You are on page 1of 127

Bhutan Schedule of Rate (Civil Works) - 2015

Foreword

Bhutan Schedule of Rate (BSR)-2015 for civil works is a revised and updated edition of its
earlier publications. Attempts have been made to include as many items as possible that are
being used in construction works. However, due to complex nature of construction, covering
every single item is not possible.
The basic material rates are based on market prices collected from vendors at four base towns of
Thimphu, Phuentsholing, Gelephu and Samdrup Jongkhar. These rates have been applied while
analyzing and developing Built-Up item rates. Labour and Material Coefficients have been used
for the purpose of analysis. All items of work prescribed in BSR-2015 should be read and
understood in conjunction with Specifications for Building and Road Works. Only when items
are executed as per the Specifications for Building and Road Works, this schedule of rates is
applicable.
In this edition, few items pertaining to roads have been included: fog sealing, rock anchorage and
thermoplastic road marking paint.
The users are encouraged to send comments and suggestions to the Department for making
productive reforms in the schedule. As many new developments in construction is taking place in
terms of material use, construction technology and engineering practices, it is only through
collective efforts of people involved in construction industry that more relevant schedule of rates
can be developed. Manufacturers and dealers are welcome to send details of materials approved
by BSB including its specification and pricing in order to be incorporated in the BSR.

Dr.Sonam Tenzin
Secretary
Ministry of Works and Human Settlement
Thimphu

Date:Ob/

0 ~J1-oIS'-

Department of Engineering Services, Mo WHS

Bhutan Schedule of Rates 2015

Disclaimer
The BSR (both Civil and Electrical) 2015 is prepared and published primarily as a tool
to assist in the estimation of project costs. Due to difficulty in obtaining
comprehensive and accurate rates from base towns, and the associated complexity in
their analysis, the BSR reflects only suggestive averages and not accurate current
market rates. Material and labour rates also fluctuate frequently, and by the time of
the publication of this book, many rates would have already changed. Hence users are
advised to refrain from using the BSR for the purposes of filling tenders, evaluating
tenders, awarding works and/or making contractual payments. The publisher is in no
way accountable or answerable for any issues/disputes arising as a result of
individuals or agencies using the rates in the BSR 2015 as a basis for filling their
tenders, evaluating tenders, awarding works and/or making contractual payments.

All rights reserved with DES, MoWHS. Reproduction for sale of this publication, in part(s) or
whole, in any form or by any means, by any agency or individual, is a punishable offence and is
strictly prohibited.

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Preface
1. Bhutan Schedule of Rates - 2015 is the revised edition of Bhutan Schedule of Rates - 2013.
2. The rates shown for all the built - up items are for up to 10 Km radius and is inclusive of:

5% on labour cost for hand tools, equipments, machinery and material wastages

1 % for water charges

10% for overhead charges

3. The built up item rates are based on "Labour and Material Coefficients 2015" with the applicable
percentages given above.
4. The schedule is designed primarily as a tool for estimation of construction projects only and not for
payment to contractors (unless stated so in the tender document) or filling up tenders.
5. This Schedule will be read along with the" Specifications for Building and Road works " and the
"Labour and Materials Coefficients - 2015"
6. Fog sealing, Rock anchorage and Thermoplastic road marking paint for the road works have been
incorporated. Kindly refer similar items for materials.
7. Generally, the basic rates of materials, incorporated in this Schedule pertain to average rates of the
most available brands
8. Hire charges for plants and machinery are based on the built- up rates provided by the Construction
Development Corporation Limited, Thimphu.
9. Calculation of cost indices has been detailed and few samples are provided on calculation of cost
indices.
10. List of approved brands, as applicable at the time of publication of BSR - 2015, is provided. However,
please note that this list is reviewed from time to time. The latest list is available on www.bsb.gov.bt
11. Material Rates used in BSR-2015 are collected during the period February 2015 March 2015. Users
are suggested to update rates accordingly with the prevailing market rates.
12. BSR contains only the commonly used items, the new items may be workout and analyzed by the
engineers as may be relevant.

Department of Engineering Services, MoWHS

II

Bhutan Schedule of Rates 2015

Contents

CONTENTS
Section 1 BASIC RATES

Description

Page

Labour

Bitumen Products, Chemicals and Blasting Materials

Quarry and Forest Products

Bricks

Cement and Concrete Materials

Steel and Other Metals

Roofing Materials

Carpentry and Joinery Materials

Doors, Windows and Hardware

Tiles and Glass Materials

10

Plastering Materials

10

Paint and Wall Paper Materials

10

Drainage Materials

11

Plumbing ( Pipe Work)

12

Plumbing ( Sanitary Installations, Fittings and Accessories)

20-23

Machinery and Plant Hire Charges

24-26

Section 2 MECHANICAL TRANSPORTATION RATES

Description

Page

Hill Roads

27

Plain Roads

28

Department of Engineering Services, MoWHS

III

Bhutan Schedule of Rates 2015

Contents

Section 3 BUILT UP RATES


Sl. No

Description

Page

01

Dismantling and Demolition

02

Clearing and Grubbing

03

Earthwork

04

Drainage

05

Mortars

12

06

Concrete Works

13

07

Damp Proofing

15

08

Reinforced Concrete

15

09

Brick Work

20

10

Stone/Mud

24

11

Wood Work

27

12

Steel

38

13

Flooring

40

14

Tiling Wall and Floor

44

15

Roofing

45

16

Plumbing Indoor Work

49

17

Plumbing Outdoor Work

54

18

Plastering

63

19

Painting and Wall Paper

65

20

Additions, Alterations and Repairs

68

21

Road Works

68-79

Section 4 - COST INDICES


Section 5 - APPROVED MATERIAL BRANDS

Department of Engineering Services, MoWHS

IV

Bhutan Schedule of Rates 2015

SECTION 1
Basic Rates of Materials and Labour
Hire Charges of Plants and Equipments

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code

Description

Category Units

Page 1

PL

GP

SJ

Th

Chapter 1: BASIC RATES - LABOUR

Bhutanese National Labour


LB0001
LB0002
LB0003
LB0004
LB0005
LB0006

Category 1
Category 2
Category 3
Category 4
Category 5 (Male)
Category 5 (Female)

LB
LB
LB
LB
LB
LB

day
day
day
day
day
day

240.00
220.00
195.00
180.00
165.00
165.00

240.00
220.00
195.00
180.00
165.00
165.00

240.00
220.00
195.00
180.00
165.00
165.00

240.00
220.00
195.00
180.00
165.00
165.00

LB
LB
LB
LB
LB
LB
LB

year
year
year
year
day
year
year

360.00
660.00
400.00
180.00
10.00
50.00
450.00

360.00
660.00
400.00
180.00
10.00
50.00
450.00

360.00
660.00
400.00
180.00
10.00
50.00
450.00

360.00
660.00
400.00
180.00
10.00
50.00
450.00

LB
LB
LB
LB
LB
LB

day
day
day
day
day
day

259.60
259.60
259.60
259.60
259.60
259.60

259.60
259.60
259.60
259.60
259.60
259.60

259.60
259.60
259.60
259.60
259.60
259.60

259.60
259.60
259.60
259.60
259.60
259.60

LB
LB
LB
LB
LB
LB
LB
LB
LB
LB

day
day
day
day
day
day
day
day
day
day

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB

day
day
day
day
day
day
day
day
day
day
day
day

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

Statutory-On-Cost Allowances
LB0010
LB0011
LB0012
LB0013
LB0014
LB0015
LB0016

Workers Compensation premium


Temporary site accommodation
Transportation to-&-from site
Dependency allowance
Leading-hand allowance
Recruitment agency fee
Incentive payment

Built-up Trade Rates


Category 1
LB0020
LB0021
LB0022
LB0023
LB0024
LB0025

Auto-Mechanic Gd.1
Carpenter Gd.1
General Mechanic Gd.1
Lharib
Lineman Gd.1
Plant Operator Gd.1

Category 2
LB0030
LB0031
LB0032
LB0033
LB0034
LB0035
LB0036
LB0037
LB0038
LB0039

Auto-Electrician Gd.1
Auto-Mechanic Gd.2
Blacksmith (metal-worker)
Carpenter Gd.2
General Mechanic Gd.2
Lineman Gd.2
Mason Gd.1
Plant Operator Gd.2
Plumber Gd.1
Work Supervisor (Lajab)

Category 3
LB0045
LB0046
LB0047
LB0048
LB0049
LB0050
LB0051
LB0052
LB0053
LB0054
LB0055
LB0056

Auto-Electrician Gd.2
Auto-Mechanic Gd.3
Blaster
Carpenter Gd.3
General Mechanic Gd.3
Lineman Gd.3
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Plumber Gd.2
Sawyer Gd.1
Wireman Gd.1

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code

Description

Category Units

Page 2

PL

GP

SJ

Th

Category 4
LB0065
LB0066
LB0067
LB0068
LB0069

Cleaner
Machine Operator
Painter Gd.2
Sawyer Gd.2
Wireman Gd.2

LB
LB
LB
LB
LB

day
day
day
day
day

195.60
195.60
195.60
195.60
195.60

195.60
195.60
195.60
195.60
195.60

195.60
195.60
195.60
195.60
195.60

195.60
195.60
195.60
195.60
195.60

LB
LB

day
day

178.76
178.76

178.76
178.76

178.76
178.76

178.76
178.76

LB

day

178.76

178.76

178.76

178.76

Category 5
LB0075
LB0076

Labourer (Male)
Labourer (Female)

Labour ( Market Rate)


LB0077

Labour

Note: The above rates are calculated to comply with the Ministry of Labour and Human Resourses Wage Regulations, revised from
15th July 2011

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code

Description

Units

PL

GP

S/J

TH

BASIC RATES - BITUMEN PRODUCTS, CHEMICALS & BLASTING MATERIALS


Bitumen materials
MT0001
MT0002

Bitumen 80\100
Bitumen Emulsion

tonne
tonne

Bitumen felt Type 3


MT0005
Grade 1
MT0006
Grade 2

50655.46 51510.00 51510.00 52130.73


51832.26 52621.00 52621.00 53681.35

sq.m
sq.m

209.00
115.00

209.00
115.00

209.10
115.26

238.00
137.50

kg
litre

41.71
53.04

41.71
53.04

42.12
53.56

47.38
59.74

sq.m

611.05

617.10

617.10

664.35

kg
each
each
each
kg
each
each

78.74
68.00
5.92
5887.00
337.00
3844.67
3385.00

79.52
73.84
5.91
4925.70
341.70
3648.75
2497.95

78.74
73.12
5.85
4672.46
370.85
4704.88
3729.15

78.16
73.12
5.85
5017.38
341.70
3544.50
2426.58

Aldrin Emulsifiable Concentrate 30% (for anti-termite


treatment)

litre

284.58

304.98

299.88

302.82

Kerosene
Diesel
Petrol

litre
litre
litre

13.86
49.25
57.54

14.77
50.12
55.50

15.00
49.30
55.42

14.35
50.96
59.48

cu.m
truck
cu.m
cu.m
kg
bundle
each
each
each
Sq.m

882.64
51.00
86.39
441.36
67.88
12.34
0.13
6.12
0.09
33.32

666.42
50.33
84.70
421.05
67.55
13.10
0.13
7.00
0.09
33.67

810.00
52.50
87.24
581.48
67.55
13.10
0.13
7.00
0.09
33.67

1102.25
50.00
86.00
610.42
67.55
13.00
0.14
6.50
0.09
33.67

Sealing Compounds
MT0010
MT0011

Hot sealing compound Grade A


Bitumen Solution primer

Joint-filler
MT0015

Blasting
MT0020
MT0021
MT0022
MT0023
MT0024
MT0025
MT0026

Pre-moulded bitumen impregnated fibre board, 12mm thick


(IS: 1838 or equivalent)
materials
Super dyne / Gelatine
Fuse Coil
Detonator
Drill rod - 8' - 0"
Silent Blaster
Drill rod - 5' - 0"
Drill rod - 3' - 0"

Chemicals
MT0030

Fuels
MT0035
MT0036
MT0037

BASIC RATES - QUARRY & FOREST PRODUCTS


MT0040
MT0041
MT0042
MT0043
MT0044
MT0045
MT0046
MT0047
MT0048
MT0049

Firewood (stacked volume)


Royalty for earth, mud, boulder, sand & gravel
Mud dry
Sand
Hay/husk
Straw, girth <100mm
Cuttings
Seedlings
Grass Slips
Turf

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Stone
MT0060

Boulder

PL

GP

S/J

TH

cu.m

546.42

537.71

559.82

549.81

Crushed Rock
MT0064
100mm
MT0065
75mm
MT0066
63mm
MT0067
50mm
MT0068
40mm
MT0069
25mm
MT0070
20mm
MT0071
12.5 - 6mm

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

910.86
910.86
910.86
910.86
910.86
1056.42
1056.42
1056.42

829.21
829.21
829.21
829.21
821.24
919.70
919.70
935.50

856.50
896.78
910.00
930.00
953.48
1059.42
1147.60
1103.61

1082.39
1082.39
1082.39
1082.39
1082.39
1121.96
1121.96
1126.45

Gravel\Shingles (River stone)


MT0080
40mm to 20mm
MT0081
20mm to 10mm

cu.m
cu.m

408.00
525.30

438.60
548.76

456.96
548.76

452.00
542.00

Marble Chips 6mm


MT0085
Black or White
MT0086
Coloured

tonne
tonne

Marble Slab 20mm


MT0090
Black
MT0091
White
MT0092
Black and White
MT0093
Coloured

sq.m
sq.m
sq.m
sq.m

4165.63
4593.33
0.00
0.00
1397.40
1397.40
1397.40
1419.80

7750.00
6250.00
0.00
0.00
1294.21
1294.21
1320.48
1289.67

5610.00
5610.00
0.00
0.00
1294.21
1294.21
1320.48
1450.00

7542.91
6419.07
0.00
0.00
1400.00
1400.00
1500.00
1760.22

Marble Slab 40mm


MT0100
Black
MT0101
White
MT0102
Black and White
MT0103
Coloured

sq.m
sq.m
sq.m
sq.m

1452.42
1452.42
1452.42
1647.08

1332.63
1332.63
1411.43
1453.50

1332.63
1332.63
1411.43
1453.50

1717.27
1717.25
1781.29
1937.97

Kota Stone Slab


MT0110
20mm
MT0111
40mm

sq.m
sq.m

1442.00
2233.80

1428.00
2233.80

1428.00
2233.80

1124.96
2075.00

kg
kg

26.12
33.78

27.00
34.48

30.60
30.25

32.34
33.99

each

99.45

99.45

99.45

100.43

1000#
cu.m
cu.m
1000#
1000#
1000#
1000#

10015.50
2047.50
2067.50
27300.00
15700.00
42000.00
12800.00

9400.00
1950.00
1990.00
29650.00
16950.00
42000.00
12800.00

10660.00
2040.00
1837.50
34533.33
19200.00
42000.00
12800.00

14250.00
2260.00
2370.00
22500.00
14000.00
42000.00
12800.00

Marble

Units

Items

Lime
MT0120
MT0121

Slaked lime
Unslaked lime

Others
MT0122

Sealed Bag

BASIC RATES - BRICK


Brick
MT0125
MT0126
MT0127
MT0128
MT0129
MT0130
MT0131

materials
Bricks 2nd class
Brick aggregate
Graded brick aggregate
Interlocking cement earth block (300mmX150mmX100mm)
Interlocking cement earth block (250mmX125mmX100mm)
Concrete block bricks - Hollow Block 390 x 190 x 190mm
Concrete block bricks - Solid Brick 240 x 115 x 80mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

MT0132

Concrete block bricks - Porous brick 230 x 110 x 70mm


Concrete block bricks - Partition Hollow Brick 390 x 190 x
MT0133
90mm
BASIC RATES - CEMENT & CONCRETE MTERIALS

3
PL

GP

S/J

TH

1000#

12100.00 12100.00 12100.00 12100.00

1000#

35500.00 35500.00 35500.00 35500.00

Cement (OPC/PSC)
White Cement

tonne
tonne

6011.51 6702.38 6088.50 6300.00


29450.00 30572.50 28840.00 29070.00

A d d i t i v e s & A d-m i x t u r e s
MT0150
Red Oxide Pigment\other pigments
MT0151
Water proofing compound
MT0152
Floor Hardener (metallic)

kg
kg
kg

149.60
112.20
91.80

170.00
93.48
61.80

124.95
107.10
61.20

143.00
143.00
142.80

sq.m
sq.m
sq.m

65.40
85.15
102.37

62.97
73.54
103.15

70.40
84.23
108.05

72.33
94.33
122.33

Aluminium Materials
MT0160
Aluminium Fluted Strips 3.15mm thick 150mm wide
MT0161
Aluminium Strip 40x1.6mm

m
m

357.00
96.90

350.00
104.50

346.80
96.90

383.68
166.00

Anodised Aluminium Section for doors, windows


MT0165
Sliding, open able and pivoted windows
MT0166
Sliding and openable doors
MT0167
Partitions framing
MT0168
False ceiling framing

kg
kg
kg
kg

388.50
388.50
388.50
388.50

480.00
480.00
480.00
480.00

362.10
362.10
362.10
362.10

391.40
391.40
391.40
391.40

Aluminium Strip Edging


MT0175
57mmx12mmx1.6mm
MT0176
38mmx12mmx1.6mm

m
m

105.95
91.61

94.34
73.59

96.39
72.73

236.10
176.73

Rolled sections (250 MPa)


MT0180
Angles
MT0181
Channels
MT0182
Flats
MT0183
Joists
MT0184
Plates

kg
kg
kg
kg
kg

72.48
72.00
70.67
80.20
80.00

85.00
92.50
85.00
92.50
92.50

76.50
78.54
78.54
94.80
96.50

80.05
78.40
82.45
91.80
90.30

Sheet (250 MPa)


MT0190
1mm
MT0191
2mm
MT0192
2.8mm
MT0193
3.5mm

kg
kg
kg
kg

78.50
78.50
78.50
78.50

77.50
77.50
77.50
77.50

85.00
85.00
85.00
85.00

93.67
93.67
93.67
93.67

Mild steel Strips


MT0194
1830mm X 230mm X 3mm

kg

77.25

70.04

69.36

79.83

Cement
MT0145
MT0146

Underlay

for

Slabs

Plastic Sheet
MT0155
50 micro-metre
MT0156
100 micro-metre
MT0157
200 micro-metre
BASIC RATES - STEEL & OTHER METAL MATERIALS

Steel

Materials

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

4
PL

GP

S/J

TH

Welded Tube (250 MPa)


MT0200
50mm dia
MT0201
40mm dia

m
m

283.50
181.00

258.06
178.50

270.30
181.56

359.12
288.36

Reinforcing Bars & Mesh


Thermo - Mechanically Treated ( TMT ) bars (yield strength
500 MPa)
MT0208

kg

49.75

54.50

59.67

58.48

sq.m
sq.m

290.00
290.55

205.51
229.19

245.00
250.00

328.73
279.30

kg
kg

98.60
104.88

73.13
107.18

87.55
101.00

130.00
106.30

14.22

16.50

15.97

18.60

G.I double knotted mesh


MT0230
100 x 100 x 8-gauge
MT0231
100 x 100 x 12-gauge
MT0232
150 x 150 x 8-gauge
MT0233
150 x 150 x 12-gauge

sq.m
sq.m
sq.m
sq.m

214.20
180.60
199.50
173.25

272.50
207.50
181.25
161.25

283.25
252.35
283.25
195.70

297.38
311.10
298.86
272.34

G.I chain-link mesh


MT0240
100 x 100 x 8-gauge
MT0241
100 x 100 x 12-gauge
MT0242
75 x 75 x 8-gauge
MT0243
75 x 75 x 12-gauge
MT0244
50 x 50 x 8-gauge
MT0245
50 x 50 x 12-gauge

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

341.25
330.75
309.75
288.75
372.75
341.25

262.53
256.67
273.33
261.67
367.68
352.68

334.16
338.75
352.64
348.64
352.64
366.64

354.41
304.17
364.64
306.27
339.82
323.32

Galvanised Iron
MT0250
Plain G.I Sheet, 24-gauge (0.63mm)

tonne

71070.00 72420.00 72420.00 74800.00

MT0252

tonne

72991.67 73950.00 73440.00 74460.00

Welded Mesh
MT0215
75mmx25mm
MT0216
Expanded Metal (19mm x 3mm x 16 gauge)
Fasteners
MT0220
MT0221

M.S. Rivets
M.S. Bolts & Nuts, Screws etc

Fencing

Wire

MT0225

Barbed Wire

Products

Pre Painted Galvanised Steel sheets 24g

Punched Type Concertina Wire


MT0255
Punched Type Concertina Wire

555.39

555.39

560.84

596.70

Wires
MT0256

kg

93.00

104.00

95.79

103.02

GI wires ( assorted diameters)

BASIC RATES - ROOFING MATERIALS


Galvanised

Iron

Corrugated G.I Sheets


MT0275
24G (0.63mm)

MT0278

tonne

73310.00 74286.00 72000.00 76024.85

Pre Painted Galvanised Steel Corrugated Roofing Sheets 24g tonne

76750.00 74970.00 73500.00 79285.00

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

5
PL

GP

S/J

TH

Fibreglass
Reinforced polyester transparent sheets - 1.2mm, corrugated

sq.m

1234.20

1234.20

1234.20

1419.00

each

27.42

27.95

27.15

32.96

Plain Pantile / Roman II 500mm x 250mm concrete tiles


MT0290
6mm
MT0291
8mm
MT0292
10mm

each
each
each

14.37
16.52
17.16

13.98
16.52
17.16

13.71
16.20
16.83

14.74
17.23
17.86

Coloured Pantile / Roman II 500mm x 250mm concrete tiles


MT0295
6mm
MT0296
8mm
MT0297
10mm

each
each
each

17.45
18.08
19.06

17.79
18.43
19.06

17.45
18.08
18.69

19.41
19.93
20.75

600mm x 330mm x 10mm concrete tiles


Super Roman
MT0300
Plain
MT0301
Coloured

each
each

32.40
36.14

33.03
36.84

32.40
36.14

34.51
38.11

each
each

33.67
53.25

34.30
54.63

33.65
53.59

35.54
56.65

Hip/Ridge, 600mm
MT0310
Plain
MT0311
Coloured

each
each

34.89
55.56

35.57
57.17

34.90
56.08

37.60
59.23

Shinglep roofing
MT0315
1500mm (approx.)

pair

53.00

52.50

51.50

51.50

sq.m
m

350.00
275.00

345.58
254.10

338.99
249.26

342.99
262.65

m
m
m

29.83
41.95
46.98

29.22
41.93
48.28

31.06
41.36
46.98

33.00
46.00
54.75

MT0280

Roofing Slate
MT0285
600mm x 300mm
Concrete Roofing Tiles

Semi-sheet
MT0305
MT0306

Red

600mm x 600mm x 8mm concrete tiles


Plain
Coloured

Mud

MT0320
MT0321

Plastic

Sheet

Red mud plastic corrugated sheet, 1.5mm


Red mud plastic plain sheet, 1.3mm

BASIC RATES - CARPENTRY & JOINERY MATERIALS


Timber
MT0325
MT0326
MT0327

Ballies 75 to 125mm dia


Ballies 250 to 300mm dia
Ballies 125 to 250mm dia

Rough-sawn timber (urban rate)


MT0330
Class 'B', (Mixed Conifer)
MT0331
Class 'A', (Blue pine, Champ)

cu.m
cu.m

Plywood
MT0340
MT0341
MT0342
MT0343

sq.m
sq.m
sq.m
sq.m

4mm, commercial ply


4mm, teak ply
6mm, commercial ply
12mm, commercial ply

10256.69 10256.69 10459.68 10558.05


10848.07 10848.07 10552.37 10635.15

191.75
206.25
318.75
519.50

Department of Engineering Services, MoWHS

202.50
273.75
371.06
586.47

192.34
308.34
348.43
550.44

178.36
301.59
323.27
592.43

Bhutan Schedule of Rates - 2015


Code

Description

Units

6
PL

GP

S/J

TH

Gypsum Wallboard
MT0345
10mm
MT0346
12mm
MT0347
15mm

sq.m
sq.m
sq.m

189.65
207.28
239.93

216.50
255.50
310.00

188.34
207.35
237.59

265.63
314.36
425.10

Bison panel, Pre-laminated (both sides)


MT0350
6mm
MT0351
8mm
MT0352
10mm
MT0353
12mm
MT0354
16mm
MT0355
20mm
MT0356
25mm
MT0357
30mm

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

311.00
329.34
379.00
409.44
497.31
619.60
679.61
848.95

315.21
334.91
380.76
415.93
507.26
629.44
667.70
857.77

315.21
334.91
380.76
415.93
507.26
629.44
667.70
857.77

318.10
338.30
383.80
445.62
579.97
739.43
879.48
1030.00

Plain Particle Board


MT0365
6mm
MT0366
10mm
MT0367
12mm
MT0368
18mm
MT0369
25mm
MT0370
35mm

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

366.60
497.17
628.67
879.67
1083.33
1340.33

410.20
571.33
819.50
998.00
1205.00
1452.00

429.12
578.00
750.00
999.75
1206.25
1455.25

403.31
607.11
734.16
991.70
1188.60
1462.00

Pre-laminated Particle Board (one side)


MT0375
8mm
MT0376
10mm
MT0377
12mm
MT0378
18mm

sq.m
sq.m
sq.m
sq.m

444.00
625.50
650.50
798.50

469.20
580.38
663.00
867.00

483.00
597.45
682.50
892.50

469.20
580.38
663.00
867.00

sq.m

716.30

729.30

741.60

867.00

m
m
sq.m
each

15.05
17.91
73.50
291.38

16.10
24.75
75.50
283.50

13.65
17.85
94.50
283.50

12.61
29.54
96.90
316.20

25mm, Mixed conifer


38mm, Blue pine

sq.m
sq.m

618.33
734.00

425.19
607.41

429.36
613.37

727.50
793.33

Wall panelling
MT0400
19mm, blue pine
MT0401
15mm, blue pine
MT0402
12mm, blue pine
MT0403
19mm, mixed conifer
MT0404
12mm, mixed conifer
MT0405
12mm, Champ wood

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

702.68
619.52
571.01
614.46
556.95
657.47

689.30
607.72
560.13
602.76
559.05
644.94

689.30
607.72
560.13
602.76
559.05
644.94

689.30
607.72
560.13
573.38
559.05
644.94

Skylight panel
MT0385
Cane
Bamboo
MT0390
MT0391
MT0392
MT0393
Prefab.
Flooring
MT0395
MT0396

Translucent diffuser panel, for skylights etc


Products

25mm dia
75mm dia
Mat
cane basket
Pannelling

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

PL

GP

S/J

TH

sq.m

210.00

216.30

210.50

234.60

Flush Door, block board core, commercial ply veneer, U\F bonded
MT0415
25mm
MT0416
30mm
MT0417
35mm
MT0418
40mm

sq.m
sq.m
sq.m
sq.m

1100.00
1394.33
1554.33
1645.10

1133.00
1288.22
1501.33
1551.44

1148.45
1302.95
1508.95
1575.90

1109.69
1208.13
1408.75
1606.50

Flush Door, block board core, teak ply veneer, U\F bonded
MT0425
25mm
MT0426
30mm
MT0427
35mm
MT0428
40mm

sq.m
sq.m
sq.m
sq.m

1750.48
2068.34
2282.16
2712.53

1720.10
2039.55
2255.70
2523.50

1735.80
2061.03
2281.45
2559.55

1735.80
2061.03
2281.45
2559.55

Flush Door, block board core, ply veneer, chemically treated


MT0435
25mm
MT0436
30mm
MT0437
35mm
MT0438
40mm

sq.m
sq.m
sq.m
sq.m

1241.00
1482.00
1604.00
1790.25

1221.37
1433.25
1682.51
1931.77

1254.68
1472.33
1728.39
1984.45

1241.00
1482.00
1604.00
1984.45

Panelled Door, with single lock rail


MT0445
30mm, 12mm veneered particle board panel
MT0446
35mm, 12mm veneered particle board panel
MT0447
40mm, 12mm veneered particle board panel
MT0448
30mm, 12mm plywood panel
MT0449
35mm, 12mm plywood panel
MT0450
40mm, 12mm plywood panel
MT0451
30mm, 9mm plywood panel
MT0452
35mm, 9mm plywood panel
MT0453
40mm, 9mm plywood panel

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1543.66
1562.72
1575.42
1130.75
1144.72
1227.30
1109.15
1120.58
1128.20

1514.25
1532.95
1545.41
1109.21
1122.92
1203.93
1088.02
1099.24
1106.71

1514.25
1532.95
1545.41
1109.21
1122.92
1203.93
1088.02
1099.24
1106.71

1558.36
1577.60
1590.42
1141.51
1155.62
1238.99
1119.71
1131.25
1138.95

Panelled Door, with single lock rail & stile


MT0465
30mm, 12mm veneered particle board panel
MT0466
35mm, 12mm veneered particle board panel
MT0467
40mm, 12mm veneered particle board panel
MT0468
30mm, 12mm plywood panel
MT0469
35mm, 12mm plywood panel
MT0470
40mm, 12mm plywood panel
MT0471
30mm, 9mm plywood panel
MT0472
35mm, 9mm plywood panel
MT0473
40mm, 9mm plywood panel

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1612.23
1617.36
1619.92
1196.67
1199.23
1204.36
1153.06
1158.19
1164.60

1566.60
1571.58
1574.08
1162.80
1165.29
1170.28
1120.42
1125.41
1131.64

1566.60
1571.58
1574.08
1162.80
1165.29
1170.28
1120.42
1125.41
1131.64

1612.23
1617.36
1619.92
1196.67
1199.23
1204.36
1153.06
1158.19
1164.60

Panelled Door, with double lock rail & stile


MT0485
30mm, 12mm veneered particle board panel
MT0486
35mm, 12mm veneered particle board panel
MT0487
40mm, 12mm veneered particle board panel
MT0488
30mm, 12mm plywood panel
MT0489
35mm, 12mm plywood panel

sq.m
sq.m
sq.m
sq.m
sq.m

1644.92
1680.52
1684.40
1225.12
1227.71

1583.43
1617.70
1621.44
1179.32
1181.81

1583.43
1617.70
1621.44
1179.32
1181.81

1629.55
1664.81
1668.66
1213.67
1216.23

Wire
MT0410

Description

Units

Gauze
Galv. mild steel wire gauze, 85G (0.85mm average width of
aperture), 0.56mm dia.

BASIC RATES - DOORS, WINDOWS & HARDWARE


P r e f a b. T i m b e r D o o r s & B o a r d s

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

MT0490
MT0491
MT0492
MT0493

40mm, 12mm plywood panel


30mm, 9mm plywood panel
35mm, 9mm plywood panel
40mm, 9mm plywood panel

8
PL

GP

S/J

TH

sq.m
sq.m
sq.m
sq.m

1235.14
1178.51
1186.28
1196.63

1188.97
1134.45
1141.93
1151.90

1188.97
1134.45
1141.93
1151.90

1223.60
1167.49
1175.19
1185.45

sq.m
sq.m
sq.m

608.57
730.00
623.82

596.98
606.95
611.93

596.98
606.95
611.93

730.00
606.95
611.93

Prefab. fully glazed window shutters, incl. 75mm rail with preservative
& one primer coat, excluding glass
MT0505
MT0506
MT0507
Steel

30mm
35mm
40mm
Doors

and

Windows

MT0510
MT0511

Steel door with necessary hinges, lugs, glazing clips


Steel windows (fixed) with lugs and glazing clips

sq.m
sq.m

1200.62
381.15

1177.75
373.89

1177.75
373.89

1177.75
373.89

MT0512

Steel windows (side hung) with hinges, lugs and glazing clips

sq.m

660.66

648.08

648.08

648.08

MT0513

Steel ventilators (top hung) with hinges, lugs and glazing clips. sq.m
Steel ventilators (centre hung) with pivots, lugs and glazing
clips
sq.m
Rolling shutters with all accessories, excluding top cover
sq.m
Top cover for Rolling shutter
m

660.66

648.08

648.08

648.08

825.83
1123.12
470.45

810.10
1101.73
448.67

810.10
1101.73
448.67

810.10
1101.73
448.67

each
each
each

58.30
44.52
31.80

52.50
42.50
33.50

54.21
36.05
30.30

70.00
50.33
33.33

Anodised Aluminium Fittings: Handles


MT0540
150mm
MT0541
125mm
MT0542
100mm
MT0543
75mm

each
each
each
each

37.36
32.28
25.98
23.35

40.00
35.00
30.00
22.33

32.25
26.25
21.00
17.50

42.50
35.00
27.50
26.37

Anodised Aluminium Fittings: Hooks and Eyes


MT0550
300mm
MT0551
200mm
MT0552
150mm
MT0553
100mm

each
each
each
each

49.50
35.20
23.73
18.90

79.00
68.33
55.67
39.33

71.67
53.75
38.75
25.00

47.50
32.50
27.50
25.00

Anodised Aluminium Fittings: Kicking Plate


MT0560
4mm thick

sq.m

385.00

415.00

502.50

515.00

Anodised Aluminium Fittings: Sliding Door Bolts


MT0565
300mm
MT0566
250mm
MT0567
200mm

each
each
each

187.94
167.44
151.55

200.00
180.00
140.00

197.95
179.92
155.84

251.26
227.80
195.50

Anodised Aluminium Fittings: Tower Bolts (Barrel Type)


MT0570
200mm
MT0571
150mm

each
each

48.56
39.38

100.00
79.00

63.33
34.75

66.30
40.80

MT0514
MT0515
MT0516

Aluminium
Anodised Aluminium Fittings: Butt Hinges
MT0530
MT0531
MT0532

100mm
75mm
50mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

MT0572

100mm

Units

9
PL

GP

S/J

TH

each

30.71

70.00

22.75

30.60

each
each
each

135.00
95.00
52.50

107.88
82.63
55.81

87.50
57.50
37.00

140.00
92.50
60.00

Bright finished brass: Handles


MT0580
150mm
MT0581
125mm
MT0582
100mm
MT0583
75mm

each
each
each
each

105.48
79.48
63.25
54.42

129.00
103.00
95.00
83.00

102.50
87.00
65.00
51.25

100.00
82.50
75.00
65.00

Bright finished brass: Hooks and Eyes


MT0590
150mm
MT0591
100mm

each
each

75.25
59.50

93.75
82.50

65.00
50.00

77.50
50.00

Bright finished brass: Sliding Door Bolts


MT0595
300mm
MT0596
250mm
MT0597
200mm

each
each
each

571.20
515.10
464.10

615.00
531.67
332.50

700.00
520.00
533.33

862.50
772.50
655.00

Bright finished brass: Tower Bolts (Barrel Type)


MT0600
250mm
MT0601
150mm
MT0602
100mm

each
each
each

175.00
123.33
98.33

208.33
151.25
121.25

203.33
120.00
96.67

228.23
185.00
110.00

Door Closers/Stoppers
MT0605
Bright finished brass: Door Stopper
MT0606
Bright finished brass: Mortise Latch 100mm
MT0607
brass, hinged, spring-loaded type
MT0608
brass, over-head, hydraulic type

each
each
each
each

281.13
790.00
750.00
700.00

306.00
882.30
721.14
734.50

275.00
890.95
728.21
739.25

285.00
850.00
775.00
756.00

100mm
75mm
50mm

each
each
each

35.07
26.91
21.25

27.50
23.75
15.00

28.33
18.33
12.33

38.75
25.00
17.50

Mild Steel: Handles


MT0620
150mm
MT0621
125mm
MT0622
100mm
MT0623
75mm

each
each
each
each

35.00
25.00
24.00
18.90

38.75
31.25
30.00
20.00

45.00
33.33
26.67
17.33

50.00
35.00
27.50
25.00

Mild Steel: Hooks and Eyes


MT0630
300mm
MT0631
200mm
MT0632
150mm
MT0633
100mm

each
each
each
each

35.75
36.05
26.87
20.23

37.50
28.00
32.75
27.50

37.50
35.00
27.50
25.00

35.00
28.00
45.00
35.00

Mild Steel: Sliding Door Bolts


MT0640
300mm

each

168.33

163.33

140.00

157.50

Brass
Bright finished brass: Butt Hinges
MT0575
MT0576
MT0577

100mm
75mm
50mm

Mild Steel
Mild Steel: Butt Hinges
MT0615
MT0616
MT0617

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

MT0641
MT0642

250mm
200mm

Units

10
PL

GP

S/J

TH

each
each

133.33
119.33

138.75
104.28

121.00
95.00

122.50
126.14

each
each
each

66.39
44.80
30.25

80.00
46.67
35.00

51.25
35.00
26.67

62.50
45.00
25.00

each

85.75

105.00

108.50

95.00

Plain Glass
MT0655
3mm thick
MT0656
4mm thick
MT0657
5.5mm thick

sq.m
sq.m
sq.m

402.24
442.59
585.83

408.00
417.21
606.90

412.50
487.50
684.41

430.40
484.20
645.60

Frosted Glass
MT0660
3mm thick
MT0661
5.5mm thick

sq.m
sq.m

427.45
679.80

389.09
586.50

473.28
724.20

484.20
807.00

each
each
each
each
each
each
each
sq.m

24.15
1.96
2.54
33.60
29.05
26.25
24.15
378.00

23.46
1.91
2.47
38.76
29.17
24.48
22.44
357.00

27.20
1.91
2.45
43.25
28.33
30.00
27.00
377.40

23.46
1.91
2.47
32.64
28.22
25.50
23.46
367.20

kg

21.60

25.50

25.75

29.00

kg
kg
kg

65.00
60.25
55.67

93.75
88.32
49.30

70.00
62.25
79.50

62.50
85.67
94.00

51.31
96.59
50.71
27.95
249.25
1854.00

45.00
93.33
33.38
33.63
350.00
785.00

47.50
100.00
40.00
41.20
306.00
899.91

75.00
140.00
110.00
30.90
101.00
1650.00

Mild Steel: Tower Bolts (Barrel Type)


MT0645
250mm
MT0646
150mm
MT0647
100mm
MS Door Stopper
MT0650

Mild Steel: Door Stopper

BASIC RATES - TILES & GLASS MATERIALS


Glass

Tiles
Glazed tiles
MT0665
MT0666
MT0667
MT0668
MT0669
MT0670
MT0671
MT0672

white, 150 x 150mm


extra, for regular colours
extra, for special colours
White, 300 x 300 mm
White,200 x 200 mm
White,200 x 100 mm
White,100 x 100 mm
Linoleum sheet, 2mm

BASIC RATES - PLASTERING MATERIALS


MT0685

Plaster of Paris

BASIC RATES - PAINT & WALL PAPER MATERIALS


Distemper & Distemper Primers
MT0690
Dry Distemper
MT0691
Acrylic washable distemper
MT0692
Water proofing Cement paint
Bhutanese Painting Materials
MT0695
Mud Paint for Bhutanese traditional painting
MT0696
Animal glue
MT0697
Cloth for Bhutanese painting
MT0698
Paper for Bhutanese painting
MT0699
Colour powder(excluding gold powder)
MT0700
Gold powder

kg
kg
sq.m
sq.m
kg
kg

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

Primers
MT0710
MT0711
MT0712
MT0713
MT0714

Cement primer
Synthetic red lead primer
Red oxide primer, for metals
White primer, for wood
Pink primer, for wood

11
PL

GP

S/J

TH

litre
litre
litre
litre
litre

148.75
151.67
151.25
162.50
171.25

133.75
148.33
158.75
171.25
170.00

130.00
148.00
122.75
150.00
148.33

168.00
161.00
182.67
192.33
200.00

Finishing coat
MT0720
Aluminium paint
MT0721
Red Corrugal paint
MT0722
Synthetic enamel paint
MT0723
High gloss synthetic enamel
MT0724
Acrylic emulsion
MT0725
Vinyl plastic emulsion paint (for cement plaster)
MT0726
Black\White bitumen enamel

litre
litre
litre
litre
litre
litre
litre

281.25
226.25
212.50
283.33
218.75
280.00
225.75

285.00
221.67
227.50
238.00
225.00
277.00
213.33

252.50
212.67
214.75
246.67
256.25
291.00
278.67

324.67
247.00
236.67
330.50
400.00
557.50
295.00

Stains - Varnish - Polish


MT0730
Wood Stain (various colours)
MT0731
Clear synthetic varnish
MT0732
French Polish

litre
litre
litre

330.00
280.00
283.50

319.60
270.00
265.20

540.60
227.00
250.00

55.00
320.00
313.30

Wood Preservative
MT0735
Wood preservative -Brown
MT0736
Crude Coal Tar

litre
litre

243.25
126.00

218.15
92.70

151.30
91.80

238.96
149.35

kg

57.65

58.33

60.00

80.00

sq.m
sq.m

316.20
433.50

319.30
437.75

311.10
423.30

319.30
437.75

each

721.00

803.40

953.13

781.13

each

2343.25

2178.50

2815.83

2970.24

each

7364.50

7364.50

8447.50

8420.10

each

1648.00

1751.00

1882.50

1863.54

m
each
each

1133.00
293.55
267.80

1246.30
310.03
273.98

1050.00
210.00
225.00

1122.00
290.70
265.20

Accessories
MT0740
Putty
Wall

Paper

Wall paper:
MT0745
Standard
MT0746
High Quality
BASIC RATES - DRAINAGE MATERIALS
C. I.

