CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
N/A
1.1
1.2
Section 1-2, 2 of 79
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
1.3
1.4
Section 1-2, 3 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
1.5
1.6
Are all molding related internal The molder should have a documented process and
and external best practices
system for maintaining best practices obtained through
documented and maintained? lessons learned or from industry knowledge.
1.7
Section 1-2, 4 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
1.8
1.9
1.10
Section 1-2, 5 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
1.11
1.12
1.13
1.14
Section 1-2, 6 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
1.15
1.16
1.17
Section 1-2, 7 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
1.18
1.19
Question
Is there a preventive
maintenance program? Is
maintenance data being
utilized to form a predictive
maintenance program?
Objective Evidence
Section 1-2, 8 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
2.2
2.3
2.4
2.1
Section 1-2, 9 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
2.5
Question
Objective Evidence
Section 1-2, 10 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
2.7
2.8
2.9
2.6
Section 1-2, 11 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Assessment
Question
Number
Question
Objective Evidence
2.10
2.11
2.12
2.13
2.14
2.15
Section 1-2, 12 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate
Action
CQI-23
Version 1, 3/2014
Question #
Related
Molding System
Assessment
Question #
Customer or Internal
Requirement
3.1
1.1
1.2
1.3
1.4
1.6
N/A
3.2
1.5
N/A
3.3
2.1
3.4
2.2
2.3
2.4
3.5
1.5
1.6
2.1
2.11
2.13
Job Audit 13 of 79
Actual Condition
(Objective Evidence)
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Question #
Related
Molding System
Assessment
Question #
Customer or Internal
Requirement
Actual Condition
(Objective Evidence)
Process #1:
Process #2:
3.6
3.6.1
1.5
2.13
2.14
Each part may have one or more requirements determined by the molding specification.
Parts must meet each requirement. List each requirement below and validate.
(Listed below are some examples)
Requirement: Weight
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Job Audit 14 of 79
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Question #
3.6.2
Related
Molding System
Assessment
Question #
Customer or Internal
Requirement
Requirement: Color
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
3.6.3
Requirement: Gloss
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.4
Requirement: Flash
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Job Audit 15 of 79
Actual Condition
(Objective Evidence)
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Question #
3.6.5
Related
Molding System
Assessment
Question #
Customer or Internal
Requirement
Requirement: Dimension
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.6
Requirement: Appearance
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.7
Job Audit 16 of 79
Actual Condition
(Objective Evidence)
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Question #
Related
Molding System
Assessment
Question #
Customer or Internal
Requirement
3.7
3.8
3.9
1.2
1.4
1.6
3.10
1.2
1.4
1.6
1.10
1.16
3.11
1.5
1.10
1.2
1.4
Job Audit 17 of 79
Actual Condition
(Objective Evidence)
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Question #
Related
Molding System
Assessment
Question #
3.12
2.11
2.13
3.13
1.16
3.14
2.6
Customer or Internal
Requirement
Packaging Requirements
3.15
2.6
2.7
2.9
3.16
2.6
2.7
2.9
Shipping Requirements
3.17
2.3
2.9
3.18
2.3
2.9
Job Audit 18 of 79
Actual Condition
(Objective Evidence)
Pass / Fail
/ N/A
CQI-23
Version 1, 3/2014
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
A1.1
1.4
2.1
2.13
A1.2
1.4
2.1
2.13
Manual
2.0
A2.1
1.4
2.3
2.11
2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
A2.2
1.4
2.11
2.12
Automatic
Continuous monitoring by
controller or manual
verification daily
A2.3
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
Continuous
A2.4
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
Per Container
PT A 19 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
3.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Material Drying
A3.1
1.4
