Bhutan Schedule of Rate (BSR)-2015 for civil works is a revised and updated edition of its
earlier publications. Attempts have been made to include as many items as possible that are
being used in construction works. However, due to complex nature of construction, covering
every single item is not possible.
The basic material rates are based on market prices collected from vendors at four base towns of
Thimphu, Phuentsholing, Gelephu and Samdrup Jongkhar. These rates have been applied while
analyzing and developing Built-Up item rates. Labour and Material Coefficients have been used
for the purpose of analysis. All items of work prescribed in BSR-2015 should be read and
understood in conjunction with Specifications for Building and Road Works. Only when items
are executed as per the Specifications for Building and Road Works, this schedule of rates is
applicable.
In this edition, few items pertaining to roads have been included: fog sealing, rock anchorage and
thermoplastic road marking paint.
The users are encouraged to send comments and suggestions to the Department for making
productive reforms in the schedule. As many new developments in construction is taking place in
terms of material use, construction technology and engineering practices, it is only through
collective efforts of people involved in construction industry that more relevant schedule of rates
can be developed. Manufacturers and dealers are welcome to send details of materials approved
by BSB including its specification and pricing in order to be incorporated in the BSR.
Dr.Sonam Tenzin
Secretary
Ministry of Works and Human Settlement
Thimphu
Date:Ob/
0 ~J1-oIS'-
Disclaimer
The BSR (both Civil and Electrical) 2015 is prepared and published primarily as a tool
to assist in the estimation of project costs. Due to difficulty in obtaining
comprehensive and accurate rates from base towns, and the associated complexity in
their analysis, the BSR reflects only suggestive averages and not accurate current
market rates. Material and labour rates also fluctuate frequently, and by the time of
the publication of this book, many rates would have already changed. Hence users are
advised to refrain from using the BSR for the purposes of filling tenders, evaluating
tenders, awarding works and/or making contractual payments. The publisher is in no
way accountable or answerable for any issues/disputes arising as a result of
individuals or agencies using the rates in the BSR 2015 as a basis for filling their
tenders, evaluating tenders, awarding works and/or making contractual payments.
All rights reserved with DES, MoWHS. Reproduction for sale of this publication, in part(s) or
whole, in any form or by any means, by any agency or individual, is a punishable offence and is
strictly prohibited.
Preface
1. Bhutan Schedule of Rates - 2015 is the revised edition of Bhutan Schedule of Rates - 2013.
2. The rates shown for all the built - up items are for up to 10 Km radius and is inclusive of:
5% on labour cost for hand tools, equipments, machinery and material wastages
3. The built up item rates are based on "Labour and Material Coefficients 2015" with the applicable
percentages given above.
4. The schedule is designed primarily as a tool for estimation of construction projects only and not for
payment to contractors (unless stated so in the tender document) or filling up tenders.
5. This Schedule will be read along with the" Specifications for Building and Road works " and the
"Labour and Materials Coefficients - 2015"
6. Fog sealing, Rock anchorage and Thermoplastic road marking paint for the road works have been
incorporated. Kindly refer similar items for materials.
7. Generally, the basic rates of materials, incorporated in this Schedule pertain to average rates of the
most available brands
8. Hire charges for plants and machinery are based on the built- up rates provided by the Construction
Development Corporation Limited, Thimphu.
9. Calculation of cost indices has been detailed and few samples are provided on calculation of cost
indices.
10. List of approved brands, as applicable at the time of publication of BSR - 2015, is provided. However,
please note that this list is reviewed from time to time. The latest list is available on www.bsb.gov.bt
11. Material Rates used in BSR-2015 are collected during the period February 2015 March 2015. Users
are suggested to update rates accordingly with the prevailing market rates.
12. BSR contains only the commonly used items, the new items may be workout and analyzed by the
engineers as may be relevant.
II
Contents
CONTENTS
Section 1 BASIC RATES
Description
Page
Labour
Bricks
Roofing Materials
10
Plastering Materials
10
10
Drainage Materials
11
12
20-23
24-26
Description
Page
Hill Roads
27
Plain Roads
28
III
Contents
Description
Page
01
02
03
Earthwork
04
Drainage
05
Mortars
12
06
Concrete Works
13
07
Damp Proofing
15
08
Reinforced Concrete
15
09
Brick Work
20
10
Stone/Mud
24
11
Wood Work
27
12
Steel
38
13
Flooring
40
14
44
15
Roofing
45
16
49
17
54
18
Plastering
63
19
65
20
68
21
Road Works
68-79
IV
SECTION 1
Basic Rates of Materials and Labour
Hire Charges of Plants and Equipments
Code
Description
Category Units
Page 1
PL
GP
SJ
Th
Category 1
Category 2
Category 3
Category 4
Category 5 (Male)
Category 5 (Female)
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
240.00
220.00
195.00
180.00
165.00
165.00
240.00
220.00
195.00
180.00
165.00
165.00
240.00
220.00
195.00
180.00
165.00
165.00
240.00
220.00
195.00
180.00
165.00
165.00
LB
LB
LB
LB
LB
LB
LB
year
year
year
year
day
year
year
360.00
660.00
400.00
180.00
10.00
50.00
450.00
360.00
660.00
400.00
180.00
10.00
50.00
450.00
360.00
660.00
400.00
180.00
10.00
50.00
450.00
360.00
660.00
400.00
180.00
10.00
50.00
450.00
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
day
day
day
day
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
day
day
day
day
day
day
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
Statutory-On-Cost Allowances
LB0010
LB0011
LB0012
LB0013
LB0014
LB0015
LB0016
Auto-Mechanic Gd.1
Carpenter Gd.1
General Mechanic Gd.1
Lharib
Lineman Gd.1
Plant Operator Gd.1
Category 2
LB0030
LB0031
LB0032
LB0033
LB0034
LB0035
LB0036
LB0037
LB0038
LB0039
Auto-Electrician Gd.1
Auto-Mechanic Gd.2
Blacksmith (metal-worker)
Carpenter Gd.2
General Mechanic Gd.2
Lineman Gd.2
Mason Gd.1
Plant Operator Gd.2
Plumber Gd.1
Work Supervisor (Lajab)
Category 3
LB0045
LB0046
LB0047
LB0048
LB0049
LB0050
LB0051
LB0052
LB0053
LB0054
LB0055
LB0056
Auto-Electrician Gd.2
Auto-Mechanic Gd.3
Blaster
Carpenter Gd.3
General Mechanic Gd.3
Lineman Gd.3
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Plumber Gd.2
Sawyer Gd.1
Wireman Gd.1
Code
Description
Category Units
Page 2
PL
GP
SJ
Th
Category 4
LB0065
LB0066
LB0067
LB0068
LB0069
Cleaner
Machine Operator
Painter Gd.2
Sawyer Gd.2
Wireman Gd.2
LB
LB
LB
LB
LB
day
day
day
day
day
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
LB
LB
day
day
178.76
178.76
178.76
178.76
178.76
178.76
178.76
178.76
LB
day
178.76
178.76
178.76
178.76
Category 5
LB0075
LB0076
Labourer (Male)
Labourer (Female)
Labour
Note: The above rates are calculated to comply with the Ministry of Labour and Human Resourses Wage Regulations, revised from
15th July 2011
Code
Description
Units
PL
GP
S/J
TH
Bitumen 80\100
Bitumen Emulsion
tonne
tonne
sq.m
sq.m
209.00
115.00
209.00
115.00
209.10
115.26
238.00
137.50
kg
litre
41.71
53.04
41.71
53.04
42.12
53.56
47.38
59.74
sq.m
611.05
617.10
617.10
664.35
kg
each
each
each
kg
each
each
78.74
68.00
5.92
5887.00
337.00
3844.67
3385.00
79.52
73.84
5.91
4925.70
341.70
3648.75
2497.95
78.74
73.12
5.85
4672.46
370.85
4704.88
3729.15
78.16
73.12
5.85
5017.38
341.70
3544.50
2426.58
litre
284.58
304.98
299.88
302.82
Kerosene
Diesel
Petrol
litre
litre
litre
13.86
49.25
57.54
14.77
50.12
55.50
15.00
49.30
55.42
14.35
50.96
59.48
cu.m
truck
cu.m
cu.m
kg
bundle
each
each
each
Sq.m
882.64
51.00
86.39
441.36
67.88
12.34
0.13
6.12
0.09
33.32
666.42
50.33
84.70
421.05
67.55
13.10
0.13
7.00
0.09
33.67
810.00
52.50
87.24
581.48
67.55
13.10
0.13
7.00
0.09
33.67
1102.25
50.00
86.00
610.42
67.55
13.00
0.14
6.50
0.09
33.67
Sealing Compounds
MT0010
MT0011
Joint-filler
MT0015
Blasting
MT0020
MT0021
MT0022
MT0023
MT0024
MT0025
MT0026
Chemicals
MT0030
Fuels
MT0035
MT0036
MT0037
Description
Stone
MT0060
Boulder
PL
GP
S/J
TH
cu.m
546.42
537.71
559.82
549.81
Crushed Rock
MT0064
100mm
MT0065
75mm
MT0066
63mm
MT0067
50mm
MT0068
40mm
MT0069
25mm
MT0070
20mm
MT0071
12.5 - 6mm
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
910.86
910.86
910.86
910.86
910.86
1056.42
1056.42
1056.42
829.21
829.21
829.21
829.21
821.24
919.70
919.70
935.50
856.50
896.78
910.00
930.00
953.48
1059.42
1147.60
1103.61
1082.39
1082.39
1082.39
1082.39
1082.39
1121.96
1121.96
1126.45
cu.m
cu.m
408.00
525.30
438.60
548.76
456.96
548.76
452.00
542.00
tonne
tonne
sq.m
sq.m
sq.m
sq.m
4165.63
4593.33
0.00
0.00
1397.40
1397.40
1397.40
1419.80
7750.00
6250.00
0.00
0.00
1294.21
1294.21
1320.48
1289.67
5610.00
5610.00
0.00
0.00
1294.21
1294.21
1320.48
1450.00
7542.91
6419.07
0.00
0.00
1400.00
1400.00
1500.00
1760.22
sq.m
sq.m
sq.m
sq.m
1452.42
1452.42
1452.42
1647.08
1332.63
1332.63
1411.43
1453.50
1332.63
1332.63
1411.43
1453.50
1717.27
1717.25
1781.29
1937.97
sq.m
sq.m
1442.00
2233.80
1428.00
2233.80
1428.00
2233.80
1124.96
2075.00
kg
kg
26.12
33.78
27.00
34.48
30.60
30.25
32.34
33.99
each
99.45
99.45
99.45
100.43
1000#
cu.m
cu.m
1000#
1000#
1000#
1000#
10015.50
2047.50
2067.50
27300.00
15700.00
42000.00
12800.00
9400.00
1950.00
1990.00
29650.00
16950.00
42000.00
12800.00
10660.00
2040.00
1837.50
34533.33
19200.00
42000.00
12800.00
14250.00
2260.00
2370.00
22500.00
14000.00
42000.00
12800.00
Marble
Units
Items
Lime
MT0120
MT0121
Slaked lime
Unslaked lime
Others
MT0122
Sealed Bag
materials
Bricks 2nd class
Brick aggregate
Graded brick aggregate
Interlocking cement earth block (300mmX150mmX100mm)
Interlocking cement earth block (250mmX125mmX100mm)
Concrete block bricks - Hollow Block 390 x 190 x 190mm
Concrete block bricks - Solid Brick 240 x 115 x 80mm
Description
Units
MT0132
3
PL
GP
S/J
TH
1000#
1000#
Cement (OPC/PSC)
White Cement
tonne
tonne
A d d i t i v e s & A d-m i x t u r e s
MT0150
Red Oxide Pigment\other pigments
MT0151
Water proofing compound
MT0152
Floor Hardener (metallic)
kg
kg
kg
149.60
112.20
91.80
170.00
93.48
61.80
124.95
107.10
61.20
143.00
143.00
142.80
sq.m
sq.m
sq.m
65.40
85.15
102.37
62.97
73.54
103.15
70.40
84.23
108.05
72.33
94.33
122.33
Aluminium Materials
MT0160
Aluminium Fluted Strips 3.15mm thick 150mm wide
MT0161
Aluminium Strip 40x1.6mm
m
m
357.00
96.90
350.00
104.50
346.80
96.90
383.68
166.00
kg
kg
kg
kg
388.50
388.50
388.50
388.50
480.00
480.00
480.00
480.00
362.10
362.10
362.10
362.10
391.40
391.40
391.40
391.40
m
m
105.95
91.61
94.34
73.59
96.39
72.73
236.10
176.73
kg
kg
kg
kg
kg
72.48
72.00
70.67
80.20
80.00
85.00
92.50
85.00
92.50
92.50
76.50
78.54
78.54
94.80
96.50
80.05
78.40
82.45
91.80
90.30
kg
kg
kg
kg
78.50
78.50
78.50
78.50
77.50
77.50
77.50
77.50
85.00
85.00
85.00
85.00
93.67
93.67
93.67
93.67
kg
77.25
70.04
69.36
79.83
Cement
MT0145
MT0146
Underlay
for
Slabs
Plastic Sheet
MT0155
50 micro-metre
MT0156
100 micro-metre
MT0157
200 micro-metre
BASIC RATES - STEEL & OTHER METAL MATERIALS
Steel
Materials
Description
Units
4
PL
GP
S/J
TH
m
m
283.50
181.00
258.06
178.50
270.30
181.56
359.12
288.36
kg
49.75
54.50
59.67
58.48
sq.m
sq.m
290.00
290.55
205.51
229.19
245.00
250.00
328.73
279.30
kg
kg
98.60
104.88
73.13
107.18
87.55
101.00
130.00
106.30
14.22
16.50
15.97
18.60
sq.m
sq.m
sq.m
sq.m
214.20
180.60
199.50
173.25
272.50
207.50
181.25
161.25
283.25
252.35
283.25
195.70
297.38
311.10
298.86
272.34
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
341.25
330.75
309.75
288.75
372.75
341.25
262.53
256.67
273.33
261.67
367.68
352.68
334.16
338.75
352.64
348.64
352.64
366.64
354.41
304.17
364.64
306.27
339.82
323.32
Galvanised Iron
MT0250
Plain G.I Sheet, 24-gauge (0.63mm)
tonne
MT0252
tonne
Welded Mesh
MT0215
75mmx25mm
MT0216
Expanded Metal (19mm x 3mm x 16 gauge)
Fasteners
MT0220
MT0221
M.S. Rivets
M.S. Bolts & Nuts, Screws etc
Fencing
Wire
MT0225
Barbed Wire
Products
555.39
555.39
560.84
596.70
Wires
MT0256
kg
93.00
104.00
95.79
103.02
Iron
MT0278
tonne
Description
Units
5
PL
GP
S/J
TH
Fibreglass
Reinforced polyester transparent sheets - 1.2mm, corrugated
sq.m
1234.20
1234.20
1234.20
1419.00
each
27.42
27.95
27.15
32.96
each
each
each
14.37
16.52
17.16
13.98
16.52
17.16
13.71
16.20
16.83
14.74
17.23
17.86
each
each
each
17.45
18.08
19.06
17.79
18.43
19.06
17.45
18.08
18.69
19.41
19.93
20.75
each
each
32.40
36.14
33.03
36.84
32.40
36.14
34.51
38.11
each
each
33.67
53.25
34.30
54.63
33.65
53.59
35.54
56.65
Hip/Ridge, 600mm
MT0310
Plain
MT0311
Coloured
each
each
34.89
55.56
35.57
57.17
34.90
56.08
37.60
59.23
Shinglep roofing
MT0315
1500mm (approx.)
pair
53.00
52.50
51.50
51.50
sq.m
m
350.00
275.00
345.58
254.10
338.99
249.26
342.99
262.65
m
m
m
29.83
41.95
46.98
29.22
41.93
48.28
31.06
41.36
46.98
33.00
46.00
54.75
MT0280
Roofing Slate
MT0285
600mm x 300mm
Concrete Roofing Tiles
Semi-sheet
MT0305
MT0306
Red
Mud
MT0320
MT0321
Plastic
Sheet
cu.m
cu.m
Plywood
MT0340
MT0341
MT0342
MT0343
sq.m
sq.m
sq.m
sq.m
191.75
206.25
318.75
519.50
202.50
273.75
371.06
586.47
192.34
308.34
348.43
550.44
178.36
301.59
323.27
592.43
Description
Units
6
PL
GP
S/J
TH
Gypsum Wallboard
MT0345
10mm
MT0346
12mm
MT0347
15mm
sq.m
sq.m
sq.m
189.65
207.28
239.93
216.50
255.50
310.00
188.34
207.35
237.59
265.63
314.36
425.10
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
311.00
329.34
379.00
409.44
497.31
619.60
679.61
848.95
315.21
334.91
380.76
415.93
507.26
629.44
667.70
857.77
315.21
334.91
380.76
415.93
507.26
629.44
667.70
857.77
318.10
338.30
383.80
445.62
579.97
739.43
879.48
1030.00
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
366.60
497.17
628.67
879.67
1083.33
1340.33
410.20
571.33
819.50
998.00
1205.00
1452.00
429.12
578.00
750.00
999.75
1206.25
1455.25
403.31
607.11
734.16
991.70
1188.60
1462.00
sq.m
sq.m
sq.m
sq.m
444.00
625.50
650.50
798.50
469.20
580.38
663.00
867.00
483.00
597.45
682.50
892.50
469.20
580.38
663.00
867.00
sq.m
716.30
729.30
741.60
867.00
m
m
sq.m
each
15.05
17.91
73.50
291.38
16.10
24.75
75.50
283.50
13.65
17.85
94.50
283.50
12.61
29.54
96.90
316.20
sq.m
sq.m
618.33
734.00
425.19
607.41
429.36
613.37
727.50
793.33
Wall panelling
MT0400
19mm, blue pine
MT0401
15mm, blue pine
MT0402
12mm, blue pine
MT0403
19mm, mixed conifer
MT0404
12mm, mixed conifer
MT0405
12mm, Champ wood
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
702.68
619.52
571.01
614.46
556.95
657.47
689.30
607.72
560.13
602.76
559.05
644.94
689.30
607.72
560.13
602.76
559.05
644.94
689.30
607.72
560.13
573.38
559.05
644.94
Skylight panel
MT0385
Cane
Bamboo
MT0390
MT0391
MT0392
MT0393
Prefab.
Flooring
MT0395
MT0396
25mm dia
75mm dia
Mat
cane basket
Pannelling
PL
GP
S/J
TH
sq.m
210.00
216.30
210.50
234.60
Flush Door, block board core, commercial ply veneer, U\F bonded
MT0415
25mm
MT0416
30mm
MT0417
35mm
MT0418
40mm
sq.m
sq.m
sq.m
sq.m
1100.00
1394.33
1554.33
1645.10
1133.00
1288.22
1501.33
1551.44
1148.45
1302.95
1508.95
1575.90
1109.69
1208.13
1408.75
1606.50
Flush Door, block board core, teak ply veneer, U\F bonded
MT0425
25mm
MT0426
30mm
MT0427
35mm
MT0428
40mm
sq.m
sq.m
sq.m
sq.m
1750.48
2068.34
2282.16
2712.53
1720.10
2039.55
2255.70
2523.50
1735.80
2061.03
2281.45
2559.55
1735.80
2061.03
2281.45
2559.55
sq.m
sq.m
sq.m
sq.m
1241.00
1482.00
1604.00
1790.25
1221.37
1433.25
1682.51
1931.77
1254.68
1472.33
1728.39
1984.45
1241.00
1482.00
1604.00
1984.45
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1543.66
1562.72
1575.42
1130.75
1144.72
1227.30
1109.15
1120.58
1128.20
1514.25
1532.95
1545.41
1109.21
1122.92
1203.93
1088.02
1099.24
1106.71
1514.25
1532.95
1545.41
1109.21
1122.92
1203.93
1088.02
1099.24
1106.71
1558.36
1577.60
1590.42
1141.51
1155.62
1238.99
1119.71
1131.25
1138.95
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1612.23
1617.36
1619.92
1196.67
1199.23
1204.36
1153.06
1158.19
1164.60
1566.60
1571.58
1574.08
1162.80
1165.29
1170.28
1120.42
1125.41
1131.64
1566.60
1571.58
1574.08
1162.80
1165.29
1170.28
1120.42
1125.41
1131.64
1612.23
1617.36
1619.92
1196.67
1199.23
1204.36
1153.06
1158.19
1164.60
sq.m
sq.m
sq.m
sq.m
sq.m
1644.92
1680.52
1684.40
1225.12
1227.71
1583.43
1617.70
1621.44
1179.32
1181.81
1583.43
1617.70
1621.44
1179.32
1181.81
1629.55
1664.81
1668.66
1213.67
1216.23
Wire
MT0410
Description
Units
Gauze
Galv. mild steel wire gauze, 85G (0.85mm average width of
aperture), 0.56mm dia.