Manhole

MT0750

MT0751

MT0752

MT0753

Watertight C.I. Manhole Cover with frame, 300 x 300mm


inside size Wt. of cover not less than 4.53 kg wt. of frame not
less than 2.72 kg
C.I. manhole cover with frame (light duty) internal dimension
455 x 610mm Total weight of Cover and frame not less than
38 kg. (Cover 23 kg. and frame 15 kg.)
C.I. manhole cover and frame (medium duty) 500mm internal
dia. Total weight of cover and frame not less than 116 kg.
(cover 58 kg. and frame 58 kg)
C.I.manhole cover 400mm dia. inside, mosquito proof with
locking arrangement (Wt of cover not less than 7kg).

Rain-water
Cast Iron
MT0760
MT0761
MT0762

Covers

Pipes

&

Pipe, 100mm dia.


Bend 100mm
Head 100mm

Fittings

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

MT0763
MT0764
MT0765
MT0766

Offset 100mm, 75mm projection


Offset 100mm, 150mm projection
Shoe, 100mm
Grating

12
PL

GP

S/J

TH

each
each
each
each

389.34
581.95
453.20
150.38

346.08
596.37
469.63
159.65

350.00
580.00
487.65
162.74

385.56
576.30
448.80
148.92

m
m
m
m
m
m
m
m
m
m

361.21
393.20
490.98
614.03
922.22
1307.46
1885.31
2381.53
5118.26
7311.88

364.75
397.05
495.79
620.05
931.26
1320.27
1903.80
2404.88
5168.43
7383.56

364.75
397.05
495.79
620.05
931.26
1320.27
1903.80
2404.88
5168.43
7383.56

387.60
398.70
771.78
968.92
1255.50
1874.00
2700.32
2917.33
5141.80
7322.00

each
each
each
each
each
each
each
each
each
each

57.84
62.86
78.56
120.19
180.51
255.90
369.00
417.05
584.34
771.89

59.00
64.10
80.12
122.58
184.10
261.00
376.35
421.14
590.07
779.46

59.29
64.42
80.52
123.19
185.01
262.30
378.21
421.14
590.07
779.46

58.71
63.80
79.74
122.00
183.22
259.75
374.54
417.05
584.34
771.89

Stoneware pipes 60 cm long


MT0795
100mm dia
MT0796
150mm dia
MT0797
200mm dia
MT0778
230mm dia
MT0779
250mm dia
MT0780
300mm dia
MT0781
350mm dia
MT0782
400mm dia
MT0793
500mm dia
MT0794
600mm dia

each
each
each
each
each
each
each
each
each
each

129.59
288.63
506.58
619.68
695.08
860.01
1030.84
1207.55
1584.54
1902.63

132.17
294.38
516.66
632.02
708.91
877.13
1051.36
1231.59
1616.09
1940.50

132.83
295.83
519.23
635.14
712.43
881.48
1056.56
1237.68
1624.08
1950.11

131.54
292.96
514.19
628.98
705.51
872.92
1046.30
1225.66
1608.31
1931.17

S\W trap - P Type


MT0800
100 x 100mm
MT0801
150 x 100mm
MT0802
180 x 150mm

each
each
each

106.03
120.17
153.15

108.14
122.56
156.20

108.68
123.16
156.98

107.62
121.97
155.46

100.50

98.67

101.67

96.00

R.C Non-Pressure pipe


NP2 class
MT0768
MT0769
MT0770
MT0771
MT0772
MT0773
MT0774
MT0775
MT0776
MT0777

100 mm dia
150 mm dia
225mm dia
300mm dia
450mm dia
600mm dia
750mm dia
900mm dia
1050mm dia
1200mm dia

NP2 Class Collar


MT0783
100 mm dia
MT0784
150 mm dia
MT0785
225mm dia
MT0786
300mm dia
MT0787
450mm dia
MT0788
600mm dia
MT0789
750mm dia
MT0790
900mm dia
MT0791
1050mm dia
MT0792
1200mm dia
Stoneware

Pipe

Specials

BASIC RATES - PLUMBING (PIPEWORK)


Water

Supply

G.I pipe
MT0805

15mm

Pipes

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Units

13

Code

Description

PL

MT0806
MT0807
MT0808
MT0809
MT0810
MT0811
MT0812
MT0813
MT0814

20mm
25mm
32mm
40mm
50mm
65mm
80mm
100mm
150mm

m
m
m
m
m
m
m
m
m

128.33
185.00
245.67
300.00
375.00
477.22
644.44
855.00
1350.00

142.78
190.00
244.58
302.50
368.75
551.33
778.13
1029.17
1547.50

134.00
191.67
267.50
335.00
392.50
555.00
740.00
990.00
1481.39

130.00
190.00
241.00
275.00
375.00
510.00
690.00
890.00
1539.25

H.D.P.E pressure class 10kg/sq.cm


MT0817
20mm
MT0818
25mm
MT0819
32mm
MT0820
40mm
MT0821
50mm
MT0822
63mm
MT0823
75mm
MT0824
90mm
MT0825
110mm
MT0826
140mm
160mm
MT0827
MT0828
225mm

m
m
m
m
m
m
m
m
m
m
m
m

25.60
37.13
61.44
97.09
147.94
225.69
321.90
461.43
682.57
1109.75
1446.76
2842.26

35.00
46.00
60.26
185.40
190.55
303.85
422.30
602.55
906.40
1096.95
1421.40
2863.40

36.67
54.00
85.00
119.75
185.75
276.25
446.00
622.00
985.00
2105.00
1430.00
2850.00

34.50
51.50
80.46
123.00
193.00
288.50
409.00
591.50
944.50
1354.00
2255.00
3184.00

H.D.P.E Pipes of pressure class 6kg/sq.cm


MT0830
32mm
MT0831
40mm
MT0832
50mm
MT0833
63mm
MT0834
75mm
MT0835
90mm
MT0836
110mm
MT0837
140mm
MT0838
160mm
MT0839
225mm

m
m
m
m
m
m
m
m
m
m

41.26
63.88
99.06
150.39
212.71
301.29
451.68
725.15
947.11
1858.97

46.35
82.40
128.75
195.70
278.10
391.40
597.40
669.50
856.96
1738.13

62.00
81.00
125.00
168.00
246.67
340.00
616.00
868.50
1226.33
1929.00

70.00
66.50
102.50
159.50
225.50
325.00
479.50
770.50
1006.50
1975.50

H.D.P.E Pipes of pressure class 4kg/sq.cm


MT0841
40mm
MT0842
50mm
MT0843
63mm
MT0844
75mm
MT0845
90mm
MT0846
110mm
MT0847
140mm
MT0848
160mm
MT0849
225mm

m
m
m
m
m
m
m
m
m

45.32
79.32
107.64
146.27
212.71
318.29
505.75
662.83
1295.78

56.65
103.00
144.20
193.64
278.10
412.00
527.88
664.35
1251.45

104.25
131.55
117.50
139.12
200.00
286.50
488.33
628.00
1266.67

64.89
84.00
114.00
192.00
275.00
341.00
537.50
704.50
1377.50

H.D.P.E Pipes of pressure class 2.5kg/sq.cm


MT0852
110mm
MT0853
140mm
MT0854
160mm
MT0855
225mm

m
m
m
m

204.46
335.79
434.68
839.48

257.50
360.50
435.69
852.84

233.67
364.33
525.64
964.77

217.00
355.00
462.00
892.50

Ductile Iron Pipes - Class K9


MT0856
80 mm
MT0857
100 mm

m
m

937.96
1091.47

937.96
1091.47

928.85
1080.87

988.80
1133.00

Department of Engineering Services, MoWHS

GP

S/J

TH

Bhutan Schedule of Rates - 2015


Code

Description

MT0858
MT0859
MT0860
MT0861
MT0862
MT0863
MT0864
MT0865
MT0866

150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

Units
m
m
m
m
m
m
m
m
m

14
PL

GP

S/J

TH

1589.88 1589.88 1574.45 1648.00


2189.19 2189.19 2167.93 2266.00
2909.42 2909.42 2881.17 2987.00
3677.13 3677.13 3641.43 3811.00
4611.39 4611.39 4566.62 4841.00
5486.48 5486.48 5433.21 5665.00
6473.77 6473.77 6410.92 6695.00
7587.18 7587.18 7513.51 7931.00
10406.31 10406.31 10305.27 10918.00

Ductile Iron Pipes - Class K7


MT0871
MT0872
MT0873
MT0874
MT0875
MT0876
MT0877
MT0878
MT0879
MT0880

100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

m
m
m
m
m
m
m
m
m
m

Ductile Iron Pipes K -9 Double Flanged


MT0882
100 mm
MT0883
150 mm
MT0884
200 mm
MT0885
250 mm
MT0886
300 mm
MT0887
350 mm
MT0888
400 mm
MT0889
450 mm
MT0890
500 mm
MT0891
600 mm
Pipe

m
m
m
m
m
m
m
m
m
m

914.02
1417.19
1863.67
2454.91
3074.94
3872.81
4597.09
5375.86
6342.36
8598.96

922.98
1431.08
1881.94
2478.98
3105.09
3910.78
4642.16
5428.57
6404.54
8683.27

914.02
1417.19
1863.67
2454.91
3074.94
3872.81
4597.09
5375.86
6342.36
8598.96

936.00
1456.00
1976.00
2600.00
3224.00
4056.00
4888.00
5720.00
6760.00
9152.00

1842.12 1860.18 1842.12 1854.00


2656.08 2682.12 2656.08 2781.00
3737.79 3774.44 3737.79 3914.00
4915.89 4964.09 4915.89 5203.56
6093.99 6153.74 6093.99 6386.00
7550.55 7624.58 7550.55 7931.00
9049.95 9138.68 9049.95 9579.00
12209.40 12329.10 12209.40 12875.00
14351.40 14492.10 14351.40 15141.00
18688.95 18872.18 18688.95 19776.00

Fittings

H.D.P.E welded-type fittings


MT0895
TEE, 20mm
MT0896
TEE, 25mm
MT0897
TEE, 32mm
MT0898
TEE, 50mm
MT0899
TEE, 63mm
MT0900
TEE, 90mm
MT0901
TEE, 110mm
MT0902
TEE, 160mm
MT0903
Elbow, 32mm
MT0904
Elbow, 50mm
MT0905
Elbow, 63mm
MT0906
Elbow, 90mm
MT0907
Elbow, 110mm
MT0908
Reducer, 90 x 50mm
MT0909
Reducer, 90 x 63mm
MT0910
Reducer, 110 x 63mm
MT0911
Reducer, 160 x 90mm
MT0912
Blank end, 50mm

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

41.18
55.83
89.57
202.42
255.00
353.43
481.95
2040.00
61.16
128.56
227.21
313.27
417.69
255.00
255.00
306.00
663.00
153.00

Department of Engineering Services, MoWHS

48.67
70.30
102.74
167.63
292.01
416.38
681.35
2130.56
91.93
154.08
220.34
325.74
405.49
243.97
246.94
271.94
650.95
115.40

32.86
45.66
70.88
195.98
263.25
370.99
645.55
2521.88
52.43
110.02
204.16
318.14
519.70
246.33
252.49
252.49
726.67
119.47

72.10
98.88
168.92
248.71
409.00
622.58
934.39
2823.10
84.74
180.00
322.48
450.25
622.67
257.50
257.50
309.00
669.50
154.50

Bhutan Schedule of Rates - 2015


Code

Description

MT0913
MT0914
MT0915
MT0916

Blank end, 63mm


Blank end, 90mm
Blank end, 110mm
Blank end, 160mm

Units

15
PL

GP

S/J

TH

each
each
each
each

181.80
275.95
387.15
658.00

148.71
289.08
333.10
571.03

153.96
299.29
344.86
591.19

185.40
355.35
389.48
612.00

M.I. Fittings Union


MT0921
32mm
MT0922
40mm

each
each

215.58
292.25

152.44
231.75

180.00
210.00

234.00
318.00

Brass Fittings Bibcock


MT0925
15mm

each

238.33

252.50

300.00

276.67

Stopcock
MT0930
MT0931
MT0932

15mm nom-bore
20mm nom-bore
25mm nom-bore

each
each
each

282.04
397.31
590.81

395.00
475.00
490.00

250.00
400.00
575.00

315.00
415.00
555.00

Wheel valve
MT0940
MT0941
MT0942
MT0943
MT0944

32mm nom-bore
40mm nom-bore
50mm nom-bore
65mm nom-bore
80mm nom-bore

each
each
each
each
each

1103.33
1253.75
1415.00
2441.00
3231.25

1326.38
1705.17
2181.28
3886.71
5572.56

1326.38
1705.17
2181.28
3886.71
5572.56

1450.00
1650.00
2175.00
3725.00
4945.00

Non return valve


MT0951
50mm nom-bore
MT0952
65mm nom-bore
MT0953
80mm nom-bore

each
each
each

1435.00
2352.00
3570.00

2007.68
3326.39
5037.11

1945.00
3360.00
5300.00

2213.40
3921.90
5724.24

Rubber Gasket of S.B.R Quality


MT0960
80 mm
MT0961
100 mm
MT0962
150 mm
MT0963
200 mm
MT0964
250 mm
MT0965
300 mm
MT0966
350 mm
MT0967
400 mm
MT0968
450 mm
MT0969
500 mm
MT0970
600 mm

each
each
each
each
each
each
each
each
each
each
each

63.00
72.00
102.00
164.00
178.50
298.00
338.00
393.00
462.50
655.50
871.50

57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20

57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20

57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20

Waste-water Pipework
Cast Iron Pipes, Single Socketted, 1.83m long
MT0975
MT0976
MT0977
MT0978

50mm
75mm
100mm
150mm

each
each
each
each

532.91
732.91
907.91
1207.91

550.84
799.58
948.29
1221.37

624.23
704.05
1133.00
1283.43

600.00
755.00
1200.00
1350.00

Plain bend
MT0985
MT0986
MT0987

50mm
75mm
100mm

each
each
each

163.20
174.10
179.10

131.67
151.67
201.67

170.00
180.00
222.50

180.00
205.00
255.00

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Door bend
MT0990
MT0991
MT0992

50mm
75mm
100mm

Collar
MT1000
MT1001
MT1002

Units

16
PL

GP

S/J

TH

each
each
each

214.20
214.20
214.20

221.45
241.85
283.70

225.64
264.26
332.33

200.85
232.95
342.22

50mm
75mm
100mm

each
each
each

126.48
171.36
231.54

162.23
205.49
329.86

171.36
203.49
348.08

127.72
173.04
233.81

Heel rest bend


MT1010
50mm
MT1011
75mm
MT1012
100mm

each
each
each

130.56
226.85
215.28

132.87
226.48
277.91

156.56
247.20
350.20

131.84
269.86
342.99

Single equal junction - plain


MT1020
50mm
MT1021
75mm
MT1022
100mm

each
each
each

224.91
337.37
460.53

221.45
314.15
401.70

287.98
353.28
497.20

227.12
340.67
465.05

Single equal junction, door


MT1030
50mm
MT1031
75mm
MT1032
100mm
MT1033
150mm

each
each
each
each

182.07
231.34
315.95
337.37

190.88
229.28
329.86
375.00

195.70
247.20
350.85
366.67

183.86
233.60
319.04
340.67

Double equal junction, plain


MT1040
50mm
MT1041
75mm
MT1042
100mm

each
each
each

310.59
388.77
582.62

221.71
264.97
529.94

237.93
281.19
600.23

310.59
388.77
582.62

Double equal junction, door


MT1050
50mm
MT1051
75mm
MT1052
100mm

each
each
each

268.82
344.33
451.96

243.34
292.01
421.79

237.93
281.19
500.19

268.82
344.33
451.96

Single unequal junction, plain


MT1060
75 x 50mm
MT1061
100 x 50mm
MT1062
100 x 75mm

each
each
each

224.91
294.53
342.72

236.85
308.23
352.57

236.90
313.12
352.26

224.91
294.53
342.72

Single unequal junction, door


MT1070
75 x 50mm
MT1071
100 x 50mm
MT1072
100 x 75mm

each
each
each

241.51
369.50
393.06

249.29
373.12
406.64

259.56
389.34
413.67

241.51
369.50
393.06

Double unequal junction, plain


MT1080
100 x 50
MT1081
100 x 75

each
each

332.01
385.56

334.75
374.92

351.49
400.16

332.01
385.56

Double unequal junction, door


MT1085
100 x 50
MT1086
100 x 75

each
each

348.08
396.27

337.84
386.25

367.71
421.79

348.08
396.27

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

17
PL

GP

S/J

TH

Single equal Y-Junction


MT1090
50mm
MT1091
75mm
MT1092
100mm

each
each
each

203.49
393.06
546.21

169.95
369.77
516.03

227.12
259.56
486.68

203.49
393.06
546.21

Double equal Y-Junction


MT1100
50mm
MT1101
75mm
MT1102
100mm

each
each
each

310.59
434.83
582.62

281.19
346.08
524.53

209.78
299.52
375.28

310.59
434.83
582.62

Single unequal invert branch


MT1110
75 x 50mm
MT1111
100 x 50mm

each
each

291.72
397.80

302.82
415.30

316.88
429.36

291.72
397.80

Offsets 50mm dia offset


MT1115
with 75mm projection
MT1116
with 150mm projection

each
each

292.74
404.94

257.50
413.03

237.93
427.19

292.74
404.94

75mm dia offset


MT1120
with 75mm projection
MT1121
with 150mm projection

each
each

270.30
382.50

278.10
383.16

275.00
340.00

272.95
386.25

100mm dia offset


MT1125
with 75mm projection
MT1126
with 150mm projection

each
each

326.40
397.80

323.42
400.67

340.00
425.00

329.60
401.70

Terminal Guard
MT1130
50mm
MT1131
75mm
MT1132
100mm
MT1133
150mm

each
each
each
each

128.52
214.20
326.66
578.34

135.19
229.28
324.45
584.01

188.90
262.84
323.83
520.83

128.52
214.20
326.66
578.34

P-type Nahani Trap


MT1140
100mm inlet & 50mm outlet
MT1141
100mm inlet & 75mm outlet
MT1142
C.I. P-trap 100mm

each
each
each

209.05
361.08
489.60

195.73
338.87
468.65

230.00
320.00
462.34

209.05
361.08
489.60

kg

97.46

105.99

112.46

98.42

Pipes, Single Socketed 1.83 m long


MT1150
75mm
MT1151
90mm
MT1152
110mm

each
each
each

285.00
373.50
430.00

256.25
382.50
386.25

285.00
345.00
435.00

246.17
411.65
432.97

Pipes, Single Socketed 3.00 m long


MT1160
75mm
MT1161
90mm
MT1162
110mm

each
each
each

376.67
567.50
590.00

410.00
585.50
630.00

355.00
485.00
580.00

327.28
561.90
556.43

Pipes, Doubled Socketed 1.83 m long


MT1170
75mm
MT1171
90mm

each
each

305.00
526.67

329.21
555.90

320.00
420.00

297.38
473.25

Jointing
MT1145

Materials
Pig lead

P.V.C Pipes & fittings (Soil Waste and Vent)

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

MT1172

110mm

Units

18
PL

GP

S/J

TH

each

645.00

619.91

520.00

636.65

Pipes, Doubled Socketed 1.20 m long


MT1180
75mm
MT1181
90mm
MT1182
110mm

each
each
each

204.00
326.40
358.02

195.84
311.10
366.69

180.25
309.00
360.50

219.39
327.54
482.73

Pipe Connector
MT1190
110mm

each

160.00

157.50

147.85

151.90

Reducer
MT1195
MT1196
MT1197

90x75mm
110x75mm
110x90mm

each
each
each

101.66
110.00
132.60

130.00
140.00
160.00

112.50
147.50
157.50

138.36
164.03
184.05

Coupler
MT1205
MT1206
MT1207

75mm
90mm
110mm

each
each
each

63.25
77.33
89.75

59.53
85.80
95.48

71.40
92.80
99.30

63.39
77.00
96.32

Plain bend
MT1215
MT1216
MT1217

75mm
90mm
110mm

each
each
each

90.17
99.67
109.75

87.50
120.00
125.00

99.00
110.00
141.25

87.43
110.84
113.11

Door bend
MT1225
MT1226
MT1227

75mm
90mm
110mm

each
each
each

99.00
132.50
142.33

95.00
130.00
157.50

110.00
142.00
146.63

96.00
115.00
143.50

Long Arm Bend


MT1235
75mm
MT1236
90mm
MT1237
110mm

each
each
each

173.40
255.00
346.80

183.60
265.20
346.80

189.77
278.00
356.05

171.33
215.00
339.50

Plain Shoe
MT1239
MT1240
MT1241

75mm
90mm
110mm

each
each
each

112.20
132.60
163.20

117.81
144.59
171.36

117.30
142.80
173.40

113.30
133.90
164.80

Single Tee, Plain


MT1245
75mm
MT1246
90mm
MT1247
110mm

each
each
each

99.33
138.00
150.00

102.50
135.00
148.75

95.00
136.67
166.67

95.00
140.00
182.50

Single Tee, With Door


MT1255
75mm
MT1256
90mm
MT1257
110mm

each
each
each

104.33
143.00
171.67

116.25
155.00
173.33

100.00
140.00
155.00

122.50
170.00
202.50

Double Tee, Plain


MT1265
75mm
MT1266
90mm
MT1267
110mm

each
each
each

206.25
277.25
370.00

174.27
214.20
277.40

185.00
260.00
325.00

98.00
155.00
172.00

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

19
PL

GP

S/J

TH

Double Tee, With Door


MT1275
75mm
MT1276
90mm
MT1277
110mm

each
each
each

222.50
260.00
340.00

295.25
372.30
386.65

205.80
233.58
323.00

210.00
260.00
315.00

Single Y, Plain
MT1285
75mm
MT1286
90mm
MT1287
110mm

each
each
each

104.50
170.00
196.50

147.50
295.00
309.00

120.00
180.00
230.00

126.00
186.00
220.00

Single Y, With Door


MT1295
75mm
MT1296
90mm
MT1297
110mm

each
each
each

123.50
213.00
252.50

170.00
270.00
235.00

162.00
232.00
272.33

141.50
236.00
281.00

Double Y, Plain
MT1305
75mm
MT1306
90mm
MT1307
110mm

each
each
each

176.67
252.50
296.67

203.75
250.00
250.00

170.33
231.33
268.33

178.67
257.50
315.33

Double Y, With Door


MT1315
75mm
MT1316
90mm
MT1317
110mm

each
each
each

230.00
267.50
351.67

249.00
336.00
365.00

176.50
207.50
255.00

255.00
235.00
357.50

Seal Ring
MT1320
MT1321
MT1322

each
each
each

30.00
45.00
52.50

31.67
41.67
50.00

30.00
42.50
50.00

31.33
46.67
60.00

75mm dia. offset


MT1325
With 75mm projection
MT1326
With 150mm projection

each
each

295.00
397.00

204.00
295.80

230.00
285.00

250.00
497.00

90mm dia. offset


MT1330
With 75mm projection
MT1331
With 150mm projection

each
each

391.67
477.50

336.60
418.20

300.00
450.00

375.00
510.00

110mm dia. offset


MT1335
With 75mm projection
MT1336
With 150mm projection

each
each

439.00
505.00

377.40
423.30

350.00
440.00

521.67
577.50

Terminal Guard
MT1340
75mm
MT1341
90mm
MT1342
110mm

each
each
each

81.60
91.80
96.90

91.80
107.10
112.20

92.70
103.00
113.30

82.40
92.70
97.85

Nahani Trap
MT1345
100mm inlet & 75mm outlet

each

186.67

215.00

288.40

189.55

P-Trap without air vent


MT1350
Big
MT1351
Small

each
each

342.04
300.00

423.30
377.40

422.30
360.50

455.43
368.36

75 mm
90 mm
110 mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

20
PL

GP

S/J

TH

BASIC RATES - PLUMBING (Sanitary Installation, Fittings & accessories)


Baths
MT1355
MT1356

Porcelain bath tub, white enamelled, 1700x740x440mm


Fibreglass bath tub

each
each

13450.00 13997.00 14170.00 13680.00


13400.00 13260.00 15255.00 15450.00

B a s i n s, S i n k s
Flat-back wash basin, white vitreous
MT1360
630 x 450mm
MT1361
550 x 400mm

each
each

1516.67
1031.67

1550.00
910.00

1325.00
850.00

1741.46
1035.25

Angle back wash basin


MT1365
400mm x 400mm, white vitreous china

each

850.00

867.00

950.00

1105.00

Pedestal for wash basin


MT1370
white vitreous china

each

1497.50

1400.00

1400.00

1420.00

Sinks White glazed vitreous China


MT1375
600 x 450 x 250

each

3025.00

3417.00

3605.00

3650.00

Stainless Steel Kitchen Sinks


MT1380
single bowl, 450 x 400 x 150mm
MT1381
single bowl, 580 x 480 x 175mm
MT1382
single bowl & drain-board, 940 x 460 x 160mm
MT1383
single bowl & drain-board, 1080 x 520 x 175mm
MT1384
single bowl & drain-board, 1150 x 515 x 175mm
MT1385
single bowl & double drain-board, 1740 x 520 x 200mm
MT1386
double bowl, 940 x 460 x 160mm
MT1387
double bowl, 1150 x 520 x 150mm
MT1388
double bowl & single drain-board, 1740 x 520 x 200mm
MT1389
double bowl & double drain-board, 1740 x 520 x 165mm
MT1390
single drain-board, 610 x 460mm

each
each
each
each
each
each
each
each
each
each
each

1035.00
1242.50
1670.00
1930.80
2650.00
3650.00
3731.25
4697.50
7650.00
9690.00
1094.08

1075.00
1150.00
1550.00
1611.60
2121.60
2973.00
3315.00
4590.00
7650.00
9690.00
969.75

963.33 1050.00
1175.00 1400.00
1648.00 1600.00
1627.40 2250.00
2142.40 2650.00
2984.50 3650.00
3347.50 4180.00
4635.00 4850.00
7725.00 9945.00
9785.00 10042.50
973.38 1266.67

each
each
each
each
each
each
pair

1262.50
1787.50
1375.00
1390.00
1575.00
738.75
166.67

1300.00
1950.00
1204.00
1250.00
1938.00
516.67
150.00

1368.75
1606.25
1283.33
1300.00
1516.67
632.50
150.00

1500.00
1475.00
1183.33
1287.50
1525.00
613.33
150.00

each
each
each

1479.00
1653.33
1989.00

1200.00
1836.00
2040.00

1589.29
1970.39
2070.30

1479.00
1683.00
1989.00

each
each

1555.00
2372.50

1450.00
2263.50

1450.00
2183.33

1550.00
2200.00

W.C P a n s
W.C. P a n s
MT1400
MT1401
MT1402
MT1403
MT1404
MT1405
MT1406

Vitreous China European - white


Vitreous China European - colour
Vitreous China Indian type - 500mm, white
Vitreous China Indian type - 580mm Orissa, white
Vitreous China Indian type - 580mm Orissa, colour
Plastic seat & lid for European pan
Vitreous China Footrests (250 x 130 x 30), for Indian pan

Cisterns
C.I. Automatic flushing Cistern with fittings
MT1420
MT1421
MT1422

5 litres
10 litres
12.5 litres

Vitreous China cistern - low level, incl. fittings & flush-bend


MT1430
10 litres, white
MT1431
10 litres, colour

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

21
PL

GP

S/J

TH

Float Valve
MT1440

15mm ball valve with plastic float

each

337.50

386.67

393.33

380.00

White vitreous China flat-back lipped-front type urinals, 430 x


260 x 350mm

each

1280.00

1236.00

1200.00

1450.00

each
each
each
each

3565.00
3264.00
450.00
374.85

3264.00
3264.00
459.00
374.85

3264.00
3264.00
459.00
374.85

3296.00
3296.00
663.83
378.53

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

455.00
817.50
390.00
570.00
436.67
400.00
450.00
447.50
300.00
450.00
720.00
750.00
850.00
660.00
459.00
663.00
907.80

548.00
813.90
530.00
600.00
450.00
450.00
655.00
596.67
485.00
460.00
605.00
693.60
786.93
522.60
459.00
663.00
907.80

560.00
800.00
570.00
590.00
450.00
480.00
550.00
550.00
470.00
550.00
650.00
750.00
850.00
450.00
459.00
663.00
907.80

515.00
475.00
480.00
690.00
490.00
520.20
675.00
680.00
320.00
765.00
772.50
956.25
912.90
561.62
561.00
642.60
960.84

C.p Brass Shower fittings for 15 to 20mm inlet


MT1510
rose, 100mm dia
MT1511
rose, 150mm dia
MT1512
shower, with flex tube
MT1513
shower, revolving joint
MT1514
shower, adjustable with locking key
MT1515
shower arm, 15mm
MT1516
shower arm, 15mm, heavy duty

each
each
each
each
each
each
each

969.00
885.50
826.20
561.00
683.40
510.00
316.20

663.00
765.00
893.52
515.10
765.00
357.00
468.50

711.45
943.50
969.00
484.50
752.25
504.90
435.54

913.50
935.67
874.70
596.00
697.50
527.10
533.33

C.p Mixers
MT1530
MT1531
MT1532
MT1533
MT1534
MT1535
MT1536
MT1537
MT1538
MT1539
MT1540

each
each
each
each
each
each
each
each
each
each
each

1938.00
1652.40
1377.00
1275.00
2181.44
2696.88
2754.00
2244.00
1581.00
3570.00
4590.00

1938.00
1460.80
1377.00
1275.00
2240.72
2600.00
2754.00
2244.00
1581.00
3570.00
4590.00

1957.00
1668.60
1390.50
1287.50
2202.83
2723.32
3265.50
2266.00
1596.50
3605.00
4267.50

2800.00
2800.00
1330.00
1688.25
2880.00
3300.00
3250.00
2533.33
2120.60
3864.00
4692.00

Urinals
MT1445

Flush fittings
MT1450
c.p flush valve, 32mm
MT1451
c.p flush valve, 32mm, concealed
MT1452
c.p flush bend, long
MT1453
c.p flush valve elbow
C.p Cocks & Spouts
MT1460
MT1461
MT1462
MT1463
MT1464
MT1465
MT1466
MT1467
MT1468
MT1469
MT1470
MT1471
MT1472
MT1473
MT1474
MT1475
MT1476

15mm pillar cock


15mm pillar cock, swan neck, c.p knob
15mm pillar cock, aerator, c.p knob
20mm pillar cock (for bath)
15mm bib cock, vert, c.p knob
15mm bib cock, inclined, c.p knob
15mm bib cock, long nose, c.p knob
15mm bib cock, long body, c.p knob
15mm stop cock, c.p knob
20mm stop cock, c.p knob
15mm stop cock, concealed, c.p knob
15mm stop cock, H\D concealed, c.p knob
20mm stop cock, H\D concealed, c.p knob
15mm angle stop cock, c.p knob
Wall spout, std, 15mm
Wall spout, w\o diverter, used with single-lever mixers
Wall spout, with diverter, used with single-lever mixers

basin, single-hole, casted spout, 15mm


basin, close-hole, 15mm
sink, with spout J pipe, 15mm
sink, with casted spout swinging, 15mm
wall, non-telephonic type, 15mm
wall, telephonic type with crutch and tel. shower, 15mm
wall, telephonic type without crutch and tel. shower, 15mm
wall, telephonic type with crutch and without tel. shower, 15mm
wall, telephonic type with C.P bend & flanges, 15mm
Three hole mixer without pop-up, 15mm
Three hole mixer with pop-up, 15mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

MT1541
MT1542
MT1543

each
each

2142.00
2448.00

2142.00
2448.00

3056.50
2908.00

3723.00
3258.50

each

4998.00

4998.00

5047.00

4833.33

each

3570.00

3570.00

4052.50

3800.00

MT1546

basin, elbow action, surgical, 15mm


basin, elbow action, surgical with shower, 15mm
bath, with exposed adjustable legs with telephone shower
arrangement with crutch,15mm
wall, with telephonic shower arrangement with 115mm long
bend pipe for over head shower connection, 15mm
shower, three in one, with bend flexible tube, and shower &
hook, 15mm
sink, with swivel spout, 15mm

each
each

4845.00
714.00

4845.00
714.00

4892.50
721.00

5757.00
787.80

Traps, c.p
MT1580
MT1581

32mm
for bath

each
each

1086.30
867.00

1086.30
867.00

1096.95
875.50

936.41
852.13

pair

112.20

132.60

152.23

136.25

C.p. brass waste


MT1590
32mm
MT1591
40mm

each
each

195.00
330.00

262.65
344.25

265.23
347.63

275.00
330.00

PVC waste
MT1595
32mm

each

64.67

65.00

97.50

71.50

C.p. brass chain with plug


MT1600
32mm
MT1601
40mm

each
each

185.00
195.00

206.00
206.00

204.00
204.00

160.00
163.33

Soap Containers
MT1605
c.p brass with bracket
MT1606
c.p Liquid Soap Container
MT1607
Recessed ceramic, 200 x 100mm
MT1608
Recessed ceramic, 150 x 150mm

each
each
each
each

364.30
515.00
515.00
510.00

299.00
408.00
500.00
510.00

295.80
408.00
510.00
510.00

298.70
412.33
515.00
515.00

C.p Towel Rails


MT1615
20mm x 450mm
MT1616
20mm x 600mm
MT1617
20mm x 750mm
MT1618
C.p Towel Ring

each
each
each
each

447.50
560.00
650.00
453.33

440.00
490.00
480.00
530.00

597.33
704.75
925.00
570.00

614.14
695.25
789.67
625.69

C.p Coat Hooks


MT1625
single
MT1626
double

each
each

390.63
350.00

325.00
325.00

357.00
255.00

470.38
278.75

each
each

1031.67
655.00

999.60
622.50

1066.67
715.00

1085.14
884.75

each
each
each
each

414.73
703.50
766.50
682.50

412.30
683.40
744.60
663.00

369.91
683.40
744.60
663.00

475.00
683.40
744.60
663.00

MT1544
MT1545

Units

22
PL

GP

S/J

TH

Bathroom Accessories
Brackets
MT1585

R.S. or C.I.Brackets

Glass self/Mirror
MT1630
MT1631

Glass Shelf
Mirror (Bevelled edge) 600mm x 450mm

Toilet paper holders


MT1635
C.P. brass
MT1636
recessed ceramic (white), 200 x 100mm
MT1637
recessed ceramic (coloured), 200 x 100mm
MT1638
recessed ceramic (roll-type), 150 x 150mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

