You are on page 1of 7

CURRICULUM VITAE

1.
2.
3.
4.
5.
6.

PROPOSED POSITION
NAME
DATE OF BIRTH
STATUS
Phone Number
ADDRESS

7. EDUCATION
8. NATIONAL
9. QUALIFICATION

:
:
:
:
:
:

Sr Civil / Structural Engineer


Rr. Farina Suryanti
August 5 1967
Maried with 2 children
082298812394
Perum Taman Sari Persada Blok C8 no.9 Rt 02 Rw 15
Jl. K H Soleh Iskandar KM.5 Bogor.
: Graduate from Civil Engineering at Jayabaya University (Oct 1991)
: Indonesia
: Having 14 years experience in Oil & Gas project.
Having 7 years experience in multi story building project.

10. SUMARY EXPERIENCE

January 2006 Aug 2015


Sept 2001 Dec 2005
1997 -- 1998
1992 1997

11. DETAILED EXPERIENCE

:
:
:
:

PT GASTECH ENGINEERING CONSULTANT


PT REKAJASINDO BINA ABADI (PT RBA)
PT JATA NURMAN
PT KETIRA ENGINEERING CONSULTANT

DATE : January 2006 August 2015


EMPLOYER : PT GASTECH ENGINEERING
POSITION HELD & DESCRIPTION OF DUTIES : Senior Civil Engineer
RESPOSIBILITIES

Project Involved:
Date : February 2014 - Dec 2014
Client
: KSO PT. PERTAMINA EP INDOSPEC ENERGY LIMAU LTD
Project
: FEED (Front End Engineering Design) Gas Compressor Package SKG 1
Limau Timur - South Sumatera.
Job description
: Checking Specification, Checking Compressor Foundation calculation, checking
for Shelter calculation, MTO, Checking for all civil drawing, etc.
Date : January 2013 - Aug 2013
Client
: PT. PERTAMINA GAS P2M UNIVERSITAS INDONESIA
Project
: JASA KONSULTANSI PERANCANGAN & DESAIN PORONG - GRATI
Job description
: Checking Specification, Checking Pipe Support calculation, checking MTO,
Checking foundation lay out drawing, etc.
Date : November 2012 - September 2013
Client
: PT. YAMA HESS
Project
: API SEPARATOR AND RE RUN PUMP
Job description
: Checking Calculation for API Separator , Checking calculation for Re Run
Pump, made bracing calculation to support API Separator, checking calculation
for Pipe support, checking MTO, Checking all structure and foundation drawing
etc.

Farina CV 2016
082298812394

Page 1

Date : December 2011 - September 2012


Client
: PT PERTAMINA HULU ENERGY WMO PT ADIGUNA SE
Project
: KE40 Deck Platform Refurbishments, Extension Deck and Additional
Conductor
Job description : Supervising/design and checking calculation, check structure drawing ( new
design for Jacket, extension drawing for Deck ) , Boat landing, check for MTO,
preparation for weighing, and Load out, etc.
Date : Agust 2011 - 30 Des 2011
Client
: Total E & P Indonesie PT Kaliraya Sari
Project
: PIPELINE REINSTATEMENTAT RIVER CROSSING NO. 5
Job description : Pipe Support Calculation and MTO
Date : October 2010 April 2011
Client
: PT Inti Daya Latu Prima
Project
: Panaran To Kabil Pipeline Project
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, pipe support, drawing structure, etc
Date : September 2010 Maret 2011
Client
: CONOCO PHILLIPS / YAMA ENGINEERING
Project
: Suban 12 And Sumpal 6 Flowline Installation Project
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, plot plan, pipe support, drawing structure, control building,
road and drainage etc.
Date : July 2010 April 2011
Client
: PT. PERTAMINA EP STUDI DESIGN ENGINEERING FASILITAS INJEKSI AIR
TERPRODUKSI LAPANGAN KENALI ASAM, TAPIAN TIMUR DAN TEMPINO.
Project
: FEED Modifikasi Fasilitas Injeksi Air Terporduksi Lapangan Kenali Asam
UBEP Jambi
FEED Pembangunan Fasilitas Injeksi Air Terporduksi Lapangan Tapian Timur
UBEP Tanjung
FEED Pembangunan Fasilitas Injeksi Air Terporduksi Lapangan Tempino
UBEP Jambi
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, plot plan, pipe support, drawing structure, control building,
road and drainage etc.
Date : 26 November 2009 June 2010
Client
: MYANMA OIL & GAS ENTERPRISE (MOGE) / ARV OFFSHORE Co., LTD
Project
: Yadana Yangon Pipeline Project
Job description : Supervising/ Design, prepare and checking Design Basis of Civil and
Structure, Control Building , Telecommunication Building , Guard House, Pipe
Support Calculation, Pig Launcher/Receiver Found, Sump Tank Found, Gas
Engine Generator Found, Diesel Engine Generator Found, Metering Found,
Analyzer Found, Foundation Instrument Air & Service Air Skid, Landfall Found,
Oil Catcher, Metering Shelter, Diesel Engine Generator Shelter, Gas Engine
Generator shelter , Typical Steel Frame, Roads and Parking Area, Open Drain
Calculation, Water Tower, and also checking drawing foundation, structure and
shelter.
Date : November 2008 - Oktober 2010
Client
: SALAMANDER ENERGY (NORTH SUMATRA) LIMITED.
Project
: Kambuna Development Project.
Job description
: Supervising/ Design, prepare and checking Design Basis of Civil and Structure,
Structural Calc. for PSV Platform, Structural and Foundation For Access
Platform Type 1 at Module 1 Area, Foundation of Laboratory Building , Guard
House, Water Treatment, Pipe Rack Structure, Lighting Pole Found, Found of
Farina CV 2016
082298812394