Description
Units
MT0490
MT0491
MT0492
MT0493
8
PL
GP
S/J
TH
sq.m
sq.m
sq.m
sq.m
1235.14
1178.51
1186.28
1196.63
1188.97
1134.45
1141.93
1151.90
1188.97
1134.45
1141.93
1151.90
1223.60
1167.49
1175.19
1185.45
sq.m
sq.m
sq.m
608.57
730.00
623.82
596.98
606.95
611.93
596.98
606.95
611.93
730.00
606.95
611.93
Prefab. fully glazed window shutters, incl. 75mm rail with preservative
& one primer coat, excluding glass
MT0505
MT0506
MT0507
Steel
30mm
35mm
40mm
Doors
and
Windows
MT0510
MT0511
sq.m
sq.m
1200.62
381.15
1177.75
373.89
1177.75
373.89
1177.75
373.89
MT0512
Steel windows (side hung) with hinges, lugs and glazing clips
sq.m
660.66
648.08
648.08
648.08
MT0513
Steel ventilators (top hung) with hinges, lugs and glazing clips. sq.m
Steel ventilators (centre hung) with pivots, lugs and glazing
clips
sq.m
Rolling shutters with all accessories, excluding top cover
sq.m
Top cover for Rolling shutter
m
660.66
648.08
648.08
648.08
825.83
1123.12
470.45
810.10
1101.73
448.67
810.10
1101.73
448.67
810.10
1101.73
448.67
each
each
each
58.30
44.52
31.80
52.50
42.50
33.50
54.21
36.05
30.30
70.00
50.33
33.33
each
each
each
each
37.36
32.28
25.98
23.35
40.00
35.00
30.00
22.33
32.25
26.25
21.00
17.50
42.50
35.00
27.50
26.37
each
each
each
each
49.50
35.20
23.73
18.90
79.00
68.33
55.67
39.33
71.67
53.75
38.75
25.00
47.50
32.50
27.50
25.00
sq.m
385.00
415.00
502.50
515.00
each
each
each
187.94
167.44
151.55
200.00
180.00
140.00
197.95
179.92
155.84
251.26
227.80
195.50
each
each
48.56
39.38
100.00
79.00
63.33
34.75
66.30
40.80
MT0514
MT0515
MT0516
Aluminium
Anodised Aluminium Fittings: Butt Hinges
MT0530
MT0531
MT0532
100mm
75mm
50mm
Description
MT0572
100mm
Units
9
PL
GP
S/J
TH
each
30.71
70.00
22.75
30.60
each
each
each
135.00
95.00
52.50
107.88
82.63
55.81
87.50
57.50
37.00
140.00
92.50
60.00
each
each
each
each
105.48
79.48
63.25
54.42
129.00
103.00
95.00
83.00
102.50
87.00
65.00
51.25
100.00
82.50
75.00
65.00
each
each
75.25
59.50
93.75
82.50
65.00
50.00
77.50
50.00
each
each
each
571.20
515.10
464.10
615.00
531.67
332.50
700.00
520.00
533.33
862.50
772.50
655.00
each
each
each
175.00
123.33
98.33
208.33
151.25
121.25
203.33
120.00
96.67
228.23
185.00
110.00
Door Closers/Stoppers
MT0605
Bright finished brass: Door Stopper
MT0606
Bright finished brass: Mortise Latch 100mm
MT0607
brass, hinged, spring-loaded type
MT0608
brass, over-head, hydraulic type
each
each
each
each
281.13
790.00
750.00
700.00
306.00
882.30
721.14
734.50
275.00
890.95
728.21
739.25
285.00
850.00
775.00
756.00
100mm
75mm
50mm
each
each
each
35.07
26.91
21.25
27.50
23.75
15.00
28.33
18.33
12.33
38.75
25.00
17.50
each
each
each
each
35.00
25.00
24.00
18.90
38.75
31.25
30.00
20.00
45.00
33.33
26.67
17.33
50.00
35.00
27.50
25.00
each
each
each
each
35.75
36.05
26.87
20.23
37.50
28.00
32.75
27.50
37.50
35.00
27.50
25.00
35.00
28.00
45.00
35.00
each
168.33
163.33
140.00
157.50
Brass
Bright finished brass: Butt Hinges
MT0575
MT0576
MT0577
100mm
75mm
50mm
Mild Steel
Mild Steel: Butt Hinges
MT0615
MT0616
MT0617
Description
MT0641
MT0642
250mm
200mm
Units
10
PL
GP
S/J
TH
each
each
133.33
119.33
138.75
104.28
121.00
95.00
122.50
126.14
each
each
each
66.39
44.80
30.25
80.00
46.67
35.00
51.25
35.00
26.67
62.50
45.00
25.00
each
85.75
105.00
108.50
95.00
Plain Glass
MT0655
3mm thick
MT0656
4mm thick
MT0657
5.5mm thick
sq.m
sq.m
sq.m
402.24
442.59
585.83
408.00
417.21
606.90
412.50
487.50
684.41
430.40
484.20
645.60
Frosted Glass
MT0660
3mm thick
MT0661
5.5mm thick
sq.m
sq.m
427.45
679.80
389.09
586.50
473.28
724.20
484.20
807.00
each
each
each
each
each
each
each
sq.m
24.15
1.96
2.54
33.60
29.05
26.25
24.15
378.00
23.46
1.91
2.47
38.76
29.17
24.48
22.44
357.00
27.20
1.91
2.45
43.25
28.33
30.00
27.00
377.40
23.46
1.91
2.47
32.64
28.22
25.50
23.46
367.20
kg
21.60
25.50
25.75
29.00
kg
kg
kg
65.00
60.25
55.67
93.75
88.32
49.30
70.00
62.25
79.50
62.50
85.67
94.00
51.31
96.59
50.71
27.95
249.25
1854.00
45.00
93.33
33.38
33.63
350.00
785.00
47.50
100.00
40.00
41.20
306.00
899.91
75.00
140.00
110.00
30.90
101.00
1650.00
Tiles
Glazed tiles
MT0665
MT0666
MT0667
MT0668
MT0669
MT0670
MT0671
MT0672
Plaster of Paris
kg
kg
sq.m
sq.m
kg
kg
Description
Units
Primers
MT0710
MT0711
MT0712
MT0713
MT0714
Cement primer
Synthetic red lead primer
Red oxide primer, for metals
White primer, for wood
Pink primer, for wood
11
PL
GP
S/J
TH
litre
litre
litre
litre
litre
148.75
151.67
151.25
162.50
171.25
133.75
148.33
158.75
171.25
170.00
130.00
148.00
122.75
150.00
148.33
168.00
161.00
182.67
192.33
200.00
Finishing coat
MT0720
Aluminium paint
MT0721
Red Corrugal paint
MT0722
Synthetic enamel paint
MT0723
High gloss synthetic enamel
MT0724
Acrylic emulsion
MT0725
Vinyl plastic emulsion paint (for cement plaster)
MT0726
Black\White bitumen enamel
litre
litre
litre
litre
litre
litre
litre
281.25
226.25
212.50
283.33
218.75
280.00
225.75
285.00
221.67
227.50
238.00
225.00
277.00
213.33
252.50
212.67
214.75
246.67
256.25
291.00
278.67
324.67
247.00
236.67
330.50
400.00
557.50
295.00
litre
litre
litre
330.00
280.00
283.50
319.60
270.00
265.20
540.60
227.00
250.00
55.00
320.00
313.30
Wood Preservative
MT0735
Wood preservative -Brown
MT0736
Crude Coal Tar
litre
litre
243.25
126.00
218.15
92.70
151.30
91.80
238.96
149.35
kg
57.65
58.33
60.00
80.00
sq.m
sq.m
316.20
433.50
319.30
437.75
311.10
423.30
319.30
437.75
each
721.00
803.40
953.13
781.13
each
2343.25
2178.50
2815.83
2970.24
each
7364.50
7364.50
8447.50
8420.10
each
1648.00
1751.00
1882.50
1863.54
m
each
each
1133.00
293.55
267.80
1246.30
310.03
273.98
1050.00
210.00
225.00
1122.00
290.70
265.20
Accessories
MT0740
Putty
Wall
Paper
Wall paper:
MT0745
Standard
MT0746
High Quality
BASIC RATES - DRAINAGE MATERIALS
C. I.
Manhole
MT0750
MT0751
MT0752
MT0753
Rain-water
Cast Iron
MT0760
MT0761
MT0762
Covers
Pipes
&
Fittings
Description
Units
MT0763
MT0764
MT0765
MT0766
12
PL
GP
S/J
TH
each
each
each
each
389.34
581.95
453.20
150.38
346.08
596.37
469.63
159.65
350.00
580.00
487.65
162.74
385.56
576.30
448.80
148.92
m
m
m
m
m
m
m
m
m
m
361.21
393.20
490.98
614.03
922.22
1307.46
1885.31
2381.53
5118.26
7311.88
364.75
397.05
495.79
620.05
931.26
1320.27
1903.80
2404.88
5168.43
7383.56
364.75
397.05
495.79
620.05
931.26
1320.27
1903.80
2404.88
5168.43
7383.56
387.60
398.70
771.78
968.92
1255.50
1874.00
2700.32
2917.33
5141.80
7322.00
each
each
each
each
each
each
each
each
each
each
57.84
62.86
78.56
120.19
180.51
255.90
369.00
417.05
584.34
771.89
59.00
64.10
80.12
122.58
184.10
261.00
376.35
421.14
590.07
779.46
59.29
64.42
80.52
123.19
185.01
262.30
378.21
421.14
590.07
779.46
58.71
63.80
79.74
122.00
183.22
259.75
374.54
417.05
584.34
771.89
each
each
each
each
each
each
each
each
each
each
129.59
288.63
506.58
619.68
695.08
860.01
1030.84
1207.55
1584.54
1902.63
132.17
294.38
516.66
632.02
708.91
877.13
1051.36
1231.59
1616.09
1940.50
132.83
295.83
519.23
635.14
712.43
881.48
1056.56
1237.68
1624.08
1950.11
131.54
292.96
514.19
628.98
705.51
872.92
1046.30
1225.66
1608.31
1931.17
each
each
each
106.03
120.17
153.15
108.14
122.56
156.20
108.68
123.16
156.98
107.62
121.97
155.46
100.50
98.67
101.67
96.00
100 mm dia
150 mm dia
225mm dia
300mm dia
450mm dia
600mm dia
750mm dia
900mm dia
1050mm dia
1200mm dia
Pipe
Specials
Supply
G.I pipe
MT0805
15mm
Pipes
13
Code
Description
PL
MT0806
MT0807
MT0808
MT0809
MT0810
MT0811
MT0812
MT0813
MT0814
20mm
25mm
32mm
40mm
50mm
65mm
80mm
100mm
150mm
m
m
m
m
m
m
m
m
m
128.33
185.00
245.67
300.00
375.00
477.22
644.44
855.00
1350.00
142.78
190.00
244.58
302.50
368.75
551.33
778.13
1029.17
1547.50
134.00
191.67
267.50
335.00
392.50
555.00
740.00
990.00
1481.39
130.00
190.00
241.00
275.00
375.00
510.00
690.00
890.00
1539.25
m
m
m
m
m
m
m
m
m
m
m
m
25.60
37.13
61.44
97.09
147.94
225.69
321.90
461.43
682.57
1109.75
1446.76
2842.26
35.00
46.00
60.26
185.40
190.55
303.85
422.30
602.55
906.40
1096.95
1421.40
2863.40
36.67
54.00
85.00
119.75
185.75
276.25
446.00
622.00
985.00
2105.00
1430.00
2850.00
34.50
51.50
80.46
123.00
193.00
288.50
409.00
591.50
944.50
1354.00
2255.00
3184.00
m
m
m
m
m
m
m
m
m
m
41.26
63.88
99.06
150.39
212.71
301.29
451.68
725.15
947.11
1858.97
46.35
82.40
128.75
195.70
278.10
391.40
597.40
669.50
856.96
1738.13
62.00
81.00
125.00
168.00
246.67
340.00
616.00
868.50
1226.33
1929.00
70.00
66.50
102.50
159.50
225.50
325.00
479.50
770.50
1006.50
1975.50
m
m
m
m
m
m
m
m
m
45.32
79.32
107.64
146.27
212.71
318.29
505.75
662.83
1295.78
56.65
103.00
144.20
193.64
278.10
412.00
527.88
664.35
1251.45
104.25
131.55
117.50
139.12
200.00
286.50
488.33
628.00
1266.67
64.89
84.00
114.00
192.00
275.00
341.00
537.50
704.50
1377.50
m
m
m
m
204.46
335.79
434.68
839.48
257.50
360.50
435.69
852.84
233.67
364.33
525.64
964.77
217.00
355.00
462.00
892.50
m
m
937.96
1091.47
937.96
1091.47
928.85
1080.87
988.80
1133.00
GP
S/J
TH
Description
MT0858
MT0859
MT0860
MT0861
MT0862
MT0863
MT0864
MT0865
MT0866
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
Units
m
m
m
m
m
m
m
m
m
14
PL
GP
S/J
TH
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
914.02
1417.19
1863.67
2454.91
3074.94
3872.81
4597.09
5375.86
6342.36
8598.96
922.98
1431.08
1881.94
2478.98
3105.09
3910.78
4642.16
5428.57
6404.54
8683.27
914.02
1417.19
1863.67
2454.91
3074.94
3872.81
4597.09
5375.86
6342.36
8598.96
936.00
1456.00
1976.00
2600.00
3224.00
4056.00
4888.00
5720.00
6760.00
9152.00
Fittings
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
41.18
55.83
89.57
202.42
255.00
353.43
481.95
2040.00
61.16
128.56
227.21
313.27
417.69
255.00
255.00
306.00
663.00
153.00
48.67
70.30
102.74
167.63
292.01
416.38
681.35
2130.56
91.93
154.08
220.34
325.74
405.49
243.97
246.94
271.94
650.95
115.40
32.86
45.66
70.88
195.98
263.25
370.99
645.55
2521.88
52.43
110.02
204.16
318.14
519.70
246.33
252.49
252.49
726.67
119.47
72.10
98.88
168.92
248.71
409.00
622.58
934.39
2823.10
84.74
180.00
322.48
450.25
622.67
257.50
257.50
309.00
669.50
154.50
Description
MT0913
MT0914
MT0915
MT0916
Units
15
PL
GP
S/J
TH
each
each
each
each
181.80
275.95
387.15
658.00
148.71
289.08
333.10
571.03
153.96
299.29
344.86
591.19
185.40
355.35
389.48
612.00
each
each
215.58
292.25
152.44
231.75
180.00
210.00
234.00
318.00
each
238.33
252.50
300.00
276.67
Stopcock
MT0930
MT0931
MT0932
15mm nom-bore
20mm nom-bore
25mm nom-bore
each
each
each
282.04
397.31
590.81
395.00
475.00
490.00
250.00
400.00
575.00
315.00
415.00
555.00
Wheel valve
MT0940
MT0941
MT0942
MT0943
MT0944
32mm nom-bore
40mm nom-bore
50mm nom-bore
65mm nom-bore
80mm nom-bore
each
each
each
each
each
1103.33
1253.75
1415.00
2441.00
3231.25
1326.38
1705.17
2181.28
3886.71
5572.56
1326.38
1705.17
2181.28
3886.71
5572.56
1450.00
1650.00
2175.00
3725.00
4945.00
each
each
each
1435.00
2352.00
3570.00
2007.68
3326.39
5037.11
1945.00
3360.00
5300.00
2213.40
3921.90
5724.24
each
each
each
each
each
each
each
each
each
each
each
63.00
72.00
102.00
164.00
178.50
298.00
338.00
393.00
462.50
655.50
871.50
57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20
57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20
57.68
65.92
92.70
154.50
190.55
272.95
309.00
444.96
468.65
650.96
865.20
Waste-water Pipework
Cast Iron Pipes, Single Socketted, 1.83m long
MT0975
MT0976
MT0977
MT0978
50mm
75mm
100mm
150mm
each
each
each
each
532.91
732.91
907.91
1207.91
550.84
799.58
948.29
1221.37
624.23
704.05
1133.00
1283.43
600.00
755.00
1200.00
1350.00
Plain bend
MT0985
MT0986
MT0987
50mm
75mm
100mm
each
each
each
163.20
174.10
179.10
131.67
151.67
201.67
170.00
180.00
222.50
180.00
205.00
255.00
Description
Door bend
MT0990
MT0991
MT0992
50mm
75mm
100mm
Collar
MT1000
MT1001
MT1002
Units
16
PL
GP
S/J
TH
each
each
each
214.20
214.20
214.20
221.45
241.85
283.70
225.64
264.26
332.33
200.85
232.95
342.22
50mm
75mm
100mm
each
each
each
126.48
171.36
231.54
162.23
205.49
329.86
171.36
203.49
348.08
127.72
173.04
233.81
each
each
each
130.56
226.85
215.28
132.87
226.48
277.91
156.56
247.20
350.20
131.84
269.86
342.99
each
each
each
224.91
337.37
460.53
221.45
314.15
401.70
287.98
353.28
497.20
227.12
340.67
465.05
each
each
each
each
182.07
231.34
315.95
337.37
190.88
229.28
329.86
375.00
195.70
247.20
350.85
366.67
183.86
233.60
319.04
340.67
each
each
each
310.59
388.77
582.62
221.71
264.97
529.94
237.93
281.19
600.23
310.59
388.77
582.62
each
each
each
268.82
344.33
451.96
243.34
292.01
421.79
237.93
281.19
500.19
268.82
344.33
451.96
each
each
each
224.91
294.53
342.72
236.85
308.23
352.57
236.90
313.12
352.26
224.91
294.53
342.72
each
each
each
241.51
369.50
393.06
249.29
373.12
406.64
259.56
389.34
413.67
241.51
369.50
393.06
each
each
332.01
385.56
334.75
374.92
351.49
400.16
332.01
385.56
each
each
348.08
396.27
337.84
386.25
367.71
421.79
348.08
396.27
Description
Units
17
PL
GP
S/J
TH
each
each
each
203.49
393.06
546.21
169.95
369.77
516.03
227.12
259.56
486.68
203.49
393.06
546.21
each
each
each
310.59
434.83
582.62
281.19
346.08
524.53
209.78
299.52
375.28
310.59
434.83
582.62
each
each
291.72
397.80
302.82
415.30
316.88
429.36
291.72
397.80
each
each
292.74
404.94
257.50
413.03
237.93
427.19
292.74
404.94
each
each
270.30
382.50
278.10
383.16
275.00
340.00
272.95
386.25
each
each
326.40
397.80
323.42
400.67
340.00
425.00
329.60
401.70
Terminal Guard
MT1130
50mm
MT1131
75mm
MT1132
100mm
MT1133
150mm
each
each
each
each
128.52
214.20
326.66
578.34
135.19
229.28
324.45
584.01
