used.

Wearing of loose clothing, chains, rings, and wristwatches is not allowed.

Follow the internationally accepted wiring color code at all times.

All electrical maintenance or repair work must be performed by a competent and


authorized electrical person.

All electrical work in hazardous areas shall be decided and planned by the supervisor
taking into consideration the hazard, competency of the individual, tools and
equipment, requirement, condition of weather, etc.

During maintenance and repair work, the equipment involved should be isolated and
locked out to ensure physical separation and inadvertent switching on.

Electrical tools and equipment should be inspected periodically. Damaged or


defective tools must be returned to tool room/workshop for necessary repair.

At night standard warning signs, barriers, red light, etc. must be used.

Regard all conductors as Live, do not touch them, and use a meter.

All junction boxes, circuit breaker panels must be covered.

ELCB shall be used on all circuits and in extended power from extension rolls
using portable electric power tools. (ELCB - Earth Leakage Circuit Breaker)

Overloading of electric circuits is prohibited. All circuits must be used only for
designated load.

August 2016

Page 36 of 67

Safety rev 001

Work in pairs on electrically energized equipment, one can check and render aid if
necessary.

Never insert base wires into outlets. Use only approved three pin plugs.

All repair or maintenance work on motors, starters and other electrical apparatus
must be done with devices isolated. Testing shall be done only by authorized
competent persons.

Hot fuses or circuit breakers must be handled with gloves and approved fuse pullers.

Handles of electrical tools shall be insulated properly.

Portable Appliance Testing (PAT)

Island Tower Electromechanical LLC employees using electrical equipment and


tools must use only the connections approved and supplied by service department.

Contractors are strictly forbidden to take electrical equipment and tools without first
having such equipment inspected by the service department.

Once the inspection has been completed and services department are satisfied that
the equipment or tools are good construction and safe to use, they will attach an
Inspection Sticker and allow the equipment or tools to be connected to the
electrical system provided.

If the service department is not satisfied with the standard of the equipment or
tools to be used, they will refuse permission for the said items to be used within
Island Tower Electromechanical LLC until such time as the appropriate
rectification is made.

In all cases the, portable electrical tools must be rated at 110 volts supply. In
exceptional circumstances where the use of a supply greater than 110 volts is
unavoidable, approval to use such equipment or tools must be sought from the
Safety Department.

Welding equipment brought on the site by the contractor must be 380v AC with
the secondary voltage being DC.

In areas where the flammable or explosive vapours may be present, intrinsically


safe equipment and fittings must be used.

August 2016

Page 37 of 67

Safety rev 001

6.7.7Fire Prevention and Control Measures.

Fire safety is the set of practices intended to reduce the destruction caused by fire. Fire
safety measures include those that are intended to prevent ignition of an uncontrolled fire,
and those that are used to limit the development and effects of afire after it starts.
Legal Requirement:Dubai Municipality, Code of construction safety practice Chapter 5 article 5.4, 5.5.1,
5.5.4, 5.6.1, 5.6.3, 5.12
Island Tower Electromechanical LLC has wide range of effective measures for controlling
such hazards and risks associated with it at the Jumeirah Village South District Cooling
Project worksite by Island Tower Elecromechanical and those are as follows: a) Adequate fire extinguishers shall be made available at prominent position at the work
area.
b) All fire extinguishers shall be checked monthly for serviceability.
c) All leaders of work team shall be trained in the use of extinguishers.
d) Temporary buildings, huts, stores etc, shall be spaced so as to minimize the risk of fire
spreading between buildings or structures.
e) Access to hydrants and fire appliances shall be clearly indicated and accessible at all
times.
f) Smoking will only be allowed in the designated smoking areas. Ash trays or similar
bins will be placed in these areas to prevent the risk of fire.
g) No smoking or No ignition areas shall be demarcated and noted before starting the
work itself.
h) The company shall ensure adequate provision of fire extinguisher through
the works for the duration of the construction period.
i)

Where personnel are carrying out hot work at heights, adequate fire resistant

blankets or the similar must be used to protect persons and equipment on lower level.
August 2016

Page 38 of 67

Safety rev 001

j) No unauthorized open fire is allowed on site.


k) Dangerous goods shall be stored according to the compatibility categories.
l) Sufficient ventilation shall be ensured to prevent accumulation of flammable
vapors to the lower explosive limit.
m) Vaporizable flammable liquids shall be stored in closed/safety cans to prevent
leakage of flammable vapor.
n)

Temporary

fire

pump

is

suggested

to

be

installed

when

constructing

multistoried station.
6.7.8Working at Height
The purposeof this section is to give instruction, guidelines and considerations to be
adopted by all personnel who are required to work at height.This procedures may be
supported by theissuse of other instructions and informations from time to time as deemed
necessary to maintain safe working practices.
The scope of this section aplies to all employees and contractors of the Island Tower
Electromechanical LLC-DUBAI at all location of the Jumeirah Village South District
Cooling Project worksite, within or without the confines of the Island Tower
Electromechanical LLC-Dubai Rules & Regulations. The contents should also be used as
guidance and advice to confined space crew who may be required to conduct work at
height.
Work at height mean work includes moving around at a lace of work but not travel to or
from a place of work or a place is at height if a person could be injured falling from it, even
if it is at or below ground level.
Legal Requirement: Dubai Municipality, Code of construction safety practice Chapters 3, 4,8, article 4.1,
4.2.1, 4.2.6, 4-2-7,4-2-8, 4-3-2, 3.15, 8 2, 8.3
Examples of activities that are classified as working at height include:

August 2016

Page 39 of 67

Safety rev 001

Working off bandstands

Working on a flat roof

Erecting false work and formwork

Working at ground level adjacent to an open excavation

Working near or adjacent to fragile materials

Working on formwork within an excavation

Working from a ladder

Island Tower Electromechanical LLC has wide range of effective measures for controlling
such hazards and risks associated with it and those are as follows: The Working at Height Regulations 2005 require all work at height to be properly planned,
supervised and carried out in a manner which is, so far as reasonably practicable, safe.
Work may only be carried out when weather conditions will not jeopardise the health and
safety of any person involved in the work. There are further requirements to ensure that
planning includes appropriate selection of work equipment for the job and that emergency
procedures are in place for the duration of work. The hierarchy of control for working at
height should followed and are detailed below:

August 2016

Page 40 of 67

Safety rev 001

Consider using the safest means of working at height as far as reasonably practicable and
determine what control measures can be implemented to reduce the risk of injury. The use
of roof edging, debris netting, mobile or static work platforms and ladders should be
considered. A non-exhaustive safety equipment selection list, which may be suitable for
undertaking work at height, is produced below;
Work Equipment Safety Selection List

Static Platforms such as Scaffolds

Trestles

Ladders and Stepladders

DUTY HOLDERS
Persons responsible for operations involving working at height are designated as duty
holders, and must ensure the following requirements are met all work at height is properly planned and organized;
all work at height takes account of weather conditions that could endanger health and
safety;
those involved in work at height are trained and competent;
the place where work at height is done is safe;
equipment for work at height is appropriately inspected;
the risks from fragile surfaces are properly controlled; and
the risks from falling objects are properly controlled.
MINIMISE THE LIKELIHOOD OF AN INCIDENT OCCURRING;
Good practice and legislation indicate that where working at height is deemed necessary
arrangements must be made to reduce the risk of injury to a minimum, therefore work at
height should only take place if there is no other practical alternative. Where possible staff
should not be asked to work in any area where there is a risk of falling, if this is not
possible suitable edge protection should be supplied and lone working avoided. All
equipment used during the course of working at height must be suitable and sufficient for
the task, and fall arrest/ fall protection equipment must be provided where necessary.
August 2016

Page 41 of 67

Safety rev 001

Personal Protective Equipment should only be used when all other safety measures have
been implemented and a residual risk that is un-acceptable remains. Staff working at
height must be adequately trained and any equipment (such as harness/lanyards or fall
arrest equipment) provided must be regularly inspected, visually before use and formal
inspection made and documented by a competent person at minimum 6 monthly periods.
Inspection periods may be more frequent if determined by the condition and use of the
equipment, manufacturers recommendation or risk assessment.
Work environments are also a consideration and hazards such as fragile roofs, working
over water or other high-risk areas must be taken into account, this also includes below
ground level situations. Arrangements must be in place to allow for access, egress and
rescue in an emergency situation.
Equipment such as scaffolds, ladders, work platforms (whether mobile or static) must be
properly selected, built and maintained, inspected and dismantled as detailed in any
specific legislation and guidance that may be applicable. Equipment for working at height
should be regularly inspected by a competent person, and repaired or disposed of as
necessary, the inspection should be documented and items marked to indicate the date
tested.
A Register of equipment should be compiled for use in managing the inspection regime;
equipment manufacturers indicate the frequency of inspection that is required. Visual
inspections should always be made prior to use and defects reported to supervisory staff,
defective equipment should be withdrawn from use until replaced or repaired as
appropriate.
A further consideration relates to objects falling or being thrown from height, it is the
employers responsibility to prevent this, where it is not practicable to prevent such
actions employers must ensure that persons are protected from injury by appropriate
means. Practically this means the provision of personal protective equipment such as head
protection (Hard Hats) or protective items such as debris netting or covered overhead
walkways, and securing of work areas to prevent unauthorised entry and possible injury.

August 2016

Page 42 of 67

Safety rev 001

Ladders & Stepladders


Ladders are a useful means of working at height although they should be considered only
when safer equipment, as far as reasonably practicable is not suitable for the work being
undertaken. Ladders should not be the first consideration for working at height operations.
Unless identified by risk assessment, ladders used should be type Class 1 which are rated
for industrial and not domestic use. Example Ladder Inspection form/checklists are
produced as Appendix 7and may be used as appropriate to the department. Formal
inspection should be made at 6 monthly periods and be recorded; visual inspections must
be made before use.
Ladders if used must be suitable for the work being undertaken; therefore ladders made of
an appropriate material that is suitable for the task i.e. a ladder being used close to an
electricity source should be constructed of a non-electricity conducting material. All
persons using ladders must be trained and competent to use them.
Harness & Lanyards
Where operational need and risk assessment identify lanyards and harnesses are required
this equipment must be provided as personal protective equipment. There is great variation
regarding harness design dependent on the manufacturer and the use the equipment is
required for, therefore expert advice from the Councils Health & safety equipment
supplier should be sought. All staff using such equipment must be suitably and sufficiently
trained as should any person with supervisory or maintenance duties involving harness
use. Harnesses must be formally checked at 6 monthly intervals and visual checks made
prior to every use, damaged, worn or ill fitting harnesses must be removed from use. All
formal checks must be recorded. Lanyards must always be anchored to a robust nonmovable anchor point when harnesses are used and Departments must ensure their
arrangements meet the requirements of this performance standard
Scaffolds
Competent persons who have received suitable and sufficient training must only erect
scaffolds. Any person using a scaffold or mobile tower must follow Safe Systems of
Work and these must be formulated and implemented by departments. When contractors
erect scaffolds or towers, they must not be accepted until checked by competent Council

August 2016

Page 43 of 67

Safety rev 001

staff, which have recognised qualifications or suitable scaffold training, and a handover
certificate is properly completed.
Legislation and guidance is in place with regard to use of scaffolds and mobile towers
which must be complied with, risk assessment must also be undertaken and further advice
may be provided on request to the Corporate Health, Safety & Wellbeing team. Inspection
regimes apply to scaffolds and mobile towers and records of inspection must be kept.
Trestles
Various types of trestles and work platforms are used during the course of work, where
possible professional equipment should be supplied and used as those made up of
stepladders and boards are by todays standards considered a safety risk. Risk Assessment
should indicate the need for use of trestles or work platforms and further advice can be
sought from the corporate Health & Safety team.
General control measures of Island Tower Electromechanicl LLC for Work At
Height with respect to this project are as follows:a)

Any open edges from which a person is liable to fall from heights shall be protected

by suitable fencing barriers of a height of between 900 and 1150 mm. The barriers could be
formed by two guardrails with the same height on top and the intermediate guard rail shall
be of height between 450 ~ 600 mm from the toe board.
b)

Work Platforms/ scaffolds will be erected in accordance with manufacturers

instructions and shall comply with the prevailing statutory safety requirements.
c)

Working platforms, walkways, passages and gangways shall be at least

400 mm wide for passage of persons only and at least 650 mm wide for passage of
materials.
d)

Workers working at height where the erection of fencing barriers is impracticable will

be provided with fall arrest safety harnesses equipped with a suitable fall arrest lanyard.
Suitable and sufficient safe anchorage points or life line system for securing the safety of
the workers will also be provided. Fall arrest safety harnesses are required to be worn at
heights above 2m.

August 2016

Page 44 of 67

Safety rev 001

6.7.9Confined Space
A Confined Space can be any space of an enclosed nature where there is a risk of death or
serious injury from hazardous substances or dangerous conditions (e.g. lack of oxygen).
Some confined spaces are fairly easy to identify, e.g.

Enclosures with limited openings:

Storage tanks;

Silos;

Enclosed drains and sewers.

Others may be less obvious, but can be equally dangerous, e.g.

Open-topped chambers;

Vats;

Combustion chambers in furnaces etc;

Ductwork;

Unventilated or poorly ventilated rooms.

It is not possible to provide a comprehensive list of confined spaces. Some places may
become confined spaces when work is carried out, or during their construction, fabrication
or subsequent modification.
Confined spaces can be deadly. On average, work in confined spaces kills 15 people every
year in the UAE across a wide range of industries, from those involving complex plant
through to simple storage vessels and rooms.

In addition, a number of people are

seriously injured. Those killed include not only people working in the confined space but
those who try to rescue them without proper training and equipment.
As a part of this project for Island Tower Electromechanical LLC the confined space task
is at the District Cooling Chamber entry for various tasks like overall condition survey,
flushing and pressure testing of the GRP lines.

The purpose of this procedure is to ensure that:

August 2016

Entry into confined spaces is avoided where possible.

Page 45 of 67

Safety rev 001

When entry into confined spaces is unavoidable, all hazards have been considered
and there are sufficient safe systems of work and emergency arrangements in place
that will reduce the risk of injury to the persons involved.

Ensure compliance with relevant legislation.


The scope of this section applies to all confined spaces Island Tower
Electromechanical LLC worksite premises that pose a risk to employees, visitors and
members of the public.
Legal Requirements:
Dubai Municipality Code of construction Safety Practice #chapter 19 article
19.1, 19.2, 19.2.3,19.3.1, 19.3.2, 19.3.3

8.9.1Hazards

associated

with

the

confined

space

entry

for

Island

Tower

Electromechanical LLC employees for Jumeirah Village South District Cooling Project
are as follows: -`
Lack of oxygen: This can occur:

Where there is a reaction between some soils and the oxygen in the atmosphere;

Following the action of groundwater on chalk and limestone which can produce
carbon dioxide and displace normal air;

In freight containers, lorries etc as a result of the cargo reacting with oxygen inside
the space;

Inside steel tanks and vessels when rust forms;

When using inert gases, for example, during some welding operations.

Poisonous gas, fume or vapour.


These can:

Build-up in sewers and manholes and in pits connected to the system;

Enter tanks or vessels from connecting pipes;

Leak into trenches and pits in contaminated land.

August 2016

Page 46 of 67

Safety rev 001

Ingress of liquids and solids.


Liquids and solids, which can suddenly fill the space, or release gases into it, when
disturbed. Free flowing solids such as grain can also partially solidify or bridge in silos
causing blockages, which can collapse unexpectedly.
Fire and explosions.
Fire and explosions may occur due to flammable vapour concentrations being within the
flammable range or excess oxygen being present in a sufficient concentration.
Residues.
Residues left in tanks, vessels etc, or remaining on internal surfaces can give off gas, fume
or vapour.
Dust.
Dust (especially organic materials) present in high concentrations may pose a risk of
explosion.
Temperature.
Hot conditions or the wearing of personal protective equipment may lead to a dangerous
increase in body temperature.
Mechanical and electrical isolations.
Mechanical/electrical isolations and lock off systems may be necessary prior to entering a
confined space to prevent inadvertent start-up of equipment. Where this is necessary test
starts should always be carried out to demonstrate the isolation is effective.
Hazards arising out of work activity
Some of the above conditions may already be present in the confined space. However,
some may arise through the work being carried out, or because of ineffective isolation of
plant nearby, e.g. leakage from pipe work, ducting or other ancillary equipment connected

August 2016

Page 47 of 67

Safety rev 001

to the confined space. The enclosure and working space may increase other dangers arising
through the work being carried out, for example:

Machinery being used may require special precautions, such as provision of

exhaust/dust extraction, or special precautions against electric shock and generation of


sparks that may be a source of ignition;

Gas, fume or vapour can arise from welding, or by use of volatile and flammable

solvents from paints and adhesives etc. It may be necessary to mechanically ventilate the
confined space;
If access to the space is through a restricted entrance, such as a manhole, escape or rescue
in an emergency will be more difficult.
Island Tower Electromechanical LLC has developed a Safe System of Work for handling
Confined Space situations: It is a requirement of the Confined Spaces Regulations that there is a safe system of
work for all confined space entries. To be effective, a safe system of work needs to be in
writing

Appointment of supervisor
Supervisors must be appointed to oversee all confined space work. It is their responsibility
to ensure all the necessary precautions are taken and that the safe system of work is being
followed. It is the responsibility of the relevant Head of School/Service to appoint a
suitably trained and experienced supervisor.

The degree of supervision will be based on the findings of the risk assessment. In some
cases, periodic checks may be sufficient if the work is low risk and routine.

It is more likely that the level of risk will require a competent person to supervise the work
and remain present while the work is being undertaken.

August 2016

Page 48 of 67

Safety rev 001

Competence
Specific training for work in confined spaces is required for all personnel involved in this
type of work. The training will include topics such as:

Awareness of the Confined Spaces regulations and in particular the need to avoid

entry where possible;

An understanding of the work to be undertaken, the hazards, the safe system of work

and all necessary precautions;

An understanding of the permit to work and the permit to enter systems;

How emergencies arise, the need to follow prepared emergency plans and the dangers

of not doing so.


Communications
An adequate communication system is required to enable:

Communication between people inside and people outside the confined space;

Help to be summoned in an emergency;

Emergency rescue procedures to be initiated.

Systems can include speech, tugs on a rope, telephones, radios etc. Equipment to be used in
potentially flammable or explosive atmospheres should be specially protected so they do
not present a source of ignition.

Testing the air and provision of ventilation.


The risk assessment may highlight a need to check that the atmosphere is free from both
toxic and flammable vapours and that there is an adequate concentration of oxygen prior to
entry. A competent person using a suitable gas detector, which is correctly calibrated, must
carry out testing. Where the risk assessment indicates that conditions may change, or as a
further precaution, continuous monitoring of the air may be necessary. Test results must be
recorded on the permit to enter.
Note: The acceptable oxygen concentration range is between 19.5% and 21%. Work must
not be undertaken if the oxygen concentration is outside this range.

August 2016

Page 49 of 67

Safety rev 001

It is the responsibility of the supervisor to ensure that air-testing requirements identified by


the risk assessment are carried out by a competent person, who is trained in the use of the
equipment and can interpret results.
Ventilation may be improved by increasing the number of openings, however,
mechanical forced ventilation may be necessary to ensure an adequate supply of fresh
air, if this is the case, then continuous monitoring is required. Fresh air should be
drawn from a point where it is not contaminated either by used air or other
contaminants.

Use of portable gas cylinders and diesel equipment should be avoided where possible.
If their use cannot be avoided, then forced ventilation is essential to prevent the
accumulation of gases/fumes.

Warning: carbon monoxide in the exhaust from petrol-fueled engines is so dangerous that
use of such equipment in confined spaces must never be allowed.
Decontamination before entry.
It is essential ensure fumes do not develop from residues etc while the work is being done.
All decontamination requirements must be carried out and the atmosphere tested prior to
work starting. It is the responsibility of the supervisor to ensure effective decontamination is
carried out.

Isolation from gases, liquids and other flowing materials.


Confined spaces will often need to be isolated from ingress of substances that could pose a
risk to those working within the space. Methods of isolation may include:

Complete disconnection of pipes or ducts.

Insertion of blanks.

Reliable valves that can be locked shut.

August 2016

Page 50 of 67

Safety rev 001

Whatever means of isolation is used, it needs to be tested to ensure it is suitably reliable. It


is the responsibility of the supervisor to ensure that all necessary isolations have been made
and are effective.
Isolation from mechanical and electrical equipment
Mechanical and electrical isolation of equipment is essential if it could otherwise operate,
or be operated, inadvertently. It is the responsibility of the supervisor to ensure that all
necessary mechanical and electrical isolations (including lock-off of isolation switches)
have been made and are effective.
Use of suitable equipment
Any equipment provided for use in a confined space needs to be suitable for the purpose.
Consideration should given to:

Likelihood of flammable atmospheres and sources of ignition.

Emissions of fumes/gases.

Risk of electrocution.

Earthing requirements with regard to static electricity.

Mechanical hazards (e.g. trapping, falling, shearing etc).

Personal Protective Equipment (PPE) and Respiratory Protective Equipment (RPE)


Ideally the need to wear PPE or use RPE should be eliminated by implementation of robust
risk control measures. It should only be used as a last resort, except for rescue work. If the
use of PPE or RPE is necessary, then it must be assessed for suitability by a competent
person and offer the correct level of protection.
Note: wearing PPE and RPE can contribute to heat stress.
Gas supplied by pipes and hoses.
The use of pipes and hoses for conveying oxygen or flammable gases into confined spaces
must be controlled to minimize the risk.
At the end of every working period:

Supply valves for pipes and hoses must be securely closed.

Pipes and hoses must be withdrawn from the confined space to a well ventilated area.

Where pipes and hoses cannot be removed, they must be disconnected from the

supply at a point outside the confined space.

August 2016

Page 51 of 67

Safety rev 001

Size of entrance
The access/egress point must be big enough to allow workers wearing all the necessary
equipment to climb in and out easily, and provide ready access and egress in an emergency.

Fire Prevention
Flammable and combustible materials must not be stored in confined spaces that have not
been specifically created or allocated for that purpose. If this type of material is used during
work it must be kept to a minimum and not be allowed to accumulate. Control of ignition
sources and ventilation requirements must also be considered. Smoking is prohibited in all
confined spaces, it may be necessary to extend this exclusion area to a distance beyond the
confined space
Lighting: - Adequate and suitable lighting, including emergency lighting should be
provided. The lighting must be specially protected where flammable/explosive atmospheres
are likely to occur. Lighting may need to be protected from impacts and be suitable for use
in wet environments. Where possible, residual current devices should be utilized to protect
against electric shock.
Permit to Enter a Confined Space
Permission to enter a confined space can only be given by a person who has received
appropriate training and is authorized to sign a confined space Permit to Enter. An
example of a Permit to Enter can be found in Appendix 1. A Permit to Enter is required
for ALL Confined Space work at the University. It must be signed in the authorization and
acceptance section prior to work starting by a competent person. A hand-back signature
must also be completed on the permit when to work is complete or the expiry time
exceeded. It is the responsibility of the supervisor to ensure that a permit to enter has been
completed for every confined space entry.

Suitability of persons
Those persons required to enter confined spaces must by mentally suitable (e.g. not
claustrophobic), physically fit, have received general training in the hazards presented by
August 2016

Page 52 of 67

Safety rev 001

confined spaces and the procedures to be followed. In addition, prior to entry to any
particular confined space, persons entering must be instructed by the area supervisor in the
specific hazards and precautions applying, and in the confined space rescue plan. All
Confined Spaces training must be recorded. When limiting the working time, consideration
should be given to temperature, humidity, restricted movement, the need to wear PPE/RPE
etc.

Emergency Arrangements
No confined space work must be undertaken unless their emergency plans in place for the
rescue of persons in an emergency. Account needs to be taken not only of accidents arising
out of specified risks, but also any other accident in which a person may need to be
recovered.
To be suitable and sufficient the arrangements for rescue should include consideration of:

Rescue and resuscitation equipment;

Raining the alarm and rescue;

Safeguarding the rescuer;

Fire safety;

Control of plant;

First aid;

Public emergency services;

Training.

It is the responsibility of the relevant Head of School/Service to ensure an assessment of


the emergency requirements has been made. It is the supervisors responsibility to ensure
any measures deemed necessary are in place and tested prior to any confined space entry.
6.7.10 Hot Work Procedure
Hot Work is any temporary or permanent operation involving open flames or
producing heat and / or sparks. This includes but is not limited to brazing, cutting, grinding,
soldering, torch applied roofing and welding.
August 2016

Page 53 of 67

Safety rev 001

The purpose of this section is to minimize the risk of fire and explosion by controlling hot
work which is undertaken by Island Tower Electromechanical LLC and to emphasize on
the significance in following 2 lifesaving golden rules where deviation from these rules
may lead to a major injury or death.
i.e.,1. Work with a valid Work Permit when required.
2. Conduct atmospheric test when required.
The scope of this section relates to the control for all hot work in those area where Hot
work process is done within the Jumeirah Village South District Cooling Project worksite.
Legal Requirements:

Dubai Municipality, Local Order #61 of 1991

Dubai Municipality, Code of construction safety practice #Chapter15article


15.1,15.2, 15.3, 15.4,15.6

Procedure
No Hot Work will be performed without a valid permit, signed by the Project Safety
Engineer who will be in charge of completing the Hot Work Permit Form, specifying the
Project Number, visiting and evaluating the location of work and the nature of Hot Work
and arrange for Fire Watch. (1 Hour after completion of the work)
The Project Safety Engineer will notify the following:
Client for approval
Once the Hot Work Permit has been signed by client it will be handed to the Site
Supervision.
Hot Work Permits will be numbered according to the following system: Project / Month /
Permit Number (e.g. project number/Feb/06). Client will maintain a log of permit issued.
Client will maintain and update the Hot Work Permit log at every site.
Any Permit issued will only be valid for a single shift.
On receiving the Hot Work Permit Log the Client will perform periodic / random audits to
check whether Hot Work Permits are in place.
August 2016

Page 54 of 67

Safety rev 001

Island tower is responsible for ensuring that the area is constantly attended by the Fire
Watch who will ensure that a fire extinguisher is placed near the hot work activity and that
all flammable material is either removed from the area or covered with a fire blanket.
On completion of the Hot Work Activity at Jumeirah Village South District Cooling
Project worksiteby Island Tower Electromechanical LLC will ensure the following:

A 1-hour continuous fire watch is performed immediately following the ceasing of the

activity. (N.B. Hot Working must cease 1 hour before the end of the shift so that this fire
watch can be undertaken)

The Hot Work Permit is completed and returned to consult

If an unsafe condition develops the persons conducting the work will cease and consultant
will be notified immediately.
Any responsible person, manager or supervisor can terminate a Hot Work Permit at any
time if conditions are considered unsafe.
Ceasing unsafe hot works will take priority over financial or timescale pressures.
6.7.11. Hoists, & Lifting Equipment
The purpose of this section is to ensure as far as practicable, that all equipment related
to the lifting of are without defect and safe for use. The scope of this section applies to the
examination, testing and inspection of lifting appliances and lifting gear used by Island
Tower Electromechanical Dubai personnel, subcontractors for Jumeirah Village South
District Cooling Project worksite.
Legal Requirements: Dubai Municipality, Local Order #61 of 1991
Dubai MunicipalityEPSS Section Technical Guideline #41
Lifting Operations and Lifting Equipment Regulations (LOLER) 1998
Dubai Municipality, Code of construction safety practice #Chapter 21 article21.1,
22.2,22.3.1, 22.3.2, 22.5,22.7

August 2016

Page 55 of 67

Safety rev 001

General procedures that are followed by Island Electromechanical LLC are as follows :The daily log book and inspection register must be completed by the operator first using
the machine each day and checked weekly by the Safety Engineer.
All lifting equipment used on the site is to be inspected daily by the Safety Engineer before
use.
Material Hoist
a) The hoist way shall be properly enclosed.
b) Landing place shall be kept closed except during loading and unloading
c) Safe working load shall be clearly and legibly marked on the platform/cage
d) No person shall be carried by material hoist and such notice shall be clearly and legibly
displayed on the platform/cage
e) The winch for driving the hoist shall be constructed such that:
i.

the brake is applied when it is not in the operation position; and

ii.

if it is fitted with pawl and ratchet gear the pawl has to be disengaged before the
platform/cage can be lowered.

e)

Motion limit devices shall be fitted to the hoist.

6.7.12. Excavations Safety.


The purpose of this section is to minimize the risk associated with Excavation by
controlling the associated hazards on the work is undertaken by Island Tower
Electromechanical LLC at the Jumeirah Village South District Cooling Project worksite
Legal Requirement:Dubai Municipality Code of construction Safety Practice #chapter 9 article 9.1,
9.2.1, 9.3, 9.3.1.1, 9.3.1.2, 9.3.1.3
Dubai Municipality, Local Order #61 of 1991

August 2016

Page 56 of 67

Safety rev 001

The hazards and risks associated with excavation works are as follows: Cave-in: People at risk of being caught in a cave-in include workers who repair water,
sewer and utility lines; road builders; and workers who perform digging operations.
Cave-ins can be caused by:

Loose soil due to vibrations from construction equipment or traffic in the construction
area

The weight of equipment too close to the edge of a trench

Soil that does not hold tightly together, such as sandy soil

Water, which weakens the strength of trench sides


Before performing trenching or excavation work:
A competent person must evaluate possible dangers before work begins and until the
operation is completed.

The operation must be monitored at all times.


Protective systems must be used for any trench or excavation that is 5 feet or more deep.
(Excavations that are less than 5 feet deep also may require a protective system if the
competent person onsite thinks a cave-in is possible.)
Control Measures for avoiding such issues are:
a)

All excavations in excess of 1.5 meters will be barricaded at least 1 meter back from

the edge on both sides of the excavation using rigid barricading. Excavations within the
construction site less than 1.5 meters in depth shall be protected, or made visible by using
barricade tape.
b)

If access is required to excavations deeper than 1 meter a secured ladder or steps will

be provided and the excavation will be battered, stepped or shored to prevent collapse of
any loose materials.
c) Where possible all excavations shall be back filled on the same day they are opened. If
this is not possible, the excavation is to be barricaded using an approved system of rigid
barricading, erected 1 meter back from the edge. If left overnight flashing lights are to
be placed around the excavation to alert persons to the excavation.
August 2016

Page 57 of 67

Safety rev 001

7. Emergency Preparedness Training & Resources


Emergency response programs will be placed at the Jumeirah Village South District
Cooling Project worksiteto educate and inform employees of ways to decrease the
possibility of emergency situations during handling chemicals, conducting flushing,
pressure testing and teach them how to respond to accidents. Appropriate training will be
provided to each relevant employee. Emergency contact numbers are provided to each
employee.
Fire Emergency:
When you discover a fire, asses it. If you can extinguish with proper extinguisher, put it
out if not sound the alarm. If fire alarm bell sound automatically.
1. Do not panic
2. Find out the location and check for the fire.
3. Attempt to put off small fire using the proper portable fire extinguisher provided.
5. Call for emergency help.
2. Medical Emergency
General Rules:
1. Be calm and size up the situation first.
2. Follow the basic
3. Take priorities on 3 Bs Breathing / Bleeding / Bone
4. Unless required, do not move the person.
5. Only authorized/trained first aider should give first aid to affected persons. All or
selected employees should be trained in basic and advance first aid.
6. Seek assistance and take the affected person for medical attention.
Emergency Response Procedures of Island Tower Electromechanical LLC are developed
for the Jumeirah Village South District Cooling Project worksite with particular attention
given to Fire and Personal Injury Accidents.