23
PL

GP

S/J

TH

Electric Water Heater


Electric Water Heaters
MT1645
10 litres, vertical
MT1646
15 litres, vertical
MT1647
25 litres, vertical
MT1648
35 litres, vertical
MT1649
50 litres, vertical
MT1650
75 litres, vertical
MT1651
100 litres, vertical
Water

Storage

each
each
each
each
each
each
each

6678.83 6886.40 6286.00 6479.00


7387.83 7526.00 6765.00 6676.67
8672.50 8625.00 7742.00 8321.00
9610.30 9875.00 8923.67 9090.33
12370.00 12590.25 12413.00 12619.50
17925.00 17925.00 17351.67 17527.50
21641.15 20879.98 20811.33 21217.00

each
each
each
each
each

2749.36 2703.50 2633.75 2724.31


4956.25 4925.00 4750.00 4925.83
9712.50 9250.00 9050.00 9188.75
18150.00 19000.00 18450.00 18377.50
27333.33 28400.00 28250.00 27566.25

Tanks

H.D.P.E water storage tank


MT1665
270 litres
MT1666
500 litres
MT1667
1000 litres
MT1668
2000 litres
MT1669
3000 litres
Steel formwork
MT1670
MT1671
MT1672
MT1673
MT1674
MT1675
MT1676
MT1677

Plates, angles and channels


Single Clip
Double clip
Adjustable span ESO+SI
Adjustable telescopic prop(3m)
Beam clamp
Column clamp
Prop 2 m

kg
each
each
each
each
each
each
each

89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00

89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00

89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00

89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00

each
litre

50.40
172.00

51.30
173.00

50.40
172.00

53.40
176.00

Road works (new items)


MT1678
MT1679

Painting Brush
Thermoplastic road marking paint

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code

Description

Units

24

PL

GP

SJ

Th

Chapter 17B: MACHINERY AND PLANT HIRE CHARGES


Machinery and Plant Hire Charges (CDCL - February 5, 2015
MP0100

Air Compressor(KG)

day

4855.20

4855.20

4855.20

4855.20

MP0101

Air Compressor(P - 300)

day

5744.00

5744.00

5744.00

5744.00

MP0102

Air Compressor(XAM140)

day

5488.00

5488.00

5488.00

5488.00

MP0103

Air Compressor(VT/6)

day

4552.80

4552.80

4552.80

4552.80

MP0104

Air Compressor(VT/250)

day

5488.00

5488.00

5488.00

5488.00

MP0105

Bull Dozer(CAT D4H)

day

12528.00

12528.00

12528.00

12528.00

MP0106

Bull Dozer( CAT D6D)

day

14582.40

14582.40

14582.40

14582.40

MP0107

Bull Dozer(D7G)

day

14952.00

14952.00

14952.00

14952.00

MP0108

Bull Dozer(TD12E)

day

13893.60

13893.60

13893.60

13893.60

MP0109

Bull Dozer(CAT - D5M XL)

day

15736.00

15736.00

15736.00

15736.00

MP0110

Bull Dozer(CAT D4G)

day

13264.00

13264.00

13264.00

13264.00

MP0111

Asphalt Pave, Hanta

day

8032.00

8032.00

8032.00

8032.00

MP0112

Bitumen Heating/Storage Tank - 12000 litres

day

4136.00

4136.00

4136.00

4136.00

MP0113

Bitumen Heating/Storage Tank - 4000 litres

day

3832.00

3832.00

3832.00

3832.00

MP0114

Compactor, Plate Type

day

1224.00

1224.00

1224.00

1224.00

MP0115

Crane ( Kato, KR - 250)

day

21048.00

21048.00

21048.00

21048.00

MP0116

Chips spreader

day

760.00

760.00

760.00

760.00

MP0117

Motor Grader(MG -330)

day

12840.00

12840.00

12840.00

12840.00

MP0118

Spot Mix Plant, 10/16 TPH

day

18160.00

18160.00

18160.00

18160.00

MP0119

Spot Mix Plant, 6/10 TPH

day

9298.80

9298.80

9298.80

9298.80

MP0120

Excavator(PC - 200)

day

14712.00

14712.00

14712.00

14712.00

MP0121

Excavator(PC - 120)

day

11680.00

11680.00

11680.00

11680.00

MP0122

Excavator ( PC60)

day

7467.60

7467.60

7467.60

7467.60

MP0123

Excavator CAT 312B

day

11736.00

11736.00

11736.00

11736.00

MP0124

Excavator CAT 320

day

14536.00

14536.00

14536.00

14536.00

MP0125

Water Pump - KUBOTA

day

1168.00

1168.00

1168.00

1168.00

MP0126

Backhoe Loader ( CASE 580 Super M)

day

8896.00

8896.00

8896.00

8896.00

MP0127

Backhoe Loader ( CAT 416)

day

7840.00

7840.00

7840.00

7840.00

MP0128

Pay Loader ( IH 510B)

day

9727.20

9727.20

9727.20

9727.20

MP0129

Pay Loader ( IH 515B)

day

10164.00

10164.00

10164.00

10164.00

MP0130

Pay Loader ( CAT 916)

day

10392.00

10392.00

10392.00

10392.00

MP0131

Pay Loader ( CAT 926E)

day

10976.00

10976.00

10976.00

10976.00

MP0132

Pay Loader ( CAT 930)

day

13032.00

13032.00

13032.00

13032.00

MP0133

Pay Loader ( CAT 928F)

day

13208.00

13208.00

13208.00

13208.00

MP0134

Road Broom (Mechanical), 2595 x 1220 x 965

day

616.00

616.00

616.00

616.00

MP0135

Road Roller (10 tonnes, BRITANIA)

day

4048.00

4048.00

4048.00

4048.00

MP0136

RoadRoller (10 tonnes, JAYPEE)

day

2184.00

2184.00

2184.00

2184.00

MP0137

Road Roller (8 tonnes, JESSOP)

day

3049.20

3049.20

3049.20

3049.20

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

MP0138

Road Roller (8 tonnes, Speed Craft)

MP0139
MP0140

25

PL

GP

SJ

Th

day

3808.00

3808.00

3808.00

3808.00

Road Roller (Pneumatic Tyre) TS -300

day

10064.00

10064.00

10064.00

10064.00

Road Roller (SV91 Sakai)

day

10824.00

10824.00

10824.00

10824.00

MP0141

Concrete Pump

day

14312.00

14312.00

14312.00

14312.00

MP0142

Concrete /Grout Pump, P -88

day

10408.00

10408.00

10408.00

10408.00

MP0143

Core Drill Machine, TS190R -S

day

19051.20

19051.20

19051.20

19051.20

MP0144

Fork Lift - Toyota

day

3104.00

3104.00

3104.00

3104.00

MP0145

Tanker ( NISSAN)

day

4960.00

4960.00

4960.00

4960.00

MP0146

Tanker ( TATA)

day

4784.00

4784.00

4784.00

4784.00

MP0147

Canter Tipper, Mitsubishi

day

3472.00

3472.00

3472.00

3472.00

MP0148

Tata LB (1210SE)

day

4792.00

4792.00

4792.00

4792.00

MP0149

Tata LB (1612SE)

day

4848.00

4848.00

4848.00

4848.00

MP0150

Canter Tipper, Long Body, FE444E(Nissan)

day

3704.00

3704.00

3704.00

3704.00

MP0151

Tripper(Hino), 172 KD

day

4520.00

4520.00

4520.00

4520.00

MP0152

ISUZU Truck

day

5200.00

5200.00

5200.00

5200.00

MP0153

Tractor with Trailor, Toyota

day

3376.00

3376.00

3376.00

3376.00

MP0154

Trailor(HINO 25 MT)

day

21608.00

21608.00

21608.00

21608.00

MP0155

Road Brush Head, Sweetper

day

680.40

680.40

680.40

680.40

MP0156

Rock Breaker

day

4208.00

4208.00

4208.00

4208.00

MP0157

Asphalt/Bitumen heating Kettle, India Make

day

3208.80

3208.80

3208.80

3208.80

MP0158

Jack Hammer

day

464.00

464.00

464.00

464.00

MP0159

Asphalt/Bitumen heating Kettle, Japan Make

day

7000.00

7000.00

7000.00

7000.00

MP0160

Explosive Van, FE1210

day

5233.20

5233.20

5233.20

5233.20

MP0161

Daewoo Dumper/Tipper

day

5408.00

5408.00

5408.00

5408.00

MP0162

Lubricating/Service Van, ISUZU

day

4616.00

4616.00

4616.00

4616.00

MP0163

Lubricating/Service Van, TATA

day

4584.00

4584.00

4584.00

4584.00

MP0164

Mini-Dumper, TATA

day

2752.00

2752.00

2752.00

2752.00

MP0165

Nissan Dumper/Tipper CKA12HHT ( 10 MT)

day

5216.00

5216.00

5216.00

5216.00

MP0166

Nissan Dumper/Tipper CKA12HHT ( 8 MT)

day

5056.00

5056.00

5056.00

5056.00

MP0167

Side Dump Truck

day

2646.00

2646.00

2646.00

2646.00

MP0168

TATA Tipper, 1612 SE

day

4560.00

4560.00

4560.00

4560.00

MP0169

TATA Mini Truck, 407

day

2848.00

2848.00

2848.00

2848.00

MP0170

Trailer CPB12E16772, NISSAN 10MT

day

9408.00

9408.00

9408.00

9408.00

MP0171

Trailer Short Body NISSAN 20MT

day

15616.00

15616.00

15616.00

15616.00

MP0172

Truck Mounted Concrete Mixer, 1612 SE

day

6816.00

6816.00

6816.00

6816.00

MP0173

Truck with Crane, HINO/ISUZU

day

62600.00

62600.00

62600.00

62600.00

MP0174

Vibromax

day

907.20

907.20

907.20

907.20

MP0175

Workshop Van

day

4584.00

4584.00

4584.00

4584.00

MP0200

Roller, CAT - CS551

day

11384.00

11384.00

11384.00

11384.00

MP0201

Water pump AVI Type

day

1168.00

1168.00

1168.00

1168.00

MP0202

Welder - Electric arc

day

183.75

183.75

183.75

183.75

MP0203

Pay Loader ( CAT -910)

day

8568.00

8568.00

8568.00

8568.00

MP0204

Crusher (Kurimoto FJ-2010 R)

day

6464.00

6464.00

6464.00

6464.00

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Units

26

Code

Description

PL

GP

SJ

Th

MP0205

Concrete Mixer(7/5 Cft)

day

1392.00

1392.00

1392.00

1392.00

MP0206

Concrete Vibrator(M/C5)

day

856.00

856.00

856.00

856.00

MP0207

Stone Crusher( Sisco)

day

4920.00

4920.00

4920.00

4920.00

MP0208

Bull Dozer (IH TD20E)

day

18261.60

18261.60

18261.60

18261.60

MP0209

Hyd. Excavator (IH640)

day

13918.80

13918.80

13918.80

13918.80

MP0210

Motor Grader (CAT 130G)

day

13000.00

13000.00

13000.00

13000.00

MP0211

Truck/Tipper (Tata,1210SK32)

day

4480.00

4480.00

4480.00

4480.00

MP0212

Compressor (CPS300)

day

5760.00

5760.00

5760.00

5760.00

MP0213

Road Broom (TD96)

day

518.40

518.40

518.40

518.40

MP0214

Asphalt/Bitumen Sprayer (Hino)

day

5328.00

5328.00

5328.00

5328.00

MP0215

Drill (Pinjor Machine)

day

1153.28

1153.28

1153.28

1153.28

MP0216

Air Compressor CPS-300

day

5760.00

5760.00

5760.00

5760.00

MP0217

Air Compressor CPS-325

day

6328.00

6328.00

6328.00

6328.00

MP0218

Air Compressor P-310

day

5800.00

5800.00

5800.00

5800.00

MP0219

Excavator SK 115

day

11672.00

11672.00

11672.00

11672.00

MP0220

Excavator SK 200

day

14944.00

14944.00

14944.00

14944.00

MP0221

Motor Grader CASE 845

day

13720.00

13720.00

13720.00

13720.00

MP0222

Motor Grader CAT 130 G

day

13000.00

13000.00

13000.00

13000.00

MP0223

Road marking machine

day

2000.00

2000.00

2000.00

2000.00

Note: Buit-up rates are inclusive of HSD, M.Oil, Operators/drivers, etc complete.

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates 2015

SECTION 2
Mechanical Transportation Costs

Department of Engineering Services, MoWHS

BHUTAN SCHEDULE OF RATES - 2015

27

CARRIAGE OF MATERIALS - MECHANICAL TRANSPORT INCLUDING LOADING, UNLOADING AND STACKING


1 HILL ROADS
Rate
sl.no

Materials

quantity
payable

Unit

1 km

2km

3km

4 km

beyond 5 beyond
beyond
upto 10 10 upto
20 for
km for 20 km for
every km
every km every km

5 km

10

1 Lime, moorum, building rubbish

cu.m

135.82

146.31

156.57

166.38

175.74

8.25

6.18

7.73

2 Dry earth

cu.m

4.8

169.78

182.88

195.72

207.97

219.68

10.31

7.73

9.66

3 Manure or Sludge

cu.m

5.7

142.97

154.01

164.81

175.13

184.99

8.68

6.51

8.13

4 Excavated Rock

cu.m

271.64

292.61

313.15

332.75

351.48

16.50

12.36

15.45

5 Sand, stone aggregates of less than 40 mm size cu.m

162.98

175.57

187.89

199.65

210.89

9.90

7.42

9.27

6 Stone aggregates of more than 40 mm size

cu.m

4.6

177.16

190.83

204.23

217.01

229.23

10.76

8.06

10.08

7 stone boulders

cu.m

4.25

191.75

206.55

221.04

234.88

248.10

11.65

8.73

10.91

8 bricks

1000 nos

2000

382.46

413.92

444.72

474.13

500.22

24.75

18.55

23.18

9 tiles

1000 nos

3000

254.97

275.94

296.48

316.08

333.48

16.50

12.36

15.45

10 cement

tonne

95.62

103.48

111.18

118.53

125.06

6.19

4.64

5.80

11 GI, CI Pipes

tonne

109.27

118.26

127.06

135.46

142.92

7.07

5.30

6.62

12 Concrete

tonne

109.27

118.26

127.06

135.46

142.92

7.07

5.30

6.62

13 steel

tonne

95.62

103.48

111.18

118.53

125.06

6.19

4.64

5.80

14 bitumen

tonne

4.5

169.98

183.96

197.65

210.72

222.32

11.00

8.24

10.30

15 timber

cu.m

7.5

108.66

117.04

125.26

133.10

140.06

6.60

4.95

6.18

Department of Engineering Services, MoWHS

BHUTAN SCHEDULE OF RATES - 2015

28

2. PLAIN ROADS
Rate
sl.no

Materials

quantity
payable

Unit

1 km

2km

3km

4 km

beyond 5 beyond
beyond
upto 10 10 upto
20km for
km for 20 km for
every km
every km every km

5 km

10

1 Lime, moorum, building rubbish

cu.m

133.50

142.41

150.98

159.22

167.16

7.13

5.58

4.17

2 Dry earth

cu.m

4.8

166.88

178.01

188.72

199.02

208.94

8.91

6.98

5.21

3 Manure or Sludge

cu.m

5.7

140.53

149.91

158.92

167.60

175.95

7.51

5.87

4.39

4 Excavated Rock

cu.m

267.00

284.82

301.95

318.44

334.31

14.26

11.16

8.33

5 Sand, stone aggregates of less than 40 mm size cu.m

160.20

170.89

181.17

191.06

200.59

8.56

6.70

5.00

6 Stone aggregates of more than 40 mm size

cu.m

4.6

174.13

185.75

196.92

207.68

218.03

9.30

7.28

5.43

7 stone boulders

cu.m

4.25

188.47

201.05

213.14

224.78

235.98

10.07

7.88

5.88

8 bricks

1000 nos

2000

375.51

402.23

427.93

452.66

476.47

21.39

16.74

12.50

9 tiles

1000 nos

3000

250.34

268.15

285.28

301.77

317.64

14.26

11.16

8.33

10 cement

tonne

93.88

100.56

106.98

113.16

119.12

5.35

4.19

3.13

11 GI, CI Pipes

tonne

107.29

114.92

122.26

129.33

136.13

6.11

4.78

3.57

12 Concrete

tonne

107.29

114.92

122.26

129.33

136.13

6.11

4.78

3.57

13 steel

tonne

93.88

100.56

106.98

113.16

119.12

5.35

4.19

3.13

14 bitumen

tonne

4.5

166.89

178.77

190.19

201.18

211.76

9.51

7.44

5.56

15 timber

cu.m

7.5

106.80

113.93

120.78

127.37

133.72

5.70

4.46

3.33

NOTE : For manual transportation, refer the LMC ( CIVIL) - 2015 and SBRW

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates 2015

SECTION 3 - Built Up Rates

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

PL

GP

SJ

TH

DD0001 Demolishing cement concrete 1:3:6 & richer, including cu.m


disposal of materials within 50m lead

602.66

602.66

602.66

602.66

DD0002 Demolishing cement concrete 1:4:8 & leaner, including cu.m


disposal of materials within 50m lead

373.27

373.27

373.27

373.27

DD0003 Demolishing reinforced concrete, including stacking


steel bars and disposal of rubbish within 50m lead

cu.m

878.55

878.55

878.55

878.55

cu.m

158.48

158.48

158.48

158.48

Chapter 1: DISMANTLING & DEMOLITION WORK


Concrete

Lime concrete
DD0004 Demolishing lime concrete and disposal of rubbish
within 50m lead
Stone Masonry
Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within 50m
lead
DD0005 In lime mortar
DD0006 In cement mortar

cu.m
cu.m

229.39
469.20

229.39
469.20

229.39
469.20

229.39
469.20

Dismantling dressed ashlar face stone work including stacking useful materials & disposal of rubbish
within 50m lead
DD0007 In lime mortar
DD0008 In cement mortar

cu.m
cu.m

291.95
563.04

291.95
563.04

291.95
563.04

291.95
563.04

Removing mortar from stones, cleaning stones and concrete articles, and arranging in stacks
DD0009 In lime mortar
DD0010 In cement mortar

cu.m
cu.m

238.71
264.50

238.71
264.50

238.71
264.50

238.71
264.50

DD0011 Demolishing hollow block masonry including stacking cu.m


useful materials & disposal of rubbish within 50m lead

851.86

851.86

851.86

851.86

DD0012 Demolishing reinforced brickwork, including stacking


steel bars and disposal of rubbish within 50m lead

787.21

787.21

787.21

787.21

2.29

2.29

2.29

2.29

250.24

250.24

250.24

250.24

Brick & Hollow Block Masonry

DD0013 Extra for scraping, cleaning, straightening


reinforcement from R.C & reinforced brick work

cu.m

kg

sq.m
DD0014 Extra for cutting reinforcement bars in reinforced
cement concrete and reinforced brickwork( payment to
be made the cross sectional area of RCC or RB work)

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code
Description
Units
PL
GP
Demolishing brick work including stacking useful materials & disposal of rubbish within 50m lead
DD0015 In mud mortar
DD0016 In lime mortar
DD0017 In cement mortar

cu.m
cu.m
cu.m

135.55
160.57
396.21

135.55
160.57
396.21

SJ

TH

135.55
160.57
396.21

135.55
160.57
396.21

Removing Mortar from bricks and cleaning bricks including stacking useful materials within 50m lead
DD0018 From BW in mud mortar
DD0019 From BW in lime mortar
DD0020 From BW in cement mortar

1000#
1000#
1000#

899.68
1027.78
1282.92

899.68
1027.78
1282.92

899.68
1027.78
1282.92

899.68
1027.78
1282.92

Steel Work
Dismantling steelwork in single sections including dismembering and stacking within 50m lead
DD0021 In RS joists

kg

0.71

0.71

0.71

0.71

DD0022 In channels, angles, tees and flats


DD0023 Dismantling steelwork in built up sections in channels,
angles, tees and flats in all gusset plates, bolts, nuts,
cutting rivets, welding etc. including dismembering
and stacking within 50 m lead

kg
kg

0.63
1.46

0.63
1.46

0.63
1.46

0.63
1.46

DD0024 Dismantling steelwork in built up sections without


dismembering and stacking within 50 m lead

kg

1.25

1.25

1.25

1.25

611.66

611.66

611.66

611.66

55.61

55.61

55.61

55.61

cu.m

121.64

121.64

121.64

121.64

DD0028 Extra for dismantling trusses, rafters, purlins etc. every cu.m
additional span of 1metre or part thereof >10m
(sectional area < 40sq.cm)
DD0029 Dismantling doors, windows, and clerestory windows each
<3sq.m (steel, wood) including architrave, hold fasts,
stacking within 50m lead

0.56

0.56

0.56

0.56

95.15

95.15

95.15

95.15

each

129.87

129.87

129.87

129.87

DD0031 Taking out doors, windows and clerestory windows


each
shutters <3sq.m (steel, wood) including stacking within
50m lead

36.28

36.28

36.28

36.28

Wood work
DD0025 Dismantling wood work of sectional area 40 sq.cm and cu.m
above in frames, trusses (<10m span) including
stacking within 50m lead
DD0026 Dismantling wood work of sectional area <40 sq.cm in
frames, trusses including stacking within 50m lead
DD0027 Extra for dismantling trusses, rafters, purlins etc. of
every additional span of 1 metre or part thereof for
span >10m (sectional area > 40sq.cm)

DD0030 Dismantling doors, windows and clerestory windows


>3sq.m (steel\wood) including architrave, hold fasts,
and stacking within 50m lead

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
DD0032 Taking out doors, windows and clerestory window
shutters >3sq.m (steel or wood) including stacking
within 50m lead

Units
each

PL
86.99

GP
86.99

SJ
86.99

TH
86.99

DD0040 Dismantling wooden flooring including stacking useful sq.m


materials & disposal of rubbish within 50m lead

38.92

38.92

38.92

38.92

Flooring

DD0041 Dismantling dry brick patching in floors, drains etc


including stacking useful materials & disposal of
rubbish within 50m lead
DD0042 Dismantling stone slab flooring laid in cement mortar
including stacking useful materials & disposal of
rubbish within 50m lead

cu.m

260.67

260.67

260.67

260.67

sq.m

53.09

53.09

53.09

53.09

DD0043 Dismantling jack arch roofing and floors including


stacking useful materials & disposal of rubbish within
50m lead

sq.m

52.13

52.13

52.13

52.13

DD0045 Dismantling G.I sheets including ridges, hips, valleys,


gutters & stacking materials within 50m lead

sq.m

43.44

43.44

43.44

43.44

DD0046 Dismantling tiled roofing with batten boarding etc.


complete including stacking useful materials &
disposal of rubbish within 50m lead

sq.m

46.22

46.22

46.22

46.22

sq.m

19.12

19.12

19.12

19.12

kg

9.18

9.18

9.18

9.18

DD0056 Dismantling fence posts, struts\T & L iron\pipes &


earth work\demolishing of concrete and stacking
within 50m lead

each

87.06

87.06

87.06

87.06

DD0057 Dismantling fence posts, struts R.C including earth


work\demolishing concrete footings, stacking, 50m
lead
DD0058 Cutting ballies\wooden posts at ground or projection
above concrete & stacking within 50m lead

each

103.62

103.62

103.62

103.62

each

26.07

26.07

26.07

26.07

Roofing

Metal w o r k
DD0050 Dismantling expanded metal, fabrics & battens,
beading including stacking useful within 50m lead
Fencing
DD0055 Dismantling barbed wire, flexible wire including
making rolls & stacking within 50m lead

Ceiling & Cladding

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

Code
Description
Units
DD0065 Dismantling cement A.C, celotex, hardboard ceiling,
sq.m
partition, including stacking useful materials &
disposal rubbish within 50m
DD0066 Dismantling of ekra wall in cement mortar 1:6 or richer sq.m
including stacking useful materials & disposal of
rubbish within 50m lead

PL
14.87

GP
14.87

SJ
14.87

TH
14.87

26.34

26.34

26.34

26.34

DD0067 Dismantling old plaster or skirting, raking out joints


and cleaning the surface for plaster including disposal
of rubbish within 50m lead

10.43

10.43

10.43

10.43

sq.m

Pipes
Demolishing of old S.W pipes including breaking joints, bed concrete, stacking of useful materials & disposal of
rubbish within 50m lead
DD0075 100mm dia
DD0076 150mm dia
DD0077 200mm dia

m
m
m

22.31
24.61
26.28

22.31
24.61
26.28

22.31
24.61
26.28

22.31
24.61
26.28

Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked
joints, melting of lead and making into blocks, stacking of pies at site and disposal of rubbish within 50m lead
DD0078 Up to 150 mm dia
DD0079 From 150 mm up to 300 mm
DD0080 Above 300 mm dia

m
m
m

70.41
106.21
174.89

70.18
105.60
174.45

70.36
106.07
175.59

70.63
106.50
175.83

Dismantling of G.I or HDPE pipes of diameter 100mm to 250mm including breaking bed concrete, clamps, etc. and
stacking of useful materials & disposal of rubbish within 50 m lead
DD0085 G.I Pipes
DD0086 H.D.P.E Pipes

m
m

20.23
26.69

20.23
26.69

20.23
26.69

20.23
26.69

Precast Walls
Dismantling of precast concrete or stone slabs in walls, partition walls etc. including stacking of useful materials &
disposal of rubbish within 50 m lead
DD0090 Up to 40 mm thickness
DD0091 Above 40 mm thickness and up to 74mm thickness

sq.m
sq.m

60.31
88.76

60.31
88.76

60.31
88.76

60.31
88.76

DD0095 Dismantling water bound macadam road including


stacking of useful materials & disposal of rubbish
within 50 m lead

sq.m

46.71

46.71

46.71

46.71

DD0096 Dismantling bituminous road including cutting,


stacking of useful materials & disposal of rubbish
within 50 m lead

sq.m

7.19

7.19

7.19

7.19

Roads

Cisterns

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

DD0100 Dismantling of flushing cistern of any size including


stacking of useful materials & disposal of rubbish
within 50 m lead

no

5
PL

GP

SJ

TH

180.24

180.24

180.24

180.24

Chapter 2: CLEARING AND GRUBBING


Clearing Grass
CG0001 Clearing grass including removal of rubbish within
50m of site

sq.m

2.21

2.21

2.21

2.21

CG0002 Clearing jungle including uprooting of vegetation &


trees of girth < 300mm & disposal within 50m of the
site

sq.m

6.99

6.99

6.99

6.99

Felling Trees (Manually)


Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and
disposal of rubbish within 50m lead

CG0010 Girth 300 to 600mm

each

65.19

65.19

65.19

65.19

CG0011 Girth 600 to 1200m


CG0012 Girth 1200 to 2400
CG0013 Girth > 2400mm

each
each
each

294.03
1368.49
2736.99

294.03
1368.49
2736.99

294.03
1368.49
2736.99

294.03
1368.49
2736.99

Felling Trees (Dozer)


Felling of trees including removal of roots and disposal of rubbish using bull dozer (excluding cutting of trunks,
branches & stacking)
CG0020 Girth 300 to 600mm

Each

76.69

76.69

76.69

76.69

CG0021 Girth 600 to 1200m


CG0022 Girth 1200 to 2400

Each
Each

288.17
576.33

290.31
580.62

289.58
579.17

289.24
578.49

CG0023 Girth > 2400m

Each

1046.15

1054.73

1051.82

1050.46

cu.m

47.13

47.13

47.13

47.13

Landslide Debris
CG0030 Clearing grass removal of landslide debris & surface
material including excavation & disposal within 50m
lead
Chapter 3: EARTH WORK
E x c a v a t i o n (Manually)
Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal of rubbish
within 50m lead and 1.5m lifts
EW0001 Ordinary Soil
EW0002 Hard Soil

sq.m
sq.m

7.07
9.93

Department of Engineering Services, MoWHS

7.07
9.93

7.07
9.93

7.07
9.93

Bhutan Schedule of Rates - 2015


Code

Description

Units

6
PL

GP

SJ

TH

2.61
6.26

2.61
6.26

2.61
6.26

Ploughing the existing ground to a depth 150mm to 250mm, and watering the same
EW0010 Ordinary Soil
EW0011 Hard Soil

sq.m
sq.m

2.61
6.26

Earth work in surface excavation, depth <300mm, width >1.5m, area >10 Sq.m in plan, including disposal of
excavated earth within 50m lead & 1.5m lift and disposed soil to be neatly dressed
EW0020 Ordinary Soil
EW0021 Hard Soil

sq.m
sq.m

13.05
18.25

13.05
18.25

13.05
18.25

13.05
18.25

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of
excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed
EW0030 Ordinary Soil

cu.m

89.69

89.69

89.69

89.69

EW0031 Hard Soil

cu.m

116.01

116.01

116.01

116.01

EW0032 Ordinary rock with or without blasting

cu.m

368.16

369.70

369.34

369.21

EW0033 Hard rock requiring blasting

cu.m

512.26

515.34

514.63

514.36

EW0034 Hard rock requiring chiselling (where blasting is prohibi cu.m

758.16

758.16

758.16

758.16

27.11

27.11

56.92

56.92

56.92

79.74
107.43

79.74
107.43

79.74
107.43

75.63
151.26

76.52
153.05

Extra for every additional lead of 25m beyond 50m up to 250m and deposit to a level up to 1.5m
EW0035 All Kinds of Soil

cu.m

27.11

27.11

Extra for every additional lead of 250m beyond 50m up to 1000m and deposit to a level up to 1.5m
EW0040 All Kinds of Soil

cu.m

56.92

Dozer Excavation
Earth work in excavation over areas by Dozer including levelling and dressing
EW0046 All kinds of Soil
EW0047 All kinds of rocks ( blasted)

cu.m
cu.m

79.74
107.43

Blasting Operation
Blasting of rocks complete excluding the cost of collection and stacking of blasted rock
EW0055 Ordinary rock
EW0056 Hard rock

cu.m
cu.m

77.99
155.98

76.70
153.40

Silent Blaster
Breaking of rocks using non-explosive blaster (silent blaster) in over areas, depth >300mm, width >1.5m, area
>10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish etc. complete
EW0065 Ordinary rock
EW0066 Hard rock

cu.m
cu.m

4414.01
4547.56

Department of Engineering Services, MoWHS

4467.44
4595.66

4807.12
4933.94

4467.57
4596.31

Bhutan Schedule of Rates - 2015

Code
Description
Units
PL
GP
SJ
TH
Breaking of rocks using non-explosive blaster (silent blaster) in foundation trenches width <1.5m, area <10sq.m on
plan including stacking of boulders or useful materials and disposal of rubbish etc. complete
EW0075 Ordinary rock
EW0076 Hard rock

cu.m
cu.m

4452.38
4610.12

4505.81
4658.22

4845.49
4996.50

4505.94
4658.87

Excavation & Banking


Earth work in rough excavation & banking of excavated earth in layers < 200 mm in depth for road, flood/guide
banks & depressions, including watering, power rolling, dressing, lead upto 50m & 1.5m lift
EW0085 All Kinds of Soil

cu.m

144.46

144.46

144.46

144.46

Banking excavated earth for road, flood banks, guide banks & depressions, in layers <200mm depth, including
watering, rolling & dressing up within 50m lead & 1.5m lift
EW0096 All Kinds of Soil
cu.m
EW0097 Deduction - for not rolling with power roller in layered cu.m
banking works

98.93
26.77

98.93
26.77

98.93
26.77

98.93
26.77

EW0098 Deduction - for not watering in layered, banking works cu.m

4.44

4.44

4.44

4.44

Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including
dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift
EW0105
EW0106
EW0107
EW0108
EW0109

Ordinary Soil
cu.m
Hard Soil
cu.m
Ordinary rock with or without blasting
cu.m
Hard rock requiring blasting
cu.m
Hard rock requiring chiselling (where blasting is prohibi cu.m

95.67
122.62
397.66
590.37
769.21

95.67
122.62
399.91
595.71
769.21

95.67
122.62
399.43
594.50
769.21

95.67
122.62
399.28
594.06
769.21

Extra for every additional lift of 1.5m or part thereof


EW0115 All kinds of soils

cu.m

10.43

10.43

10.43

10.43

EW0116 All kinds of rocks

cu.m

18.56

18.56

18.56

18.56

EW0125 Under water

cu.m

38.15

38.15

38.15

38.15

EW0126 In foul conditions

cu.m

30.65

30.65

30.65

30.65

Extra for trench, pit works per cu.m per m depth

Excavation/Refilling for Pipes/Cables


Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: All kinds of soil

EW0135 Pipes, cables etc. 80mm < dia < 300mm


EW0136 Pipes, cables etc. dia.>300 mm

m
m

133.91
209.02

Department of Engineering Services, MoWHS

133.91
209.02

133.91
209.02

133.91
209.02

Bhutan Schedule of Rates - 2015

Code
Description
Units
PL
GP
SJ
TH
Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or
without blasting
EW0155 Pipes, cables etc. 80mm < dia < 300mm

546.33

548.96

548.40

548.22

EW0156 Pipes, cables etc. dia.> 300mm

628.65

631.67

631.04

630.83

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Hard rock requiring
blasting
EW0165 Pipes, cables etc. 80mm < dia < 300mm
EW0166 Pipes, cables etc. dia.> 300mm

m
m

771.80
888.15

778.05
895.34

776.63
893.71

776.12
893.12

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring chiselling (where blasting is prohibited)
EW0175 Pipes, cables etc. 80mm < dia < 300mm

981.03

981.03

981.03

981.03

EW0176 Pipes, cables etc. dia.> 300mm

1128.97

1128.97

1128.97

1128.97

277.51
1411.21

277.51
1411.21

277.51
1411.21

277.51
1411.21

cu.m

61.62

61.62

61.62

61.62

cu.m

575.10

551.40

738.55

772.31

cu.m

163.97

161.99

164.96

163.51

Extra for excavating trenches for pipes, cables etc., 1.5 < depth < 3m
EW0185 All kinds of Soils
EW0186 All kinds of Rocks

m
m

Filling or bedding
EW0195 Filling of trenches, sides of foundations etc. in layers
<200mm using selected excavated earth, ramming etc.
within lead 50 m & lift 1.5m
EW0196 Providing &laying sand bedding, including watering,
ramming, dressing
EW0197 Providing &laying dry earth bedding, including
consolidating each deposited layer by watering,
ramming and dressing
Timbering for Trenches & cuts
Open timbering over areas including lagging & strutting of trenches, cuts (per sq.m face area timbered)
EW0205 Depth not exceeding 1.5m
EW0206 1.5m < depth < 3 m
EW0207 Depth > 3 m

sq.m
sq.m
sq.m

116.31
118.71
122.91

116.11
118.51
122.70

118.77
121.17
125.37

120.42
122.81
127.01

Close timbering over areas including lagging & strutting of trenches, cuts ( per sq.m face area timbered)

EW0215 Depth not exceeding 1.5m


EW0216 1.5m < depth < 3m

sq.m
sq.m

322.17
328.51

Department of Engineering Services, MoWHS

321.97
328.31

328.67
335.00

332.26
338.59

Bhutan Schedule of Rates - 2015


Code
Description
EW0217 3m < depth < 4.5m

Units
sq.m

PL
334.82

9
GP
334.62

SJ
341.31

TH
344.90

Close timbering including lagging & strutting of shafts, wells, cess pits, manholes (per sq.m face area
timbered
EW0225 Depth not exceeding 1.5m
EW0226 1.5m < Depth < 3m
EW0227 3m < Depth < 4.5m

sq.m
sq.m
sq.m

293.30
301.57
310.42

292.94
301.21
310.06

299.31
307.59
316.43

303.02
311.29
320.14

cu.m

94.65

94.65

94.65

94.65

sq.m

104.15

107.72

106.83

107.34

De-Watering
EW0235 Pumping out water caused by springs, river, seepage,
broken water mains, drains, and alike

Anti-Termite Treatment
EW0240 Providing and injecting chemical emulsion for Preconstruction anti-termite treatment using aldrin
emulsifiable 0.5% concentration

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration
EW0245 Along outside of foundation

228.30

231.87

230.98

231.49

EW0246 Along external walls below concrete \ masonry apron


EW0247 Under existing floors including drilling & plugging
12mm holes with mortar 1:2

m
sq.m

160.18
282.74

160.77
283.52

160.62
283.33

160.71
283.44

EW0248 Voids in masonry including drilling holes at 45 degree


& plugging with cement mortar 1:2)

177.28

177.66

177.57

177.62

EW0249 Woodwork (using chemical in oil or kerosene based


solution) including drilling & plugging 6mm holes

169.52

169.64

169.61

169.63

Chapter 4: DRAINAGE
Plinth Protection
Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well rammed,
finishing the top smooth
DR0001 With cement concrete 1:3:6, 20mm aggregates, laid
over 75mm thick layer of compacted gravel (40mm)

sq.m

293.11

296.46

308.20

310.07

DR0002 With cement concrete 1:3:6, 20mm gravel or shingles


laid over 75mm thick layer of compacted gravel
(40mm)

sq.m

258.95

267.34

275.22

280.34

DR0003 With cement concrete 1:3:6, 20mm aggregate, laid


over 75mm thick layer of compacted dry brick
aggregate(40mm)

sq.m

440.26

432.41

450.60

472.20

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
DR0004 With cement concrete 1:3:6, 20mm gravel or shingles
laid on 75mm thick layer of compacted dry brick
aggregate(40mm)

Units
sq.m

PL
410.55

10
GP
411.67

SJ
417.11

TH
439.76

Open Surface Drains


Constructing second class brick masonry open surface drain in cement mortar 1:4 including earth work in
excavation 100 mm thick concrete bed 1:5:10, 40mm aggregate and 25mm thick cement concrete 1:2:4,12 mm
aggregate for filling haunches including 12mm cement plastering 1:4 with a floating coat of neat cement and
disposal of surplus earth etc. complete
DR0010
DR0011
DR0012
DR0013

100mm x 200mm depth


150mm x 200mm depth
250mm x 300mm depth
300mm x 450mm depth

Extra for additional depth of brick masonry drain


DR0020 100mm wide ........per metre additional depth
DR0021 150mm wide ........per metre additional depth
DR0022 250mm wide ........per metre additional depth

m
m
m
m

489.21
512.62
711.84
1083.72

484.66
508.35
704.73
1063.21

512.00
536.31
744.99
1136.06

591.59
617.01
863.02
1347.80

m
m
m

1553.21
1558.13
1567.56

1520.44
1525.36
1534.80

1631.28
1636.19
1645.63

1983.49
1988.41
1997.85

Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in excavation,
100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4, 12mm aggregate for filling
haunches, including 20mm cement plaster with a floating coat of neat cement, disposal of surplus earth
DR0030
DR0031
DR0032
DR0033

100 x 200mm depth


150 x 200mm depth
250 x 300mm depth
300mm x 450mm depth

m
m
m
m

691.70
714.27
941.84
1752.51

706.12
728.93
961.50
1788.05

715.98
739.42
974.54
1813.41

735.01
759.53
998.75
1838.59

m
m
m

1924.08
1928.86
1938.43

1973.82
1978.61
1988.17

1985.22
1990.00
1999.57

2006.55
2011.34
2020.90

Extra for additional depth of random rubble masonry drain


DR0040 100mm wide ........per metre additional depth
DR0041 150mm wide ........per metre additional depth
DR0042 250mm wide ........per metre additional depth
Stoneware Pipe Drains & Fittings
Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1: including testing of
joints complete
DR0047 100mm dia.
DR0048 150mm dia.
DR0049 200mm dia.

m
m
m

334.42
694.11
1171.71

339.89
706.33
1193.17

341.53
709.78
1199.10

338.81
703.69
1188.41

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 including testing of
joints complete
DR0050 100mm dia.