188.90
262.84
323.83
520.83
128.52
214.20
326.66
578.34
each
each
each
209.05
361.08
489.60
195.73
338.87
468.65
230.00
320.00
462.34
209.05
361.08
489.60
kg
97.46
105.99
112.46
98.42
each
each
each
285.00
373.50
430.00
256.25
382.50
386.25
285.00
345.00
435.00
246.17
411.65
432.97
each
each
each
376.67
567.50
590.00
410.00
585.50
630.00
355.00
485.00
580.00
327.28
561.90
556.43
each
each
305.00
526.67
329.21
555.90
320.00
420.00
297.38
473.25
Jointing
MT1145
Materials
Pig lead
Description
MT1172
110mm
Units
18
PL
GP
S/J
TH
each
645.00
619.91
520.00
636.65
each
each
each
204.00
326.40
358.02
195.84
311.10
366.69
180.25
309.00
360.50
219.39
327.54
482.73
Pipe Connector
MT1190
110mm
each
160.00
157.50
147.85
151.90
Reducer
MT1195
MT1196
MT1197
90x75mm
110x75mm
110x90mm
each
each
each
101.66
110.00
132.60
130.00
140.00
160.00
112.50
147.50
157.50
138.36
164.03
184.05
Coupler
MT1205
MT1206
MT1207
75mm
90mm
110mm
each
each
each
63.25
77.33
89.75
59.53
85.80
95.48
71.40
92.80
99.30
63.39
77.00
96.32
Plain bend
MT1215
MT1216
MT1217
75mm
90mm
110mm
each
each
each
90.17
99.67
109.75
87.50
120.00
125.00
99.00
110.00
141.25
87.43
110.84
113.11
Door bend
MT1225
MT1226
MT1227
75mm
90mm
110mm
each
each
each
99.00
132.50
142.33
95.00
130.00
157.50
110.00
142.00
146.63
96.00
115.00
143.50
each
each
each
173.40
255.00
346.80
183.60
265.20
346.80
189.77
278.00
356.05
171.33
215.00
339.50
Plain Shoe
MT1239
MT1240
MT1241
75mm
90mm
110mm
each
each
each
112.20
132.60
163.20
117.81
144.59
171.36
117.30
142.80
173.40
113.30
133.90
164.80
each
each
each
99.33
138.00
150.00
102.50
135.00
148.75
95.00
136.67
166.67
95.00
140.00
182.50
each
each
each
104.33
143.00
171.67
116.25
155.00
173.33
100.00
140.00
155.00
122.50
170.00
202.50
each
each
each
206.25
277.25
370.00
174.27
214.20
277.40
185.00
260.00
325.00
98.00
155.00
172.00
Description
Units
19
PL
GP
S/J
TH
each
each
each
222.50
260.00
340.00
295.25
372.30
386.65
205.80
233.58
323.00
210.00
260.00
315.00
Single Y, Plain
MT1285
75mm
MT1286
90mm
MT1287
110mm
each
each
each
104.50
170.00
196.50
147.50
295.00
309.00
120.00
180.00
230.00
126.00
186.00
220.00
each
each
each
123.50
213.00
252.50
170.00
270.00
235.00
162.00
232.00
272.33
141.50
236.00
281.00
Double Y, Plain
MT1305
75mm
MT1306
90mm
MT1307
110mm
each
each
each
176.67
252.50
296.67
203.75
250.00
250.00
170.33
231.33
268.33
178.67
257.50
315.33
each
each
each
230.00
267.50
351.67
249.00
336.00
365.00
176.50
207.50
255.00
255.00
235.00
357.50
Seal Ring
MT1320
MT1321
MT1322
each
each
each
30.00
45.00
52.50
31.67
41.67
50.00
30.00
42.50
50.00
31.33
46.67
60.00
each
each
295.00
397.00
204.00
295.80
230.00
285.00
250.00
497.00
each
each
391.67
477.50
336.60
418.20
300.00
450.00
375.00
510.00
each
each
439.00
505.00
377.40
423.30
350.00
440.00
521.67
577.50
Terminal Guard
MT1340
75mm
MT1341
90mm
MT1342
110mm
each
each
each
81.60
91.80
96.90
91.80
107.10
112.20
92.70
103.00
113.30
82.40
92.70
97.85
Nahani Trap
MT1345
100mm inlet & 75mm outlet
each
186.67
215.00
288.40
189.55
each
each
342.04
300.00
423.30
377.40
422.30
360.50
455.43
368.36
75 mm
90 mm
110 mm
Description
Units
20
PL
GP
S/J
TH
each
each
B a s i n s, S i n k s
Flat-back wash basin, white vitreous
MT1360
630 x 450mm
MT1361
550 x 400mm
each
each
1516.67
1031.67
1550.00
910.00
1325.00
850.00
1741.46
1035.25
each
850.00
867.00
950.00
1105.00
each
1497.50
1400.00
1400.00
1420.00
each
3025.00
3417.00
3605.00
3650.00
each
each
each
each
each
each
each
each
each
each
each
1035.00
1242.50
1670.00
1930.80
2650.00
3650.00
3731.25
4697.50
7650.00
9690.00
1094.08
1075.00
1150.00
1550.00
1611.60
2121.60
2973.00
3315.00
4590.00
7650.00
9690.00
969.75
963.33 1050.00
1175.00 1400.00
1648.00 1600.00
1627.40 2250.00
2142.40 2650.00
2984.50 3650.00
3347.50 4180.00
4635.00 4850.00
7725.00 9945.00
9785.00 10042.50
973.38 1266.67
each
each
each
each
each
each
pair
1262.50
1787.50
1375.00
1390.00
1575.00
738.75
166.67
1300.00
1950.00
1204.00
1250.00
1938.00
516.67
150.00
1368.75
1606.25
1283.33
1300.00
1516.67
632.50
150.00
1500.00
1475.00
1183.33
1287.50
1525.00
613.33
150.00
each
each
each
1479.00
1653.33
1989.00
1200.00
1836.00
2040.00
1589.29
1970.39
2070.30
1479.00
1683.00
1989.00
each
each
1555.00
2372.50
1450.00
2263.50
1450.00
2183.33
1550.00
2200.00
W.C P a n s
W.C. P a n s
MT1400
MT1401
MT1402
MT1403
MT1404
MT1405
MT1406
Cisterns
C.I. Automatic flushing Cistern with fittings
MT1420
MT1421
MT1422
5 litres
10 litres
12.5 litres
Description
Units
21
PL
GP
S/J
TH
Float Valve
MT1440
each
337.50
386.67
393.33
380.00
each
1280.00
1236.00
1200.00
1450.00
each
each
each
each
3565.00
3264.00
450.00
374.85
3264.00
3264.00
459.00
374.85
3264.00
3264.00
459.00
374.85
3296.00
3296.00
663.83
378.53
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
455.00
817.50
390.00
570.00
436.67
400.00
450.00
447.50
300.00
450.00
720.00
750.00
850.00
660.00
459.00
663.00
907.80
548.00
813.90
530.00
600.00
450.00
450.00
655.00
596.67
485.00
460.00
605.00
693.60
786.93
522.60
459.00
663.00
907.80
560.00
800.00
570.00
590.00
450.00
480.00
550.00
550.00
470.00
550.00
650.00
750.00
850.00
450.00
459.00
663.00
907.80
515.00
475.00
480.00
690.00
490.00
520.20
675.00
680.00
320.00
765.00
772.50
956.25
912.90
561.62
561.00
642.60
960.84
each
each
each
each
each
each
each
969.00
885.50
826.20
561.00
683.40
510.00
316.20
663.00
765.00
893.52
515.10
765.00
357.00
468.50
711.45
943.50
969.00
484.50
752.25
504.90
435.54
913.50
935.67
874.70
596.00
697.50
527.10
533.33
C.p Mixers
MT1530
MT1531
MT1532
MT1533
MT1534
MT1535
MT1536
MT1537
MT1538
MT1539
MT1540
each
each
each
each
each
each
each
each
each
each
each
1938.00
1652.40
1377.00
1275.00
2181.44
2696.88
2754.00
2244.00
1581.00
3570.00
4590.00
1938.00
1460.80
1377.00
1275.00
2240.72
2600.00
2754.00
2244.00
1581.00
3570.00
4590.00
1957.00
1668.60
1390.50
1287.50
2202.83
2723.32
3265.50
2266.00
1596.50
3605.00
4267.50
2800.00
2800.00
1330.00
1688.25
2880.00
3300.00
3250.00
2533.33
2120.60
3864.00
4692.00
Urinals
MT1445
Flush fittings
MT1450
c.p flush valve, 32mm
MT1451
c.p flush valve, 32mm, concealed
MT1452
c.p flush bend, long
MT1453
c.p flush valve elbow
C.p Cocks & Spouts
MT1460
MT1461
MT1462
MT1463
MT1464
MT1465
MT1466
MT1467
MT1468
MT1469
MT1470
MT1471
MT1472
MT1473
MT1474
MT1475
MT1476
Description
MT1541
MT1542
MT1543
each
each
2142.00
2448.00
2142.00
2448.00
3056.50
2908.00
3723.00
3258.50
each
4998.00
4998.00
5047.00
4833.33
each
3570.00
3570.00
4052.50
3800.00
MT1546
each
each
4845.00
714.00
4845.00
714.00
4892.50
721.00
5757.00
787.80
Traps, c.p
MT1580
MT1581
32mm
for bath
each
each
1086.30
867.00
1086.30
867.00
1096.95
875.50
936.41
852.13
pair
112.20
132.60
152.23
136.25
each
each
195.00
330.00
262.65
344.25
265.23
347.63
275.00
330.00
PVC waste
MT1595
32mm
each
64.67
65.00
97.50
71.50
each
each
185.00
195.00
206.00
206.00
204.00
204.00
160.00
163.33
Soap Containers
MT1605
c.p brass with bracket
MT1606
c.p Liquid Soap Container
MT1607
Recessed ceramic, 200 x 100mm
MT1608
Recessed ceramic, 150 x 150mm
each
each
each
each
364.30
515.00
515.00
510.00
299.00
408.00
500.00
510.00
295.80
408.00
510.00
510.00
298.70
412.33
515.00
515.00
each
each
each
each
447.50
560.00
650.00
453.33
440.00
490.00
480.00
530.00
597.33
704.75
925.00
570.00
614.14
695.25
789.67
625.69
each
each
390.63
350.00
325.00
325.00
357.00
255.00
470.38
278.75
each
each
1031.67
655.00
999.60
622.50
1066.67
715.00
1085.14
884.75
each
each
each
each
414.73
703.50
766.50
682.50
412.30
683.40
744.60
663.00
369.91
683.40
744.60
663.00
475.00
683.40
744.60
663.00
MT1544
MT1545
Units
22
PL
GP
S/J
TH
Bathroom Accessories
Brackets
MT1585
R.S. or C.I.Brackets
Glass self/Mirror
MT1630
MT1631
Glass Shelf
Mirror (Bevelled edge) 600mm x 450mm
Description
Units
23
PL
GP
S/J
TH
Storage
each
each
each
each
each
each
each
each
each
each
each
each
Tanks
kg
each
each
each
each
each
each
each
89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00
89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00
89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00
89.00
91.70
112.00
2170.00
1330.00
490.00
1420.00
966.00
each
litre
50.40
172.00
51.30
173.00
50.40
172.00
53.40
176.00
Painting Brush
Thermoplastic road marking paint
Code
Description
Units
24
PL
GP
SJ
Th
Air Compressor(KG)
day
4855.20
4855.20
4855.20
4855.20
MP0101
day
5744.00
5744.00
5744.00
5744.00
MP0102
Air Compressor(XAM140)
day
5488.00
5488.00
5488.00
5488.00
MP0103
Air Compressor(VT/6)
day
4552.80
4552.80
4552.80
4552.80
MP0104
Air Compressor(VT/250)
day
5488.00
5488.00
5488.00
5488.00
MP0105
day
12528.00
12528.00
12528.00
12528.00
MP0106
day
14582.40
14582.40
14582.40
14582.40
MP0107
Bull Dozer(D7G)
day
14952.00
14952.00
14952.00
14952.00
MP0108
Bull Dozer(TD12E)
day
13893.60
13893.60
13893.60
13893.60
MP0109
day
15736.00
15736.00
15736.00
15736.00
MP0110
day
13264.00
13264.00
13264.00
13264.00
MP0111
day
8032.00
8032.00
8032.00
8032.00
MP0112
day
4136.00
4136.00
4136.00
4136.00
MP0113
day
3832.00
3832.00
3832.00
3832.00
MP0114
day
1224.00
1224.00
1224.00
1224.00
MP0115
day
21048.00
21048.00
21048.00
21048.00
MP0116
Chips spreader
day
760.00
760.00
760.00
760.00
MP0117
day
12840.00
12840.00
12840.00
12840.00
MP0118
day
18160.00
18160.00
18160.00
18160.00
MP0119
day
9298.80
9298.80
9298.80
9298.80
MP0120
Excavator(PC - 200)
day
14712.00
14712.00
14712.00
14712.00
MP0121
Excavator(PC - 120)
day
11680.00
11680.00
11680.00
11680.00
MP0122
Excavator ( PC60)
day
7467.60
7467.60
7467.60
7467.60
MP0123
day
11736.00
11736.00
11736.00
11736.00
MP0124
day
14536.00
14536.00
14536.00
14536.00
MP0125
day
1168.00
1168.00
1168.00
1168.00
MP0126
day
8896.00
8896.00
8896.00
8896.00
MP0127
day
7840.00
7840.00
7840.00
7840.00
MP0128
day
9727.20
9727.20
9727.20
9727.20
MP0129
day
10164.00
10164.00
10164.00
10164.00
MP0130
day
10392.00
10392.00
10392.00
10392.00
MP0131
day
10976.00
10976.00
10976.00
10976.00
MP0132
day
13032.00
13032.00
13032.00
13032.00
MP0133
day
13208.00
13208.00
13208.00
13208.00
MP0134
day
616.00
616.00
616.00
616.00
MP0135
day
4048.00
4048.00
4048.00
4048.00
MP0136
day
2184.00
2184.00
2184.00
2184.00
MP0137
day
3049.20
3049.20
3049.20
3049.20
Description
Units
MP0138
MP0139
MP0140
25
PL
GP
SJ
Th
day
3808.00
3808.00
3808.00
3808.00
day
10064.00
10064.00
10064.00
10064.00
day
10824.00
10824.00
10824.00
10824.00
MP0141
Concrete Pump
day
14312.00
14312.00
14312.00
14312.00
MP0142
day
10408.00
10408.00
10408.00
10408.00
MP0143
day
19051.20
19051.20
19051.20
19051.20
MP0144
day
3104.00
3104.00
3104.00
3104.00
MP0145
Tanker ( NISSAN)
day
4960.00
4960.00
4960.00
4960.00
MP0146
Tanker ( TATA)
day
4784.00
4784.00
4784.00
4784.00
MP0147
day
3472.00
3472.00
3472.00
3472.00
MP0148
Tata LB (1210SE)
day
4792.00
4792.00
4792.00
4792.00
MP0149
Tata LB (1612SE)
day
4848.00
4848.00
4848.00
4848.00
MP0150
day
3704.00
3704.00
3704.00
3704.00
MP0151
Tripper(Hino), 172 KD
day
4520.00
4520.00
4520.00
4520.00
MP0152
ISUZU Truck
day
5200.00
5200.00
5200.00
5200.00
MP0153
day
3376.00
3376.00
3376.00
3376.00
MP0154
Trailor(HINO 25 MT)
day
21608.00
21608.00
21608.00
21608.00
MP0155
day
680.40
680.40
680.40
680.40
MP0156
Rock Breaker
day
4208.00
4208.00
4208.00
4208.00
MP0157
day
3208.80
3208.80
3208.80
3208.80
MP0158
Jack Hammer
day
464.00
464.00
464.00
464.00
MP0159
day
7000.00
7000.00
7000.00
7000.00
MP0160
day
5233.20
5233.20
5233.20
5233.20
MP0161
Daewoo Dumper/Tipper
day
5408.00
5408.00
5408.00
5408.00
MP0162
day
4616.00
4616.00
4616.00
4616.00
MP0163
day
4584.00
4584.00
4584.00
4584.00
MP0164
Mini-Dumper, TATA
day
2752.00
2752.00
2752.00
2752.00
MP0165
day
5216.00
5216.00
5216.00
5216.00
MP0166
day
5056.00
5056.00
5056.00
5056.00
MP0167
day
2646.00
2646.00
2646.00
2646.00
MP0168
day
4560.00
4560.00
4560.00
4560.00
MP0169
day
2848.00
2848.00
2848.00
2848.00
MP0170
day
9408.00
9408.00
9408.00
9408.00
MP0171
day
15616.00
15616.00
15616.00
15616.00
MP0172
day
6816.00
6816.00
6816.00
6816.00
MP0173
day
62600.00
62600.00
62600.00
62600.00
MP0174
Vibromax
day
907.20
907.20
907.20
907.20
MP0175
Workshop Van
day
4584.00
4584.00
4584.00
4584.00
MP0200
day
11384.00
11384.00
11384.00
11384.00
MP0201
day
1168.00
1168.00
1168.00
1168.00
MP0202
day
183.75
183.75
183.75
183.75
MP0203
day
8568.00
8568.00
8568.00
8568.00
MP0204
day
6464.00
6464.00
6464.00
6464.00
26
Code
Description
PL
GP
SJ
Th
MP0205
day
1392.00
1392.00
1392.00
1392.00
MP0206
Concrete Vibrator(M/C5)
day
856.00
856.00
856.00
856.00
MP0207
day
4920.00
4920.00
4920.00
4920.00
MP0208
day
18261.60
18261.60
18261.60
18261.60
MP0209
day
13918.80
13918.80
13918.80
13918.80
MP0210
day
13000.00
13000.00
13000.00
13000.00
MP0211
Truck/Tipper (Tata,1210SK32)
day
4480.00
4480.00
4480.00
4480.00
MP0212
Compressor (CPS300)
day
5760.00
5760.00
5760.00
5760.00
MP0213
day
518.40
518.40
518.40
518.40
MP0214
day
5328.00
5328.00
5328.00
5328.00
MP0215
day
1153.28
1153.28
1153.28
1153.28
MP0216
day
5760.00
5760.00
5760.00
5760.00
MP0217
day
6328.00
6328.00
6328.00
6328.00
MP0218
day
5800.00
5800.00
5800.00
5800.00
MP0219
Excavator SK 115
day
11672.00
11672.00
11672.00
11672.00
MP0220
Excavator SK 200
day
14944.00
14944.00
14944.00
14944.00
MP0221
day
13720.00
13720.00
13720.00
13720.00
MP0222
day
13000.00
13000.00
13000.00
13000.00
MP0223
day
2000.00
2000.00
2000.00
2000.00
Note: Buit-up rates are inclusive of HSD, M.Oil, Operators/drivers, etc complete.
