SECTION III
INTRODUCTION
ITB 1.1
ITB 1.1
ITB 2.1
Name of Employer:
Tendaho Sugar Factory Project (TSFP), P. O. Box. 2574, 6th Floor,
Bole Road, Addis Ababa, Ethiopia.
ITB 2.4
ITB 3.2
ITB 6.1
ITB 6.4
Section - III
Page - 2 / 14
P. O. Box. 2574,
6th Floor, Bole Road,
Addis Ababa, Ethiopia
Date:
Time:
09:00 h
PREPARATION OF BIDS
ITB 8.1
Bidders
or
Individual
Members
of
Joint
Section - III
Page - 3 / 14
Item of equipment
Description, make, and age (years)
Condition (new, good, poor) and number available
Owned, leased (from whom?), or to be purchased (from
whom?)
Position
Name
Qualifications
Type of experience in similar functions
Years of experience (general)
Years of experience in proposed position
1.8 Audited accounts for the last three years; bank references; etc.
[Furnish details below and attach copies.]
Section - III
Page - 4 / 14
Section - III
Page - 5 / 14
operation;
number
of
years
following
ITB 11.3
Schedule No. 2
Schedule No.3
Schedule No. 4
Ocean Transportation
Schedule No. 5
Local Transportation
Schedule No. 6
Section - III
Page - 6 / 14
Schedule No. 8
i)
ii)
iii)
i)
ii)
iii)
ITB 11.6
Section - III
Page - 7 / 14
ITB 13.2
ITB 14.1
Bid validity period 120 days from the date of bid opening.
ITB 16.1
Bidders shall not have the option of submitting their bids only
electronically but with hard copies as indicated under BDS 15.1.
ITB 17.1
City:
Country:
Addis Ababa
Ethiopia
Telephone:
Fax:
Email address:
tsfp@ethionet.et
Kind attn:
Section - III
Page - 8 / 14
ITB 22.5
Bid Responsiveness
Responsiveness are those important points which conform to the
major conditions set out in the Bid, without which, the Bid is
considered as non-responsive and will not be considered for further
evaluation. Following six points are considered under this category.
Table-1 below is to be filled for marking Yes I No against each
points for each Bidder.
Table- 1
Sl. No.
1
2
3
4
5
6
Description
Bidder # 1
Bid form
Bid security and its validity
Bid validity
Scope of work including amendments
Technical data
Price schedule
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Section - III
Page - 9 / 14
ITB 24.1
80
20
----100
Technical Evaluation
The technical evaluation shall be carried out in the following four
major categories:
1) Technical specification which covers Technical specification,
Technical Schedule, Drawings and flow diagrams, Scope of
work, Terminal points of supply, Performance Parameters,
Erection and Commissioning, etc.
2) Project Time Schedule
3) Training
4) Bidders Company Structure & Profile which includes
Company reputation, Financial position, Shop facility and set
up, Key personnel CV, Experience in similar jobs, Document
presentation, Resource Level, Quality plan, Confidence in
method statement, understanding the requirement, etc.
Following merit point system shall be followed for Technical
Evaluation. Upon completion of evaluation, the marks will be
corrected to level of 80 from 200.
Sl.No
Description
1.
1.1
1.2
1.3
Technical Specification
Technical Schedule
Drawings / Flow Diagrams
Terminal points of supply
Max.
Marks
20
25
25
10
Section - III
Page - 10 / 14
1.4
1.5
Performance parameters
Erection & Commissioning
2.
3.
4.
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
Sub Total
Sub Total
Total Score (1+2+3+4)
Technical evaluated score corrected to 80
15
25
100
10
10
5
10
5
10
15
5
5
10
10
5
80
200
80
ITB 25.2
Evaluated Price
A)
ii)
For those figures, which were not filled by the bidders, the
corresponding maximum value of other bidder shall be filled
for evaluation purpose.
iii)
Section - III
Page - 11 / 14
=
=
=
=
xxxxx
xxxxx
xxxxx
xxxxx
-------xxxxx
--------
P
Pmin
Pmax
=
-
20 x [1 (P Pmin)/Pmax]
Section - III
Page - 12 / 14
Max. Marks
Bidder #
Evaluated Price
Financial Evaluated score
3.0
20.00
xx . xx
Particulars
Max. Marks
Bidder #
80
20
xx . xx
xx . xx
100
xx . xx
4.0
Winning Bidders
Award of Contract
The 1st successful and qualified bidder shall be invited for AWARD
OF CONTRACT.
ITB 25.3 (b)
Time schedule:
Time to complete the facilities from the effective date specified in
Article 3 of the Contract Agreement for determining time for
completion of pre-commissioning activities shall be as under.
a)
Section - III
Page - 13 / 14
ii)
iii)
iv)
Section - III
Page - 14 / 14
2. Power Consumption :
Lowest of power consumed (within the battery limits ) amongst
the bids received.
ITB 25.3 (d) (ii)
Adjustment factor
used in bid
evaluation
b)
Nil
CONTRACT AWARD
ITB 33