335.17

340.63

342.32

339.59

DR0051 150mm dia.

695.17

707.38

710.86

704.76

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

11
PL

GP

SJ

TH

DR0052 200mm dia.

1173.11

1194.55

1200.54

1189.82

DR0053 230mm dia.

1185.59

1207.01

1213.08

1202.36

DR0054 250mm dia.

1595.18

1624.60

1632.76

1618.04

DR0055 300mm dia.

1962.63

1999.02

2009.16

1990.95

DR0056 350mm dia.

2344.04

2387.65

2399.94

2378.14

DR0057 400mm dia.

2736.46

2787.53

2801.95

2776.41

DR0058 500mm dia.

3559.89

3626.96

3645.59

3612.05

DR0059 600mm dia.

4255.98

4336.52

4358.81

4318.53

Providing and laying cement concrete 1:5:10, 40mm aggregates encasing Stone Ware pipes including
150mm concrete bed
DR0060 100mm dia S.W pipe
DR0061 150mm dia S.W pipe
DR0062 200mm dia S.W pipe

m
m
m

512.36
548.94
630.59

512.62
549.21
630.90

536.54
574.85
660.35

569.67
610.34
701.12

Providing & laying cement concrete 1:5:10, 40mm aggregates upto haunches of S.W pipes including
150mm concrete bed
DR0070 100mm dia. S\W pipe
DR0071 150mm dia. S\W pipe
DR0072 200mm dia. S\W pipe

m
m
m

343.45
377.22
439.21

343.62
377.41
439.43

359.66
395.02
459.93

381.86
419.41
488.33

Providing & fixing square mouth S.W gully-trap A-grade including C.I grating, C.I. cover with frame of 300 x 300
mm, brick masonry chamber
DR0080 100 x 100mm P Type
DR0081 150 x 100mm P or S Type
DR0082 180 x 150mm P or S Type

each
each
each

2095.07
2200.37
1776.60

2181.37
2221.52
1781.69

2435.38
2310.93
1877.22

2423.78
3081.96
2085.74

R.C P i p e s & F i t t i n g s
Providing & laying NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including
testing of joints etc. complete
DR0088
DR0089
DR0090
DR0091
DR0092
DR0093
DR0094
DR0095
DR0096
DR0097

100mm dia
150mm dia
225mm dia.
300mm dia.
450mm dia.
600mm dia.
750mm dia.
900mm dia.
1050mm dia.
1200mm dia.

m
m
m
m
m
m
m
m
m
m

483.22
528.59
700.48
848.36
1260.81
1766.19
2502.06
3153.49
6353.69
9110.80

Manholes

Department of Engineering Services, MoWHS

488.33
534.21
707.06
856.57
1273.19
1783.73
2527.21
3182.96
6415.60
9198.87

489.40
535.52
707.68
857.33
1274.65
1785.70
2529.21
3185.07
6415.80
9199.13

514.87
536.02
1029.04
1263.58
1651.68
2429.96
3456.28
3780.19
6381.31
9122.80

Bhutan Schedule of Rates - 2015


Code

Description

Units

12
PL

GP

SJ

TH

Constructing Brick masonry manhole in cement mortar 1:5, R.C.C top slab with 1:2:4 20mm aggregates,
foundation concrete 1:4:8 40mm aggregates, 12mm plaster in CM 1:3 finished with floating coat of neat cement and
making channels in cement concrete 1:2:4 20mm aggregates, neatly finished complete

DR0105 Inside dimension 900 x 800mm & 450mm deep


including C.I. cover & frame (weight >38 kg)
DR0106 Inside dimension 900 x 800mm & 600mm deep
including C.I. cover & frame (weight >38 kg)
DR0107 Inside dimension 1200 x 900mm & 900mm deep
including C.I. cover & frame weight >116 kg)

each

8171.25

8014.96

9062.64

9833.97

each

8852.20

8671.83

9786.74 10765.63

each

19455.86

19490.14

21460.56 22906.41

m
m

5553.11
6633.63

5379.68
6428.29

5864.20
7004.49

7329.39
8749.20

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

7754.43
5492.38
4362.00
3450.35
2959.46
2538.70

8559.59
6017.90
4747.67
3731.24
3183.94
2714.82

7962.50
5708.74
4582.70
3659.37
3162.19
2736.04

8238.21
5908.58
4744.66
3789.25
3274.80
2833.85

cu.m
MR0010 Lime mortar 1:2 (1 lime putty : 2 Brick Powder)
MR0011 Lime Mortar 1:1 :1 (1 Lime putty : 1 Brick Powder : 1 S cu.m

10868.55
13552.62

11061.41
13746.78

cu.m

358.15

355.77

359.33

357.59

cu.m
cu.m
cu.m

2320.98
1967.16
1489.46

2220.66
1883.80
1428.84

2470.27
2137.59
1661.64

2677.89
2304.60
1777.32

MR0025 Cement lime mortar 1:1:3 (1 cement : 1 lime putty : 3 sa cu.m


MR0026 Cement lime mortar 1:1:6 (1 cement : 1 lime putty : 6 sa cu.m

10741.75
7048.49

11201.15
7317.85

Extra for additional depth of manholes


DR0115 900 x 800mm
DR0116 1200 x 900mm
Chapter 5: MORTARS
Cement Mortar
MR0001
MR0002
MR0003
MR0004
MR0005
MR0006

Cement mortar 1:1 (1 cement : 1 sand)


Cement mortar 1:2 (1 cement : 2 sand)
Cement mortar 1:3 (1 cement : 3 sand)
Cement mortar 1:4 (1 cement : 4 sand)
Cement mortar 1:5 (1 cement : 5 sand)
Cement mortar 1:6 (1 cement : 6 sand)

Lime Mortar
12026.29 13165.10
12264.49 13888.82

Mud Mortar
MR0015 Mud mortar
White Cement Mortar
MR0020 White Cement mortar 1:2 (1 white cement : 2 sand)
MR0021 White Cement mortar 1:3 (1 white cement : 3 sand)
MR0022 White Cement mortar 1:5 (1 white cement : 5 sand)
Cement Lime Mortar

Chapter 6: CONCRETE WORK

Department of Engineering Services, MoWHS

10174.50 11094.37
6780.95 7371.76

Bhutan Schedule of Rates - 2015


Code

Description

Units

13
PL

GP

SJ

TH

Plain Cement Concrete


Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work
upto plinth level.
CW0001 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20
mm nominal size)
CW0002 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size)
CW0003 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0004 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 40
mm nominal size)
CW0005 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
CW0006 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 40
mm nominal size)
CW0007 1:3:6 (1 cement : 3 sand : 6 graded gravel/shingles 40
mm nominal size)
CW0008 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40
mm nominal size)
CW0009 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50
mm nominal size)
CW0010 1:4:8 (1 cement : 4 sand : 8 graded gravel/shingles 40
mm nominal size)
CW0011 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40
mm nominal size)
CW0012 1:5: 10 (1 cement : 5 sand : 10 graded crushed stone 50
mm nominal size)
CW0013 1:5:10 (1 cement : 5 sand : 10 graded gravel/shingles
40 mm nominal size)

cu.m

6194.58

6536.14

6407.10

6558.60

cu.m

4716.13

4893.86

4906.90

5007.31

cu.m

4229.60

4331.81

4423.20

4503.52

cu.m

4149.45

4284.17

4314.74

4487.84

cu.m

3610.64

3626.36

3800.31

3855.67

cu.m

3453.39

3507.16

3613.70

3777.57

cu.m

2896.86

3093.83

3041.44

3106.14

cu.m

3064.58

3073.92

3225.04

3379.14

cu.m

3064.58

3073.92

3225.04

3379.14

cu.m

2490.43

2647.68

2634.26

2686.93

cu.m

2730.00

2713.88

2879.81

3020.03

cu.m

2719.57

2709.61

2851.24

3009.61

cu.m

2171.02

2296.05

2305.32

2347.81

Providing and laying in position plain cement concrete in retaining walls, return walls, walls (any thickness)
including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses,
parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of
centering and shuttering
CW0020 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20
mm nominal size)
CW0021 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size)
CW0022 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0023 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 40
mm nominal size)
CW0024 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
CW0025 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 40
mm nominal size)
CW0026 1:3:6 (1 cement : 3 sand : 6 graded gravel/shingles 40
mm nominal size)

cu.m

6444.66

6786.21

6657.18

6808.68

cu.m

4967.44

5145.02

5158.29

5258.70

cu.m

4479.68

4581.89

4673.28

4753.59

cu.m

4350.33

4485.19

4515.57

4688.64

cu.m

3812.75

3828.47

4002.43

4057.78

cu.m

3655.50

3709.27

3815.81

3979.68

cu.m

3098.97

3295.94

3243.56

3308.25

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Pre-cast Cement Concrete

Units

14
PL

GP

SJ

TH

Providing and fixing upto floor five level pre-cast cement concrete lacing courses, copings, bed plates, anchor
blocks, plain window sills, shelves, louvers, steps, staircases etc. including hoisting and setting in position with
cement mortar 1:3 (1 cement : 3 sand) cost of required formwork and finishing smooth with 6 mm thick cement
plaster on exposed surface complete
CW0050 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)

cu.m

4084.15

4232.80

4289.02

4385.06

CW0051 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20


mm nominal size)

cu.m

3472.68

3533.75

3688.46

3762.89

cu.m
CW0060 Providing and fixing at or near ground level pre-cast
cement concrete in kerbs, edgings etc. as per approval
pattern and setting in position with cement mortar 1:3
(1 cement : 3 sand)
cost of required formwork and finishing smooth with 6
mm thick cement plaster on exposed surface complete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)

3984.44

4117.36

4196.11

4289.44

Providing and fixing upto floor five level pre-cast cement concrete solid block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing smooth with 6 mm thick cement plaster on exposed surface complete
CW0070 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0071 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)

cu.m

4397.23

4568.72

4630.99

4740.52

cu.m

3739.42

3825.46

3969.37

4054.27

Providing and fixing upto floor five level pre-cast cement concrete hollow block including hoisting and setting in
position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork and finishing smooth
with 6 mm thick cement plaster on exposed surface complete
CW0080 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0081 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
Lime Concrete

cu.m

2547.71

2642.13

2683.12

2745.28

cu.m

2148.39

2191.76

2280.04

2327.12

Providing and laying lime concrete, with 40 % mortar comprising of 1:1:1 lime mortar, in footings and bases for
columns excluding cost of formwork
CW0090 With graded stone aggregate of 40 mm
CW0091 with graded brick aggregate of 40 mm

cu.m
cu.m

6933.64
6933.64

Extra
Extra for laying cement concrete work

Department of Engineering Services, MoWHS

6913.04
6913.04

6465.13
6465.13

7256.21
7256.21

Bhutan Schedule of Rates - 2015

15

Code
Description
CW0135 Cement concrete work in super-structure above floor
five level for each four floors or part thereof

Units
cu.m

PL
GP
SJ
8% of the rates worked out for
respective items

TH

CW0136 In or under water, mud, including the cost of pumping


or bailing out water and removing slush etc.
complete....per metre depth (concrete not leaner than
1:2:4)

cu.m

524.21

541.94

526.19

531.62

CW0137 Cement concrete work under foul conditions

cu.m

437.91

437.91

437.91

437.91

CW0140 Providing and mixing water-proofing materials in in


the proportion 12 kg/cu.m or as prescribed by the
manufacturer

cu.m

794.02

662.96

758.32

1009.60

136.50
202.66

137.19
203.77

140.14
208.49

Chapter 7: DAMP-PROOFING
Concrete Course
Providing and laying damp-proof course with cement concrete 1:2:4, 12.5mm aggregate
DP0001
DP0002

25mm thick
40mm thick

sq.m
sq.m

133.43
197.75

Providing and laying damp-proof course with cement concrete 1:2:4, 20mm aggregate
DP0010

50mm thick

sq.m

240.61

245.93

250.42

253.81

sq.m

133.73

135.55

135.58

136.72

sq.m
sq.m
sq.m

87.16
111.35
132.44

84.18
97.12
133.39

93.28
110.21
139.40

95.65
122.60
156.89

sq.m

149.20

149.20

149.52

176.76

Bituminous Coatings
DP0015

Applying a coat of hot bitumen (maxphalt) 80\100 or


equivalent using 1.7 kg per sq.m including the surface
cleaning

Moisture Barriers
Providing and laying moisture barrier using plastic sheeting underlay
DP0020
DP0021
DP0022

50 micro-metre
100 micro-metre
200 micro-metre

Providing and laying Bitumen felt Type 3 in wall bases etc.


DP0030

Grade 2

Chapter 8: REINFORCED CONCRETE


Concreting Items
Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and
reinforcement - all work upto plinth level
RC0001

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


mm nominal size)

cu.m

6206.70

Department of Engineering Services, MoWHS

6548.26

6419.22

6570.72

Bhutan Schedule of Rates - 2015


Code
RC0002
RC0003

Description
Units
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

16

PL
4728.25

GP
4905.98

SJ
4919.02

TH
5019.43

4241.72

4343.93

4435.32

4515.64

Providing & laying in position reinforced cement concrete work in walls (any thickness) including attached
pilasters buttresses, piers, abutments etc. upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0005
RC0006
RC0007

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

6208.87

6550.43

6421.39

6572.89

4730.42

4908.15

4921.20

5021.60

4223.04

4325.25

4416.64

4496.95

Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns ,
pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement.
RC0009
RC0010
RC0011

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

6254.75

6596.31

6467.27

6618.77

4776.30

4954.03

4967.07

5067.48

4289.77

4391.98

4483.37

4563.68

Providing & laying in position reinforced cement concrete work in suspended floor, roofs having slope upto 15o,
landings, balconies, shelves and chajjas upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0013
RC0014
RC0015

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

6319.49

6661.04

6532.00

6683.51

4841.04

5018.76

5031.81

5132.22

4354.50

4456.72

4548.10

4628.42

Providing & laying in position reinforced cement concrete work in beams, lintels, bands, plain window sills,
staircases, spiral staircases upto floor five level excluding the cost of centering, shuttering and reinforcement
RC0017
RC0018
RC0019

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

6245.79

6587.34

6458.30

6609.80

4767.33

4945.06

4958.11

5058.52

4280.80

4383.02

4474.40

4554.72

Providing & laying in position reinforced cement concrete work in kerbs, steps and the like upto floor five level
excluding the cost of centering, shuttering and reinforcement

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
RC0020
RC0021
RC0022

Description
1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)

17

Units
cu.m

PL
6245.79

GP
6587.34

SJ
6458.30

TH
6609.80

cu.m

4767.33

4945.06

4958.11

5058.52

cu.m

4280.80

4383.02

4474.40

4554.72

Providing & laying in position reinforced cement concrete work in arches and arch ribs upto floor five level
excluding the cost of centering, shuttering and reinforcement
RC0023
RC0024
RC0025

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

7110.63

7452.18

7323.15

7474.65

5632.18

5809.91

5822.95

5923.36

5145.65

5247.86

5339.25

5419.56

Providing & laying in position reinforced cement concrete work in domes, vaults, shells folded plates and roofs
having more than 15 upto floor five level excluding the cost of centering, shuttering and reinforcement
RC0026
RC0027
RC0028

1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20


cu.m
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)

7183.94

7528.09

7402.36

7557.69

5637.37

5818.95

5831.81

5934.30

5142.50

5246.74

5339.97

5421.89

Providing & laying in position reinforced cement concrete work in vertical and horizontal fins individually or
forming box louvers, fascias and eaves boards - upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0029 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock cu.m 05170
20 mm nominal size)

05331

05385

05472

Traditional Cornices
Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement &
decorative painting cost as per standard design (Measurement to be taken along the cornice and wall junction)
RC0030
RC0031

RC0032
RC0033
RC0034

Single Storied building, including Phana


Multi-Storied building..at floor 2 level including the
cost of lhanglag and at other floors where Lhanglag is
provided
Multi-Storied building.. at all middle floor levels
(excluding the cost of phana)
Phana
Lintel Cornice (only cornice portion at external face)

m
m

1324.45
1335.14

1332.30
1342.87

1334.91
1345.40

1340.72
1351.07

1780.67

1797.80

1802.47

1814.10

m
m

744.53
756.41

746.75
759.39

747.02
760.73

748.50
763.17

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

18
PL

GP

SJ

TH

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including finishing
with 6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement & decorative
painting cost as per standard design (Measurement to be taken along the cornice and wall junction)
RC0040
RC0041

RC0042
RC0043
RC0044

Single Storied building, including Phana


Multi-Storied building..at floor 2 level and at other
floors where Lhanglag is provided including the cost of
lhanglag
Multi-Storied building.. at all middle floor levels
(excluding the cost of phana)
Phana
Lintel cornice (only cornice portion at external face)

m
m

1305.85
1316.79

1311.07
1321.93

1316.33
1327.07

1321.38
1332.00

1877.33

1888.46

1899.14

1909.07

m
m

741.07
749.00

742.80
750.93

743.56
753.32

744.90
755.46

25.75

27.97

26.00

26.67

Extra for R.C Works


RC0050

RC0051

Applying cement slurry on R.C.C slabs using 2.75 kg sq.m


per sq.m for receiving C.C. floor including roughening,
cleaning & dampen the surface
Extra for R.C.C work above floor 5 level for every four cu.m
floors or part thereof, excluding cost of reinforcement

8% of respective item rates

RC0052

Extra for rendering in cement mortar 1:2, the top of


suspended floors\landings\staircase treads and risers

sq.m

36.13

37.70

36.78

37.38

RC0053

Rendering smooth finishing of the exposed surface


with 6mm thick C.M 1:3
Providing throating, plastering drip and moulding to
R.C.C chajjas

sq.m

81.06

83.84

82.65

83.82

19.78

19.78

19.78

19.78

RC0054

Precast Items
Providing & fixing, below & including floor 2 level, Precast R.C.C jali 1:2:4, 12.5mm aggregate, reinforced with
mild steel wire 1.6mm dia., including roughening, cleaning, fixing, finishing in cement mortar 1:3, excluding
plastering of the jambs, sills, soffits
RC0060
RC0061
RC0062

50 mm thick
40 mm thick
25 mm thick

sq.m
sq.m
sq.m

871.56
788.55
724.16

779.14
694.90
628.67

826.60
742.08
675.44

930.18
844.48
776.06

Providing & fixing, below & including floor 2 level, Precast R.C.C 1:2:4, 20mm aggregate including finishing,
plastering with 6mm cement plaster 1:3 and formwork, but excluding reinforcement cost
RC0070
RC0071
RC0072

String courses, copings, bed plates, anchor blocks,


plain window sills
Small lintels & joists < 1.5m clear span, shelves
Joists, span > 1.5m, shelves

cu.m

18200.97

18280.66

18418.36 18533.48

cu.m
cu.m

16333.14
14642.66

16403.96
14732.79

16543.20 16650.48
14825.22 14919.84

Steel Reinforcement

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
RC0083

Description
Units
Providing & fixing Thermo-Mechanically Treated
kg
reinforcement bar (Yield Strength 500 MPa) for R.C.C
work including cutting, bending, binding and placing
in position complete

PL
67.63

19
GP
73.45

SJ
79.78

TH
78.32

Form work
Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork
RC0090
RC0091
RC0092

Foundation and plinth etc.


Walls, pilasters, buttresses, string course etc.
Lintels, beams, girders, bresummers, cantilevers etc.

sq.m
sq.m
sq.m

252.04
506.25
343.80

251.74
505.61
342.79

255.84
510.96
349.72

258.34
514.68
354.81

RC0093
RC0094

Columns, pillars, post, struts etc.


Staircase (except spiral staircase) excluding landing

sq.m
sq.m

429.48
348.39

428.63
348.13

435.30
352.59

440.03
355.20

RC0095

Suspended floor, roof, landing, shelves and their


supports, balconies, chajjas, etc.
Spiral stair case excluding landing
Arches, curved surfaces
Domes, vaults, shell roof

sq.m

545.68

544.21

552.63

559.26

sq.m
sq.m
sq.m

428.36
1681.11
1909.30

427.74
1688.80
1918.75

433.21
1707.13
1946.69

436.94
1735.72
1976.89

67901.67
19451.24

68292.57
19512.35

967.94

975.35

RC0096
RC0097
RC0098

Expansion Joints
Providing & filling or fixing in position in expansion joints
cu.m
RC0105 Blown bitumen
RC0106 Bitumen mix filler of proportion 80 kg of hot bitumen, cu.m
1 kg of cement and 0.25 cum of sand for expansion
joints
sq.m
RC0107 12 mm bitumen impregnated fibre board

68728.06 70374.78
19778.57 20228.27

977.36

1061.00

Providing and fixing sheet-covering over expansion joints with iron screws as per design to match the colour shade
of the distemper or wall treatment
RC0116

Aluminium fluted strip 3.15x150mm

477.66

469.09

465.17

510.34

Design Mix Concrete


Providing & laying in position machine batched, machine mixed and machine vibrated M-20 design mix cement
concrete for reinforced cement concrete structural elements, excluding the cost of centering, shuttering and
reinforcement, Including admixtures in recommended proportions (as per IS 9103) to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per the direction of the engineer

Note: Mix design should be done by a qualified engineer


RC0130
RC0131
RC0132

All work upto plinth level


All work from plinth level to floor five level
Walls, Columns, Pillars, posts and struts

cu.m
cu.m
cu.m

4371.97
4508.66
4560.80

Department of Engineering Services, MoWHS

4476.43
4613.12
4665.25

4567.90
4704.60
4756.73

4649.50
4786.19
4838.33

Bhutan Schedule of Rates - 2015


Code
RC0133

Description
Units
Beams, Plinth beams, girders, bresummers, cantilevers, cu.m
suspended floors, lintels, roofs and staircases including
spiral staircases, shelves etc.

PL
4636.48

20
GP
4740.94

SJ
4832.41

TH
4914.01

Add or deduct for providing richer or leaner mixes respectively at all floors providing
RC0135
RC0136
RC0137

Providing M-25 grade RCC instead of M-20 grade RCCcu.m


Providing M-30 grade RCC instead of M-20 grade RCC cu.m
Providing M-35 grade RCC instead of M-20 grade RCC cu.m

increase/decrease rate by 3% as applicable


140.25
156.37
142.05
146.99
280.51
312.75
284.10
293.97

Chapter 9: BRICK WORK


O n e - B r i c k M a s o n r y (250mm)
Providing & laying Second-Class Brick work in Foundation & Plinth
BW0001
BW0002
BW0003
BW0004
BW0005

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6
In mud mortar

cu.m
cu.m
cu.m
cu.m
cu.m

6355.01
6127.09
6004.37
5899.18
5301.70

6159.19
5905.09
5768.26
5650.98
5008.88

6716.18
6485.35
6361.05
6254.52
5608.00

8461.15
8222.30
8093.69
7983.45
7312.04

cu.m
cu.m
cu.m

248.62
2215.44
138.09

248.62
2113.48
138.09

248.62
2322.20
138.09

248.62
2916.88
138.09

cu.m

60.47

60.47

60.47

60.47

sq.m

84.91

102.13

94.37

99.07

cu.m

264.84

221.15

252.94

336.70

Extras
BW0010 Extra for brick work in square or rectangular pillars
BW0011 Extra for brick in circular pillars
BW0012 Extra for brick work in superstructure above plinth
level, up to floor two level
BW0013 Extra for brick work in superstructure above floor two
level...per floor
BW0014 Extra for providing hoop iron 25x1.6mm or equivalent
reinforcement in masonry at every third course,
embedded in cement mortar
BW0015 Extra for mixing water-proofing compound in cement
mortar
H a l f - B r i c k M a s o n r y (125mm)
Providing & laying Second-Class Half-brick Masonry (125 mm) in superstructure below floor 2 level
BW0020 In cement mortar 1:3
BW0021 In cement mortar 1:4

sq.m
sq.m

828.72
805.93

801.02
775.61

873.33
850.25

1095.15
1071.27

sq.m

7.09

7.09

7.09

7.09

sq.m

29.24

24.87

28.05

36.43

sq.m

468.76

453.48

496.06

628.82

Extras for Half-Brick


BW0030 Extra for half-brick masonry in superstructure above
floor 2 level...per floor
BW0031 Extra for mixing water-proofing compound in cement
mortar
BW0032 75mm thick brick masonry (second class bricks) in
cement mortar 1:3 in partitions etc. in superstructure
below floor 2 level

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Units
BW0033 Extra for 75mm brick masonry in cement mortar 1:3 in sq.m
partitions etc. in superstructure above floor 2
level...Per floor

PL
7.09

21
GP
7.09

SJ
7.09

TH
7.09

Traditional Cornices
Providing & laying second class brick work in Bhutan type Traditional Cornices in cement mortar 1:3, including
12mm plaster in cement mortar 1:5, but excluding decorative painting.
(Measurement to be taken along the cornice and wall junction)
BW0040 Floor one level including lhanglag
BW0041 Middle Floor levels excluding phana

m
m

814.03
1336.76

809.48
1321.66

828.49
1372.09

892.02
1532.26

sq.m
sq.m
sq.m
sq.m

62.15
67.73
91.29
121.28

63.31
68.89
92.45
123.05

62.82
68.39
91.96
122.29

63.30
68.88
92.44
123.04

Pointing
Pointing on brickwork with cement mortar 1:3
BW0050
BW0051
BW0052
BW0053

Flush pointing
Ruled pointing
Cut, weather struck pointing
Raised & cut pointing

Interlocking Cement Earth Block (300mmX150mmX100mm)


Providing & laying ICEB (300mmX150mmX100mm) in Foundation & Plinth
cu.m
cu.m
cu.m
cu.m
cu.m

8021.41
7809.94
7753.28
7693.29
7381.71

8689.65
8454.97
8390.70
8323.82
7990.03

9932.23
9715.96
9660.66
9599.91
9255.09

6841.81
6617.89
6560.80
6497.94
6138.57

BW0070 Extra for ICEB work in square or rectangular pillars


cu.m
cu.m
BW0071 Extra for ICEB work in superstructure above plinth
level, up to floor two level
BW0072 Extra for ICEB work in superstructure above floor two cu.m
level...per floor

130.23
73.05

130.23
73.05

130.23
73.05

130.23
73.05

31.53

31.53

31.53

31.53

1457.93
1450.97

991.64
984.44

BW0060
BW0061
BW0062
BW0063
BW0064

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6
In mud mortar

Extras

Interlocking Cement Earth Block (300mmX150mmX100mm)


Providing & laying ICEB(300mmX150mmX100mm) in superstructure below floor 2 level
BW0080 In cement mortar 1:3
BW0081 In cement mortar 1:4

sq.m
sq.m

1174.46
1167.59

Extras

Department of Engineering Services, MoWHS

1269.52
1261.86

Bhutan Schedule of Rates - 2015


Code
Description
BW0090 Extra for ICEB work in superstructure above floor 2
level...per floor

Units
sq.m

PL
7.41

22
GP
7.41

SJ
7.41

TH
7.41

Interlocking Cement Earth Block (250mmX125mmX100mm)


Providing & laying ICEB (250mmX125mmX100mm) in Foundation & Plinth
cu.m
cu.m
cu.m
cu.m
cu.m

6718.81
6626.53
6537.61
6531.57
6304.80

7224.08
7121.18
7022.04
7015.32
6771.06

8051.75
7958.28
7868.22
7862.11
7611.51

6127.89
6031.18
5937.99
5931.67
5670.11

cu.m

186.07

186.07

186.07

186.07

BW0111 Extra for ICEB work in superstructure above plinth


cu.m
level, up to floor two level
BW0112 Extra for ICEB work in superstructure above floor two cu.m
level...per floor

104.37

104.37

104.37

104.37

45.04

45.04

45.04

45.04

BW0100
BW0101
BW0102
BW0103
BW0104

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6
In mud mortar

Extras
BW0110 Extra for ICEB work in square or rectangular pillars

Interlocking Cement Earth Block (250mmX125mmX100mm)


Providing & laying ICEB(250mmX125mmX100mm) in superstructure below floor 2 level
BW0120 In cement mortar 1:3
BW0121 In cement mortar 1:4

sq.m
sq.m

869.58
861.23

932.38
923.07

1035.60
1027.15

794.87
786.13

sq.m

8.98

8.98

8.98

8.98

5079.91
4852.00
4729.27
4624.08

5176.33
4922.22
4785.39
4668.11

5135.09
4904.25
4779.96
4673.42

5175.57
4936.72
4808.11
4697.87

8362.40
8134.48
8011.76
7906.57

8458.81
8204.71
8067.88
7950.60

8417.57
8186.74
8062.44
7955.91

23885.26
23646.41
23517.80
23407.56

Extras
BW0130 Extra for ICEB work in superstructure above floor 2
level...per floor

Concrete Hollow Block Brick (390mm x 190mm x 190mm)


Providing & laying concrete block brick in Foundation & Plinth
BW0140
BW0141
BW0142
BW0143

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6

cu.m
cu.m
cu.m
cu.m

Concrete Solid Brick (240mm x 115mm x 80mm)


Providing & laying concrete block brick in Foundation & Plinth
BW0145
BW0146
BW0147
BW0148

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6

cu.m
cu.m
cu.m
cu.m

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Concrete Porous Brick (230mm x 110mm x 70mm)

Units

23
PL

GP

SJ

TH

cu.m
cu.m
cu.m
cu.m

9570.01
9342.09
9219.37
9114.18

9666.42
9412.32
9275.49
9158.21

9625.18
9394.35
9270.05
9163.52

9665.67
9426.82
9298.21
9187.97

BW0170 Extra for concrete block brick in square or rectangular


cu.m
pillars
BW0171 Extra for concrete block brick in circular pillars
cu.m

248.62
1774.41

248.62
1774.41

248.62
1774.41

248.62
1774.41

cu.m

138.09

138.09

138.09

138.09

BW0173 Extra for concrete block brick work in superstructure cu.m


above floor two level...per floor
BW0174 Extra, for providing hoop iron 25x1.6mm or equivalent sq.m
reinforcement in masonry at every third course,
embedded in cement mortar

60.47

60.47

60.47

60.47

84.91

102.13

94.37

99.07

Extra, for mixing water-proofing compound in cement cu.m


BW0175 mortar

264.84

221.15

252.94

336.70

Providing & laying concrete block brick in Foundation & Plinth


BW0150
BW0151
BW0152
BW0153

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6

Extras

BW0172 Extra for concrete block brick work in superstructure


above plinth level, up to floor two level

Concrete Hollow Block Brick (390mm x 190mm x 190mm)


Providing & laying concrete Hollow block brick Masonry (190 mm) in superstructure below floor 2 level

BW0190 In cement mortar 1:3


BW0191 In cement mortar 1:4

sq.m
sq.m

882.37
859.58

892.01
866.60

887.89
864.81

891.94
868.05

Concrete Partition Hollow Block (390mm x 190mm x 90mm)


Providing & laying Concrete Partition Hollow Block Masonry (90 mm) in superstructure below floor 2
level
BW0194 In cement mortar 1:3
BW0195 In cement mortar 1:4

sq.m
sq.m

780.04
757.25

789.69
764.28

785.56
762.48

789.61
765.73

1004.39
981.31

1008.44
984.55

Concrete Solid Brick (240mm x 115mm x 80mm)


Providing & laying Concrete Solid Block Masonry (115 mm) in superstructure below floor 2 level
BW0198 In cement mortar 1:3
BW0199 In cement mortar 1:4

sq.m
sq.m

998.87
976.08

1008.51
983.10

Concrete Porous Brick (230mm x 110mm x 70mm)


Providing & laying Concrete Porous Brick Masonry (110 mm) in superstructure below floor 2 level
BW0202 In cement mortar 1:3

sq.m

1097.89

Department of Engineering Services, MoWHS

1107.54

1103.41

1107.46

Bhutan Schedule of Rates - 2015


Code
Description
BW0203 In cement mortar 1:4

24

Units
sq.m

PL
1075.10

GP
1082.13

SJ
1080.33

TH
1083.58

sq.m

7.09

7.09

7.09

7.09

29.24

24.87

28.05

36.43

sq.m
sq.m
sq.m
sq.m

62.15
67.73
91.29
121.28

63.31
68.89
92.45
123.05

62.82
68.39
91.96
122.29

63.30
68.88
92.44
123.04

cu.m

476.35

474.16

478.90

478.67

Extras
BW0220 Extra, for concrete block half-brick masonry in
superstructure above floor 2 level...per floor
BW0221 Extra, for mixing water-proofing compound in cement
mortar

sq.m

Pointing
Pointing on concrete block brick work with cement mortar 1:3
BW0230
BW0231
BW0232
BW0233

Flush pointing
Ruled pointing
Cut, weather struck pointing
Raised & cut pointing

Chapter 10: STONE/MUD


Rammed Mud Work
SM0001 Constructing rammed mud walls in superstructure
including the cost of form work
Random Rubb le Maso nry
Providing & laying Random Rubble Masonry with hard stone in foundation & plinth
SM0005
SM0006
SM0007
SM0008