SECTION 2
Mechanical Transportation Costs
27
Materials
quantity
payable
Unit
1 km
2km
3km
4 km
beyond 5 beyond
beyond
upto 10 10 upto
20 for
km for 20 km for
every km
every km every km
5 km
10
cu.m
135.82
146.31
156.57
166.38
175.74
8.25
6.18
7.73
2 Dry earth
cu.m
4.8
169.78
182.88
195.72
207.97
219.68
10.31
7.73
9.66
3 Manure or Sludge
cu.m
5.7
142.97
154.01
164.81
175.13
184.99
8.68
6.51
8.13
4 Excavated Rock
cu.m
271.64
292.61
313.15
332.75
351.48
16.50
12.36
15.45
162.98
175.57
187.89
199.65
210.89
9.90
7.42
9.27
cu.m
4.6
177.16
190.83
204.23
217.01
229.23
10.76
8.06
10.08
7 stone boulders
cu.m
4.25
191.75
206.55
221.04
234.88
248.10
11.65
8.73
10.91
8 bricks
1000 nos
2000
382.46
413.92
444.72
474.13
500.22
24.75
18.55
23.18
9 tiles
1000 nos
3000
254.97
275.94
296.48
316.08
333.48
16.50
12.36
15.45
10 cement
tonne
95.62
103.48
111.18
118.53
125.06
6.19
4.64
5.80
11 GI, CI Pipes
tonne
109.27
118.26
127.06
135.46
142.92
7.07
5.30
6.62
12 Concrete
tonne
109.27
118.26
127.06
135.46
142.92
7.07
5.30
6.62
13 steel
tonne
95.62
103.48
111.18
118.53
125.06
6.19
4.64
5.80
14 bitumen
tonne
4.5
169.98
183.96
197.65
210.72
222.32
11.00
8.24
10.30
15 timber
cu.m
7.5
108.66
117.04
125.26
133.10
140.06
6.60
4.95
6.18
28
2. PLAIN ROADS
Rate
sl.no
Materials
quantity
payable
Unit
1 km
2km
3km
4 km
beyond 5 beyond
beyond
upto 10 10 upto
20km for
km for 20 km for
every km
every km every km
5 km
10
cu.m
133.50
142.41
150.98
159.22
167.16
7.13
5.58
4.17
2 Dry earth
cu.m
4.8
166.88
178.01
188.72
199.02
208.94
8.91
6.98
5.21
3 Manure or Sludge
cu.m
5.7
140.53
149.91
158.92
167.60
175.95
7.51
5.87
4.39
4 Excavated Rock
cu.m
267.00
284.82
301.95
318.44
334.31
14.26
11.16
8.33
160.20
170.89
181.17
191.06
200.59
8.56
6.70
5.00
cu.m
4.6
174.13
185.75
196.92
207.68
218.03
9.30
7.28
5.43
7 stone boulders
cu.m
4.25
188.47
201.05
213.14
224.78
235.98
10.07
7.88
5.88
8 bricks
1000 nos
2000
375.51
402.23
427.93
452.66
476.47
21.39
16.74
12.50
9 tiles
1000 nos
3000
250.34
268.15
285.28
301.77
317.64
14.26
11.16
8.33
10 cement
tonne
93.88
100.56
106.98
113.16
119.12
5.35
4.19
3.13
11 GI, CI Pipes
tonne
107.29
114.92
122.26
129.33
136.13
6.11
4.78
3.57
12 Concrete
tonne
107.29
114.92
122.26
129.33
136.13
6.11
4.78
3.57
13 steel
tonne
93.88
100.56
106.98
113.16
119.12
5.35
4.19
3.13
14 bitumen
tonne
4.5
166.89
178.77
190.19
201.18
211.76
9.51
7.44
5.56
15 timber
cu.m
7.5
106.80
113.93
120.78
127.37
133.72
5.70
4.46
3.33
NOTE : For manual transportation, refer the LMC ( CIVIL) - 2015 and SBRW
Description
Units
PL
GP
SJ
TH
602.66
602.66
602.66
602.66
373.27
373.27
373.27
373.27
cu.m
878.55
878.55
878.55
878.55
cu.m
158.48
158.48
158.48
158.48
Lime concrete
DD0004 Demolishing lime concrete and disposal of rubbish
within 50m lead
Stone Masonry
Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within 50m
lead
DD0005 In lime mortar
DD0006 In cement mortar
cu.m
cu.m
229.39
469.20
229.39
469.20
229.39
469.20
229.39
469.20
Dismantling dressed ashlar face stone work including stacking useful materials & disposal of rubbish
within 50m lead
DD0007 In lime mortar
DD0008 In cement mortar
cu.m
cu.m
291.95
563.04
291.95
563.04
291.95
563.04
291.95
563.04
Removing mortar from stones, cleaning stones and concrete articles, and arranging in stacks
DD0009 In lime mortar
DD0010 In cement mortar
cu.m
cu.m
238.71
264.50
238.71
264.50
238.71
264.50
238.71
264.50
851.86
851.86
851.86
851.86
787.21
787.21
787.21
787.21
2.29
2.29
2.29
2.29
250.24
250.24
250.24
250.24
cu.m
kg
sq.m
DD0014 Extra for cutting reinforcement bars in reinforced
cement concrete and reinforced brickwork( payment to
be made the cross sectional area of RCC or RB work)
Code
Description
Units
PL
GP
Demolishing brick work including stacking useful materials & disposal of rubbish within 50m lead
DD0015 In mud mortar
DD0016 In lime mortar
DD0017 In cement mortar
cu.m
cu.m
cu.m
135.55
160.57
396.21
135.55
160.57
396.21
SJ
TH
135.55
160.57
396.21
135.55
160.57
396.21
Removing Mortar from bricks and cleaning bricks including stacking useful materials within 50m lead
DD0018 From BW in mud mortar
DD0019 From BW in lime mortar
DD0020 From BW in cement mortar
1000#
1000#
1000#
899.68
1027.78
1282.92
899.68
1027.78
1282.92
899.68
1027.78
1282.92
899.68
1027.78
1282.92
Steel Work
Dismantling steelwork in single sections including dismembering and stacking within 50m lead
DD0021 In RS joists
kg
0.71
0.71
0.71
0.71
kg
kg
0.63
1.46
0.63
1.46
0.63
1.46
0.63
1.46
kg
1.25
1.25
1.25
1.25
611.66
611.66
611.66
611.66
55.61
55.61
55.61
55.61
cu.m
121.64
121.64
121.64
121.64
DD0028 Extra for dismantling trusses, rafters, purlins etc. every cu.m
additional span of 1metre or part thereof >10m
(sectional area < 40sq.cm)
DD0029 Dismantling doors, windows, and clerestory windows each
<3sq.m (steel, wood) including architrave, hold fasts,
stacking within 50m lead
0.56
0.56
0.56
0.56
95.15
95.15
95.15
95.15
each
129.87
129.87
129.87
129.87
36.28
36.28
36.28
36.28
Wood work
DD0025 Dismantling wood work of sectional area 40 sq.cm and cu.m
above in frames, trusses (<10m span) including
stacking within 50m lead
DD0026 Dismantling wood work of sectional area <40 sq.cm in
frames, trusses including stacking within 50m lead
DD0027 Extra for dismantling trusses, rafters, purlins etc. of
every additional span of 1 metre or part thereof for
span >10m (sectional area > 40sq.cm)
Units
each
PL
86.99
GP
86.99
SJ
86.99
TH
86.99
38.92
38.92
38.92
38.92
Flooring
cu.m
260.67
260.67
260.67
260.67
sq.m
53.09
53.09
53.09
53.09
sq.m
52.13
52.13
52.13
52.13
sq.m
43.44
43.44
43.44
43.44
sq.m
46.22
46.22
46.22
46.22
sq.m
19.12
19.12
19.12
19.12
kg
9.18
9.18
9.18
9.18
each
87.06
87.06
87.06
87.06
each
103.62
103.62
103.62
103.62
each
26.07
26.07
26.07
26.07
Roofing
Metal w o r k
DD0050 Dismantling expanded metal, fabrics & battens,
beading including stacking useful within 50m lead
Fencing
DD0055 Dismantling barbed wire, flexible wire including
making rolls & stacking within 50m lead
Code
Description
Units
DD0065 Dismantling cement A.C, celotex, hardboard ceiling,
sq.m
partition, including stacking useful materials &
disposal rubbish within 50m
DD0066 Dismantling of ekra wall in cement mortar 1:6 or richer sq.m
including stacking useful materials & disposal of
rubbish within 50m lead
PL
14.87
GP
14.87
SJ
14.87
TH
14.87
26.34
26.34
26.34
26.34
10.43
10.43
10.43
10.43
sq.m
Pipes
Demolishing of old S.W pipes including breaking joints, bed concrete, stacking of useful materials & disposal of
rubbish within 50m lead
DD0075 100mm dia
DD0076 150mm dia
DD0077 200mm dia
m
m
m
22.31
24.61
26.28
22.31
24.61
26.28
22.31
24.61
26.28
22.31
24.61
26.28
Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked
joints, melting of lead and making into blocks, stacking of pies at site and disposal of rubbish within 50m lead
DD0078 Up to 150 mm dia
DD0079 From 150 mm up to 300 mm
DD0080 Above 300 mm dia
m
m
m
70.41
106.21
174.89
70.18
105.60
174.45
70.36
106.07
175.59
70.63
106.50
175.83
Dismantling of G.I or HDPE pipes of diameter 100mm to 250mm including breaking bed concrete, clamps, etc. and
stacking of useful materials & disposal of rubbish within 50 m lead
DD0085 G.I Pipes
DD0086 H.D.P.E Pipes
m
m
20.23
26.69
20.23
26.69
20.23
26.69
20.23
26.69
Precast Walls
Dismantling of precast concrete or stone slabs in walls, partition walls etc. including stacking of useful materials &
disposal of rubbish within 50 m lead
DD0090 Up to 40 mm thickness
DD0091 Above 40 mm thickness and up to 74mm thickness
sq.m
sq.m
60.31
88.76
60.31
88.76
60.31
88.76
60.31
88.76
sq.m
46.71
46.71
46.71
46.71
sq.m
7.19
7.19
7.19
7.19
Roads
Cisterns
Description
Units
no
5
PL
GP
SJ
TH
180.24
180.24
180.24
180.24
sq.m
2.21
2.21
2.21
2.21
sq.m
6.99
6.99
6.99
6.99
each
65.19
65.19
65.19
65.19
each
each
each
294.03
1368.49
2736.99
294.03
1368.49
2736.99
294.03
1368.49
2736.99
294.03
1368.49
2736.99
Each
76.69
76.69
76.69
76.69
Each
Each
288.17
576.33
290.31
580.62
289.58
579.17
289.24
578.49
Each
1046.15
1054.73
1051.82
1050.46
cu.m
47.13
47.13
47.13
47.13
Landslide Debris
CG0030 Clearing grass removal of landslide debris & surface
material including excavation & disposal within 50m
lead
Chapter 3: EARTH WORK
E x c a v a t i o n (Manually)
Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal of rubbish
within 50m lead and 1.5m lifts
EW0001 Ordinary Soil
EW0002 Hard Soil
sq.m
sq.m
7.07
9.93
7.07
9.93
7.07
9.93
7.07
9.93
Description
Units
6
PL
GP
SJ
TH
2.61
6.26
2.61
6.26
2.61
6.26
Ploughing the existing ground to a depth 150mm to 250mm, and watering the same
EW0010 Ordinary Soil
EW0011 Hard Soil
sq.m
sq.m
2.61
6.26
Earth work in surface excavation, depth <300mm, width >1.5m, area >10 Sq.m in plan, including disposal of
excavated earth within 50m lead & 1.5m lift and disposed soil to be neatly dressed
EW0020 Ordinary Soil
EW0021 Hard Soil
sq.m
sq.m
13.05
18.25
13.05
18.25
13.05
18.25
13.05
18.25
Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of
excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed
EW0030 Ordinary Soil
cu.m
89.69
89.69
89.69
89.69
cu.m
116.01
116.01
116.01
116.01
cu.m
368.16
369.70
369.34
369.21
cu.m
512.26
515.34
514.63
514.36
758.16
758.16
758.16
758.16
27.11
27.11
56.92
56.92
56.92
79.74
107.43
79.74
107.43
79.74
107.43
75.63
151.26
76.52
153.05
Extra for every additional lead of 25m beyond 50m up to 250m and deposit to a level up to 1.5m
EW0035 All Kinds of Soil
cu.m
27.11
27.11
Extra for every additional lead of 250m beyond 50m up to 1000m and deposit to a level up to 1.5m
EW0040 All Kinds of Soil
cu.m
56.92
Dozer Excavation
Earth work in excavation over areas by Dozer including levelling and dressing
EW0046 All kinds of Soil
EW0047 All kinds of rocks ( blasted)
cu.m
cu.m
79.74
107.43
Blasting Operation
Blasting of rocks complete excluding the cost of collection and stacking of blasted rock
EW0055 Ordinary rock
EW0056 Hard rock
cu.m
cu.m
77.99
155.98
76.70
153.40
Silent Blaster
Breaking of rocks using non-explosive blaster (silent blaster) in over areas, depth >300mm, width >1.5m, area
>10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish etc. complete
EW0065 Ordinary rock
EW0066 Hard rock
cu.m
cu.m
4414.01
4547.56
4467.44
4595.66
4807.12
4933.94
4467.57
4596.31
Code
Description
Units
PL
GP
SJ
TH
Breaking of rocks using non-explosive blaster (silent blaster) in foundation trenches width <1.5m, area <10sq.m on
plan including stacking of boulders or useful materials and disposal of rubbish etc. complete
EW0075 Ordinary rock
EW0076 Hard rock
cu.m
cu.m
4452.38
4610.12
4505.81
4658.22
4845.49
4996.50
4505.94
4658.87
cu.m
144.46
144.46
144.46
144.46
Banking excavated earth for road, flood banks, guide banks & depressions, in layers <200mm depth, including
watering, rolling & dressing up within 50m lead & 1.5m lift
EW0096 All Kinds of Soil
cu.m
EW0097 Deduction - for not rolling with power roller in layered cu.m
banking works
98.93
26.77
98.93
26.77
98.93
26.77
98.93
26.77
4.44
4.44
4.44
4.44
Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including
dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift
EW0105
EW0106
EW0107
EW0108
EW0109
Ordinary Soil
cu.m
Hard Soil
cu.m
Ordinary rock with or without blasting
cu.m
Hard rock requiring blasting
cu.m
Hard rock requiring chiselling (where blasting is prohibi cu.m
95.67
122.62
397.66
590.37
769.21
95.67
122.62
399.91
595.71
769.21
95.67
122.62
399.43
594.50
769.21
95.67
122.62
399.28
594.06
769.21
cu.m
10.43
10.43
10.43
10.43
cu.m
18.56
18.56
18.56
18.56
cu.m
38.15
38.15
38.15
38.15
cu.m
30.65
30.65
30.65
30.65
m
m
133.91
209.02
133.91
209.02
133.91
209.02
133.91
209.02
Code
Description
Units
PL
GP
SJ
TH
Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or
without blasting
EW0155 Pipes, cables etc. 80mm < dia < 300mm
546.33
548.96
548.40
548.22
628.65
631.67
631.04
630.83
Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Hard rock requiring
blasting
EW0165 Pipes, cables etc. 80mm < dia < 300mm
EW0166 Pipes, cables etc. dia.> 300mm
m
m
771.80
888.15
778.05
895.34
776.63
893.71
776.12
893.12
Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of
sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring chiselling (where blasting is prohibited)
EW0175 Pipes, cables etc. 80mm < dia < 300mm
981.03
981.03
981.03
981.03
1128.97
1128.97
1128.97
1128.97
277.51
1411.21
277.51
1411.21
277.51
1411.21
277.51
1411.21
cu.m
61.62
61.62
61.62
61.62
cu.m
575.10
551.40
738.55
772.31
cu.m
163.97
161.99
164.96
163.51
Extra for excavating trenches for pipes, cables etc., 1.5 < depth < 3m
EW0185 All kinds of Soils
EW0186 All kinds of Rocks
m
m
Filling or bedding
EW0195 Filling of trenches, sides of foundations etc. in layers
<200mm using selected excavated earth, ramming etc.
within lead 50 m & lift 1.5m
EW0196 Providing &laying sand bedding, including watering,
ramming, dressing
EW0197 Providing &laying dry earth bedding, including
consolidating each deposited layer by watering,
ramming and dressing
Timbering for Trenches & cuts
Open timbering over areas including lagging & strutting of trenches, cuts (per sq.m face area timbered)
EW0205 Depth not exceeding 1.5m
EW0206 1.5m < depth < 3 m
EW0207 Depth > 3 m
sq.m
sq.m
sq.m
116.31
118.71
122.91
116.11
118.51
122.70
118.77
121.17
125.37
120.42
122.81
127.01
Close timbering over areas including lagging & strutting of trenches, cuts ( per sq.m face area timbered)
sq.m
sq.m
322.17
328.51
321.97
328.31
328.67
335.00
332.26
338.59
Units
sq.m
PL
334.82
9
GP
334.62
SJ
341.31
TH
344.90
Close timbering including lagging & strutting of shafts, wells, cess pits, manholes (per sq.m face area
timbered
EW0225 Depth not exceeding 1.5m
EW0226 1.5m < Depth < 3m
EW0227 3m < Depth < 4.5m
sq.m
sq.m
sq.m
293.30
301.57
310.42
292.94
301.21
310.06
299.31
307.59
316.43
303.02
311.29
320.14
cu.m
94.65
94.65
94.65
94.65
sq.m
104.15
107.72
106.83
107.34
De-Watering
EW0235 Pumping out water caused by springs, river, seepage,
broken water mains, drains, and alike
Anti-Termite Treatment
EW0240 Providing and injecting chemical emulsion for Preconstruction anti-termite treatment using aldrin
emulsifiable 0.5% concentration
Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration
EW0245 Along outside of foundation
228.30
231.87
230.98
231.49
m
sq.m
160.18
282.74
160.77
283.52
160.62
283.33
160.71
283.44
177.28
177.66
177.57
177.62
169.52
169.64
169.61
169.63
Chapter 4: DRAINAGE
Plinth Protection
Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well rammed,
finishing the top smooth
DR0001 With cement concrete 1:3:6, 20mm aggregates, laid
over 75mm thick layer of compacted gravel (40mm)
sq.m
293.11
296.46
308.20
310.07
sq.m
258.95
267.34
275.22
280.34
sq.m
440.26
432.41
450.60
472.20
Units
sq.m
PL
410.55
10
GP
411.67
SJ
417.11
TH
439.76
m
m
m
m
489.21
512.62
711.84
1083.72
484.66
508.35
704.73
1063.21
512.00
536.31
744.99
1136.06
591.59
617.01
863.02
1347.80
m
m
m
1553.21
1558.13
1567.56
1520.44
1525.36
1534.80
1631.28
1636.19
1645.63
1983.49
1988.41
1997.85
Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in excavation,
100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4, 12mm aggregate for filling
haunches, including 20mm cement plaster with a floating coat of neat cement, disposal of surplus earth
DR0030
DR0031
DR0032
DR0033
m
m
m
m
691.70
714.27
941.84
1752.51
706.12
728.93
961.50
1788.05
715.98
739.42
974.54
1813.41
735.01
759.53
998.75
1838.59
m
m
m
1924.08
1928.86
1938.43
1973.82
1978.61
1988.17
1985.22
1990.00
1999.57
2006.55
2011.34
2020.90
m
m
m
334.42
694.11
1171.71
339.89
706.33
1193.17
341.53
709.78
1199.10
338.81
703.69
1188.41
Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 including testing of
joints complete
DR0050 100mm dia.
335.17
340.63
342.32
339.59
695.17
707.38
710.86
704.76
Description
Units
11
PL
GP
SJ
TH
1173.11
1194.55
1200.54
1189.82
1185.59
1207.01
1213.08
1202.36
1595.18
1624.60
1632.76
1618.04
1962.63
1999.02
2009.16
1990.95
2344.04
2387.65
2399.94
2378.14
2736.46
2787.53
2801.95
2776.41
3559.89
3626.96
3645.59
3612.05
4255.98
4336.52
4358.81
4318.53
Providing and laying cement concrete 1:5:10, 40mm aggregates encasing Stone Ware pipes including
150mm concrete bed
DR0060 100mm dia S.W pipe
DR0061 150mm dia S.W pipe
DR0062 200mm dia S.W pipe
m
m
m
512.36
548.94
630.59
512.62
549.21
630.90
536.54
574.85
660.35
569.67
610.34
701.12
Providing & laying cement concrete 1:5:10, 40mm aggregates upto haunches of S.W pipes including
150mm concrete bed
DR0070 100mm dia. S\W pipe
DR0071 150mm dia. S\W pipe
DR0072 200mm dia. S\W pipe
m
m
m
343.45
377.22
439.21
343.62
377.41
439.43
359.66
395.02
459.93
381.86
419.41
488.33
Providing & fixing square mouth S.W gully-trap A-grade including C.I grating, C.I. cover with frame of 300 x 300
mm, brick masonry chamber
DR0080 100 x 100mm P Type
DR0081 150 x 100mm P or S Type
DR0082 180 x 150mm P or S Type
each
each
each
2095.07
2200.37
1776.60
2181.37
2221.52
1781.69
2435.38
2310.93
1877.22
2423.78
3081.96
2085.74
R.C P i p e s & F i t t i n g s
Providing & laying NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including
testing of joints etc. complete
DR0088
DR0089
DR0090
DR0091
DR0092
DR0093
DR0094
DR0095
DR0096
DR0097
100mm dia
150mm dia
225mm dia.
300mm dia.
450mm dia.
600mm dia.
750mm dia.
900mm dia.
1050mm dia.
1200mm dia.
m
m
m
m
m
m
m
m
m
m
483.22
528.59
700.48
848.36
1260.81
1766.19
2502.06
3153.49
6353.69
9110.80
Manholes
488.33
534.21
707.06
856.57
1273.19
1783.73
2527.21
3182.96
6415.60
9198.87
489.40
535.52
707.68
857.33
1274.65
1785.70
2529.21
3185.07
6415.80
9199.13
514.87
536.02
1029.04
1263.58
1651.68
2429.96
3456.28
3780.19
6381.31
9122.80
Description
Units
12
PL
GP
SJ
TH
Constructing Brick masonry manhole in cement mortar 1:5, R.C.C top slab with 1:2:4 20mm aggregates,
foundation concrete 1:4:8 40mm aggregates, 12mm plaster in CM 1:3 finished with floating coat of neat cement and
making channels in cement concrete 1:2:4 20mm aggregates, neatly finished complete
each
8171.25
8014.96
9062.64
9833.97
each
8852.20
8671.83
9786.74 10765.63
each
19455.86
19490.14
21460.56 22906.41
m
m
5553.11
6633.63
5379.68
6428.29
5864.20
7004.49
7329.39
8749.20
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
7754.43
5492.38
4362.00
3450.35
2959.46
2538.70
8559.59
6017.90
4747.67
3731.24
3183.94
2714.82
7962.50
5708.74
4582.70
3659.37
3162.19
2736.04
8238.21
5908.58
4744.66
3789.25
3274.80
2833.85
cu.m
MR0010 Lime mortar 1:2 (1 lime putty : 2 Brick Powder)
MR0011 Lime Mortar 1:1 :1 (1 Lime putty : 1 Brick Powder : 1 S cu.m
10868.55
13552.62
11061.41
13746.78
cu.m
358.15
355.77
359.33
357.59
cu.m
cu.m
cu.m
2320.98
1967.16
1489.46
2220.66
1883.80
1428.84
2470.27
2137.59
1661.64
2677.89
2304.60
1777.32
10741.75
7048.49
11201.15
7317.85
Lime Mortar
12026.29 13165.10
12264.49 13888.82
Mud Mortar
MR0015 Mud mortar
White Cement Mortar
MR0020 White Cement mortar 1:2 (1 white cement : 2 sand)
MR0021 White Cement mortar 1:3 (1 white cement : 3 sand)
MR0022 White Cement mortar 1:5 (1 white cement : 5 sand)
Cement Lime Mortar
10174.50 11094.37
6780.95 7371.76
Description
Units
13
PL
GP
SJ
TH
cu.m
6194.58
6536.14
6407.10
6558.60
cu.m
4716.13
4893.86
4906.90
5007.31
cu.m
4229.60
4331.81
4423.20
4503.52
cu.m
4149.45
4284.17
4314.74
4487.84
cu.m
3610.64
3626.36
3800.31
3855.67
cu.m
3453.39
3507.16
3613.70
3777.57
cu.m
2896.86
3093.83
3041.44
3106.14
cu.m
3064.58
3073.92
3225.04
3379.14
cu.m
3064.58
3073.92
3225.04
3379.14
cu.m
2490.43
2647.68
2634.26
2686.93
cu.m
2730.00
2713.88
2879.81
3020.03
cu.m
2719.57
2709.61
2851.24
3009.61
cu.m
2171.02
2296.05
2305.32
2347.81
Providing and laying in position plain cement concrete in retaining walls, return walls, walls (any thickness)
including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses,
parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of
centering and shuttering
CW0020 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20
mm nominal size)
CW0021 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size)
CW0022 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0023 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 40
mm nominal size)
CW0024 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
CW0025 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 40
mm nominal size)
CW0026 1:3:6 (1 cement : 3 sand : 6 graded gravel/shingles 40
mm nominal size)
cu.m
6444.66
6786.21
6657.18
6808.68
cu.m
4967.44
5145.02
5158.29
5258.70
cu.m
4479.68
4581.89
4673.28
4753.59
cu.m
4350.33
4485.19
4515.57
4688.64
cu.m
3812.75
3828.47
4002.43
4057.78
cu.m
3655.50
3709.27
3815.81
3979.68
cu.m
3098.97
3295.94
3243.56
3308.25
Units
14
PL
GP
SJ
TH
Providing and fixing upto floor five level pre-cast cement concrete lacing courses, copings, bed plates, anchor
blocks, plain window sills, shelves, louvers, steps, staircases etc. including hoisting and setting in position with
cement mortar 1:3 (1 cement : 3 sand) cost of required formwork and finishing smooth with 6 mm thick cement
plaster on exposed surface complete
CW0050 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
cu.m
4084.15
4232.80
4289.02
4385.06
cu.m
3472.68
3533.75
3688.46
3762.89
cu.m
CW0060 Providing and fixing at or near ground level pre-cast
cement concrete in kerbs, edgings etc. as per approval
pattern and setting in position with cement mortar 1:3
(1 cement : 3 sand)
cost of required formwork and finishing smooth with 6
mm thick cement plaster on exposed surface complete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
3984.44
4117.36
4196.11
4289.44
Providing and fixing upto floor five level pre-cast cement concrete solid block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing smooth with 6 mm thick cement plaster on exposed surface complete
CW0070 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0071 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
cu.m
4397.23
4568.72
4630.99
4740.52
cu.m
3739.42
3825.46
3969.37
4054.27
Providing and fixing upto floor five level pre-cast cement concrete hollow block including hoisting and setting in
position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork and finishing smooth
with 6 mm thick cement plaster on exposed surface complete
CW0080 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
CW0081 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20
mm nominal size)
Lime Concrete
cu.m
2547.71
2642.13
2683.12
2745.28
cu.m
2148.39
2191.76
2280.04
2327.12
Providing and laying lime concrete, with 40 % mortar comprising of 1:1:1 lime mortar, in footings and bases for
columns excluding cost of formwork
CW0090 With graded stone aggregate of 40 mm
CW0091 with graded brick aggregate of 40 mm
cu.m
cu.m
6933.64
6933.64
Extra
Extra for laying cement concrete work
6913.04
6913.04
6465.13
6465.13
7256.21
7256.21
15
Code
Description
CW0135 Cement concrete work in super-structure above floor
five level for each four floors or part thereof
Units
cu.m
PL
GP
SJ
8% of the rates worked out for
respective items
TH
cu.m
524.21
541.94
526.19
531.62
cu.m
437.91
437.91
437.91
437.91
cu.m
794.02
662.96
758.32
1009.60
136.50
202.66
137.19
203.77
140.14
208.49
Chapter 7: DAMP-PROOFING
Concrete Course
Providing and laying damp-proof course with cement concrete 1:2:4, 12.5mm aggregate
DP0001
DP0002
25mm thick
40mm thick
sq.m
sq.m
133.43
197.75
Providing and laying damp-proof course with cement concrete 1:2:4, 20mm aggregate
DP0010
50mm thick
sq.m
240.61
245.93
250.42
253.81
sq.m
133.73
135.55
135.58
136.72
sq.m
sq.m
sq.m
87.16
111.35
132.44
84.18
97.12
133.39
93.28
110.21
139.40
95.65
122.60
156.89
sq.m
149.20
149.20
149.52
176.76
Bituminous Coatings
DP0015
Moisture Barriers
Providing and laying moisture barrier using plastic sheeting underlay
DP0020
DP0021
DP0022
50 micro-metre
100 micro-metre
200 micro-metre
Grade 2
cu.m
6206.70
6548.26
6419.22
6570.72
Description
Units
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 cu.m
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
cu.m
mm nominal size)
16
PL
4728.25
GP
4905.98
SJ
4919.02
TH
5019.43
4241.72
4343.93
4435.32
4515.64
Providing & laying in position reinforced cement concrete work in walls (any thickness) including attached
pilasters buttresses, piers, abutments etc. upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0005
RC0006
RC0007
6208.87
6550.43
6421.39
6572.89
4730.42
4908.15
4921.20
5021.60
4223.04
4325.25
4416.64
4496.95
Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns ,
pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement.
