You are on page 1of 4

Date

Doc. No

7-Feb-14

APPLICATION FOR INSPECTION


Client

: RFCC Site Construction Manager

Project

: Cilacap RFCC PROJECT

Inspection Legend :
H

Gentlement,

DATE

TIME

7-Feb-14

9:00

INSPECTION ITEM

PLACE

Inspection for Elevation


Settler Tank :

SW

PRESENCE REQUIRED
ADHI-GSEC

PERTAMINA

Area 41
Sub - 1

Result

Accepted

Rejected

Re-Inspection Required

Yes

No

Remarks :

Prepared by

Sukadi

Reviewed by

Approved by

Subcontractor / Construction

ADHI - GSEC

PERTAMINA

Date

Doc. No

23-01-2014

APPLICATION FOR INSPECTION


Client

: RFCC Site Construction Manager

Project

: Cilacap RFCC PROJECT

Inspection Legend :
H

Gentlement,

DATE

TIME

INSPECTION ITEM

PLACE

Inspection for pad elevation


equipment Closed Drain Drum

SW

PRESENCE REQUIRED
ADHI-GSEC

PERTAMINA

Area 47 Nort

47-V-581

Result

Accepted

Rejected

Re-Inspection Required

Yes

No

Remarks :

Prepared by

Reviewed by

Approved by

Subcontractor / Construction

ADHI - GSEC

PERTAMINA