August 2016

Page 58 of 67

Safety rev 001

7.3 EMERGENCY CONTACTS DUBAI


Police

999

Fire Department

997

Ambulance

999

7.4FIRST AID AND EMERGENCY PROCEDURE


The emergency evacuation and response plan for theJumeirah Village South District
Cooling Project worksite is to be displayed on Safety Notice Boards and other prominent
locations around the Jumeirah Village South District Cooling Project worksite. These
plans are reviewed during safety committee meetings and they are tested by conducting
drills at regular intervals.
All injuries will be treated in the Clinic. First Aid will only be given by trained FirstAiders.

8. RESOURCE MANAGEMENT
8.1 Facility and Infrastructure Management
The company management has identified and established resources required that satisfy
the regulatory requirements regarding equipment and competent personnel.
The Company has trained personnel who carry out internal audits.

Adequacy of

resources, including; trained personnel, equipment, and software, with regards to meeting
the client requirements and company HSE requirements, are reviewed periodically during
Management Review meetings and any necessary action taken accordingly.
Procedure
i.

Procedure for Infrastructure management


o

The company shall identify its assets by providing an asset number.

The MR shall ensure all assets are segregated and give chronological number.

The details of asset shall be recorded in the Master List of Fixed assets.

The physical assets shall be cross verified with record during internal auditing.

August 2016

Page 59 of 67

Safety rev 001

If any damages identified, then the details shall be recorded in the remarks column

of Master List of Fixed assets.


o

New assets shall be numbered within one week of purchase

Procedure for Maintenance

ii.

Preventive Maintenance
o

The organization shall do the preventive maintenance for its assets as per the

Preventive maintenance schedule and record it.


o

The in charge shall prepare the Preventive Maintenance Schedule of new

Equipments after consulting with the engineers of the vendors.


o

The maintenance of vehicles to be done as per schedule by concerned drivers.

The MR shall maintain a list of supporting servicers/ AMC Contact details with

Telephone numbers
o

The Engineers shall perform the preventive maintenance activity themselves or

contact the approved vendor and perform the preventive maintenance.


o

The MR shall ensure and verify the preventive maintenance being carried out in all

departments, if it is not done frequently, he/she can report it to the MD.


o

The maintenance activities shall be verified during the course of internal audit.

The asset under warranty/AMC period shall follow the manufacturers/Vendors

suggested maintenance program.

The details shall be recorded in Master List of External Service & Maintenance

Contract.
iii.
o

Corrective Maintenance
For corrective maintenance in departments, a Request send to Admin. By the

Department head/designated staff of each department.


o

On receiving the request, the admin will contact the corresponding suppliers to

perform the service & rectify the problem. After completion of work the details shall be
filled in the maintenance record.

Equipments under

servicing

shall be labeled by NOT TO BE USED tags or

signage to prevent accidents to personnel and damage to customer products.


o

A schedule to be prepared by MR for cleaning and housekeeping. This shall be

supervised and recorded in Cleaning & Housekeeping record.


August 2016

Page 60 of 67

Safety rev 001

8.2 Human Resources & Training: The Company attaches great importance to ensuring
that all personnel performing activities where their performance may impact on QHSE
issues have adequate experience, skills and qualifications. This is achieved through the
recruitment of suitably qualified personnel and the provision of adequate training. Job
Descriptions for individual designations in the company are documented along with
competence requirements and relevant information communicated.
Procedures require all new personnel to undergo induction training, which includes an
introduction to the companys QHSE Policy, the HSE Management System, legal &
statutory requirements related to the product and, the employees responsibilities and
authority.
The procedure also requires that the training needs of personnel be reviewed at least once
every year. Where training requirements are identified, a plan for further training is
established to ensure appropriate personnel qualification, experience, skills and training
records are maintained. The procedure assigns responsibility for the provision of any
such further training and evaluates the effectiveness of training provided.

8.2.1TRAINING PROCEDURE
The HR department identifies the requirement of the training on a regular and periodical
manner. All department heads try to analyze the staff development requirement and
requests for training to the HR department who in turn obtains approval from the MD.
Once the training is complete, the trainees are evaluated while on Job and an update is
being given by the Head of the departments to the HR departments with regards to the
output of the conducted training sessions.
a)

Induction

All new staff shall undergo induction training to assist them in the process of becoming
integrated to the institution within the shortest time possible. The respective immediate
supervisor in collaboration with the HRD shall conduct induction training.
Induction training shall include the following:

August 2016

instruction on the organization and its internal rules


Page 61 of 67

Safety rev 001

introduction to job requirements, responsibility and authority

introduction to staff, and facilities orientation

identification of any required training

operation line management control

The organization shall provide periodic training for all the employees on the following

Introduction to the companys QHSE Policy and QHSE System

Issue of relevant QHSE system documents where required

Instruction on the organization and its internal rules

Introduction to job requirements, responsibility and authority

Introduction to staff, and facilities orientation

Identification of any required training

Emergency preparedness and response arrangements

Operation line management control

b)

Performance Appraisal

The HR department provides a guideline for the evaluation of the performance of an


employee with basic parameters namely performance, potentiality and the initiative in
taking up responsibility. The Appraisal is an annual exercise. The parameters for which
the Head of the Departments & the HR follows for the appraisal systems are indicated
below
a.

Key responsibility area

b.

Quality of Output

c.

Coordination skills / Job knowledge

d.

Problem solving capacity

e.

Customer service

f.

Cost effectiveness

g.

Aptitude and initiative for taking up new tasks

h.

Administrative skills

i.

Team Building/ Leadership

j.

Public relation/ Communication skills

August 2016

Page 62 of 67

Safety rev 001

d)

Promotion & Incentives / Punishment & Termination Procedure

The HR department in close liaison with the department head closely monitors all the
staff for facilitation skilled and smart employees for promotions (performance appraisal).
If found eligible for an advancement from one level to a higher level, this will be done
with an increment in salary, status, rank and responsibility by obtaining approval from
Managing Director.
An employee if found to be working below the standards of the company or not in line
with the stipulation laid down the company then the employee may be suspended as a
matter of punishment for a specified period with salary deduction and the same has to be
placed on records for reference during the appraisal period.
If the employee continues to be inefficient and if recommended by the Head of the
departments to be terminated, then the recommendation has to be referred to the HR who
in consultation with the MD relieves the staff from his duties as per the rules laid down
by the company.

9. MEASUREMENT, ANALYSIS AND IMPROVEMENT PROGRAM


9.1Measurement of Customer/Client Satisfaction
The Company has defined methods to analyze& monitor client/customer satisfaction of
services delivered. The information collected through Feedback forms is used for analysis
of data for ensuring customer satisfaction and continuous improvement. The results of
such review are submitted for Management Review and subsequent action.

9.2Internal QHSE Audits


Procedures have been established, which ensure that activities throughout the company
are regularly audited against the company documented QHSE System standards. Audits
are scheduled based on the status and importance of the activity and results of previous
audits. The procedures require that an audit schedule be established which includes all
relevant activities.

August 2016

Page 63 of 67

Safety rev 001

Audits are prepared and planned by trained auditors. The procedure ensures that in all
cases the auditor(s) will be independent of the function or area being audited.
All non-conformities discovered during on audit are recorded and an audit report is
prepared. The results of audits are communicated to respective managers who are
responsible for timely implementation of agreed corrective actions.
Procedure requires that the implementation and effectiveness of corrective action be
verified by a follow-up audit and recording results.
Findings and results of corrective action of audits are presented and reviewed during
Management Review meetings. This information is evaluated to help assess the
effectiveness of the QHSE system in satisfying the interested parties, and achieving the
relevant Standards, and to determine if any improvements in the QHSE system are
required.
9.3Measurement and Monitoring of Processes
All the processes are carried out by qualified personnel according to documented
procedures / process descriptions. All employees undergo training where required for
their assigned job. Procedures for various operations / processes are evaluated through
internal audits and if found inadequate, improvements are made to operations and
documents are revised accordingly.
Procedures are established to monitor and measure the key characteristics of the
operations and activities that may have significant aspects and safety hazards, on a
regular basis. The procedure includes recording of information to track performance with
defined objectives and targets.
Periodic inspections of are planned and conducted to ensure special precautions are in
place and complied with in accordance with procedures. These include the recording of
information to track performance, relevant operational controls and conformance with the
environmental, health and safety objectives & targets.
Monitoring and measuring activities for significant impacts and for objectives and targets
are documented. The HSE Manager/MR will identify the key characteristics of the
activities or services that are associated with the significant environment, health and
safety aspects/ hazards that require monitoring.

August 2016

Page 64 of 67

Safety rev 001

Programs are in place through the respective departments to ensure that the appropriate
information is collected and maintained to track performance of the operational control.

9.4Measurement and Monitoring of Services


Inspections are carried out in order to verify that specified shipping, marine and logistic
service requirements are met. Inspection and checking of all enquiries are carried out to
verify compliance with requirements. The procedures ensure that such services are not
provided until inspected.
Injuries, Incidents and Non- conformities
Concerned personnel are responsible for identification, recording and immediate
reporting of any instances of non-conforming product. The authority and responsibility
for review and disposition of non-conforming product and service is defined in
procedures.
Non-conforming products disposition can be any of the following:

Accepted as it is under concession

Re-graded/Modified for alternative application

Repaired, reworked, scrapped

Returned to the supplier

Procedures provide for suitable identification of non-conforming products to prevent


unintended use. The procedure requires that, apart from immediate disposition, the
reasons for product non-conformities be analyzed to determine corrective actions
required avoiding recurrence. The records related to non-conformance, disposition,
concession, etc shall be maintained.
Procedures are established for handling and investigating Injuries, incidents and near
misses, taking actions to mitigate any hazards caused and for initiating and completing
corrective and preventive action. The procedure defines the authority and responsibility
for handling accidents, Near Misses & Incidents.

August 2016

Page 65 of 67

Safety rev 001

9.5Analysis of Data
The company collects and analyses data to demonstrate the suitability and effectiveness
of the HSE system and to evaluate continuous improvement.
The focus of the analysis is on customer satisfaction (client, company stakeholders,
employees etc), achievement of objectives, product conformance requirements,
preventive action, beneficial supplier relationship and continuous improvement. The
feedback of such analysis is presented during management reviews for review and further
setting the phase for continuous improvement.
9.6 Corrective &Preventive Actions
The non-conformance reports requiring system related or product related corrective
actions shall be attended to immediately and the relevant documents shall be changed
appropriately.
The results of Internal Quality Audits and customer complaints shall be reviewed during
the Management Review Meetings and appropriate corrective actions shall be decided.
Product related non-conformance pertaining to purchase products is reported to the
respective supplier for necessary corrective action. In case of repeated non-conformances,
the supplier is removed from the Approved Supplier List.
When the non-conformance is due to inadequate training of personnel, the concerned
staffs shall be provided with necessary training.
All formal customer complaints regarding products shall be analyzed and results shall be
discussed in the Management Review Meetings to decide on the corrective measures.
Actions required and time frame for completion is specified in the records of such
meetings and is regularly followed up.
The corrective actions implemented shall be verified for their effectiveness during the
Internal Quality Audit and Management Review Meetings.

9.6.1 Preventive Actions:


The organization has established procedures to ensure that complaints of interested
parties are acted upon in a timely manner and effectively processed to a satisfactory
conclusion.

August 2016

Page 66 of 67

Safety rev 001

Procedures require that complaints of interested parties, whether written or verbal, are
recorded and reviewed by authorized personnel to establish that they are justified. In the
event of unjustified complaints, a reasonable explanation will be offered to the customers.
All justified complaints are subject to analysis in order to determine the suitable
preventive action. Interested parties are notified of any immediate corrective measures
taken and what preventive action will be taken to avoid recurrence.
Any non- conformities identified are recorded and reported. Procedures ensure that the
reasons for occurrence of non-conformity are thoroughly studied such that the root cause
shall be determined. The preventive actions to be taken is identified and implemented for
this root cause. The results of corrective action taken shall be submitted for Management
Review.
Corrective/preventive actions are implemented commensurate with the magnitude of the
problem. Any permanent changes resulting from corrective action taken are recorded in
appropriate system documentation.
All corrective and preventive actions related to environment, health and safety are
reviewed through the risk assessment process prior to implementation.
Procedure also requires that available information be studied in order to detect, analyze
and eliminate potential causes of non-conformities. Information on subsequent preventive
action taken is submitted for consideration during Management Review.
Personnel are encouraged to indicate areas where potential non-conformities may occur
and report such situations. Any suggestions on possible improvements of the HSE
System are also welcomed from all staff.

August 2016

Page 67 of 67

Safety rev 001

ANNEXURE 1
Method Statements

QHSE Plan-JVS

TR-164

Method Statement No:EMP/FLS/MS01/2016

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:00


21.08.2016

FLUSHING AND CHEMICAL CLEANING FOR


CHILLED WATER SYSTEM

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING


PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

FLUSHING CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC
CLIENT

CONTRACTOR

SUB CONTRACTOR

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

INDEX
1.0 SCOPE OF WORK ..........................................................................................................................3
2.0 PURPOSE .......................................................................................................................................3
3.0 REFERENCES AND OTHER RELATED DOCUMENTS ................................................................3
3.1 PROJECT SPECIFICATION ...................................................................................................................3
3.2. STANDARDS AND RELEVANT CODES ..................................................................................................3
4.0 DRAWING REFERENCES/DOCUMENTS .....................................................................................3
5.0 ABBREVIATIONS, TERMS AND DEFINITIONS ............................................................................4
6.0 RESPONSIBILITIES .......................................................................................................................5
7. INSTRUMENT, EQUIPMENT & TOOLS ...........................................................................................7
7.1 INSTRUMENTS ....................................................................................................................................8
7.2 EQUIPMENT & TOOLS .........................................................................................................................8
8. INSTRUMENT/ EQUIPMENT CHECKING & CALIBRATION ...........................................................9
9. FLUSHING AND CLEANING PROCEDURES ..................................................................................9
9.1 PROCEDURE: .....................................................................................................................................9
9.2 PROCESS: .........................................................................................................................................9
9.3

PREREQUISITES FOR FLUSHING ..................................................................................................10

9.3.1 PREREQUISITES: - .........................................................................................................................10


9.3.2 PRE-START CHECKS .....................................................................................................................10
9.3.3 STAGE 1 DYNAMIC FLUSHING WITH CLEAN WATER.......................................................................11
9.3.4. STAGE 2 - FLUSHING WITH CHEMICALS: - ......................................................................................12
9.3.4.1 FINAL FLUSHING AND REMOVAL OF CHEMICALS / LEFT OVER SUSPENDED PARTICLES ...................13
9.3.5 STAGE 3-CHEMICAL TREATMENT UPON COMMISSIONING CHILLED WATER SYSTEM:..........................14
10.0 INTERFACE PROCEDURE ......................................................................................................144
11.0 DOCUMENTATION ...................................................................................................................144
12.0 DEMONSTRATION PROCEDURE .............................................................................................15
13. COMMISSIONING FLOW CHART ..............................................................................................166
14.0 ENVIRONMENTAL, SAFETY AND HEALTH ...........................................................................177
14.1. RISK ASSESSMENT .......................................................................................................................17
14.2 SAFETY RULES DURING TESTING: ...................................................................................................17
14.3 ENVIRONMENTAL CONSIDERATIONS ................................................................................................18
14.4 TASK & SAFETY LIGHTING .............................................................................................................18
14.5 EMERGENCY ARRANGEMENTS ........................................................................................................18
15. QUALITY: - CONTROL PARAMETERS .......................................................................................19
15.1 CHILLED WATER.............................................................................................................................19

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

16.0 CONTINGENCY PLAN FOR MITIGATION OF WATER LEAKS AND FLOODING DURING FLUSHING OF CHILLED
WATER PIPELINES .................................................................................................................................19
16.1 OBJECTIVE ....................................................................................................................................19
16.2 PLANNING STAGE ...........................................................................................................................19
16.3 IDENTIFICATION OF MAJOR & MINOR WATER LEAKAGE POINTS ..........................................................20
16.4 IDENTIFICATION OF WATER INGRES TO AREAS..................................................................................20
16.5 COMMUNICATION AND ACCESS TO CONTROL VALVES .......................................................................20
16.6 EMERGENCY WATER LEAKAGE/ FLOODING CONTROL .......................................................................20
16.7 PROTECTION OF SOFT POINTS FROM EXTERNAL IMPACTS .................................................................21
17. CALCULATION OF MEAN FLUSHING VELOCITY ....................................................................................22
18. FLUSHING CHEMICAL REQUIRED........................................................................................................23
19.0 ATTACHMENTS ..............................................................................................................................23
20.0 COMPLIANCE SIGN OFF SHEET ..............................................................................................24

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

1.0 SCOPE OF WORK


This procedure covers the Flushing, Cleaning and Chemical Treatment of CHW Pipe
Work System for JVC & JVT. The test includes pre-commissioning, commissioning
and chemical treatment of the system in accordance with the approved site test
procedures and in compliance with the specifications and standards.
2.0 PURPOSE
This purpose of this procedure is to ensure that the CHW Pipe for JVC & JVT is
flushed to remove dirt, debris and micro-organisms therefore reducing the likelihood
of blockage of the system. It also deals with the necessary final chemical treatment
to minimise scaling and Bacterial contamination within the system including testing
and approval of pipe work cleaning.
3.0 REFERENCES AND OTHER RELATED DOCUMENTS
3.1 Project Specification
EMPOWER FLUSHING AND CHEMICAL TREATMENT SPECIFICATION
TECH-SPEC-032 Rev 02
3.2. Standards and Relevant Codes
As per the specification, the following standards and codes are to be followed:
BSRIA - BG 29/2012 Pre-Commission Cleaning of Pipework Systems.

4.0 DRAWING REFERENCES/DOCUMENTS


Approved Shop Drawing for Chilled Water Systems.
Risk Assessment

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

5.0 ABBREVIATIONS, TERMS AND DEFINITIONS


5.1 Definition of Water System Contaminants
Scale:
Scale is a build-up of solid material. Scale is dense, adherent deposition of mineral
particles bound to metal surfaces. Calcium, magnesium and iron scale (e.g. calcium
carbonates, calcium sulphate, magnesium carbonate, magnesium silicate are the
most common ones). Scale is formed when the water is heated (mainly at the
internal surface of the heat exchangers) or when the pH of the water changes. The
harder the water (more calcium and magnesium) the greater the risk of scale
formation.
Biological Fouling:
This is a result of impurities introduced to the system during the installation. Bio-film
layer can form when a system is filled but left unused. Certain types of bacteria are
responsible for the formation of this layer.
5.2 Abbreviation and Terms:
CP

: Commissioning Procedure

HDPE

: High-density polyethylene

RA

: Risk Assessment

ATP

: Authority to Proceed

CIR

: Commissioning Inspection Request

PPM

: Parts Per Million

ITEM

: Island Tower Electro Mechanical Works LLC, Specialist


contractor for water treatment.

HSE

: Health Safety and Environment

HVAC

: Heating Ventilation Air Conditioning

BSRIA

: Building Services Research and Information Association

TSS

: Total Suspended Solid

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

6.0 RESPONSIBILITIES
All employees are responsible for working safely and maintaining a safe and
healthful working environment. It is the responsibility of all personnel involved in the
works to implement this Procedure in accordance with the Risk Assessment
(attached Section), Pre-Commissioning/Flushing and Cleaning of Chilled Water
Piping Plan and project safety rules and regulations.
a. Project Manager (ITEM)
Will have the overall responsibility of the Commissioning for execution, quality and
safety as well as the maintaining of the planning progress and coordination of works
with the Main Contractor for the site execution of different commissioning phases.
Manage the entire flushing and cleaning activities as well as the personnel
(Engineers, 3rd party flushing and cleaning team hired by the contractor, etc.).
Will inform in advance all related internal Sub Contractors and organize a meeting
to prevent future difficulties during the flushing and cleaning of the particular system.
Conduct coordination meetings with the other Sub Contractors in order to organise
their interfacing works.
Monitor that the progressing works are carried out according to the planned program
and all the equipment required to execute the full flushing and cleaning works are
available as per the project planning and are in good condition.
Plans, schedules and coordinates the flushing and cleaning team to implement the
procedure for Flushing and Cleaning of Chilled Water Pipe works.
Ensure ATP System is followed.
Coordination and closeout of open point raised during testing and commissioning.
Report overall commissioning progress to the empower.

b. Project Engineer (ITEM)

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Responsible for the day to day activities on site, for test sheet, design information
approval and for the onsite Flushing and Cleaning ensuring that quality standards
are maintained throughout the commissioning process.
Verify that applicable equipment and systems are installed according to the
manufacturers recommendations and to industry accepted standards.
Verify that all flushing and cleaning works are to be carried out according to
specification and approved drawings.
To ensure in consultation with the Project Manager that the manpower involved in
the flushing and cleaning process are moved as agreed and planned.
Coordinate with the Lead Engineer, Flushing and Cleaning Team, and Specialist
Sub Contractor and plan the work in advance as per the work sequence.
Coordinate with the Empower and ensure implementation of any comments raised
by the Engineer.
Monitor and update Testing and Commissioning progress and report to the
Commissioning Manager.
c. 3rd Party Flushing and Cleaning Team/Lead Engineer (ITEM)
Ensure that his Commissioning Team are aware of the job requirements and that
they have enough information to carry out their duties properly.
Provide all necessary information and distribute the responsibilities to his flushing
and cleaning team.
Coordinate with the Safety In charge to ensure that the works are carried out in a
safe working practice.
Ensure the work area is safe for the activities being performed.
Identification of deficiency or areas needing remedial actions and required timing
for completion, such as, immediate need to complete test before further work or
future testing, or before system handover

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Shall check the flushing and cleaning works prior to submission for inspection and
approval.
Shall verify that the documentation is complete prior to requesting witness; this
includes documentation to demonstrate review/internal witness of flushing.
Maintain the details and report periodically the progress of flushing and cleaning
works to the Commissioning Engineer.
d. 3rd Party Flushing and Cleaning Team (Technicians)
Verify test results, documentation completeness, proper performance of
equipment and full system.
Maintain proper coordination with the Lead Engineer from time to time regarding
the commissioning status of the particular equipment/system being undertaken.
To provide the Lead Engineer progress report indicating the works achieved and
discuss with him the planned activities for the next day.
To inform the Lead Engineer of the areas/system ready for inspection.
Ensure full coordination with the Safety Officer to maintain safe working and proper
housekeeping of the site.
e. Manufacturer/Specialist Sub Contractor (Chemical manufacturer
Supplier VEOLIA)
Shall co-operate with the Project Manager & Engineer, as far as may be necessary,
to enable them (the main contractor) to carry out their legal duties in health and
safety matters.
Shall provide their own specialist equipment which is not generally on site and this
should be agreed before commencement.
7. INSTRUMENT, EQUIPMENT & TOOLS
The following test instruments will be used for the commissioning and testing
activities. These will be selected as having the maximum field measuring accuracy

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

and being the best suited to the function being measured, and will be applied as
recommended by the manufacturer.
7.1 Instruments
Temporary Flushing Pumps
Chemical dosing pot (temporary filter skids will use as manual chemical dosing pot).
Chemicals (to be provided by Approved Supplier).
Calibrated Pressure gauges
Water Quality Tester Kit for testing of iron (Fe) content, Total Dissolved Solids,
conductivity and suspended solid.
Spill kits.
First aid kits.
* Instruments requiring a calibration certificate.
7.2 Equipment & Tools
Temporary Flushing Pumps (Drawing attached for each loop)
Filtration housing with bag filter (2 no Filter skids)
Filter bag 50 microns
25 microns
10 microns
5 microns
1 micron.
Effluent water disposal tanker
HDPE fusion welding machine (spark free)
Mobile tank for back flushing.
Power tools (pipe cutter)
Hose and container for draining water
Portable Hand tools
HDPE pipes and fittings for Looping/By passing and Flushing pump connection

JVS DC

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

8. INSTRUMENT/ EQUIPMENT CHECKING & CALIBRATION


All Calibrated instruments used for testing should be have a valid Calibration Test
Certificates from an approved authorized Test Laboratory and must be made
available prior to commencement of works.
Instruments will be properly maintained and protected against damage.
All equipment references will be included on all test sheets.
All calibration certificates shall be prepared, obtained and maintained by ITEM
9. FLUSHING AND CLEANING PROCEDURES
9.1 Procedure:
The Chilled water system will be flushed in Following phases (Approx. Volume
calculated by details availed from site):
1) JVC Section C1

=6000 m3

2) JVC Section C2

=7000 m3

3) JVC Section C3

=14500 m3

4) JVT Section T1

=1200 m3

5) JVT Section T2

=620 m3

6) JVT Section T3

=1780 m3

Pipes Materials: GRP


9.2 Process:
The process of pre-commission cleaning is designed to remove surface rust, mill
scale and light debris, which may have entered the systems during their
construction. Pebbles, small pieces of metal and wood cannot be dissolved by any
chemical, which may be safely used, and although one would expect the majority of
such debris to be removed by the flushing process. Prior to commencement of
works, all system should be filled, vented and fully circulated

JVS DC

Jumeirah Village South District


Cooling Plant
9.3

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Prerequisites for Flushing

9.3.1 Prerequisites: Location of Temporary Flushing Equipments: The location of temporary flushing equipment is as per attached sketch.
Installation of temporary piping: The network flushing shall be carried out by Temporary pumps, and the temporary
system is connected by temporary HDPE pipes and fittings, Temporary tanks are
used for effluent water collection
Loop the CHW pipe to and from the network by adequate pipe size
Effluent will be pumped to the temporary tanks provided outside of the plant and
tankered out to Municipality approved area.
Relevant work permit must be taken prior to commencing of works.
Samples for the mains water supply will be taken and tested by the Chemical
specialist for analysis and will be offered for inspection to Empower prior to filling
into the system.
9.3.2 Pre-Start Checks
Hydrostatic pressure tests of the pipework completed and signed off.
Clean the temporary tanks before filling the water
Effluent water holding Tanks installed and operational.
Safe system and routes for tankers to remove the Effluent from site.
Availability of continuous fresh water supply for flushing activities.
The location drain and filling points has been identified and as per the approved
drawing.
Ensure that all pipe ends are looped using a dedicated flushing bypass and ensure
no open ends present in the circuits.

JVS DC

10

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Ensure the availability of Chemicals as per the approved submittal.


Confirm the temporary system is connected properly to the network as per attached
schematic flushing plan.
Confirm availability of safety equipment on site and ensure that tool box talk is
carried out.
Confirm the bag filters are put in the filter skid.
Ensure that pressure gauges are installed in the inlet and outlet of the strainers.
Ensure Suitable spanners are available to open close the strainer lid for frequent
opening and cleaning of strainer mesh with a dedicated team
All steps of the procedures must be followed as per check sheets attached with this
procedure.
The flushing and chemical treatment of the system will be carried out under the
supervision of Veolia and monitored and assisted by the Empower.
Prior to commencement of cleaning activities Empower and the water treatment
Specialist will determine the proper procedure for filling, circulating and flushing the
system and to review disposal procedure of the cleaning solution as per agreed
flushing plan.
9.3.3 Stage 1 Dynamic Flushing with clean water
The purpose of this stage is to remove inert suspended matter such as pieces, slags,
and foreign particles etc. this flushing will be continued until all suspended solids are
removed from the system.
Sequence of Operation: System to be filled with potable water from the lowest point (If any pressure drop in
the system) and vented from the highest point to make sure that proper circulation
will occur with no air entrapment.

JVS DC

11

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Check the pressure gauges in the system to confirm that the system is fully filled
with water.
After filling, circulate the water for one hour with the flushing pumps connected in
the network and simultaneously water is drained to the temporary drain tank located
on the agreed and specified drain point. During the balance flush the system
pressure is monitored to ensure that the filling and draining is balanced and that we
are not losing water from the upper levels.
Note: The drainage flow must never be more than the clean make-up water flow as
to avoid system pressure lost and drainage.
Whilst maintaining a balance flush, it is important that the velocity of circulating water
is sufficient to force all the debris from the system pipework.
If the flushing pump cannot match/achieve the desired flow/velocity across the
system at the same time. It will be necessary to regulate the system by closing
certain sections to force the pumps total flow through the open sections of the
system thus achieving the required flow velocity. The closed sections will then be
opened and then the open section will be closed so the required velocities will have
been achieved across the system.
During dynamic flushing, all strainer screens and dirt pockets within the system must
be checked and cleaned at regular intervals and recorded, strainer would be cleaned
periodically until the system is free of impurities, during the flushing process until the
screens has no longer show any signs of contaminant and no more deposits are
found. Carry out filling, draining and circulating until the water is visibly clear.
9.3.4. Stage 2 - Flushing with Chemicals: Cleaning with chemical

This process involves the use of chemical HYDREX 2331 which is manufactured

by M/s VEOLIA.
HYDREX 2331 will be poured to the network at the rate of 20ppm through
Temporary filter installed in the system.

JVS DC

12

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

In this stage after adding the Dispersant chemicals, TSS increasing and the

exact parameters depend on piping situation/case

The product shall circulate in the system minimum 24 hours and maximum 48

hours,

After adding cleaning chemical, we keep collect samples every 2 hours till

TSS increasing then be stable, then starting dynamic flushing. Chemical specialist
will monitor the TSS levels of the chemical and determine when the system is ready
to be drained out.

9.3.4.1 Final Flushing and removal of Chemicals / left over suspended


particles
The purpose of final flushing is to take out all the left over suspended particles, mill
scale, debris, and metal oxides which are accumulated in the system.
In this phase the water should be circulated through the Temporary filter installed in
the system
Sequence of work: After the chemical flushing has been completed the system is then circulated through
filtration system until the system has been cleaned from the cleaning chemical, again
monitored and inspected by the Chemical Specialist VEOLIA
The monitoring of the samples after the flushing with the chemical to clean the
system shall be carried out until the Suspended solid level >30 ppm. All strainer
screens and dirt pockets within the system must be checked and cleaned until the
screens has no longer show any signs of contaminant and no more deposits are
found. Carry out filling, draining and circulating until the water is visibly clear.
Note: It is important to drain the water and collected in the temporary mobile tanks
at the locations where a dead end was created due to closing of valve or placing a
dead plate. Generally, the muck will get accumulated at these locations.

JVS DC

13

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

9.3.5 Stage 3-Chemical treatment upon commissioning chilled water System:


This involves the use of chemicals (HYDREX 2856). This process will ensure the
system is treated with inhibiting chemicals to prevent future corrosion and scale
problems. HYDREX 2856 should be dosed at the rate of 2.65 Kg/m3 based on the
system volume.
The system should circulate for at least 4 hours.
The system will be put -in continuous circulation with the final treatment program.
Micro-bio-control should be added to the system HYDREX 7310 at the dosage rate
of 0.1 Kg per m3 based on the system volume.
Sample should be taken to confirm the water parameters as below:
Parameters
Control parameter during normal treatment
pH

9.0-10.5

Total Dissolved solids

<2100 ppm

Conductivity

<3000 Siemens/cm

Total iron

<1 ppm as Fe

Nitrite

800-1200 as NaNO2

10.0 INTERFACE PROCEDURE


There are no BMS interfaces with flushing and cleaning of chilled water piping
system.
11.0 DOCUMENTATION
The test sheets proposed to record the commissioning of the project are listed below:
CL1 Flushing Checklist Stage-1
CL2 Flushing Checklist Stage-2
CL3 Flushing Checklist Stage-3
SDP1 Strainer and dirt pocket record sheet
Water analysis report

JVS DC

14

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

12.0 DEMONSTRATION PROCEDURE


The Flushing engineer will ensure that the following works are carried out:
Phase 1: Flushing with Clean Water
Phase 1 involves the demonstration to the Commissioning Authority the cleanliness
of the flushed water from any point of the system as instructed by the Commissioning
Authority. Regular water samples from the system will be taken and delivered for
visual check.
Phase 2: Flushing with Chemicals
Phase 2 involves demonstration to the Commissioning Authority the high presence
of iron level from any point during chemical cleaning process to be drained after the
chemical has circulated into the system. Clean water must be circulated and water
samples will be taken from the system and delivered for visual check and to verify
the iron level.
Phase 3: Chemical Treatment upon Commissioning
Phase 4 involves the final demonstration to the Commissioning Authority with all the
proper documentation and laboratory test results for final acceptance of the system.
Correct dosage of chemical and the presence of iron in the system should be as per
the approved specifications.
Flushing and cleaning team shall submit water samples in clear bottles of a type
that is locally available during various stages of the treatment. These bottles will be
labelled with information of time and location of sampling.
After the system have been flushed and cleaned, electronically typed copy of test
packs and results and all supporting documents shall be submitted by ITEM to the
Engineer for review and approval.
With the availability of Engineer will then organize the time and date.