RC0009
RC0010
RC0011
6254.75
6596.31
6467.27
6618.77
4776.30
4954.03
4967.07
5067.48
4289.77
4391.98
4483.37
4563.68
Providing & laying in position reinforced cement concrete work in suspended floor, roofs having slope upto 15o,
landings, balconies, shelves and chajjas upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0013
RC0014
RC0015
6319.49
6661.04
6532.00
6683.51
4841.04
5018.76
5031.81
5132.22
4354.50
4456.72
4548.10
4628.42
Providing & laying in position reinforced cement concrete work in beams, lintels, bands, plain window sills,
staircases, spiral staircases upto floor five level excluding the cost of centering, shuttering and reinforcement
RC0017
RC0018
RC0019
6245.79
6587.34
6458.30
6609.80
4767.33
4945.06
4958.11
5058.52
4280.80
4383.02
4474.40
4554.72
Providing & laying in position reinforced cement concrete work in kerbs, steps and the like upto floor five level
excluding the cost of centering, shuttering and reinforcement
Description
1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20
mm nominal size)
1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size)
1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20
mm nominal size)
17
Units
cu.m
PL
6245.79
GP
6587.34
SJ
6458.30
TH
6609.80
cu.m
4767.33
4945.06
4958.11
5058.52
cu.m
4280.80
4383.02
4474.40
4554.72
Providing & laying in position reinforced cement concrete work in arches and arch ribs upto floor five level
excluding the cost of centering, shuttering and reinforcement
RC0023
RC0024
RC0025
7110.63
7452.18
7323.15
7474.65
5632.18
5809.91
5822.95
5923.36
5145.65
5247.86
5339.25
5419.56
Providing & laying in position reinforced cement concrete work in domes, vaults, shells folded plates and roofs
having more than 15 upto floor five level excluding the cost of centering, shuttering and reinforcement
RC0026
RC0027
RC0028
7183.94
7528.09
7402.36
7557.69
5637.37
5818.95
5831.81
5934.30
5142.50
5246.74
5339.97
5421.89
Providing & laying in position reinforced cement concrete work in vertical and horizontal fins individually or
forming box louvers, fascias and eaves boards - upto floor five level excluding the cost of centering, shuttering and
reinforcement
RC0029 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock cu.m 05170
20 mm nominal size)
05331
05385
05472
Traditional Cornices
Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement &
decorative painting cost as per standard design (Measurement to be taken along the cornice and wall junction)
RC0030
RC0031
RC0032
RC0033
RC0034
m
m
1324.45
1335.14
1332.30
1342.87
1334.91
1345.40
1340.72
1351.07
1780.67
1797.80
1802.47
1814.10
m
m
744.53
756.41
746.75
759.39
747.02
760.73
748.50
763.17
Description
Units
18
PL
GP
SJ
TH
Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including finishing
with 6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement & decorative
painting cost as per standard design (Measurement to be taken along the cornice and wall junction)
RC0040
RC0041
RC0042
RC0043
RC0044
m
m
1305.85
1316.79
1311.07
1321.93
1316.33
1327.07
1321.38
1332.00
1877.33
1888.46
1899.14
1909.07
m
m
741.07
749.00
742.80
750.93
743.56
753.32
744.90
755.46
25.75
27.97
26.00
26.67
RC0051
RC0052
sq.m
36.13
37.70
36.78
37.38
RC0053
sq.m
81.06
83.84
82.65
83.82
19.78
19.78
19.78
19.78
RC0054
Precast Items
Providing & fixing, below & including floor 2 level, Precast R.C.C jali 1:2:4, 12.5mm aggregate, reinforced with
mild steel wire 1.6mm dia., including roughening, cleaning, fixing, finishing in cement mortar 1:3, excluding
plastering of the jambs, sills, soffits
RC0060
RC0061
RC0062
50 mm thick
40 mm thick
25 mm thick
sq.m
sq.m
sq.m
871.56
788.55
724.16
779.14
694.90
628.67
826.60
742.08
675.44
930.18
844.48
776.06
Providing & fixing, below & including floor 2 level, Precast R.C.C 1:2:4, 20mm aggregate including finishing,
plastering with 6mm cement plaster 1:3 and formwork, but excluding reinforcement cost
RC0070
RC0071
RC0072
cu.m
18200.97
18280.66
18418.36 18533.48
cu.m
cu.m
16333.14
14642.66
16403.96
14732.79
16543.20 16650.48
14825.22 14919.84
Steel Reinforcement
Description
Units
Providing & fixing Thermo-Mechanically Treated
kg
reinforcement bar (Yield Strength 500 MPa) for R.C.C
work including cutting, bending, binding and placing
in position complete
PL
67.63
19
GP
73.45
SJ
79.78
TH
78.32
Form work
Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork
RC0090
RC0091
RC0092
sq.m
sq.m
sq.m
252.04
506.25
343.80
251.74
505.61
342.79
255.84
510.96
349.72
258.34
514.68
354.81
RC0093
RC0094
sq.m
sq.m
429.48
348.39
428.63
348.13
435.30
352.59
440.03
355.20
RC0095
sq.m
545.68
544.21
552.63
559.26
sq.m
sq.m
sq.m
428.36
1681.11
1909.30
427.74
1688.80
1918.75
433.21
1707.13
1946.69
436.94
1735.72
1976.89
67901.67
19451.24
68292.57
19512.35
967.94
975.35
RC0096
RC0097
RC0098
Expansion Joints
Providing & filling or fixing in position in expansion joints
cu.m
RC0105 Blown bitumen
RC0106 Bitumen mix filler of proportion 80 kg of hot bitumen, cu.m
1 kg of cement and 0.25 cum of sand for expansion
joints
sq.m
RC0107 12 mm bitumen impregnated fibre board
68728.06 70374.78
19778.57 20228.27
977.36
1061.00
Providing and fixing sheet-covering over expansion joints with iron screws as per design to match the colour shade
of the distemper or wall treatment
RC0116
477.66
469.09
465.17
510.34
cu.m
cu.m
cu.m
4371.97
4508.66
4560.80
4476.43
4613.12
4665.25
4567.90
4704.60
4756.73
4649.50
4786.19
4838.33
Description
Units
Beams, Plinth beams, girders, bresummers, cantilevers, cu.m
suspended floors, lintels, roofs and staircases including
spiral staircases, shelves etc.
PL
4636.48
20
GP
4740.94
SJ
4832.41
TH
4914.01
Add or deduct for providing richer or leaner mixes respectively at all floors providing
RC0135
RC0136
RC0137
cu.m
cu.m
cu.m
cu.m
cu.m
6355.01
6127.09
6004.37
5899.18
5301.70
6159.19
5905.09
5768.26
5650.98
5008.88
6716.18
6485.35
6361.05
6254.52
5608.00
8461.15
8222.30
8093.69
7983.45
7312.04
cu.m
cu.m
cu.m
248.62
2215.44
138.09
248.62
2113.48
138.09
248.62
2322.20
138.09
248.62
2916.88
138.09
cu.m
60.47
60.47
60.47
60.47
sq.m
84.91
102.13
94.37
99.07
cu.m
264.84
221.15
252.94
336.70
Extras
BW0010 Extra for brick work in square or rectangular pillars
BW0011 Extra for brick in circular pillars
BW0012 Extra for brick work in superstructure above plinth
level, up to floor two level
BW0013 Extra for brick work in superstructure above floor two
level...per floor
BW0014 Extra for providing hoop iron 25x1.6mm or equivalent
reinforcement in masonry at every third course,
embedded in cement mortar
BW0015 Extra for mixing water-proofing compound in cement
mortar
H a l f - B r i c k M a s o n r y (125mm)
Providing & laying Second-Class Half-brick Masonry (125 mm) in superstructure below floor 2 level
BW0020 In cement mortar 1:3
BW0021 In cement mortar 1:4
sq.m
sq.m
828.72
805.93
801.02
775.61
873.33
850.25
1095.15
1071.27
sq.m
7.09
7.09
7.09
7.09
sq.m
29.24
24.87
28.05
36.43
sq.m
468.76
453.48
496.06
628.82
PL
7.09
21
GP
7.09
SJ
7.09
TH
7.09
Traditional Cornices
Providing & laying second class brick work in Bhutan type Traditional Cornices in cement mortar 1:3, including
12mm plaster in cement mortar 1:5, but excluding decorative painting.
(Measurement to be taken along the cornice and wall junction)
BW0040 Floor one level including lhanglag
BW0041 Middle Floor levels excluding phana
m
m
814.03
1336.76
809.48
1321.66
828.49
1372.09
892.02
1532.26
sq.m
sq.m
sq.m
sq.m
62.15
67.73
91.29
121.28
63.31
68.89
92.45
123.05
62.82
68.39
91.96
122.29
63.30
68.88
92.44
123.04
Pointing
Pointing on brickwork with cement mortar 1:3
BW0050
BW0051
BW0052
BW0053
Flush pointing
Ruled pointing
Cut, weather struck pointing
Raised & cut pointing
8021.41
7809.94
7753.28
7693.29
7381.71
8689.65
8454.97
8390.70
8323.82
7990.03
9932.23
9715.96
9660.66
9599.91
9255.09
6841.81
6617.89
6560.80
6497.94
6138.57
130.23
73.05
130.23
73.05
130.23
73.05
130.23
73.05
31.53
31.53
31.53
31.53
1457.93
1450.97
991.64
984.44
BW0060
BW0061
BW0062
BW0063
BW0064
Extras
sq.m
sq.m
1174.46
1167.59
Extras
1269.52
1261.86
Units
sq.m
PL
7.41
22
GP
7.41
SJ
7.41
TH
7.41
6718.81
6626.53
6537.61
6531.57
6304.80
7224.08
7121.18
7022.04
7015.32
6771.06
8051.75
7958.28
7868.22
7862.11
7611.51
6127.89
6031.18
5937.99
5931.67
5670.11
cu.m
186.07
186.07
186.07
186.07
104.37
104.37
104.37
104.37
45.04
45.04
45.04
45.04
BW0100
BW0101
BW0102
BW0103
BW0104
Extras
BW0110 Extra for ICEB work in square or rectangular pillars
sq.m
sq.m
869.58
861.23
932.38
923.07
1035.60
1027.15
794.87
786.13
sq.m
8.98
8.98
8.98
8.98
5079.91
4852.00
4729.27
4624.08
5176.33
4922.22
4785.39
4668.11
5135.09
4904.25
4779.96
4673.42
5175.57
4936.72
4808.11
4697.87
8362.40
8134.48
8011.76
7906.57
8458.81
8204.71
8067.88
7950.60
8417.57
8186.74
8062.44
7955.91
23885.26
23646.41
23517.80
23407.56
Extras
BW0130 Extra for ICEB work in superstructure above floor 2
level...per floor
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
Units
23
PL
GP
SJ
TH
cu.m
cu.m
cu.m
cu.m
9570.01
9342.09
9219.37
9114.18
9666.42
9412.32
9275.49
9158.21
9625.18
9394.35
9270.05
9163.52
9665.67
9426.82
9298.21
9187.97
248.62
1774.41
248.62
1774.41
248.62
1774.41
248.62
1774.41
cu.m
138.09
138.09
138.09
138.09
60.47
60.47
60.47
60.47
84.91
102.13
94.37
99.07
264.84
221.15
252.94
336.70
Extras
sq.m
sq.m
882.37
859.58
892.01
866.60
887.89
864.81
891.94
868.05
sq.m
sq.m
780.04
757.25
789.69
764.28
785.56
762.48
789.61
765.73
1004.39
981.31
1008.44
984.55
sq.m
sq.m
998.87
976.08
1008.51
983.10
sq.m
1097.89
1107.54
1103.41
1107.46
24
Units
sq.m
PL
1075.10
GP
1082.13
SJ
1080.33
TH
1083.58
sq.m
7.09
7.09
7.09
7.09
29.24
24.87
28.05
36.43
sq.m
sq.m
sq.m
sq.m
62.15
67.73
91.29
121.28
63.31
68.89
92.45
123.05
62.82
68.39
91.96
122.29
63.30
68.88
92.44
123.04
cu.m
476.35
474.16
478.90
478.67
Extras
BW0220 Extra, for concrete block half-brick masonry in
superstructure above floor 2 level...per floor
BW0221 Extra, for mixing water-proofing compound in cement
mortar
sq.m
Pointing
Pointing on concrete block brick work with cement mortar 1:3
BW0230
BW0231
BW0232
BW0233
Flush pointing
Ruled pointing
Cut, weather struck pointing
Raised & cut pointing
cu.m
cu.m
cu.m
cu.m
2593.68
2431.68
2292.83
1623.31
2676.21
2495.60
2340.79
1612.36
2678.28
2514.21
2373.58
1639.33
2709.46
2539.69
2394.18
1627.08
cu.m
183.78
183.78
183.78
183.78
cu.m
60.47
60.47
60.47
60.47
cu.m
267.19
267.19
267.19
267.19
cu.m
529.75
529.75
529.75
529.75
cu.m
251.75
210.25
240.45
320.02
Ext ras
SM0015 Extra for random rubble masonry with hard stone in
superstructure above plinth, below & including floor 2
level
SM0016 Extra for random rubble masonry with hard stone in
superstructure above floor 2 level
SM0017 Extra for random rubble masonry work with hard stone
in square or rectangular pillars
SM0018 Extra for random rubble masonry work with hard stone
in circular pillars
SM0019 Extra for random rubble masonry work with hard stone
for mixing water-proofing materials in cement mortar
25
Code
Description
Units
PL
GP
SJ
Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth
SM0025
SM0026
SM0027
SM0028
TH
cu.m
cu.m
cu.m
cu.m
3084.40
2810.91
2663.64
2537.41
3188.92
2883.99
2719.80
2579.06
3167.80
2890.80
2741.65
2613.80
3203.54
2916.92
2762.58
2630.30
cu.m
173.22
173.22
173.22
173.22
cu.m
60.47
60.47
60.47
60.47
cu.m
278.26
278.26
278.26
278.26
cu.m
811.66
808.40
816.66
812.92
cu.m
59.03
59.03
59.03
59.03
cu.m
191.43
191.43
191.43
191.43
cu.m
304.11
253.86
290.42
386.74
cu.m
1268.20
1258.03
1283.83
1272.15
cu.m
1403.53
1392.35
1420.72
1407.87
cu.m
1513.41
1502.23
1530.60
1517.76
cu.m
2702.03
2726.99
2782.42
2793.07
cu.m
2473.41
2468.60
2553.90
2556.09
cu.m
2834.14
2858.09
2916.10
2925.58
cu.m
2624.29
2618.47
2706.34
2707.37
E xt ras
SM0035 Extra for C.R. masonry with hard stone in
superstructure above plinth, below & including floor 2
level
SM0036 Extra for C.R. masonry with hard stone in
superstructure above floor 2 level
SM0037 Extra for C.R masonry with hard stone in square or
rectangular pillars
SM0038 Extra for C.R masonry with hard stone in circular
pillars
SM0039 Extra for C.R masonry with hard stone chisel dressed
in foundations and plinth
SM0040 Extra for C.R masonry with hard stone chisel dressed
in superstructure above plinth, below & including floor
2 level
SM0041 Extra for C.R masonry with hard stone for mixing
water-proofing materials
Dry Hand Packed Rubb le Mason ry
26
Code
Description
SM0064 Providing and laying rubble masonry chisel dressed
(facing) with hard stone (average volume 0.008 cu.m)
in concrete mortar 1:2:4 20mm aggregates
Units
cu.m
PL
3273.94
GP
3297.89
SJ
3355.89
TH
3365.38
cu.m
3064.09
3058.26
3146.14
3147.16
SM0070 Providing and laying Hammer dressed dry stone soling cu.m
1079.14
1067.96
1096.33
1083.49
cu.m
1136.07
1124.89
1153.26
1140.41
cu.m
SM0072 Providing and laying Hand packed stone filling or
soling with stones
m
SM0073 Providing and laying Hammer dressed stone edging
150 x 250 mm with stones including excavation,
refilling and disposal of surplus earth within 30 m lead
878.79
868.62
894.41
882.73
63.34
62.87
64.06
63.52
sq.m
sq.m
sq.m
351.55
272.23
301.51
350.83
271.15
298.98
359.78
275.77
305.66
360.87
273.88
302.87
F l a t S t o n e (D o l e p) P a v i n g
Providing & laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the
cost of bedding)
SM0090 20mm
SM0091 30mm
SM0092 40mm
sq.m
sq.m
sq.m
312.08
401.41
490.73
311.54
400.59
489.64
315.85
407.05
498.25
316.62
408.21
499.80
399.93
488.98
406.39
497.59
407.55
499.14
Providing and laying hammer dressed dry dolep paving including preparation of bed
SM0093 30mm
SM0094 40mm
sq.m
sq.m
400.75
490.07
Providing & laying all sides chisel dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding
the cost of bedding)
SM0100 20mm
SM0101 30mm
SM0102 40mm
sq.m
sq.m
sq.m
397.41
486.73
603.86
397.04
486.09
602.94
401.36
492.57
611.57
402.24
493.83
613.23
sq.m
sq.m
27
GP
SJ
TH
484.15
601.28
483.33
600.19
489.79
608.80
490.96
610.35
67.17
71.52
131.44
68.06
72.40
132.90
67.68
72.02
132.27
68.05
72.39
132.89
Pointing
Providing & laying pointing on stone work with cement mortar 1:3
SM0110 Flush pointing
SM0111 Ruled pointing
SM0112 Raised and cut pointing
sq.m
sq.m
sq.m
Gabion Work
Providing & filling hand-packed stone in G.I mesh 4mm (8swg)including supplying and weaving of mesh
complete
SM0120 Double-knotted mesh....100mm
SM0121 Double-knotted mesh....150mm
SM0122 Chain-link mesh....100mm
cu.m
cu.m
cu.m
2037.70
1969.11
2630.54
2286.04
1860.25
2239.54
2523.36
2523.36
2760.91
2623.05
2629.96
2889.16
sq.m
sq.m
1021.93
687.55
1019.67
685.17
1055.27
709.95
1072.45
721.53
Providing & laying Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in superstructure up to
floor two level
SM0140 20 cms thick
SM0141 15 cms thick
SM0142 10 cms thick
sq.m
sq.m
sq.m
690.68
518.58
350.82
688.30
516.81
349.58
713.08
535.40
362.06
724.66
544.10
367.87
sq.m
71.59
71.59
71.59
71.59
cu.m
cu.m
cu.m
18514.05
18514.05
18514.05
18514.05
18514.05
18514.05
18151.86 18253.25
18151.86 18253.25
18151.86 18253.25
28
Code
Description
Units
PL
GP
SJ
TH
Providing & fixing blue pine moulded beading to door, window frames with iron screws including plugs, priming
coat on unexposed surfaces
WW0010 50 x 12 mm
WW0011 50 x 20 mm
m
m
50.81
56.67
50.80
56.66
50.42
56.11
50.84
56.62
Providing & fixing joists, including hoisting, applying wood preservative on unexposed surfaces
WW0020 Blue pine
WW0021 Mixed Conifer
cu.m
cu.m
16771.13
16046.76
16764.98
16040.61
16386.41 16509.28
16272.87 16414.84
Providing & fixing Eaves board (225x25mm) with moulding fitted and fixed with necessary screws
WW0030 Mixed Conifer
115.94
115.94
117.39
118.09
Traditional Cornices
Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design in Mixed
Conifer, including applying wood preservative on unexposed surfaces, excluding decorative painting
(Measurement to be taken along the cornice and wall junction line)
WW0035
WW0036
WW0037
WW0038
WW0039
m
m
m
m
m
1661.22
2321.90
2072.42
973.53
1438.69
1655.37
2313.12
2062.76
967.68
1438.69
1655.73
2313.07
2060.21
959.98
1456.68
1683.92
2355.06
2105.19
984.26
1465.40
2139.36
2142.82
2143.04
2145.91
Providing & fixing traditional wooden Tshegay for windows\railing etc. as per standard design
WW0045 In mixed conifer
WW0046 In blue pine
sq.m
sq.m
2131.79
2153.86
2131.79
2153.86
16228.33
16228.33
Providing & fixing roof framing, in trusses, purlins, rafters, posts, post plates including hoisting, etc.