In cement mortar 1:4


In cement mortar 1:5
In cement mortar 1:6
Hammer dressed, in mud mortar

cu.m
cu.m
cu.m
cu.m

2593.68
2431.68
2292.83
1623.31

2676.21
2495.60
2340.79
1612.36

2678.28
2514.21
2373.58
1639.33

2709.46
2539.69
2394.18
1627.08

cu.m

183.78

183.78

183.78

183.78

cu.m

60.47

60.47

60.47

60.47

cu.m

267.19

267.19

267.19

267.19

cu.m

529.75

529.75

529.75

529.75

cu.m

251.75

210.25

240.45

320.02

Ext ras
SM0015 Extra for random rubble masonry with hard stone in
superstructure above plinth, below & including floor 2
level
SM0016 Extra for random rubble masonry with hard stone in
superstructure above floor 2 level
SM0017 Extra for random rubble masonry work with hard stone
in square or rectangular pillars
SM0018 Extra for random rubble masonry work with hard stone
in circular pillars
SM0019 Extra for random rubble masonry work with hard stone
for mixing water-proofing materials in cement mortar

Cours ed Rubble Maso nry

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

25

Code
Description
Units
PL
GP
SJ
Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth
SM0025
SM0026
SM0027
SM0028

In cement mortar 1:3


In cement mortar 1:4
In cement mortar 1:5
In cement mortar 1:6

TH

cu.m
cu.m
cu.m
cu.m

3084.40
2810.91
2663.64
2537.41

3188.92
2883.99
2719.80
2579.06

3167.80
2890.80
2741.65
2613.80

3203.54
2916.92
2762.58
2630.30

cu.m

173.22

173.22

173.22

173.22

cu.m

60.47

60.47

60.47

60.47

cu.m

278.26

278.26

278.26

278.26

cu.m

811.66

808.40

816.66

812.92

cu.m

59.03

59.03

59.03

59.03

cu.m

191.43

191.43

191.43

191.43

cu.m

304.11

253.86

290.42

386.74

SM0050 Dry hand packed rubble masonry with stone boulders


>0.01 Cu.m
SM0051 Dry hand packed rubble masonry hammer dressed
(facing), with stone-boulder > 0.01 cu.m

cu.m

1268.20

1258.03

1283.83

1272.15

cu.m

1403.53

1392.35

1420.72

1407.87

SM0052 Dry hand packed rubble masonry chisel dressed


(facing) with stone-boulder > 0.01 cu.m

cu.m

1513.41

1502.23

1530.60

1517.76

SM0060 Providing and laying with hard stone (average volume


0.008 Cu.m) hand packed stone masonry in cement
concrete mortar 1:2:4, 20mm aggregates

cu.m

2702.03

2726.99

2782.42

2793.07

SM0061 Providing & laying with hard stone (average volume


0.008 Cu.m) hand packed stone masonry in cement
concrete mortar 1:3:6, 20mm aggregates

cu.m

2473.41

2468.60

2553.90

2556.09

SM0062 Providing and laying hammer dressed stone masonry


with hard stone (average volume 0.008 Cu.m) in
cement concrete mortar 1:2:4 20mm aggregates

cu.m

2834.14

2858.09

2916.10

2925.58

SM0063 Providing and laying hammer dressed stone masonry


with hard stone (average volume 0.008 Cu.m) in
concrete mortar 1:3:6 20mm aggregates

cu.m

2624.29

2618.47

2706.34

2707.37

E xt ras
SM0035 Extra for C.R. masonry with hard stone in
superstructure above plinth, below & including floor 2
level
SM0036 Extra for C.R. masonry with hard stone in
superstructure above floor 2 level
SM0037 Extra for C.R masonry with hard stone in square or
rectangular pillars
SM0038 Extra for C.R masonry with hard stone in circular
pillars
SM0039 Extra for C.R masonry with hard stone chisel dressed
in foundations and plinth
SM0040 Extra for C.R masonry with hard stone chisel dressed
in superstructure above plinth, below & including floor
2 level
SM0041 Extra for C.R masonry with hard stone for mixing
water-proofing materials
Dry Hand Packed Rubb le Mason ry

Stone Masonry in Concrete Mortar

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

26

Code
Description
SM0064 Providing and laying rubble masonry chisel dressed
(facing) with hard stone (average volume 0.008 cu.m)
in concrete mortar 1:2:4 20mm aggregates

Units
cu.m

PL
3273.94

GP
3297.89

SJ
3355.89

TH
3365.38

SM0065 Providing and laying rubble masonry chisel dressed


(facing) with hard stone (average volume 0.008 cu.m)
in concrete mortar 1:3:6 20mm aggregates

cu.m

3064.09

3058.26

3146.14

3147.16

SM0070 Providing and laying Hammer dressed dry stone soling cu.m

1079.14

1067.96

1096.33

1083.49

SM0071 Providing and laying Chisel dressed dry stone soling

cu.m

1136.07

1124.89

1153.26

1140.41

cu.m
SM0072 Providing and laying Hand packed stone filling or
soling with stones
m
SM0073 Providing and laying Hammer dressed stone edging
150 x 250 mm with stones including excavation,
refilling and disposal of surplus earth within 30 m lead

878.79

868.62

894.41

882.73

63.34

62.87

64.06

63.52

Stone Soling Filling & Edging

Stone Pavem ent Hammer Dressed


Providing and laying hammer dressed 150mm thick flat stone pavement with hammer dressed stone
edging 150mm wide & 250mm deep on both sides, including grouting joints
SM0080 With cement concrete mortar 1:3:6, 12mm aggregate
SM0081 With cement mortar 1:3
SM0082 With sand or earth etc.

sq.m
sq.m
sq.m

351.55
272.23
301.51

350.83
271.15
298.98

359.78
275.77
305.66

360.87
273.88
302.87

F l a t S t o n e (D o l e p) P a v i n g
Providing & laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the
cost of bedding)
SM0090 20mm
SM0091 30mm
SM0092 40mm

sq.m
sq.m
sq.m

312.08
401.41
490.73

311.54
400.59
489.64

315.85
407.05
498.25

316.62
408.21
499.80

399.93
488.98

406.39
497.59

407.55
499.14

Providing and laying hammer dressed dry dolep paving including preparation of bed
SM0093 30mm
SM0094 40mm

sq.m
sq.m

400.75
490.07

Providing & laying all sides chisel dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding
the cost of bedding)
SM0100 20mm
SM0101 30mm
SM0102 40mm

sq.m
sq.m
sq.m

397.41
486.73
603.86

Department of Engineering Services, MoWHS

397.04
486.09
602.94

401.36
492.57
611.57

402.24
493.83
613.23

Bhutan Schedule of Rates - 2015


Code
Description
Units
PL
Providing and laying chisel dressed dry dolep paving including preparation of bed
SM0103 30mm
SM0104 40mm

sq.m
sq.m

27
GP

SJ

TH

484.15
601.28

483.33
600.19

489.79
608.80

490.96
610.35

67.17
71.52
131.44

68.06
72.40
132.90

67.68
72.02
132.27

68.05
72.39
132.89

Pointing
Providing & laying pointing on stone work with cement mortar 1:3
SM0110 Flush pointing
SM0111 Ruled pointing
SM0112 Raised and cut pointing

sq.m
sq.m
sq.m

Gabion Work
Providing & filling hand-packed stone in G.I mesh 4mm (8swg)including supplying and weaving of mesh
complete
SM0120 Double-knotted mesh....100mm
SM0121 Double-knotted mesh....150mm
SM0122 Chain-link mesh....100mm

cu.m
cu.m
cu.m

2037.70
1969.11
2630.54

2286.04
1860.25
2239.54

2523.36
2523.36
2760.91

2623.05
2629.96
2889.16

Precast Stone Masonry


Providing & laying Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in foundation and plinth
SM0130 30 cms thick
SM0131 20 cms thick

sq.m
sq.m

1021.93
687.55

1019.67
685.17

1055.27
709.95

1072.45
721.53

Providing & laying Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in superstructure up to
floor two level
SM0140 20 cms thick
SM0141 15 cms thick
SM0142 10 cms thick

sq.m
sq.m
sq.m

690.68
518.58
350.82

688.30
516.81
349.58

713.08
535.40
362.06

724.66
544.10
367.87

sq.m

71.59

71.59

71.59

71.59

Extra for Precast Stone Masonry blocks


SM0150 Extra for Precast Stone Masonry blocks in
superstructure above floor two level...per floor
Chapter 11: WOOD WORK
Dressed Timber Framing
Providing & fixing in position dressed wood work in frames of doors, windows, clerestory windows and other
frames, wrought and framed
WW0001 Blue pine
WW0002 Champ wood
WW0003 Mixed Conifer

cu.m
cu.m
cu.m

18514.05
18514.05
18514.05

Department of Engineering Services, MoWHS

18514.05
18514.05
18514.05

18151.86 18253.25
18151.86 18253.25
18151.86 18253.25

Bhutan Schedule of Rates - 2015

28

Code
Description
Units
PL
GP
SJ
TH
Providing & fixing blue pine moulded beading to door, window frames with iron screws including plugs, priming
coat on unexposed surfaces
WW0010 50 x 12 mm
WW0011 50 x 20 mm

m
m

50.81
56.67

50.80
56.66

50.42
56.11

50.84
56.62

Providing & fixing joists, including hoisting, applying wood preservative on unexposed surfaces
WW0020 Blue pine
WW0021 Mixed Conifer

cu.m
cu.m

16771.13
16046.76

16764.98
16040.61

16386.41 16509.28
16272.87 16414.84

Providing & fixing Eaves board (225x25mm) with moulding fitted and fixed with necessary screws
WW0030 Mixed Conifer

115.94

115.94

117.39

118.09

Traditional Cornices
Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design in Mixed
Conifer, including applying wood preservative on unexposed surfaces, excluding decorative painting
(Measurement to be taken along the cornice and wall junction line)
WW0035
WW0036
WW0037
WW0038
WW0039

At floor one level including lhanglag


At all other floor levels (excluding phana)
For single-storied structure including phana
Phana
Lintel level

m
m
m
m
m

1661.22
2321.90
2072.42
973.53
1438.69

1655.37
2313.12
2062.76
967.68
1438.69

1655.73
2313.07
2060.21
959.98
1456.68

1683.92
2355.06
2105.19
984.26
1465.40

2139.36
2142.82

2143.04
2145.91

Providing & fixing traditional wooden Tshegay for windows\railing etc. as per standard design
WW0045 In mixed conifer
WW0046 In blue pine

sq.m
sq.m

2131.79
2153.86

2131.79
2153.86

WW0055 Providing & fixing Mixed Conifer (undressed) in wall- cu.m


frames etc.

16228.33

16228.33

Undressed Timber Framing


16476.97 16597.46

Providing & fixing roof framing, in trusses, purlins, rafters, posts, post plates including hoisting, etc.
WW0060 Mixed Conifer
WW0061 Blue Pine

cu.m
cu.m

19115.05
19839.42

19115.05
19839.42

19363.69 19484.18
19477.23 19578.62

Providing & fixing gussets for timber trusses including wood preservative (coal tar)
WW0070 12mm phenolic plywood

sq.m

502.59

566.66

538.94

508.13

Wall and ceiling Linings


Providing and fixing to frames (wall or ceiling) Gypsum plaster board including finishing of joints smooth complete
(excluding cost of frame)
WW0080 10 mm thick

sq.m

357.41

Department of Engineering Services, MoWHS

390.30

355.81

450.48

Bhutan Schedule of Rates - 2015


Code
Description
WW0081 12 mm thick
WW0082 15 mm thick

Units
sq.m
sq.m

PL
379.00
419.00

29
GP
438.07
504.82

SJ
379.08
416.13

TH
510.16
645.81

Providing & fixing to frames (wall or ceiling) blue pine plain lining, tongued and grooved, including necessary
fixtures, wooden plugs and priming coat on unexposed surfaces (excluding cost of frames)
WW0090 12 mm thick
WW0091 20 mm thick

sq.m
sq.m

278.32
355.56

278.21
355.56

271.76
347.97

277.56
350.09

Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc. complete
(excluding cost of frames)
WW0100
WW0101
WW0102
WW0103

6 mm
10 mm
12 mm
18 mm

sq.m
sq.m
sq.m
sq.m

549.36
701.68
855.08
1147.88

600.22
788.18
1077.69
1285.92

622.30
795.97
996.62
1287.96

592.19
829.93
978.14
1278.57

Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame)
WW0110
WW0111
WW0112
WW0113

8 mm
10 mm
12 mm
18 mm

sq.m
sq.m
sq.m
sq.m

639.65
851.38
851.38
1053.20

669.05
798.75
798.75
1133.10

685.15
818.66
818.66
1162.85

669.05
798.75
798.75
1133.10

Bison Panel
Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary nails/screws etc.
complete, excluding the cost of frame
WW0120
WW0121
WW0122
WW0123
WW0124
WW0125

6 mm
8 mm
10 mm
12 mm
16 mm
20 mm

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

484.50
505.90
563.83
599.34
701.84
844.50

489.41
512.39
565.88
606.90
713.45
855.98

489.41
512.39
565.88
606.90
713.45
855.98

492.79
516.35
569.43
641.54
798.27
984.29

Providing & fixing Plywood lining with necessary nails etc. including beading complete (excluding cost
of frame)
WW0130 4 mm, commercial
WW0131 4 mm, teak
WW0132 6 mm, commercial

sq.m
sq.m
sq.m

482.91
500.68
638.47

496.08
583.35
702.54

484.63
626.72
675.82

467.99
618.93
645.49

925.80
824.85
1589.21

925.80
790.58
1589.21

Providing & fixing Pre-fabricated wall panelling profiles with necessary nails etc. complete but
excluding the cost of frame)
WW0140 19 mm, blue pine
WW0141 19 mm, mixed conifer
WW0142 15 mm, blue pine

sq.m
sq.m
sq.m

941.42
838.50
1616.74

925.80
824.85
1589.21

Providing & fixing wooden skirting in mixed conifer with necessary nails or screws complete

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

WW0150 20 mm
WW0151 25 mm

30

Units

PL

GP

SJ

TH

sq.m
sq.m

1066.03
1129.44

1065.92
1129.33

1069.00
1133.67

1075.93
1116.79

sq.m

636.61

755.34

645.00

832.17

sq.m

614.66

730.86

622.76

809.17

sq.m

595.79

709.83

603.66

789.40

sq.m

355.89

461.93

354.97

536.25

sq.m

405.83

511.69

404.99

586.14

sq.m

98.85

101.30

124.57

127.51

Bamboo Walling
WW0160 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:4 both sides (excluding cost of frame)
WW0161 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:5 both sides (excluding cost of frame)
WW0162 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:6 both sides (excluding cost of frame)
WW0163 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm mud plaster both
sides (excluding cost of frame)
WW0164 Providing & fixing 150mm thick split bamboo wall
including grooving frames, 60mm mud plaster both
sides (excluding cost of frame)
WW0165 Providing & fixing split Bamboo matting (excluding
the cost of framing and beading)
Partitions
Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame
etc. complete
WW0170 100mm framing, 38mm thick Mixed Conifer panelling sq.m

1627.24

1628.83

1642.51

1653.48

WW0171 75mm framing, 38mm thick Mixed Conifer panelling


WW0172 100mm framing, 38mm thick Champ or Blue Pine
panelling
WW0173 75mm framing, 38mm thick Champ or Blue Pine
panelling

sq.m
sq.m

1525.90
1663.47

1527.49
1665.06

1539.75
1648.19

1550.03
1658.20

sq.m

1558.00

1559.59

1544.78

1554.22

Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame
WW0180
WW0181
WW0182
WW0183

100mm framing, 4mm Commercial Ply


75mm framing, 4mm Commercial Ply
100mm framing, 4mm Teak Ply
75mm framing, 4mm Teak Ply

sq.m
sq.m
sq.m
sq.m

1116.87
1024.42
1154.08
1054.94

1144.09
1051.65
1326.95
1227.84

1117.26
1023.40
1414.96
1314.87

1099.23
1004.69
1415.49
1313.67

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face
WW0190
WW0191
WW0192
WW0193
WW0194
WW0195

100mm, 12mm blue pine


75mm, 12mm blue pine
100mm, 12mm mixed conifer
75mm, 12mm mixed conifer
100mm, 12mm champ wood
75mm, 12mm champ wood

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1962.10
1862.96
1929.30
1830.17
2163.81
2064.68

Department of Engineering Services, MoWHS

1936.36
1837.25
1933.83
1834.72
2134.23
2035.12

1935.60
1835.51
1933.08
1832.98
2133.47
2033.38

1953.45
1851.64
1950.93
1849.11
2151.32
2049.51

Bhutan Schedule of Rates - 2015


Code

Description

Units

31
PL

GP

SJ

TH

1289.24
1094.03

1351.15
1156.37

Door & Window Shutters


Providing & fixing 25mm thick Panelled or glazed Shutters for cup-boards etc. complete including
hinges
WW0200 Champ wood
WW0201 Mixed Conifer

sq.m
sq.m

1321.66
1112.48

1317.68
1108.50

Providing & fixing 35mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0210 Champ wood
WW0211 Mixed Conifer

sq.m
sq.m

1524.47
1335.47

1509.25
1320.25

1502.86
1313.86

1574.37
1385.37

Providing & fixing 38mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0220 Champ wood
WW0221 Mixed Conifer

sq.m
sq.m

1121.29
1360.78

1534.56
1345.56

1527.48
1338.48

1599.19
1410.18

Providing & fixing 44mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0230 Champ wood
WW0231 Mixed Conifer

sq.m
sq.m

1589.85
1399.73

1574.62
1384.51

1566.48
1376.36

1638.48
1448.36

Providing & fixing 50mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0240 Champ wood
WW0241 Mixed Conifer

sq.m
sq.m

1651.86
1491.82

1636.63
1467.85

1626.79
1463.73

1699.27
1551.10

Providing & fixing Wire-gauze Shutters 25mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0250 Champ wood
WW0251 Mixed Conifer

sq.m
sq.m

1153.66
910.94

1138.21
895.49

1133.51
890.78

1209.08
966.35

Providing & fixing Wire-gauze Shutters 35mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0260 Champ wood
WW0261 Mixed Conifer

sq.m
sq.m

1230.86
988.13

1215.41
972.69

1208.60
965.87

1284.76
1042.03

Providing & fixing Wire-gauze Shutters 38mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0270 Champ wood
WW0271 Mixed Conifer

sq.m
sq.m

1254.90
1012.18

Department of Engineering Services, MoWHS

1239.45
996.73

1231.99
989.26

1308.33
1065.61

Bhutan Schedule of Rates - 2015

32

Code
Description
Units
PL
GP
SJ
Providing & fixing Battened door & window shutters 20mm, with ledges and braces (25 mm), including
the cost of hinges
WW0280 Champ wood
WW0281 Blue pine
WW0282 Mixed Conifer

sq.m
sq.m
sq.m

1000.98
1000.98
1000.98

983.33
983.33
983.33

972.85
972.85
972.85

TH

1000.63
1000.63
1000.63

Providing & fixing battened garage door with ledges and braces (38mm) in Mixed Conifer, including
mountings etc. complete
WW0290 22 mm

sq.m

1081.90

1112.49

1082.49

1095.38

Providing & fixing battened and framed door shutters, Mixed Conifer excluding the cost of hinges
WW0295 38mm

sq.m

912.51

891.36

881.03

910.50

WW0300 Providing & fixing 38mm thick louvered shutters for


windows, doors with fixed 12mm venetians, in Mixed
Conifer excluding the cost of hinges

sq.m

1033.03

1001.49

957.28

1006.58

WW0301 Providing & fixing Mixed Conifer venetians 50mm


wide, 10mm thick at 45mm apart in ventilators above
doors (excluding frame)

sq.m

339.78

339.78

338.02

338.51

WW0310 Providing & fixing plain trellis of 38x12mm laths with sq.m
38mm gap (excluding frames) including fixing beading
50x12mm with Mixed Conifer
sq.m
WW0311 Providing & fixing Door & window shutters of plain
trellis of 38x12mm laths with 38mm gap (excluding
frame) including fixing beading 50x12mm with Mixed
conifer

569.25

569.25

573.27

575.22

1073.32

1034.44

1040.64

1092.29

1417.01

1554.61

1502.06

1544.22

kg

79.69

85.78

92.41

90.88

kg

78.40

86.79

90.77

90.42

kg

148.79

167.18

158.89

163.91

sq.m

543.45

464.71

492.48

530.59

Venetian Works

Trellis

Compound Gates
WW0320 Providing & fixing Compound Gate including hingesupports complete as per

sq.m

Window Accessories
WW0325 Providing & fixing M.S. round or square bars in
window frames
WW0326 Providing & fixing M.S. round or square bars with
M.S. flats in window frames
WW0327 Providing & fixing ornamental steel grills in frames
with M.S. flats & bars including round headed bolts
and nuts etc.
WW0328 Providing & fixing expanded metal 20x60mm strands
3.25x1.6mm including 60x20mm beading of Mixed
Conifer

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Pre-fabricated shutters

Units

33
PL

GP

SJ

TH

804.41
1001.95

790.52
1012.24

790.52
1012.24

1037.56
1213.15

Providing & fixing Flush Door shutters with pre-laminated bison panel
WW0335 25mm
WW0336 30mm

sq.m
sq.m

Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer
WW0345
WW0346
WW0347
WW0348

25mm
30mm
35mm
40mm

sq.m
sq.m
sq.m
sq.m

1294.81
1638.17
1824.82
1930.70

1333.31
1514.38
1762.98
1821.44

1351.33
1531.56
1771.87
1849.97

1306.11
1420.95
1654.99
1885.67

2036.50
2345.87
2673.03
2997.45

2036.50
2345.87
2673.03
2997.45

Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer
WW0355
WW0356
WW0357
WW0358

25mm
30mm
35mm
40mm

sq.m
sq.m
sq.m
sq.m

2053.63
2424.43
2673.87
3175.91

2018.19
2321.55
2642.99
2955.40

Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated
WW0365
WW0366
WW0367
WW0368

25mm
30mm
35mm
40mm

sq.m
sq.m
sq.m
sq.m

1459.30
1740.44
1882.75
2100.02

1436.40
1683.56
1974.33
2265.11

1475.26
1729.16
2027.86
2326.57

1459.30
1740.44
1882.75
2326.57

1778.06
1799.87
1814.41

1829.51
1851.96
1866.92

Providing & fixing panelled doors, with 12mm particle board panels with horizontal middle rail
including prime coat
WW0375 30mm
WW0376 35mm
WW0377 40mm

sq.m
sq.m
sq.m

1812.36
1834.59
1849.41

1778.06
1799.87
1814.41

Providing & fixing panelled doors, with 12mm plywood panels with horizontal middle rail including
prime coat
WW0385 30mm
WW0386 35mm
WW0387 40mm

sq.m
sq.m
sq.m

1330.68
1346.98
1443.32

1305.55
1321.55
1416.05

1305.55
1321.55
1416.05

1343.24
1359.70
1456.95

Providing & fixing panelled doors, with 9mm plywood panels with horizontal middle rail including
prime coat
WW0395 30mm
WW0396 35mm
WW0397 40mm

sq.m
sq.m
sq.m

1305.48
1318.82
1327.71

1280.84
1293.92
1302.65

1280.84
1293.92
1302.65

Providing & fixing panelled doors, with 12mm particle board panels with horizontal single lock rail &
stile including prime coat

Department of Engineering Services, MoWHS

1317.81
1331.27
1340.25

Bhutan Schedule of Rates - 2015


Code

Description

WW0400 30mm
WW0401 35mm
WW0402 40mm

34

Units

PL

GP

SJ

TH

sq.m
sq.m
sq.m

1892.35
1898.34
1901.33

1839.12
1844.94
1847.85

1839.12
1844.94
1847.85

1892.35
1898.34
1901.33

Providing & fixing panelled doors, with 12mm plywood panels with horizontal single lock rail & stile
including prime coat
WW0410 30mm
WW0411 35mm
WW0412 40mm

sq.m
sq.m
sq.m

1901.33
1410.57
1416.56

1847.85
1370.98
1376.79

1847.85
1370.98
1376.79

1901.33
1410.57
1416.56

Providing & fixing panelled doors, with 9mm plywood panels with horizontal single lock rail & stile
including prime coat
WW0420 30mm
WW0421 35mm
WW0422 40mm

sq.m
sq.m
sq.m

1356.71
1362.69
1370.17

1318.64
1324.45
1331.72

1318.64
1324.45
1331.72

1356.71
1362.69
1370.17

Providing & fixing panelled doors, with 12mm particle board panels with horizontal double lock rail & stile
including prime coat
WW0430 30mm
WW0431 35mm
WW0432 40mm

sq.m
sq.m
sq.m

1930.49
1972.02
1976.55

1858.76
1898.73
1903.09

1858.76
1898.73
1903.09

1912.56
1953.70
1958.19

Providing & fixing panelled doors, with 12mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0440 30mm
WW0441 35mm
WW0442 40mm

sq.m
sq.m
sq.m

1976.55
1443.79
1452.47

1903.09
1390.25
1398.60

1903.09
1390.25
1398.60

1958.19
1430.41
1439.00

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0450 30mm
WW0451 35mm
WW0452 40mm

sq.m
sq.m
sq.m

1386.40
1395.46
1407.54

1335.00
1343.73
1355.36

1335.00
1343.73
1355.36

1373.55
1382.53
1394.50

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0460 30mm
WW0461 35mm
WW0462 40mm

sq.m
sq.m
sq.m

721.53
863.19
739.32

708.01
719.64
725.46

708.01
719.64
725.46

863.19
719.64
725.46

Shelving & Cupboards


Providing & fixing 38mm thick wooden shelves supported on 40x40x6mm `T' or `L' iron brackets fixed at suitable
distance but not exceeding 75 cm apart in 7.5x7.5x15cm blocks of cement concrete 1:3:6, 20 mm aggregates

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

WW0470 Mixed Conifer

35

Units

PL

GP

SJ

TH

sq.m

792.19

792.26

802.82

807.72

Providing & fixing 25mm thick Cupboard (900x2000x450 mm...LxHxD) with glazed or panelled shutters, 25mm
thick partitions and shelves supported on 25x25mm wooden runners, 50x20mm architraves and 25mm dia curtain
rod mounted on wooden brackets, including with Anodised Aluminium Hinges and frame in mixed conifer
WW0475 Mixed Conifer
WW0476 Champ wood

each
each

4836.07
5170.76

4814.12
5148.81

4744.45
5056.80

4999.16
5310.81

50mm
100mm

240.59
479.67

239.66
468.49

237.24
463.83

246.68
484.31

100mm

477.95

466.83

462.17

482.60

100mm

364.77

357.72

354.54

369.41

100mm

363.72

356.71

353.53

368.37

Extras for Cupboards including frame of mixed conifer


WW0485 For additional depth of 50mm or part thereof
WW0486 For additional width of 100mm or part thereof
including shutters of Mixed conifer
WW0487 For additional width of 100mm or part thereof,
including shutters of Champ wood
WW0488 For additional height of 100mm or part thereof,
including shutters of Mixed conifer
WW0489 For additional height of 100mm or part thereof,
including shutters of Champ wood
Railing
Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete
WW0495
WW0496
WW0497
WW0498
WW0499
WW0500

900 mm high, Champ wood


900 mm high, Mixed Conifer
1000 mm high, Champ wood
1000 mm high, Mixed Conifer
1200 mm high, Champ wood
1200 mm high, Mixed Conifer

m
m
m
m
m
m

464.30
445.74
534.79
519.82
632.14
632.14

466.84
448.27
537.77
522.80
635.66
635.66

455.70
448.19
524.90
522.56
620.46
620.46

466.95
459.78
538.05
536.10
636.02
636.02

Pelmets
Providing & fixing 100x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats 25x3x100mm
and plugs etc. complete
WW0505 Champ wood
WW0506 Mixed Conifer

m
m

137.05
131.44

138.05
132.44

136.34
132.85

136.97
133.54

Providing & fixing 150x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats 25x3x100mm
and plugs etc. complete
WW0515 Champ wood
WW0516 Mixed Conifer

m
m

144.26
135.78

Shutters Fittings
Providing & fixing M.S. pressed butt hinges with necessary screws etc. complete

Department of Engineering Services, MoWHS

145.26
136.29

143.36
137.05

144.04
137.67

Bhutan Schedule of Rates - 2015


Code

Description

WW0525 100mm
WW0526 75mm
WW0527 50mm

36

Units

PL

GP

SJ

TH

each
each
each

48.21
38.69
32.09

39.38
35.00
24.80

40.35
28.68
21.69

52.50
36.46
27.71

96.94
58.89
45.28

63.40
45.28
35.56

76.52
56.94
33.61

Providing & fixing M.S tower bolt (barrel type) with necessary screws etc. complete
WW0535 250mm
WW0536 150mm
WW0537 100mm

each
each
each

81.07
56.71
39.74

Providing & fixing M.S. sliding door bolt, bright finished, enamelled with necessary screws etc. complete
WW0545 300mm
WW0546 250mm
WW0547 200mm

each
each
each

217.22
176.39
160.06

211.66
182.98
142.76

183.72
161.55
131.22

204.75
163.92
168.17

43.05
31.39
30.22
24.27

47.43
38.68
37.22
25.56

54.72
41.11
33.33
22.44

60.55
43.05
34.30
31.39

each
each
each
each

43.93
44.28
33.57
25.82

45.97
34.89
40.43
34.30

45.97
43.05
34.30
31.39

43.05
34.89
54.72
40.83

each

121.23

143.69

147.77

132.02

Providing & fixing M.S. handle with necessary screws etc. complete
WW0555
WW0556
WW0557
WW0558

150mm
125mm
100mm
75mm

each
each
each
each

Providing & fixing M.S. hook-and-eye with necessary screws etc. complete
WW0565
WW0566
WW0567
WW0568

300mm
200mm
150mm
100mm

M.S door stopper


WW0575 Providing & fixing M.S. door stopper with nuts and
necessary screws complete

Providing & fixing anodised aluminium butt hinges with necessary aluminium screws etc. complete
WW0580 100mm
WW0581 75mm

each
each

73.46
57.39

66.69
55.03

68.68
47.51

87.11
64.17

Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete
WW0590 200mm
WW0591 150mm
WW0592 100mm

each
each
each

60.59
48.96
38.86

120.59
95.19
84.69

77.82
43.57
29.57

81.28
50.62
38.72

Providing & fixing anodised aluminium sliding door bolts with nuts and aluminium screws etc. complete
WW0600 300mm
WW0601 250mm
WW0602 200mm

each
each
each

238.32
214.40
195.87

252.39
229.06
182.40

Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete

Department of Engineering Services, MoWHS

249.99
228.96
200.87

312.18
284.81
247.14

Bhutan Schedule of Rates - 2015

37

Code

Description

Units

PL

GP

SJ

TH

WW0610
WW0611
WW0612
WW0613

150mm
125mm
100mm
75mm

each
each
each
each

46.00
40.08
32.73
29.66

49.08
43.25
37.42
28.48

40.04
33.04
26.92
22.84

52.00
43.25
34.50
33.18

Providing & fixing anodised aluminium hook-and-eye with necessary screws etc. complete
WW0620
WW0621
WW0622
WW0623

300mm
200mm
150mm
100mm

each
each
each
each

60.17
43.49
30.11
24.47

94.58
82.14
67.36
48.31

86.03
65.12
47.63
31.59

57.83
40.34
34.50
31.59

sq.m

528.49

563.48

665.56

680.14

133.59
104.13
72.85

109.82
74.82
50.91

171.06
115.65
77.74

246.97
179.47
144.47

241.14
143.01
115.79

270.17
218.84
131.35

681.48
616.03
556.54

732.57
635.36
403.02

831.73
621.75
637.30

1021.29
916.30
779.23

Kicking plate
WW0630 Providing & fixing anodised aluminium kicking plate,
4mm thick with necessary aluminium screws etc.
complete

Providing & fixing brass pressed butt hinges with necessary screws etc. complete
WW0635 100mm
WW0636 75mm
WW0637 50mm

each
each
each

165.23
118.57
68.99

Providing & fixing brass tower bolt (barrel type) with necessary screws etc. complete
WW0645 250mm
WW0646 150mm
WW0647 100mm

each
each
each

208.08
146.90
117.74

Providing & fixing brass sliding door bolt with nuts necessary screws etc. complete
WW0655 300mm
WW0656 250mm
WW0657 200mm

each
each
each

Providing & fixing brass handle with necessary screws etc. complete
WW0665 150mm

each

125.47

152.91

121.99

119.08

WW0666 125mm

each

95.14

122.58

103.91

98.66

WW0667 100mm

each

76.21

113.24

78.25

89.91

WW0668 75mm

each

65.90

99.25

62.21

78.25

WW0675 Providing & fixing bright finish brass 100 mm mortise each
latch & pair of levers, handles with necessary screws
etc. complete

927.93

1035.61

1045.70

997.93

Other fittings

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

38

Code
Description
Units
WW0676 Providing & fixing bright finish brass spring-loaded,
each
hinged door-closer with necessary screws etc. complete

PL
890.05

GP
856.39

SJ
864.64

TH
919.22

WW0677 Providing & fixing bright finish brass hydraulic doorcloser

each

836.94

877.19

882.73

902.27

WW0678 Providing & fixing bright finished brass door stopper


with nuts and necessary screws etc. complete

each

330.61

359.63

323.47

335.13

Providing & fixing bright finished brass hook-and-eye with necessary screws etc. complete
WW0685 150mm

each

90.21

111.79

78.25

92.83

WW0686 100mm

each

71.84

98.66

60.75

60.75

each

80.19

87.00

84.85

86.90

cu.m

944.09

913.42

1003.60

1024.42

sq.m

1125.42

1141.35

1157.41

1311.49

WW0710 Providing & fixing Decorative Traditional Timber Carv sq.m

908.51

908.51

908.51

908.51

Fixing Accessories
WW0695 P&f 40x3mm M.S. hold fast 400mm long, fixing to
frame with 10mm bolts & nuts, plugs, concrete blocks
300x100x150mm with 1:3:6, 20mm aggregate
Ceiling Insul at ion
WW0700 Providing & laying dry earth in ceilings in proportion
1:5 (1 straw: 5 dry earth) including plastic underlay

Skylight
WW0705 Providing & fixing skylight translucent diffuser panel
including 50x12 beading etc. complete
Tim ber Carvi ng

Chapter 12: STEEL


Single Sections
Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead
paint
SW0001 In R.S. joists

kg

104.58

119.64

122.45

118.80

SW0002 In Flats

kg

93.34

110.89

102.97

107.79

SW0003 In Tees, angles and channels

kg

95.39

120.49

103.39

103.24

Fabric at ed & Buit-up Secti ons


Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl.
priming coat of red lead paint

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

SW0010 In R.S. joists


SW0011 In Tees, angles, flats and channels

kg
kg

39
PL

GP

SJ

TH

104.58
156.47

118.73
171.20

122.78
168.58

118.63
168.41

Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming
SW0020 In R.S. joists
SW0021 In Tees, angles, flats and channels
SW0022 In Tubular sections

kg
kg
kg

105.49
103.11
73.68

120.66
118.58
69.10

124.40
115.64
71.48

119.00
114.54
97.10

D oo rs/Windows &Accessories
Providing & fixing in position with vertical channels 20x10x2mm and braced with flat iron, diagonals 20x5mm with
top and bottom rails of T-iron 40x40x6mm with 38mm dia steel pulleys complete with bolts, nuts, locking
arrangement, stoppers handles including applying a priming coat of red lead paint
SW0030 Collapsible steel shutters

sq.m

4564.24

5248.53

4846.34

4937.38

1519.46

1494.51

1494.51

1494.51

666.97

641.56

641.56

641.56

Providing & fixing in position including applying a priming coat of red lead paint
SW0035 Rolling shutters, including all accessories complete but sq.m
excluding top cover
m
SW0036 Top cover for rolling shutters

Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false ceiling
framing of specified sections including all accessories such as U-rubber gasket for fixing glass panes, weather strips
or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in case of
partitions/doors/windows and ceiling boards in case of ceiling)
SW0045
SW0046
SW0047
SW0048

Sliding, open able and pivoted windows


Sliding and open able doors
Partition framing
False ceiling framing

kg
kg
kg
kg

479.83
481.22
477.05
475.93

586.57
587.96
583.79
582.67

449.03
450.42
446.25
445.14

483.21
484.60
480.43
479.32

Extra for providing and fixing plain glass panes on aluminium section complete (excluding the cost of aluminium
frame & accessories)
SW0055 4mm thick plain glass
SW0056 5.5mm thick, plain glass
SW0057 5.5mm thick frosted glass

sq.m
sq.m
sq.m

594.09
761.20
870.82

564.49
785.77
761.98

646.49
876.19
922.61

642.64
830.92
1019.20

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints mitred and
welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of primer
SW0065
SW0066
SW0067
SW0068
SW0069

Doors
Windows fixed
Windows side hung
Ventilators top hung
Ventilators centre hung

sq.m
sq.m
sq.m
sq.m
sq.m

2003.18
1042.35
1374.37
1368.41
1561.08

Extra for Bhutan type Architraves

Department of Engineering Services, MoWHS

1981.62
1038.93
1364.82
1358.78
1547.78

1985.79
1043.05
1369.01
1362.90
1551.90

2003.52
1060.56
1386.79
1380.41
1569.42

Bhutan Schedule of Rates - 2015


Code
Description
SW0075 Extra for Providing & fixing Bhutan type architraves
with 24G steel sheet....per sq.m. of window area

40

Units
sq.m

PL
266.88

GP
264.67

SJ
280.89

TH
299.83

SW0080 Providing & fixing M.S. round hold-down bolts with


nuts and washer plates
SW0081 Providing & fixing bolts of various sizes including nuts
& washers

kg

69.74

77.17

82.91

80.31

kg

145.70

148.38

141.18

147.36

SW0082 Providing & fixing M.S. rivets of various sizes

kg

165.63

135.91

152.73

202.25

kg

94.33

109.42

108.76

107.39

each

122.99

132.41

142.65

140.29

sq.m

333.54

385.61

346.42

382.93

SW0101 Providing and fixing steel form work in suspended


sq.m
floors, roofs, landings, shelves and their support,
balconies, chajjas etc
SW0102 Providing and fixing steel form work in lintels, beams, sq.m
girders, bresummers, cantilevers, etc.
sq.m
SW0103 Providing and fixing steel form work in columns,
pillars, posts, struts etc.