JVS DC

15

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

13. COMMISSIONING FLOW CHART


Start
Pre-commissioning
Flushing and
Cleaning of CHW
piping system plan/
Test Sheets Approval

System pipe work


installation complete &
signed off by
Consultant. Flushing
flushing pumps,
Filtration housing and
pipe installation
complete and approved

Flushing Plan,
Chemical
submittal &
Water system
schematics
Approval

Civil works complete. Building sealed by


Contractor
Potable water tanker, Effluent water
disposal tanker and mobile tank for back
flushing is available
Fill and drain points identified
Stage-1: Dynamic Flushing with clean water
complete and signed off

Stage-2: Flushing with chemical complete,


control parameter for water analysis is
signed off
Stage-3: Final chemical treatment upon
commissioning complete, control parameter
for water analysis, signed off
Flushing and Cleaning of CHW piping
system report submitted
System witness and signed off

JVS DC

16

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

14.0 ENVIRONMENTAL, SAFETY AND HEALTH


Health and Safety procedures by the Contractor will be implemented for this job. The
responsible ITEM safety in charge as per procedure will conduct a routine safety
inspection in conjunction with the relevant test Engineer.
14.1. Risk Assessment
A risk assessment analysing potential risks and their mitigation measures is
attached to this test procedure in Attachment 19
14.2 Safety Rules during testing:
In order to ensure safe conditions during testing the following rules have to
be followed:
Competent Chemical Specialist subcontractor employees only are allowed to mix
the flushing chemicals by mixing unit installed in the plant room and do the flushing.
The Specialist Subcontractor carrying out the procedures will provide all information
regarding safety mitigation procedures for the use of chemical to be implemented.
A suitable enclosure shall be provided for safe storage of chemicals, lockable and
ideally well ventilated. Chemicals should be tagged with warning signs "chemical for
chilled water treatment".
Adequate information to others working nearby and display warning signage's
(Danger Flushing Going on, No Unauthorized Entry, Danger Keep Away, etc...) on
the doors of that particular plant room will be provided during flushing and chemical
treatment of HVAC pipework.
Area to be restricted and provide warning signs and caution notices. All valves
should be locked and fixed with signage in different language readable as "DO NOT
OPEN THIS VALVE".
Safety procedures for energization of MCCs and fan motors is to be followed as per
approved Lock Out Tag Out / Safe System of Work Procedures and a Power On/Off

JVS DC

17

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

requests work permit controlled by Main Contractor will be strictly implemented. All
necessary permits will be in place prior to activities proceeding.
Test instruments should be maintained in a safe condition and the test methods
should not create danger either for the operator or for other persons. All test
instruments shall be registered with the HSE for which Authorised Person is
responsible and making sure that it is regularly inspected, calibrated and is
maintained in good condition
Ensure that all plant drives have been pre-commissioned by the drive supplier prior
to flushing and cleaning.
14.3 Environmental Considerations
After the finalization of the works, the working area should be cleaned from any
waste materials related to the performed work. Disposal of the chemicals by SubContractor should by no means be allowed to enter the municipality drainage system
nor be allowed to run off on soil.
14.4 Task & Safety Lighting
Ensure adequate lighting is available to undertake task. Where sufficient light is not
available, additional task lighting will be provided.
14.5 Emergency Arrangements
a) Site general safety procedures will be followed. In case of emergency the most
senior employee or the Flushing and Cleaning in-charge present will stop the work
in the absence of Safety Officer, and make the necessary emergency arrangements
and report to the assembly points as briefed in the daily Tool box talk
b) Electric shock & Fire Precautions: inform the concern person (team leader/incharge, first aider) & HSE Department at the earliest, giving the location and as much
detail as possible about the accident. It is a requirement that a presence of a
competent authorized person & approved person who know safe isolations must be
available for the start-up and closed out of all equipment (as per LOTO procedure).

JVS DC

18

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

c) Verbal communication shall be done between the team working inside as well as
the watchman during an emergency and the commissioning in charge/engineer/
safety officer shall assess the situation as well as, communicated to the project
emergency and clinic numbers for necessary supports to manage the emergency.
d) Communications must be maintained and all the people working inside must know
the contacts number of respective engineer/supervisors, HSE officer, projects
Emergency no.
e) Assembly point must be visible, kept clean & tidy to contain the employees during
emergency.
15. QUALITY: - CONTROL PARAMETERS
15.1 Chilled water
Parameters

Control parameter during normal treatment

pH
Total Dissolved solids
Conductivity
Total iron
Nitrite

9.0-10.5
<2100 ppm
<3000 siemens/cm
<1 ppm as Fe
800-1200 as NaNO2

16.0 Contingency Plan for Mitigation of Water Leaks and Flooding during
Flushing of Chilled Water Pipelines
16.1 Objective
To limit the damage of property in the event of water leakage and flooding while
carrying out flushing of chilled water pipe lines.
16.2 Planning stage
Obtain all relevant permit before starting the flushing
Maximum Hydro pressure of the system is 6 bar
Identification of major and minor water leak points

JVS DC

19

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

Identification of emergency team members for strategic valve location points


Communication system between flushing pump operator and emergency team
members. (Mobile Phone)
Quantifying and placement of dewatering & cleaning equipment and accessories
based on water leakages.
16.3 Identification of major & minor water leakage points
The following locations were identified as strategic water leakage points during
flushing (Temporary flushing pipe joints, flanges, valves, Pumps in the network).
16.4 Identification of water Ingres to areas
The following areas are identified where water seepage can occur.
Flushing pumps plant room.
Flange connection.
Flexible joint connection.
16.5 Communication and access to control valves
A person shall be appointed to attend constantly in each 2 strategic valve location.
The appointed person shall receive communication for isolating the valves in case
of any leakage in the network and shall inform any leakage in the vicinity of the pump
operator.
Communication shall be maintained between the pump operator, Supervisor and the
emergency team members for the duration of the operations.
Access platforms/ Scaffolds shall be in place where valves are to be operated by
hand in above 1.8-meter height.
16.6 Emergency water leakage/ flooding control
Minor leakage in the network (spillage)
When a minor water leakage is identified during the flushing operation,

JVS DC

20

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

The appointed person informs the pump operator for flushing activity shut down.
Isolation of valves is immediately done in the nearby upstream and downstream
valves in the network.
Water spills on ground shall be cleaned by cleaning team with mopping equipment
and collected in buckets and put into temporary storage waste tanks.
Major leaks in the network
When a major leakage is identified during the flushing operation:
The appointed person informs the pump operator to stop the flushing activity.
The flushing pump operator stops the flushing pumps immediately and shut down is
done.
The appointed person isolates nearby upstream and downstream valves in the
network.
Upon receiving the information of major leakage, the supervisor inspects the area
and engages emergency team to clean the water by using the following equipment.
a)

Portable/submersible electrical water pumps.

b)

Flexible water hoses.

c)

Mops and water collection/cleaning equipment like buckets, gum boots, PVC

hand gloves etc.


16.7 Protection of soft points from external impacts
Valves shall be identified with valve numbers and warning signs.
All Electrical services and Utility services are protected by suitable measures.
In all areas where flexible hoses lay on the floor, they must be protected with suitable
hard covering

JVS DC

21

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

17. Calculation of Mean flushing velocity


Flushing Velocity Calculation- Chilled Water System 1
Pipe Diameter

1400 mm

Flushing Velocity considered As per BSRIA 29/2012 & AG 1/2001

2 m/s

Flushing flow required for achieving 3 m/s velocity

11088 m3/h

Calculation: Flow

= Area A * Velocity V

Where Area of pipe A

= r2

Area of 700 mm pipe,A

= 3.14 (0.7 * 0.7)

= 1.54 m2

Velocity

= 2 m/s

Therefore

= 1.54 * 2

= 3.08 m3/s
= 3.08 * 3600

= 11088 m3/h

Flushing Velocity Calculation- Chilled Water System 2


Pipe Diameter

1000 mm

Flushing Velocity considered As per BSRIA 29/2012 & AG 1/2001

2 m/s

Flushing flow required for achieving 3 m/s velocity

5688m3/h

Calculation:Flow

= Area A * Velocity V

Where Area of pipe

= r2

Area of 700 mm pipe,

= 3.14 (0.5 * 0.5)

JVS DC

22

Jumeirah Village South District


Cooling Plant
A

0.79 m2

Velocity

= 2 m/s

Therefore

= 0.79 * 2

1.58 m3/s

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

1.58 * 3600
Q

= 5688 m3/h

18.0 Flushing Chemical Requirements


SYSTEM

Volume (m3)

HYDREX 2331 (Kg)

HYDREX 2856 (Kg)

HYDREX 7310 (Kg)

JVC Section C1

6000

120

15600

600

JVC Section C2

7000

140

18200

700

JVC Section C3

14500

290

37700

1450

JVT Section T1

1200

24

3120

120

JVT Section T2

620

12.4

1612

62

JVT Section T3

1750

35

4550

175

19. 0. Attachments
Risk Assessment
System Acceptance Sheet
Inspection Test Report
Flushing and Cleaning Checklist
Scope matrix
Project organization chart

JVS DC

23

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/FLS/MS01/2016


Rev. No.& Date:00
21.08.2016

20.0 COMPLIANCE SIGN OFF SHEET


We confirm that we have read and understood the attached Commissioning
Procedure for the Flushing and Cleaning of Chilled Water Pipework. We accept and
agree to follow the procedure laid out in this Commissioning Procedure.

Name

JVS DC

Company

Date

Signature

24

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/HT/MS02/2016


Rev. No.&Date:01
03.09.2016

METHODSTATEMENT FOR
HYDROSTATIC PRESSURE TESTING OF GRP PIPIELINES

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC

CLIENT

CONTRACTOR

INDEX
1.0 SCOPE OF WORK

2.0 PURPOSE

3.0 REFERENCES

4.0 DEFENITIONS

5.0 RESPONSIBILITIES

6.0 PROCEDURE

JVS DC Hydrostatic Pressure Testing

Page 2 of 9

1.0 SCOPE OF WORK


The scope of this procedure is to define and establish a methodology for the safe
performance of hydrostatic and pressure testing activities on GRP pipe network
2.0 PURPOSE
The objectives of the procedure shall be, but not limited to the following:
2.1. To ensure that all pressure testing activities is being carried out in a planned, controlled
and safe manner, in order to prevent harm to people and or damage to equipment.
2.2. To provide confirmation that adequate HSE coverage is in place for Hydro-testing
operations both during day and night, and ensure that the work complies with relevant
regulations and provisions in force.
2.3. To ensure that safe practices are observed and implemented during pressure testing of
pipes and vessels etc, due to the potential hazards associated with high pressure liquids.
2.4. To ensure providing necessary induction training to the personnel involved in pressure
testing operations.
3.

REFERENCES

3.1. HSE Requirements as stipulated in Contract Documents.


3.2. All applicable Local Regulatory Authority requirements and regulations.
3.3. Health, Safety and Environment Plan
3.4. Contract Specifications
4.

DEFINITIONS AND ABBREVIATIONS

4.1 Definitions
4.1.1 CLIENT: EMPOWER
4.1.2 PROJECT: JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT
4.1.3 ENGINEER: ISLANDTOWER Electromechanical Works LLC
4.2 Abbreviations
4.2.1 HSE: Health, Safety Environment & Security
5

RESPONSIBILITIES

5.1 Project Manager


Project Manager shall be responsible for the implementation of this procedure within his
project
JVS DC Hydrostatic Pressure Testing

Page 3 of 9

5.2 Project Engineer


The Project Engineer shall be responsible for the management of all pressure testing
activities on the work sites of the project.
He shall ensure that these pressure-testing activities are carried out, by competent and
experienced personnel according to a planned and safe procedure, in compliance with the
Project HSE Plan and relevant Authorities (when applicable).
The Project Engineer shall investigate, in liaison with the Project HSE Engineer any
accident / incident that may occur, take necessary immediate corrective measures and issue
required reports.
5.3 Competent Person(s)
The Competent Person(s) is a person fully trained, qualified and experienced in the planning
and performance of pressure testing operations, and has detailed knowledge of the hazards
and safety precautions applicable to this type of work.
He shall be directly responsible for the pressure testing operations and shall supervise the
activities and performance of all personnel involved, and ensure that all work is performed
by persons who are fully qualified and experienced in this type of work.
He shall be responsible for ensuring that Work Permit (PTW) System (and other permits if
applicable) are strictly adhered to during all related operations.He shall ensure that all
Personal Protective Equipment (PPE) and other safety equipment required for his working
crew are available, in good working condition, and are used as requested.
5.4 HSE Engineer
Shall be responsible to monitor the implementation of this procedure, and the safe work of
the pressure testing operations being carried out at the work site.
Shall provide HSE awareness and advice, e.g. toolbox training, safety and firefighting
equipment and guidance to the Personnel involved in the operation.
Shall investigate, in liaison with the Project Engineer any accident or incident that may
occur, take necessary corrective measures and issue necessary reports.

JVS DC Hydrostatic Pressure Testing

Page 4 of 9

PROCEDURE

6.1 BEFORE WORK STARTS


6.1.1 General:
Prior to commencement of pressure testing activities, and in order to eliminate hazards, the
following factors will be considered and implemented in the planning and preparation:
All persons who shall be involved in the pressure testing work, shall receive training and be
informed of the potential hazards associated with these activities, and the necessary safety
precautions implemented.
For pipelines projects, no pressure testing shall be performed without prior receipt of an
approved Hydro-Test Procedure, which includes the method statement and Tool box talk
detailing the safety measures that shall be followed during carrying out the work.
All needed Work Permits (and other permits if required) shall be obtained from the Client
prior to commencement of any pressure testing. This shall be completed in accordance with
Project HSE Plan and relevant Authority requirements (where applicable).
Pipeline specific barricades, barriers, tape and warning signs shall be installed and
prominently displayed in areas of pressure testing, especially in pipeline loops are exposed.
Adequate lighting shall be in place,
Personnel directly involved in the work (e.g. Competent Person, Supervisors and Foremen)
shall be present / available at all times during the testing operations, based on shift work
timing, to check and monitor work areas on day and night.
Re-routing of local traffic may be necessary advance coordination with local authorities is
required to establish proper traffic routing and control.
NOTE: For further information and back up document, reference shall be made to the
following HSE Procedures:

Permit To Work (PTW) System Procedure

Hazard Identification & Risk Assessment

Personal Protective Equipment (PPE) Procedure

Environmental Management Procedure

Job Safety / Hazard Analysis Procedure

JVS DC Hydrostatic Pressure Testing

Page 5 of 9

6.1.2 Vessels and Equipment Safety


Piping, vessels, supports and foundations (wherever available), shall not be overloaded by
the extra weight of the test liquid. Temporary supports and braces may be required.
Vents of adequate capacity shall be installed at high points, to vent air from the item while
is being filled with the test liquid.
Low point drains must be installed at a suitable location to allow removal of the test liquid,
if any requirement of draining of water during testing operations.
Prior to testing, investigations shall be carried out to verify whether or not temporary
restraints are required to restrict the movement of piping and joints during testing and, when
necessary, adequate restraints shall be provided.
6.1.3 PIPELINE HYDROSTATIC TESTING
6.1.3.1

Testing Overview

Provide adequate calibrated pressure gauges to monitor the pressure drop


For Pipeline Hydrostatic Testing (Pressure testing), the pipeline shall be visually checked
where ever applicable.
The objective is to pressure test the pipeline in two stages, first at 6 bar and then at 9 bar. A
section, say C1, is taken for pressure test. This section C1 has valves (IVC s) in the pipeline
and by closing these, sub-sections can be formed. In the first stage, each sub-section will
pressure tested for 6 bar and if all the sub-sections withstand 6 bar, the complete section C1
will be subjected to 9 bar pressure.
The first sub-section pipeline is now hydro-statically tested by gradually increasing the
pressure up to 6 bar, intermittent increase of 0.5 bar water, after temporary closing off the
ends / valves (IVCs) of the pipe sub-section.
Check the system for any leak and rectify if any as per the instruction from the engineer
The quantities of test water required depend on the lengths of pipe section to be tested. After
use, this water may pass on to the next test section (where possible), to minimize the overall
water usage.

JVS DC Hydrostatic Pressure Testing

Page 6 of 9

On satisfactory completion of the first stage pressure test at 6 bar the pipeline, the end of
the entire section are closed by installing locally fabricated blind flanges as a spade to both
ends. This blind flange is installed after the Butterfly Valve (BFV) by removing the flange
adaptor. The BFV in the pipeline are kept at open position. Both end BFVs are in close
position. Pressurize the pipe line up to 9 bar. Hold the pressure for 2 hours
In case any further leak detected will be rectified and again pressurize the system up to 9
bar and maintain for 2 hours.
Critical Work Areas
Critical Work areas i.e. Flooding Station, High Pressure Station, Pipe ends, Works near
Permanent & Temporary Settlements, Environmental Sensitive areas, Evaporation Ponds
areas etc. shall be clearly identified and cordoned with Safety tapes and adequate warning
signs shall be erected in compliance with the Project HSE Procedures and the Authorities
requirements.
Adequate number and suitable type of fire extinguishers and Sand Buckets as (firefighting
facilities) shall be provided near potential risk areas (e.g. fuel storage, etc.).
First Aiders and well-equipped First Aid Kits shall be provided at all critical work areas
during carrying out the work, in order to obtain First Aid facilities immediately during
emergencies.
6.1.3.1.1

All accidental spills shall be cleaned and contaminated soil disposed as per

local environmental regulations. Spill Contingency Equipment and cleaning tools shall be
placed in required areas
6.1.3.1.2

WHILE WORK IN PROGRESS

The following general requirements and precautions pertaining to the work, shall be
observed and complied with during the performance of pressure testing operations:
No one shall be permitted to approach a system never previously tested, which is undergoing
increase of pressure up to final strength test pressure.
The pressure rise during a pressure test should be gradual and under control to allow time
for the material to strain, and time for personnel to check for leaks.

JVS DC Hydrostatic Pressure Testing

Page 7 of 9

Any ancillary equipment not under test shall be isolated by valves or blind flanged and
vented or disconnected.
Only calibrated test gauges shall be used and they shall be mounted in the upright position.
Pump discharge gauges must be visible to the pump operator for the duration of the test.
A block valve is required on the line from the test pump to the equipment under test.
When draining of test fluid /liquid, the line shall be vented slowly so as to avoid creating an
excessive vacuum inside the line.
Vessels and Tanks shall be depressurized four hours prior to bolt un-tie process; bolts also
should be untied gradually and in a way facing each other.
6.3.2 PRESSURE TESTING AGENTS (LIQUIDS)
6.3.2.1

General

Water is normally the preferred test liquid. Alternatives may be used but they must be
approved by a deviation from a standard and must be detailed within the specific test
procedure or Method Statement.
Salt water must not be used for testing any material subject to stress corrosion cracking in
the presence of chloride ions, unless anti- corrosive agent (chemical) to be added to the salty
water, and subject to approval by the Project Management and relevant Authorities.
Possible changes in pressure due to thermal expansion, contraction or hydrostatic heads
must be taken into account during the planning phase of the pressure testing procedure.
6.3.2.2

Disposal and Environmental Aspects

Disposal of hydro-test water on land could lead to contamination of the local water sources,
deterioration in quality and an impact to existing or potential users.
6.4 Spill and Contingency Plan
A spill and contingency plan shall be developed and shall be included as a part of the
pressure testing procedure, with the following main objectives and criteria:

JVS DC Hydrostatic Pressure Testing

Page 8 of 9

To ensure that immediate affective action is taken by Line Management and other Personnel
to minimize the effects on the Environment should an accidental spill or liquid materials
occur during Hydro-testing operations.
Project Line Management shall in the first instance take every effort to prevent accidental
releases of any materials to the environment, which could lead to a pollution incident. This
shall be done by ensuring that all work activities are pre- planned, the risks evaluated and
environmental protection requirements are fully identified.
Personnel shall be given instructions, Tool Box Talks Meeting and guidance on the
precautions they shall take when handling, transferring or transporting potentially polluting
materials.
Personnel shall be given instruction and training on the emergency actions and remedial
measures to be taken should a spillage incident occur.
Accidental release of fuel, chemical or other potentially polluting material shall be cleaned
immediately. Spill Contingency equipment shall be placed at potential areas.

JVS DC Hydrostatic Pressure Testing

Page 9 of 9

Method Statement No:-

EMP/EXC/MS05/2016

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:00130.09.2016

METHODSTATEMENT FOR EXCAVATION AND


BACKFILLING FOR BURRIED VALVE PIT

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING


PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC
CLIENT

CONTRACTOR

SUB CONTRACTOR

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:001


30.08.2016

TABLE OF CONTENTS
1. PURPOSE
2. SCOPE
3. RESPONSIBILITES
4. CO ORDINATION WITH CLIENT
5. PROCEDURE
6. WORKING HOURS
7. MATERIAL AND EQUPMENT
8. SAFETY INSTRUCTIONS
9. INSPECTION TEST PLAN

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 2

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:001


30.08.2016

INTRODUCTION:
This Method Statement is to be read in conjunction with the Project Specific Risk
Assessment, Site Construction Phase Health and Safety Plan.
1. PURPOSE.
The purpose of the method statement is to guide the procedure for e x c a v a t i o n and backfilling
for Buried Valve pit in Jumeirah Village South District Cooling Project. This method
statement covers requirement for the excavation, blinding, casting and backfilling for valve
pit for the chilled water network.
2. SCOPE.
Scope of this method statement covers the following activities. It applies to all employees and
contractor.

Procedure.

Precautions.

3. RESPONSIBILITIES.
3.1

Project Manager (PM)

Guide, direct and instruct the PE and other staff belongs to Contractor in such way that the
works are performed to the program and confirm to the requirement of Owner/Engineer. Liaise
with the Owner/Engineer to clarify and confirm the requirements of the Contractor. All field
staffs like PE, HSE, QCE, FOM etc. belongs to the Contractor will be reported to the PM
regarding the progress and status of the work.
3.2

Project Coordinator (PC)

The PC is responsible for monitoring the overall work in accordance with the specifications,
Construction drawings and method statements. He arranges the smooth and uninterrupted flow
of work, resolving the day issues, arranging necessary inspection activities, timely generation
of as-built drawings and co- coordinating at site with all staff including that of Owner/Engineer.
The PC will be reporting all progress and concerns to the PM.

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 3

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:001


30.08.2016

3.3 Site Engineer (SE)


Identify the resources required to carry out the work safely according to the specification and
programmed and arrange the same in advance. Properly organize the team and plan the work as
per the approved method statement and drawing. Coordinate with client, consultant for the
timely inspection and approval of works executed at site. Make sure about the required NOC
and other permission from authorities and available before commencing the actual works.
3.4 Health & Safety Officer (HSE)
The HSE shall be responsible for ensuring the safe working method and practice at the
construction site. The HSE leads safety team to ensure that all field staff has obtained periodic
safety induction during various stages of the construction activity. The PI will be reporting all
progress and concerns to the PC and PM.
3.5 Quality Control Engineer (QCE)
The QCE together with the PE are responsible for all the inspection activities and maintaining
the quality control records in accordance with the specifications and method statements. The
QCE leads the QA/QC team to ensure that all the activities comply with the contractual
requirements. QCE will be reporting all progress and concerns to the PM.
4. COORDINATION WITH CLIENT.
Site engineer is making daily report of site activities and Co-ordinate with client engineer.
5. PROCEDURE.
5.1 Setting Out
Site setting out and establishing level points, lines, and temporary bench-marks shall be done and
shall be approved by the consultant prior to start of Excavation, Backfilling and Compaction
Works.
5.2 Work procedure
5.2.1

Surveyor to mark the required excavation area and monitor the required depth of excavation.
5.2.2

Ensure there is no underground services in the area need to be excavated, proper care

should be taken.

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 4

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant
5.2.3

Rev. No.& Date:001


30.08.2016

Excavation should be done by suitable equipment up to the required level and


excavated area should be levelled and compacted after achieving the required level.

5.2.4

The Materials excavated from the site or imported from outside shall be checked for

suitability test as back fill materials by third party independent testing laboratory as per
specification requirement.
5.2.5

The Backfill material shall be free from refuse, large stones or rocks that might prevent

proper compaction.
5.2.6

Once the formation level is approved by the Consultant, the approved fill materials shall

be then laid and compacted in accordance with the project specification requirements.
5.2.7

Filling (Class A material) shall be conditioned with water to within +/-2% of OMC

and shall be laid in layers. 150mm / 300 mm (Compacted) depending upon the suitability and
requirements of site condition.
5.2.8

Site excavated material will be used as backfill material since it has passed the suitability

testing requirements for Class A


5.2.9

Site excavated materials conforms to class A specification shall be used below and side

of footings and below ground floor slab. (suitability test conducted and approved as class A)
5.2.10

Spreading will be by means of JCB or by any other mechanical means, manual labour

using wheel borrow and other suitable methods that could give a uniform distributed thickness.
Sprinkling of water is applied while filling to attain good compaction result.
5.2.11

Compaction process shall be carried out by using proper equipment such as 5-10 tonnes

vibratory rollers or equivalent, smooth roller/Plate compactor.


5.2.12

The compacted soil shall be tested for compaction density and required compaction

needed is 95% of MDD.


5.2.13

Collecting of soil samples from the site and conducting all the necessary tests as per the

project specification shall be done by an approved Independent Testing Laboratory. Once the
results are approved by the Consultant for the 1st layer of backfilling the above procedures shall
be repeated for the further layers until the required backfilling levels are achieved.

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 5

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant
5.2.14

Rev. No.& Date:001


30.08.2016

If the test reports fail to meet the project requirements re compaction shall be done and

re test shall be carried out.


5.2.15

Once the required levels are achieved all the approved test reports shall be attached to

RFIA for closing out procedure for the particular activity.


6.

Working Hours.

The Working hours will be 7am to 6pm, 6 days a week which will include one-hour lunch break and
two refreshment breaks. Overtime will be arranged depends upon the urgency of the work.

7. Material and Equipments.


Sl

Description

No

On duty

Stand by

Total

Asphalt cutting machine

Backhoe Excavator JCB

Bobcat

De Watering pumps

Power drilling machine

Generator 5KVA ,220V

Plate compactor

Roller

Grinding machine 220 v

10

Water tanker 2000 gallon

11

3-ton pickup tipper

12

1 ton pick up

13

Concrete Vibrator

14

Manual tools for skilled and skilled labours

15

De watering Equipment and accessories

16

Shoring Equipment and accessories

17

All other equipment as per site requirement

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

1
1

pg. 6

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant

Rev. No.& Date:001


30.08.2016

8. Safety Instruction.
During the Installation all measures shall be adopted to ensure safe working.

Client site management system shall be implemented.

All personnel involved shall use necessary PPE.

All equipment will be inspected by HSE prior to use.

Access and good housekeeping will be maintained.

Fire extinguishers will be available at all time where applicable.

All activities at height will be provided with suitable working platform.

Waste management should be strictly followed to keep the job site neat and clean.

The personal protection wears shall be used tagged before used helmet, safety shoes and hand

gloves.

8.1

Prior to the commencement of any activities. The workforce will receive an induction
talk on the project as per the site safety requirements. This induction talk will include
both activity safety issues. As well as general safety requirements.

8.2

Front line supervisor will ensure that personal protective Equipment is worn by site
personnel at all times during construction activities.

8.3

Heat Stress Training will be provided.

8.4

Adequate cool drinking water. Shade and salt water tablets will be in place

8.5

Plant and Equipment will be provided with back-up alarms, lights and all other
applicable safety devices.

8.6

Safety Hazards and precautions

8.7

Strike UG Services.
Use locater and/or hand excavation (trial holes)

8.8

Excavation Collapse.

Batter sides to safe slope or provide shoring (as directed by Geo Technical
Consultant) and subject to Engineers approval

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 7

Method Statement No:EMP/EXC/MS05/2016.R.00

Jumeirah Village South District Cooling


Plant

8.9

Keep vehicle/equipment safely away exaction edges

Keep spoil at least 2.0 meters away from edge

Rev. No.& Date:001


30.08.2016

Fall in to excavation

Provide fencing guard rails or flagging tape around edges as well as night
lamps

Provide safely fixed ladders (every 50 m)

Provide banks when operating equipment near excavation.

JVS DC- MS FOR EXCAVATION AND BACKFILLING FOR BVP

pg. 8

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/HT/MS02/2016


Rev. No.&Date:01
03.09.2016

METHODSTATEMENT FOR
HYDROSTATIC PRESSURE TESTING OF GRP PIPIELINES

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC

CLIENT

CONTRACTOR

INDEX

1.0 PURPOSE
2.0 SCOPE OF WORK
3.0 REFERENCES
4.0 DEFINITIONS AND ABBREVIATIONS
5.0 RESPONSIBILITIES
6.0 TOOLS / EQUIPMENT
7.0 MATERIAL
8.0 HANDLING AND STORAGE
9.0 PROCEDURE
10.0 INSPECTION
11.0 SAFETY INSTRUCTION.
12.0 ATTACHMENTS

JVS DC GRP PIPE INSTALLATION

Page 2 of 7

1.0 PURPOSE:
The purpose of generating this Method Statement is to define the procedure step by step to
implement the correct practices for Installation of GRP Chilled Water Piping including
valves and accessories through the guide line complies with the requirements of client
within the time limit with maximum satisfactory level.
2.0 SCOPE
This Method Statement refers to various work procedures contained within JVS DC project
control documents, which explains and covers the Installation GRP Chilled Water Piping
including valves and accessories.
3.0 REFERENCES
3.1 HSE Requirements as stipulated in Contract Documents.
3.2 All applicable Local Regulatory Authority requirements and regulations.
3.3 Health, Safety and Environment Plan
3.4 Contract Specifications
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
4.1.1

CLIENT: EMPOWER

4.1.2

PROJECT: JUMEIRAH VILLAGE SOUTH DISTRICT COOLING


PLANT

4.1.3

ENGINEER: ISLANDTOWER Electromechanical Works LLC

4.2 Abbreviations
HSE: Health, Safety Environment & Security
5.0 RESPONSIBILITIES
5.1 Project Manager
Project Manager shall be responsible for the implementation of this procedure within his
project
5.2 Project Engineer
The Project Engineer shall be responsible for the management of all pressure testing
activities on the work sites of the project.

