PART 1 - GENERAL
A.
Section 15990, Basic HVAC
Requirements, shall be referred to for
general requirements. Section 15990
specifies requirements for the final
adjusting and balancing of air and
hydronic fluid distribution systems,
including the equipment and devices
associated with each system to
produce the design objectives.
NEBB
7th Ed. 2005
AABC
2002 Ed.
TABB
2003 Ed.
QUALITY REPORTING
REQUIREMENTS
TAB firm certification and Reporting Standards
PROJECT RESPONSIBLITIES
ENGINEERS ...Know what you are specifying!
Understand your design!
CONTRACTORS...Install all system components that
insure a predicable final balance.
Complete the system before
requesting TAB (including control of systems).
Construction Specifications
CERTIFIED FIRM
CERTIFIED PROFESSIONAL
REPORTS
A IRPATH
CALIBRATION REPORT
REQUIRE PROOF OF
INSTRUMENTATION
CALIBRATION
NIST STANDARD
WITHIN PAST 12 MONTHS
PROJECT:
ADDRESS:
APPLICATION
DATES
OF USE : thru
CALIBRATION
DATE
EXPIRATION
STROBE TACHOMETER
9/24/09
9/24/10
STROBE TACHOMETER
3/11/09
3/11/10
STROBE TACHOMETER
3/11/09
3/11/10
UEI DCP9T
VOLT / AMMETER
2/28/09
2/28/10
3/21/09
3/21/10
2/28/09
2/28/10
9/12/09
9/12/10
9/27/07
9/27/08
9/12/09
9/12/10
6/20/08
6/20/09
9/27/07
9/27/08
2/28/09
2/28/10
9/30/09
9/30/10
10/11/07
10/11/08
MICROMANOMETER
11/19/08
11/19/09
9/23/09
9/23/10
6/25/08
6/25/09
1/26/09
1/26/10
AIRFOIL/ MANOMETER
2/14/08
2/14/09
MICROMANOMETER
3/11/09
3/11/10
11/18/08
11/18/09
HYGROMETER/THERMOMETER
10/22/09
10/22/10
1/21/09
1/21/10
5/22/09
5/22/10
9/24/09
9/24/10
9/24/09
9/24/10
6/14/07
6/14/08
3/19/08
3/19/09
Expired
In Calibration
2/13/07
2/13/08
7/16/07
7/16/08
3/3/06
3/3/07
3/24/08
3/24/09
9/24/09
9/24/10
12/4/08
12/4/09
3/20/08
3/20/09
3/11/09
3/11/10
3/4/09
3/4/10
6/26/08
6/26/09
10/12/09
10/12/10
11/20/08
11/20/09
10/12/09
10/12/10
10/12/09
10/12/10
DWYER Manometer
16'' U TUBE
DWYER Manometer
36'' U TUBE
NOT USED
NOT USED
PAGE 1 . 5
Air systems
Water systems
Pumps
Chillers
Cooling towers
Equipment Submittals
The equipment
submittal is the base
point for the accurate
reporting of all
installed equipment.
Exhaust Fan
submittal:
Make
Type
Equipment TAG or
Number
Design CFM
Design SP
Fan speed
Performance
Curve
PRE-BALANCING REPORT
Submitted to engineer
prior to TAB site
activities
Fan submittal
info:
Engineers look for
the following:
Make
Model
Equipment TAG or
Number
Design CFM
Design TSP
Fan speed
On site execution
Final report
Marked up
drawing
example
E3
E4
Fan
Air devices
Duct traverse
Duct Traverse
Traverse
Report
CERTIFIED FIRM
TRAVERSE REPORT
ADDRESS:
2 Rector Street
ALTITUDE:
100
shall always be
completed
0.074
CORR. FACTOR:
20
POINTS FPM:
40
POINTS
0.996
ACTUAL
SCFM:
WIDTH:
5.56
Womens Bathroom
REQUIRED
74DEG. F.
HEIGHT:
AREA (SF):
13th Floor
TRAVERSE LOCATION:
SUPPLY MAIN
0.13AIR TEMP.
DISTANCE
32 POINT
SERVICE:
DENSITY
DUCT:
S.P.=
SIZE
(IN.):
RECTANGULAR DUCT
AIRPATH
2160 CFM:
12000
SCFM:
12000 FPM:
1736
CFM:
9647
10
11
12
ID SIZE
POSITION
1656
1771
1707
1674
1477
1663
1614
1670
1732
1906
1841
1823
1815
1766
1816
1756
13
1714
1740
1832
1849
1874
1845
1876
1694
18
1558
1681
1645
1818
1782
1686
1662
1624
13
18
23
28
33
38
6660
7098
7025
7164
6948
6960
6968
6744
AVERAGE
VELOCITY
1736
FPM
FROM
BOTTOM
5
6
7
8
9
should be
completed
10
11
12
DISTANCE
FROM
EDGE ( INCHES )
VELOCITY
SUB- TOTALS (FPM) :
32
REMARKS:
PAGE 2
.1
Executing
the air
balance
CERTIFIED FIRM
TRAVERSE REPORT
ADDRESS:
2 Rector Street
ALTITUDE:
100
DUCT:
AIR
0.13TEMP.
S.P.=
SIZE
(IN.):
DISTANCE
32 POINT
SERVICE:
DENSIT
Y
SUPPLY MAIN
SCFM:
20
POINTS FPM:
WIDTH:
40
POINTS
POSITIO
N
Womens Bathroom
REQUIRED
74DEG. F.
5.56
13th Floor
HEIGHT:
AREA (SF):
RECTANGULAR DUCT
AIRPATH
2160 CFM:
12000
SCFM:
12000 FPM:
1736
CFM:
9647
ID SIZE
10
11
12
FROM
BOTTOM
1656
1771
1707
1674
1477
1663
1614
1670
1732
1906
1841
1823
1815
1766
1816
1756
13
1714
1740
1832
1849
1874
1845
1876
1694
18
1558
1681
1645
1818
1782
1686
1662
1624
13
18
23
28
33
38
6660
7098
7025
7164
6948
6960
6968
6744
AVERAGE
VELOCITY
1736
FPM
5
6
7
8
9
10
11
12
DISTANCE
FROM
EDGE ( INCHES )
VELOCITY
SUB- TOTALS (FPM) :
32
REMARKS:
PAGE 2
.1
Approved Submittal
Performance and
capacity features are
indicated on this form.
Transfer pertinent
information from the
submittal to the AHU
report form
TM
SP: (Static Pressure
Reading Location)
SP
SP
SP
SP
SP
SP
PITOT
TRAVERSE
TR
PITOT
TRAVERSE
AIR HANDLER
SYSTEM REPORT
Diagrammatic Reporting
On site execution
Final report
VAV Systems
terminal boxes
Discharge air duct static pressure control
Fan motor speed control (VFD) or
Fan inlet guide vanes
Integrated DDC control over equipment
VAV
terminal boxes
VFD Controls
Velocity dp
Cover page
Contents page
Summary page
Evidence of Certification & Signiture
Calibrated instrument list
Equipment report forms
Air device report forms
Optional traverse form
Marked up drawings
PROBABLE CAUSES:
AIR
POOR
PROBABLE CAUSES:
FAN
SYSTEM EFFECT..
Questions