610.47

620.70

580.68

622.02

619.68

622.23

566.44

616.57

1096.87

1086.29

967.25

1063.91

sq.m
sq.m
sq.m

785.20
759.43
697.62

756.30
727.45
660.15

830.06
803.99
738.92

1049.92
1023.13
955.71

sq.m

541.17

524.94

570.38

707.97

Steel Fasten ers

Plates
Providing, making and fixing M.S. straps, flats, sole
SW0090 plates etc.
Fan Clamps
SW0095 Providing & fixing M.S. fan clamps of 16 mm dia. in
R.C. slabs, including painting with red lead paint

A
SW0100 Providing and fixing steel form work in foundations,
footings, bases of columns etc for mass concrete

Chapter 13: FLOORING


Brick Floo ring
Providing & laying 2nd class Brick-on-edge flooring
FL0001
FL0002
FL0003

In cement mortar 1:4


In cement mortar 1:6
In dry brick , including filling joints with sand on
bedding of 12.5mm mud mortar

Providing & laying 2nd class Flat brick flooring


FL0010

In cement mortar 1:4

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
FL0011
FL0012

Description
In cement mortar 1:6
In dry brick, filling joints with sand, on a base of
12.5mm mud mortar

Units
sq.m
sq.m

41

PL
517.84
439.45

GP
499.14
416.16

SJ
546.69
465.50

TH
683.08
599.90

46.83
50.62

47.39
51.18

47.25
51.04

47.51
51.30

46.83
50.62

47.39
51.18

47.25
51.04

47.51
51.30

45.01
48.80

45.36
49.15

45.40
49.19

45.60
49.39

191.51
262.50
306.56
411.44
530.41
641.11

190.58
264.51
309.45
416.97
552.99
669.62

194.06
267.76
313.38
422.46
559.89
678.10

280.38
246.36

283.15
250.21

Providing & laying pointing on brick flooring with cement mortar 1:2
FL0020
FL0021

Flush pointing
Ruled pointing

sq.m
sq.m

Providing & laying pointing on brick flooring with cement mortar 1:4
FL0030
FL0031

Flush pointing
Ruled pointing

sq.m
sq.m

Providing & laying Pointing on brick flooring with cement mortar 1:6
FL0040
FL0041

Flush pointing
Ruled pointing

sq.m
sq.m

Concrete Flooring
Pal cement concrete flooring 1:2:4, finished with floating coat of neat cement
FL0050
FL0051
FL0052
FL0053
FL0054
FL0055

12mm aggregates, 25mm thick


20mm aggregates, 40mm thick
20mm aggregates, 50mm thick
20mm aggregates, 75mm thick
20mm river gravel, 40mm thick
20mm river gravel, 50mm thick

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

186.66
256.46
299.44
402.09
512.80
619.52

Providing & laying cement concrete flooring 1:3:6, finished with a floating coat of neat cement
FL0060
FL0061

20mm aggregates, 50mm


20mm river gravel, 50mm

sq.m
sq.m

269.99
239.82

272.77
251.70

Red Oxide Flooring


Providing & laying 40mm red oxide flooring, finished with a floating coat of neat cement (red oxide mixed)
including cement slurry etc. complete
FL0070

Under layer of 30mm thick cement concrete 1:2:4,


12.5mm aggregates and top layer of 10mm thick
plaster of cement red oxide mixed

sq.m

598.90

622.78

589.56

607.81

Surface Hardening
Providing & laying 62mm thick flooring with sub-layer cement concrete 1:2:4 20mm aggregates, top layer with
metallic cement hardener consisting of mix 1:2 (1 cement hardener: 2 6mm stone aggregate), the metallic hardening
compound is mixed by volume in the ratio 4 parts of cement & 1 part of metallic hardening compound including
cement slurry
FL0075

50mm thick sub-layer and 12mm topping

sq.m

651.21

Department of Engineering Services, MoWHS

590.93

588.11

791.99

Bhutan Schedule of Rates - 2015


Code

Description

42

Units

PL

GP

SJ

TH

sq.m

20.04

20.04

20.04

20.04

Extra for Concrete flooring


FL0080

Extra for making chequers on concrete floors, steps,


landings, pavements etc.

Terrazzo-Marble Chip Flooring


Providing & laying 40mm thick marble chips flooring top layer 6mm thick with white, black or black and white
marble chips of nominal size 1.5-3mm in proportion 1:2 (cement: chips), on 34mm thick concrete base in cement
concrete 1:2:4, 12.5mm aggregate ( cement and marble powder mix shall be of the ratio 3 part of cement to 1 part
of marble powder)
FL0085
FL0086

In grey cement
In white cement

sq.m
sq.m

625.40
750.69

669.24
797.58

645.55
767.48

670.18
792.48

Extra for coloured chips instead of black, white or


sq.m
black and white chips in top 6mm layer of marble chips
flooring
Extra for coloured chips instead of black, white or
sq.m
black and white chips in top 10mm layer marble chips
flooring

46.62

63.43

56.94

65.15

75.02

102.07

91.62

104.83

Extra for coloured chips


FL0095

FL0096

Providing & laying 40mm thick marble chips flooring top layer 10mm thick with white, black or black and white
marble chips of size 6mm in proportion 1:2 (cement : chips), on 30mm cement concrete 1:2:4 base, 12.5mm
aggregate
FL0105
FL0106

In grey cement
In white cement

sq.m
sq.m

542.49
818.84

596.67
889.01

569.87
842.88

602.61
879.75

Extra for Providing & fixing glass strips in joints of


m
terrazzo floors
Extra for terrazzo flooring laid as floor borders,
sq.m
margins, bands, 75 < width > 300mm
Extra for laying terrazzo flooring on stair case treads, sq.m
width < 300mm including forming nosing
Extra for laying terrazzo in narrow bands width
m
<75mm
Extra for making moulded nosing in terrazzo,
m
including moulded returns, ends, angles
Providing & fixing aluminium strip 40x1.6mm in joints m
of terrazzo floor

15.09

15.09

15.09

15.09

16.60

16.60

16.60

16.60

24.90

24.90

24.90

24.90

1.76

1.76

1.76

1.76

67.28

67.28

67.28

67.28

127.29

136.16

127.29

207.90

Extra for Terrazzo Flooring


FL0115
FL0116
FL0117
FL0118
FL0119
FL0120

Skirting
Providing & laying Cement plaster skirting < 300mm height with cement mortar 1:3 with a floating coat of neat
cement including rounding off junctions with floor

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
FL0130
FL0131

Description
20mm
22mm

Units
sq.m
sq.m

PL
230.72
243.81

43
GP
240.66
254.91

SJ
236.00
249.75

TH
240.08
254.32

Providing & fixing Terrazzo or Marble chips skirting < 300mm height top layer 6mm thick with white or black,
black and white marble chips size 4mm in proportion 1:2, laid on 12.5mm thick cement plaster 1:3 base
FL0140
FL0141

In grey cement
In white cement

sq.m
sq.m

604.35
721.92

650.90
770.64

623.24
737.36

646.73
760.95

Marble Stone Flooring


Providing & laying marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement
slurry mixed with pigment where necessary, rubbing & polishing complete
FL0150
FL0151
FL0152
FL0153
FL0154
FL0155
FL0156
FL0157

20mm thick black marble


20mm thick white marble
20mm thick black and white marble
20mm thick coloured marble
40mm thick black marble
40mm thick white marble
40mm thick black and white marble
40mm thick coloured marble

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

3068.25
3068.25
3068.25
3403.21
3144.86
2892.12
3144.86
3098.30

2940.14
2940.14
2975.37
3153.83
2994.81
2742.07
3100.51
2934.04

2934.95
2934.95
2970.19
3148.64
2989.33
2736.59
3095.04
3143.95

3081.01
3081.01
3215.17
3802.72
3509.57
3256.81
3595.47
3564.26

Providing & laying Kota stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement
slurry mixed with pigment where necessary, rubbing & polishing complete
FL0160
FL0161

20mm
40mm

sq.m
sq.m

2835.44
3851.49

2827.80
3861.81

2822.61
3856.62

2437.89
3656.99

206.72

206.72

206.72

206.72

173.77

173.77

173.77

173.77

Extras for Marble stone flooring


FL0170
FL0171

Extra for marble stone flooring for laying in steptreads, width < 300 mm
Extra for marble stone flooring for nosing in steptreads

Timber Flooring
Providing & fixing bison panel flooring including nails/screws etc. complete excluding the cost of frame
FL0180
FL0181

25mm
30mm

sq.m
sq.m

954.14
1161.57

939.56
1172.37

939.56
1172.37

1198.96
1383.33

Providing & fixing Plain Particle-Board Flooring fixing with necessary screws etc. complete, excluding
cost of frame
FL0190
FL0191

25mm
35mm

sq.m
sq.m

1385.47
1685.27

1527.40
1815.54

1528.86
1819.33

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame

Department of Engineering Services, MoWHS

1508.27
1827.20

Bhutan Schedule of Rates - 2015

44

Code

Description

Units

PL

GP

SJ

TH

FL0200
FL0201
FL0202
FL0203
FL0204
FL0205

25mm thick, T&G


25mm thick, half-lapped
40mm thick, T&G
40mm thick, half-lapped
45mm thick, T&G
45mm thick, half-lapped

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

466.59
443.21
668.03
661.66
719.49
709.46

466.59
443.21
668.03
661.66
719.49
709.46

473.65
450.27
678.92
672.55
731.21
721.18

477.07
453.69
684.20
677.83
736.89
726.86

Parquet flooring
Providing & fixing Parquet (wood block) flooring including blown bitumen underlay and iron screws etc. complete,
excluding cost of frame
FL0210

38mm thick, champ wood

sq.m

2468.92

2473.40

2458.98

2466.28

Providing & fixing Pre-Fabricated Flooring Profiles in mixed conifer including necessary screws etc.
complete
FL0215
FL0216

25mm thick
38mm thick

sq.m
sq.m

843.02
977.95

617.71
830.28

622.57
837.23

970.37
1047.17

Vinyl & Linoleum Flooring


Providing & fixing 2mm thick Vinyl or Linoleum sheet 1.3mm laid with special adhesive, including 2 coat of
bitumen applied over subfloor on prepared surface @ 1.5 kg/sq.m each coat including the cost of base concrete
FL0225

Over base of 25mm thick cement concrete 1:2:4 ,


12.5mm aggregate

sq.m

898.70

882.90

905.83

899.80

sq.m

82.15

81.65

81.94

81.80

Providing & fixing white/ coloured Glazed tiles, 150 x sq.m


150 mm in skirting, step risers, dado, finished with
flush-pointing in white cement

1819.04

1790.88

1982.54

1789.29

Mud flooring
FL0230

Providing & laying rammed mud flooring complete

Chapter 14: TILING - WALL & FLOOR


GL0001

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of 12mm thick
cement mortar 1:3 finished with flush pointing in white cement:
GL0005
GL0006
GL0007
GL0008
GL0009

for 150 x 150 mm


for 100 x 100 mm
for 200 x 100 mm
for 200 x 200 mm
for 300 x 300 mm

sq.m
sq.m
sq.m
sq.m
sq.m

1635.61
3327.15
2025.39
1286.59
875.68

1607.45
3135.73
1930.21
1298.21
955.97

1799.11
3663.01
2247.51
1269.08
1014.16

1605.86
3253.13
1988.12
1268.86
868.71

sq.m

92.44

92.44

92.44

92.44

Extra for laying glazed tiles


GL0015

In treads of steps, width <300mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
GL0016

Description
In skirting, risers of steps, dado where tiles are
required to be cut (only area of portion of cut tiles to
be measured)

Units
sq.m

PL
532.77

45
GP
532.77

SJ
532.77

TH
532.77

Chapter 15: ROOFING


C.G.I S h e e t i n g
Providing & fixing Corrugated Galvanised Iron (CGI) sheeting, including bolts, hooks and nuts 8mm dia. with
bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and
trusses
RF0001

24g

sq.m

660.78

668.86

649.93

683.27

Providing & fixing Pre Painted Galvanised Steel Corrugated Roofing sheets, including bolts, hooks and nuts 8mm
dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter
and trusses.
RF0003

24g

sq.m

689.27

674.53

662.35

710.27

Providing & fixing 600mm ridges or hips in plain G.I. including bolts, hooks and nuts 8mm dia G.I limpet and
bitumen washers for connection
RF0005

24g.

517.22

524.37

524.37

536.97

Providing & fixing 600mm ridges or hips in Pre Painted Galvanised Steel sheets, including bolts, hooks and nuts
8mm dia G.I limpet and bitumen washers for connection.
RF0007

24g.

527.39

532.47

529.77

535.17

Providing & fixing 450mm over all semi-circular plain G.I gutter, including brackets, bolts, nuts, washers & rain
water pipes connections, excluding the cost of pipes
RF0010

24g sheet

416.46

434.79

428.53

440.18

7.05

7.05

7.05

7.05

7.09

7.09

7.09

7.09

135.04

136.40

133.22

138.81

20.61
50.60
75.90

20.61
50.60
75.90

20.61
50.60
75.90

20.61
50.60
75.90

Extra for Galvanised Iron


RF0015
RF0016
RF0017

Extra for Providing & fixing curved C.G.I. sheet in


sq.m
roofing
Extra for Providing & fixing C.G.I. sheets vertically or sq.m
to a pitch > 60 degrees
Extra for making straight-cut openings (in 24g) for
m
chimney, sky lights

Extra for making opening or recess in CGI roofing of girth < 1 metre
RF0025
RF0026
RF0027

Area upto 0.01sq.m


0.01 < Area < 0.04sq.m
Area > 0.04sq.m

each
each
each

Wind Bracing

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

RF0060

Providing & fixing wind tie of 40 x 6 mm flats

46
PL

GP

SJ

TH

175.09

208.53

193.46

202.59

761.33

803.48

736.47

706.46

393.56

416.57

363.19

340.68

1440.83

1468.08

1395.92

1365.48

751.26

757.47

748.28

851.42

Thatched Roofing
RF0065

RF0066
RF0067

Providing & fixing 150mm thatched roofing, including sq.m


straws/grass bundles, half split bamboo fillet, tying
strings complete
Providing & fixing 25mm dia. bamboos at 225mm
sq.m
apart including moonj ban(rope) or string
Providing & fixing thatched coping to ridges and hips,
m
girth <1 metre including tying and split bamboo wind
tie complete

Slate Roofing
RF0075

Providing & fixing single slate roofing including


bitumen felt water-proofing etc complete, excluding
the cost of wooden reapers, trusses

sq.m

Concrete Tiles Roofing


Providing & fixing PLAIN Pantile or Roman II concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work
RF0080
RF0081
RF0082

6mm
8mm
10mm

sq.m
sq.m
sq.m

231.76
262.99
272.33

225.94
262.99
272.33

222.06
258.40
267.56

237.07
273.42
282.58

Providing & fixing COLOURED Pantile or Roman concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work
RF0090
RF0091
RF0092

6mm
8mm
10mm

sq.m
sq.m
sq.m

276.58
285.74
300.04

281.52
290.86
300.04

276.58
285.74
294.75

305.11
312.77
324.79

Providing & fixing PLAIN Super Roman concrete tiles-600mm x 330mm including tying wires but excluding the
cost of frame work

RF0100

10mm

sq.m

318.64

324.51

318.64

338.25

Providing & fixing COLOURED Super Roman concrete tiles-600mm x 330mm including tying wires but excluding
the cost of frame work
RF0105

10mm

sq.m

353.53

360.08

353.53

371.89

172.09

180.89

Providing & fixing PLAIN Semi-Sheet concrete tiles-600mm x 600mm including tying wires but
excluding the cost of frame work
RF0110

8mm

sq.m

172.18

Department of Engineering Services, MoWHS

175.14

Bhutan Schedule of Rates - 2015

47

Code
Description
Units
PL
GP
SJ
TH
Providing & fixing COLOURED Semi-Sheet concrete tiles-600mm x 600mm including tying wires but excluding the
cost of frame work
RF0115

8mm

sq.m

263.55

269.99

265.14

279.41

87.78
136.00

89.37
139.76

87.79
137.22

94.09
144.55

717.91

712.08

700.41

700.41

sq.m

576.20

569.60

559.77

565.74

521.03

492.14

485.45

503.96

1609.19

1609.19

1609.19

1835.55

Providing and fixing concrete tiles ridges or hips including tying wire etc. complete
RF0120
RF0121

Plain
Coloured

m
m

Shinglep Roofing
RF0130

Providing & fixing shinglep roofing with shinglep of


sq.m
size 1350x125x12mm in 3 layers including tying, uplift
protection complete

Red- Mud Plastic Sheeting


RF0135
RF0136

Providing & fixing red mud corrugated plastic


sheeting, 1.5 mm thick
Providing & fixing red mud plastic sheet 600 mm
ridging, 1.3mm thick

Corrugated Fibreglass Sheeting


RF0150

P&f 1.2mm transparent sheet including 8mm G.I J or L sq.m


hooks, bitumen & G.I limpet washers etc complete,
excluding cost of frame

Providing & laying lime concrete terracing on roofing , average depth 100mm
RF0155

including drainage fall, ramming, rounding at parapets sq.m

1038.72

1036.99

1095.73

1178.34

RF0156

including drainage fall, ramming, rounding at parapets sq.m


and under-coat of hot bitumen 80/100

1151.59

1151.69

1210.46

1294.20

Providing & laying cement concrete terracing on roof with cement concrete 1:3:6, 20mm aggregates over a base
coat of bitumen 80\100 mixed with coarse sand
RF0165
RF0166

115mm average thickness


Painting roof with bitumen including spreading sand,
cleaning slab etc. complete

sq.m
sq.m

548.72
120.57

551.23
122.14

573.81
123.37

581.38
124.85

Rain Water Pipe


Providing & fixing C.I. rain water pipes & fittings with necessary screws on the wall face including
filling joints etc. complete
RF0175

100mm dia C.I pipes

1425.04

Department of Engineering Services, MoWHS

1563.82

1323.38

1411.57

Bhutan Schedule of Rates - 2015


Code
RF0176
RF0177
RF0178

Description
100mm dia C.I. head for pipe
100mm dia C.I. bend for pipe
100mm dia C.I. shoes for pipe

Units
each
each
each

PL
314.01
344.05
530.29

48
GP
321.22
363.28
549.45

SJ
264.09
246.59
570.48

TH
310.98
340.73
525.16

409.90
678.21

451.39
673.89

Providing & fixing 100mm dia C.I. offset for rain water pipe on wall face including filling joints
RF0185
RF0186

75mm projection
150mm projection

each
each

455.80
680.49

405.33
697.31

Providing and fixing on wall face single socketed rigid PVC ( Working Pressure 4kgf per sq.cm) rain water pipes
including jointing with seal ring leaving 10 mm gap for thermal expansion- complete
RF0190
RF0191
RF0192

75mm dia
90mm dia
110mmdia

m
m
m

338.85
418.89
430.55

352.46
424.59
445.13

330.42
385.83
425.69

320.16
417.36
420.41

Providing and fixing on wall face PVC coupler for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0195
RF0196
RF0197

75 mm
90 mm
110 mm

each
each
each

168.10
219.53
251.51

167.65
221.63
252.36

177.61
231.74
256.82

171.37
223.04
276.67

Providing and fixing on wall face PVC Single tee with door for rigid rain water pipes including jointing with seal
ring leaving 10 mm gap for thermal expansion - complete
RF0200
RF0201
RF0202

75 mm
90 mm
110 mm

each
each
each

216.03
296.13
347.07

233.82
302.35
343.18

210.98
286.80
321.80

240.33
331.52
400.54

Providing and fixing on wall face PVC plain Single tee for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion - complete
RF0205
RF0206
RF0207

75 mm
90 mm
110 mm

each
each
each

210.20
290.30
321.80

217.78
279.02
314.51

205.14
282.91
335.41

208.25
296.52
377.21

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0210
RF0211
RF0212

75 mm
90 mm
110 mm

each
each
each

199.50
245.58
274.84

200.28
261.53
286.80

209.81
251.80
305.76

199.42
262.51
296.27

Providing and fixing on wall face PVC shoe for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0215
RF0216
RF0217

75 mm
90 mm
110 mm

each
each
each

225.21
284.00
337.20

Department of Engineering Services, MoWHS

235.64
290.21
340.88

231.16
290.07
343.26

229.60
289.41
356.56

Bhutan Schedule of Rates - 2015


Code
Description
Chapter 16: PLUMBING - INDOOR WORK

Units

49
PL

GP

SJ

TH

167.17
204.20
275.37
354.27
436.32
542.49

165.03
221.05
281.20
353.01
439.24
535.20

168.53
210.81
283.14
379.74
477.15
562.90

161.92
206.15
281.20
348.83
407.16
542.49

95.32
113.22
178.96
302.64
327.32

97.27
122.55
207.83
226.05
321.72

94.74
119.63
202.53
229.85
330.17

Water Supply
Providing & fixing G.I. pipes including G.I. fittings & clamps & repair walls
PI0001
PI0002
PI0003
PI0004
PI0005
PI0006

15mm
20mm
25mm
32mm
40mm
50mm

m
m
m
m
m
m

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete
PI0010
PI0011
PI0012
PI0013
PI0014

20mm
25mm
32mm
40mm
50mm

m
m
m
m
m

84.36
102.87
180.35
199.62
277.61

Storage Tanks
Providing & fixing storage tank of M.S. sheet welded all round, including 40mm G.I scour pipe, 25mm G.I overflow
, 15mm ball valve , pads for inlet and outlet pipes , red lead primer & two coats of bitumastic paint
PI0020
PI0021
PI0022

270 litre capacity of 2mm steel sheet


810 litre capacity of 2.8mm steel sheet
1620 litre capacity of 3.15mm steel sheet

each
each
each

8846.05
17795.58
26732.95

8974.95
17816.98
26650.91

9573.67 9984.72
19207.71 20516.50
28804.81 30980.05

3711.63
6308.21
11889.81
21741.08
32495.61

3715.49
6329.11
11407.63
22790.01
33797.28

3641.90 3731.99
6132.74 6322.30
11182.10 11328.40
22156.18 22056.05
33630.08 32816.89

Providing & fixing plastic tank including all accessories complete


PI0030
PI0031
PI0032
PI0033
PI0034

270 litre capacity


500 litre capacity
1000 litre capacity
2000 litre capacity
3000 litre capacity

each
each
each
each
each

Pans & Cisterns


Providing & fixing Indian-type vitreous china w.c squatting pan, including 100 mm H.C.I P or S trap, 10 lit low
level vitreous china cistern & fittings, repair walls
PI0040
PI0041
PI0042

500mm, white
580mm, white Orissa-model
580mm, colour Orissa-model

each
each
each

4989.53
5007.03
5222.84

4666.92
4720.59
5523.17

4775.00
4794.45
5047.20

4788.17
4909.68
5186.74

Providing & fixing European-type vitreous china w.c pedestal including seat and lid with c.p brass hinges, 15 lit
white vitreous china low level cistern, fittings, brackets, repair walls
PI0050

white, with plastic seat & lid

each

5196.18

Department of Engineering Services, MoWHS

4882.16

5120.38

5349.15

Bhutan Schedule of Rates - 2015


Code
PI0051

Description
coloured, with plastic seat & lid

50

Units
each

PL
5808.62

GP
5640.42

SJ
5397.44

TH
5319.99

pair

215.28

195.83

195.83

195.83

Foot Rests
PI0060

Providing & fixing white vitreous china foot rests


(250x130x30mm) for Indian W.C

Urinals
Providing & fixing white vitreous china flat back, lipped front urinal basin 430x260x350mm including C.I cistern &
fittings, brackets, G.I. flush pipe & spreaders, brass unions, G.I. clamps, painting, repair walls
PI0065
PI0066
PI0067

One bowl-5 litres. C.I. cistern


Two bowls-10 litres. C.I. cistern
Three bowls-10 litres. C.I. cistern

each
each
each

4353.07
6612.61
8711.19

4000.07
6746.84
8794.10

4435.09
6842.51
8847.77

4579.44
7071.90
9368.80

each

19578.03

20175.01

21419.86 21683.74

each
each

19422.38
1039.20

19217.94
1039.20

22588.25 23651.22
1049.12 1021.85

Baths
Providing and fixing bath tubs with fittings and accessories complete
PI0075

PI0076
PI0077

Porcelain, white enamelled, with a pair of 20mm C.P


pillar tap, 40mm C.P brass waste, 32mm C.P brass
over flow, rubber plug, 40mm C.P trap etc.
Fibreglass tub, white
P-Trap, heavy duty, for bath-tub

Basins & Sinks


Providing & fixing white vitreous china wash basin, including C.I brackets, 15mm C.P. brass pillar taps, c.p. chain
& rubber plug, 32mm pvc waste, 32mm dia. trap & union, repair walls
PI0085
PI0086
PI0087
PI0088

Flat back wash basin 630x450mm with a pair of 15mm


c.p. brass pillar taps
Flat back wash basin 630x450mm with single 15mm
c.p. brass pillar taps
Flat back wash basin 550x400mm with a pair of 15mm
c.p. brass pillar taps
Flat back wash basin 550x400mm with single 15mm
c.p. brass pillar tap

each

5416.29

5728.79

5504.93

5765.91

each

4868.83

5072.84

4834.98

5148.45

each

4850.51

4982.20

4950.82

4942.08

each

4303.05

4326.24

4280.87

4324.63

Providing & fixing white vitreous china angle back wash basin 400x400mm including brackets, 15mm c.p brass
pillar taps, c.p brass chain & rubber plug, 32mm c.p brass waste, 32mm dia c.p brass trap and M.I union and
repair walls
PI0095
PI0096

With single 15mm c.p. brass pillar tap


With pair of 15mm c.p. brass pillar taps

each
each

4303.05
4850.51

4326.24
4982.20

4280.87
4950.82

4324.63
4942.08

each

4186.55

3835.42

3835.42

3872.75

Flush Valve & Bend


PI0105

Providing & fixing c.p. flush valve, 32mm with 40mm


outlet

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PI0106
PI0107
PI0108

Description
Providing & fixing c.p. concealed flush valve, 32mm
with 40mm outlet
Providing & fixing c.p. flush bend, long
Providing & fixing c.p. flush valve elbow

51

Units
each

PL
3835.42

GP
3835.42

SJ
3835.42

TH
3872.75

each
each

552.75
465.08

563.25
465.08

563.25
465.08

802.19
469.37

Providing & fixing pedestals for basins, white vitreous


china, recessed back for pipes and necessary fittings each

1760.81

1647.07

1647.07

1670.40

4554.24
1381.37
1623.43

4989.24
1428.03
1515.52

5203.74
1297.77
1544.69

5312.26
1398.87
1807.16

2209.12

2069.14

2183.46

2127.46

2513.36

2141.00

2159.43

2885.72

3352.34

2735.94

2760.20

3352.34

4605.89
4613.67
5740.85

3816.13
4128.10
5615.45

3829.55
4166.01
5667.94

4605.89
5137.16
5918.75

9272.09

9272.09

9359.58 11949.32

11651.85

11651.85

11762.67 12063.06

Pedestals & Kitchen Sinks

PI0115

Providing & fixing Kitchen Sinks including all connections and fittings
PI0120
PI0121
PI0122
PI0123
PI0124
PI0125
PI0126
PI0127
PI0128
PI0129
PI0130

White glazed vitreous china 600 x 450 x 250 mm


including accessories and repairs to walls etc.
Stainless steel, 450 x 400 x 150 mm, single bowl
Stainless steel, 580 x 480 x 175 mm, single bowl
Stainless steel, 940 x 460 x 160 mm, single bowl &
drain-board
Stainless steel, 1080 x 520 x 175 mm, single bowl &
drain-board
Stainless steel, 1150 x 515 x 175 mm, single bowl &
drain-board
Stainless steel, 1740 x 520 x 200 mm, single bowl &
double drain-board
Stainless steel, 940 x 460 x 160 mm, double bowl
Stainless steel, 1150 x 520 x 160 mm, single bowl
Stainless steel, 1740 x 520 x 200 mm, double bowl &
single drain-board
Stainless steel, 1740 x 520 x 200 mm, double bowl &
double drain-board

each
each
each
each
each
each
each
each
each
each
each

Drain Board, Rubber plug


PI0140
PI0141

Providing & fixing stainless steel drain-board, 610 x


460 mm with all necessary fittings
Providing & fixing c.p. brass chain & rubber plug for
basin and sink

each

1422.17

1277.13

1281.35

1623.49

each

229.71

254.21

251.88

200.55

Providing & fixing 32mm dia pvc. waste


Providing & fixing 32mm c.p. brass waste
Providing & fixing 40mm c.p. brass waste

each
each
each

89.34
241.38
398.86

89.73
320.29
415.49

127.64
323.30
419.42

97.31
334.70
398.86

7868.26
8705.85
10207.49

8114.76
8872.32
10157.63

7412.50
7982.32
9125.20

7639.47
7881.49
9802.96

Wastes
PI0150
PI0151
PI0152

Water Heaters
Providing & fixing Electric water heater including necessary fittings
PI0160
PI0161
PI0162

10 litres
15 litres
25 litres

each
each
each

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PI0163
PI0164
PI0165
PI0166

Description
35 litres
50 litres
70 litres
100 litres

52

Units
each
each
each
each

PL
11301.48
14536.54
21016.73
25356.59

GP
11615.82
14800.42
21023.67
24476.01

SJ
10503.67
14590.68
20351.88
24392.79

TH
10700.42
14834.48
20559.91
24869.11

each
each
each
each
each

682.24
825.02
622.74
396.66
1085.44

628.69
920.21
444.26
574.33
1163.97

592.99
905.34
616.79
535.88
1252.02

723.07
841.47
642.69
649.96
1142.02

each
each
each
each
each

377.77
552.75
1019.37
867.72
797.72

593.58
564.41
945.79
733.56
637.43

576.08
669.40
1019.37
786.06
552.75

401.10
920.21
1092.74
928.96
682.96

each
each

558.58
981.46

667.07
977.26

681.07
961.04

628.57
581.91

each
each
each
each

537.19
494.42
552.75
549.83

552.75
552.75
791.89
723.84

552.75
587.75
669.40
669.40

599.41
634.64
815.22
821.06

2288.58
1955.41
2526.55
2883.52
1634.14
1515.15
860.72
2572.56

2288.58
1731.90
2526.55
2883.52
1634.14
1515.15
860.72
2641.71

2310.74
1974.31
3593.36
3420.13
1649.89
1529.73
868.88
2597.51

3294.14
3294.14
4370.87
3829.00
1579.31
1997.23
946.81
3387.47

Water Supply Fittings


Providing & fixing C.P. Brass shower fittings
PI0175
PI0176
PI0177
PI0178
PI0179

Shower with revolving joint, 15mm,


Adjustable shower, with locking key, 15mm
Shower arm, standard 15mm
Shower arm, heavy duty 15mm
Flexible shower tube & shower

Providing & fixing c.p. brass stop cock


PI0185
PI0186
PI0187
PI0188
PI0189

15mm, standard, c.p knob


20mm, standard, c.p knob
20mm, heavy-duty, c.p knob
15mm, concealed, c.p knob
15mm, angle, c.p knob

Providing & fixing c.p. brass pillar-cock


PI0195
PI0196

15mm, standard, c.p knob


15mm, swan neck, c.p knob

Providing & fixing c.p. brass bibcock


PI0205
PI0206
PI0207
PI0208

15mm, standard vertical, c.p knob


15mm, inclined, c.p. knob
15mm, long nose, c.p. knob
15mm, long body, c.p. knob

Providing & fixing c.p. brass mixers, 15mm


PI0215
PI0216
PI0217
PI0218
PI0219
PI0220
PI0221
PI0222
PI0223

For basin, single-hole, casted spout


For basin, close-hole
For basin, elbow action, surgical
For basin, elbow action, surgical with shower
For sink, with spout J pipe
For sink, with casted spout swinging
For sink, with swivel spout
For wall, non-telephonic type
For wall, telephonic type with crutch and tel. shower

each
each
each
each
each
each
each
each
each

PI0224

For wall, telephonic type without crutch and tel.


shower
For wall, telephonic type with crutch and without tel.
shower
For wall, telephonic type with C.P bend & flanges

each

3173.85
3240.48

3060.83
3240.48

3204.69
3837.17

3877.42
3819.09

each

2645.54

2645.54

2671.20

2983.06

each

1872.12

1872.12

1890.20

2501.59

PI0225
PI0226

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PI0227

PI0228
PI0229
PI0230
PI0231

Description
For wall, with telephonic shower arrangement with
115mm long bend pipe for over head shower
connection
Three hole mixer without pop-up
Three hole mixer with pop-up
For bath, with exposed adjustable legs with telephone
shower arrangement with crutch
For shower, three in one, with bend flexible tube, and
shower & hook

53

Units
each

PL
4192.38

GP
4192.38

SJ
4755.25

TH
4460.69

each
each
each

4192.38
4192.38
5858.22

4192.38
4192.38
5858.22

4233.21
4233.21
5915.38

4535.35
4535.35
5666.13

each

5679.74

5679.74

5735.15

6743.63

each
each

549.35
1072.89

549.35
1072.89

549.35
1072.89

668.34
1134.77

each

968.44

930.53

1038.43

1236.45

each

1359.19

1321.78

1400.01

1421.56

each

865.30

666.98

1186.10

1028.23

each

760.31

678.65

929.17

918.08

each

629.07

620.32

803.86

823.46

each

582.36

671.79

718.45

783.42

each
each
each
each

556.79
967.14
848.47
823.97

553.95
941.59
825.02
801.22

504.50
941.59
825.02
801.22

627.09
941.59
825.02
801.22

each

673.75

548.93

548.93

553.99

each
each
each

497.96
622.74
628.57

421.78
622.74
611.08

418.05
622.74
622.74

421.43
628.57
628.57

each
each

509.20
461.81

432.65
432.65

469.98
350.99

602.24
378.70

Providing & fixing Wall Spouts


PI0240
PI0241

C.p., standard, 15mm


With diverter, for use with single lever mixers

Bathroom Accessories
PI0250

PI0251
PI0252
PI0253
PI0254
PI0255

Providing & fixing 600x450mm bevelled edge mirror


(superior glass) incl.4mm A.C sheet base fixed to
wooden cleats
Providing & fixing 450x120mm glass shelf, including
c.p brass brackets fixed to wooden cleats
Providing & fixing c.p. towel rail 750 x 20mm with c.p
brass brackets fixed to wooden cleats
Providing & fixing c.p. towel rail 600 x 20mm with c.p
brass brackets fixed to wooden cleats
Providing & fixing c.p. towel rail 450 x 20mm with c.p
brass brackets fixed to wooden cleats
Providing & fixing c.p. towel ring

Providing & fixing toilet paper holder


PI0260
PI0261
PI0262
PI0263

C.P. brass
Recessed ceramic, 200 x 100 mm, coloured,
Recessed ceramic, 200 x 100 mm, white
Recessed ceramic, roll-type, 150 x 150 mm

Soap Container, Coat Hooks


PI0270

Providing & fixing Liquid soap container, c.p,


including c.p brass lid & brackets, wooden cleats, c.p
brass screws

Providing & fixing soap dish


PI0275
PI0276
PI0277

including brackets, wooden cleats, c.p. brass screws


Recessed, ceramic, 150x150 mm
Recessed, ceramic, 200x100 mm

Providing & fixing c.p coat hook


PI0285
PI0286

Single
Double

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

Units

54
PL

GP

SJ

TH

Chapter 17: PLUMBING - OUTDOOR WORK


.
External Water Supply Pipework
Providing & laying G.I. pipes including G.I. fittings (excluding trenching, refilling & thrust block)
PO0001
PO0002
PO0003
PO0004
PO0005
PO0006
PO0007
PO0008
PO0009
PO0010

15mm
20mm
25mm
32mm
40mm
50mm
65mm
80mm
100mm
150mm

m
m
m
m
m
m
m
m
m
m

124.19
156.66
226.45
298.26
364.08
451.57
582.91
777.98
1031.49
1628.53

122.05
173.51
232.28
297.00
366.99
444.28
669.36
933.93
1234.66
1858.92

125.55
163.27
234.22
323.73
404.90
471.98
673.64
889.45
1188.97
1781.80

118.94
158.60
232.28
292.82
334.91
451.57
621.15
831.12
1072.32
1849.30

Providing & laying H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching,
refilling & thrust block)