JVS DC GRP PIPE INSTALLATION

Page 3 of 7

He shall ensure that these pressure-testing activities are carried out, by competent and
experienced personnel according to a planned and safe procedure, in compliance with the
Project HSE Plan and relevant Authorities (when applicable).
The Project Engineer shall investigate, in liaison with the Project HSE Engineer any
accident / incident that may occur, take necessary immediate corrective measures and issue
required reports.
5.3 Competent Person(s)
The Competent Person(s) is a person fully trained, qualified and experienced in the planning
and performance of pressure testing operations, and has detailed knowledge of the hazards
and safety precautions applicable to this type of work.
He shall be directly responsible for the pressure testing operations and shall supervise the
activities and performance of all personnel involved, and ensure that all work is performed
by persons who are fully qualified and experienced in this type of work.
He shall be responsible for ensuring that Work Permit (PTW) System (and other permits if
applicable) are strictly adhered to during all related operations. He shall ensure that all
Personal Protective Equipment (PPE) and other safety equipment required for his working
crew are available, in good working condition, and are used as requested.
5.4 HSE Engineer
Shall be responsible to monitor the implementation of this procedure, and the safe work of
the pressure testing operations being carried out at the work site.
Shall provide HSE awareness and advice, e.g. toolbox training, safety and firefighting
equipment and guidance to the Personnel involved in the operation.
Shall investigate, in liaison with the Project Engineer any accident or incident that may
occur, take necessary corrective measures and issue necessary reports.
6.0 TOOLS / EQUIPMENT
6.1 Fork Lift or Crane with capacity & arrangement in line with the Manufacturer's
recommendations, pallet mover and as required at site.
6.2 Hydraulic Trolley
6.3 Portable hand tools.
6.4 Portable Drilling Machine/ Grinding Machine & Angle Cutter.
JVS DC GRP PIPE INSTALLATION

Page 4 of 7

6.5 Spirit Level / Level Threads


6.6 Step Ladder
6.7 Scaffolding with platform.
7.0 MATERIALS:
Grp pipes and fittings, joint lamination kit, air vents, valves, Hanger & Supports
8.0 HANDLING & STORAGE:
8.1

On delivery of the Chilled Water Pipe and accessories at site, necessary


precautions shall be taken for unloading, shifting & storage.

8.2

All materials received at site shall be inspected by client's representative and to


ensure that the materials are as per approved material submittals in terms of their
make, model type, country of origin and capacity.

8.3

All material while unloading shall not be dropped, but lowered to the ground.

8.4

Pipes shall be stacked on a flat surface with adequate supports.

8.5

While stacking, it shall be ensured that pipes of larger sizes are placed below and
smaller sizes on top.

8.6

All pipes ends shall be covered with end caps during transport and storage and
to be kept clean.

8.7

All other items such as valves, fittings, gauges, etc. shall be kept on racks within
site stores and shall be segregated based on size, model, type etc. for easy
retrieval.

8.8

Pipe insulation shall be stored in manufacturers packing in site stores.

8.9

Insulation material shall be segregated as per size, thickness for easy retrieval.

8.10 The adhesive material shall be stored in a covered and ventilated storage area.
8.11 All supporting materials shall be stored in a covered storage area, segregated
according to size, type, model, etc. for easy retrieval.
8.12 Any items found damaged or not suitable as per project requirements shall be
removed from site. If required to store temporarily, they shall be clearly marked
and stored separately to prevent any advertent use.
9.0 PROCEDURE
9.1
9.1.1

BEFORE WORK STARTS


Check and ensure all drawings used for installation are latest and approved for
construction.

JVS DC GRP PIPE INSTALLATION

Page 5 of 7

9.1.2

Mark the pipe routing and support locations on the underground as per approved
drawings.

9.1.3

Check the co-ordination of piping layout with other services and decide pipe
route with minimum bends / offsets.

9.1.4

Check and ensure sufficient clearance around pipe is available for insulation.

9.1.5

Check the access and clear space around valves, vent points, drain points
locations for maintenance and servicing.

9.1.6

Prior to installation clean all pipes and apply primer.

9.2

INSTALLATION PROCEDURES

9.2.1

Make excavation/trenches for the piping as per the approved method statement.

9.2.2

Selected correct size and type of material as per pipe sizes.

9.2.3

Cut the pipes accurately to measurements determined at site.

9.2.4

Flow vanes for elbows shall be installed at Return & Supply line of Pumps,
Chillers, Flow Meters & Check Valves.

9.2.5

Internal of pipes and fittings have to be kept clean before and after the welding.

9.2.6

Pipe support shall be installed as per approved stress analysis report.

9.2.7

Prepare the pipe ends according to the type of joints i.e. lamination joints.

9.2.8

The end preparation shall be done at site work shop / yard.

9.2.9

End preparations for joints shall be done as per approved procedure.

9.2.10 After the end preparation clean the pipe ends and ensure no material and dust
are left inside.
9.2.11 Laminate the joints and connections by using approved lamination kit.
9.2.12 Qualified technicians shall be engaged in lamination works.
9.2.13 Insert the approved hard insulating material of suitable thickness between the
pipe and support.
9.2.14 Align and level the piping as per approved drawings.
9.2.15 Sleeves / openings of suitable sizes shall be provided at wall crossings.
9.2.16 Install the piping connections with valves and accessories wherever equipment
is installed.
9.2.17 Fix the blind plugs / temporary valves on all drain, air vent, pressure gauge,
thermometer and test points tapings as applicable.
9.2.18 Automatic air vent with gate valve shall be installed at all valve chambers.
9.2.19 Flange shall be used to fix AAV with pipe.
9.2.20 A gate valve shall be installed for manual air vent system.
JVS DC GRP PIPE INSTALLATION

Page 6 of 7

9.2.21 Ensure all joints are properly laminated.


9.2.22 During initial water filling, employ sufficient man power to monitor the entire
length of the piping system for possible leakages.
9.2.23 If leakages are observed, arrest the leakages immediately. If leakages are major,
isolate the leaking portion with nearest isolating valve and / or stop the water
filling.
9.2.24 Ensure no leakages throughout the entire piping system.
10.0 INSPECTION
Inspection I

Installation of chilled water pipes & accessories.

11.0 SAFETY INSTRUCTION.


During the Installation all measures shall be adopted to ensure safe working.

Client site management system shall be implemented.

All personnel involved shall use necessary PPE.

All equipment will be inspected by HSE prior to use.

Access and good housekeeping will be maintained.

Fire extinguishers will be available at all time where applicable.

All activities at height will be provided with suitable working platform.

The personal protection wears shall be used tagged before used helmet, safety
shoes and hand gloves.

Prior to the commencement of any activities. The workforce will receive an


induction talk on the project as per the site safety requirements. This induction
talk will include both activity safety issues. As well as general safety
requirements.

Front line supervisor will ensure that personal protective Equipment is worn by
site personnel at all times during construction activities.

Heat Stress Training will be provided.

Adequate cool drinking water. Shade and salt water tablets will be in place

Plant and Equipment will be provided with back-up alarms, lights and all other
applicable safety devices.

12.0 ATTACHMENTS
Risk Assessment

JVS DC GRP PIPE INSTALLATION

Page 7 of 7

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/HDPE/MS013/2016


Rev. No.& Date:00
18.09.2016

METHODSTATEMENT FOR
INSTALLATION OF HDPE PIPES AND FITTINGS

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC

CLIENT

CONTRACTOR

INDEX

1.0 PURPOSE
2.0 SCOPE OF WORK
3.0 REFERENCES
4.0 DEFINITIONS AND ABBREVIATIONS
5.0 RESPONSIBILITIES
6.0 TOOLS / EQUIPMENT
7.0 MATERIAL
8.0 HANDLING AND STORAGE
9.0 PROCEDURE
10.0 INSPECTION
11.0 SAFETY INSTRUCTION.
12.0 ATTACHMENTS

JVS DC HDPE PIPING

Page 2 of 7

1.0 PURPOSE:
The purpose of generating this Method Statement is to define the procedure step by step to
implement the correct practices for Installation of HDPE pipes and accessories at JVS DC
project through the guide line complies with the requirements of EMPOWER within the
time limit with maximum satisfactory level.
2.0 SCOPE
This Method Statement refers to various work procedures contained within JVS DC project
control documents, which explains and covers the Installation of HDPE pipes and
accessories on chilled water network system.
3.0 REFERENCES
3.1 HSE Requirements as stipulated in Contract Documents.
3.2 All applicable Local Regulatory Authority requirements and regulations.
3.3 Health, Safety and Environment Plan
3.4 Contract Specifications
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
4.1.1

CLIENT: EMPOWER

4.1.2

PROJECT: JUMEIRAH VILLAGE SOUTH DISTRICT COOLING


PLANT

4.1.3

ENGINEER: EMPOWER

4.1.4

CONTRACTOR: ISLAND TOWER

4.2 Abbreviations
HSE: Health, Safety Environment & Security
5.0 RESPONSIBILITIES
5.1 Project Manager
Project Manager shall be responsible for the implementation of this procedure within his
project
5.2 Project Engineer
The Project Engineer shall be responsible for the management of all Installation activities
on the work sites of the project.
JVS DC HDPE PIPING

Page 3 of 7

He shall ensure that these pressure-testing activities are carried out, by competent and
experienced personnel according to a planned and safe procedure, in compliance with the
Project HSE Plan and relevant Authorities (when applicable).
The Project Engineer shall investigate, in liaison with the Project HSE Engineer any
accident / incident that may occur, take necessary immediate corrective measures and issue
required reports.
5.3 Competent Person(s)
The Competent Person(s) is a person fully trained, qualified and experienced in the planning
and performance of Installation activities, and has detailed knowledge of the hazards and
safety precautions applicable to this type of work.
He shall be directly responsible for Installation operations and shall supervise the activities
and performance of all personnel involved, and ensure that all work is performed by persons
who are fully qualified and experienced in this type of work.
He shall be responsible for ensuring that Work Permit (PTW) System (and other permits if
applicable) are strictly adhered to during all related operations. He shall ensure that all
Personal Protective Equipment (PPE) and other safety equipment required for his working
crew are available, in good working condition, and are used as requested.
5.4 HSE Engineer
Shall be responsible to monitor the implementation of this procedure, and the safe work of
the Installation operations being carried out at the work site.
Shall provide HSE awareness and advice, e.g. toolbox training, safety and firefighting
equipment and guidance to the Personnel involved in the operation.
Shall investigate, in liaison with the Project Engineer any accident or incident that may
occur, take necessary corrective measures and issue necessary reports.
6.0 TOOLS / EQUIPMENT
6.1 Fork Lift or Crane with capacity & arrangement in line with the Manufacturer's
recommendations, pallet mover and as required at site.
6.2 Mechanical hand tool, Cutting Tools,
6.3 Drilling Machine
6.4 HDPE butt fusion and welding machine
JVS DC HDPE PIPING

Page 4 of 7

7.0 MATERIALS:
HDPE pipes and fittings,
8.0 HANDLING & STORAGE:
8.1

On delivery of the HDPE Pipe and accessories at site, necessary precautions


shall be taken for unloading, shifting & storage.

8.2

All materials received at site shall be inspected by Empower representative and


to ensure that the materials are as per approved material submittals in terms of
their make, model type, country of origin and capacity.

8.3

All material while unloading shall not be dropped, but lowered to the ground.

8.4

Pipes shall be stacked on a flat surface with adequate supports.

8.5

While stacking, it shall be ensured that pipes of larger sizes are placed below and
smaller sizes on top.

8.6

All pipes ends shall be covered with end caps during transport and storage and
to be kept clean.

8.7

All other items such as valves, fittings, gauges, etc. shall be kept on racks within
site stores and shall be segregated based on size, model, type etc. for easy
retrieval.

8.8

All supporting materials shall be stored in a covered storage area, segregated


according to size, type, model, etc. for easy retrieval.

8.9

Any items found damaged or not suitable as per project requirements shall be
removed from site. If required to store temporarily, they shall be clearly marked
and stored separately to prevent any advertent use.

9.0 PROCEDURE
9.1
9.1.1

BEFORE WORK STARTS


Check and ensure all drawings used for installation are latest and approved for
construction.

9.1.2

Mark the pipe routing and support locations on the underground as per approved
drawings.

9.1.3

Check the co-ordination of piping layout with other services and decide pipe
route with minimum bends / offsets.

9.1.4

Check and ensure sufficient clearance around pipe is available for welding.

JVS DC HDPE PIPING

Page 5 of 7

9.1.5

Check the access and clear space around valves, vent points, drain points
locations for maintenance and servicing.

9.2

INSTALLATION PROCEDURES

9.2.1

Selected correct size and type of material as per pipe sizes.

9.2.2

Cut the pipes accurately to measurements determined at site.

9.2.3

Internal of pipes and fittings have to be kept clean before and after the welding.

9.2.4

Pipe support shall be installed as per approved shop drawing.

9.2.5

Prepare the pipe ends according to the type of joints i.e. butt fusion welding.

9.2.6

End preparations for joints shall be spigot with low irregularities and welding
sleeves with projections for welding.

9.2.7
9.2.8

Qualified technicians shall be engaged in Jointing/But fusion works.


During welding process, both pipe ends are placed against a hot plate at a
constant temperature and pressure.

9.2.9

Sleeves / openings of suitable sizes shall be provided at wall crossings.

9.2.10 The hot plate temperature must be 210 C.


9.2.11 Ensure that the two pipe brackets and the two pipe supports are correctly
aligned.
9.2.12 Both pipe sockets must be adjusted so that they hold the pipe tightly enough to
withstand the force of the welding process.
9.2.13 Press the pipe ends against hot plate by briefly applying a high pressure.
Continue heating very low pressure until an up stand of 1 mm has formed.
9.2.14 Quickly remove the hot plate and slowly increase the welding pressure.
9.2.15 Hold the welding pressure steady and allow the weld to cool.
9.2.16 Remove the joint and inspect the weld.
10.0 INSPECTION
Inspection I

Installation of HDPE pipes & accessories. tools and

Equipments.

11.0 SAFETY INSTRUCTION.


During the Installation all measures shall be adopted to ensure safe working.

Client site management system shall be implemented.

All personnel involved shall use necessary PPE.

All equipment will be inspected by HSE prior to use.

Access and good housekeeping will be maintained.

JVS DC HDPE PIPING

Page 6 of 7

Fire extinguishers will be available at all time where applicable.

All activities at height will be provided with suitable working platform.

The personal protection wears shall be used tagged before used helmet, safety
shoes and hand gloves.

Prior to the commencement of any activities. The workforce will receive an


induction talk on the project as per the site safety requirements. This induction
talk will include both activity safety issues. As well as general safety
requirements.

Front line supervisor will ensure that personal protective Equipment is worn by
site personnel at all times during construction activities.

Heat Stress Training will be provided.

Adequate cool drinking water. Shade and salt water tablets will be in place

Plant and Equipment will be provided with back-up alarms, lights and all other
applicable safety devices.

12.0 ATTACHMENTS
Risk Assessment
ITP

JVS DC HDPE PIPING

Page 7 of 7

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/BVLV/MS0/2016


Rev. No.&Date:00
03.09.2016

METHODSTATEMENT FOR
INSTALLATION OF BURRIED VALVE

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC

CLIENT

CONTRACTOR

INDEX

1.0 PURPOSE
2.0 SCOPE OF WORK
3.0 REFERENCES
4.0 DEFINITIONS AND ABBREVIATIONS
5.0 RESPONSIBILITIES
6.0 TOOLS / EQUIPMENT
7.0 MATERIAL
8.0 HANDLING AND STORAGE
9.0 PROCEDURE
10.0 INSPECTION
11.0 SAFETY INSTRUCTION.
12.0 ATTACHMENTS

JVS DC Buried Valve Installation

Page 2 of 9

1.0 PURPOSE:
The purpose of generating this Method Statement is to define the procedure step by step to
implement the correct practices for Installation ofBuried valve at JVS DC project through
the guide line complies with the requirements of EMPOWER&OEM within the time limit
with maximum satisfactory level.
2.0 SCOPE
This Method Statement refers to various work procedures contained within JVS DC
project controldocuments, which explains and covers the Installation ofBuried Valve on
chilled water network system.
3.0 REFERENCES
3.1 HSE Requirements as stipulated in Contract Documents.
3.2 All applicable Local Regulatory Authority requirements and regulations.
3.3 Health, Safety and Environment Plan
3.4 Contract Specifications
3.5 OEM Instructions
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
4.1.1

CLIENT: EMPOWER

4.1.2

PROJECT:

JUMEIRAH

VILLAGE

SOUTH

DISTRICT

COOLING PLANT
4.1.3

ENGINEER: EMPOWER

4.1.4

CONTRACTOR: ISLANDTOWER

4.2 Abbreviations
HSE: Health, Safety Environment & Security
OEM: Original Equipment manufacturer
5.0 RESPONSIBILITIES
5.1 Project Manager
Project Manager shall be responsible for the implementation of this procedure within his
project

JVS DC Buried Valve Installation

Page 3 of 9

5.2 Project Engineer


The Project Engineer shall be responsible for the management of all Installation activities
on the work sites of the project.
He shall ensure that these Installation activities are carried out, by competent and
experienced personnel according to a planned and safe procedure, in compliance with the
Project HSE Plan and relevant Authorities (when applicable).
The Project Engineer shall investigate, in liaison with the Project HSE Engineer any
accident / incident that may occur, take necessary immediate corrective measures and
issue required reports.
5.3 Competent Person(s)
The Competent Person(s) is a person fully trained, qualified and experienced in the
planning and performance of Installation activities, and has detailed knowledge of the
hazards and safety precautions applicable to this type of work.
He shall be directly responsible for the pressure testing operations and shall supervise the
activities and performance of all personnel involved, and ensure that all work is performed
by persons who are fully qualified and experienced in this type of work.
He shall be responsible for ensuring that Work Permit (PTW) System (and other permits if
applicable) are strictly adhered to during all related operations. He shall ensure that all
Personal Protective Equipment (PPE) and other safety equipment required for his working
crew are available, in good working condition, and are used as requested.
5.4 HSE Engineer
Shall be responsible to monitor the implementation of this procedure, and the safe work of
the Installation activities being carried out at the work site.
Shall provide HSE awareness and advice, e.g. toolbox training, safety and firefighting
equipment and guidance to the Personnel involved in the operation.
Shall investigate, in liaison with the Project Engineer any accident or incident that may
occur, take necessary corrective measures and issue necessary reports.

JVS DC Buried Valve Installation

Page 4 of 9

6.0 TOOLS / EQUIPMENT


Sl No

TOOLS / EQUIPMENT

Qty

Welding machine

Pipe fitter Tool box

Tool kit for Installation of

coupling
4

Grinder

Alignment Tool

Hand tools like spanners etc

Cleaning material

Excavation Tools

7.0 MATERIALS:
Buried valves, Coupling, MS Spool pieces
8.0 HANDLING & STORAGE:
8.1

On delivery of the Buried Valves and Coupling at site, necessary precautions


shall be taken for unloading, shifting & storage.

8.2

All materials received at site shall be inspected by Empower representative and


to ensure that the materials are as per approved material submittals in terms of
their make, model type, country of origin and capacity.

8.3

All material while unloading shall not be dropped, but lowered to the ground.

8.4

While stacking, it shall be Stacked as per OEM Instructions

8.5

Any items found damaged or not suitable as per project requirements shall be
removed from site. If required to store temporarily, they shall be clearly
marked and stored separately to prevent any advertent use.

9.0 PROCEDURE
1. Setting out the location of Buried Gate Valve as per the approved shop
drawingby EMPOWER.
JVS DC Buried Valve Installation

Page 5 of 9

2. Trial trench excavation to be carried out using hand shovel as per the approved
shop

drawing

and

method

statement

for

excavation

(Ref:

EMP/EXC/MS05/16).
3. Dewatering is expected since the works are to be carried out below the natural
water table.
4. Joint survey will be done after completion of trial trench in order to complete
the final alignment.
5. After finishing the final alignment with EMPOWER and concerned authorities
(DEWA/NAKHEEL/TRAKHEES etc), excavation will be carried out up to top
of the existing line as per approved method statement for excavation (Ref:
EMP/EXC/MS05/16).
6. Installation section will be isolated by closing the existing valves on the
existing GRP chilled water linenearby the section.
7. Drain the water to make provision to install buried valves
8. Excavate up to 250mm below the existing GRP/HDPEpipe bottom level, cut
and remove pipe as per the approved alignment.
9. Dewatering pump will be used for the removal of water. The discharge will be
made as agreed with EMPOWER.
10. Preparation of reinforced concrete slab as per approved drawing
11. Installation of the buried Gate Valve will be done as per the approved shop
drawing.
12. Bevel the pipe end

13. Weld MS Pipe pieces to both end of the valve using but weld

JVS DC Buried Valve Installation

Page 6 of 9

14. Cut the HDPE/ GRP pipe as per the valve length including MS pipe pieces

15. Install the valve using Coupler

16. Install The extended stem as per the site measurement

17. Install the Air vent as per the approved drawing


18. Pre insulate the valve assembly using HDPE jacket pipe using field joint kit
18.a
Measure Sleeve length and mark jacket on both sides

18.b
18.c

Cut jacket to expose foam (approx. 3) on both ends of joint

Install HDPE sleeve

Wrap the heat shields tightly around the PE jacket next to the Ray Joint. Check that they will
not be covered by the Ray Joint when it shrinks on to the pipe. Wrap a second pair of heat
shields tightly around the Ray Joint. These should be Located next to the pipe end marks.
JVS DC Buried Valve Installation

Page 7 of 9

Use a soft flame to give the heat sufficient time to penetrate the PE jacket. Move the flame
around the circumference in close proximity to the heat shields. Carry on for about two
minutes making sure not to burn the surface.

18.d Tape sleeve to hold and seal for foam

18.e Drill 1 hole on each end of joint


18.f Make hole in the new jacket ring and fill the foam mixer A& B through
the hole to ensure that the cavity between the new jacket ring and the core
Pipe/valve/coupling is filled with foam.
18.g Remove the tape

19. Wrap the sleeve using Denso tape Stem and air vent

20. After ensuring leakage free connection to the existing line, layer by layer
backfilling will be started.
21. After backfilling, valve pit chamber for controlling the valve will be
constructed as per the approved shop drawing.
22. Close monitoring of the connection portion will be done for the next 24 hours.

JVS DC Buried Valve Installation

Page 8 of 9

10.0 INSPECTION
Inspection I

Installation of Buried valve

11.0 SAFETY INSTRUCTION.


During the Installation all measures shall be adopted to ensure safe working.

Client site management system shall be implemented.

All personnel involved shall use necessary PPE.

All tools and equipment will be inspected by QHSE prior to use.

Access and good housekeeping will be maintained.

Prior to installation activities, the workforce will receive an induction talk on


the project as per the site safety requirements. This induction talk will include
both activity safety issues as well as general safety requirements.

Front line supervisor will ensure that personal protective Equipment is worn by
site personnel at all times during construction activities.

Heat Stress Training will be provided.

Adequate cool drinking water. Shade and salt water tablets will be in place

Provide fencing guard rails or flagging tape around edges of the excavation
area.

Keep vehicle/equipment safely away excavation edges.

Keep spoil at least 2.0 meters away from edge

12.0 ATTACHMENTS
Risk Assessment
ITP Plan

JVS DC Buried Valve Installation

Page 9 of 9

Jumeirah Village South District


Cooling Plant

Method Statement No:EMP/CLD/MS12/2016


Rev. No.&Date:00
18.09.2016

METHODSTATEMENT FOR
CLADDING OF CHW PIPELINE

JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

CLIENT
EMPOWER ENERGY SOLUTONS

CONTRACTOR
ISLAND TOWER ELECTROMECHANICAL WORKS LLC

CLIENT

CONTRACTOR

INDEX

1.0 PURPOSE
2.0 SCOPE OF WORK
3.0 REFERENCES
4.0 DEFINITIONS AND ABBREVIATIONS
5.0 RESPONSIBILITIES
6.0 TOOLS / EQUIPMENT
7.0 MATERIAL
8.0 HANDLING AND STORAGE
9.0 PROCEDURE
10.0 INSPECTION
11.0 SAFETY INSTRUCTION.
12.0 ATTACHMENTS

JVS DC CLADDING OF CHW PIPELINE

Page 2 of 6

1.0 PURPOSE:
The purpose of generating this Method Statement is to define the procedure step by step to
implement the correct practices for cladding of chilled water Pipe lines through the
compliance with the requirements of client within the time limit and with maximum
satisfactory level.
2.0 SCOPE
This Method Statement refers to various work procedures contained within JVS DC project
control documents, which explains and covers the Insulation of chilled water pipe line work.
3.0 REFERENCES
3.1 HSE Requirements as stipulated in Contract Documents.
3.2 All applicable Local Regulatory Authority requirements and regulations.
3.3 Health, Safety and Environment Plan
3.4 Contract Specifications
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
4.1.1

CLIENT: EMPOWER

4.1.2

PROJECT: JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PLANT

4.1.3

ENGINEER: EMPOWER

4.1.4

CONTRACTOR: ISLAND TOWER

4.2 Abbreviations
HSE: Health, Safety Environment & Security
5.0 RESPONSIBILITIES
5.1 Project Manager
Project Manager shall be responsible for the implementation of this procedure within his
project
5.2 Project Engineer
The Project Engineer shall be responsible for the management of all cladding activities on
the work sites of the project. He shall ensure that these pressure-testing activities are carried
out, by competent and experienced personnel according to a planned and safe procedure, in
compliance with the Project HSE Plan and relevant Authorities (when applicable).
JVS DC CLADDING OF CHW PIPELINE

Page 3 of 6

The Project Engineer shall investigate, in liaison with the Project HSE Engineer any
accident / incident that may occur, take necessary immediate corrective measures and issue
required reports.
5.3 Competent Person(s)
The Competent Person(s) is a person fully trained, qualified and experienced in the planning
and performance of cladding operations, and has detailed knowledge of the hazards and
safety precautions applicable to this type of work.
He shall be directly responsible for the cladding operations and shall supervise the activities
and performance of all personnel involved, and ensure that all work is performed by persons
who are fully qualified and experienced in this type of work.
He shall be responsible for ensuring that Work Permit (PTW) System (and other permits if
applicable) are strictly adhered to during all related operations. He shall ensure that all
Personal Protective Equipment (PPE) and other safety equipment required for his working
crew are available, in good working condition, and are used as requested.
5.4 HSE Engineer
Shall be responsible to monitor the implementation of this procedure, and the safe work of
the Cladding operations being carried out at the work site.
Shall provide HSE awareness and advice, e.g. toolbox training, safety and firefighting
equipment and guidance to the Personnel involved in the operation.
Shall investigate, in liaison with the Project Engineer any accident or incident that may
occur, take necessary corrective measures and issue necessary reports.
6.0 TOOLS / EQUIPMENT
6.1 Portable hand tools like Adjustable spanner.
6.2 .Portable Drilling Machine/ Grinding Machine & Angle Cutter.
6.3 Rivet Gun
6.4 Step Ladder
6.5 Sheet rolling machine.
6.6 Lock former
6.7 Hand Grooving machine

JVS DC CLADDING OF CHW PIPELINE

Page 4 of 6

7.0 MATERIALS:
Aluminum Sheet with stucco finish and accessories shall be in line with the approved
material submittal.
8.0 HANDLING & STORAGE:
8.1 On receipt of the material at sites, shall be off-loaded carefully at site using
necessary manpower and required equipment to ensure that no damage is to cause
to the materials, necessary precautions shall be taken for unloading, shifting &
storage.
8.2 Cladding Sheets will be checked to ensure that it complies with the approved
material submittals in terms of make, thickness etc.
8.3 Any discrepancies, damage etc., found will be notified and reported for further
action.
8.4 Site Engineer has to ensure that the material used at site are of free from any
damage or deformity of any kind. Material found not suitable for site use will be
removed immediately from site and the same will be replaced by correct item.
8.5 All packages shall be stored under protected dust area.
9.0 PROCEDURE
9.1 Aluminum sheets of approved type, quantity and thickness are cut as required and
fabricated to give rectangular profile and to form the longitudinal and
circumferential groove.
9.2 Sheet thickness of 0.7 mm is used for cladding of chw pipeline.
9.3 Slip the fabricated aluminum profile on to the insulated pipeline. Care shall be
taken to ensure no damage to insulation.
9.4 Band & Wires shall be installed at an interval of 1.2 meters and at bends, short
lengths, etc. are as applicable.
9.5 Fix the successive cladding and match the rectangular circumferential groove of
previous cladding.
9.6 Cladding should be overlapped not less than 50 mm.
9.7 All longitudinal and circumferential joints are properly sealed by sealant.
9.8 Care must be taken while cladding accessories to avoid restrictions to the
operational parts.
9.9 Care shall be taken to ensure, the cladding surface is free from damages, scratches,
dirt etc.
JVS DC CLADDING OF CHW PIPELINE

Page 5 of 6

9.10 Cladding shall be firmly fixed on the pipelines.


10.0 INSPECTION
Inspection I

cladding inspection of chilled water pipes lines.

11.0 SAFETY INSTRUCTION.


During the Installation all measures shall be adopted to ensure safe working.

Client site management system shall be implemented.

All personnel involved shall use necessary PPE.

All equipment will be inspected by HSE prior to use.

Access and good housekeeping will be maintained.

Fire extinguishers will be available at all time where applicable.

All activities at height will be provided with suitable working platform.

The personal protection wears shall be used tagged before used helmet, safety
shoes and hand gloves.

Prior to the commencement of any activities. The workforce will receive an


induction talk on the project as per the site safety requirements. This induction
talk will include both activity safety issues. As well as general safety
requirements.

Front line supervisor will ensure that personal protective Equipment is worn by
site personnel at all times during construction activities.

Heat Stress Training will be provided.

Adequate cool drinking water. Shade and salt water tablets will be in place

Plant and Equipment will be provided with back-up alarms, lights and all other
applicable safety devices.

12.0 ATTACHMENTS
Risk Assessment
ITP

JVS DC CLADDING OF CHW PIPELINE

Page 6 of 6

ANNEXURE 2
ITPS For Activities

QHSE Plan-JVS

TR-164

ANNEXURE 2
2.1. INSPECTION AND TEST PLAN FLUSHING OF CHILLED WATER PIPING

QHSE Plan-JVS

TR-164

Inspection and Test Plan Flushing of CHW Piping work.

Doc No. : EMP/FLS/ITP01/2016


Rev. No. : 00
Date
; 21-08-16
Page No. : 1 of 2

ISLAND TOWER

Jumeirah Village South District Cooling Project TR-0164


Inspection Point
ITP No.

Type of Inspection

Reference
Document

Testing Requirement/
Acceptance Criteria

Verifying /Control
Data forms

VEOLIA

Inspection
Description

EMPO
WER

Contract Specification
Shop drawing,
Manufacture's recommendation.

All the documments to have


minimum status of-No
objection
with comments (B)

Drawing submittal
log

Mechanical specification,
Manufacture's
instruction/Documents

Comparison of received
material with material
submittals and specification.

Material report

IT

GENERAL

1.1

Relevant shop drawing, Method Statement for


flushing and chemical treatment, Technical
material submittal for chemical treatment. ITP's
and procedures are submitted and approved
before any start of activity.

TESTING PLAN

2.1

Check that the chemicals and relevant


accessories delivered at site are correct and in
accordance with the approved material
submitted as per specification.

Review of
Documents

Visual

Legends: H - Hold Point


W - Witness Point
R - Review Documents
S - Surveillance Inspection
SR - Submit for Record

Inspection and Test Plan Flushing of CHW Piping work.

Doc No. : EMP/FLS/ITP01/2016


Rev. No. : 00
Date
; 21-08-16
Page No. : 2 of 2

ISLAND TOWER

2.2

Check that the check sheet Flushing


with Clean water- Stage1 has been signed and
approved.

2.3

Check that the check sheet Flushing


with Chemicals- Stage2 has been signed and
approved.

2.4

Check that the check sheet Chemical treatmentStage3 has been signed and approved.

2.5

Check that the check sheet Chemical treatment


upon commissioning- Stage4 has been signed
and approved.

