JOINT OPERATING BODY

PERTAMINA- MEDCO E&P TOMORI

Doc No :
Date :

APLICATION FOR INSPECTION (AFI)


Attn, PT. PPS
Works Title

: Mr. Wawan Irwanto


: HVAC Work

Project Title
Location

: EPC FASILITAS PENGUKURAN GAS SENORO-PAU


: BATUI, CENTRAL SULAWESI

Gentlemen,
We would like to have your presence for inspection according to the following schedule :
Date and Time

Place / Area

Inspection item

Remarks

21 Dec 2016

Metering PAU-Site

Actuator Damper
Pressure Relief Damper

Warehouse

(PRD)
Fire damper
Filter Unit
Electric Duct Heater
Pipe Emt Conduit

Result
Re-inspection Required

Accepted

Rejected

Yes

No

Comment :

Prepared by
HVAC
Print name
Signature
Date

Checked by
PT.PPS

Approved by
JOB - PMTS