Page 2

Fire Water Pumps and Jockey Pumps, Found of Vru Pump,


Waste
Management Storage Bins, Found of LPG Condensate Fiscal Metering, Found
Calc. For Pipe Sleeper at ORF Area, Pipe Support Calculation, Pig
Launcher/Receiver Found, Sump Tank Found, Gas Engine Generator Found,
Diesel Engine Generator Found, Metering Found, Analyzer Found, Foundation
Instrument Air & Service Air Skid, Landfall Found, Oil Catcher, Metering
Shelter, Diesel Engine Generator Shelter, Gas Engine Generator shelter ,
Typical Steel Frame, Roads and Parking Area, Open Drain Calculation, Water
Tower, and also checking drawing foundation, structure and shelter
Date : July 2008 December 2008
Client
: PT GUNANUSA UTAMA FABICATOR
Project
: Jetty 1 & 2 Extention for Scope of Design PTG Yard
Job description
: Supervising/ Design of Design of New Pile for Jetty 2 Upgrade, include
Analysis Skidway Structure, Sizing of Group Pile Calculation, Pile Cap
Calculation, Beam Capacity Calculation, Sheet Pile Calculation, Bollard
Calculation, Padeye Calculation, Service Area Calculation, mto
Date : March 2008 July 2009
Client
: TOTAL E&P Indonesie PT Kali Raya Sari
Project
: Handil Oil 20 MOL Replacement Project.
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, plot plan, pipe support, drawing structure, control building,
road and drainage etc
Date : May 2007 November 2007
Client
: Total E&P Indonesie PT Kali Raya Sari
Project
: Tunu Field Development Project Phase 10.TP10/ EPSC2
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing,
plot plan, drawing structure, etc
Date : April 2007 November 2007
Client
: Total E&P Indonesie PT Meindo Elang Indah
Project
: Tunu Field Development Project Phase 11 SouthTP 1S/EPSC7
Job description
: Supervising/design and checking calculation, Specification, Mto and checking
Drawing .
Date : August 2007 Dec 2007
Client
: PT PUNJ LLOYD INDONESIA TOTAL SA:
Project
: DESIGN OF SKIDSHOE & RAMP AT JETTY-1 FOR TUNU FIELD
DEVELOPMENT ROJECT PHASE 11S-SOUTH LP COMPRESSION , IN
SAMARINDA.
Job description
: Supervising/ Design of Design of New Pile for Jetty 2 Upgrade, include
Analysis Skidway Structure, Sizing of Group Pile Calculation, Pile Cap
Calculation, Beam Capacity Calculation, Sheet Pile Calculation, Bollard
Calculation, Padeye Calculation, Service Area Calculation, mto
Date : June 2007 Oct 2007
Client
: PT. BANTEN INTI GASINDO RABANA
Project
: REMEDIAL OF PIPE BRIDGE FOUNDATION AT CIMAHBANG - CIKARANG.
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, road and drainage etc
Date : Jan 2007 July 2007
Client
: PT. GUNANUSA CONSTRUCTION
Project
: SIDE SKIDWAY JETTY-1, Cilegon
Job description
: Supervising/ Design of Design of New Pile for Jetty 2 Upgrade, include
Analysis Skidway Structure, Sizing of Group Pile Calculation, Pile Cap
Farina CV 2016
082298812394