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Check of quality of water and


fill the report form

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Check of quality of water &


chemical level and
fill the report form

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Check of quality of water &


chemical level and
fill the report form

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Check of quality of water &


chemical level, adjust
accordingly and fill the report
form

Legends: H - Hold Point


W - Witness Point
R - Review Documents
S - Surveillance Inspection
SR - Submit for Record

Quality control check


sheet flushing with
clean water -stage1
Test report

Quality control check


sheet flushing with
chemicals-stage2
Test report

Quality control check


sheet chemical
treatment-stage3
Test report

Quality control check


sheet Chemical
treatment upon
commission -stage4
Test report

ANNEXURE 2
2.2. INSPECTION TEST PLAN FOR HYDROSTATIC PRESSURE TESTING.

QHSE Plan-JVS

TR-164

INSPECTION TEST PLAN FOR HYDROSTATIC PRESSURE TESTING


OF GRP PIPIELINES
ISLAND TOWER

Doc No.

: EMP/HT/ITP01/2016

Rev. No.
Date

: 00
; 28-08-16

Page No. : 1 of 1

Jumeirah Village South District Cooling Project TR-0164


Inspection
Description

Type of Inspection

Relevant shop drawing, Method Statement for


Hydrostatic pressure test, ITP's and procedures
are submitted and approved before any start of
activity.

Review of
Documents

ITP No.

1
1.1

Reference
Document

Testing Requirement/
Acceptance Criteria

Inspection Point
IST

EMPOWER

Verifying /Control
Data forms

GENERAL

Contract Specification
Shop drawing,
Manufacture's recommendation.

All the documments to have


minimum status of-No
objection
with comments (B)

Drawing submittal log

Manufacture's
instruction/Documents

Comparison of delivered
plant items with approved
method of statement.

method statemnt

TESTING PLAN

2.1

Check that the plant and relevant accessories


delivered at site are correct and in accordance
with the approved method of statement.

Visual

2.2

Check that the check sheet for hydrostatic


pressure test has been signed and approved.

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Check of pressure reading


and fill the report form

Quality control check


sheet for Hydrostatic
Pressure testing

2.3

Check the pressure test report has been signed


and approved.

Visual /
Measurement

Mechanical specification,
Manufacture's
instruction/Documents

Verify the measurements and


comments on the pressure
test report

Quality control pressure


Test report

Legends: H - Hold Point


W - Witness Point
R - Review Documents
S - Surveillance Inspection
SR - Submit for Record

ANNEXURE 2
2.3. EXCAVATION AND BACKFILLING FOR BURIED VALVE
INSTALLATION.

QHSE Plan-JVS

TR-164

Doc No.

INSPECTION TEST PLAN FOR EXCAVATION AND VALVE PIT


INSTALLTION

: EMP/EXC/MS05/2016

Rev. No. : 0
Date
; 28-08-2016
Page No. : 1 of 1

ISLAND TOWER

Jumeirah Village South District Cooling Project TR-0164


Inspection
Description

ITP No.

1.1

2
2.1

Type of Inspection

Reference
Document

Testing Requirement/
Acceptance Criteria

Inspection Point
IST

EMPOWER

Verifying /Control
Data forms

Approval/permit/preliminaries

Relevant shop drawing, Method Statement for


Excavation and Buried Valve Pit Installation,
ITP's and procedures are submitted and
approved before any start of activity.

Review of
Documents

All the documments to have


Contract Specification
minimum status of-No objection
Shop drawing,
Manufacture's recommendation. with comments (B)

Drawing submittal log

Visual

Comparison of delivered plant


Approved method statement and
items with approved method of
Drawing
statement.

method statemnt

Approved Method statement

Method statement

Approved Method statement

Method statement

Material Inspection

Check that the Valve pit are delivered at site


are correct and in accordance with the
approved method of statement.
Work process
Excavation
Installation of Valve Pit/ Level to the Ground
level
Back Filling
Acces cover Installation

Measurement
Visual/measuremnt

Approved drawing
specification, Manufacture's
instruction/Documents

Visual

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

Visual

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

Legends: H - Hold Point


W - Witness Point
R - Review Documents
S - Surveillance Inspection
SR - Submit for Record

ANNEXURE 2
2.4. INSTALLATION OF GRP CHILLED WATER PIPE.

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Project


TR-0164

REF. No.
REV. No.
DATE
PAGE

:
:
:
:

EMP/GRP/ITP08/2016
00
29-Aug-16
1 of 2

INSPECTION & TEST PLAN FOR


INSTALLATION OF GRP CHILLED WATER PIPE
AREA

LEVEL

ITEM NO.
1

DESCRIPTION

SPECIFICATION / CRITERIA

INSPECTION & ACCEPTANCE


IST
EMPOWER

Document Approvals
Material Approvals

Material submittals

Quality Documents

Method Statement ref. EMP/GRP/MS08/2016

Materials Verification
Approved material submittals
Inspection of Materials Received at site
Project Specification
Manufacturer's Recommendations &
Storage
Method Statement no.EMP/GRP/ITP08/2016

Installation
Safety Clearance

Project Safety Plan


Project Specification

Installation

Method Statement ref. EMP/GRP/MS08/2016


Approved shop drawings

Installation check for chilled water pipes

Project Specification
Approved shop drawings of the area
Mehtod statement EMP/GRP/MS08/2016

VERIFYING
DOCUMENT

Jumeirah Village South District Cooling Project


TR-0164

REF. No.
REV. No.
DATE
PAGE

:
:
:
:

EMP/GRP/ITP08/2016
00
29-Aug-16
2 of 2

INSPECTION & TEST PLAN FOR


INSTALLATION OF GRP CHILLED WATER PIPE
AREA

LEVEL

ITEM NO.
4

DESCRIPTION

SPECIFICATION / CRITERIA

INSPECTION & ACCEPTANCE


IST
EMPOWER

VERIFYING
DOCUMENT

Cleaning Protection
Method statement No. EMP/GRP/MS08/2016

Method statement No. EMP/GRP/ITP08/2016

Site Inspection Reports

Signed & Approved

Test Certificates (if applicable)

Handed-over

Pressure Test Report (if applicable)

Signed & Approved

NCRs (if any)

All NCRs Closed & Signed off

Cleaning on completion of the activity


Protection (if required) against possible
damages till Commissioning/Handing-over
5

Document Review

LEGEND

: H - HOLD FOR INSPECTION

W - WITNESS INSPECTION

S - SURVEILLANCE INSPECTION

ISLANDTOWER

EMPOWER

NAME

NAME

SIGN

SIGN

DATE

DATE

- REVIEW

ANNEXURE 2
2.5. ITP FOR INSTALLATION OF HDPE PIPES AND FITTINGS.

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Project


TR-0164

: EMP/GRP/ITP08/2016
REV. No. : 00
DATE
: 29-Aug-16
PAGE
: 1 of 2
REF. No.

INSPECTION & TEST PLAN FOR


INSTALLATION OF HDPE PIPES AND FITTINGS
AREA

LEVEL

ITEM NO.
1

DESCRIPTION

SPECIFICATION / CRITERIA

INSPECTION & ACCEPTANCE


IST
EMPOWER

Document Approvals
Design and Shop drawings

Drawing submittals

Material Approvals

Material submittals

Quality Documents

Method Statement ref. EMP/HDPE/MS13/2016

Materials Verification
Approved material submittals
Inspection of Materials Received at site
Project Specification
Manufacturer's Recommendations &
Storage
Method Statement no.EMP/GRP/ITP08/2016

Installation
Safety Clearance

Project Safety Plan


Project Specification

Installation

Method Statement ref. EMP/HDPE/MS013/2016


Approved shop drawings

Joint Installation

Installation check for HDPE pipes

SPECIFICATION /approved |Method ststement


Project Specification
Approved shop drawings of the area
Mehtod statement EMP/HDPE/MS013/2016

VERIFYING
DOCUMENT

ANNEXURE 2
2.6. ITP FOR INSTALLATION OF BURIED VALVE.

QHSE Plan-JVS

TR-164

Doc No.

INSPECTION TEST PLAN FOR BURIED VALVE INSTALLATION

: EMP/HT/ITP02/2016

Rev. No. : 01
Date
; 04-09-16
Page No. : 1 of 1

ISLAND TOWER

Jumeirah Village South District Cooling Project TR-0164


Inspection
Description

ITP No.

1.1

2.1

2.2

Reference
Document

Testing Requirement/
Acceptance Criteria

Inspection Point

Verifying /Control
Data forms

IST

EMPOWER

Drawing submittal log

method statemnt

Approval/permit/preliminaries

Relevant shop drawing, Method Statement for


Buried Valve Installation, ITP's and procedures
are submitted and approved before any start of
activity.

Review of
Documents

Contract Specification
All the documments to have
Shop drawing,
minimum status of-No objection
Manufacture's recommendation. with comments (B)

Material Inspection

Check that the Valve and relevant accessories


delivered at site are correct and in accordance
with the approved method of statement.

Visual

Manufacture's
instruction/Documents

Comparison of delivered plant


items with approved method of
statement.

Mock up

Visual

Approved method ststement and


Drawing

. As per approved Shop drawing,


. All accessories are Included in
the mock up

Method statement

Installation of Valve

Visual

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

specification, Manufacture's
instruction/Documents

Approved Method statement

Method statement

specification, Manufacture's
instruction/Documents

Verify the measurements and


comments on the pressure test
report

Work process

Installation of Coupling

Field Jacketing
Wraping of Denso tape

2.3

Type of Inspection

Installtion of stem

Visual

Visual
Visual

Visual

Legends: H - Hold Point


W - Witness Point
R - Review Documents
S - Surveillance Inspection
SR - Submit for Record

Quality control pressure


Test report

ANNEXURE 2
2.7. ITP FOR CLADDING OF CHILLED WATER PIPELINE.

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Project


TR-0164

REF. No.
REV. No.
DATE
PAGE

:
:
:
:

EMP/CLD/ITP12/2016
00
30-Aug-16
1 of 2

INSPECTION & TEST PLAN FOR


CLADDING OF CHILLED WATER PIPELINES
AREA

LEVEL

ITEM NO.
1

DESCRIPTION

SPECIFICATION / CRITERIA

INSPECTION & ACCEPTANCE


IST
EMPOWER

Document Approvals
Material Approvals

Material submittals

Quality Documents

Method Statement ref. EMP/GRP/MS08/2016

Materials Verification
Approved material submittals
Inspection of Materials Received at site
Project Specification
Manufacturer's Recommendations &
Storage
Method Statement no.EMP/CLD/ITP12/2016

Installation
Safety Clearance

Project Safety Plan


Project Specification

Installation

Method Statement ref. EMP/CLD/MS12/2016


Approved shop drawings

Installation check for chilled water pipes

Project Specification
Approved shop drawings of the area
Mehtod statement EMP/CLD/MS12/2016

VERIFYING
DOCUMENT

ANNEXURE 3
OH&S RISK ASSESSMENT

QHSE Plan-JVS

TR-164

ANNEXURE 3
3.1. HSE&S RISK ASSESSMENT FOR FLUSHING OF CHILLED WATER PIPE

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Plant


Page 1 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Severity
Slight Injury - First
Aid
Likelihood

Minor or Serious
Injury

Major Injury - Lost


Time > 3 days

Single Fatality Permanent Disability

Multiple Fatalities

10

Certain

10

20

40

60

80

100

Very Likely

16

32

48

64

80

Likely

12

24

36

48

60

May happen

16

24

32

40

Unlikely

12

16

20

Trivial Risk - No further improvements necessary provided control measures are maintained
Adequately Controlled Risk - Risk is tolerable when control measures identified are implemented
Moderately controlled Risk - Further risk reduction measures should be considered
Intolerable Risk - Seek specialist advice/ support

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 2 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

Likelihood

Shifting flushing
filters, water
tanks and
accessories to
the required
location.
a). Manual
handling failures
and fall of
materials

(Refer To Risk Assessment


Procedure,)

Back injuries/
Sprain/
Amputations/
Cut injuries

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

48

Residual
Risk
(T/A/M/I)

(A)

Conduct route survey and identify onsite


hazards and take necessary alternate safe
route if there are any obstruction/trip & trap
holes.
Proper handling - Training operatives through
tool box talks.
Only selected technicians with adequate
knowledge and experience to be engaged.
Work to be carried under supervision.
Plan the lift and be sure that all member of the
group are aware of the plan. Be sure that all
team members can lift the load to the
required height without over stretching and
can lift their share of the load.

ALARP
Demonstr
ated
(Y/N)

Actions
By

Supervisor /
operators/H
SE officer

Date

Jumeirah Village South District Cooling Plant


Page 3 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

All team members should lift their share from


the start of the lift so position the team/slide
the object so that you can lift in this manner.
b) Fall of objects
from pallet
trolley while
handling

Serious

c) Poor area
illumination

Body injuries

d).Improper

Body injuries
& hand injury

access and egress

injuries, fatal

Check weight of load and object size/shape.


Secure the large volume loads with nylon rope.
Use palletized loads to the maximum extend.
Pallet trolleys to be inspected and colour coded
every month.
Ensure the shifting area is well illuminated.
Area light fixates to be installed in such a way that
it is not creating any glare to people movement.
Area light fixtures to be kept away from any
combustibles and secured.
Ensure the shifting area is free of materials.
Select correct route before accessing.
Do housekeeping regularly and removed scraps.

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 4 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

2.

Hazards

(The potential to
cause harm )

Welding / Hot
Works, fumes
inhalation,
prolong
exposure, eye
irritation
electrocution.

Risk Rating With No Controls


Effects
(Consequences)

Burns, welding
flash eye injury,
fatality,
developing lung
disease,
dermatitis.

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Outcome
(T/A/M/I)

32

Recommended Control Measures & Mitigations

Only operative fitted to manual handling activities


are involved to the task.
Provide lifting equipment if needed
While carrying the materials buddy system to be
implemented.
Supervisor to provide work rotation to prevent
prolong exposure to fumes.
Welding area must be properly protected by fire
blanket or fire rated curtain to protect other person
from burns caused by spark.
Welding area is not permitted and restricted for
unauthorized person
Wear a helmet or face shield with a darker filter
lens shade.
Wear approved head, hand and body protection,
which help to prevent injury from radiation, sparks
and electrical shock
Standby trained fire watcher always available while
welding in progress
Issued PPE must check by supervisor regularly if
fitted properly and change if necessary.
Supervisor to inspect welding machine before use,
report any defect which he believe is reasonable
foreseeable to endanger their safety
Supervisor to monitor welding works at same time
instruct his welder to keep his head out of the fumes.
Keep welding area well ventilated use local exhaust
ventilation to keep the fumes below the harmful limit
within the welder breathing zone.

Residual
Risk
(T/A/M/I)

(A)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Supervisor /
operators/
fire
warden/HSE
officer

Date

Jumeirah Village South District Cooling Plant


Page 5 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

Involvement of
Incompetent
welder

Fire, property
damage,
personnel injury &
fatality.

32

The work area shall be kept tidy and free from


flammable & combustible materials, tangled leads,
discarded off-cuts and electrode stubs.
The fire should remain on watch for at least 30
minutes after the hot work finished.
Power shall be turned off and electrode stubs
removed prior to the welder leaving the work area.
A supervisor shall be appointed to be responsible
for the safe execution of the welding work.
Welding gloves shall be sound, dry and used on
both hands.
Appointed supervisor shall immediately stop
welding work if a hazardous condition is observed.
Always maintain safe access/egress to work area.
Brief the operatives via toolbox talk / Pre Task
briefing, inspection of welding machine.
Only certified and qualified welder is allow to carryout
welding works.

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

(A)

Engineer/Su
pervisor

(A)

Engineers/S
upervisor
/operators/
HSE Officer

Read & follow manufacturers instruction & warning


labels.

Storage,
handling,
application of
chemicals
a). Storage and
stacking of

Access blocks

56

Store chemicals on designated areas away from


stair access routes, floor edges and pathways.
Store chemicals properly on the ground inside drip

Date

Jumeirah Village South District Cooling Plant


Page 6 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

accessories and
chemicals

And occurrence
of chemical
reactions
Skin burns/
breathing
discomfort /
eye injuries

tray to contain spills.


Barricade the chemical storage areas. Do not stack
one over another.
Fresh water to be provided to diluted the spills in
case of spills.
Provide warning/caution notices in stored areas.

b). Handling of

Skin - health
illness due to
chemicals

Chemicals should be tagged with warning signs


"chemical for chilled water treatment".
Handle with care sign to be visibly displayed.
Only authorised persons to be engaged for
handling chemicals with PPE's as stated in MSDS
(chemical resistant gloves and apron).
Training to be conducted for all people working in
the area and who are handling chemicals.
Fresh water to be kept readily available to rinse of
the affected part due to spills.
Provide warning/caution notices in stored areas.
Only experienced person to be engaged for
shifting chemicals.
Use PPE as described in MSDS i.e. chemical
resistant gloves, apron and respirators.

Chemicals

c). Exposure to
hazardous
chemicals
during shifting

Skin burns/
breathing
discomfort /
eye injuries

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 7 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

d).Exposure to
hazardous
chemicals during
application to
flushing system.

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

skin burns/
breathing
discomfort /
eye injuries

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

Do route survey and eliminate trip and fall


hazards.
Conduct periodic tool box talk meeting.
Only authorised persons to be engaged for
handling chemicals
Area to be restricted and provide warning signs
and caution notices. All valves to be fixed with
signage in different language readable as "DO NOT
OPEN THIS VALVE".
Use PPE as described in MSDS i.e. rubber apron,
rubber hand gloves and respirators.
Do route survey and eliminate trip and fall hazards
to avoid contact with chemicals due to spills.
Shift limited quantity of chemical for the day work.
Keep the chemical containers closed and provide
drip trays and store away from hot works /area task
lights.
If an area is restricted, crate ventilation.
Used chemical containers to be stored in
hazardous waste collection area before disposing to
the nominated contractor.
Dispose the used chemical containers on regular
(daily) basis as per Dubai municipality requirements.

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 8 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

5.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

Flushing works
a Entrapment
into rotating
machinery like
pumps.

hand injury,
Access blocks
Fractures/
Amputation /
Serious cut
injuries

b). Chemical
treatment of the
systems.

Skin - health
illness due to
chemicals
skin burns/
breathing
discomfort /
eye injuries

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Outcome
(T/A/M/I)

36

Recommended Control Measures & Mitigations

All rotating equipment/pumps to be inspected and


fitted with correct size guards in the rotating parts.
Monthly inspection and colour code to be done.
All motors pumps shall have emergency stop
button near the equipment
Only authorised person to be engaged to operate
the pumps . Barricade the operational areas.
Only authorised persons to be engaged for
handling chemicals
Area to be restricted and provide warning signs
and caution notices. All valves to be fixed with
signage in different language readable as "DO NOT
OPEN THIS VALVE".
Use PPE as described in MSDS i.e. rubber apron,
rubber hand gloves and respirators.
Do route survey and eliminate trip and fall hazards
to avoid contact with chemicals due to spills.
Shift limited quantity of chemical for the day work.
Keep the chemical containers closed and provide
drip trays and store away from hot works /area

Residual
Risk
(T/A/M/I)

(A)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Engineers/S
upervisor
/Foreman
/operators/
HSE officer

Date

Jumeirah Village South District Cooling Plant


Page 9 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

c). Working on
Mob Scaffolding

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Falls from
scaffold
platforms
Materials
falling from
scaffold
platforms
Scaffold
collapses.
Scaffold
tipping over.

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

task lights.
Area is restricted and crate proper ventilation.
All scaffolds & working platforms will be
constructed in accordance with Manufacturers
instructions
&
comply
with
legislative
requirements.
Scaffolds will only be erected, altered or
dismantled by qualified trained operatives who
hold a Scaffolder's Record Card working for the
appointed contractor;
The erection of a scaffold must be carefully
planned in advance including specialist design if
necessary.
All scaffold components will be inspected before
being used. Defective material will not be used,
including ropes & boards.
Scaffold to be fitted with guard rails and toe
boards.
No scaffold will be used until it has been
inspected by a competent person, who will be
responsible for entries in a scaffold register. It will
be inspected at least every 7 days, or after any
alteration, addition or dismantlement. Any scaffold
erected outside will also be inspected following any

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 10 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

d). Working on
Step ladders

Risk Rating With No Controls


(Refer To Risk Assessment
Procedure,)

Effects
(Consequences)

Likelihood

Falls from
stepladders
Stepladders
collapsing
Dropping
materials/plant.
/
p
l
a

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

inclement weather likely to have affected its


stability.
Protection against materials falling from heights
will be provided by using netting, fans & brick
guards as necessary.
Suitable notices will be prominently displayed on
incomplete structures.
Safe access & egress to working platforms will be
via Class 1 heavy duty ladders, suitably restrained to
prevent them falling.
Class 1 or Class 2 only to be used which must be
free from defects and maintained in good order.
Stepladders will carry an identification mark and
to be inspected before use and by a competent
person every 3 months
Any defects must be reported immediately.
Defective stepladders will be withdrawn from use
immediately and either repaired or where this is
not possible they will be scrapped.
Retaining cords must be the same length.
The top tread of the stepladder must not be
used as a working platform unless the stepladder
is of such a design as to provide a secure
handhold.

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 11 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


(Refer To Risk Assessment
Procedure,)

Effects
(Consequences)

Likelihood

n
t

d). Exposure to
chemical spills
in case of any
leakages.

Health illness
due to
chemical
property-skin
rashes

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

Ladders will be set on a firm level base with the


legs positioned as far apart as the retaining chord
or hinges will allow.
Only one person on a stepladder at a time.
Only qualified and approved welders to be used
for welding the pipe line joints.
All pipe lines to be flushed shall be pressure tested
before starting the flushing works. Pressure of the
pipe shall be more than the flushing activity while
doing pressure testing.
All pipes joints/ weld joints shall be tested with
ultra-sonic test.
As a precautionary measure, there will be a team
of cleaning staff available at site on standby and to
be called in during leaks.
Standby team shall be engaged near the valves
and the
pump to shut down operations in case of any
leakages.
Cleaning staff will be equipment with spill
containment kit and required PPE's.
Barricades and warning signs to be kept ready to
provide if there are any leaks.
ALEC RRT will be called to mitigate the situation.

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 12 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

6.

7.

8.

Hazards

(The potential to
cause harm )

Sharp objects
injuring body
and hands
Slip trip and fall
due to materials
scattered on
ground
Fire On site /
Emergency
Evacuation
Trap
Stampede
Fire spread

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Outcome
(T/A/M/I)

Body injuries

12

Body injuries

10

40

Personal
injury
Burns
fatalities

Recommended Control Measures & Mitigations

Train and give tool box talks


Provide warning/caution notices and signage.
Reduce maximum number of sharp edges.
Daily removal of scraps and disposing on identified
disposal area.
Regular cleaning of the surrounding area.
Use PPE like hand gloves and dust masks.

All the teammates in the site must aware of the


different types of fire and different type of
firefighting measures through the periodic tool
box talk, meeting,
Team supervision shall direct all the operatives
under their instructions. In the required
evacuation ,
Also , fire wardens and first aiders will be
identified as part the Tool box talk
All operatives will be instructed on the sound of
the fire and evacuation alarm to stop work
immediately leave behind all tools and
equipment/materials and leave by the quickest
root

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

(A)

(A)

(A)

Actions
By

Supervisor
/foreman
/HSE officer
Supervisor /
foreman
/HSE officer

Supervisor /
foreman /
fire warden
/ HSE officer

Date

Jumeirah Village South District Cooling Plant


Page 13 of 14

EMP-TR-0164

HSE&S Risk Assessment


Date:
Revision:
Main Activity:
Tools / Equipment Used:

21/08/2016
0
Chilled Water Flushing
Crane, Welding machine, Scaffolding, Pumps.

Location:

Jumeirah Village South

Method Statement Reference:

EMP/FLS/RA01/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating With No Controls


Effects
(Consequences)

(Refer To Risk Assessment


Procedure,)

Likelihood

Severity

Recommended Control Measures & Mitigations

Outcome
(T/A/M/I)

Once mustered the assembly point , no one shall


be return until instructed by the main contractor
emergency control authority
all must aware of the fire triangle and to ensure
the combination of the fire triangle is kept
separated
all flammable and COSHH to be handled, stored as
per the MSDS recommendation
Rescue team shall be trained regularly and be in
awareness all the time
By hearing emergency alarm or call, the work to
be stopped and all should follow the instruction of
the fire wardens/marshals
all employees shall be aware of the emergency
exists in the site
all employees shall know access &egress to site
emergency exits shall be clearly marked and
illuminated
more than one emergency exit shall be provided
for easer evacuation of persons
proper housekeeping shall be maintained
emergency drill shall be practiced regularly

Residual
Risk
(T/A/M/I)

ALARP
Demonstr
ated
(Y/N)

Actions
By

Date

ANNEXURE 3
3.2. HSE&S RISK ASSESSMENT FOR HYDROSTATIC AND PRESSURE
TESTING.

QHSE Plan-JVS

TR-164

HYDROSTATIC AND PRESSURE TESTING OF GRP PIPIELINES

SN

Hazards

CONSEQUENCES/ IMPACT

RISK EVALUATION
With No Controls
P

Hydro pressure test

Personal Injury

S
6

RISK
LEVEL
H/M/L
48

RESIDUAL RISK

IMPLEMENTED CONTROL MEASURES


PTW (Permit to Work) to be obtained before starting the work and toolbox talks should be
conducted.

Property Damage

Coordinate with all concerned parties before starting The pressure test

Spilln of water

Necessory clearance from concerened authoritied to be obtained

Water Accumulation

Area should be baricade/ cordon off

H/M/L

ACCEPT Y/N?

Actions

By
Date
Site
Engineer/Supe
rvisor/store
keepers

Close Supervision and monitoring needed


Provide warning and information signage
Ensure calibration of the gauges and certification
Access/egress rerstriction
Only authorised and trained operatives are involed for the task
Emergency prepardeness must be in ready all the time during the testing to handle the leaks
and spills
All blinds and valves are kept proper close and ensure
Ensure all support system are adequate
Using of High Pressure Electrical
pump

Electrical shock

20

Rotating equipment

Electrical connection should be carried out by Combetent persons only

Site
Engineer/Supe
rvisor/store
keepers
/operators

Only authorised and trained operatives are involed for the task
Ensure safe gaurds are installed to cover the rotating part of pumps
All electrical cables properly insulated

Use of Electric equipments like


panels,pumps etc

Entanglement

All operatives to receive appropriate training


making steps (benching) or sloping on all sides of excavation to avoid collapse and reduce
depth

Electricity

Ergonomics

Ensure the PTW system obtained before any such works.

Fire

Vibration

Sparks

Noise

Prior to start use the area must be verified by the engineer/su pervisor for any other
existing/concealed services like post & Pre tensioning cables for concrete,MEP services etc

Moving cutting edges

Personnel Injury, fatality

48

Powered equipment will be fitted with a safety breaker to prevent the tool continuing to
operate incase of any emergencies.
Only tools and plant inspected and in good condition with in-date test tags are to be used.
Power equipment users are to inspect the device & ensure there are no obvious defects
prior to use.
All extension cables are to be kept in a tidy using cable management where they will be
kept of the ground when possible.
No loose clothi ng is to be worn to avoid entanglement within the machines mechanism .

HYDROSTATIC AND PRESSURE TESTING OF GRP PIPIELINES

SN

Hazards

CONSEQUENCES/ IMPACT

RISK EVALUATION
With No Controls
P

RISK
LEVEL

RESIDUAL RISK

IMPLEMENTED CONTROL MEASURES

H/M/L

ACCEPT Y/N?

H/M/L

By

16

Any damaged or defective plant is to be reported to the works supervisor and


quarantined, replacements are to be arranged. Only authorised personnel may undertake
repa irs.
Ensure the work area is clear and the planned works will not have an effect on surrounding
trades or materials.
Manage the cables in the proper way to prevent getting slip/trip as well as getting damage
from other activities
All extension cables and plant to be removed from work area at the end of the day and
secured to avoid unauthorised use.
Adequate training and be competent training need who use the equipments.
Site mandatory and job specific PPE must be worn
3

Working under
Property damage and personnel
chambers/excavated areas/trench. injury
Fall of materials
Fall from height
Respiratory problems

64

Toolbox talks to be conducted on confined space, respiratory problems etc


Ensure proper PPE'S are worn by all the workers, working at such places.
Ensure confined space Permit to Work (PTW) system followed at such locations

Loss of consciousness of any


person at work arising from an
increase in body temperature

Periodical check of toxic gases,Oxygen availability /water In the excavated areas.


Barricade the area

Lack of visibility

Provide proper slgnage, warning lights etc


Ensure supervisors monitor site regularly on excavated locations and ensure that no
unwanted persons Is around the area.
Ensure confined space Permit to Work (PTW) system followed at such locations
Ensure the access egresses are clear.
Ensure proper lightings

Water leak testing of HDPE


(Burried duct )

Property damage and personnel


injury

48

Obtain permit prior to start testing.


Area should be isolating prior to start testing.
Area should be barricade/cordon off.
Deliver tool box talk/On job training.
Close supervision and monitoring needed .
Provide warning and Information signage.
Ensure calibration of the gauge and certification .
Access /egress restriction .
Only authorized and trained operatives involved for the task.
Ensure the pressure does not exceed the required level (do not pressurize systems above
maximum design operating pressure).

Actions
Date

HYDROSTATIC AND PRESSURE TESTING OF GRP PIPIELINES

SN

Hazards

CONSEQUENCES/ IMPACT

RISK EVALUATION
With No Controls
P

Fire On site/Emergency Evacuation Personal Injury

Trap

Burns

Stampede

Fatalities

S
10

RISK
LEVEL
H/M/L
40

RESIDUAL RISK

IMPLEMENTED CONTROL MEASURES

All the team mates in the site must aware of the different types of fire and different type of
firefighting measures through the periodic tool box talk, meeting, training

ACCEPT Y/N?

H/M/L

By

All operatives will be instructed on the sound of the fire and evacuation ala rm to stop
work immed iately leave behind all tools and equ ipments/materials and leave by the
quickest root.
Once mustered the assembly point , no one shall be return until instructed by the main
contractor emergency control authority
all employees shall be aware of the emergency exists in the site

Fire spread

all employees shall know access & egress to site


emergency exits shall be clearly ma rked and
adequate & appropriate fire extinguishers shall be provided
everyone must know the project Emergency no, Project Clinic No, area safety officer &
supervisors number for contact, report during emergency
Assembly point must be visible, kept clean & tidy to contain the employees during
emergency
6

Working in Hot and Humid climate

Collapse

Ensure proper PPE'S are worn by all the workers, working at such places.

Heat Stress

Secondary hazards like fall into


excavated area/trenches/valve
chambers

16

Adeq uate cool water and electrolytes should be provided as well as to be consumed

Heat stroke

Illness

Frequent work break shall be given at regular intervals.

Weak/fatigue

Rest areas with proper ventilation for the workers shall be provided .

Periodic tool box talk and training to be conducted for managing the work in hot climate
safely and smoothly

Provide proper slgnage, warning lights etc


Ensure supervisors monitor site regularly on excavated locations and ensure that no
unwanted persons Is around the area.
Ensure confined space Permit to Work (PTW) system followed at such locations
Ensure the access egresses are clear.
Ensure proper lightings

Actions
Date

ANNEXURE 3
3.3. HSE &S RISK ASSESSMENT FOR EXCAVATION, BACKFILLING,
LEVELING AND COMPACTION.

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Plant


EMP-TR-0164
HSE&S Risk Assessment
Date:
Main Activity:
Tools / Equipment Used:
Location:
Method Statement
Reference:
Sr.