2.11
2.12
Automatic
Continuous monitoring by
controller
A3.2
1.4
2.11
2.12
Manual
A3.3
1.4
2.11
2.12
Manual
Material change
A3.4
1.4
2.11
2.12
Dew point
Automatic
Continuous monitoring by
controller
A3.5
1.4
2.11
2.12
Manual
4.0
A4.1
1.4
1.11
2.11
2.13
Automatic
A4.2
1.4
1.11
2.11
2.12
Manual
Material change
A4.3
1.4
1.11
2.11
2.12
Automatic/Manual
Material change
A4.4
1.4
1.11
2.11
2.12
Automatic/Manual
PT A 20 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
5.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Color Management
A5.1
1.4
2.11
2.12
Automatic/Manual
A5.2
1.4
2.11
2.12
Manual
Continuous
6.0
Molding Process
A6.1
1.4
1.15
2.11
2.12
Manual
A6.2
1.4
1.15
2.11
2.12
Manual
A6.3
1.4
1.15
2.11
2.12
Manual
A6.4
1.4
1.15
2.11
2.12
Manual
A6.5
1.4
1.15
2.11
2.12
Automatic/Manual
Continuous if automatic, or at
start-up and after down time
event
A6.6
1.4
1.15
2.11
2.12
PT A 21 of 79
Continuous
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
A6.7
1.4
1.15
2.11
2.12
N/A
Start-up
A6.8
1.4
1.15
2.11
2.12
N/A
Continuous
A6.9
1.4
1.15
2.11
2.12
Automatic
Continuous
A6.10
1.4
1.15
2.11
2.12
N/A
Continuous
A6.11
1.4
1.15
2.11
2.12
Automatic
Continuous
A6.12
1.4
1.15
2.11
2.12
Hold - Cushion
N/A
Continuous
A6.13
1.4
1.15
2.11
2.12
N/A
Continuous
A6.14
1.4
1.15
2.11
2.12
PT A 22 of 79
Continuous
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
A6.15
1.4
1.15
2.11
2.12
Manual
A6.16
1.4
1.15
2.11
2.12
Manual
A6.17
1.4
1.15
2.11
2.12
Manual
A6.18
1.4
1.15
2.11
2.12
Manual
7.0
Quality Control
A7.1
1.4
2.11
2.12
Part weight
Manual
A7.2
1.4
2.11
2.12
Dimensions
Manual
A7.3
1.4
2.11
2.12
Manual
A7.4
1.4
2.11
2.12
Manual
PT A 23 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
B1.1
1.4
2.1
2.13
B1.2
1.4
2.1
2.13
Manual
2.0
B2.1
1.4
2.3
2.11
2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
B2.2
1.4
2.11
2.12
Automatic
Continuous monitoring by
controller or manual
verification daily
B2.3
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
Continuous
B2.4
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
Per container
3.0
B3.1
1.4
2.11
2.12
Automatic
B3.2
1.4
2.11
2.12
Manual
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
B3.3
1.4
2.11
2.12
Manual
Material change
B3.4
1.4
2.11
2.12
Dew point
Automatic
Continuous by controller
B3.5
1.4
2.11
2.12
Moisture content
Manual
4.0
B4.1
1.4
1.11
2.11
2.13
B4.2
1.4
1.11
2.11
2.12
Manual
Material change
B4.3
1.4
1.11
2.11
2.12
Manual
Start-up
B4.4
1.4
1.11
2.11
2.12
Automatic/Manual
Material change
B4.5
1.4
1.11
2.11
2.12
Automatic/Manual
PT B 25 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
5.0
Actual Condition
Monitoring Frequency
Minimum Requirement
B5.1
1.4
2.11
2.12
Automatic/Manual
B5.2
1.4
2.11
2.12
Manual
At color change
6.0
Molding Process
B6.1
1.4
1.15
2.11
2.12
Manual
B6.2
1.4
1.15
2.11
2.12
Manual
B6.3
1.4
1.15
2.11
2.12
Automatic
Continuous by controller or
manual verification daily
B6.4
1.4
1.15
2.11
2.12
Manual
B6.5
1.4
1.15
2.11
2.12
Manual
B6.6
1.4
1.15
2.11
2.12
Automatic/Manual
Continuous if automatic, or at
start-up and after down time
event.
PT B 26 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
B6.7
1.4
1.15
2.11
2.12
Manual
Start-up
B6.8
1.4
1.15
2.11
2.12
Manual
B6.9
1.4
1.15
2.11
2.12
Manual
B6.10
1.4
1.15
2.11
2.12
Manual
7.0
B7.1
1.4
1.15
2.11
2.12
Start-up check
Manual
B7.2
1.4
1.15
2.11
2.12
Carrier gas
Automatic
Continuous
B7.3
1.4
1.15
2.11
2.12
Volume
Automatic
Continuous
B7.4
1.4
1.15
2.11
2.12
Treatment time
Automatic
Continuous
PT B 27 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
B7.5
1.4
1.15
2.11
2.12
Actual Condition
Monitoring Frequency
Minimum Requirement
Manual
PT B 28 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
8.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Quality Control
B8.1
1.4
2.11
2.12
Part weight
Manual
B8.2
1.4
2.11
2.12
Manual
B8.3
1.4
2.11
2.12
Dimensions
Manual
B8.4
1.4
2.11
2.12
Appearance
Manual
B8.5
1.4
2.11
2.12
Manual
B8.6
1.4
2.11
2.12
Manual
B8.7
1.4
2.11
2.12
Pinch-off integrity
Manual
PT B 29 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Receiving Inspection
C1.1
1.4
2.1
2.13
C1.2
1.4
2.1
2.13
2.0
Manual
C2.1
1.4
2.3
2.11
2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife.
