1-Introduction:
1.1 General
WASCO is the operating company of two concessions at north of Egypt and Nile
Delta Areas, both exploratory and development activities are carried out in the two
concessions.
EW-Plant at Damietta governorate its about 270 km far from Cairo and about
15 km from New Damietta city.
SEM-Plant at Al-Daqahliyia governorate its about 60 km far from El-Mansoura
city.
WASCO intends to revamp the control system of its central processing facilities at
EW-plant. This is mainly due to system components obsolescent in addition to other
aspects that explained in details in the following sections of this document.
1.2 General Scope of Work
The scope of work generally, includes Engineering, supply of required hardware and
software in addition to execution of all relevant works at site up to successful
commissioning of the upgraded system.
Scope details will be explained in the following sections of this document.