Hazards
(The potential to cause
harm )

29/08/2016

Excavation, Backfilling, Leveling and Compaction


JCB ,Power Tools & Hand Tools
Jumeirah Village South
EMP/EXC/RA05/2016 Rev.00

Recommended Control Measures & Mitigations

Effects
(Consequences)

PHYSICAL HAZARDS
Fatality, Asset loss
Excavation
Equipment Failure

Overturning of
excavator

Fatality, Asset loss

Worker hit by
excavator

Fatality

Risk Rating with No Controls


(Refer To Risk Assessment Procedure,)

Page 1 of 4

Remarks

Severity

Likelihood

Outcome
(T/A/M/I)

Only COMPANY approved 3rd party certified excavator and


operator shall be deployed for excavation works.
Area HSE Officer shall ensure the validity of certificates through
random inspection.

10

Medium

Operator shall ensure daily inspection and maintenance records


of excavator shall be kept.
JCB operator and banks man shall ensure proper positioning of
outriggers.
Soil condition shall be checked prior excavation.
Excavator shall be placed on levelled surface.
Excavator shall ensure proper compaction of sand dunes prior
positioning on it to avoid any sank down.
PTW shall be applied prior excavation which must be signed by
authorized issuer, receiver and safety officer of the area.

Low

Area survey shall be done by competent foreman to ensure


unavailability of potential underground services.
MEP drawings shall be used as a reference for any potential
underground services.
Cable detectors shall be used to detect any underground facilities.
Choose manual excavation if underground facilities have been
intimated by proper signboard for complete exposure and
securing.

Low

Page 1 of 4

Jumeirah Village South District Cooling Plant


EMP-TR-0164
HSE&S Risk Assessment
Date:
Main Activity:
Tools / Equipment Used:
Location:
Method Statement
Reference:
Sr.

Hazards
(The potential to cause
harm )

Hit by vehicles

Poor illumination,
rain, sand storms

29/08/2016

Excavation, Backfilling, Leveling and Compaction


JCB ,Power Tools & Hand Tools
Jumeirah Village South
EMP/EXC/RA05/2016 Rev.00

Recommended Control Measures & Mitigations

Effects
(Consequences)

Injuries, property
damage

Injuries, property
damage

Dizziness,
unconsciousness

Remarks

Severity

Likelihood

Outcome
(T/A/M/I)

Medium

Medium

10

Medium

Hit by existing
structure

Risk Rating with No Controls


(Refer To Risk Assessment Procedure,)

Page 2 of 4

Trained banks man shall be deployed for guiding Jcb, Boom


Loader operator.
Banks man shall ensure standing at visible and safe place.
Banks man shall never rest under the shadow of Jcb, Boom
Loader
No riding shall be allowed in operator cabin.
No horseplay shall be allowed with Jcb ,Boom Loader.
Jcb ,Boom Loader operator shall not be allowed to use any
curtains or other mediums causing restriction to vision around
Jcb ,Boom Loader.
Radius of Boom Loader, Jcb shall be barricaded along with
necessary signages and beacon lights.
Boom Loader,Jcb shall be guided by trained banks man while
reversing.
No Boom Loader, Jcb ,Bobcat activity shall be carried out due to
poor illumination, rain or sand storms.
Use warnings and sign boards
Ensure proper use of PPE
Conduct toolbox talks

Page 2 of 4

Jumeirah Village South District Cooling Plant


EMP-TR-0164
HSE&S Risk Assessment
Date:
Main Activity:
Tools / Equipment Used:
Location:
Method Statement
Reference:
Sr.

Hazards
(The potential to cause
harm )

Backfilling
Compaction and
levelling
Equipment failure
Unidentified
underground
services

Page 3 of 4

29/08/2016

Excavation, Backfilling, Leveling and Compaction


JCB ,Power Tools & Hand Tools
Jumeirah Village South
EMP/EXC/RA05/2016 Rev.00

Recommended Control Measures & Mitigations

Effects
(Consequences)

Property damage

Electrocution,
injuries, property
damage

Risk Rating with No Controls


(Refer To Risk Assessment Procedure,)
Severity

Likelihood

Outcome
(T/A/M/I)

Remarks

Foreman shall ensure that plate and roller compactor have been
properly maintained, daily inspection has been carried out and
maintenance records are being kept.
Plate/Roller compactor shall only be operated by competent and
experienced operatives.

Medium

Incomplete Permit to work system for manual excavation, attached


area drawing, identify underground services and protect/ safe guard
utilities service exposed.
HSE Procedure- Excavation to be followed.
Permit to be countersigned by area in charge
Trail pit to be done to identified any underground utilities services.
Trained banks man shall be deployed to guide the Shovel/Bobcat
4
1
4
Low
operator about any temporary services
Proper marking and safeguard of exposed underground services.
No work shall be allowed due to poor illumination, rain and sand
storms.
Proper illumination shall be provided prior engaging equipment.
Additional task light to be provided in case of poor illumination.
No lone worker shall be allowed.
Note
: EL Elimination, RE Reduction, IS Isolation, EC Engineering Control, AC Administration Control, PPE Personal Protective Equipment
Legal Reference : Chapter 5, Federal Labour Law (8), UAE, 1980 / Ministerial Order No. 32, UAE, 1982 / Code of Construction Safety Practice, Dubai(2008)
DM Technical Guideline

Page 3 of 4

ANNEXURE 3
3.4. HSE&S RISK ASSESSMENT FOR GRP CHILLED WATER PIPING.

QHSE Plan-JVS

TR-164

Jumeirah Village South District Cooling Plant


Page 1 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Risk Rating with No


Controls

Effects
(Consequences)

Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

Residu
al Risk
(T/A/
M/I)

Severity
Slight Injury - First
Aid
Likelihood

Minor or Serious
Injury

Major Injury - Lost


Time > 3 days

Single Fatality Permanent Disability

Multiple Fatalities

10

Certain

10

20

40

60

80

100

Very Likely

16

32

48

64

80

Likely

12

24

36

48

60

May happen

16

24

32

40

Unlikely

12

16

20

Trivial Risk - No further improvements necessary provided control measures are maintained
Adequately Controlled Risk - Risk is tolerable when control measures identified are implemented
Moderately controlled Risk - Further risk reduction measures should be considered
Intolerable Risk - Seek specialist advice/ support

Actions
By

Date

Jumeirah Village South District Cooling Plant


Page 2 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

Material

Risk of getting Injuries

Trained & Competent personnel to be deployed

handling &

to working personnel

on material shifting & lifting operations.

Lifting

Damage of materials

Use of Adequate and maintained plants &

Operations

by miss-handling of

equipment will be ensured.

materials or lifting

Materials not to exceed safe working loads of

heavy items with

36

plants & equipment in use.

make-shift

Adequate PPE to be worn by site personnel

arrangement.

such as safety helmet, safety shoes, Gloves etc.,

Residu
al Risk
(T/A/
M/I)

Actions
By

Supervisor
/
(A)

operators/
HSE
officer

Close supervision will be ensured during heavy


lifting operations.
2.

Working

Risk of getting injuries

Safe and reasonable access will be provided for

Adjacent

from operations in

working areas.

to other

progress by other

Works of other trades will be suitably co-

Trades

trades around the actual


working locations.

ordinated by the site supervisor to ensure safe


operations of both the trades.
In case structural or other works are ongoing
close-by, suitable protection will be provided to

Supervisor
/
(A)

operators/
fire
warden/HS
E officer

Date

Jumeirah Village South District Cooling Plant


Page 3 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

Residu
al Risk
(T/A/
M/I)

Actions
By

protect the persons working close to such


locations.
3

Involvement

property damage

Brief the operatives via toolbox talk / Pre Task

of

personnel injury

briefing, inspection of tools and Equipments using

Incompetent

for lamination.

laminators

Read & follow manufacturers instruction &


4

32

warning labels.

(A)

Adequate PPE to be worn by site personnel

Engineer/
Supervisor

such as safety helmet, safety shoes, Gloves etc.,


Close supervision will be ensured during heavy
lifting operations.
4

Storage,

Access blocks

Store chemicals on designated areas away from

handling,

And occurrence of

stair access routes, floor edges and pathways.

Engineers/

application of

chemical reactions

Store chemicals properly on the ground inside

Supervisor

chemicals

Skin burns/
breathing

48

drip tray to contain spills.

(A)

/operators/

Barricade and Provide warning/caution notices

HSE

in the chemical storage areas. Do not stack one

Officer

over another.

Date

Jumeirah Village South District Cooling Plant


Page 4 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

discomfort /

Fresh water to be provided to diluted the spills in

eye injuries

case of spills.

Residu
al Risk
(T/A/
M/I)

Actions
By

Only authorised persons to be engaged for


handling chemicals with PPE's as stated in MSDS
(chemical resistant gloves and apron).
Training to be conducted for all people working
in the area and who are handling chemicals.
Keep the chemical containers closed and provide
drip trays and store away from hot works /area
task lights.
5

Working on

Falls from stepladders

Stepladders will carry an identification mark and

Step ladders

Stepladders collapsing

to be inspected before use and by a competent

Dropping

person every 3 months

materials/plant.

Any defects must be reported immediately.

24

Defective stepladders will be withdrawn from use


immediately and either repaired or where this is
not possible they will be scrapped.
Retaining cords must be the same length.

Supervisor /
(A)

foreman
/HSE officer

Date

Jumeirah Village South District Cooling Plant


Page 5 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

Residu
al Risk
(T/A/
M/I)

Actions
By

The top tread of the stepladder must not be


used as a working platform unless the stepladder
is of such a design as to provide a secure
handhold.
Ladders will be set on a firm level base with the
legs positioned as far apart as the retaining chord
or hinges will allow.
Only one person on a stepladder at a time.
6.

Slip trip and

Body injuries

Daily removal of scraps and disposing on

fall due to

identified disposal area.

materials

24

scattered on

Regular cleaning of the surrounding area.

Supervisor /
(A)

foreman

Use PPE like hand gloves and dust masks.

/HSE officer

ground
7.

Use of Power-

Risk of getting electric

Only trained and Competent personnel will be

Engineers/

Tools such as

shock causing

employed for use of power-tools.

Supervisor

Drill Machine

human injury.

or Grinding

Risk of electric sparks

Machine

by loose

48

Proper and healthy connections will be done by


trained electricians.

(A)

/operators/
HSE
Officer

Date

Jumeirah Village South District Cooling Plant


Page 6 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

connections or

Only specified / recommended industrial socket /

overheated wires which

plugs will be used for extension

may become the source

Switching off the power supply will be made

of fire incident.

compulsory while leaving the power tool idle for

Residu
al Risk
(T/A/
M/I)

Actions
By

wires.

longer durations or leaving the working locations.


Well maintained power tool will be used at site.
Proper insulators will be used by working
personnel such as hand gloves, wooden
platforms, safety shoes with rubber soles and dry
floors to prevent the chance of electric shock to
working personnel.
Wherever felt necessary MCBs, will be used for
quick disconnection of power

supply to any

defective power tool.


8.

Fire On site /

Personal injury

Emergency

Burns

Evacuation

fatalities

Trap

All the teammates in the site must aware of the


4

10

40

different types of fire and different type of


firefighting measures through the periodic tool box
talk, meeting,

Engineers/
(A)

Supervisor /
foreman /
fire warden

Date

Jumeirah Village South District Cooling Plant


Page 7 of 8

EMP-TR-0164

HSE&S Risk Assessment


Date:
Main Activity:
Tools / Equipment Used:

29/08/2016
GRP Chilled Water piping
Joint lamination kit, air vents, valves, Hanger & Supports

Location:

Jumeirah Village South

Method Statement Reference:

EMP/GRP/RA08/2016 Rev.00

Sr.

Hazards

(The potential to
cause harm )

Effects
(Consequences)

Risk Rating with No


Controls
Likeli
hood

Severi
ty

Outcome
(T/A/M/I)

Recommended Control Measures & Mitigations

Residu
al Risk
(T/A/
M/I)

Actions
By

Stampede

Fire wardens and first aiders will be identified

/ HSE

Fire spread

as part the Tool box talk

officer

Once mustered the assembly point, no one


shall be return until instructed by the main
contractor emergency control authority
everything must aware of the fire triangle and
to ensure the combination of the fire triangle is
kept separated
all flammable and COSHH to be handled,
stored as per the MSDS recommendation
all employees shall be aware of the
emergency exists in the site
Proper housekeeping shall be maintained
emergency drill shall be practiced regularly
adequate & appropriate fire extinguishers shall
be provided

Date

ANNEXURE 3
3.5. HSE&S RISK ASSESSMENT FOR HDPE PIPES AND FITTINGS.

QHSE Plan-JVS

TR-164

INSTALLATION OF HDPE PIES AND FITTINGS

SN

Hazards

Lifting
Equipments

CONSEQUENCES/
IMPACT

Fall of material
Cuts from sharp edges
Irivets
Muscle cramps
Back injury

Cuts

Abrasions

RISK EVALUATION
RISK LEVEL
With No Controls
P

H/M/L

48

RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES

PTW (Permit to Work) to be obtained before starting the work


and toolbox talks should be conducted.
Competent, trained and certified operators to be engaged with
3rd party test certificate for fork lift/telehandler, crane and all
other lifting Equipments.
Necessory clearance from concerened authoritied to be obtained
Only third party approved equipment's with valid test certificate
shall be used for lifting.
Site training to be done to lifting equipment operators to follow
site safety requirements. i.e.,maintaining maximum speed,
switching off engine in basement areas when idle and wearing seat
belt etc.,
Men and Machinery interface to be suitably separated by using
the barricades, signages
Restrict the use of forklifts truck/crane near welfare facilities such
as toilets,rest area etc and main entry/exits, particularly when the
flow of workers on foot is at a peak (such as at the end of a shift or
during breaks)
Coordinate with other trades to ensure,no one get troubles from
the lifting activities near to the gate houses, as many different
contractors are working in the congested areas.
Only authorised and trained operatives are involed for the
taskInstall physical barriers /warning barricades to ensure that
forklift movement area is isolated
Install physical barriers /warning barricades to ensu re that forklift
movement area is isolated
Secure the load and use palletized loads for shifting. Pipes must
be secured from rolling over
Engage flag man and clear the traffic/avoid employees coming in
contact.
Page 1 of 5

S H/M/L

ACCEPT
Y/N?

Actions
By

Site
Engineer/
Supervisor/
store
keepers/
operators

Date

INSTALLATION OF HDPE PIES AND FITTINGS

SN

Hazards

CONSEQUENCES/
IMPACT

RISK EVALUATION
RISK LEVEL
With No Controls
P

RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES

H/M/L

S H/M/L

ACCEPT
Y/N?
By

Safe worki ng load of the lifting Equipments and accessories shall


not be exceeded.
2

Use of Electrical
tools &
equipments like
Cutting Tools,

Personnel Injury,
fatality

Electricity

Ergonomics
Vibration
Noise

Fire
Sparks
Moving cutting
edges

Entanglement

48

All operatives to receive appropriate training


Making steps (benching) or sloping on all sides of excavation to
avoid collapse and reduce depth
Ensure the PTW system obtained before any such works.
Prior to start use the area must be verified by the engineer/su
pervisor for any other existing/concealed services like post & Pre
Powered equipment will be fitted with a safety breaker to
prevent the tool continuing to operate incase of any emergencies.
Only tools and plant inspected and in good condition with indate test tags are to be used.
Power equipment users are to inspect the device & ensure there
are no obvious defects prior to use.
All extension cables are to be kept in a tidy using cable
management where they will be kept of the ground when
possible.
No loose clothi ng is to be worn to avoid entanglement within
the machines mechanism .
Any damaged or defective plant is to be reported to the works
supervisor and quarantined, replacements are to be arranged.
Only authorised personnel may undertake repa irs.
Ensure the work area is clear and the planned works will not
have an effect on surrounding trades or materials.
Manage the cables in the proper way to prevent getting slip/trip
as well as getting damage from other activities
All extension cables and plant to be removed from work area at
the end of the day and secured to avoid unauthorised use.
Page 2 of 5

Actions

Date

INSTALLATION OF HDPE PIES AND FITTINGS

SN

Hazards

Working under
chambers/
excavated areas/
trench.
Fall of materials
Fall from height
Respiratory
problems

CONSEQUENCES/
IMPACT

Property damage and


personnel injury

RISK EVALUATION
RISK LEVEL
With No Controls
P

RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES

H/M/L

64

Loss of consciousness
of any person at work
arising from an increase
in body temperature

Adequate training and be competent training need who use the


equipments.
Site mandatory and job specific PPE must be worn
Toolbox talks to be conducted on confined space, respiratory
problems etc
Ensure proper PPE'S are worn by all the workers, working at such
places.
Ensure confined space Permit to Work (PTW) system followed at
such locations
Periodical check of toxic gases,Oxygen availability /water In the
excavated areas.

ACCEPT
Y/N?

S H/M/L

By

16

Barricade the area


Provide proper slgnage, warning lights etc

Lack of visibility

Ensure supervisors monitor site regularly on excavated locations


and ensure that no unwanted persons Is around the area.

Water leak
testing of HDPE
pipes and
accessories

Property damage and


personnel injury

48

Ensure confined space Permit to Work (PTW) system followed at


such locations
Ensure the access egresses are clear.
Ensure proper lightings
Obtain permit prior to start testing.
Area should be isolating prior to start testing.
Area should be barricade/cordon off.
Deliver tool box talk/On job training.
Close supervision and monitoring needed .
Provide warning and Information signage.
Ensure calibration of the gauge and certification .
Access /egress restriction .

Page 3 of 5

Actions
Date

INSTALLATION OF HDPE PIES AND FITTINGS

SN

Hazards

CONSEQUENCES/
IMPACT

RISK EVALUATION
RISK LEVEL
With No Controls
P

RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES

H/M/L

ACCEPT
Y/N?

S H/M/L

By

Only authorized and trained operatives involved for the task.


Ensure the pressure does not exceed the required level (do not
pressurize systems above maximum design operating pressure).

Fire On site/
Emergency
Evacuation

Trap

Stampede

Personal Injury

All the team mates in the site must aware of the different types of fire
and different type of firefighting measures through the periodic tool
box talk, meeting, training

Burns

All operatives will be instructed on the sound of the fire and


evacuation ala rm to stop work immed iately leave behind all tools
and equ ipments/materials and leave by the quickest root.

10

40

Once mustered the assembly point , no one shall be return until


instructed by the main contractor emergency control authority

Fatalities

all employees shall be aware of the emergency exists in the site

Fire spread

all employees shall know access & egress to site


emergency exits shall be clearly ma rked and
adequate & appropriate fire extinguishers shall be provided
everyone must know the project Emergency no, Project Clinic No,
area safety officer & supervisors number for contact, report during
emergency
Assembly point must be visible, kept clean & tidy to contain the
employees during emergency
6

Working in Hot and


Collapse
Humid climate
Secondary hazards
like fall into excavated
area/trenches/valve
chambers

16

Adeq uate cool water and electrolytes should be provided as well as


to be consumed
Ensure proper PPE'S are worn by all the workers, working at such
places.
Page 4 of 5

Actions
Date

INSTALLATION OF HDPE PIES AND FITTINGS

SN

Hazards

Heat Stress
Heat stroke

CONSEQUENCES/
IMPACT
Secondary
hazards
like fall into excavated
area/trenches/valve
chambers
Illness
Weak/fatigue

RISK EVALUATION
RISK LEVEL
With No Controls
P

RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES

H/M/L

P
Periodic tool box talk and training to be conducted for managing the
work in hot climate safely and smoothly
Frequent work break shall be given at regular intervals.
Rest areas with proper ventilation for the workers shall be provided
.
Provide proper slgnage, warning lights etc
Ensure supervisors monitor site regularly on excavated locations
and ensure that no unwanted persons Is around the area.
Ensure confined space Permit to Work (PTW) system followed at
such locations
Ensure the access egresses are clear.
Ensure proper lightings

Page 5 of 5

S H/M/L

ACCEPT
Y/N?

Actions
By

Date

ANNEXURE 3
3.6. HSE&S RISK ASSESSMENT FOR INSTALLATION OF BURIED VALVE.

QHSE Plan-JVS

TR-164

RISK ASSESSMENT FOR INSTALLATION OF BURIED VALVE

SN Hazards

CONSEQUENCES/ IMPACT

RISK
EVALUATION
With No Controls
P

Shifting of Valves,and
other tools/equipments

Risk of getting injuries to


working personnel/damage of
materials by miss-handling of
materials or shifting of heavy
items with make-shift
arrangement.
Risk of getting injuries by
miss-use of shifting
equipments

S
3

RISK
LEVEL

IMPLEMENTED CONTROL MEASURES

H/M/L
6

Only trained and competent personnel to be deployed for material shifting and
lifting operations.

ACCEPT
Y/N?

RESIDUAL RISK
P

H/M/L

Actions
By

Proper guidance will be given to workers and close supervision will be done
during shifting or handling of heavy equipment manually.
Materials not to exceed safe working loads of plants & equipments in use.

HSE Officer/
Site Engr/
Supervisor/
Foreman

Adequate protective equipment will be worn such as hand gloves, safety shoes &
helmets.
Trained & Competent personnel to be deputed for mobile scaffolding

Working Adjacent to other


Trades

Risk of getting injuries from


operations in progress by
other trades around the actual
working locations.

Working under
chambers/excavated
areas/trench.

Respiratory problems

Fall into excavated area

Personnel injury

Property damage

16

Loss of consciousness of any


person at work arising from
an increase in body
temperature

Working under chambers


/excavated areas/trench.

Property damage and


personnel injury

Fall from height

Loss of consciousness of any


person at work arising from
an increase in body
temperature

Respiratory problems
Lack of visibility

12

Fall of materials

Involvement of
Incompetent laminators

Property damage
Personnel injury

Safe and reasonable access will be provided for working areas.

HSE Officer/
Site Engr/
Supervisor/
Foreman

Works of other trades will be suitably co-coordinated by site supervisor to ensure


safe operations of both the trades.
In case structural or other works are ongoing close-by, suitable overhead
protection will be provided to protect the persons below.
Toolbox talks to be conducted on confined space, respiratory problems etc
Ensure proper PPE'S are worn by all the workers, working at such places.
Ensure confined space Permit to Work (PTW) system followed at such
locations
Periodical check of toxic gases,Oxygen availability /water In the excavated
areas.
Barricade the area
Provide proper signage, warning lights etc
Ensure supervisors monitor site regularly on excavated locations and ensure
that no unwanted persons Is around the area.
Ensure the access egresses are clear.
Ensure proper lightings
Toolbox talks to be conducted on confined space, respiratory problems etc
Ensure proper PPE'S are worn by all the workers, working at such places.
Ensure confined space Permit to Work (PTW) system followed at such
locations
Periodical check of toxic gases,Oxygen availability /water In the excavated
areas.
Barricade the area & Provide proper slgnage, warning lights etc
Ensure supervisors monitor site regularly on excavated locations and ensure
that no unwanted persons Is around the area.
Ensure the access egresses are clear.
Ensure proper lightings
Brief the operatives via toolbox talk / Pre Task briefing, inspection of tools and
Equipments using for insulation.
Read & follow manufacturers instruction & warning labels.

HSE Officer/
Supervisor/
Foreman

HSE Officer/
Site Engr/
Supervisor/
Foreman

HSE Officer/
Supervisor/

Date

RISK ASSESSMENT FOR INSTALLATION OF BURIED VALVE

SN Hazards

CONSEQUENCES/ IMPACT

RISK
EVALUATION
With No Controls
P

Failure of excavation
equipments

Fatality

RISK
LEVEL
H/M/L

10

Asset loss
Person injury

Unidentified underground
services

Electrocution,

Person injury
Property damage

Involvement of
Incompetent person

Person injury

IMPLEMENTED CONTROL MEASURES

Property damage

Adequate PPE to be worn by site personnel such as safety helmet, safety shoes,
Gloves etc.,
Close supervision will be ensured during insulation works.
rd
Only 3 party certified excavator and competent operator shall be deployed for
excavation works.
Excavator shall ensure proper compaction of sand dunes prior positioning on it to
avoid any sank down.
PTW shall be applied prior excavation which must be signed by authorized
issuer, receiver and safety officer of the area.
Soil condition shall be checked prior excavation.
Trail pit to be done to identified any underground utilities services.
Trained banks man shall be deployed to guide the Shovel/Bobcat operator about
any temporary services
Proper marking and safeguard of exposed underground services.
No work shall be allowed due to poor illumination, rain and sand storms.
Proper illumination shall be provided prior engaging equipment.
No lone worker shall be allowed.
Brief the operatives via toolbox talk / Pre Task briefing, inspection of tools and
Equipments
Read & follow HSE procedures
Adequate PPE to be worn by site personnel such as safety helmet, safety shoes,
Gloves etc.,

ACCEPT
Y/N?

RESIDUAL RISK
P

H/M/L

Actions
By
Foreman

HSE Officer/
Supervisor/
Foreman

HSE Officer/
Supervisor/
Foreman

HSE Officer/
Supervisor/
Foreman

Close supervision will be ensured during heavy lifting operations.


9

Use of Electrical tools &


equipments like Cutting
Tools, grinding
Machine,pumps etc

Personnel Injury, fatality


Entanglement
Ergonomics
Vibration
Noise

12

All rotating equipment/pumps to be inspected and fitted with correct size guards
in the rotating parts.
All electrical tools shall have emergency stop button near the equipment
Only authorised person to be engaged to operate the pumps . Barricade the
operational areas.
Read & follow manufactures and client HSE procedures
Adequate PPE to be worn by site personnel such as safety helmet, safety shoes,
Gloves etc.,
Close supervision will be ensured during the operations.

HSE Officer/
Supervisor/
Foreman

Date

RISK ASSESSMENT FOR INSTALLATION OF BURIED VALVE

SN Hazards

CONSEQUENCES/ IMPACT

RISK
EVALUATION
With No Controls
P

10

Welding/Hot work

Electrocution and Fire


Personnel Injury including
different degree of burns,
fatality(mulitple)

S
3

RISK
LEVEL

IMPLEMENTED CONTROL MEASURES

H/M/L
12

Fire extinguishers supplied by the workgroup / contractor are to be located immediately


adjacent to the hot work area and within 10m (fixed location fire extinguishers are not to
be relied upon
Adequate PPE to be worn by site personnel such as Respiratory mask, Welding
glassess, safety helmet, safety shoes, Gloves etc.,
The hot work involves arc-welding whereby specific controls relating to ensuring
electrical safety will be required.
Combustible and flammable materials or fuel sources are required to be cleared from the
area(consider a 15m area around the hot work where practicable).
A Fire Watcher is required to watch the area during and/or post work to monitor fire risk,
sparks, slag, hot objects.
Training on general the safe use of the equipment, general safe working practices and
the precautions to take, when and how to use the fire extinguishers

ACCEPT
Y/N?

RESIDUAL RISK
P

H/M/L

Actions
By

HSE Officer/
Supervisor/
Foreman

Date

ANNEXURE 3
3.7. HSE&S RISK ASSESSMENT FOR CLADDING OF CHILLED WATER
PIPELINE.

QHSE Plan-JVS

TR-164

CLADDING OF CHW PIPIELINES

SN
1

Hazards
Lifting Operations

CONSEQUENCES/ IMPACT
Risk of falling.

RISK EVALUATION With


RISK LEVEL
No Controls
P

H/M/L

Shifting operations

Trained & Competent personnel to be deployed for material shifting & lifting operations.

Risk of impact or collision

Adequate and maintained plants and equipment will be ensured.

Risk of failure of cranage or lifting


equipment.

Materials not to exceed safe working loads of plants and equipment in use.

Back injury
Risk of getting injuries to working
personnel/damage of materials by misshandling of materials or shifting of
heavy items with make-shift
arrangement.

RESIDUAL RISK

IMPLEMENTED CONTROL MEASURES

ACCEPT Y/N?

H/M/L

Actions
By

Adequate PPE to be worn by site personnel such as safety helmet, safety shoes,Gloves etc.,
Close supervision will be ensured during heavy lifting operations.

Only trained and competent personnel to be deployed for material shifting and lifting operations.
Proper guidance will be given to workers and close supervision will be done during shifting or
handling of heavy equipment manually.
Materials not to exceed safe working loads of plants & equipments in use.

Risk of getting injuries by miss-use of


shifting equipments

Adequate protective equipment will be worn such as hand gloves, safety shoes & helmets.
Trained & Competent personnel to be deputed for mobile scaffolding

Working Adjacent to other Trades

Risk of getting injuries from operations


in progress by other trades around the
actual working locations.

Safe and reasonable access will be provided for working areas.


Works of other trades will be suitably co-coordinated by site supervisor to ensure
safe operations of both the trades.
In case structural or other works are ongoing close-by, suitable overhead
protection will be provided to protect the persons below.

Risk of getting electric shock causing


Use of Power-tools such as Drill
Machine ,Grinding or Welding Machine human injury.

Trained and competent personnel will be employed for use of power-tools.


Proper and safe connections will be done by trained electricians.
Only specified / recommended industrial socket / plugs will be used for extension wires.

Risk of electric sparks by loose


connections or overheated wires which
may become the source of fire
incidents.

Switching off the power supply will be made compulsory while leaving the power tool idle for longer
durations or leaving the working locations.
Well maintained power tool will be used at site.
Wherever felt necessary MCBs, will be used for quick disconnection of power supply to any defective
power tool.

Involvement of Incompetent
technicians

property damage

12

personnel injury

Working under chambers /excavated


areas/trench.

Property damage and personnel


injury

Fall from height


Respiratory problems
Lack of visibility

Loss of consciousness of any person


at work arising from an increase in
body temperature

Fall of materials

Brief the operatives via toolbox talk / Pre Task briefing, inspection of tools and Equipments using for
insulation.
Read & follow manufacturers instruction & warning labels.
Adequate PPE to be worn by site personnel
Close supervision will be ensured during cladding works.
Toolbox talks to be conducted on confined space, respiratory problems etc
Ensure proper PPE'S are worn by all the workers, working at such places.
Ensure confined space Permit to Work (PTW) system followed at such locations
Periodical check of toxic gases,Oxygen availability /water In the excavated areas.
Barricade the area & Provide proper slgnage, warning lights etc
Ensure supervisors monitor site regularly on excavated locations and ensure that no unwanted
persons Is around the area.
Ensure the access egresses are clear.
Ensure proper lightings

HSE Officer/
Supervisor/
Foreman

HSE Officer/
Site Engr/
Supervisor/
Foreman

Date

ANNEXURE: 4
ENVIRONMENTAL ASPECT IMPACT ANALYSIS

Page 1 of 6

ENVIRONMENTAL ASPECT IMPACT ANALYSIS FOR FLUSHING


1. Scope
This procedure applies to all flushing activities including chemical addition under normal
conditions and reasonably foreseeable situations, in Jumeirah Village South District Cooling
project.
2. Definitions
EMS

Environmental Management System Committee

EMR

Environmental Management Representative

SEA

Significant Environmental Aspects

3. Responsibility
3.1 EMS Committee
The EMS Committee shall identify the environmental aspects of all activities coming under
flushing of chilled water piping network and evaluate the impact of the same on the environmental
conditions.
The EMS Committee / EMR shall prepare and maintain the Register of Environmental Aspects
with most up-to-date information.
3.2 Top Management
The (Top Management) shall review and approve the Register of Environmental Aspects.
4. Regulations & Requirements
a) Federal Law No. (7) Of 1993 (as amended by Federal Law No. (30) of 2001) has
established the Federal Environment Agency (FEA) as the principal environmental
authority in the UAE.
b) Federal Law No. (24) Of 1999 Protection and Development of the Environment.
c) 29 CFR (Code of Federal Regulations) Part 1926 Labor

Page 2 of 6

5. Identification of Environmental Aspects


Identification of Environmental Aspects shall include but is not limited to the following:

Method of statement for the flushing activities of chilled water system

Requirements of local laws and regulations.