Automatic/Manual
C2.2
1.4
2.11
2.12
Automatic/Manual
PT C 30 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
C2.3
1.4
1.6
2.7
2.11
2.12
Automatic
C2.4
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
C2.5
1.4
1.6
2.7
2.11
2.12
Manual
3.0
C3.1
Forming Process
1.4
1.15
2.11
2.12
Manual
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.2
1.4
1.15
2.11
2.12
Manual
C3.3
1.4
1.15
2.11
2.12
Automatic / Manual
C3.4
1.4
1.15
2.11
2.12
Manual
C3.5
1.4
1.15
2.11
2.12
Manual
C3.6
1.4
1.15
2.11
2.12
Manual
PT C 32 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.7
1.4
1.15
2.11
2.12
Automatic/Manual
C3.8
1.4
1.15
2.11
2.12
Automatic/Manual
C3.9
1.4
1.15
2.11
2.12
Automatic
C3.10
1.4
1.15
2.11
2.12
Automatic
C3.11
1.4
1.15
2.11
2.12
Automatic
PT C 33 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.12
1.4
1.15
2.11
2.12
Automatic
C3.13
1.4
1.15
2.11
2.12
Automatic
C3.14
1.4
1.15
2.11
2.12
Automatic
C3.15
1.4
1.15
2.11
2.12
Automatic
C3.16
1.4
1.15
2.11
2.12
Automatic
PT C 34 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.17
1.4
1.15
2.11
2.12
Manual
C3.18
1.4
1.15
2.11
2.12
Manual
4.0
Quality Control
C4.1
1.4
2.11
2.12
Dimensions
Manual
C4.2
1.4
2.11
2.12
Manual
C4.3
1.4
2.11
2.12
Manual
PT C 35 of 79
Actual Condition
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous by controller or
manual verification daily
PT C 36 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous by controller or
manual verification daily
Continuous
Continuous
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up
At start-up
PT C 38 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT C 39 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT C 40 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT C 41 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Receiving Inspection
D1.1
1.4
2.1
2.13
D1.2
1.4
2.1
2.13
2.0
Manual
D2.1
1.4
2.1
2.13
D2.2
1.4
2.1
2.13
Manual
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
D2.3
1.4
2.1
2.13
Manual
D2.4
1.4
2.1
2.13
Manual
3.0
D3.1
1.4
2.11
2.12
Manual
D3.2
1.4
2.11
2.12
Automatic
D3.3
1.4
2.11
2.12
Manual
PT D 43 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
D3.4
1.4
2.11
2.12
Manual
D3.5
1.4
1.6
2.7
2.11
2.12
Automatic/Manual
D3.6
1.4
2.11
2.12
Manual
4.0
D4.1
Molding Process
1.4
1.15
2.11
2.12
PT D 44 of 79
Manual
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.2
1.4
1.15
2.11
2.12
Manual
D4.3
1.4
1.15
2.11
2.12
Manual
D4.4
1.4
1.15
2.11
2.12
Automatic/Manual
D4.5
1.4
1.15
2.11
2.12
Manual
D4.6
1.4
1.15
2.11
2.12
Manual
PT D 45 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.7
1.4
1.15
2.11
2.12
Manual
D4.8
1.4
1.15
2.11
2.12
Automatic
D4.9
1.4
1.15
2.11
2.12
Cavity temperature
Automatic
D4.10
1.4
1.15
2.11
2.12
Manual
D4.11
1.4
1.15
2.11
2.12
Manual
PT D 46 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.12
1.4
1.15
2.11
2.12
5.0
Manual
Quality Control
D5.1
1.4
2.11
2.12
Part weight
Manual
D5.2
1.4
2.11
2.12
Dimensions
Manual
D5.3
1.4
2.11
2.12
Appearance
Manual
D5.4
1.4
2.11
2.12
Manual
PT D 47 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
PT D 48 of 79
Actual Condition
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT D 49 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Hourly
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
PT D 51 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up
Each cycle
Each cycle
PT D 52 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Each cycle
Continuous
Continuous
Each cycle
PT D 53 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT D 54 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT D 55 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Receiving Inspection
E1.1
1.4
2.1
2.13
E1.2
1.4
2.1
2.13
2.0
E2.1
Manual
PT E 56 of 79
Manual
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E2.2
1.4
2.1
2.13
3.0
Manual
E3.1
1.4
2.11
2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife.