PO0015
PO0016
PO0017
PO0018
PO0019
PO0020
PO0021
PO0022
PO0023
PO0024
PO0025

25mm
32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm

m
m
m
m
m
m
m
m
m
m
m

53.95
83.35
127.37
186.69
289.48
401.72
571.03
832.07
1348.27
1741.41
3369.32

64.30
81.97
230.39
236.40
380.66
518.84
735.66
1093.17
1333.34
1711.82
3393.99

73.63
110.83
153.80
230.80
348.46
546.49
758.35
1184.86
2509.28
1721.85
3378.36

70.71
105.54
157.60
239.25
362.75
503.32
722.77
1137.62
1633.20
2684.26
3767.98

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0030
PO0031
PO0032
PO0033
PO0034
PO0035
PO0036
PO0037
PO0038
PO0039

32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm

m
m
m
m
m
m
m
m
m
m

59.81
88.63
129.67
201.64
274.34
384.22
562.71
899.61
1158.54
2222.26

65.75
110.23
164.30
254.50
350.62
489.34
732.71
834.69
1053.37
2081.30

84.00
108.60
159.93
222.18
313.95
429.38
754.41
1066.84
1484.27
2303.96

93.34
91.69
133.68
212.27
289.26
411.88
595.17
952.51
1227.82
2358.21

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0045
PO0046

40mm
50mm

m
m

66.98
106.64

Department of Engineering Services, MoWHS

80.20
134.26

135.72
167.57

89.81
112.10

Bhutan Schedule of Rates - 2015


Code
PO0047
PO0048
PO0049
PO0050
PO0051
PO0052
PO0053

Description
63mm
75mm
90mm
110mm
140mm
160mm
225mm

Units
m
m
m
m
m
m
m

PL
151.77
196.83
280.89
407.11
643.67
826.91
1565.27

55
GP
194.42
252.10
357.17
516.43
669.48
828.69
1513.57

SJ
163.27
188.50
266.06
370.03
623.35
786.28
1531.32

TH
159.19
250.18
353.55
433.60
680.71
875.52
1660.61

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0060
PO0061
PO0062
PO0063

110mm
140mm
160mm
225mm

m
m
m
m

274.33
445.40
560.76
1032.98

336.20
474.23
561.94
1048.57

308.39
478.70
666.87
1179.14

288.95
467.81
592.63
1094.83

m
m
m
m
m
m
m
m
m
m
m

1108.71
1287.78
1877.74
2582.39
3431.10
4336.95
5435.92
6474.47
7639.64
8953.14
12273.68

1108.71
1287.78
1877.74
2582.39
3431.10
4336.95
5435.92
6474.47
7639.64
8953.14
12273.68

1098.09 1168.02
1275.42 1336.23
1859.73 1945.54
2557.60 2672.00
3398.15 3521.61
4295.30 4493.12
5383.70 5703.78
6412.34 6682.73
7566.32 7897.72
8867.21 9354.22
12155.82 12870.59

m
m
m
m
m
m
m
m
m
m

1080.78
1676.28
2202.65
2900.90
3634.47
4574.34
5436.96
6358.88
7501.00
10165.32

1091.24
1692.49
2223.97
2928.98
3669.64
4618.63
5489.54
6420.36
7573.53
10263.66

1080.78 1106.42
1676.28 1721.56
2202.65 2333.70
2900.90 3070.15
3634.47 3808.35
4574.34 4788.04
5436.96 5776.32
6358.88 6760.33
7501.00 7988.19
10165.32 10810.47

Providing and Laying Ductile Iron K - 9 pipes


PO0065
PO0066
PO0067
PO0068
PO0069
PO0070
PO0071
PO0072
PO0073
PO0074
PO0075

80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

Providing and Laying Ductile Iron K - 7 pipes


PO0078
PO0079
PO0080
PO0081
PO0082
PO0083
PO0084
PO0085
PO0086
PO0087

100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

Providing and Laying Double Flanged (Screwed or Welded) Centrifugally Spun Ductile Iron K-9 Pipes
PO0090
PO0091
PO0092
PO0093
PO0094
PO0095
PO0096
PO0097

100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm

m
m
m
m
m
m
m
m

2173.60
3132.95
4405.43
5793.66
7185.54
8905.43
10676.23
14409.05

Department of Engineering Services, MoWHS

2194.67
3163.33
4448.17
5849.88
7255.24
8991.79
10779.73
14548.68

2173.60 2187.46
3132.95 3278.68
4405.43 4610.98
5793.66 6129.24
7185.54 7526.19
8905.43 9349.25
10676.23 11293.39
14409.05 15185.50

Bhutan Schedule of Rates - 2015


Code
PO0098
PO0099

Description
500 mm
600 mm

56

Units
m
m

PL
16966.05
22129.04

GP
17130.18
22342.78

SJ
TH
16966.05 17887.15
22129.04 23397.14

each
each
each

334.58
469.05
694.77

466.35
559.67
577.17

297.20
472.18
676.33

373.02
489.68
653.00

each
each
each
each
each

1292.65
1468.12
1656.23
2853.11
3774.97

1552.85
1994.72
2550.14
4539.60
6506.23

1552.85
1994.72
2550.14
4539.60
6506.23

1697.06
1930.37
2542.81
4350.96
5774.15

each
each
each

1679.56
2749.29
4170.14

2347.61
3885.95
5881.60

2274.50
3925.17
6188.28

2587.60
4580.65
6683.17

each

283.59

300.11

355.53

328.31

each
each
each
each
each
each
each
each

53.60
70.69
110.05
241.69
303.03
417.85
567.78
2385.32

62.33
87.57
125.41
201.11
346.20
491.29
800.38
2490.96

43.89
58.82
88.24
234.18
312.66
438.34
758.62
2947.46

89.67
120.91
202.61
295.69
482.68
731.83
1095.57
3298.85

each
each
each
each
each

76.90
155.53
270.61
371.00
492.82

112.80
185.30
262.59
385.56
478.58

66.72
133.91
243.73
376.69
611.82

104.41
215.54
381.75
530.79
731.94

each
each

303.03
303.03

290.16
293.63

292.92
300.10

305.95
305.95

Brass Fittings
Providing & fixing brass stop cock
PO0100
PO0101
PO0102

15mm
20mm
25mm

Providing & fixing brass full way valve with wheel


PO0105
PO0106
PO0107
PO0108
PO0109

32mm
40mm
50mm
65mm
80mm

Providing & fixing non-return valve


PO0110
PO0111
PO0112

50mm
65mm
80mm

Providing & fixing brass bibcock


PO0114

15mm, brass

H.D.P.E Fittings (Butt-Welded-Type)


Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings
PO0115
PO0116
PO0117
PO0118
PO0119
PO0120
PO0121
PO0122

20mm
25mm
32mm
50mm
63mm
90mm
110mm
160mm

Providing & fixing H.D.P.E Elbow


PO0125
PO0126
PO0127
PO0128
PO0129

32mm
50mm
63mm
90mm
110mm

Providing & fixing H.D.P.E Reducer


PO0130
PO0131

90 x 50mm
90 x 63mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PO0132
PO0133

Description
110 x 63mm
110 x 90mm

57

Units
each
each

PL
362.52
778.98

GP
322.79
764.92

SJ
300.10
853.26

TH
366.02
786.57

each
each
each
each
each

184.04
217.64
327.47
457.19
773.15

140.18
179.03
342.79
394.14
671.70

144.93
185.16
354.70
407.86
695.22

185.79
221.84
420.09
459.90
719.49

Providing & fixing H.D.P.E Blank End (Cap)


PO0140
PO0141
PO0142
PO0143
PO0144

50mm
63mm
90mm
110mm
160mm

Providing and fixing push on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets
PO0150
PO0151
PO0152
PO0153
PO0154
PO0155
PO0156
PO0157
PO0158
PO0159
PO0160

80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

each
each
each
each
each
each
each
each
each
each
each

84.20
98.45
147.63
230.66
258.27
404.91
452.68
542.56
633.36
864.76
1155.66

77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31

77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31

77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31

each
each
each
each

129.91
156.21
182.06
284.87

137.56
164.96
191.81
302.38

143.37
171.60
199.21
315.66

130.76
157.19
183.16
286.84

m
m
m
m

377.63
546.05
639.79
851.20

389.76
591.16
667.11
860.30

439.42
526.52
792.08
902.29

423.02
561.00
837.42
947.34

each
each
each

255.44
255.44
255.44

263.89
287.69
336.50

268.78
313.84
393.23

239.86
277.31
404.78

each
each

195.94
208.66

159.16
182.49

203.87
215.54

215.54
244.70

Soil Waste Pipework


Providing lead-caulked joints to C.I pipes and fittings
PO0162
PO0163
PO0164
PO0165

50mm dia pipe


75mm dia pipe
100mm dia pipe
150mm dia pipe

Providing & fixing C.I Soil Waste and Vent pipes


PO0166
PO0167
PO0168
PO0169

50mm dia
75mm dia
100mm dia
150mm dia

Waste Fittings & Accessories


Providing & fixing C.I door bend including fittings
PO0170
PO0171
PO0172

50mm dia
75mm dia
100mm dia

Providing & fixing C.I plain bend including fittings


PO0180
PO0181

50mm dia
75mm dia

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PO0182

Description
100mm dia

58

Units
each

PL
214.49

GP
240.81

SJ
265.12

TH
303.03

each
each
each

157.87
270.20
256.70

160.56
269.75
329.76

188.20
293.93
414.09

159.36
320.37
405.68

532.80
407.23
319.15

497.59
346.20
289.43

589.06
333.58
283.12

532.80
407.23
319.15

685.22
459.08
367.88

623.76
314.66
264.19

705.76
333.58
283.12

685.22
459.08
367.88

399.11
399.11
275.43
217.95

443.02
443.02
273.02
228.24

433.30
433.30
293.93
233.85

402.97
402.97
278.07
220.04

542.79
399.11
267.93

474.16
372.03
263.89

585.57
417.68
341.50

548.06
402.97
270.50

each
each

467.83
411.61

456.14
399.67

497.59
434.51

467.83
411.61

each
each

455.34
392.87

442.92
396.06

472.36
415.59

455.34
392.87

each
each
each

464.08
436.59
287.29

479.93
440.82
296.36

488.13
459.74
308.35

464.08
436.59
287.29

each
each

405.36
349.14

416.85
365.12

416.49
370.83

405.36
349.14

Providing & fixing C.I heel rest bend


PO0190
PO0191
PO0192

50mm
75mm
100mm

Providing & fixing C.I double equal door junction including fittings
PO0200
PO0201
PO0202

100mm
75mm
50mm

each
each
each

Providing & fixing C.I double equal plain junction including fittings
PO0210
PO0211
PO0212

100mm
75mm
50mm

each
each
each

Providing & fixing C.I single equal door junction including fittings
PO0220
PO0221
PO0222
PO0223

150mm
100mm
75mm
50mm

each
each
each
each

Providing & fixing C.I single equal plain junction including fittings
PO0230
PO0231
PO0232

100mm
75mm
50mm

each
each
each

Providing & fixing C.I double unequal door junction including fittings
PO0240
PO0241

100x75mm
100x50mm

Providing & fixing C.I double unequal plain junction


PO0250
PO0251

100x75mm
100x50mm

Providing & fixing C.I single unequal door junction


PO0260
PO0261
PO0262

100x75mm
100x50mm
75x50mm

Providing & fixing C.I single unequal plain junction


PO0270
PO0271

100x75mm
100x50mm

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PO0272

Description
75x50mm

59

Units
each

PL
267.93

GP
281.86

SJ
281.92

TH
267.93

each
each
each

685.22
512.81
367.88

617.45
409.28
333.58

443.34
354.97
250.28

685.22
512.81
367.88

each
each
each

642.74
464.08
242.94

607.54
436.92
203.82

573.29
308.35
270.50

642.74
464.08
242.94

each
each

469.61
345.87

490.02
358.81

506.42
375.22

469.61
345.87

each
each

320.88
469.61

329.98
472.96

326.36
501.34

323.97
474.16

each
each

320.88
451.77

329.98
452.54

326.36
402.19

323.97
456.14

each
each

347.06
477.94

305.95
487.38

283.12
503.90

347.06
477.94

each
each
each
each

680.22
386.62
255.44
155.49

686.84
384.05
273.02
163.26

613.13
383.33
312.18
225.92

680.22
386.62
255.44
155.49

each
each
each

275.66
205.46
153.11

390.36
245.27
194.80

411.61
242.94
205.46

278.31
207.42
154.55

each
each

504.62
327.27

562.12
395.13

540.10
435.11

588.03
410.67

Providing & fixing C.I double equal Y-Junction


PO0280
PO0281
PO0282

100mm
75mm
50mm

Providing & fixing C.I single equal Y-Junction


PO0290
PO0291
PO0292

100mm
75mm
50mm

Providing & fixing single unequal plain inverted branch


PO0300
PO0301

100x50mm
75x50mm

Providing & fixing S.C.I offsets - 100mm Offsets


PO0310
PO0311

75mm projection
150mm projection

Providing & fixing S.C.I offsets - 75mm offset


PO0320
PO0321

75mm projection
150mm projection

Providing & fixing S.C.I offsets - 50 mm offset


PO0330
PO0331

75mm projection
150mm projection

Providing & fixing C.I terminal guard


PO0340
PO0341
PO0342
PO0343

150mm
100mm
75mm
50mm

Providing & fixing C.I collar


PO0350
PO0351
PO0352

100mm
75mm
50mm

Providing & fixing C.I P-Type Nahani trap


PO0360
PO0361

100mm inlet & 75mm outlet


100mm inlet & 50mm outlet

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

60

Code
Description
Units
PL
GP
SJ
Providing & fixing P.V.C soil waste and vent pipes, single or double socketed, including pipe clip complete
(excluding the cost of PVC fittings)
PO0370
PO0371
PO0372

75mm dia
90mm dia
110mm dia

TH

m
m
m

203.25
265.28
306.40

184.47
271.16
277.82

203.25
246.66
309.67

177.88
290.20
308.34

each

192.21

189.29

178.03

182.76

each
each
each

79.34
95.77
110.26

75.00
105.65
116.94

88.85
113.82
121.40

79.50
95.39
117.92

each
each
each

124.16
133.88
160.24

157.21
168.88
192.21

136.80
177.63
189.29

166.96
196.91
220.26

each
each
each

110.74
121.83
133.59

107.63
145.55
151.38

121.05
133.88
170.34

107.55
134.86
137.51

each
each
each

121.05
160.13
171.60

116.38
157.21
189.29

133.88
171.21
176.61

117.55
139.71
172.96

each
each
each

207.84
303.03
410.12

219.74
314.93
410.12

226.93
329.86
420.91

205.43
256.37
401.60

each
each
each

121.44
166.54
180.54

125.13
163.04
179.08

116.38
164.99
199.99

116.38
168.88
218.46

each
each
each

127.27
172.38
205.82

141.17
186.38
207.76

122.22
168.88
186.38

148.46
203.87
241.79

Providing & fixing P.V.C Pipe connector


PO0380

110mm dia

Providing & fixing P.V.C Coupler


PO0385
PO0386
PO0387

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Reducer


PO0395
PO0396
PO0397

90x75mm
110x75mm
110x90mm

Providing & fixing P.V.C plain bend


PO0405
PO0406
PO0407

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C door bend


PO0415
PO0416
PO0417

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Long arm bend with door


PO0425
PO0426
PO0427

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Single Tee plain


PO0435
PO0436
PO0437

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Single Tee with door


PO0445
PO0446
PO0447

75mm dia
90mm dia
110mm dia

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

61

Code
Description
Providing & fixing P.V.C Double Tee plain

Units

PL

GP

SJ

TH

PO0455
PO0456
PO0457

each
each
each

246.16
328.99
437.18

208.85
255.44
329.16

221.37
308.86
384.69

119.88
186.38
206.21

each
each
each

265.12
308.86
402.19

349.98
439.87
456.61

245.64
278.04
382.36

250.54
308.86
373.02

each
each
each

127.46
203.87
234.79

177.63
349.69
366.02

145.55
215.54
273.87

152.55
222.54
262.20

each
each
each

293.70
254.04
300.11

407.75
320.53
279.70

389.08
276.20
323.25

341.25
280.87
333.36

each
each
each

211.65
300.11
351.64

243.24
297.20
297.20

204.26
275.42
318.58

213.98
305.95
373.41

each
each
each

273.87
317.61
415.80

296.03
397.52
431.35

211.46
247.62
303.03

303.03
279.70
422.60

each
each

349.69
468.68

243.54
350.63

273.87
338.03

297.20
585.34

each
each

462.46
562.59

398.22
493.41

355.53
530.51

443.02
600.50

each
each

517.68
594.67

445.82
499.36

413.85
518.84

614.11
679.24

each

100.75

112.65

113.70

101.68

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Double Tee with door


PO0465
PO0466
PO0467

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Single Y, plain


PO0475
PO0476
PO0477

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Single Y, with door


PO0485
PO0486
PO0487

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Double Y, plain


PO0495
PO0496
PO0497

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Double Y, with door


PO0505
PO0506
PO0507

75mm dia
90mm dia
110mm dia

Providing & fixing P.V.C Offset, 75mm dia


PO0515
PO0516

With 75mm projection


With 150mm projection

Providing & fixing P.V.C Offset, 90mm dia


PO0525
PO0526

With 75mm projection


With 150mm projection

Providing & fixing P.V.C Offset, 110mm dia


PO0535
PO0536

With 75mm projection


With 150mm projection

Providing & fixing P.V.C Terminal guard


PO0545

75mm dia

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PO0546
PO0547

Description
90mm dia
110mm dia

62

Units
each
each

PL
112.65
118.60

GP
130.50
136.45

SJ
125.71
137.73

TH
113.70
119.71

each
each

404.57
355.53

499.36
445.82

498.19
426.10

536.84
435.27

each

223.32

256.37

341.99

226.68

4.06
5.45
6.75
8.65

4.01
5.38
6.66
8.54

4.74
6.36
7.87
10.09

Providing & fixing P.V.C P-Trap, without air vent


PO0555
PO0556

Big
Small

Providing & fixing P.V.C Nahani Trap


PO0565

110mm inlet & 75mm outlet

Painting G.I Pipes & Fittings


Painting G.I pipes and fittings including primer & white coat, for new work
PO0570
PO0571
PO0572
PO0573

15mm dia pipe


20mm dia pipe
25mm dia pipe
32mm dia pipe

m
m
m
m

4.34
5.82
7.20
9.23

Painting C.I spun soil waste vent pipes & fittings including primer, top coat (any colour), for new work
PO0580
PO0581
PO0582

50mm
75mm
100mm

m
m
m

14.78
8.30
29.55

13.73
7.92
27.46

13.92
9.65
27.84

15.93
10.28
31.85

7.37
11.06
14.75

6.70
10.05
13.40

6.83
10.24
13.65

8.08
12.12
16.16

5544.74

6236.99

Repainting C.I spun soil waste vent pipes & fittings including paints of any colour
PO0590
PO0591
PO0592

50mm
75mm
100mm

m
m
m

Soak - pits & Septic Tanks


Constructing Soak Pit
PO0600

Size 1200x1200x1200mm, filled with brick bats


including 100mm SW drain pipe X 1200mm long

each

5507.21

5273.37

PO0601

Size 2500 dia. x 3000mm depth including 450x450mm each


dry brick honeycomb shaft and SW drain pipe X
1800mm long

39967.04

38251.57

40060.04 44580.39

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with frame, 40mm
thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as per standard
design
PO0610
PO0611
PO0612
PO0613
PO0614

15 users
25 users
50 users
75 users
100 users

each
each
each
each
each

27248.10
32630.31
46004.87
52620.77
63103.82

Department of Engineering Services, MoWHS

27327.28
32838.64
46465.39
53247.25
63938.45

29378.37
34943.80
48754.88
55583.30
66368.88

29982.28
35638.44
49777.83
56616.32
67684.66

Bhutan Schedule of Rates - 2015


Code

Description

Units

63
PL

GP

SJ

TH

Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as
per standard design
PO0620
PO0621
PO0622
PO0623
PO0624

15 users
25 users
50 users
75 users
100 users

each
each
each
each
each

31887.27
39025.53
51104.06
61869.00
73772.90

31388.26
38498.05
50410.70
61022.18
72786.15

34404.33
41696.67
54719.76
66073.49
78159.97

38329.04
47087.07
62609.73
76150.69
89988.36

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover with frame,
40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as per
standard design
PO0630
PO0631
PO0632
PO0633
PO0634

15 users
25 users
50 users
75 users
100 users

each
each
each
each
each

32039.04
40824.02
57754.95
71257.69
87467.25

32442.95
41546.59
58948.47
72828.44
89280.67

34600.61
43587.85
61244.10
75354.36
92184.82

35258.33
44507.73
62500.63
76837.72
93949.55

sq.m
sq.m

68.37
72.57

68.41
72.63

68.37
72.57

68.43
72.65

sq.m
sq.m
sq.m

82.17
75.66
1.67

84.95
77.69
1.67

83.76
77.17
1.67

84.93
78.10
1.67

sq.m
sq.m
sq.m
sq.m

119.29
106.18
99.10
93.07

124.85
110.22
102.33
95.60

122.47
109.19
102.02
95.91

124.80
111.06
103.64
97.32

147.33
129.89
120.43
112.38

144.49
128.65
120.06
112.74

147.27
130.89
121.99
114.42

Chapter 18: PLASTERING


Mud Plaster
Providing & laying mud plaster including neat finish
PL0001
PL0002

15mm
20mm

Cement Plaster
Providing & laying 6mm cement plaster (in ceilings)
PL0010
PL0011
PL0012

C.M 1:3
C.M 1:4
Extra for plaster to ceiling height > 5m ......per
additional metre. ht

Providing & laying 12mm cement plaster


PL0020
PL0021
PL0022
PL0023

C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6

Providing & laying 15mm cement plaster on rough side of single or half-brick wall
PL0030
PL0031
PL0032
PL0033

C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6

sq.m
sq.m
sq.m
sq.m

140.69
125.06
116.57
109.35

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

64

Units

PL

GP

SJ

TH

sq.m
sq.m
sq.m
sq.m

175.04
154.64
143.63
134.23

183.68
160.93
148.65
138.17

179.99
159.32
148.17
138.65

183.61
162.23
150.69
140.84

220.52
238.32
267.73

224.46
242.25
271.66

223.45
241.24
270.65

225.27
243.06
272.47

275.65
296.58
332.17

281.27
302.20
337.78

279.83
300.76
336.35

282.43
303.36
338.94

157.13
179.61
215.96
142.51
162.17
193.21
123.87

153.18
175.20
210.70
139.90
159.36
190.03
121.53

156.06
178.53
214.86
142.31
162.14
193.48
123.44

Providing & laying 20mm cement plaster


PL0040
PL0041
PL0042
PL0043

C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6

Providing & laying 12mm plain cement mortar band in C.M 1:4
PL0050
PL0051
PL0052

Flush band
Sunk band
Raised band

sq.m
sq.m
sq.m

Providing & laying 20mm plain cement mortar band in C.M 1:4
PL0060
PL0061
PL0062

Flush band
Sunk band
Raised band

sq.m
sq.m
sq.m

Providing & laying cement plaster, finished with floating coat of neat cement
PL0070
PL0071
PL0072
PL0073
PL0074
PL0075
PL0076

12mm plaster in C.M 1:3


15mm plaster in C.M 1:3
20mm plaster in C.M 1:3
12mm plaster in C.M 1:4
15mm plaster in C.M 1:4
20mm plaster in C.M 1:4
6mm cement plaster in C.M 1:3, including lime wash
on top of wall when dry for bearing R.C slabs and
beams

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

149.81
171.21
205.55
136.69
155.57
185.15
119.22

Rough cast plaster with a mixture of sand and gravel or crushed stone 2-12mm including plaster in 2 layers-12mm
1:4, & 10mm 1:3 hydrated lime cement
PL0080
PL0081

Grey cement
White cement

sq.m
sq.m

282.77
457.98

290.99
472.87

293.84
465.42

299.80
472.75

Pebble dash plaster with a mixture of washed pebble or crushed stone 6mm to 12mm nominal size dashed over fresh
plaster in the layers, under layer 12mm cement plaster 1:4 and top layer 10mm cement plaster mixed with finally
ground hydrated lime by volume of cement
PL0090

Grey cement

sq.m

281.27

289.49

292.34

298.31

18 mm cement plaster in two coats; under layer 12 mm sq.m


C.P 1:5 (1 cement : 5 sand) and top layer 6 mm thick
C.P 1:4 (1 cement : 6 sand) finished even and smooth
and curing etc. complete

82.49

82.55

82.55

82.58

Cement Plaster in 2 coats


PL0091

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

65

Code

Description

Units

PL

GP

SJ

TH

Pl0092

18 mm cement plaster in two coats; under layer 12 mm


C.P 1:5 (1 cement : 5 sand) and top layer 6 mm thick
sq.m
C.P 1:3 (1 cement : 6 sand) finished even and smooth
and curing etc. complete

82.45

82.51

82.51

82.53

179.11

182.98

175.25

183.76

179.75

184.39

175.15

185.31

Cement Lime Plaster


PL0095

PL0096

12 mm cement lime plaster of mix on fair side of brick sq.m


work - 1:1:6 ( 1 cement :1 lime : 6 sand) finished even
and smooth and curing etc. complete
12 mm cement lime plaster of mix on rough side of
sq.m
brick work - 1:1:6 ( 1 cement :1 lime : 6 sand) finished
even and smooth and curing etc. complete

Extra for providing and mixing water-proofing materials in proportion recommended by the
manufacturers
PL0100
PL0101
PL0102
PL0103
PL0104
PL0105

12mm plaster in C.M 1:3


12mm plaster in C.M 1:4
15mm plaster in C.M 1:3
15mm plaster in C.M 1:4
20mm plaster in C.M 1:3
20mm plaster in C.M 1:4

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

21.46
17.14
23.62
19.36
28.83
23.16

18.22
14.63
20.02
16.48
24.36
19.64

20.58
16.45
22.64
18.58
27.61
22.20

26.77
21.27
29.53
24.11
36.17
28.94

sq.m

30.51

32.28

30.71

31.25

Extra for cement plastering


PL0110

Neat cement punning

Plaster of Paris
Providing & fixing 12mm Plaster of Paris (gypsum anhydrous) tiles, rendered smooth with Plaster of
Paris
PL0120

Height above floor < 5m

sq.m

631.97

705.22

709.92

770.96

PL0121

Extra for heights-above-floor > 5m.....per metre height sq.m

31.96

31.96

31.96

31.96

Chapter 19: PAINTING & WALL PAPER


Surface Preparation
Surface preparation removing by scraping, sand papering, including scratch repairs
PT0001
PT0002

White colour-wash
Dry oil bound distemper

sq.m
sq.m

4.44
5.48

4.44
5.48

4.44
5.48

4.44
5.48

sq.m
sq.m

27.63
23.19

26.40
23.66

26.10
21.39

29.20
25.17

Painting Items
Providing & applying one coat of primers
PT0010
PT0011

Cement primer
Metal work - synthetic red oxide primer

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PT0012
PT0013
PT0014

Description
Wood work - pink primer
Wood work - white primer
Red lead primer

66

Units
sq.m
sq.m
sq.m

PL
29.10
23.90
23.22

GP
28.99
24.45
23.01

SJ
27.09
23.11
22.98

TH
31.62
25.78
23.80

sq.m
sq.m
sq.m
sq.m

21.86
13.56
7.43
21.86

22.11
13.72
7.52
22.11

20.63
12.73
7.02
20.63

21.94
13.61
7.46
21.94

sq.m
sq.m

13.56
7.43

13.72
7.52

12.73
7.02

13.61
7.46

sq.m
sq.m

58.29
27.04

54.23
25.40

73.50
33.15

82.75
36.88

sq.m

43.74

42.70

47.50

50.47

sq.m
sq.m

16.69
60.94

16.77
64.63

16.28
59.76

16.72
66.96

sq.m
sq.m

19.78
55.98

23.05
54.61

20.01
61.85

22.74
63.66

sq.m

35.50

34.68

39.02

40.11

sq.m

39.08

40.40

39.28

41.20

sq.m

62.18

64.37

62.51

65.70

sq.m

69.14

62.79

64.01

75.74

sq.m

46.09

41.86

42.67

50.50

sq.m

52.08

51.65

50.81

54.02

sq.m

32.63

32.39

31.90

33.75

sq.m

70.26

69.84

71.81

109.43

sq.m
sq.m
sq.m

36.15
35.46
57.21

36.74
35.66
57.56

39.70
33.88
54.53

53.28
37.84
61.27

sq.m
sq.m

57.91
75.37

57.06
74.21

75.11
69.19

35.46
80.04

Providing & applying white or colour washing


PT0020
PT0021
PT0022
PT0023
PT0024
PT0025

White washing with lime-new work-three coats


White washing with lime, old work, two coats
White washing with lime, old work, one coat
Colour washing\new work, two coats, including base
coat of white-wash with lime
Colour washing with lime, old work, two coats
Colour washing with lime, old work, one coat

Finishing wall with Water-Proof Cement Paint


PT0030
PT0031

New work, three coats


Old work, one coats

Providing and applying finishing coats


PT0040
PT0041
PT0042
PT0043
PT0044
PT0045
PT0046
PT0047
PT0048
PT0049
PT0050
PT0051
PT0052
PT0053
PT0054
PT0055

Dry distemper, two coats on new work, including white


priming coat
Dry distemper, one coat on old work
Acrylic washable distemper, two coats on new work,
including cement primer coat
Acrylic washable distemper, one coat on old work
Bituminastic enamel, for steel work, two coats on new
work
Bituminastic enamel, for steel work, one coat on old
work
Synthetic enamel, for steel & wood work\one coat on
old work
Synthetic enamel, for steel & wood work, two coats on
new work
High gloss synthetic enamel\for steel & wood work,
two coats on new work
High gloss synthetic enamel, for steel & wood
work\one coat on old work
Red corrugal, ready mixed\on G.I. sheets, two coats on
new work
Red corrugal, ready mixed, on G.I. sheets\one coat on
old work
Vinyl plastic emulsion paint, for cement, masonry,
plaster, two coats on new work
Acrylic emulsion, one coat
Aluminium paint, one coat on old work
Aluminium paint, two coats on new work

Providing and applying wood stains, varnishes & polishes


PT0060
PT0061

Wood stain (various colours), one coat


Synthetic varnish (clear) - one coat, on old work

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
PT0062
PT0063
PT0064

Description
Units
Synthetic varnish (clear) - two coats, including coat of sq.m
wood filler on new work
French polish - one coat, on old work
sq.m
French polish - two coats, on new work
sq.m

67

PL
133.83

GP
131.92

SJ
123.75

TH
141.43

75.78
134.49

73.65
131.01

71.87
128.12

79.26
140.16

sq.m
sq.m
sq.m
sq.m

37.03
29.36
53.23
27.02

34.10
26.99
42.40
22.36

26.30
20.67
42.12
22.23

36.53
28.95
60.88
30.29

sq.m
sq.m

406.96
550.64

410.76
555.84

400.71
538.14

410.76
555.84

460.62
319.83
234.33

462.80
326.72
241.22

457.96
323.97
238.46

457.17
314.33
228.83

630.02
462.34
319.83

632.02
469.23
326.72

628.71
466.48
323.97

624.53
456.84
314.33

509.64
379.01
284.96

504.27
378.53
284.48

503.64
378.46
284.40

515.36
384.72
290.67

sq.m
sq.m
sq.m

643.60
484.32
353.21

638.23
483.81
352.70

637.60
483.69
352.58

649.32
490.01
358.90

sq.m
sq.m

133.67
109.45

133.18
108.26

133.05
108.73

139.28
113.93

Wood Preservatives
Providing and applying wood preservatives
PT0070
PT0071
PT0072
PT0073

Brown, two coats on new work


Brown, one coat on old work
Coal tar, two coats on new work
Coal tar, one coat on old work

Wall Paper
Providing & fixing wall paper
PT0080
PT0081

Standard Quality
High Quality

Traditional

Painting

Providing, preparing and applying Sumdang painting (Not washable)


PT0090
PT0091
PT0092

Rab
Ding
Thamar

sq.m
sq.m
sq.m

Providing, preparing and applying Dangtshon painting (Not washable)


PT0100
PT0101
PT0102

Rab
Ding
Thamar

sq.m
sq.m
sq.m

Providing, preparing and applying Sumdang washable painting


PT0110
PT0111
PT0112

Rab
Ding
Thamar

sq.m
sq.m
sq.m

Providing, preparing and applying Dangtshon washable painting


PT0120
PT0121
PT0122

Rab
Ding
Thamar

Providing, preparing and applying Yutshon painting (plain)


PT0130
PT0131

Washable
Not Washable

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

68

Code
Description
Units
PL
GP
SJ
TH
Providing, preparing and applying flower natural painting for wall decoration design such as Tashitagey symbols,
Tashi Zeegay, Za-Tshering, etc.
PT0140
PT0141

Dangtshon - Rab
Sumdang - Rab

sq.m
sq.m

109.65
105.38

97.46
93.19

103.12
98.85

142.85
138.57

Chapter 20: ADDITIONS, ALTERATIONS & REPAIRS


Repair to Plasters
Repair to plaster including cutting to shape, surface preparation, proving and applying cement plaster
to the surface, disposal rubbish within 50m lead
AA0001 Patch area <2.5sq.m

sq.m

159.88

164.94

163.64

165.98

Glass Panes
Providing & fixing glass panes with putty, nails including remaining. broken glass panes
AA0005
AA0006
AA0007
AA0008
AA0009

3mm thick plain


4mm thick plain
5.5mm thick plain
3mm thick frosted
5.5mm thick frosted

sq.m
sq.m
sq.m
sq.m
sq.m

710.18
761.96
945.77
742.53
1066.35

718.12
729.94
973.35
693.85
947.17

725.21
821.45
1074.13
803.21
1125.19

764.05
833.09
1040.19
833.09
1247.30

each

210.18

204.76

216.78

247.70

each

107.62

107.85

108.05

108.20

56.34

56.40

57.08

57.24

Cutting Walls
AA0015 Cutting holes < 300x300mm in brick walls including
repair wall
AA0016 Cutting holes < 150x150mm in R.C floors or roof
including making leak proofing with concrete 1:2:4,
20mm aggregates
AA0017 Making chases < 75x75mm in walls including repair
after fixing G.I pipe etc.
Aluminium Strip Edging
Providing & fixing Aluminium strip edging to staircases including rawl plugs and screws, a thin layer
of cement mortar 1:3
AA0025 57mm x 12mm x 3mm
AA0026 38mm x 12mm x 3mm

m
m

498.31
173.24

489.73
151.16

Chapter 21: ROAD WORKS


Contractor Work/Labour camp
RW0001 Installation of labour camps, including water supply,
pit latrines, solid waste disposal etc. according to
Environment Code of Practice

item
Lumpsum

Department of Engineering Services, MoWHS

485.81
150.11

530.98
277.50

Bhutan Schedule of Rates - 2015


Code
Description
Units
RW0002 Restoration of labour camps: Restoration of camp sites item
including disposal of wreckage, rubbish, restoration of
site using bioengineering, enclosure of temporary
access according to Environment Code of Practice

69
PL

GP

SJ

TH

Lumpsum

Excavation
Earthwork in excavation over areas, exceeding 300mm in depth, 1.5 m in width as well as 10 sq.m on plan including
disposal of excavated earth (disposed earth to be levelled and neatly dressed)
RW0006
RW0007
RW0008
RW0009
RW0010

Ordinary Soil
cu.m
Hard Soil
cu.m
Ordinary Rock with or without blasting
cu.m
Hard rock requiring blasting
cu.m
Hard rock requiring chiselling (where blasting is prohibi cu.m

Same rate as for items EW0030 to


EW0034

Excavation of road formation/trace/box cutting, with bull-dozer including separate deposition of soil, rocks and
stones within 50m for reuse
RW0011 All types of soil
RW0012 All types of rock

cu.m Same rate as for items EW0046 and


cu.m
EW0047

Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil, rocks and
stones within 50m for reuse
RW0013 All types of soil
RW0014 All types of rock

cu.m
cu.m

59.35
219.04

59.35
216.45

59.35
214.31

59.35
216.10

Earthwork in Excavation in foundation trenches or drains including dressing of sides and ramming of bottom,
disposal of surplus excavated soil within 50m lead
RW0015
RW0016
RW0017
RW0018

Ordinary Soil
Hard Soil
Ordinary Rock with or without blasting
Hard rock requiring blasting

cu.m
cu.m
cu.m
cu.m

Same rate as for items EW0105 to


EW0109

Transportation of Loose Soils


Transport of loose spoil materials in designated locations including loading/unloading, dressing of dump sites and
plantation of vegetation after completion of dumping
RW0019 Beyond 50 up to 200 m
RW0020 Beyond 200 up to 500 m
RW0021 Beyond 500 up to 1000 m

cu.m
cu.m
cu.m

Analyse as per procedure in LMC2007

Embankments

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Units
RW0030 Construction of embarkment by providing and laying
dry earth in horizontal layers not exceeding 200mm in
cu.m
depth(compacted), including watering,power
rooling,dressing and preparation of site with selected
excavated earth within 50mm lead