WW0060 Mixed Conifer
WW0061 Blue Pine
cu.m
cu.m
19115.05
19839.42
19115.05
19839.42
19363.69 19484.18
19477.23 19578.62
Providing & fixing gussets for timber trusses including wood preservative (coal tar)
WW0070 12mm phenolic plywood
sq.m
502.59
566.66
538.94
508.13
sq.m
357.41
390.30
355.81
450.48
Units
sq.m
sq.m
PL
379.00
419.00
29
GP
438.07
504.82
SJ
379.08
416.13
TH
510.16
645.81
Providing & fixing to frames (wall or ceiling) blue pine plain lining, tongued and grooved, including necessary
fixtures, wooden plugs and priming coat on unexposed surfaces (excluding cost of frames)
WW0090 12 mm thick
WW0091 20 mm thick
sq.m
sq.m
278.32
355.56
278.21
355.56
271.76
347.97
277.56
350.09
Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc. complete
(excluding cost of frames)
WW0100
WW0101
WW0102
WW0103
6 mm
10 mm
12 mm
18 mm
sq.m
sq.m
sq.m
sq.m
549.36
701.68
855.08
1147.88
600.22
788.18
1077.69
1285.92
622.30
795.97
996.62
1287.96
592.19
829.93
978.14
1278.57
Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame)
WW0110
WW0111
WW0112
WW0113
8 mm
10 mm
12 mm
18 mm
sq.m
sq.m
sq.m
sq.m
639.65
851.38
851.38
1053.20
669.05
798.75
798.75
1133.10
685.15
818.66
818.66
1162.85
669.05
798.75
798.75
1133.10
Bison Panel
Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary nails/screws etc.
complete, excluding the cost of frame
WW0120
WW0121
WW0122
WW0123
WW0124
WW0125
6 mm
8 mm
10 mm
12 mm
16 mm
20 mm
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
484.50
505.90
563.83
599.34
701.84
844.50
489.41
512.39
565.88
606.90
713.45
855.98
489.41
512.39
565.88
606.90
713.45
855.98
492.79
516.35
569.43
641.54
798.27
984.29
Providing & fixing Plywood lining with necessary nails etc. including beading complete (excluding cost
of frame)
WW0130 4 mm, commercial
WW0131 4 mm, teak
WW0132 6 mm, commercial
sq.m
sq.m
sq.m
482.91
500.68
638.47
496.08
583.35
702.54
484.63
626.72
675.82
467.99
618.93
645.49
925.80
824.85
1589.21
925.80
790.58
1589.21
Providing & fixing Pre-fabricated wall panelling profiles with necessary nails etc. complete but
excluding the cost of frame)
WW0140 19 mm, blue pine
WW0141 19 mm, mixed conifer
WW0142 15 mm, blue pine
sq.m
sq.m
sq.m
941.42
838.50
1616.74
925.80
824.85
1589.21
Providing & fixing wooden skirting in mixed conifer with necessary nails or screws complete
Description
WW0150 20 mm
WW0151 25 mm
30
Units
PL
GP
SJ
TH
sq.m
sq.m
1066.03
1129.44
1065.92
1129.33
1069.00
1133.67
1075.93
1116.79
sq.m
636.61
755.34
645.00
832.17
sq.m
614.66
730.86
622.76
809.17
sq.m
595.79
709.83
603.66
789.40
sq.m
355.89
461.93
354.97
536.25
sq.m
405.83
511.69
404.99
586.14
sq.m
98.85
101.30
124.57
127.51
Bamboo Walling
WW0160 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:4 both sides (excluding cost of frame)
WW0161 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:5 both sides (excluding cost of frame)
WW0162 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm plaster cement
mortar 1:6 both sides (excluding cost of frame)
WW0163 Providing & fixing 75mm thick split bamboo wall
including grooving frames, 20mm mud plaster both
sides (excluding cost of frame)
WW0164 Providing & fixing 150mm thick split bamboo wall
including grooving frames, 60mm mud plaster both
sides (excluding cost of frame)
WW0165 Providing & fixing split Bamboo matting (excluding
the cost of framing and beading)
Partitions
Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame
etc. complete
WW0170 100mm framing, 38mm thick Mixed Conifer panelling sq.m
1627.24
1628.83
1642.51
1653.48
sq.m
sq.m
1525.90
1663.47
1527.49
1665.06
1539.75
1648.19
1550.03
1658.20
sq.m
1558.00
1559.59
1544.78
1554.22
Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame
WW0180
WW0181
WW0182
WW0183
sq.m
sq.m
sq.m
sq.m
1116.87
1024.42
1154.08
1054.94
1144.09
1051.65
1326.95
1227.84
1117.26
1023.40
1414.96
1314.87
1099.23
1004.69
1415.49
1313.67
Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face
WW0190
WW0191
WW0192
WW0193
WW0194
WW0195
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1962.10
1862.96
1929.30
1830.17
2163.81
2064.68
1936.36
1837.25
1933.83
1834.72
2134.23
2035.12
1935.60
1835.51
1933.08
1832.98
2133.47
2033.38
1953.45
1851.64
1950.93
1849.11
2151.32
2049.51
Description
Units
31
PL
GP
SJ
TH
1289.24
1094.03
1351.15
1156.37
sq.m
sq.m
1321.66
1112.48
1317.68
1108.50
Providing & fixing 35mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0210 Champ wood
WW0211 Mixed Conifer
sq.m
sq.m
1524.47
1335.47
1509.25
1320.25
1502.86
1313.86
1574.37
1385.37
Providing & fixing 38mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0220 Champ wood
WW0221 Mixed Conifer
sq.m
sq.m
1121.29
1360.78
1534.56
1345.56
1527.48
1338.48
1599.19
1410.18
Providing & fixing 44mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0230 Champ wood
WW0231 Mixed Conifer
sq.m
sq.m
1589.85
1399.73
1574.62
1384.51
1566.48
1376.36
1638.48
1448.36
Providing & fixing 50mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges
WW0240 Champ wood
WW0241 Mixed Conifer
sq.m
sq.m
1651.86
1491.82
1636.63
1467.85
1626.79
1463.73
1699.27
1551.10
Providing & fixing Wire-gauze Shutters 25mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0250 Champ wood
WW0251 Mixed Conifer
sq.m
sq.m
1153.66
910.94
1138.21
895.49
1133.51
890.78
1209.08
966.35
Providing & fixing Wire-gauze Shutters 35mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0260 Champ wood
WW0261 Mixed Conifer
sq.m
sq.m
1230.86
988.13
1215.41
972.69
1208.60
965.87
1284.76
1042.03
Providing & fixing Wire-gauze Shutters 38mm for doors & windows using galvanised M.S wire gauze 0.56mm dia
wire including the cost of hinges
WW0270 Champ wood
WW0271 Mixed Conifer
sq.m
sq.m
1254.90
1012.18
1239.45
996.73
1231.99
989.26
1308.33
1065.61
32
Code
Description
Units
PL
GP
SJ
Providing & fixing Battened door & window shutters 20mm, with ledges and braces (25 mm), including
the cost of hinges
WW0280 Champ wood
WW0281 Blue pine
WW0282 Mixed Conifer
sq.m
sq.m
sq.m
1000.98
1000.98
1000.98
983.33
983.33
983.33
972.85
972.85
972.85
TH
1000.63
1000.63
1000.63
Providing & fixing battened garage door with ledges and braces (38mm) in Mixed Conifer, including
mountings etc. complete
WW0290 22 mm
sq.m
1081.90
1112.49
1082.49
1095.38
Providing & fixing battened and framed door shutters, Mixed Conifer excluding the cost of hinges
WW0295 38mm
sq.m
912.51
891.36
881.03
910.50
sq.m
1033.03
1001.49
957.28
1006.58
sq.m
339.78
339.78
338.02
338.51
WW0310 Providing & fixing plain trellis of 38x12mm laths with sq.m
38mm gap (excluding frames) including fixing beading
50x12mm with Mixed Conifer
sq.m
WW0311 Providing & fixing Door & window shutters of plain
trellis of 38x12mm laths with 38mm gap (excluding
frame) including fixing beading 50x12mm with Mixed
conifer
569.25
569.25
573.27
575.22
1073.32
1034.44
1040.64
1092.29
1417.01
1554.61
1502.06
1544.22
kg
79.69
85.78
92.41
90.88
kg
78.40
86.79
90.77
90.42
kg
148.79
167.18
158.89
163.91
sq.m
543.45
464.71
492.48
530.59
Venetian Works
Trellis
Compound Gates
WW0320 Providing & fixing Compound Gate including hingesupports complete as per
sq.m
Window Accessories
WW0325 Providing & fixing M.S. round or square bars in
window frames
WW0326 Providing & fixing M.S. round or square bars with
M.S. flats in window frames
WW0327 Providing & fixing ornamental steel grills in frames
with M.S. flats & bars including round headed bolts
and nuts etc.
WW0328 Providing & fixing expanded metal 20x60mm strands
3.25x1.6mm including 60x20mm beading of Mixed
Conifer
Units
33
PL
GP
SJ
TH
804.41
1001.95
790.52
1012.24
790.52
1012.24
1037.56
1213.15
Providing & fixing Flush Door shutters with pre-laminated bison panel
WW0335 25mm
WW0336 30mm
sq.m
sq.m
Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer
WW0345
WW0346
WW0347
WW0348
25mm
30mm
35mm
40mm
sq.m
sq.m
sq.m
sq.m
1294.81
1638.17
1824.82
1930.70
1333.31
1514.38
1762.98
1821.44
1351.33
1531.56
1771.87
1849.97
1306.11
1420.95
1654.99
1885.67
2036.50
2345.87
2673.03
2997.45
2036.50
2345.87
2673.03
2997.45
Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer
WW0355
WW0356
WW0357
WW0358
25mm
30mm
35mm
40mm
sq.m
sq.m
sq.m
sq.m
2053.63
2424.43
2673.87
3175.91
2018.19
2321.55
2642.99
2955.40
Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated
WW0365
WW0366
WW0367
WW0368
25mm
30mm
35mm
40mm
sq.m
sq.m
sq.m
sq.m
1459.30
1740.44
1882.75
2100.02
1436.40
1683.56
1974.33
2265.11
1475.26
1729.16
2027.86
2326.57
1459.30
1740.44
1882.75
2326.57
1778.06
1799.87
1814.41
1829.51
1851.96
1866.92
Providing & fixing panelled doors, with 12mm particle board panels with horizontal middle rail
including prime coat
WW0375 30mm
WW0376 35mm
WW0377 40mm
sq.m
sq.m
sq.m
1812.36
1834.59
1849.41
1778.06
1799.87
1814.41
Providing & fixing panelled doors, with 12mm plywood panels with horizontal middle rail including
prime coat
WW0385 30mm
WW0386 35mm
WW0387 40mm
sq.m
sq.m
sq.m
1330.68
1346.98
1443.32
1305.55
1321.55
1416.05
1305.55
1321.55
1416.05
1343.24
1359.70
1456.95
Providing & fixing panelled doors, with 9mm plywood panels with horizontal middle rail including
prime coat
WW0395 30mm
WW0396 35mm
WW0397 40mm
sq.m
sq.m
sq.m
1305.48
1318.82
1327.71
1280.84
1293.92
1302.65
1280.84
1293.92
1302.65
Providing & fixing panelled doors, with 12mm particle board panels with horizontal single lock rail &
stile including prime coat
1317.81
1331.27
1340.25
Description
WW0400 30mm
WW0401 35mm
WW0402 40mm
34
Units
PL
GP
SJ
TH
sq.m
sq.m
sq.m
1892.35
1898.34
1901.33
1839.12
1844.94
1847.85
1839.12
1844.94
1847.85
1892.35
1898.34
1901.33
Providing & fixing panelled doors, with 12mm plywood panels with horizontal single lock rail & stile
including prime coat
WW0410 30mm
WW0411 35mm
WW0412 40mm
sq.m
sq.m
sq.m
1901.33
1410.57
1416.56
1847.85
1370.98
1376.79
1847.85
1370.98
1376.79
1901.33
1410.57
1416.56
Providing & fixing panelled doors, with 9mm plywood panels with horizontal single lock rail & stile
including prime coat
WW0420 30mm
WW0421 35mm
WW0422 40mm
sq.m
sq.m
sq.m
1356.71
1362.69
1370.17
1318.64
1324.45
1331.72
1318.64
1324.45
1331.72
1356.71
1362.69
1370.17
Providing & fixing panelled doors, with 12mm particle board panels with horizontal double lock rail & stile
including prime coat
WW0430 30mm
WW0431 35mm
WW0432 40mm
sq.m
sq.m
sq.m
1930.49
1972.02
1976.55
1858.76
1898.73
1903.09
1858.76
1898.73
1903.09
1912.56
1953.70
1958.19
Providing & fixing panelled doors, with 12mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0440 30mm
WW0441 35mm
WW0442 40mm
sq.m
sq.m
sq.m
1976.55
1443.79
1452.47
1903.09
1390.25
1398.60
1903.09
1390.25
1398.60
1958.19
1430.41
1439.00
Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0450 30mm
WW0451 35mm
WW0452 40mm
sq.m
sq.m
sq.m
1386.40
1395.46
1407.54
1335.00
1343.73
1355.36
1335.00
1343.73
1355.36
1373.55
1382.53
1394.50
Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat
WW0460 30mm
WW0461 35mm
WW0462 40mm
sq.m
sq.m
sq.m
721.53
863.19
739.32
708.01
719.64
725.46
708.01
719.64
725.46
863.19
719.64
725.46
Description
35
Units
PL
GP
SJ
TH
sq.m
792.19
792.26
802.82
807.72
Providing & fixing 25mm thick Cupboard (900x2000x450 mm...LxHxD) with glazed or panelled shutters, 25mm
thick partitions and shelves supported on 25x25mm wooden runners, 50x20mm architraves and 25mm dia curtain
rod mounted on wooden brackets, including with Anodised Aluminium Hinges and frame in mixed conifer
WW0475 Mixed Conifer
WW0476 Champ wood
each
each
4836.07
5170.76
4814.12
5148.81
4744.45
5056.80
4999.16
5310.81
50mm
100mm
240.59
479.67
239.66
468.49
237.24
463.83
246.68
484.31
100mm
477.95
466.83
462.17
482.60
100mm
364.77
357.72
354.54
369.41
100mm
363.72
356.71
353.53
368.37
m
m
m
m
m
m
464.30
445.74
534.79
519.82
632.14
632.14
466.84
448.27
537.77
522.80
635.66
635.66
455.70
448.19
524.90
522.56
620.46
620.46
466.95
459.78
538.05
536.10
636.02
636.02
Pelmets
Providing & fixing 100x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats 25x3x100mm
and plugs etc. complete
WW0505 Champ wood
WW0506 Mixed Conifer
m
m
137.05
131.44
138.05
132.44
136.34
132.85
136.97
133.54
Providing & fixing 150x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats 25x3x100mm
and plugs etc. complete
WW0515 Champ wood
WW0516 Mixed Conifer
m
m
144.26
135.78
Shutters Fittings
Providing & fixing M.S. pressed butt hinges with necessary screws etc. complete
145.26
136.29
143.36
137.05
144.04
137.67
Description
WW0525 100mm
WW0526 75mm
WW0527 50mm
36
Units
PL
GP
SJ
TH
each
each
each
48.21
38.69
32.09
39.38
35.00
24.80
40.35
28.68
21.69
52.50
36.46
27.71
96.94
58.89
45.28
63.40
45.28
35.56
76.52
56.94
33.61
Providing & fixing M.S tower bolt (barrel type) with necessary screws etc. complete
WW0535 250mm
WW0536 150mm
WW0537 100mm
each
each
each
81.07
56.71
39.74
Providing & fixing M.S. sliding door bolt, bright finished, enamelled with necessary screws etc. complete
WW0545 300mm
WW0546 250mm
WW0547 200mm
each
each
each
217.22
176.39
160.06
211.66
182.98
142.76
183.72
161.55
131.22
204.75
163.92
168.17
43.05
31.39
30.22
24.27
47.43
38.68
37.22
25.56
54.72
41.11
33.33
22.44
60.55
43.05
34.30
31.39
each
each
each
each
43.93
44.28
33.57
25.82
45.97
34.89
40.43
34.30
45.97
43.05
34.30
31.39
43.05
34.89
54.72
40.83
each
121.23
143.69
147.77
132.02
Providing & fixing M.S. handle with necessary screws etc. complete
WW0555
WW0556
WW0557
WW0558
150mm
125mm
100mm
75mm
each
each
each
each
Providing & fixing M.S. hook-and-eye with necessary screws etc. complete
WW0565
WW0566
WW0567
WW0568
300mm
200mm
150mm
100mm
Providing & fixing anodised aluminium butt hinges with necessary aluminium screws etc. complete
WW0580 100mm
WW0581 75mm
each
each
73.46
57.39
66.69
55.03
68.68
47.51
87.11
64.17
Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete
WW0590 200mm
WW0591 150mm
WW0592 100mm
each
each
each
60.59
48.96
38.86
120.59
95.19
84.69
77.82
43.57
29.57
81.28
50.62
38.72
Providing & fixing anodised aluminium sliding door bolts with nuts and aluminium screws etc. complete
WW0600 300mm
WW0601 250mm
WW0602 200mm
each
each
each
238.32
214.40
195.87
252.39
229.06
182.40
Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete
249.99
228.96
200.87
312.18
284.81
247.14
37
Code
Description
Units
PL
GP
SJ
TH
WW0610
WW0611
WW0612
WW0613
150mm
125mm
100mm
75mm
each
each
each
each
46.00
40.08
32.73
29.66
49.08
43.25
37.42
28.48
40.04
33.04
26.92
22.84
52.00
43.25
34.50
33.18
Providing & fixing anodised aluminium hook-and-eye with necessary screws etc. complete
WW0620
WW0621
WW0622
WW0623
300mm
200mm
150mm
100mm
each
each
each
each
60.17
43.49
30.11
24.47
94.58
82.14
67.36
48.31
86.03
65.12
47.63
31.59
57.83
40.34
34.50
31.59
sq.m
528.49
563.48
665.56
680.14
133.59
104.13
72.85
109.82
74.82
50.91
171.06
115.65
77.74
246.97
179.47
144.47
241.14
143.01
115.79
270.17
218.84
131.35
681.48
616.03
556.54
732.57
635.36
403.02
831.73
621.75
637.30
1021.29
916.30
779.23
Kicking plate
WW0630 Providing & fixing anodised aluminium kicking plate,
4mm thick with necessary aluminium screws etc.