Automatic/Manual
E3.2
1.4
2.11
2.12
Automatic
E3.3
1.4
2.11
2.12
Automatic
PT E 57 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E3.4
1.4
2.11
2.12
E3.5
1.4
2.11
2.12
E3.6
1.4
1.6
2.11
2.12
Automatic/Manual
E3.7
1.4
1.6
2.11
2.12
Automatic/Manual
4.0
Molding Process
PT E 58 of 79
Manual
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.1
1.4
1.15
2.11
2.12
Manual
E4.2
1.4
1.15
2.11
2.12
Manual
E4.3
1.4
1.15
2.11
2.12
Manual
E4.4
1.4
1.15
2.11
2.12
Automatic
E4.5
1.4
1.15
2.11
2.12
manual
PT E 59 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.6
1.4
1.15
2.11
2.12
Automatic
E4.7
1.4
1.15
2.11
2.12
Automatic
E4.8
1.4
1.15
2.11
2.12
Automatic
E4.9
1.4
1.15
2.11
2.12
Cure Time
Automatic
E4.10
1.4
1.15
2.11
2.12
Automatic
PT E 60 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.11
1.4
1.15
2.11
2.12
manual
E4.12
1.4
1.15
2.11
2.12
Automatic
E4.13
1.4
1.15
2.11
2.12
Automatic
E4.14
1.4
1.15
2.11
2.12
Automatic
E4.15
1.4
1.15
2.11
2.12
Manual
PT E 61 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.16
1.4
1.15
2.11
2.12
Manual
E4.17
1.4
1.15
2.11
2.12
Manual
5.0
Quality Control
E5.1
1.4
2.11
2.12
Part weight
Manual
E5.2
1.4
2.11
2.12
Dimensions
Manual
PT E 62 of 79
Actual Condition
CQI-23
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
E5.3
1.4
2.11
2.12
Manual
E5.4
1.4
2.11
2.12
Manual
PT E 63 of 79
Actual Condition
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT E 64 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous monitoring by
controller or manual
verification daily
Continuous monitoring (i.e.,
by chart recorder)
PT E 65 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
Per Container
PT E 66 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up
Continuous
PT E 67 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
Continuous
Continuous
Continuous
Continuous
PT E 68 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
Continuous
Continuous
Continuous
PT E 69 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT E 70 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT E 71 of 79
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
F1.1
1.4
2.1
2.13
F1.2
1.4
2.1
2.13
Manual
2.0
F2.1
1.4
2.11
2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
F2.2
1.4
2.11
2.12
Automatic
Continuous monitoring by
controller or manual
verification daily
F2.3
1.4
1.6
2.11
2.12
Automatic/Manual
Continuous
F2.4
1.4
1.6
2.11
2.12
Automatic/Manual
Per Container
PT F 72 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
3.0
Actual Condition
Monitoring Frequency
Minimum Requirement
F3.1
1.4
2.11
2.12
Automatic
F3.2
1.4
2.11
2.12
Manual
F3.3
1.4
2.11
2.12
Manual
Material change
F3.4
1.4
2.11
2.12
Dew point
Automatic
Continuous by controller
F3.5
1.4
2.11
2.12
Moisture content
Manual
Automatic
Manual
Material change
4.0
F4.1
1.4
1.11
2.11
2.13
F4.2
1.4
1.11
2.11
2.12
PT F 73 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
F4.3
1.4
1.11
2.11
2.12
Automatic/Manual
Material change
F4.4
1.4
1.11
2.11
2.12
Automatic/Manual
5.0
F5.1
1.4
2.11
2.12
Automatic/Manual
F5.2
1.4
2.11
2.12
Manual
At color change
6.0
Extrusion Process
F6.1
1.4
1.15
2.11
2.12
Manual
F6.2
1.4
1.15
2.11
2.12
Manual
F6.3
1.4
1.15
2.11
2.12
Manual
F6.4
1.4
1.15
2.11
2.12
Manual
PT F 74 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
F6.5
1.4
1.15
2.11
2.12
Automatic/Manual
Continuous if automatic, or at
start-up and after down time
event.