Technical specifications from EMPOWER/NAKHEEL/government authorities and


MSDS of materials using.

HSE Reports and records

Observations in site inspections;

Records of compliance and/or non-compliance;

Past monitoring records; and

Records for past management reviews and/or environmental audits.

6. Identification of Environmental Impacts of Aspects


The environmental impacts of each aspect shall be identified with regards to:

Resources utilisation (including use of raw materials, energy, etc);

Waste management;

Air emissions;

Water pollution;

Noise and vibration nuisance;

Land contamination;

Indirect impacts caused by flushing procedure.

Transportation impact.

6.1 Air Emissions Impacts


The following activities may potentially lead to quantities of dust being emitted to the atmosphere
during the various phases of construction:
a) Dust generation from Vehicle movements on unpaved surfaces
b) Dust from Storage areas of flushing equipment and chemicals

Page 3 of 6

c) Gaseous emissions from Diesel electricity generators, Pumps and heavy loading machineries
d) Odour result from use of chemicals, accumulation of surface water, washout facilities and due
to improper segregation of chemical.

6.2 Soil &Water Pollution


The potential impact to groundwater in the project area can be as a result of any of the following:
a)

Accidental spillage of diesel, petrol or lubricants through equipment failure, human error,
or incidents from improper storage or handling of hazardous materials and substances.

b)

Infiltration of waste Water into the Ground Water.

c)

Disposal of Polluted water into surface Water bodies.

The following prevention measures are as well considered:


1. Slopes are designed to drain the surface water outside of it boundary,
2. All facilities temporary buildings like site offices, washroom etc are on elevated
foundations,
3. Wheel washing basin / vehicle washing will be emptied every day to prevent overflow of
it tank in case of rain.
4. Monthly good logs shall be maintained which include Volume of water pumped.
5. The waste water will be safely disposed as per Dubai Municipality Norms according to the
approved plan from EPOWER.
6.3 Noise & Vibration Impacts
During flushing activities, several noises will be generated from various machinery and equipment
used. This will have a temporary impact on the surrounding environment.
The main source of noise & Vibration are
a. Flushing pumps
b. Generators
c. Vehicles
d. Hammering by individuals during connecting equipments/pipes and fittings.
The following noise control measures will be implemented if required & feasible
1. Company shall ensure employees and visitors are not being exposed to any continuous,
intermittent or impact noise levels above 100 dB, unless the appropriate hearing protection
is provided.
Page 4 of 6

2. Locating noisy equipment away from potential sources of conflict


3. Enclosing compressors and pumps
4. Positioning access and exit points away from noise sensitive areas
5. Ensuring that maintenance is conducted in enclosed sheds, away from sources of conflict.

6.4 Traffic Impacts


Movement of vehicles should be restricted to defined access routes and points & regular use of
water trucks to suppress dust on high-use site access and haul roads.The Maximum speed limits in
the project site are 40 Km/hr on asphalt, and 20km/hr on unpaved road.
6.5 Waste Management Impacts
The main source of waste materials produced during flushing activities are
1.

Fuels, waste lubricants and hydraulic oil from pumps, generator, and other machineries.

2.

Scrap metals used for pump connections and piping.

3.

Empty drums of chemicals used for flushing.

4.

Woods, and pellets used for loading and unloading.

5.

Domestic Wastes Food Waste, Domestic Trash

6.

Waste water from flushing activities.

7.

Leakage or spillage of raw materials from pipe fittings and mechanical equipments

Control measures used waste management are as follows


a) Keeping proper housekeeping register to ensure proper disposal of waste materials.
b) Maximum recycling/salvaging of waste are ensured by proper monitoring.
c) Training for reducing the waste production and maximum utilization of resources.
6.6 Resources utilisation (including use of raw materials, energy, etc);
Company will closely track and monitor the records showing the water and diesel consumption and
seek for reducing these consumption regimes as much as possible. The collection and analysis of
the above data will constitute the practical means to identify the possibility of improvements, i.e.
the possibilities of reducing the consumptions without negatively impacting on the operations.
Energy and water Conservation Techniques
a) All generators shall be turned off when not in use.
b) Air Conditioning and Lighting in Offices shall be switched off when not in use.
c) Vehicles and heavy machinery shall not be left idle at any point, and all engines shall be
switched off when not in use.

Page 5 of 6

d) Materials shall be properly stored to minimize damage and wastage.


e) Where possible, materials shall be sourced locally.
f)

All water pipes and fixtures will be inspected for leaks on weekly basis.

g) Groundwater from dewatering wells shall be used for construction purposes such as dust
suppression.
h) Use of low-flow fixtures in the toilets and washing areas.

7. Development and Updating of the Register of Environmental Aspects


The EMS Committee shall identify environmental aspects of flushing process and evaluate their
significance. The result shall be shown in the Register of Environmental Aspects (document EAR01).
The members of EMS Committee shall prepare and review the Register of Environmental Aspects
for approval by the (Top Management). The Register shall be updated:

on a weekly basis after the Management Review as necessary; and

whenever planned or new development, or new or modified activities, products or services

are introduced during any of flushing stages.


8. Records
Record Description
Register of Environmental Aspects

Record Location/

Minimum Retention

Retention Responsibility

Time

EMR keeps the Master Copy

Two previous versions

(EAR-01)

Page 6 of 6

Dubai waste water Discharge limits as per the Dubai Municipality Environmental Department

*Maximum Allowable Limits for Discharge to


Sewerage
Land as for Irrigation

INDICATORS
Physico-Chemical
Biochemical Oxygen Demand
Chemical Oxygen Demand
Chlorides
Chlorine residual

Units
mg/l
mg/l
mg/l
mg/l

System
1,000
3,000

Cyanides as CN
Detergents
Fluorides
Nitrogen, ammonia cal
Nitrogen, organic (Kjeldhal)
Nitrogen, total
Oil & Grease Emulsified
Oil & Grease Free oil
pH (range)
Pesticides, non-chlorinated
Phenols
Phosphorous (P)
Sulfates, total
Sulfides as S
Surfactants
Suspended Solids (SS)

mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
units
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l

1
30

Temperature
Total Dissolved Solids (TDS)
Metals
Total Metals
Aluminum (Al)
Arsenic (As)
Barium (Ba)
Beryllium (Be)
Boron (B)
Cadmium (Cd)
Chromium (Cr)
Cobalt
Copper (Cu)
Iron (Fe)
Lead (Pb)
Magnesium (mg)
Manganese (Mn)
Mercury (Hg)
Molybdenum (Mo)
Nickel (Ni)
Selenium (Se)
Silver (Ag)
Sodium (Na)
Zinc (Zn)
Bacteriological

0C
mg/l

Fecal Coliforms

mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
MPN/100 ml.

10

Drip
Spray
20
10
100
50
500
350
Not less than 0.5 mg/l after
30 min contact time
0.05
0.05
1
5
10
50

1
1
5
30

5
6.0 8.0

5
6.0 8.0

0.1
20
200
0.05

0.1
20
200
0.05

50

10

1,500

1,000

2
0.05
1
0.1
2.0
0.01
0.1
0.1
0.2
2.0
0.5
100
0.2
0.001
0.01
0.2
0.02

2
0.05
1
0.1
2.0
0.01
0.1
0.1
0.2
2.0
0.5
100
0.2
0.001
0.01
0.2
0.02

2.0

500
0.5

200
0.2

500

20

40

150
50
6 10
5
50
30
500
10
500
45 or > 5 of ambient
3,000
10
0.50

2.0
0.3
1.0
1.0
1.0
1.0
0.01
1.0
1.0

Page 7 of 9

Land Contamination Indicator Levels as per Dubai municipality Environment


department
Indicator
Arsenic
Barium
Cadmium
Chromium
Copper
Lead
Manganese
Mercury
Selenium
Zinc
Pesticides (total)
Cyanide
Fluoride
Phenol
Benzene
BTEX (total)
Chlorinated Hydrocarbons
Polychlorinated Biphenyls
Total Petroleum Hydrocarbons
< C9
> C9

**Concentration (mg/kg)
50
400
5
250
100
200
700
2
2
500
2
10
500
1
1
100
1
0.5
1,000
10,000

Page 8 of 9

Allowable Emission Limits from Stationary Sources as per Dubai Municipality Environment
Department
Waste
Visible emissions

Sources
to
which Emission limits*
limit is applicable
Combustion sources
Ring Lemann 1 or
20% opacity

Other sources

Total Particulate
Matter

Sulfuric acid mist


and sulphur trioxide
Sulphur dioxide
Hydrogen sulphide
Oxides of Nitrogen

Carbon Monoxide
Lead and its
compounds
Fluorine
compounds
Chlorine & Chlorine
compounds
Metal fumes in total
Iron Oxide fume

No visible
emissions

All combustion sources

0.25 g/Nm3

Large sources
All sources

0.1 g/Nm3

Notes
1. Does not apply to
emissions of water
vapor and a
reasonable period for
cold startup,
shutdown or
emergency operation
1. as above
Gas Volumes
calculated to
12% CO2

0.1 g/Nm3 as

All fuel burning sources


All sources
Fuel burning units
having a gross heat
input above 100,000
MJ, excluding glass
furnaces

SO3
0.50 g/Nm3
5 mg/Nm3

0.35 g/Nm3 for

@ 7% O2 reference

gaseous fuels
0.5 g/Nm3 for
liquid fuels

Power generation by
other fuels
All Stationary sources
All stationary sources

0.15 g/Nm3

Aluminium smelters

0.02 g/Nm3

All other sources


All stationary sources

0.05 g/Nm3

Not applicable to
small units less than
30MW and @ 15 %
O2 Reference

1.5 g/Nm3
10 mg/Nm3
as Pb

0.2g/Nm3

as Cl2
All stationary sources
Iron
and
foundries.

10mg/Nm3

steel 0.1 g/Nm3

Excluding iron oxide


fume

Page 9 of 9

ANNEXURE 5
HSE TRAINING PLAN

QHSE Plan-JVS

Page 1 of 3

ANNEXURE 5 HSE TRAINING PLAN


HSE TRAINING PLAN

The Management of Occupational Health and Safety at Work places a duty on the Company
to:
Take into account an employees capabilities with regards to Occupational Health and
Safety.
In order to achieve this Island Tower Electromechanical LLC will provide adequate health,
safety and environmental training, in particular:
i.

Upon being recruited into the company health, safety and environmental Induction
training will be provided and recorded

ii.

Safety training for construction site workers will be systematically arranged for all
Island Tower Electromechanical LLCemployees and sub-contractors on site.

iii.

Upon being exposed to new or increased risk; Toolbox Talk training will be carried
out, attendance at which will be recorded

iv.

Training Evaluation Forms are to be completed by a selection of attendees for use in


improving training course standards

All employees will receive induction training upon joining the Company and all construction
site workers will receive site induction training on attending the site. The training will cover
the following as appropriate:

i)

Occupiers/ Clients rules

ii)

Company rules and procedures

iii)

Project Safety Plan/ Potential Hazards

iv)

First Aid

v)

Fire Fighting provisions

vi)

Welfare provisions

vii) Emergency procedures


viii) Personal protective equipment
ix)

Security

x)

Specific training for specialist activities such as:


Slinging and rigging

QHSE Plan-JVS

Page 2 of 3

Confined space entry


Fork lift truck operators
Work at height
xi)

General responsibilities of employees

xii) Housekeeping
xiii) Environmental Aspects and Impacts
xiv) Accident Reporting Procedure
xv) Safety & Environmental Audits
xvi) Local Authoritys rules and regulations
The Project Manager, Safety Engineer, Safety Officer and Site Engineer will agree the type
of training required and will make the necessary arrangements to carry out the training. A
record of all training carried out will be maintained by the Safety Engineer on site and these
records will be audited internally and externally to ensure compliance with this procedure.

QHSE Plan-JVS

Page 3 of 3

Safety Training Programme


This is a partial listing of the regulatory training requirements that affect that will affect too all the Island Tower Electromechanical LLC employees who will
come under the project of Jumeirah Village South District cooling. This is framed upon the requirements apply and are based on the type of work performed
and chemicals present at the jobsite.
Type of Training

Standard

Affected Employees

Frequency

Welding and Cutting

OSHA 29 CFR 1910

All workers who perform welding/cutting

Initial/Periodic/Change

Subpart Q

operations.

in Procedure

OSHA 29 CFR 1910.1200

Workers with exposure or potential exposure to

Initial/Periodic/New

hazardous chemicals

Chemical

Hazard Communication

Electrical Safe Practices

OSHA 29 CFR 1910.332

All workers

Initial/Periodic

Emergency Action &

OSHA 29 CFR 1910.38

All workers

Initial/Periodic/Changes

Fire Prevention Plans


Emergency

to Plan
OSHA 29 CFR 1910.120

Response/Spills

Any worker expected to respond to hazardous

Initial/Annual

chemical spills.

Fall Prevention/Walking

OSHA 29 CFR 1910

& Working Surfaces

Subpart D

All exposed workers

Initial/Periodic/Changes
in Equipment or Site

(Ladders, etc.)
Cranes & Hoists

QHSE Plan-JVS

OSHA 29 CFR 1910.179

Crane and hoist operators

Initial/Periodic

TR-164

Type of Training

Standard

Affected Employees

Frequency

Fire Extinguishers

OSHA 29 CFR 1910.157

Any worker expected to use a fire extinguisher on the job

Initial/Annual

Occupational Exposure to

OSHA 29 CFR 1926.65

All Workers expected to handle hazardous chemicals at

Initial/Periodic

the job site.

Hazardous Chemicals
Environmental awareness

OSHA 29 CFR 1910.120

All workers

Personal Protective

OSHA 29 CFR 1910.132

All workers required to use personal protective

Initial/Periodic/Change

equipment

in PPE or

Equipment

Annually

hazards/Improper Use
Process Safety

OSHA 29 CFR 1910.119

Management of Highly

Workers who operate a regulated process that

Initial/ 3 Year

involves a listed chemical.

Refresher/Change in

Hazardous Chemicals
Powered Tools

Process
OSHA 29 CFR 1910

All employees who work with powered tools

in Equipment

Subpart P
Confined Space

Medical services and first


aid

Initial/Periodic/Changes

OSHA 29 CFR 1926.1207,

All personnel involved in the activity where entry to

Daily

1926.1211

a confined space is required

OSHA 29 CFR 1910.151

Anyone expected to provide on-site first aid/medical

Initial/Periodic (varies

assistance. (Required if quick response by 911/EMS

by program used) (Must

is not available.)

use recognized,
approved program such
as Red Cross)

QHSE Plan-JVS

TR-164

Type of Training

Standard

Permit-Required Confined Space

OSHA 29 CFR 1910.146

Affected Employees
Any entrants, attendants or entry

Frequency
Initial/Annual

supervisors involved in permit

Entry

required confined space entry.


Rescue personnel

Specifications for Accident

All workers

OSHA 29 CFR 1910.145

Initial/Periodic

Prevention/ Signs/Tags
Hazardous waste operations and

OSHA 29 CFR 1910.120

All employees working on site

Initial/Review

exposed to hazardous substances,

emergency response

health hazards, or safety hazards


and their supervisors

Bloodborne Pathogens

OSHA 29 CFR 1910.1030

All workers with occupational

Initial/Annual/Changes to Plan

exposure to bloodborne pathogens

Tools Hand and Power

OSHA 29 CFR 1926.300,


1926.302

QHSE Plan-JVS

All employees who work with such


tools

Initial/Periodic/Changes in
Equipment

TR-164

ANNEXURE 6
TRAFFIC MANAGEMENT PLAN

QHSE Plan-JVS

TR-164

TRAFFIC MANAGEMENT PLAN FOR JVC


SINGLE LINE CLOSURE WITH SPEED REDUCTION - TEMPORARY BARRIERS
LANDSCAPING
AREA

LANDSCAPING
AREA

KERB STONES

WORK AREA
839,43

ISOLATION
VALVE
CHAMBER

284,84

743,13

Temporary
Barriers

872,04

ROAD NARROW

REDUCE SPEED

1518,06

B
REDUCE SPEED

REDUCE SPEED

SPEED LIMIT
A

SPEED LIMIT

Road Works Ahead


Sorry for any Delay

LEGENDS :A - ADVANCE WARNING - SIGNS/SPEED


B - SPEED LIMIT TRANSITION
C - INTERMEDIATE WARNING
D - TAPER
E - STABILISATION
F - TERMINATION

ROAD NARROW

Men At Work
Sorry for any Delay

Not To Scale

ANNEXURE 7
FORMS AND RECORDS

QHSE Plan-JVS

TR-164

ACCIDENT/NEARMISSREPORT
Reportno:________________________Date:________________________

Project/Office/Workshop

Date&Timeofaccident/incident

Details(Name,Age,Numberetc)ofthe

ProjectNo.__________________

injuredand/orDamagetoProperty

Nameoftheimmediatesupervisor

NameoftheEngineerconcerned

ExactLocationofAccident

Witnessifany(givedetails)

Whoreportedtheaccident/incident?

Towhomwastheaccidentreportedfirst? :
Nature/ExtentofInjury/damage(Details) :

Whatmedicalattentionishereceivingnow?:

DescriptionoftheAccident(attachphotosifany):

Whatwouldhavepreventedtheaccident? :

Actionstakentopreventsimilaraccidentsinfuture:
Signature

Date:

:
Name
(ProjectManager)
________________________________________________________________________________________
Distribution:HeadOffice1.SafetyDept.
2.PersonnelDept.

Siteaspersiterequirement

***YOURSAFETYISOURCONCERN***

DECLARATIONBYVISITORS

This is to declare that I have been briefed about the basic safety requirements to be
followed while being at site. I will exercise enough care, which is expected from a normal
persontosafeguardothersandmyself.Iwillberesponsibleforanyofthemishapsoccurring
duetomynegligenceandcarelessnessatsite.Iagreetofollowallthesafetyprecautionstold
tomewithspecificreferencetothefollowing:
Usageofsafetyhelmetandshoesinprojectarea.
Not entering the hazardous areas, which are barricaded or provided with sign
boardsprohibitingentry.
Notenteringareasotherthanauthorizedtome,whicharerelatedtomywork.
Not interfering with the operation of any of the equipment or any construction
machinery.
Followingthespeedrestrictionsintheproject.
Complyingwithanyothersafetysignsdisplayedattheprojectarea.

Name:

Company

Date

Signature

Time

(ORIGINALCOPYOFTHEDECLARATIONTOBEKEPTBYTHESITEOFFICESECRETARY)

***YOURSAFETYISOURCONCERN***

LaddersInspectionChecklist
(Inspectionshouldbecarriedoutoneverymonth)
Sl.
CHECKPOINTS
No.
1.
Isthenonslipbaseoftheladderinplace?
2.

Isthelockprovidedintheladder(ifany)ingood
condition?
Isthereanysignofcrackorbendinthestileorrung?
Isthereanydefectinthelockingmechanismofthe
extensionladder?
Aretheportableandstraightladdersplacedatcorrect
angle(75degrees)orabasetoheightratioof1:4?
Istheladdersecuredproperlytopreventitsslipping?
Istheladderplacedinsuchawaythatthereisabout1.05
mprojectionabovethelandingplatform,ifitisusedas
approach?
Istheladderstrongenoughandstabletouseitwithout
anotherworkerholdingit?

3.
4.
5.
6.
7.

8.

Commentsontheinspection:

HSERepresentative
Name

Signature

Date

Time

ProjectManager
Name

Signature

Date

Time

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately
***YOURSAFETYISOURCONCERN***

PortablePowerToolsInspectionCheckList

S.
No.

(Inspectionistobecarriedouteverymonthbyanauthorizedelectricianatsite)
CHECKPOINTS
A B CDE F Remarks

1. Isthereaprovisionforearthingthebodyofthe
tool?
2. Hasaplugtopbeenprovidedtothepowercable?
3. Isthereanyunusualsparkingfrominsidethe
machine?
4. Aretheconnectionsinsidethemachinewell
secured?
5. Isthereanyvibrationorunusualnoisewhilethe
machineisinoperation?
6. Isthereanyleakagecurrentonthebodyofthe
tool?
7. Arealltherotatingpartsofthemachineryproperly
guarded?(Includingthecollapsibleguardinthe
anglecutter)
8. Is the cutting edge of tool (wherever applicable)
sharp enough and properly connected to the
machine?
Comments:

Signature

Name

Date
:
(ElectricalSupervisor)
ProjectManager
Name

Signature

Date

Time

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately
***YOURSAFETYISOURCONCERN***

SELFINSPECTIONCHECKLIST
(GuidelinesforSiteEngineers/Supervisors/Foremen)
SL.O

1.

2.

3.
4.

5.
6.
7.
8.
9.
10.
11.

CHECKPOINTS

Aretheworkmenclearaboutthecompletedetails
aboutthework,withparticularreferencetothe
correctmethodtobeused?
Aretheyawareofthespecifichazardslikelytobe
encounteredwhileperformingthejob?
Havetheybeenbriefedaboutthesafety
precautions
tobetakenforthespecificjob?
Havetheworkmenbeeninformedabouttheir
responsibilitytokeeptheirworkplaceneatand
tidy?
Aretheycleaningtheirworkplaceattheendofthe
jobeveryday?
Istheworkplacefreefromallunsafeconditions?
Isthereadequatelightingavailableattheplaceof
work?
Isthereanyfirehazardinandaroundthework
place?
Dotheportablepowertoolshavingearthing?Are
theyprotectedbyELCB?
Isthereproperapproachtotheplaceofworkforall
theworkmen?
Arethescaffoldsandladdersbeingusedby
workmenfreefromalldefects?

Columns:A,B,C,D,E,F
A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately

***YOURSAFETYISOURCONCERN***

HOTWORKPERMIT
PermitNumber

SectionI:
Locationofthehotwork

Date:
:

Descriptionofthework :
Approximatedurationofwork:
Nameofthetaskincharge :
Subcontractor(ifapplicable):
SectionII:Precautionstaken
1.
2.
3.
4.
5.
*Pleaseseethebottomofthispermitforguidanceonthechecks/precautionsthataretobetakenbefore
obtainingthepermit

Irequestforahotworkpermitfortheabovementionedworkatthelocationspecifiedabove.Ihave
personally inspected the work place to ensure that the precautions mentioned above have been
compliedwith.
SupervisorsName:

Signature:

Time:

SectionIII:Approval
Workshallbecarriedout(only)aftercomplyingwiththeprecautionsgiveninsectionIIandthefollowing(if
any):

Thepermitisvalidupto__________Hrs.(Time)__________________(Date)
SectionEngineers/HSERepresentativesName:________________________Signature:______________
SectionIV:Renewalofpermitforextensionfortheday
Theworkisnotcompletedandthepermitisrenewedforanadditionalperiodfrom_______Hrs.to
________Hrs.on...(DateasinsectionIII)
Time

:..

SupervisorsName:.

Date

:.

Signature

:..

Thepermitisrenewedfor:(Thisisapplicableonlyforjobswhereworkandsiteconditionsremainssame)
Date:
Date:
Date:
Date:
Date:
Thepermitmustberenewed
everydayandcanbeusedonly
Time:
Time:
Time:
Time:
Time:
foramaxperiodof6days
Sign:
Sign:
Sign:
Sign:
Sign:
includingdateofissue
SectionV:Closureofpermit
Theworkiscompletedandtheareahasbeencleared
Date:..Time:
SupervisorsSignature:..(asinsectionII)
*Checks/arrangementsforthelisteditemsshouldbecarriedoutbytheconcernedSupervisor
Flammablematerialsnearby
Flashbackarrestor
Leakage/damageofcylinder/fittings
Fireblanket
Cylindertrolley
Personalprotectiveequipments
Fireextinguisher
Protectivescreen
Firewatch
TobereturnedtotheHSErepresentativeafterthecompletionofworkorforrevalidation,if
required.Thispermitisnotvalidforcuttingcontainersofflammables.
***YOURSAFETYISOURCONCERN***

Occupational Health Safety Environment Report


SITE /FACTORY:
Sl.
No

Unsafe condition / Unsafe Act observed


(with location and time)

Report o: _______


Corrective / Preventive
Action Required

Inspected by:.

DATE:

Action to be
taken by who /
when?

Corrective / preventive
Action Taken (with date/time)
(to be filled in and returned to HSE dept.)

Report to: ..
Copy to:

ote: It will be the responsibility of the concerned engineer/supervisor mentioned above to ensure that necessary corrective /
preventive actions are taken against the observations made.
***YOUR SAFETY IS OUR CONCERN***

TOOLBOXTALK
Project:

Date:

1. TBTwascarriedoutat(time)on(date)by..Thesubjectcovered
inthetalkwere(pleaseseereverseofthissheetfordetails):
a)
b)
2. Thefollowingstaff/operativesattendedthetrainingsession:
Sl.
No:

Name

IDNo.*

Trade

* Ifitissubcontractoremployees,indicatethenameofthecompany)
***YOURSAFETYISOURCONCERN***

Signature

EXCAVATION, TRENCHING AND BREAKING GROUND PERMIT


Supervisor/Responsible Person:

Address of Job:

Task Description:

Date:

Hole size:

Duration:

mm/mts Wide by

to

mts Long by

mm/mts Deep

Potential Hazards
Communication/Telstra lines
Underground power
Overhead power
Gas lines
Pressurised water line
Falls from above
Falls to below
Traffic
Public
Difficult Access
Manual handling

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Controls Required

No

Heavy machinery collapse

No

Heavy machinery injury

No

Heavy Machinery vibration

No

Side wall collapse

No

Adjoining structure instability

No

Unstable soils/ Fractured rock

No

Flooding rain, sewage, water

No

Biological Sewage, landfill

No

Power tool exhaust

No

Power tool injury

No

Chemical ingression

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

No

Dial and dig information reqd.

Benched at 1.5m and every 1.5m

No

Review site plans to ID utilities

Battered back from lower than 1.5m

No

Potholing to locate utilities

Shoring to be used

No

Sewage Isolation

Engineers assessment of stability

No

Water Isolation

Signs and 2 mt high barricades

No

Electrical Isolation

Confined space risk assessment reqd.

No

PPE in trench eg Goggles, Hard Hat

Engineers authorisation reqd.

No

Pressurised utility Isolation

Hot work Permit

No

Ladder at least every 9 m

Continuous gas monitoring

No

Ventilation reqd. for:

No

Spotter for excavator

Issue of Permit to Enter and Excavate in the designated area is outlined above:

Work Method Statement

min

Safety Management Plan

Person in Control to complete: I understand the requirements of this permit and will comply
with the instructions given

This trench is assessed as safe for excavation and entry provided all conditions on this permit
are met. Persons working under this permit have been instructed on the control measures to be
observed and the control measures identified in this permit are in place and being observed.
Approval has been gained from the Responsible Persons in the following sections.
Grounds:

Plumbing:

Electrical:

ITD:

Name

Initial

Name

Initial

FM Operations Manager or
delegate:

Withdrawal of Permit to Excavate and Enter:

Emergency Response

All persons and equipment have been accounted for.

1. Contact emergency services on 998, 999 and the appropriate supervisors

Any non-conformances or undesired events reported in writing.

2. Tell them who you are, where you are, what the emergency is, what help you need.

Site left in a secure condition, posing tolerable risk to people, property, equipment and environment.

3. Employees on site are to assist without endangering themselves.

Responsible Person:

Date:

ime:

10

MONTHLYHEALTH&SAFETYREPORT
Forthemonthof

General

NameoftheOffice/site/div
:.
Totalnumberofstaff
:.
Averageno.ofworkmenemployed
duringthemonth
:....
Manhoursworkedduringthemonth :.
(Totalemployeesxnumberofhours/dayxnumberofworkingdays+OTworked)
Numberoffirstaidcases
:.
Numberofhospitalreferredcases
:.
NumberofLTAs*
:.
Mandayslostduetoaccident
:.
Nearmissincidentsreported
:
Activities

No.oftoolboxtrainingconducted
:..
(givesubjects)
:..
No.ofattendeesintoolboxtalks
:.

No.ofemployeesreceivedinductiontrg:.....
:..
No.ofHSEmeetingsheld(byETA)
AnyHSErecommendationgiven
bySO/Maincontractor/Client/authorities
:..
whichcouldnotbeimplemented?
(Ifyes,givedetails)
ListoutotherHSEinspections
conducted
(scaffolding,ladders,powertools,etc.)

UsageofPPEbythestaffandworkmen
atsite

:.....
:...

:.
:.....
:(
(

)Good
)Bad

( )Satisfactory
( )Unsatisfactory

Commentsifany:

Sign:..
Name:..

Date:..
(ProjectManager)
_______________________________________________________________________________________

note:ThisreportshouldbesendtotheSafetyDept.onorbefore5thofeverymonth.
* LTAistheoneresultinginadisabilityperiodofmorethan48hours.
***YOURSAFETYISOURCONCERN***

11

HSEINDUCTIONTRAINING
PROJECT:

DATE:

1. TheFollowingStaff/Technicians/Operativeshavejoinedandcommencedworkatsite.
Theyhavebeengivenproject"HSEInductiontraining"andhaveexplainedaboutproject
healthandsafetyplan,DubailocalrulesandotherlocalordersonHealthandSafety.The
pointscoveredinthetrainingareasperAnnexure12oftheHSEplan.
2. Thetrainingwasconductedby..
UNDERTAKING
I, the undersigned, have attended the HSE induction training and understood the
requirementsoffollowingHealth&Safetyrulesinworkplaceandagreedtofollowthem.My
signatureisappendedbelow.
Sl.
No:

Staff/Card
No:

Sticker

Position/
Name

Trade

***YOURSAFETYISOURCONCERN***

Signature

referenceNo.

12

HSEINDUCTIONTRAINIGPOINTS
General.
a) Explanationofthecontract.
b) RequirementsoftheSafetyProgram.
c) AbuDhabiGovt.regulations
d) ETAH&Sstandards
e) ETASafetyPolicy
f) ProjectH&Sstandards
g) SiteSafetyorganization
2.
SiteSafety
a) PPErequirements
b) FallPreventionProcedures
WorkingPlatforms
Ladders
Scaffolds
Heightphobia
Windhazards
3.
Barricadesandperimeterguards

4.
Housekeeping
5.
FireProtectionandFirePrevention
WorkPermitsystems
6.
7.
LockoutTagoutprocedure
8.
Safetysigns
a) Safesigns,
b) Mandatorysigns
c) Prohibitionsigns
d) Warningsigns
9.
EmergencyProcedure
10.
Evacuationprocedure
11.
Welfarefacilities
12.
MaterialHandling
Riggingandliftingequipment
13.
14.
ElectricalSafety

15.
COSHH
16.
Environmentprotection
a) Wastemanagement&spillage
b) Energyconservation
c) Disposalofwastewater
d) Noisereduction
17.
Accidentreporting

18.
Firstaidfacilities
19.
Trafficregulations
Accesscontrol
20.
21.
Smokingpolicy
[Thosewhoprovidingthetraininghastoexplainthesepointstoallemployeesduringtheinductiontraining.]
1.

***YOURSAFETYISOURCONCERN***

13

EMERGENCYPROCEDURE
IFSERIOUSACCIDENTOCCURSATSITETHEFOLLOWINGMUSTBEIMPLEMENTED
DONOTPANICANDBECALM
SENDSOMEONETOCALLFORTHEAMBULANCE
TELEPHOE:

997
998
999

CIVILDEFENCE
AMBULANCE
POLICE
GIVE
YOURNAME
SITELOCATION
ACCESSTOTHESITEENTRANCE.