Page 3

Calculation, Beam Capacity Calculation, Sheet Pile Calculation, Bollard


Calculation, Padeye Calculation, Service Area Calculation, mto.
Date : Oct 2006 Jan 2007
Client
: BP West Java PT Dwisatu Mustika Bumi
Project
: Offshore Pipeline Replacement Project
Job description : Supervising/design and checking calculation, Specification, Mto and Drawing,
drawing structure.
Date : August 2006 June 2008
Client
: Chandra Asri PT Citra Panji Manunggal
Project
: Detail Design and Detail Engineering Pipeline Extention Project.
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing
Foundation Layout, plot plan, pipe support, drawing structure, control building,
road and drainage, Control Room Foundation etc

Date : March 2006 July 2008


Client
: PT. Perusahaan Gas Negara CRW Consortium
Project
: SSWJ 2 Gas Pipeline Transmission Project, Grissik Pagardewa.
Job description : Supervising/ Design of Sheet Pile, Calculation of Concrete, Specification, Mto and
Drawing Foundation Layout, plot plan, pipe support, drawing structure, control building, road and
drainage etc
Date : Feb 2006 June 2006
Client
: KODECO ENERGY Adiguna SE
Project
: Onshore Fabrication Services for Ke-38 Platform
Job description
: Supervising/design and checking calculation, Specification, Mto and Drawing,
plot plan, drawing structure.
DATE : Juni 2002 Desember 2005
EMPLOYER : REKAJASINDO BINA ABADI
POSITION HELD & DESCRIPTION OF DUTIES : Lead Civil/Structural Engineer
RESPONSIBILITIES :

Project Involved:
Date : Sept 2005 May 2008
Client
: PT. Perusahaan Gas Negara Nippon Steel Corporation
Project
: SSWJ Gas Pipeline Project, West Java Distribution Pipeline Package 4.
Job description
: Supervising/design and checking Pipe Support and Foundation, Fence Plan &
Detail for Sectional Valve, Valve Box Plan and Detail , Valve Box for
Branchline.
Date : June 2005 Sept 2005
Client
: PT. Gasindo Pratama Sejati
Project
: New Gas Scrubber Project in Cikarang.
Job description
: Supervising/ Design, prepare and checking Design Basis Of Civil and
Structure, Control Building , Telecommunication Building , Guard House, Pipe
Support Calculation, Pig Launcher/Receiver Found, Sump Tank Found, Gas
Engine Generator , Diesel Engine Generator Found, Metering Found, Analyzer
Found, Metering Shelter, Diesel Engine Generator Shelter, Gas Engine
Generator shelter , Roads and Parking Area, Water Tower, and also checking
drawing foundation, structure and shelter.