F6.6
1.4
1.15
2.11
2.12
Automatic
F6.7
1.4
1.15
2.11
2.12
Automatic
F6.8
1.4
1.15
2.11
2.12
Automatic
F6.9
1.4
1.15
2.11
2.12
Manual
F6.10
1.4
1.15
2.11
2.12
Manual
F6.11
1.4
1.15
2.11
2.12
Manual
PT F 75 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Type of Control
Minimum Requirement
7.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Quality Control
F7.1
1.4
2.11
2.12
Thickness
Manual
F7.2
1.4
2.11
2.12
Manual
F7.3
1.4
2.11
2.12
Manual
F7.4
1.4
2.11
2.12
Dimensions
Manual
F7.5
1.4
2.11
2.12
Manual
F7.6
1.4
2.11
2.12
Manual
PT F 76 of 79
Actual Condition
Observation/
Comments
(Pass / Fail /
N/A)
CQI-23
Item #
Related
Molding System
Assessment
Question #
1.0
Equipment Type
Injection
Molding
Blow
Molding
Vacuum
Forming
Compression
Molding
Transfer
Molding
Extrusion
Verification Frequency
Calibration /
Certification
Frequency *
PROCESS EQUIPMENT
G1.1
2.14
N/A
G1.2
2.14
Filters, if applicable
N/A
G1.3
2.14
Thermocouple
G1.4
2.14
G1.5
2.14
Mold
G1.6
2.14
G1.7
2.14
G1.8
2.14
G1.9
2.14
Extrusion machine
G1.10
2.14
Dryer
G1.11
2.14
Regrinder
G1.12
2.14
G1.13
2.14
G1.14
G1.15
Annual
Every 5 years
N/A
Every 5 years
N/A
N/A
Every 5 years
N/A
N/A
N/A
N/A
2.14
N/A
2.14
N/A
X
X
X
X
X
PT G 77 of 79
Included in Preventative
Maintenance Plan
Comment
CQI-23
Item #
Related
Molding System
Assessment
Question #
2.0
Equipment Type
Injection
Molding
Blow
Molding
Vacuum
Forming
Compression
Molding
Transfer
Molding
Extrusion
Verification Frequency
Calibration /
Certification
Frequency *
N/A
SECONDARY EQUIPMENT
G2.1
2.14
G2.2
2.14
Conveyers
N/A
G2.3
2.14
Degater/Trim Operation
N/A
G2.4
2.14
Cutter
N/A
G2.5
2.14
Robot
At Installation
G2.6
2.14
Oven, if applicable
Annual
G2.7
2.14
Annual
G2.8
2.14
N/A
Per lot
Annual
Every 6 months
Annual
Annual
At start up
Annual
3.0
G3.1
2.14
G3.2
2.14
G3.3
2.14
Color
G3.4
2.14
Gloss
G3.5
2.14
Weight
G3.6
2.14
Dimensions
At start up
Every 6 months
G3.7
2.14
Moisture
Every 6 months
G3.8
2.14
Performance, if applicable
Annual
X
X
X
X
PT G 78 of 79
Included in Preventative
Maintenance Plan
Comment
CQI-23
Item #
Related
Molding
System
Assessment
Question #
Category/Process Steps
Monitoring Frequency
Minimum Requirement
General
Dimensions
Appearance
Performance
H1.1
1.4
2.9
Procedures are in place to prevent damage to the finish or part during the
inspection and packaging processes
100%
H1.2
1.4
Appearance (flash, color and gloss, short shots, splay/burns, blister, sink
marks, gate vestige, and other molding defects) of the molding shall be
verified per specification and applications manual
H1.3
1.4
H1.4
1.4
Part identification
First off
H1.5
1.4
Manufacturing information
H1.6
1.4
H1.7
1.4
Wall thickness
H1.8
1.4
First off
H1.9
1.4
Performance
H1.10
1.4
Environmental
PT H 79 of 79
Actual Condition
Observation/Comments