Professional Documents
Culture Documents
1 Drainage Area
2 Run-off Estimation
I) Peak Run-off estimation based on
18830 m2
Q = CsCiA
ii)
iii)
iv)
v)
Cs = 2tc / (2tc + td )
vi) Rainfall intensity
(Fig A-19 ref(1), tc =18830 mins)
vii) Peak Run-off
=
=
=
=
=
=
=
0.75
200 metres
17.5 minutes
1
89 mm/hour
0.34914 m3/sec
=
=
=
=
=
126
18830
1.883
126
237.258
Q = CsCiA
3 Storage Required
I) Minimum storage capacity required
ii) Drainage Area
iii) Stroage Required
m3/hec
m2
hec
x 1.883
m3
=
=
=
50 m3/hec
50 x 1.883
94.15 m3
331.408 m3
=
=
=
=
=
18
20
360
1
360
6 Storage Provided
i)
ii)
i)
ii)
iii)
m
m
m2
m
m3
hec.
1 Drainage Area
2 Run-off Estimation
I) Peak Run-off estimation based on
0.44 acre
1,780 m
=
1,780 m2
Q = CsCiA
ii)
iii)
iv)
v)
=
=
=
=
=
=
=
0.9
65 metres
15 minutes
1
150 mm/hour
0.06676 m3/sec
=
=
=
=
=
126
1780.24
0.17802
126
22.431
Q = CsCiA
3 Storage Required
I) Minimum storage capacity required
ii) Drainage Area
iii) Stroage Required
m3/hec
m2
hec
x
m3
0.178 hec.
=
=
=
50 m3/hec
50
x
8.9012 m3
31.3322 m3
=
=
=
=
=
5.00
4.00
20
1.5
30.00
0.178
6 Storage Provided
i)
ii)
i)
ii)
iii)
m
m
m2
m
m3
Check
hec.