SENDFORTHEDUTYNURSE/TRAINEDFIRSTAIDER.
APPOINTONETOGOTOTHENOMINATEDSITEENTRANCEREADYTOGIVEDIRECTIONTOTHE

AMBULANCECREW.

ENSURESOMEONESTAYSWITHTHECASUALTYATALLTHETIMES.
IFOUTSIDETHENORMALWORKINGHOURSITISTHERESPONSIBILITYOFTHESENIORMOST

PERSONATSITETOASSESSTHESITUATIONANDINFORMPROJECTDIRECTOR,PROJECT
MANAGER&SAFETYOFFICER.
IMMEDIATESUPERVISORTOACCOMPANYTHECASUALTYTOHOSPITAL.
WITNESSOFTHEACCIDENTTOREPORTTOSAFETYOFFICER/SAFETYCOORDINATOR.
BARRICADETHEAREAANDPROTECTITFORFURTHERINVESTIGATIONBYTHEPOLICEOR

GOVT.AUTHORITIES.
SAFETYOFFICERSHALLBEPRESENTTOGIVEALLASSISTANCETOTHEPOLICE.
PROJECTINCHARGETOCOORDINATEALLACTIONSATSITEANDINFORMHOACCORDINGLY.

REMEMBER

MOVETHEINJUREDPERSONONLYONINSTRUCTIONSFROMTHECOMPETENTPERSONi.e.THENURSE
ORTRAINEDFIRSTAIDER
OR
THEREISARISKOFFURTHERINJURYTOCASUALTYIFTHEYREMAINWHERETHEYARE.

***YOURSAFETYISOURCONCERN***

14

PERMITTOWORK
(HV/LV/Electrical/PlantRoom)

SectionI

PermitNo:

REQUEST

Locationanddescriptionofthework

Permitisrequiredfrom(indicatetimeanddate) :.Hrsto..Hrson
.(date)
Numberofworkersrequiredfortheoperation
:
(Indicatetheirnamesatthebacksideorinaseparate
sheet)
Requestedby:
Name:
Signature:.

Designation:
Date:...

Company:.....
Time:.

SectionII
ISSUE
IssuedtoMr.of
Worktobecarriedout:(specifytheexactjob).
..

Iherebydeclarethatitissafetoworkontheaboveapparatus/unit/plantwhichisdeador
isolated and earthed. It is safe to carry out the specified work during the time mentioned
below.AllnecessaryprecautionshavebeentakenincludingLockoutTagOutprocedure.
Thispermitisvalidfrom..Hrsto..Hrson.(date).Issuing
Authority.
Name:..Designation:.Signature:..
Date:Time:
(IssuingauthorityhastobeaqualifiedEngineerandhemustbeauthorizedbytheProjectIncharge)
SectionIII
RECEIPT

IherebydeclarethatIacceptresponsibilityforcarryingouttheworkontheapparatus/unit/
plantdetailedonthispermitandthatIwillnotattemptorallowmysubordinatestoattempt
toworkonanyotherapparatus/unit/plant.
Competentperson.
Name:.Signature:.Date/Time:..
(Competentpersonhastobeaqualifiedelectricianorelectricalengineerauthorizedtocarryoutthework.)
SectionIV
CLEARANCE

Iherebydeclarethattheworkforwhichthispermitwasissuedisnowsuspended/completedand
that all personnel under my control have been withdrawn. The area has been cleared and the
tools/gearshavebeenremovedandismadesafe.
Competentperson.
Name:..
Signature:Date/Time:
SectionV

CANCELLATION

ThisPermitisherebycancelled.
IssuingAuthority.
Name:..Designation:.Signature:..
Date:Time:
(Copyofthepermitshallbesendtothesafetyofficerbeforeandaftercancellationofworkforinspectionandrecords.)
***YOURSAFETYISOURCONCERN***

15

MobileTowerScaffoldingsCheckList
SL.
CHECKPOINTS

NO

1.

Isthescaffoldapprovalsystembeingfollowedproperly?

2.

Arethecastorwheellocksinmobilescaffoldingoodworkingcondition?
Hastheheightofthemobilescaffoldbeenrestrictedto3.5timesthe
minimumbasewidthwhileworkinginsidethebuildingand3timeswhile
workingoutside?

3.
4.

Isallthebracinginplace?

5.

Istheworkingplatformprovidedwithhandrail,guardrailandtoeboard
onallsides?

6.

Aretheplanks/platformfixedproperlytothescaffoldingpipes/frames?

7.

Trapdoorisavailabletoaccesstheplatform?

8.

Arethepartsfreefromdefectssuchasknots,cracks,splitends,etc.?

9.

Isthereaproperaccesstotheworkingplatformanditissecuredproperly
withthescaffolding?

(The scaffold will be inspected, as per the checklist after erection and it will be tagged. The tag will
becomeinvalidifanycomponentsareremovedorchanged.)
Commentsifany:

HSERepresentative
Name

Signature

Date

Time

ProjectManager
Name

Signature

Date

Time

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately
***YOURSAFETYISOURCONCERN***

16

HouseKeepingChecklist
Thisinspectionshallbecarriedoutoneveryweek
SL.O

CHECKPOINTS

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Generalneatnessofworkingarea
Materialisstackedproperlyandnotscatteredatsite
Extramaterialremovedfromsite
Adequatelightingisprovided
Passagewaysandaislesarekeptclear
Regulardisposalofwasteandrubbishisarranged
Wastecontainersareprovidedandused
Properaccessandegressisavailableatallworkplaces
Restareaismaintainedproperly
Toiletfacilitiesarekeptclean

11.

Drainagefacilitiesaremaintainedproperly

12.
13.
14.
15.

Commentsifany:

Name
Date

:
:

ProjectManager
Name
:
Date
:

Signature
Time

:
:

Signature
Time

:
:

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately

***YOURSAFETYISOURCONCERN***

17

MaterialHandling&StorageChecklist
Thisinspectionshallbecarriedoutoneveryweek
SL.NO

CHECKPOINTS

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

IsMaterialproperlystoredorstacked?
Arepassagewaysclear?
Stacksonfirmfootings,andatcorrectheight
Adequatemanpowerisavailableformaterialhandling
Aremenliftingloadcorrectly?
Allliftingtoolsandtacklesareofgoodcondition
Validtestcertificatesareavailable?
Storageisareaiscleanandtidy
Necessaryfireprecautionsareinplace
Isvehiclemovementsarecontrolledatstorearea?

11.

Isthereanyspillageofchemicalsorothermaterials?

12.

Wastedisposalsareperformedaspertheacceptedplan?

13.
14.
15.

Commentsifany:

Name

Signature

Date

Time

Signature

ProjectManager
Name
:
Date
:

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately
***YOURSAFETYISOURCONCERN***

18

HEALTHANDHYGIENECHECKLIST
Thisinspectionshallbecarriedoutoneveryweek
SL.O
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

CHECKPOINTS

Therearesufficientandsuitablelavatories
Therearesufficientandsuitablewashingfacilities
Therearesufficientandsuitableeatingfacilities
Therearesufficientandsuitablerestingfacilities
Therearesufficientandsuitablefirstaidfacilities
Alltheaboveareasaremaintainedproperlyandareingood
condition
Wasteandrubbishareremovedregularly
Foodwasteisnotaccumulated
Theofficepantryismaintainedandisclean

11.
12.
13.
14.
15.

Commentsifany:

HSERepresentative
Name

Signature

Date

Time

ProjectManager
Name

Signature

Date

Time

Columns:A,B,C,D,E,F

A:yes
B:no
C:good

D:satisfactory
E:bad
F:needsattentionimmediately

***YOURSAFETYISOURCONCERN***

19

EMERGENCYPROCEDURE
IFAMAJORFIREACCIDENTOCCURSATSITETHEFOLLOWINGMUSTBEIMPLEMENTED
DONOTPANICANDBECALM
TRYTOPUTOFFTHEFIREWITHEXTINGUISHERPROVIDED
DONOTPUTYOURSELFINDANGER
DONOTWAITTOCOLLECTYOURBELONGINGS
RAISEALARM
CALLCIVILDEFENCEAUTHORITIES
TELEPHONE:

997
998
999

CivilDefense
Ambulance
Police

GIVE
YOURNAME
SITELOCATION
ACCESSTOTHESITEENTRANCE.

Uponhearingthefirealarmallpersonsaretoevacuatetheworkareabythenearest
availablefireescaperoute.Ensurethefollowing:
Report to your supervisor / fire warden of your
areaGotothenearestAssemblyArea
Witnessoftheaccidenttoreporttosafetyofficer/safetycoordinator.

Barricade the area and protect it for further investigation by the police or
Govt.authorities.
Safety officer shall be present to give all assistance and information to the
police.Projectmanagertocoordinateallactionsatsite.
Haveaheadcountandreportifsomebodyismissing.

DONOTENTERTHEAREAUNLESSDECLAREDSAFE
***YOURSAFETYISOURCONCERN***

20

ACCIDENT/INCIDENTINVESTIGATIONREPORT
ReportNo:______(ProjectGONo.)/_______

AccidentReportRef.No:___________

[Thisreportmustbecompletedassoonastheinvestigationisover.TheformistobecompletedindetailbytheSupervisor,
SectionEngineer,ProjectManagerandSafetyAdvisorintherespectivesections]

SectionI

AccidentDetails(tobefilledbythesupervisorofthelocation)

1. TypeofAccident
:Injury/Illness/NearMiss/Chemicalspill/PropertyDamage
2. LocationofAccident:
a) Project/Office/Workshop/Camp:
b) Date:
c) Time:
3. DescriptionoftheAccident:(attachadditionalsheetsifrequiredwithphotographs)
..
..

..
..
..
4. Detailsofthewitnessifany:Name:
Number:
Section:
5. ImmediateActionsTaken:
.
..
Name:
SectionII

Signature:
Date:
TobefilledbytheDepartment/Sectionincharge

1. Detailsoftheinjuredemployee
a) Nameinfull
:
b) Number
:
c) Age
:
d) Nationality
:
e) LengthofService
:
f) Section/Dept
:
g) JobTitle
:
h) ImmediateSupervisor:
2. DetailsofthePropertyDamageorIllnessorInjuryresultedfromtheaccident:
..

...
3.HadtheinjuredreceivedHSEinductiontraining?(attachtheinductionrecord)
Yes/No/NA
4.Wastheinjuredperformingthejoballocatedtohim?
Yes/No/NA
5.Wastheemployeebriefedaboutthehazardsaboutthejobtobeperformed?
Yes/No/NA
6.WastheemployeeprovidedwithnecessaryPPEtoperformtheallocatedjob?
Yes/No/NA
7.Wastheemployeeprovidedwithallequipmentrequiredtoperformthejob?
Yes/No/NA
8. WhatistheDirectCauseoftheaccident?
...................................................................
9. Whatarethecorrective/Preventiveactionstaken?
....................................................................................
......

...
Section/DepartmentHeadattheproject/location:
Name:

Signature:
***YOURSAFETYISOURCONCERN***

Date:

SectionIII

(TobefilledbytheProjectManager/FactoryManager)

1. Thecorrective/preventiveactionstakenareinplace.
2. TheSiteEngineers/SupervisorshaveconductedtoolboxTalks
andoperativesaremadeawareoftheaccidentandthecauses.
3. Therootcausehasbeeneliminatedinallouroperations
4. Theinjuredpersonhasbeenprovidedwithallnecessarymedicaltreatment.
(attachmedicalreportifavailable)
5. Lossofmandayslikelytoloseduetothisaccident:
(attachmedicalcertificatealongwiththereportifavailable)
6. Istheaccidentduetonegligencefromanybody?
(ifyesgivedetails)

Name:

Signature:

Yes/No*
Yes/No
Yes/No*
Yes/No

Yes/No

Date:

* IfanswerisNopleaseprovidethetargetdateforcompletion
SectionIV

(TobefilledbytheHSErepresentative)

1.
2.
3.
4.
5.
6.

Isthehazardidentifiedintheriskassessment?
AreallcontrolmeasuresindicatedintheRiskAssessmentfollowed?
IsallcontrolmeasuresindicatedintheRiskAssessmentadequate?
Accidentsite/locationhavebeenvisited.
Injuredperson/witnessoftheaccidenthavebeeninterviewed.
CorrectiveandPreventivemeasuresmentionedinSectionIandIIare
adequatetopreventanyrecurrenceandareinplace.
7. Anyotherpoints:

Name:

Signature:

Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA(attachthesignedstatement)
Yes/No/NA

Date:

Note:
ThisreportshallbesenttoHSEDepartmentatHOwithinthreeworkingdaysfromthedateof
theaccident.

Insuranceclaimwillnotbeprocessedwithoutthisinvestigationreport.

ThisreportisinadditiontotheAccidentReport,whichshallbepreparedimmediatelyaftertheaccident.

***YOURSAFETYISOURCONCERN***

21

WARNINGNOTICESAFETYVIOLATION
Project:

WarningNoticeNo:.

1. Warningissuedto:
Name:

Designation:

StaffNumber:

2. a) You were found working unsafely at site, which could have resulted in serious accident and thus
injuringyouand/orothersatapproximately_________on____.Theviolationisasfollows:
i.

b) Youwerefoundworkingunsafely/allowingtheoperativesworkingunderyoutocarryoutworkinan
unsafe manner thus putting in danger their life as well as others working nearby at approximately
__________on___________.Theviolationisasfollows:
i.

ThisisagainsttheCompanySafetyPolicyandthelocalRulesgoverningtheHealthandSafetyof
employees.Thefollowingactionwillbetakenagainstyou:
ForWorkers

ForStaff

1stWarning
2ndWarning

WrittenWarning(toberecordedintheregister).To
attendtheSiteSafetyinductionTrainingagain.

Writtenwarningtobegivenandcopytobesent
personneldepartmentforEmployeesConfidentialFile
(ECF).

3rdWarning

SuspendedfromworkandtoreporttoExecutive
DirectoratHO.WarningcopytoECF.

Verbalwarningwillgiven(tobe
recordedintheregister)
Individualwillbeissuedwithawritten
warningandtoattendSafetyInduction
Trainingagain.
SuspendedfromworkandsendtoHO
forSafetyTraining.

Safetyviolationnoticedby:
Name:

Designation:

Signature:

Date:

Designation:

Signature:

Date:

SafetyWarningissuedby:
Name:

***YOURSAFETYISOURCONCERN***

22

ToolBoxTalkTopics
1.
2.
3.

4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

32.
33.

Abrasivewheels
Accidentcauses
Alcohol&Drugs
AnchorFasteners
CompressedGases
Dust&fumes
Electricityonsite
Excavation
Firedrill
Fireextinguishers
Firstaid
Flammableliquids&adhesives
Forklifts
Handtools
Heatstroke
Legaldutiesofemployees
Mobiletowers
Nearmiss
Repetitivemotiondisorders
Seatbelts
Skinprotection
Slips,trips&falls
Vibration
Weilsdisease
Welding
Workatheight
Safestackingofmaterials
Ladders
Stepladders
Energyconservation
Wastemanagement
Landcontamination
Waterpollution

***YOURSAFETYISOURCONCERN***

23

Confinedspacepermit
PermitNumber:
SectionI(tobefilledbytheworkincharge(SiteEngineer/SiteSupervisor)
Locationofwork:
Natureofwork:
Approximatedurationofwork:
From.(time)to.(time)
on..(date)
Nameofworkincharge:..
Thefollowingconditionshavebeenensuredtocarryouttheworksafely

1. Hastheareabeenfenced/cordonedoff?
2. Hasproperilluminationbeenarranged?
3. Havetrafficdiversionsigns(flashersatnight)beenkept?
4. Haveallconcerned/affectedpersonsbeeninformed?
5. Hasgastestbeendonetochecktheabsenceofflammablegases?
6. Isthereenoughventilation?
7. Havelowvoltageandflameprooflightingbeenarranged?
8. Havenecessarysafetyappliancesbeenprovided?
9. Hasastandbyworker(buddy)beenarranged?
10. Istheconfinedspacecheckedforoxygendeficiency?
11. Ifanytoxicgasesareanticipated,hasitbeenchecked?
12. Havetheemergencyprecautionstakenandprocedurebeenbriefedtoall?
13. Anyotherprecautionstaken?(Pleasespecify)

Yes

No NA

IhavecheckedpersonallythattheaboveprecautionshavebeentakenandIhavebriefedalltheworkmen
involvedinthisactivityaboutthesafetyrequirementsofthejob.Workcontrolmeasuresprescribedinany
otherworkpermitissuedforthesameareawillalsobefollowedalongwiththeseprecautions.
Name:
Signature:
Designation:
Date&Time:
SectionII(tobefilledbytheauthorized/approvedpersonafterphysicallyinspectingtheplace)
The work may be carried out provided the precautions mentioned above are in place. I authorize
Mr....tosend...numberofworkmeninsidetheconfinedspacetocarryoutthework
asmentionedinSectionI.
Name:.
Signature:
Designation:.
Date&Time:
SectionIII(tobefilledbyworkinchargeaftercompletionofthework)
Theworkisoverandtheareahasbeenmadesafeat_______(hrs.)on__________(date).Allextra
arrangementmadehasbeenremovedandtheareaiscleared.
Name:
Designation:

Signature:
Date:

note:
*ThepermitistobeobtainedforallpermitrequiredconfinedspaceworksandtheHSEprofessionalwilldecideifPTWis
necessary.*ConcentrationofH2Sshallberestrictedtolessthan10PPMandpercentageofO2shallbenotlessthan20%.
*Theoriginalpermitmustbeavailableatplaceofwork.
*Copyofthepermittobeissuedtothesafetyofficertomonitorthework.
***YOURSAFETYISOURCONCERN***

24

PartA:SITESPECIFICASSESSMENT
(ThissitespecificassessmentmustbecarriedoutatsiteinconjunctionwiththegenericassessmentbytheEngineer
incharge,inordertoaddressanyadditionalhazardsthatmayariseduetolocation,environment,adjacentactivities
etc.)

Project:
Locationoftheactivity:
Maximumnumberofpeopleinvolved:
Additionalhazardsnoticedandcontrolmeasurestaken:
No.

Hazards

Date:

ControlMeasures

ResponsiblePerson
(toimplement)

Theactivityisallowedtobecarriedoutoncethespecifiedcontrolmeasuresareinplace.

DateandTime:
Name:

Signature:
Distribution:[Tickwhicheverisapplicable]
MainContractor:
Client/Consultant:
ProjectManager:
Subcontractor:

HSEOffice:

Note:
Severityassessment:

Negligible

Nofirstaidrequiredandno
materialdamage

Minor

Firstaidcaseandno
furtherlosstime

Losttime
injury

Notavailablefordutynext
day

Major

Severe

Fatality
Risk
Action
required

Absencefromworkfor
morethan3days
Multipleinjuries;single/
severaldisabilities
Single/Multiple
High
Specialequipments,training,
PTW,closesupervision,
alternativemethodsof
controllinghazardsetcshould
beconsidered

Others:

Likelihoodassessment:
Controlmeasuresunlikelyto
Very
1
breakdownorbeeasily
unlikely
removed
Multiplecontrolmeasuresin
2 Unlikely
placeandfailureofonedoes
notresultinaccident
Failureofcontrolmeasures
May
e.g.,failureofthemachinery
3
occur
orlackofproperactionfrom

otherworkers
Controlmeasurestobein
4
Likely
placeaswellasPPE
Very
Controlmeasuresrequired
5
likely
constantlyincludingPPE
Constantexposuretothe
6
Certain
hazard
Medium

Low

Risksnotacceptable.Hazards
andcontrolsneedinvestigation
toconsiderreasonable
practicableimprovements

Acceptablerisk.Further
controlmeasuresmaybe
takenonlywithoutadditional
costs

SSeverity;LiLikelihood;RRRiskRating; R Risk; H High; M Medium;LLow


816> Medium;
RR: 1736>High;
17>Low
***YOURSAFETYISOURCONCERN***

25

Lifting Operation Permit


Job Name & Description of Work:

Document Control No:


(PERMIT-Date-Initials)

PERMITWeight of Load:

Method by Which Weight was Determined:

Estimated or Known?

Center of Gravity determined by:


Estimated or Calculated?

Date/Time Permit Requested:

Date/Time Permit Issued:

Date/Time Permit Expires:

CONTACT INFORMATION
Name

Company

Phone Number

Designated Lift Leader


(Issuing Authority)
Qualified Crane Operator
(Performing Authority)
Designated Rigger

SAFETY REVIEW
CRANE If the answer to any of the following questions is NO, lifting operations shall not proceed.

Yes No

NA

Yes No

NA

Yes No

NA

Yes No

NA

1. Was a pre-lift operations meeting held?


2. Is the yearly crane/hoist inspection current? (Is it documented?)
3. Has the daily visual inspection been completed?
4. Are safety devices installed and tested?
5. Is the wind speed below 30 mph? (Wind speed >20 mph require reassessment of Work Risk Assessment and TSEA, if wind speed >30 mph,
lifting operation shall not proceed.
6. Have precautions been taken to keep other personnel out of the area?
7. Was the need to protect the swing area and lift/landing zones considered?
8. Has the ground stability been assessed, and is the ground stability adequate for this lift?

RIGGING If the answer to any of the following questions is NO, lifting operations shall not proceed.
9. Has the rigging been inspected? (shackles, chains, wire, rope, etc.)
10. Is the rigging attached to the pole at the proper angle?

LOAD If the answer to any of the following questions is NO, lifting operations shall not proceed.
11. Has the need for taglines been evaluated?
12. Is the load to be lifted stable? (no liquid or other resulting load)
13. Have the lifting lugs and pad eyes been inspected?

CRITICAL LIFT ASSESSMENT If the answer to any of the following questions is YES, a critical lift plan must be completed.
14. Are people being lifted? If yes, refer to Section 5.7 of the Lifting Operations Defined Practice.
15. Are power lines within twice the maximum boom swing radius plus the equaled clearance?
16. Are two or more lifting machines being used to simultaneously lift one load?
17. Is this a lift that presents a risk of significant property damage or high potential of personal injury?
18. Will the crane or hoist operator lose sight of the lead original person at any time during the lifting operation?
19. Is the weight of the load more than 80% of the dynamic or static capabilities of the lift equipment?
20. Is the lift being conducted over energized or pressurized equipment?

Page 1

Lifting Operation Permit


LIFT DETAILS
Crane Make & Model
Total weight of required rigging
Total weight of planned load
Additional weight to be added to load
TOTAL WEIGHT OF THE LIFT:
Maximum operating boom radius
Planned operating boom radius
ALLOWABLE LOAD (from load chart):
RATIO OF LIFT TO ALLOWABLE LOAD:
Rigging Diagram:

Crane Setup Diagram

Yes No

1.

Does this lift involve lifting personnel? If YES, attach manbasket inspection checklist.

2.

Are there nearby power lines that are closer than twice the distance of the maximum length of the boom?

3.

Are the power lines energized? If YES, then stop the job and contact the Electrical Service Provider (ESP) to request the power turned off.

4.

Do you have documentation from the ESP that all electrical power lines have been de-energized?

5.

Is there sufficient clearance to de-energize power lines?

6.

Is there a spotter?

7. Will there be a representative of the ESP on site during the lift? Name:
NOTE: There may be instances that require lifts that are closer than twice the boom radius to be made near a live electrical power line. These must be
very carefully planned and require approval from the Area Lift Champion and a Regional Manager or Deputy Regional Manager.

AUTHORIZING SIGNATURES
I certify the total weight of the lift is less than the allowable load (from the load chart) at the planned boom radius.
TITLE

NAME

SIGNATURE

Designated Lift Leader


(Issuing Authority)
Qualified Crane Operator
(Performing Authority)
Designated Rigger
Signaler

Page 2

DATE/TIME

NA

26

WeeklyHSEReport
Project/FactoryName:
Sl.No.

fortheweek:

Description

previousweek

TrainingDone
a) SafetyInduction
b) ToolBoxTalk

Accident/Incident
a) NoofFirstAidCases
b) NoofHospitalreferredcases
c) NoofLostTimeAccidents
d) Property/MaterialdamageIncidents
e) Nearmiss Incidents
AvgNo.ofemployeesworkedduringtheweek
TotalManhoursWorked
AccidentFrequencyrate*
AccidentSeverityrate**
Numberofsafetyviolationnoticesreceived
Numberofsafetyviolationnoticesrectified
NumberofSafetyMeetingsconducted
NumberofSafetyviolationsrecorded
Numberofwarningnoticesissued
InspectionsCarriedout
a) Health&SafetyInspectionreport
b) Health&Hygiene
c) LadderInspection
d) MobileScaffolding
e) PortablePowertool
f) FireSafetyInspection
g) MaterialStorage&Stores

3
4
5
6
7
8
9
10
11
12

currentweek

Name

Designation

HSERep
ProjectManager

Note:

*AccidentFrequencyRate(AFR)=(Numberofaccidentsx1000000) /TotalManhours workedforthe


period
**AccidentSeverityRate(ASR)=(Numberofdayslostx1000000) /Totalmanhours workedfortheperiod

/2016to
cumulative

/2016
Remarks

Signature/Date

27

EXCAVATION CHECKLIST
(TobecompletedbyaCompetentPerson)
Indicateforeachitem:YESNOorN/Afornotapplicable
SITELOCATION:
DATE:
TIME:
SOILCLASSIFICATION:

COMPETENTPERSON:

EXCAVATIONDEPTH:

EXCAVATIONWIDTH:

TYPEOFPROTECTIVESYSTEMUSED:
1. GeneralInspectionofJobsite:
A.Excavations,adjacentareas,andprotectivesystemsinspectedbya competentpersondailybeforethe
startofwork.
B.Competentpersonhastheauthoritytoremoveemployeesfromthe excavationimmediately.
C.Surfaceencumbrancesremovedorsupported.
D. Employees protected from loose rock or soil that could pose a hazard by falling or rolling into the
excavation.
E.Hardhatswornbyallemployees.
F.Spoils,materials,andequipmentsetbackatleasttwofeetfromtheedgeof theexcavation.
G.Barriersprovidedatallremotelylocatedexcavations,wells,pits,shafts,etc.
H. Walkways and bridges over excavations four feet or more in depth are equipped with standard
guardrailsandtoeboards.
I.Warningvestsorotherhighlyvisibleclothingprovidedandwornbyall employeesexposedtopublic
vehiculartraffic.
J.Employeesrequiredtostandawayfromvehiclesbeingloadedorunloaded.
K.Warning systemestablishedandutilizedwhenmobileequipmentis operatingneartheedgeofthe
excavation.
L.Employeesprohibitedfromgoingundersuspendedloads.
M. Employees prohibited from working on the faces of slopes or benched excavations above other
employees.
2. Utilities:
A.Utilitycompaniescontactedand/orutilitieslocated.
B.Exactlocationofutilitiesmarked.
C.Undergroundinstallationsprotected,supported,orremovedwhen excavationisopen.
3. MeansofAccessandEgress:
A.Lateraltraveltomeansofegressnogreaterthan25feetinexcavationsfour feetormoreindepth.
B.Laddersusedinexcavationssecuredandextendedthreefeetabovetheedge ofthetrench.
C.Structuralrampsusedbyemployeesdesignedbyacompetentperson.
D.Structuralrampsusedforequipmentdesignedbyaregisteredprofessional engineer(RPE)
E.Rampsconstructedofmaterialsofuniformthickness,cleatedtogetheron thebottom,equippedwith
noslipsurface.
F.Employeesprotectedfromcaveinswhenenteringorexitingtheexcavation.
4. WetConditions:
A.Precautionstaketoprotectemployeesfromtheaccumulationofwater.
B.Waterremovalequipmentmonitoredbyacompetentperson.
C.Surfacewaterorrunoffdivertedorcontrolledtopreventaccumulationin theexcavation.
D.Inspectionsmadeaftereveryrainstormorotherhazardincreasing occurrence.
5. HazardousAtmosphere:
A. Atmosphere within the excavation tested where there is a reasonable possibility of an oxygen
deficiency,combustibleorotherharmful contaminantexposingemployeestoahazard.

B.Adequateprecautionstakentoprotectemployeesfromexposuretoan atmospherecontainingless
than19.5%oxygenand/ortootherhazardous atmospheres
C. Ventilation provided to prevent employeeexposure to an atmosphere containing flammable gas in
excessof10%ofthelowerexplosivelimitofthe gas.
D.Testingconductedoftentoensurethattheatmosphereremainssafe.
E.Emergencyequipment,suchasbreathingapparatus,safetyharnessand lifeline,and/orbasket
stretcherreadilyavailablewherehazardous atmospherescouldordoexist.
F.Employeestrainedtousepersonalprotectiveandotherrescueequipment.
G.Safetyharnessandlifelineusedandindividuallyattendedwhenenteringbell bottomorotherdeep
confinedexcavations.
6. SupportSystems:
A.Materialsand/orequipmentfor supportsystemsselectedbasedonsoil analysis,trench depth, and
expectedloads.
B.Materialsandequipmentusedforprotectivesystemsinspectedandingood condition.
C.Materialsandequipmentnotingoodconditionhavebeenremovedfrom service.
D.Damagedmaterialsandequipmentusedforprotectivesystemsinspectedby aregisteredprofessional
engineer(RPE)afterrepairsandbeforebeing placedbackintoservice.
E.Protectivesystemsinstalledwithoutexposingemployeestothehazardsof caveins,collapses,or
threatofbeingstruckbymaterialsorequipment.
F.Membersofsupportsystemsecurelyfastenedtopreventfailure.
G.Supportsystems provided inensure stabilityofadjacent structures, buildings, roadways,sidewalks,
walls,etc.
H.Excavationsbelowthelevelofthebaseorfootingsupported,approvedby anRPE.
I.Removalofsupportsystemsprogressesfromthebottomandmembersare releasedlowlyastonote
anyindicationofpossiblefailure.
J.Backfillingprogresseswithremovalofsupportsystem.
K.Excavationofmaterialtoalevelnogreaterthantwofeetbelowthebottom ofthesupportsystemand
onlyifthesystemisdesignedtosupporttheloads calculatedforthefulldepth.
L.Shieldsystemplacedtopreventlateralmovement.
M.Employeesareprohibitedfromremaininginshieldsystemduringvertical movement.

28

DAILY TRENCHING LOG


DATE:

SIGNATURE:

WEATHER:

PROJECT:

Was One Call System contacted:

Yes

No

Protective system: Trenchshield(box)


Other
Purpose of trenching: Drainage
Gas
Other

Woodshoring
Water

Werevisualsoiltestsmade:
type?
Type ofSoil:
Stable Rock

Sloping
Sewer

Yes
Type A

Surfaceencumbrances:
type?
Water conditions:
Wet

No
Type B

Yes
Dry

Ifyes,what

Type C
No

Ifyes,what

Submerged

Hazardous atmosphere exists:

Yes

No

(Ifyes,followconfinedspaceentryprocedurespolicy;completeconfinedSpaceEntryPermit;monitorfortoxicgas(es))

Is trenching orexcavation exposedto public vehicular traffic (exhaust emission): Yes


(Ifyes,refertoconfinedspaceentryprocedures;completeConfinedSpaceEntryPermit;monitorfortoxicgas(es))

Measurements oftrench: Depth

Length

Width

Is ladder within 25 feet ofall workers:

Yes

No

Is excavated material stored two feet or more from edge of excavation:Yes


Are employees exposedto public vehicular traffic: Yes

No

(Ifyes,warningvestsrequired)

Are other utilities protected:

Yes

No

(Water,sewer,gasorotherstructures)

Are sewer ornatural gas lines exposed: Yes


Periodic Inspection:
Didemployees receive training inexcavating:
CorrectiveActionsandRemarks:

No
Yes
Yes

No
No

No

No