Farina CV 2016
082298812394

Page 4

Date : April 2005 August 2005


Client
: PT.Gunanusa Construction
Project
: Upgradding Jetty-1 & Sheet Pile for Jetty-1, in Bojonegara.
Job description
: Supervising/ Design of Sheet Pile, Calculation of Concrete, Specification,Mto
and Drawing Foundation Layout, plot plan, pipe support, drawing structure,
control building, road and drainage etc
Date : Dec 04 2005
Client
: SEMCO
Project
: Gas Supply for PLN Power Plant
Job description
: Supervising/ Design, prepare and checking for Semberah Gas Facilities,
Binangat Gas Junction Facilities, Tanjung Batu Metering Skid Facilities, design
include Flare Stack Found, Pig Launcher/Receiver Found, Sump Tank Found,
Gas Engine Generator , Diesel Engine Generator Found, Metering Found,
Analyzer Found, Air Receiver Found, KO Drum Found, Fuel Gas Filter,
Manifold Found, Drain Tank and Drain Pump Found, Metering Shelter, Diesel
Engine Generator Shelter, Gas Engine Generator shelter , Roads and Parking
Area, Water Tower, and also checking drawing foundation, structure and
shelter.
Date : August 2004 Sept 2004
Client
: PT. Pertamina PT. Banten Inti Gasindo
Project
: Gas Distribution Pipeline,Cilegon Industrial Area in Banten
Job description
: Supervising/ Design and checking of Pipe Support Plan And Detail Custody
Meter Area Pipe Support Layout Consumer Metering Unit, Pipe Support Details
Consumer Metering Unit, Cunsumer Meter Foundation , Valve Box Plan,
Section And Detail, Specification Civil & Structure, Pipe Support Calculation ,
Custody Metering Found, MTO Civil
Date : April 2004 July 2004
Client
: Pertamina Daerah Operasi Hulu Sumatera Bagian Selatan
Project
: Gas Pipeline, Diameter 20 Cambai Simpang Y
Job description
: Supervising/ Design, prepare and checking Design Basis Of Civil and
Structure,Control Building , Telecommunication Building , Guard House, Pipe
Support Calculation, Pig Launcher/Receiver Found, Sump Tank Found, Gas
Engine Generator , Diesel Engine Generator Found, Metering Found, Analyzer
Found, Metering Shelter, Diesel Engine Generator Shelter, Gas Engine
Generator shelter , Roads and Parking Area, Water Tower, and also checking
drawing foundation, structure and shelter.
Date : August 2003 Sept 2003
Client
: PT. Binamitra Sumberarta
Project
: Haul Road Pipeline Crossing Coal Mine Muara Kembang East Kalimantan.
Job description
: Prepare and made Specification of Civil work, design calculation for
Maintenance Bridge, design calculation for removable steel foundation.
Date : May 2003 July 2003
Client
: PT.Igas Utama
Project
: Cilegon Pipeline Distribution Development, Cilegon.
Job description
: Supervising/ Design, prepare and checking Design Basis Of Civil and
Structure, Control Building , Telecommunication Building , Guard House, Pipe
Support Calculation, Pig Launcher/Receiver Found, Sump Tank Found, Gas
Engine Generator , Diesel Engine Generator Found, Metering Found, Analyzer
Found, Metering Shelter, Diesel Engine Generator Shelter, Gas Engine
Farina CV 2016
082298812394

Page 5

Generator shelter , Roads and Parking Area, Water Tower, and also checking
drawing foundation, structure and shelter.
Date
: July 2002 2003
Client
: PERUSAHAAN GAS NEGARA (PGN)
Project
: PGN Project for Gressik Sakernan , Panaran Pemping
Job description
: Supervising/ Design, prepare and checking Design Basis Of Civil and Structure,
Control Building , Telecommunication Building , Guard House (Panaran and
Pemping), Pipe Support Calculation (Panaran and Pemping), Pig
Launcher/Receiver Found, Sump Tank Found, Gas Engine Generator Found,
Diesel Engine Generator Found, Metering Found, Analyzer Found, Metering
Shelter, Diesel Engine Generator Shelter, Gas Engine Generator shelter ,
Helipad (Pemping), Roads and Parking Area, Open Drain Calculation, Water
Tower, and also checking drawing foundation, structure and shelter.
Date : June 2002
Client
: CONOCO
Project
: Belida Platform and Hangtuah Platform
Date
: May 2002
Client
: CALTEX
Project
: Project for : Foundation Waste Brine CGS-3 , Foundation of Trust Block ,
Waste Management Project Duri F.
Date : March 2002 May 2002
Client
: PT. GUNANUSA UTAMA FABRICATOR
Project
: Project for Jetty 1 Structure
and Sheet file for Jetty 3
Date : June 2002 Sept 2002
Client
: PT TITIS SAMPURNA /PERTAMINA
Project
: Basic & Detail Design of Gas Pipeline from Air Serdang Beringin Limau
Timur at Prabumulih,South Sumatra.
DATE : 1997 1998
EMPLOYER : PT JATA NURMAN
POSITION HELD & DESCRIPTION OF DUTIES : Civil/Structural Engineer
RESPONSIBILITIES :
Project:
Design of Hyundai Factory Jakarta
Design and Construction for Building Bali
Gallery Shopping Wold Bali

DATE : 1992 1997


EMPLOYER : PT. KETIRA ENGINEERING CONSULTANT
POSITION HELD & DESCRIPTION OF DUTIES : Civil/Structural
Engineer
RESPONSIBILITIES :

Project Involved:

Farina CV 2016
082298812394

Design and Construction for Building Bali Duty


Free II Bali
Design and Construction for Bridge of Novotel
Hotel Lombok
Page 6

Farina CV 2016
082298812394

Design and Construction for Factory of Shinto


Indonesia
Design and Construction for Quality Hotel Solo
Middle Java
Design for Kartini Apartement
Design for Simpruk Apartement
Design for Building of Duncan Donuts
Design and Construction for Factory of
Polysindo Indonesia West Java

Page 7

You might also like