complete
Providing & fixing brass pressed butt hinges with necessary screws etc. complete
WW0635 100mm
WW0636 75mm
WW0637 50mm
each
each
each
165.23
118.57
68.99
Providing & fixing brass tower bolt (barrel type) with necessary screws etc. complete
WW0645 250mm
WW0646 150mm
WW0647 100mm
each
each
each
208.08
146.90
117.74
Providing & fixing brass sliding door bolt with nuts necessary screws etc. complete
WW0655 300mm
WW0656 250mm
WW0657 200mm
each
each
each
Providing & fixing brass handle with necessary screws etc. complete
WW0665 150mm
each
125.47
152.91
121.99
119.08
WW0666 125mm
each
95.14
122.58
103.91
98.66
WW0667 100mm
each
76.21
113.24
78.25
89.91
WW0668 75mm
each
65.90
99.25
62.21
78.25
WW0675 Providing & fixing bright finish brass 100 mm mortise each
latch & pair of levers, handles with necessary screws
etc. complete
927.93
1035.61
1045.70
997.93
Other fittings
38
Code
Description
Units
WW0676 Providing & fixing bright finish brass spring-loaded,
each
hinged door-closer with necessary screws etc. complete
PL
890.05
GP
856.39
SJ
864.64
TH
919.22
each
836.94
877.19
882.73
902.27
each
330.61
359.63
323.47
335.13
Providing & fixing bright finished brass hook-and-eye with necessary screws etc. complete
WW0685 150mm
each
90.21
111.79
78.25
92.83
WW0686 100mm
each
71.84
98.66
60.75
60.75
each
80.19
87.00
84.85
86.90
cu.m
944.09
913.42
1003.60
1024.42
sq.m
1125.42
1141.35
1157.41
1311.49
908.51
908.51
908.51
908.51
Fixing Accessories
WW0695 P&f 40x3mm M.S. hold fast 400mm long, fixing to
frame with 10mm bolts & nuts, plugs, concrete blocks
300x100x150mm with 1:3:6, 20mm aggregate
Ceiling Insul at ion
WW0700 Providing & laying dry earth in ceilings in proportion
1:5 (1 straw: 5 dry earth) including plastic underlay
Skylight
WW0705 Providing & fixing skylight translucent diffuser panel
including 50x12 beading etc. complete
Tim ber Carvi ng
kg
104.58
119.64
122.45
118.80
SW0002 In Flats
kg
93.34
110.89
102.97
107.79
kg
95.39
120.49
103.39
103.24
Description
Units
kg
kg
39
PL
GP
SJ
TH
104.58
156.47
118.73
171.20
122.78
168.58
118.63
168.41
Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming
SW0020 In R.S. joists
SW0021 In Tees, angles, flats and channels
SW0022 In Tubular sections
kg
kg
kg
105.49
103.11
73.68
120.66
118.58
69.10
124.40
115.64
71.48
119.00
114.54
97.10
D oo rs/Windows &Accessories
Providing & fixing in position with vertical channels 20x10x2mm and braced with flat iron, diagonals 20x5mm with
top and bottom rails of T-iron 40x40x6mm with 38mm dia steel pulleys complete with bolts, nuts, locking
arrangement, stoppers handles including applying a priming coat of red lead paint
SW0030 Collapsible steel shutters
sq.m
4564.24
5248.53
4846.34
4937.38
1519.46
1494.51
1494.51
1494.51
666.97
641.56
641.56
641.56
Providing & fixing in position including applying a priming coat of red lead paint
SW0035 Rolling shutters, including all accessories complete but sq.m
excluding top cover
m
SW0036 Top cover for rolling shutters
Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false ceiling
framing of specified sections including all accessories such as U-rubber gasket for fixing glass panes, weather strips
or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in case of
partitions/doors/windows and ceiling boards in case of ceiling)
SW0045
SW0046
SW0047
SW0048
kg
kg
kg
kg
479.83
481.22
477.05
475.93
586.57
587.96
583.79
582.67
449.03
450.42
446.25
445.14
483.21
484.60
480.43
479.32
Extra for providing and fixing plain glass panes on aluminium section complete (excluding the cost of aluminium
frame & accessories)
SW0055 4mm thick plain glass
SW0056 5.5mm thick, plain glass
SW0057 5.5mm thick frosted glass
sq.m
sq.m
sq.m
594.09
761.20
870.82
564.49
785.77
761.98
646.49
876.19
922.61
642.64
830.92
1019.20
Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints mitred and
welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of primer
SW0065
SW0066
SW0067
SW0068
SW0069
Doors
Windows fixed
Windows side hung
Ventilators top hung
Ventilators centre hung
sq.m
sq.m
sq.m
sq.m
sq.m
2003.18
1042.35
1374.37
1368.41
1561.08
1981.62
1038.93
1364.82
1358.78
1547.78
1985.79
1043.05
1369.01
1362.90
1551.90
2003.52
1060.56
1386.79
1380.41
1569.42
40
Units
sq.m
PL
266.88
GP
264.67
SJ
280.89
TH
299.83
kg
69.74
77.17
82.91
80.31
kg
145.70
148.38
141.18
147.36
kg
165.63
135.91
152.73
202.25
kg
94.33
109.42
108.76
107.39
each
122.99
132.41
142.65
140.29
sq.m
333.54
385.61
346.42
382.93
610.47
620.70
580.68
622.02
619.68
622.23
566.44
616.57
1096.87
1086.29
967.25
1063.91
sq.m
sq.m
sq.m
785.20
759.43
697.62
756.30
727.45
660.15
830.06
803.99
738.92
1049.92
1023.13
955.71
sq.m
541.17
524.94
570.38
707.97
Plates
Providing, making and fixing M.S. straps, flats, sole
SW0090 plates etc.
Fan Clamps
SW0095 Providing & fixing M.S. fan clamps of 16 mm dia. in
R.C. slabs, including painting with red lead paint
A
SW0100 Providing and fixing steel form work in foundations,
footings, bases of columns etc for mass concrete
Description
In cement mortar 1:6
In dry brick, filling joints with sand, on a base of
12.5mm mud mortar
Units
sq.m
sq.m
41
PL
517.84
439.45
GP
499.14
416.16
SJ
546.69
465.50
TH
683.08
599.90
46.83
50.62
47.39
51.18
47.25
51.04
47.51
51.30
46.83
50.62
47.39
51.18
47.25
51.04
47.51
51.30
45.01
48.80
45.36
49.15
45.40
49.19
45.60
49.39
191.51
262.50
306.56
411.44
530.41
641.11
190.58
264.51
309.45
416.97
552.99
669.62
194.06
267.76
313.38
422.46
559.89
678.10
280.38
246.36
283.15
250.21
Providing & laying pointing on brick flooring with cement mortar 1:2
FL0020
FL0021
Flush pointing
Ruled pointing
sq.m
sq.m
Providing & laying pointing on brick flooring with cement mortar 1:4
FL0030
FL0031
Flush pointing
Ruled pointing
sq.m
sq.m
Providing & laying Pointing on brick flooring with cement mortar 1:6
FL0040
FL0041
Flush pointing
Ruled pointing
sq.m
sq.m
Concrete Flooring
Pal cement concrete flooring 1:2:4, finished with floating coat of neat cement
FL0050
FL0051
FL0052
FL0053
FL0054
FL0055
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
186.66
256.46
299.44
402.09
512.80
619.52
Providing & laying cement concrete flooring 1:3:6, finished with a floating coat of neat cement
FL0060
FL0061
sq.m
sq.m
269.99
239.82
272.77
251.70
sq.m
598.90
622.78
589.56
607.81
Surface Hardening
Providing & laying 62mm thick flooring with sub-layer cement concrete 1:2:4 20mm aggregates, top layer with
metallic cement hardener consisting of mix 1:2 (1 cement hardener: 2 6mm stone aggregate), the metallic hardening
compound is mixed by volume in the ratio 4 parts of cement & 1 part of metallic hardening compound including
cement slurry
FL0075
sq.m
651.21
590.93
588.11
791.99
Description
42
Units
PL
GP
SJ
TH
sq.m
20.04
20.04
20.04
20.04
In grey cement
In white cement
sq.m
sq.m
625.40
750.69
669.24
797.58
645.55
767.48
670.18
792.48
46.62
63.43
56.94
65.15
75.02
102.07
91.62
104.83
FL0096
Providing & laying 40mm thick marble chips flooring top layer 10mm thick with white, black or black and white
marble chips of size 6mm in proportion 1:2 (cement : chips), on 30mm cement concrete 1:2:4 base, 12.5mm
aggregate
FL0105
FL0106
In grey cement
In white cement
sq.m
sq.m
542.49
818.84
596.67
889.01
569.87
842.88
602.61
879.75
15.09
15.09
15.09
15.09
16.60
16.60
16.60
16.60
24.90
24.90
24.90
24.90
1.76
1.76
1.76
1.76
67.28
67.28
67.28
67.28
127.29
136.16
127.29
207.90
Skirting
Providing & laying Cement plaster skirting < 300mm height with cement mortar 1:3 with a floating coat of neat
cement including rounding off junctions with floor
Description
20mm
22mm
Units
sq.m
sq.m
PL
230.72
243.81
43
GP
240.66
254.91
SJ
236.00
249.75
TH
240.08
254.32
Providing & fixing Terrazzo or Marble chips skirting < 300mm height top layer 6mm thick with white or black,
black and white marble chips size 4mm in proportion 1:2, laid on 12.5mm thick cement plaster 1:3 base
FL0140
FL0141
In grey cement
In white cement
sq.m
sq.m
604.35
721.92
650.90
770.64
623.24
737.36
646.73
760.95
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
3068.25
3068.25
3068.25
3403.21
3144.86
2892.12
3144.86
3098.30
2940.14
2940.14
2975.37
3153.83
2994.81
2742.07
3100.51
2934.04
2934.95
2934.95
2970.19
3148.64
2989.33
2736.59
3095.04
3143.95
3081.01
3081.01
3215.17
3802.72
3509.57
3256.81
3595.47
3564.26
Providing & laying Kota stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement
slurry mixed with pigment where necessary, rubbing & polishing complete
FL0160
FL0161
20mm
40mm
sq.m
sq.m
2835.44
3851.49
2827.80
3861.81
2822.61
3856.62
2437.89
3656.99
206.72
206.72
206.72
206.72
173.77
173.77
173.77
173.77
Extra for marble stone flooring for laying in steptreads, width < 300 mm
Extra for marble stone flooring for nosing in steptreads
Timber Flooring
Providing & fixing bison panel flooring including nails/screws etc. complete excluding the cost of frame
FL0180
FL0181
25mm
30mm
sq.m
sq.m
954.14
1161.57
939.56
1172.37
939.56
1172.37
1198.96
1383.33
Providing & fixing Plain Particle-Board Flooring fixing with necessary screws etc. complete, excluding
cost of frame
FL0190
FL0191
25mm
35mm
sq.m
sq.m
1385.47
1685.27
1527.40
1815.54
1528.86
1819.33
Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame
1508.27
1827.20
44
Code
Description
Units
PL
GP
SJ
TH
FL0200
FL0201
FL0202
FL0203
FL0204
FL0205
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
466.59
443.21
668.03
661.66
719.49
709.46
466.59
443.21
668.03
661.66
719.49
709.46
473.65
450.27
678.92
672.55
731.21
721.18
477.07
453.69
684.20
677.83
736.89
726.86
Parquet flooring
Providing & fixing Parquet (wood block) flooring including blown bitumen underlay and iron screws etc. complete,
excluding cost of frame
FL0210
sq.m
2468.92
2473.40
2458.98
2466.28
Providing & fixing Pre-Fabricated Flooring Profiles in mixed conifer including necessary screws etc.
complete
FL0215
FL0216
25mm thick
38mm thick
sq.m
sq.m
843.02
977.95
617.71
830.28
622.57
837.23
970.37
1047.17
sq.m
898.70
882.90
905.83
899.80
sq.m
82.15
81.65
81.94
81.80
1819.04
1790.88
1982.54
1789.29
Mud flooring
FL0230
Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of 12mm thick
cement mortar 1:3 finished with flush pointing in white cement:
GL0005
GL0006
GL0007
GL0008
GL0009
sq.m
sq.m
sq.m
sq.m
sq.m
1635.61
3327.15
2025.39
1286.59
875.68
1607.45
3135.73
1930.21
1298.21
955.97
1799.11
3663.01
2247.51
1269.08
1014.16
1605.86
3253.13
1988.12
1268.86
868.71
sq.m
92.44
92.44
92.44
92.44
Description
In skirting, risers of steps, dado where tiles are
required to be cut (only area of portion of cut tiles to
be measured)
Units
sq.m
PL
532.77
45
GP
532.77
SJ
532.77
TH
532.77
24g
sq.m
660.78
668.86
649.93
683.27
Providing & fixing Pre Painted Galvanised Steel Corrugated Roofing sheets, including bolts, hooks and nuts 8mm
dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter
and trusses.
RF0003
24g
sq.m
689.27
674.53
662.35
710.27
Providing & fixing 600mm ridges or hips in plain G.I. including bolts, hooks and nuts 8mm dia G.I limpet and
bitumen washers for connection
RF0005
24g.
517.22
524.37
524.37
536.97
Providing & fixing 600mm ridges or hips in Pre Painted Galvanised Steel sheets, including bolts, hooks and nuts
8mm dia G.I limpet and bitumen washers for connection.
RF0007
24g.
527.39
532.47
529.77
535.17
Providing & fixing 450mm over all semi-circular plain G.I gutter, including brackets, bolts, nuts, washers & rain
water pipes connections, excluding the cost of pipes
RF0010
24g sheet
416.46
434.79
428.53
440.18
7.05
7.05
7.05
7.05
7.09
7.09
7.09
7.09
135.04
136.40
133.22
138.81
20.61
50.60
75.90
20.61
50.60
75.90
20.61
50.60
75.90
20.61
50.60
75.90
Extra for making opening or recess in CGI roofing of girth < 1 metre
RF0025
RF0026
RF0027
each
each
each
Wind Bracing
Description
Units
RF0060
46
PL
GP
SJ
TH
175.09
208.53
193.46
202.59
761.33
803.48
736.47
706.46
393.56
416.57
363.19
340.68
1440.83
1468.08
1395.92
1365.48
751.26
757.47
748.28
851.42
Thatched Roofing
RF0065
RF0066
RF0067
Slate Roofing
RF0075
sq.m
6mm
8mm
10mm
sq.m
sq.m
sq.m
231.76
262.99
272.33
225.94
262.99
272.33
222.06
258.40
267.56
237.07
273.42
282.58
Providing & fixing COLOURED Pantile or Roman concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work
RF0090
RF0091
RF0092
6mm
8mm
10mm
sq.m
sq.m
sq.m
276.58
285.74
300.04
281.52
290.86
300.04
276.58
285.74
294.75
305.11
312.77
324.79
Providing & fixing PLAIN Super Roman concrete tiles-600mm x 330mm including tying wires but excluding the
cost of frame work
RF0100
10mm
sq.m
318.64
324.51
318.64
338.25
Providing & fixing COLOURED Super Roman concrete tiles-600mm x 330mm including tying wires but excluding
the cost of frame work
RF0105
10mm
sq.m
353.53
360.08
353.53
371.89
172.09
180.89
Providing & fixing PLAIN Semi-Sheet concrete tiles-600mm x 600mm including tying wires but
excluding the cost of frame work
RF0110
8mm
sq.m
172.18
175.14
47
Code
Description
Units
PL
GP
SJ
TH
Providing & fixing COLOURED Semi-Sheet concrete tiles-600mm x 600mm including tying wires but excluding the
cost of frame work
RF0115
8mm
sq.m
263.55
269.99
265.14
279.41
87.78
136.00
89.37
139.76
87.79
137.22
94.09
144.55
717.91
712.08
700.41
700.41
sq.m
576.20
569.60
559.77
565.74
521.03
492.14
485.45
503.96
1609.19
1609.19
1609.19
1835.55
Providing and fixing concrete tiles ridges or hips including tying wire etc. complete
RF0120
RF0121
Plain
Coloured
m
m
Shinglep Roofing
RF0130
Providing & laying lime concrete terracing on roofing , average depth 100mm
RF0155
1038.72
1036.99
1095.73
1178.34
RF0156
1151.59
1151.69
1210.46
1294.20
Providing & laying cement concrete terracing on roof with cement concrete 1:3:6, 20mm aggregates over a base
coat of bitumen 80\100 mixed with coarse sand
RF0165
RF0166
sq.m
sq.m
548.72
120.57
551.23
122.14
573.81
123.37
581.38
124.85
1425.04
1563.82
1323.38
1411.57
Description
100mm dia C.I. head for pipe
100mm dia C.I. bend for pipe
100mm dia C.I. shoes for pipe
Units
each
each
each
PL
314.01
344.05
530.29
48
GP
321.22
363.28
549.45
SJ
264.09
246.59
570.48
TH
310.98
340.73
525.16
409.90
678.21
451.39
673.89
Providing & fixing 100mm dia C.I. offset for rain water pipe on wall face including filling joints
RF0185
RF0186
75mm projection
150mm projection
each
each
455.80
680.49
405.33
697.31
Providing and fixing on wall face single socketed rigid PVC ( Working Pressure 4kgf per sq.cm) rain water pipes
including jointing with seal ring leaving 10 mm gap for thermal expansion- complete
RF0190
RF0191
RF0192
75mm dia
90mm dia
110mmdia
m
m
m
338.85
418.89
430.55
352.46
424.59
445.13
330.42
385.83
425.69
320.16
417.36
420.41
Providing and fixing on wall face PVC coupler for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0195
RF0196
RF0197
75 mm
90 mm
110 mm
each
each
each
168.10
219.53
251.51
167.65
221.63
252.36
177.61
231.74
256.82
171.37
223.04
276.67
Providing and fixing on wall face PVC Single tee with door for rigid rain water pipes including jointing with seal
ring leaving 10 mm gap for thermal expansion - complete
RF0200
RF0201
RF0202
75 mm
90 mm
110 mm
each
each
each
216.03
296.13
347.07
233.82
302.35
343.18
210.98
286.80
321.80
240.33
331.52
400.54
Providing and fixing on wall face PVC plain Single tee for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion - complete
RF0205
RF0206
RF0207
75 mm
90 mm
110 mm
each
each
each
210.20
290.30
321.80
217.78
279.02
314.51
205.14
282.91
335.41
208.25
296.52
377.21
Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0210
RF0211
RF0212
75 mm
90 mm
110 mm
each
each
each
199.50
245.58
274.84
200.28
261.53
286.80
209.81
251.80
305.76
199.42
262.51
296.27
Providing and fixing on wall face PVC shoe for rigid rain water pipes including jointing with seal ring leaving 10
mm gap for thermal expansion - complete
RF0215
RF0216
RF0217
75 mm
90 mm
110 mm
each
each
each
225.21
284.00
337.20
235.64
290.21
340.88
231.16
290.07
343.26
229.60
289.41
356.56
Units
49
PL
GP
SJ
TH
167.17
204.20
275.37
354.27
436.32
542.49
165.03
221.05
281.20
353.01
439.24
535.20
168.53
210.81
283.14
379.74
477.15
562.90
161.92
206.15
281.20
348.83
407.16
542.49
95.32
113.22
178.96
302.64
327.32
97.27
122.55
207.83
226.05
321.72
94.74
119.63
202.53
229.85
330.17
Water Supply
Providing & fixing G.I. pipes including G.I. fittings & clamps & repair walls
PI0001
PI0002
PI0003
PI0004
PI0005
PI0006
15mm
20mm
25mm
32mm
40mm
50mm
m
m
m
m
m
m
Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete
PI0010
PI0011
PI0012
PI0013
PI0014
20mm
25mm
32mm
40mm
50mm
m
m
m
m
m
84.36
102.87
180.35
199.62
277.61
Storage Tanks
Providing & fixing storage tank of M.S. sheet welded all round, including 40mm G.I scour pipe, 25mm G.I overflow
, 15mm ball valve , pads for inlet and outlet pipes , red lead primer & two coats of bitumastic paint
PI0020
PI0021
PI0022
each
each
each
8846.05
17795.58
26732.95
8974.95
17816.98
26650.91
9573.67 9984.72
19207.71 20516.50
28804.81 30980.05
3711.63
6308.21
11889.81
21741.08
32495.61
3715.49
6329.11
11407.63
22790.01
33797.28
3641.90 3731.99
6132.74 6322.30
11182.10 11328.40
22156.18 22056.05
33630.08 32816.89
each
each
each
each
each
500mm, white
580mm, white Orissa-model
580mm, colour Orissa-model
each
each
each
4989.53
5007.03
5222.84
4666.92
4720.59
5523.17
4775.00
4794.45
5047.20
4788.17
4909.68
5186.74
Providing & fixing European-type vitreous china w.c pedestal including seat and lid with c.p brass hinges, 15 lit
white vitreous china low level cistern, fittings, brackets, repair walls
PI0050
each
5196.18
4882.16
5120.38
5349.15
Description
coloured, with plastic seat & lid
50
Units
each
PL
5808.62
GP
5640.42
SJ
5397.44
TH
5319.99
pair
215.28
195.83
195.83
195.83
Foot Rests
PI0060
Urinals
Providing & fixing white vitreous china flat back, lipped front urinal basin 430x260x350mm including C.I cistern &
fittings, brackets, G.I. flush pipe & spreaders, brass unions, G.I. clamps, painting, repair walls
PI0065
PI0066
PI0067
each
each
each
4353.07
6612.61
8711.19
4000.07
6746.84
8794.10
4435.09
6842.51
8847.77
4579.44
7071.90
9368.80
each