70
PL

GP

SJ

TH

Rate same as EW0096

Filling of Trenches
RW0035 Filling of trenches, sides of foundations, walls, etc
including filter material (600mm wide) with 100 to
200mm stones wherever applicable including filling
with selected suitable excavated
cu.m
material in layer not exceeding 200mm in depth
(compacted), consolidating each layer with power
roller or portable compactor, watering etc. within 50m
lead

Rate same as EW0195

Quarries
RW0040 Opening, running and restoration of quarries according item
to environmental code of practice and as per technical
specifications
item
RW0041 Opening, running and restoration of sand quarries
according to environmental code of practice for
Highways and Roads, and as per the technical
specification

Lumpsum

Lumpsum

Supply and Stacking


Supplying/collection and stacking of stone aggregate
RW0044 100mm

cu.m

1177.26

1082.00

1113.84

1377.35

RW0045 75 mm

cu.m

1135.55

1040.30

1119.13

1335.64

RW0046 50 mm

cu.m

1145.98

1050.72

1168.30

1346.07

RW0047 63 - 40 mm

cu.m

1145.98

1047.70

1169.04

1346.07

RW0048 20 mm

cu.m

1326.21

1166.72

1432.57

1402.66

RW0049 12 - 6 mm

cu.m

1336.64

1195.58

1391.68

1418.33

RW0050 50 - 20 mm

cu.m

1219.11

1095.38

1262.70

1369.75

RW0055 Blinding materials

cu.m

248.06

246.08

249.05

247.60

RW0056 Gravel/Coarse sand

cu.m

560.25

556.19

554.82

556.19

RW0057 Boulder

cu.m

291.35

291.21

291.67

291.14

Supplying/collection and stacking at site

Walls
Construction of Gabion wall as per drawings, including excavation of foundations in all types of soils, sides and
backfilling, delivery of materials etc. complete

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code

Description

RW0065
RW0066
RW0067
RW0068
RW0069
RW0070
RW0071

Height up to 1.0m
Height up to 2.0m
Height up to 3.0m
Height up to 4.0m
Height up to 5.0m
Height up to 6.0m
Height up to 7.0m

RW0072 Height up to 8.0m


RW0073 Height up to 9.0m

Units

71
PL

GP

SJ

TH

m
m
m
m
m
m
m

2906.67
5839.10
10365.32
16130.01
25398.21
34816.41
42524.86

3036.64
6104.17
10844.60
16869.22
26466.70
36276.93
44480.01

2959.66
5946.38
10556.98
16427.64
25856.11
35443.82
43311.13

3039.59
6109.61
10852.75
16883.27
26507.09
36333.23
44516.48

m
m

53774.52
67013.74

56223.88
70074.92

54766.24 56274.43
68250.76 70136.34

sq.m

14516.71

14265.68

14251.89 14264.03

sq.m

1050.52

1088.68

1055.73

1116.74

727.79

717.63

743.42

731.74

Providing and Construction Light timber crib walls


RW0075 With timber section of 100 to 150 mm diameter
including excavation in all types of soil and back
filling
RW0076 With timber section of 250 to 300 mm diameter
including excavation in all types of soil and back
filling
Barriers
RW0081 Providing and constructing boulder barrier, height not
exceeding 1.5 m, max. inclination of 20 deg. to the
road alignment and width not less than 900mm within
50m lead
Drains

Construction of French drain, including jungle clearance, earthwork in excavation, levelling of excavated earth to
the sides, filling drain with 50-100 mm stones, complete as per design
RW0095 Drain Size 0.6m X 1.0m
RW0096 Drain Size 1.0m X 1.5m

m
m

972.60
2090.50

910.92
1945.12

961.96
2065.43

1102.16
2395.90

RW0100 Construction of foundation drains of minimum size


200mm wide & 250 mm deep with stone fill of average
size 50 - 100 mm as per drawing or as directed by the
engineer including excavation and delivery of
materials

203.22

198.81

202.46

212.48

Construction of V-shaped stone pitched drain including excavation, levelling and disposal of surplus
earth within 50m
RW0105 depth 300mm, width 600 mm
RW0106 depth 300 mm and width 450 mm

m
m

256.80
137.99

254.56
136.97

260.24
139.55

257.67
138.38

18.39

18.39

Construction of V-shaped earthen drain including excavation, levelling and disposal of surplus
excavated earth within 50m
RW0107 depth 500 mm and width 600 mm

18.39

Department of Engineering Services, MoWHS

18.39

Bhutan Schedule of Rates - 2015


Code
Description
Units
RW0108 Construction of Lined V Shaped drain 600 X 300 with
m
50mm thick PCC 1:2:4, 150mm thick stone soling,
RRM in CM 1:5 on sides, finished with 20mm thick
1:4 cement plaster including excavation, levelling and
disposal of surplus earth within 50m
RW0120 Providing and laying Hammer dressed stone edging
150 x 250 mm with stones including excavation,
refilling and disposal of surplus earth within 30 m lead

72

PL
588.72

GP
599.87

SJ
608.00

TH
613.23

63.34

62.87

64.06

63.52

Subgrade
Preparation of sub grade with proper camber by excavating earth to depth equal to pavement thickness,
consolidation with roller, disposal of surplus earth up to 50m
RW0121 All kinds of soil
RW0122 Blasted Rock

cu.m
cu.m

31.72
107.54

31.72
107.54

31.72
107.54

31.72
107.54

RW0123 Consolidation of sub-grade with roller, and making


sq.m
good the undulation with earth and re-rolling the sub
grade
cu.m
RW0124 Extra for compaction of earth in embankments under
suitable moisture conditions to give at least 95% of the
proctor density

7.28

7.28

7.28

7.28

15.17

15.17

15.17

15.17

cu.m

1367.76

1363.15

1408.43

1445.07

cu.m

1759.65

1701.02

1826.36

1840.74

Granular Sub-base
RW0130 Providing and laying Granular sub-base course (GSB)
to required degree of compaction with proper
formation of cross fall using motor grader for laying
and compacted to required density as per material
gradation and aggregate quality specified
Wet Mix Macadam
RW0131 Providing and laying wet mix macadam graded
aggregate base course to required degree of
compaction with proper formation of cross fall by
using well graded crushed aggregates premixed with
OMC using suitable mixer, motor grader as per
material gradation and a aggregates quality specified

Dense Bituminous Macadam


Providing and Laying Dense Bituminous Macadam ( DBM) to required degree of compaction based on mixture
design ( job mix formula) approved by the supervising engineer including preparation of surface with road broom,
application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant, paver, steel roller, tyre roller
etc. complete
RW0132 50 mm

sq.m

576.46

Department of Engineering Services, MoWHS

578.47

589.87

595.86

Bhutan Schedule of Rates - 2015


Code

Description

RW0133 60 mm
RW0134 70 mm
RW0135 80 mm

73

Units

PL

GP

SJ

TH

sq.m
sq.m
sq.m

671.96
766.65
861.67

674.22
769.15
864.43

687.90
785.11
882.66

694.98
793.28
891.92

Asphalt/Bituminous Concrete
Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job mixture
design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller etc. as per material
gradation and aggregate quality specified
RW0136
RW0137
RW0138
RW0139

25 mm
30 mm
35 mm
40 mm

sq.m
sq.m
sq.m
sq.m

339.58
394.66
449.75
504.05

341.68
397.12
452.58
507.23

346.67
403.11
459.56
515.21

350.54
407.71
464.89
521.27

sq.m
RW0145 Scarifying metalled (water bound) road surface
disposal of rubbish up to 50m and consolidation of the
aggregate received from scarifying

31.02

31.02

31.02

31.02

162.18

166.61

Scarifying

Repair of Roads
Cutting and repairing of roads, including supply of required quantities of aggregates complete
RW0146 Water bound macadam road

sq.m

161.61

159.21

Wearing Course
Laying wearing course including screening, sorting, spreading to template and consolidation (measurement of
wearing course to be taken equal to the quantity of aggregate used, excluding blinding materials)- With stone
aggregates and blinding materials

RW0147 With stone aggregates and blinding materials

cu.m

651.57

651.57

651.57

651.57

Using Bitumen Emulsion


Cutting & repairing bituminous road including supply of required quantity of aggregate & bitumen
emulsion
RW0150 Manually

cu.m

519.07

518.29

523.86

531.88

Cutting bituminous road along with W.B.M layer & soling and making good the same including supply of extra
quantities of aggregate, grit & bitumen emulsion required complete
RW0151 Manually

sq.m

925.75

915.58

934.86

957.55

Painting two coats with bitumen emulsion (coat 1 - 12 kg emulsion and 0.1 cu.m, 12 mm aggregates per 10 sq.m,
coat 2 - 1.6 kg emulsion 0.06 cu.m, 10 mm aggregates per 10 sq.m) complete
RW0152 Mechanized

sq.m

212.50

Department of Engineering Services, MoWHS

212.82

215.96

219.85

Bhutan Schedule of Rates - 2015


Code

Description

Units

74
PL

GP

SJ

TH

Repainting one coat with bitumen emulsion @ 2.3 kg of emulsion and 0.002 cu.m of 10 mm nominal size stone chips
per sq.m of surface area complete
RW0153 Mechanized

sq.m

160.05

161.89

162.28

165.18

Premix consolidated carpet surfacing including a tack coat @ 0.75 kg bitumen emulsion per sq.m of road
surface
RW0154 50mm thick with 6.0 cu.m of aggregate 10mm nominal sq.m
size per 100 sq.m using 96 kg of emulsion of approved
quality per cu.m of stone aggregate (Mechanized)

442.80

442.59

450.92

466.36

RW0155 25 mm thick with 2.7 cu.m of stone aggregate, 10 mm sq.m


nominal size per 100 sq.m using 149 kg of bitumen
emulsion per cu.m of stone aggregate (Mechanized)
RW0156 20 mm thick with 2.10 cu.m of stone aggregate, 10 mm sq.m
nominal size per 100 sq.m using 147 kg of bitumen
emulsion per cu.m of stone aggregate (Mechanized)

344.22

344.38

350.26

356.96

279.99

280.13

284.84

290.21

sq.m

104.26

104.33

105.90

107.72

sq.m

51.65

52.03

52.87

53.68

Providing seal coat with bitumen emulsion


RW0157 Using 1.3 kg of emulsion and 0.80 cu.m stone
aggregate of 10mm per 10 sq.m of road surface
complete
Providing seal coat of premixed sand with bitumen emulsion
RW0158 Using 5.3 kg of emulsion and 0.045 cu.m coarse sand
per 10 sq.m of road surface complete
U s i n g B i t u m e n 80/100
Cutting and repairing of roads, including supply of required quantities of aggregate, grit and bitumen
RW0160 Bituminous road

sq.m

573.72

568.71

578.10

588.07

Cutting bituminous road and making good the same including supply of extra quantities of aggregate, grit &
bitumen required complete
RW0161 Bituminous road along with W.B.M layer & soling
(mechanized)

sq.m

929.45

917.56

938.15

961.88

Painting two coats of bitumen 80\100 (coat 1 - 2 kg of bitumen, 0.015 cu.m, 12.5mm aggregate per sq.m; coat 2 - 1
kg of bitumen, 0.009 cu.m, 10 mm aggregates, per sq.m complete)

RW0165 Mechanized

sq.m

225.82

225.42

230.13

232.94

RW0166 Manually

sq.m

264.60

262.24

268.25

273.72

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

75

Code
Description
Units
PL
GP
Premix carpet surfacing including a tack coat @ 0.75 kg bitumen per sq.m of road surface
RW0167 50mm thick with 6 cu.m of aggregate 10mm nominal
size per 100 sq.m using 51.5 kg of bitumen 80/100
grade per cu.m of stone aggregate (Mechanized)

SJ

TH

sq.m

329.60

324.96

336.73

341.11

RW0168 25mm thick with 3 cu.m of stone aggregate per 100


sq.m
sq.m and 51.5 kg of bitumen 80/100 grade per cu.m of
stone aggregate (Mechanised)

1808.04

1837.94

1837.94

1859.67

56.61

54.10

57.80

61.41

RW0169 20mm thick with 2.40 cu.m of stone aggregate 10mm


nominal size per 100 sq.m and 51.5 kg of bitumen
80/100 grade per cu.m of stone aggregate
(Mechanized)

sq.m

Premix Carpeting with 64 kg of bitumen 80\100 per cu.m of aggregates including a tack coat with bitumen of same
quality @ 0.75 kg per sq.m of road surface
RW0170 20 mm thick with 2.4 cu.m, 10mm aggregate per 100
sq.m (Manually)
RW0171 25 mm thick with 3.0 cu.m, 10mm aggregate per 100
sq.m (Manually)

sq.m

74.49

69.59

75.30

77.99

sq.m

89.15

83.16

90.21

93.40

Repainting, one coat of bitumen 80\100 @ 1 kg of bitumen; 0.009 cu.m, 10mm aggregate per sq.m of
road surface

RW0175 Manually

sq.m

31.12

29.19

31.39

32.52

RW0176 Mechanised

sq.m

74.68

74.41

76.18

77.14

Providing seal coat with bitumen 80/100 grade of approved quality using 1.12 cu.m of stone aggregate 10mm size
per 100 sq.m and 56 kg of bitumen 80/100 grade per cu.m of stone aggregate with a tack coat of 0.75 kg of bitumen
per sq.m of road surface complete
RW0177 Mechanized

sq.m

106.45

106.24

108.44

109.74

Providing seal coat with bitumen 80\100 using 1.5 kg of bitumen per sq.m with 1.05 cu.m, 10mm aggregate per 100
sq.m of road surface
RW0178 Manually

sq.m

124.32

123.35

126.06

128.76

Providing seal coat of premixed sand with bitumen 80\100 using 128 kg of bitumen per cu.m of sand and 0.75 cu.m
of coarse sand per 100 sq.m of road surface
RW0179 Manually

sq.m

80.45

80.60

82.42

84.22

Providing & fixing RC name board including primer and white zinc paint
RW0180 Rectangular with post
RW0181 Flat without post for one direction only

each
each

1672.45
2462.83

1728.07
2527.78

1786.99
2593.06

1791.89
2634.36

RW0182 Flat without post for two directions only

each

2641.98

2713.06

2784.82

2834.01

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015

76

Code
Description
Road Signs

Units

PL

GP

SJ

TH

RW0183 Engraving letters on hard stone.......per letter per


centimetre height

each

3.45

3.45

3.45

3.45

Providing & fixing precast boundary stone of RC 1:2:4 (20mm aggregate) including finishing with mortar 1:3 (cost
of excavation, refilling etc to be paid separately)
RW0185 150mm dia x 900mm high

each

374.42

385.47

397.07

398.33

Providing & fixing precast kilometre stone of RC 1:2:4 (20mm aggregate) including finishing with mortar 1:3
complete as per standard design (cost of excavation, concreting, painting etc. shall be paid separately)
RW0186 35cm x 111cm x 25cm
RW0187 50cm x 152.5cm x 25cm
RW0188 35cm x 93.5cm x 18cm

each
each
each

1209.88
2135.03
780.91

1252.30
2214.73
807.01

1294.43
2293.68
832.58

1298.63
2300.40
835.80

each

1.09

1.09

1.09

1.10

each

0.84

0.85

0.84

0.85

m
each
each
each
m
m

67.70
159.40
779.01
587.22
1060.36
643.96

67.68
159.35
806.26
604.61
1088.52
649.31

67.02
158.17
836.19
624.28
1127.66
730.19

72.43
167.91
837.51
626.30
1148.25
689.08

Letterings
RW0189 Lettering with paint of approved brand and
manufacture......per letter per centimetre ht
RW0190 Relettering with paint of approved brand and
manufacture......per letter per centimetre ht
Fencing
Supplying posts & struts
RW0195
RW0196
RW0197
RW0198
RW0199
RW0200

Local ballies, 250 mm min. girth


Local ballies 250 mm min girth , 1.8m long
Precast R.C posts, 1.8 m long
Precast R.C struts 2.0 m long
RCC posts & struts, 1.8m long
RCC posts & struts, 2m long

Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of
ballies complete (posts/struts, earthwork, concrete paid separately)
RW0202 2.5mm , (12 SWG), 4 barbs form by twisting two point
wires, each two turns, pitch of barbs 75mm

18.66

21.32

20.70

23.77

Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in case of
ballies complete (excluding the cost of posts/struts, earthwork, concrete)
RW0205
RW0206
RW0207
RW0208

4mm (8 SWG) x 100mm


2.5mm (12 SWG) x 100mm
4mm (8 SWG) x 150mm
2.5mm (12 SWG) x 150mm

sq.m
sq.m
sq.m
sq.m

265.36
226.17
248.21
217.59

333.37
257.55
226.92
203.59

345.91
309.87
345.91
243.78

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of
posts/struts, earthwork, concrete etc.)

Department of Engineering Services, MoWHS

362.40
378.40
364.12
333.19

Bhutan Schedule of Rates - 2015

77

Code

Description

Units

PL

GP

SJ

TH

RW0209
RW0210
RW0211
RW0212
RW0213
RW0214

4mm (8 SWG) x 50mm


2.5mm (12 SWG) x 50mm
4mm (8 SWG) x 75mm
2.5mm (12 SWG) x 75mm
4mm (8 SWG) x 100mm
2.5mm (12 SWG) x 100mm

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

450.32
413.57
376.83
352.33
413.57
226.17

444.40
426.90
334.34
320.73
321.75
257.55

426.86
443.19
426.86
422.19
405.30
309.87

411.91
392.66
440.85
372.77
428.92
378.40

RW0215 1.2 m high fencing with 1.8 m R.C.C posts of standard


design placed every 3 m apart, embedded in cement
concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end
post one side only, provided with nine horizontal lines
and two diagonals of barbed wire between two posts
fitted and fixed with GI staples on wooden plugs or GI
binding wire tied to 6mm bars nibs fixed while casting
the post (cost of RCC posts, struts, earthwork and
concrete to be paid for separately)

7252.19

7252.19

7323.14

7790.47

RW0216 1.2 m high fencing with 1.8 m balli posts 250 mm girth
( min) placed every 2.5 m apart, embedded in cement
concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end
post one side only, provided with six horizontal lines
and two diagonals of barbed wire between two posts
fitted and fixed with GI staples driven into the posts
complete (cost of RCC posts, struts, earthwork and
concrete to be paid for separately)

5311.88

5309.04

5360.75

5706.73

RW0217 2.4 m high fencing with 3.3 m balli posts 250 mm girth
( min) placed every 2.5 m apart, embedded in cement
concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end
post one side only,
provided with twelve horizontal lines and two
diagonals of barbed wire between two post fitted and
fixed with GI staples
driven into the posts complete (cost of RCC posts,
struts, earthwork and concrete to be paid for
separately)
RW0218 1.3 m high concrete rail and pale fencing with 1.8 m
R.C.C posts 2.2 m rails and 1.25 m pales placed every
2.5 m apart, embedded in cement concrete blocks
(450 mm x 450 mm x 700 mm), of mix 1:5:10 (1
cement : 5 sand : 10 graded crushed rock 40 mm
nominal size) (cost of earthwork in excavation,
concrete work, posts, rails and pales to be paid for
separately)

9532.85

9527.99

9620.86 10241.79

88.34

88.34

Providing and Fixing Barbed Wire ( Min. 10kg/100m) fencing

Department of Engineering Services, MoWHS

88.34

88.34

Bhutan Schedule of Rates - 2015


Code
Description
Units
RW0219
1.2 m high fencing with 1.2 m angle posts ( 40mm x 40
mm x 6 mm) placed every 3 m apart, embedded in
cement concrete blocks, every 15th post, last but one
end post and corner post shall be strutted on both sides
and end post one side only, provided with nine
m
horizontal lines and two diagonals of barbed wire
between two post fitted and fixed with GI staples, turn
buckles complete ( cost of , posts, struts, earthwork and
concrete to be paid for separately)

78
PL

GP

SJ

TH

197.97

227.53

220.61

254.66

258.30

296.30

287.40

331.18

kg

372.51

372.51

372.51

373.65

sq.m

35.45

35.45

35.45

35.45

RW0232 Direct seeding of shrubs or tree seeds at 30 cm spacing sq.m


including digging holes up to 5cm depth and covering
with soil, with two seeds per planting hole

35.45

35.45

35.45

35.45

43.32

43.37

43.37

43.50

51.76

51.94

51.94

52.41

RW0220 1.8 m high fencing with 1.8 m angle posts ( 50mm x 50


mm x 6 mm) placed every 3 m apart, embedded in
cement concrete blocks, every 15th post, last but one
end post and corner post shall be strutted on both sides
and end post one side only, provided with nine
horizontal lines and two diagonals of barbed wire
between two post fitted and fixed with GI staples, turn
buckles complete ( cost of , posts, struts, earthwork and
concrete to be paid for separately)

Bioengineering
Seeds Collection, treatment and storage
RW0230 Grass and pioneer plant seed collection, including
separation, drying in the sun & storing
Broadcasting
RW0231 Broadcasting of grass/pioneer plants seeds on slopes;
seeding rate 25 gm per m2
Direct Seeding

Live Stacking/Palisade
RW0233 Preparation of materials (woody cuttings 2-4 cm
diameter and 50 cm length) and staking them of the
cuttings in the soil
Brush layer/Hedge Brush Layer
RW0234 Collection and preparation of materials (woody
cuttings 2-4 cm diameter and 60 cm length) and
staking them of the cuttings in the soil

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates - 2015


Code
Description
Planting of seedlings/wildings

Units

79
PL

GP

SJ

TH

140.21

150.47

150.47

144.64

RW0236 Sodding of slopes with sods, eg lemon grass (30 cms


sq.m
centre to centre), titepati (1metre centre to centre) in
contour lines. The sods should be placed even closer to
each other if the slope is greater than 25 degree

43.81

43.35

43.35

45.26

RW0237 Turfing of embankment with 30 x 30 cm turfs and


fixed to the ground with wooden pegs, if slope is
greater than 25

sq.m

80.58

80.98

80.98

80.98

RW0238 Grass slips planting on slopes (random or in line) at 10 sq.m


cm apart and 5 cm deep.

20.93

20.93

20.93

20.93

RW0239 Providing and laying fog sealing as per technical


specification and drwaing.

sq.m

38.12

38.60

39.13

39.97

RW0240 Providing and laying of Rock Anchorage including


TMT rebar (25mm dia) and cement slurry to fill the
gap. The hole diameter should at least 32mm and 1m
length as provided in the drawing.

sq.m
1432.93

1560.97

1701.35

1667.59

120.97

124.21

121.30

128.00

474.76

477.49

474.76

485.69

RW0235 Planting of seedlings or wildlings (including the


collection of wildlings from the wild) and planting
them in a pit size 30 cm x 30 cm

no

Sodding/Turfing

Grass Slips Planting

RW0241 Supply and apply permanent road marking on the road sq.m
surface as per technicial specification,(manually)

RW0242 Road martking with hot applied thermoplastic


compound with reflectorising glass beads on
Bituminuous surface as per IRC:35 and technical
specifications. The finished surface to be level and
free from streaks and holes

sq.m

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates 2015

4. COST INDICES
5. APPROVED MATERIAL BRANDS

Department of Engineering Services, MoWHS

Bhutan Schedule of Rates 2015

COST INDEX CALCULATION

Any rates calculated adding cost index shall not be used for making payment to contractors or parties
Payment to contractors shall be strictly as per the contract agreement only
The six examples, that follow, are for purpose of guidance and engineers are encouraged to calculate
cost indices on their own.
I

Procedure for calculation of cost Index:

a)
b)
c)
d)
e)

Col.(4) =
Col.(5) =
Col.(6) =
Col.(7) =
Col.(8) =

II

Weightage

Basic rates at nearest base town


Rates at the project location
[{col.5/col.4} - 1]x100
Weightage shall remain fixed
{Col.(6)xCol.(7)}/100

Weightage of a particular material is the percentage of its cost from the total cost of the project.
II

The cost index shall not be applicable for:

a)
b)

All basic rates


Any works where only labour is involved such as:
- Dismantling and demolition.
- Earth work
- Installation, testing, commissioning
For such works actual labour requirement shall be worked out and additional amount added for any increase in labour rates

II

Procedure for calculation of rates at the project location

a)

To derive the approximate item rate at any location, the BSR item rates of the nearest base town shall be enhanced by the
cost index calculated above.

b)

Same weightage shall be applicable for similar works at any location

c)

Weightage differs for different kinds of projects and engineers can calculate weightages using rates of items of the nearest
base towns

Department of Engineering Services, MoWHS

80

Bhutan Schedule of Rates - 2015

81

SAMPLE CALCULATIONS OF COST INDICES


1. Building Works with Brick Infill walls and steel trusses

Sl.No. Description
(1)
1

(2)
Cement

Unit
(3)
MT

Cost at a base Town


(4)

Cost at Project
Location
(5)

4770.00

5689.00

% Increase

Weightage

Cost Index

(6)

(7)

(8)

19.27

17.00

3.28

Steel Reinforcement

MT

31500.00

33500.00

6.35

14.00

0.89

Rolled Steel

MT

32300.00

34400.00

6.50

3.00

0.20

C.G.I Sheet

MT

44000.00

50600.00

15.00

5.00

0.75

Brick /ICEB

Nos

4650.00

6830.00

46.88

9.50

4.45

Stone Boulders

cu.m

180.00

530.00

194.44

1.50

2.92

Rough SawnTimber

cu.m

7800.66

8122.45

4.13

17.00

0.70

Stone Aggregates
(20mm)

cu.m

618.00

883.00

42.88

4.50

1.93

Sand

cu.m

180.00

534.00

196.67

2.00

3.93

10

Labour : Average
Cat. I to IV

each

208.75

208.75

0.00

11.50

0.00

Cat. V

each

165.00

165.00

0.00

15.00

0.00

Remarks
(9)

100.00
Cost Index =

19.04 %

2. Building Works with Brick Infill walls and timber trusses


Sl.No. Description
(1)

(2)

Unit
(3)

Cost at a base Town


(4)

Cost at Project
Location
(5)

% Increase

Weightage

(6)

(7)

Cost Index

Remarks

(8)

Cement

MT

4770.00

5689.00

19.27

17.00

3.28

Steel Reinforcement

MT

31500.00

33500.00

6.35

14.00

0.89

C.G.I Sheet

MT

46000.00

50600.00

10.00

5.00

0.50

Brick /ICEB

Nos

4630.00

6830.00

47.52

10.50

4.99

Stone Boulders

cu.m

180.00

530.00

194.44

1.50

2.92

Rough SawnTimber

cu.m

7800.66

8122.45

4.13

19.00

0.78

Stone Aggregates
(20mm)

cu.m

618.00

883.00

42.88

4.50

1.93

Sand

cu.m

180.00

534.00

196.67

2.00

3.93

Labour : Average
Cat. I to IV

each

208.75

208.75

0.00

11.50

0.00

Cat. V

each

165.00

165.00

0.00

15.00

0.00

100.00
Cost Index =

Department of Engineering Services, MoWHS

19.22 %

(9)

82

Bhutan Schedule of Rates - 2015

3. Building Works with stone masonry Infill walls

Sl.No. Description
(1)

(2)

Unit
(3)

Cost at base
town

Cost at Project
Location
% Increase

Weightage

Cost Index Remarks

(4)

(5)

(6)

(7)

(8)

Cement

MT

4770.00

5689.00

19.27

17.00

3.28

Steel Reinforcement

MT

31500.00

33500.00

6.35

5.00

0.32

C.G.I Sheet

MT

46000.00

50600.00

10.00

8.00

0.80

Stone boulders

cu.m

180.00

534.00

196.67

6.00

11.80

Bricks/ICEB

1000#

4650.00

6830.00

46.88

1.00

0.47

Rough SawnTimber

cu.m

7800.66

8122.45

4.13

22.00

0.91

Stone Aggregates
(20mm)

cu.m

618.00

883.00

42.88

3.00

1.29

Sand

cu.m

180.00

530.00

194.44

3.00

5.83

Labour : Average
Cat. I to IV

each

208.75

208.75

0.00

20.00

0.00

Cat. V

each

165.00

165.00

0.00

15.00

0.00

(9)

100.00
Cost Index =

24.69 %

Weightage

Cost Index Remarks

4. Bitumen Sealing Works


Sl.No. Description

Unit

Cost at a base
town
(4)
32189.00
3928.00
535.00

(1)
1
2
3

(2)
Bitumen***
Road Roller (8-10T)
Fire wood**

(3)
MT
day
cu.m

Stone Aggregates .
20mm

cu.m

618.00

each
each

Labour : Average
Cat. I to IV
Cat. V

Cost at Project
Location
(5)
34389.00
3928.00
650.00

% Increase
(6)
6.83
0.00
21.50

(7)
63.00
9.00
3.00

(8)
4.31
0.00
0.64

635.70

2.86

14.00

0.40

208.75

208.75

165.00

165.00

0.00
0.00

0.50
10.50

0.00
0.00

100.00
Cost Index =
***
**

Bitumen 80/100 or Emulsion as appropreate


Fire wood measured in stacked volume

Department of Engineering Services, MoWHS

5.35 %

(9)

Bhutan Schedule of Rates - 2015

83
5. Road Permanent Works - Retaining Walls, Culvert and other similar works
Sl.No. Description
(1)
1

(2)

Unit

Cost at a base town

Cement

(3)
MT

(4)
4770.00

Stone boulder

cu.m

Stone Aggregates
(20mm)

Sand

Labour : Average

Cost at Project
Location
(5)

% Increase

Weightage

Cost Index Remarks

5689.00

(6)
19.27

(7)
30.00

(8)
5.78

180.00

205.00

13.89

20.00

2.78

cu.m

618.00

700.00

13.27

3.00

0.40

cu.m

180.00

534.00

196.67

5.00

9.83

Cat. I to IV

each

208.75

208.75

0.00

16.00

0.00

Cat. V

each

165.00

165.00

0.00

26.00

0.00

(9)

100.00
Cost Index =

18.79 %

Weightage

Cost Index Remarks

6. Road Works - Base Course


Sl.No. Description
(1)

(2)

Unit
(3)

Stone Boulder

cu.m

Road Roller (8-10T)

Blinding materials
Stone Aggregates 20
mm
Labour : Average
Cat. I to IV
Cat. V

4
5

Cost at a base town


(4)

Cost at Project
Location
(5)

% Increase
(6)

(7)

(8)

180.00

205.00

13.89

5.00

0.69

day

3440.00

3440.00

0.00

32.00

0.00

cu.m

70.00

70.00

0.00

3.75

0.00

cu.m

618.00

700.00

13.27

42.00

5.57

each
each

208.75

208.75

165.00

165.00

0.00
0.00

0.25
17.00

0.00
0.00

100.00
Cost Index =

Department of Engineering Services, MoWHS

6.27 %

(9)

Approved Brands as of February 12, 2015


I. PLUMBING MATERIALS
Sl.
No.
1

Materials

Approved Brands

Pipes

a.

GI

Bansal Skipper

b.

HDPE (potable water)

Arpan, Berlia, Dura-Line, Jain, Ajaplas, Supreme, Drukpipe,


Umex

c.

DWC HDPE

d.
e.

PPR
CPVC (potable water)

Umex
Raksha, Astral, Ori-plast

f.

u-PVC (potable water)

Jain, Skipper-Bansal, Ori-plast

g.

u-PVC(SWR)

h.

Ductile Iron (DI)

Bansal Utkarsh, SFMC, Astral Ultradrain, B-sure,


Skipper-Bansal ,Ori-plast
Jindal Saw, Electrosteel

i.

M.S pipes (tubular)

Bansal Skipper

Pipe Fittings (Union, Socket, Elbow, Tee, Plug, Bend, Tank nipple, Barrel nipple, Flanges)
a.

GI

NVR

b.

HDPE

Ajaplas, Duraline, Supreme

c.

PPR

d.

CPVC

Raksha, Astral

e.

DI

Electrosteel

a.

Bibcocks, Stopcocks, Pushcocks, Lift


cocks, Gate valves, Float valves, Nonreturn valves, etc.

Valves & Cocks

Sanitary Appliances
a.

PIC, Essco

Sinks, Wash basins, WC pans, Cistern,


Urinals, Bath tubs, Bidets, etc.
Bathroom fittings (Bib taps, pillar
taps, concealed Valves and angle stop
valves)

Water Storage Tanks


a.
Water storage tanks

Jal, Jalangi, Gold Star

Ori-Plast

II. ELECTRICAL MATERIALS


Sl.
No.
1
a.
b.
c.
2
a.

Materials
LAMPS
Incandescent/GLS lamps
Fluorescent tube light
CFLs
LUMINARIES/FIXTURES
Outdoor lighting/Indoor Lighting

Approved Brands

SWITCHES, SOCKETS & WIRING


ACCESSORIES
Kolors(Krest, Kraze, Kubik, .kom), System, Newlike, Tinsel,
Logus(Millon), Indoasian,CPL-Synchro, CPL-Flirt

WIRES & CABLES


a.

Domestic wires (0.5 sq.mm to 10


sq.mm, 1100V grade)

b.

LT Power cables (2.5 sq.mm to 600


sq.mm)
LV SWITCHGEARS

a.

MCB

b.
c.
d.

RCCB/ELCB/RCBO
Distribution Board
Isolators

e.

Control Panels(LT)

Emgee, Royal Cables, Mescab, Anchor by Panasonic, Homeflex,


ATC, KEI, Richa, V-guard, RR Kabel, Paradise, Kolors, System,
Pointer, Juvas, Finolex
Mescab, ATC, KEI, V-guard, RR Kabel, Paradise,System, Richa

Geco, Kolor(Kwiktrip),C&S Electric, Anchor by Panasonic,


Indoasian
Geco, C&S Electric, Anchor by Panasonic, Indoasian
C&S Electric
Geco, Kolor(Kwiktrip), C&S Electric, Anchor by Panasonic,
Indoasian
JD Electrical

FANS
a.

Celing/exhaust/pedestral/wall/
table fans

V-guard, Anchor by Panasonic(ceiling fan only), system(ceiling


fan only), Berlia(Ceiling fans only)

ELECTRIC WATER HEATERS


a.

Venus, V-Guard, Racold, System, Berlia, Atlantic


PVC CASING CAPPING & FITTINGS

a.
9

Richa
PVC CONDUIT & FITTINGS

a.
10
a
11

Richa
HDPE PIPES AND FITTINGS
DWC HDPE pipes and fittings
ELECTRICAL EARTHING
Gee Slab

III. OTHER MATERIALS


Sl.
No.
1

Materials

Approved Brands

Reinforcement Steel
a.

Fe 415

b.

Fe 500

KARMA TMX
PELDEN TMX TMT, Electrosteel, PERFECT TMX TMT

Roofing Sheet /Tiles/Tubular pipes(This is in addition to the locally available materials)


a.

CGI

Aarti Suraksha (0.60mm and above)

Aluminium roofing sheet


b.

c.

Pre-painted galvanized steel sheets


(Colour Roof)
Fiber-cement Roofing tiles

SHERA

Flooring and Wall Tiles


Tiles (floor, wall, bath, etc )

Durakolor, Galvacolor, CRiL, METASHIELD(coil), Dyna Roof


(0.60mm and above)

Bitumen/Emulsion

SOMANY, Johnson, Endura, Marbonite, AGL

a.

Cationic Emulsion

Bhubit (Bhutan Bitumen Industries)

Bricks/Hollow Blocks & Others


a.

b.

Interlocking Cement Earth Block

Solid/hollow blocks

E3 (Druk Soednam Enterprise)

A.Bhutan Concrete Bricks


1. Solid (240x115x53)
2. 2 Hole porous (230x110x70)
3. Hollow(390x90x190)
B.Yang Building Materials (Solid bricks-240x120x74)

c. Biltech-ACE-AAC (Aerated)-625x250x100-300
D.Bhutan Concrete Bricks (Phuntsholing) - 240x114x80
E. Yangjung Sonam Bricks (Gelephu)
1.solid bricks-16x8x4 & 16x8x8
2. hollow blocks- 16x8x4 & 16x8x6

Boards/Ply

a.

Fiber- Cement boards/ply/wood

SHERA

b.

Plywood/block board, Decorative


laminates and Veneers

Archidply, Archidstar/Archidlam, Archidgold

8
9
10
11

Cements
a.

33 Grade

Penden Ordinary

b.

43 Grade

Penden Supreme, Dungsam cement, Druk Cement

c.

PSC

Penden Special, Dungsam Cement

d.

PPC

Penden premium, Dungsam Cement

e.

OPC 53

Integral Water proofing compound


for cement mortar, concrete and
concrete admixtures
M.S Wires and Mesh
Adhesives for use with ceramic tiles
and mosaics
High Strength Geo-synthetics for Soil
Reinforcement

Tata Wiron, Gabions & Gabion Materess (Zn and Zn+PVC coated),
Terramesh, Green Terramesh (Maccaferri)
Dendrite (Denseal & yamapoxy)
Paralink and Paraweb (Maccaferri)

Note:
1. The above lists of approved brands are the products for which the approval certificates are still valid
and those brands for which the certificates are expired and not renewed will not feature in the list.
2. The Brand Bhubit manufactured by M/s Bhutan Bitumen Industries and OPC 43 grade cement
manufactured by M/s Druk Cement are certified as per the requirements of ISO/IEC17065:2012