19578.03
20175.01
21419.86 21683.74
each
each
19422.38
1039.20
19217.94
1039.20
22588.25 23651.22
1049.12 1021.85
Baths
Providing and fixing bath tubs with fittings and accessories complete
PI0075
PI0076
PI0077
each
5416.29
5728.79
5504.93
5765.91
each
4868.83
5072.84
4834.98
5148.45
each
4850.51
4982.20
4950.82
4942.08
each
4303.05
4326.24
4280.87
4324.63
Providing & fixing white vitreous china angle back wash basin 400x400mm including brackets, 15mm c.p brass
pillar taps, c.p brass chain & rubber plug, 32mm c.p brass waste, 32mm dia c.p brass trap and M.I union and
repair walls
PI0095
PI0096
each
each
4303.05
4850.51
4326.24
4982.20
4280.87
4950.82
4324.63
4942.08
each
4186.55
3835.42
3835.42
3872.75
Description
Providing & fixing c.p. concealed flush valve, 32mm
with 40mm outlet
Providing & fixing c.p. flush bend, long
Providing & fixing c.p. flush valve elbow
51
Units
each
PL
3835.42
GP
3835.42
SJ
3835.42
TH
3872.75
each
each
552.75
465.08
563.25
465.08
563.25
465.08
802.19
469.37
1760.81
1647.07
1647.07
1670.40
4554.24
1381.37
1623.43
4989.24
1428.03
1515.52
5203.74
1297.77
1544.69
5312.26
1398.87
1807.16
2209.12
2069.14
2183.46
2127.46
2513.36
2141.00
2159.43
2885.72
3352.34
2735.94
2760.20
3352.34
4605.89
4613.67
5740.85
3816.13
4128.10
5615.45
3829.55
4166.01
5667.94
4605.89
5137.16
5918.75
9272.09
9272.09
9359.58 11949.32
11651.85
11651.85
11762.67 12063.06
PI0115
Providing & fixing Kitchen Sinks including all connections and fittings
PI0120
PI0121
PI0122
PI0123
PI0124
PI0125
PI0126
PI0127
PI0128
PI0129
PI0130
each
each
each
each
each
each
each
each
each
each
each
each
1422.17
1277.13
1281.35
1623.49
each
229.71
254.21
251.88
200.55
each
each
each
89.34
241.38
398.86
89.73
320.29
415.49
127.64
323.30
419.42
97.31
334.70
398.86
7868.26
8705.85
10207.49
8114.76
8872.32
10157.63
7412.50
7982.32
9125.20
7639.47
7881.49
9802.96
Wastes
PI0150
PI0151
PI0152
Water Heaters
Providing & fixing Electric water heater including necessary fittings
PI0160
PI0161
PI0162
10 litres
15 litres
25 litres
each
each
each
Description
35 litres
50 litres
70 litres
100 litres
52
Units
each
each
each
each
PL
11301.48
14536.54
21016.73
25356.59
GP
11615.82
14800.42
21023.67
24476.01
SJ
10503.67
14590.68
20351.88
24392.79
TH
10700.42
14834.48
20559.91
24869.11
each
each
each
each
each
682.24
825.02
622.74
396.66
1085.44
628.69
920.21
444.26
574.33
1163.97
592.99
905.34
616.79
535.88
1252.02
723.07
841.47
642.69
649.96
1142.02
each
each
each
each
each
377.77
552.75
1019.37
867.72
797.72
593.58
564.41
945.79
733.56
637.43
576.08
669.40
1019.37
786.06
552.75
401.10
920.21
1092.74
928.96
682.96
each
each
558.58
981.46
667.07
977.26
681.07
961.04
628.57
581.91
each
each
each
each
537.19
494.42
552.75
549.83
552.75
552.75
791.89
723.84
552.75
587.75
669.40
669.40
599.41
634.64
815.22
821.06
2288.58
1955.41
2526.55
2883.52
1634.14
1515.15
860.72
2572.56
2288.58
1731.90
2526.55
2883.52
1634.14
1515.15
860.72
2641.71
2310.74
1974.31
3593.36
3420.13
1649.89
1529.73
868.88
2597.51
3294.14
3294.14
4370.87
3829.00
1579.31
1997.23
946.81
3387.47
each
each
each
each
each
each
each
each
each
PI0224
each
3173.85
3240.48
3060.83
3240.48
3204.69
3837.17
3877.42
3819.09
each
2645.54
2645.54
2671.20
2983.06
each
1872.12
1872.12
1890.20
2501.59
PI0225
PI0226
PI0228
PI0229
PI0230
PI0231
Description
For wall, with telephonic shower arrangement with
115mm long bend pipe for over head shower
connection
Three hole mixer without pop-up
Three hole mixer with pop-up
For bath, with exposed adjustable legs with telephone
shower arrangement with crutch
For shower, three in one, with bend flexible tube, and
shower & hook
53
Units
each
PL
4192.38
GP
4192.38
SJ
4755.25
TH
4460.69
each
each
each
4192.38
4192.38
5858.22
4192.38
4192.38
5858.22
4233.21
4233.21
5915.38
4535.35
4535.35
5666.13
each
5679.74
5679.74
5735.15
6743.63
each
each
549.35
1072.89
549.35
1072.89
549.35
1072.89
668.34
1134.77
each
968.44
930.53
1038.43
1236.45
each
1359.19
1321.78
1400.01
1421.56
each
865.30
666.98
1186.10
1028.23
each
760.31
678.65
929.17
918.08
each
629.07
620.32
803.86
823.46
each
582.36
671.79
718.45
783.42
each
each
each
each
556.79
967.14
848.47
823.97
553.95
941.59
825.02
801.22
504.50
941.59
825.02
801.22
627.09
941.59
825.02
801.22
each
673.75
548.93
548.93
553.99
each
each
each
497.96
622.74
628.57
421.78
622.74
611.08
418.05
622.74
622.74
421.43
628.57
628.57
each
each
509.20
461.81
432.65
432.65
469.98
350.99
602.24
378.70
Bathroom Accessories
PI0250
PI0251
PI0252
PI0253
PI0254
PI0255
C.P. brass
Recessed ceramic, 200 x 100 mm, coloured,
Recessed ceramic, 200 x 100 mm, white
Recessed ceramic, roll-type, 150 x 150 mm
Single
Double
Description
Units
54
PL
GP
SJ
TH
15mm
20mm
25mm
32mm
40mm
50mm
65mm
80mm
100mm
150mm
m
m
m
m
m
m
m
m
m
m
124.19
156.66
226.45
298.26
364.08
451.57
582.91
777.98
1031.49
1628.53
122.05
173.51
232.28
297.00
366.99
444.28
669.36
933.93
1234.66
1858.92
125.55
163.27
234.22
323.73
404.90
471.98
673.64
889.45
1188.97
1781.80
118.94
158.60
232.28
292.82
334.91
451.57
621.15
831.12
1072.32
1849.30
Providing & laying H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching,
refilling & thrust block)
PO0015
PO0016
PO0017
PO0018
PO0019
PO0020
PO0021
PO0022
PO0023
PO0024
PO0025
25mm
32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm
m
m
m
m
m
m
m
m
m
m
m
53.95
83.35
127.37
186.69
289.48
401.72
571.03
832.07
1348.27
1741.41
3369.32
64.30
81.97
230.39
236.40
380.66
518.84
735.66
1093.17
1333.34
1711.82
3393.99
73.63
110.83
153.80
230.80
348.46
546.49
758.35
1184.86
2509.28
1721.85
3378.36
70.71
105.54
157.60
239.25
362.75
503.32
722.77
1137.62
1633.20
2684.26
3767.98
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0030
PO0031
PO0032
PO0033
PO0034
PO0035
PO0036
PO0037
PO0038
PO0039
32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm
m
m
m
m
m
m
m
m
m
m
59.81
88.63
129.67
201.64
274.34
384.22
562.71
899.61
1158.54
2222.26
65.75
110.23
164.30
254.50
350.62
489.34
732.71
834.69
1053.37
2081.30
84.00
108.60
159.93
222.18
313.95
429.38
754.41
1066.84
1484.27
2303.96
93.34
91.69
133.68
212.27
289.26
411.88
595.17
952.51
1227.82
2358.21
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0045
PO0046
40mm
50mm
m
m
66.98
106.64
80.20
134.26
135.72
167.57
89.81
112.10
Description
63mm
75mm
90mm
110mm
140mm
160mm
225mm
Units
m
m
m
m
m
m
m
PL
151.77
196.83
280.89
407.11
643.67
826.91
1565.27
55
GP
194.42
252.10
357.17
516.43
669.48
828.69
1513.57
SJ
163.27
188.50
266.06
370.03
623.35
786.28
1531.32
TH
159.19
250.18
353.55
433.60
680.71
875.52
1660.61
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching,
refilling & thrust block)
PO0060
PO0061
PO0062
PO0063
110mm
140mm
160mm
225mm
m
m
m
m
274.33
445.40
560.76
1032.98
336.20
474.23
561.94
1048.57
308.39
478.70
666.87
1179.14
288.95
467.81
592.63
1094.83
m
m
m
m
m
m
m
m
m
m
m
1108.71
1287.78
1877.74
2582.39
3431.10
4336.95
5435.92
6474.47
7639.64
8953.14
12273.68
1108.71
1287.78
1877.74
2582.39
3431.10
4336.95
5435.92
6474.47
7639.64
8953.14
12273.68
1098.09 1168.02
1275.42 1336.23
1859.73 1945.54
2557.60 2672.00
3398.15 3521.61
4295.30 4493.12
5383.70 5703.78
6412.34 6682.73
7566.32 7897.72
8867.21 9354.22
12155.82 12870.59
m
m
m
m
m
m
m
m
m
m
1080.78
1676.28
2202.65
2900.90
3634.47
4574.34
5436.96
6358.88
7501.00
10165.32
1091.24
1692.49
2223.97
2928.98
3669.64
4618.63
5489.54
6420.36
7573.53
10263.66
1080.78 1106.42
1676.28 1721.56
2202.65 2333.70
2900.90 3070.15
3634.47 3808.35
4574.34 4788.04
5436.96 5776.32
6358.88 6760.33
7501.00 7988.19
10165.32 10810.47
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
Providing and Laying Double Flanged (Screwed or Welded) Centrifugally Spun Ductile Iron K-9 Pipes
PO0090
PO0091
PO0092
PO0093
PO0094
PO0095
PO0096
PO0097
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
m
m
m
m
m
m
m
m
2173.60
3132.95
4405.43
5793.66
7185.54
8905.43
10676.23
14409.05
2194.67
3163.33
4448.17
5849.88
7255.24
8991.79
10779.73
14548.68
2173.60 2187.46
3132.95 3278.68
4405.43 4610.98
5793.66 6129.24
7185.54 7526.19
8905.43 9349.25
10676.23 11293.39
14409.05 15185.50
Description
500 mm
600 mm
56
Units
m
m
PL
16966.05
22129.04
GP
17130.18
22342.78
SJ
TH
16966.05 17887.15
22129.04 23397.14
each
each
each
334.58
469.05
694.77
466.35
559.67
577.17
297.20
472.18
676.33
373.02
489.68
653.00
each
each
each
each
each
1292.65
1468.12
1656.23
2853.11
3774.97
1552.85
1994.72
2550.14
4539.60
6506.23
1552.85
1994.72
2550.14
4539.60
6506.23
1697.06
1930.37
2542.81
4350.96
5774.15
each
each
each
1679.56
2749.29
4170.14
2347.61
3885.95
5881.60
2274.50
3925.17
6188.28
2587.60
4580.65
6683.17
each
283.59
300.11
355.53
328.31
each
each
each
each
each
each
each
each
53.60
70.69
110.05
241.69
303.03
417.85
567.78
2385.32
62.33
87.57
125.41
201.11
346.20
491.29
800.38
2490.96
43.89
58.82
88.24
234.18
312.66
438.34
758.62
2947.46
89.67
120.91
202.61
295.69
482.68
731.83
1095.57
3298.85
each
each
each
each
each
76.90
155.53
270.61
371.00
492.82
112.80
185.30
262.59
385.56
478.58
66.72
133.91
243.73
376.69
611.82
104.41
215.54
381.75
530.79
731.94
each
each
303.03
303.03
290.16
293.63
292.92
300.10
305.95
305.95
Brass Fittings
Providing & fixing brass stop cock
PO0100
PO0101
PO0102
15mm
20mm
25mm
32mm
40mm
50mm
65mm
80mm
50mm
65mm
80mm
15mm, brass
20mm
25mm
32mm
50mm
63mm
90mm
110mm
160mm
32mm
50mm
63mm
90mm
110mm
90 x 50mm
90 x 63mm
Description
110 x 63mm
110 x 90mm
57
Units
each
each
PL
362.52
778.98
GP
322.79
764.92
SJ
300.10
853.26
TH
366.02
786.57
each
each
each
each
each
184.04
217.64
327.47
457.19
773.15
140.18
179.03
342.79
394.14
671.70
144.93
185.16
354.70
407.86
695.22
185.79
221.84
420.09
459.90
719.49
50mm
63mm
90mm
110mm
160mm
Providing and fixing push on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets
PO0150
PO0151
PO0152
PO0153
PO0154
PO0155
PO0156
PO0157
PO0158
PO0159
PO0160
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
each
each
each
each
each
each
each
each
each
each
each
84.20
98.45
147.63
230.66
258.27
404.91
452.68
542.56
633.36
864.76
1155.66
77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31
77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31
77.99
91.36
136.78
219.57
272.33
375.68
418.85
603.17
640.54
859.47
1148.31
each
each
each
each
129.91
156.21
182.06
284.87
137.56
164.96
191.81
302.38
143.37
171.60
199.21
315.66
130.76
157.19
183.16
286.84
m
m
m
m
377.63
546.05
639.79
851.20
389.76
591.16
667.11
860.30
439.42
526.52
792.08
902.29
423.02
561.00
837.42
947.34
each
each
each
255.44
255.44
255.44
263.89
287.69
336.50
268.78
313.84
393.23
239.86
277.31
404.78
each
each
195.94
208.66
159.16
182.49
203.87
215.54
215.54
244.70
50mm dia
75mm dia
100mm dia
150mm dia
50mm dia
75mm dia
100mm dia
50mm dia
75mm dia
Description
100mm dia
58
Units
each
PL
214.49
GP
240.81
SJ
265.12
TH
303.03
each
each
each
157.87
270.20
256.70
160.56
269.75
329.76
188.20
293.93
414.09
159.36
320.37
405.68
532.80
407.23
319.15
497.59
346.20
289.43
589.06
333.58
283.12
532.80
407.23
319.15
685.22
459.08
367.88
623.76
314.66
264.19
705.76
333.58
283.12
685.22
459.08
367.88
399.11
399.11
275.43
217.95
443.02
443.02
273.02
228.24
433.30
433.30
293.93
233.85
402.97
402.97
278.07
220.04
542.79
399.11
267.93
474.16
372.03
263.89
585.57
417.68
341.50
548.06
402.97
270.50
each
each
467.83
411.61
456.14
399.67
497.59
434.51
467.83
411.61
each
each
455.34
392.87
442.92
396.06
472.36
415.59
455.34
392.87
each
each
each
464.08
436.59
287.29
479.93
440.82
296.36
488.13
459.74
308.35
464.08
436.59
287.29
each
each
405.36
349.14
416.85
365.12
416.49
370.83
405.36
349.14
50mm
75mm
100mm
Providing & fixing C.I double equal door junction including fittings
PO0200
PO0201
PO0202
100mm
75mm
50mm
each
each
each
Providing & fixing C.I double equal plain junction including fittings
PO0210
PO0211
PO0212
100mm
75mm
50mm
each
each
each
Providing & fixing C.I single equal door junction including fittings
PO0220
PO0221
PO0222
PO0223
150mm
100mm
75mm
50mm
each
each
each
each
Providing & fixing C.I single equal plain junction including fittings
PO0230
PO0231
PO0232
100mm
75mm
50mm
each
each
each
Providing & fixing C.I double unequal door junction including fittings
PO0240
PO0241
100x75mm
100x50mm
100x75mm
100x50mm
100x75mm
100x50mm
75x50mm
100x75mm
100x50mm
Description
75x50mm
59
Units
each
PL
267.93
GP
281.86
SJ
281.92
TH
267.93
each
each
each
685.22
512.81
367.88
617.45
409.28
333.58
443.34
354.97
250.28
685.22
512.81
367.88
each
each
each
642.74
464.08
242.94
607.54
436.92
203.82
573.29
308.35
270.50
642.74
464.08
242.94
each
each
469.61
345.87
490.02
358.81
506.42
375.22
469.61
345.87
each
each
320.88
469.61
329.98
472.96
326.36
501.34
323.97
474.16
each
each
320.88
451.77
329.98
452.54
326.36
402.19
323.97
456.14
each
each
347.06
477.94
305.95
487.38
283.12
503.90
347.06
477.94
each
each
each
each
680.22
386.62
255.44
155.49
686.84
384.05
273.02
163.26
613.13
383.33
312.18
225.92
680.22
386.62
255.44
155.49
each
each
each
275.66
205.46
153.11
390.36
245.27
194.80
411.61
242.94
205.46
278.31
207.42
154.55
each
each
504.62
327.27
562.12
395.13
540.10
435.11
588.03
410.67
100mm
75mm
50mm
100mm
75mm
50mm
100x50mm
75x50mm
75mm projection
150mm projection
75mm projection
150mm projection
75mm projection
150mm projection
150mm
100mm
75mm
50mm
100mm
75mm
50mm
60
Code
Description
Units
PL
GP
SJ
Providing & fixing P.V.C soil waste and vent pipes, single or double socketed, including pipe clip complete
(excluding the cost of PVC fittings)
PO0370
PO0371
PO0372
75mm dia
90mm dia
110mm dia
TH
m
m
m
203.25
265.28
306.40
184.47
271.16
277.82
203.25
246.66
309.67
177.88
290.20
308.34
each
192.21
189.29
178.03
182.76
each
each
each
79.34
95.77
110.26
75.00
105.65
116.94
88.85
113.82
121.40
79.50
95.39
117.92
each
each
each
124.16
133.88
160.24
157.21
168.88
192.21
136.80
177.63
189.29
166.96
196.91
220.26
each
each
each
110.74
121.83
133.59
107.63
145.55
151.38
121.05
133.88
170.34
107.55
134.86
137.51
each
each
each
121.05
160.13
171.60
116.38
157.21
189.29
133.88
171.21
176.61
117.55
139.71
172.96
each
each
each
207.84
303.03
410.12
219.74
314.93
410.12
226.93
329.86
420.91
205.43
256.37
401.60
each
each
each
121.44
166.54
180.54
125.13
163.04
179.08
116.38
164.99
199.99
116.38
168.88
218.46
each
each
each
127.27
172.38
205.82
141.17
186.38
207.76
122.22
168.88
186.38
148.46
203.87
241.79
110mm dia
75mm dia
90mm dia
110mm dia
90x75mm
110x75mm
110x90mm
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
61
Code
Description
Providing & fixing P.V.C Double Tee plain
Units
PL
GP
SJ
TH
PO0455
PO0456
PO0457
each
each
each
246.16
328.99
437.18
208.85
255.44
329.16
221.37
308.86
384.69
119.88
186.38
206.21
each
each
each
265.12
308.86
402.19
349.98
439.87
456.61
245.64
278.04
382.36
250.54
308.86
373.02
each
each
each
127.46
203.87
234.79
177.63
349.69
366.02
145.55
215.54
273.87
152.55
222.54
262.20
each
each
each
293.70
254.04
300.11
407.75
320.53
279.70
389.08
276.20
323.25
341.25
280.87
333.36
each
each
each
211.65
300.11
351.64
243.24
297.20
297.20
204.26
275.42
318.58
213.98
305.95
373.41
each
each
each
273.87
317.61
415.80
296.03
397.52
431.35
211.46
247.62
303.03
303.03
279.70
422.60
each
each
349.69
468.68
243.54
350.63
273.87
338.03
297.20
585.34
each
each
462.46
562.59
398.22
493.41
355.53
530.51
443.02
600.50
each
each
517.68
594.67
445.82
499.36
413.85
518.84
614.11
679.24
each
100.75
112.65
113.70
101.68
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
90mm dia
110mm dia
75mm dia
Description
90mm dia
110mm dia
62
Units
each
each
PL
112.65
118.60
GP
130.50
136.45
SJ
125.71
137.73
TH
113.70
119.71
each
each
404.57
355.53
499.36
445.82
498.19
426.10
536.84
435.27
each
223.32
256.37
341.99
226.68
4.06
5.45
6.75
8.65
4.01
5.38
6.66
8.54
4.74
6.36
7.87
10.09
Big
Small
m
m
m
m
4.34
5.82
7.20
9.23
Painting C.I spun soil waste vent pipes & fittings including primer, top coat (any colour), for new work
PO0580
PO0581
PO0582
50mm
75mm
100mm
m
m
m
14.78
8.30
29.55
13.73
7.92
27.46
13.92
9.65
27.84
15.93
10.28
31.85
7.37
11.06
14.75
6.70
10.05
13.40
6.83
10.24
13.65
8.08
12.12
16.16
5544.74
6236.99
Repainting C.I spun soil waste vent pipes & fittings including paints of any colour
PO0590
PO0591
PO0592
50mm
75mm
100mm
m
m
m
each
5507.21
5273.37
PO0601
39967.04
38251.57
40060.04 44580.39
Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with frame, 40mm
thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as per standard
design
PO0610
PO0611
PO0612
PO0613
PO0614
15 users
25 users
50 users
75 users
100 users
each
each
each
each
each
27248.10
32630.31
46004.87
52620.77
63103.82
27327.28
32838.64
46465.39
53247.25
63938.45
29378.37
34943.80
48754.88
55583.30
66368.88
29982.28
35638.44
49777.83
56616.32
67684.66
Description
Units
63
PL
GP
SJ
TH
Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as
per standard design
PO0620
PO0621
PO0622
PO0623
PO0624
15 users
25 users
50 users
75 users
100 users
each
each
each
each
each
31887.27
39025.53
51104.06
61869.00
73772.90
31388.26
38498.05
50410.70
61022.18
72786.15
34404.33
41696.67
54719.76
66073.49
78159.97
38329.04
47087.07
62609.73
76150.69
89988.36
Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover with frame,
40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.C 1:4:8 etc. complete as per
standard design
PO0630
PO0631
PO0632
PO0633
PO0634
15 users
25 users
50 users
75 users
100 users
each
each
each
each
each
32039.04
40824.02
57754.95
71257.69
87467.25
32442.95
41546.59
58948.47
72828.44
89280.67
34600.61
43587.85
61244.10
75354.36
92184.82
35258.33
44507.73
62500.63
76837.72
93949.55
sq.m
sq.m
68.37
72.57
68.41
72.63
68.37
72.57
68.43
72.65
sq.m
sq.m
sq.m
82.17
75.66
1.67
84.95
77.69
1.67
83.76
77.17
1.67
84.93
78.10
1.67
sq.m
sq.m
sq.m
sq.m
119.29
106.18
99.10
93.07
124.85
110.22
102.33
95.60
122.47
109.19
102.02
95.91
124.80
111.06
103.64
97.32
147.33
129.89
120.43
112.38
144.49
128.65
120.06
112.74
147.27
130.89
121.99
114.42
15mm
20mm
Cement Plaster
Providing & laying 6mm cement plaster (in ceilings)
PL0010
PL0011
PL0012
C.M 1:3
C.M 1:4
Extra for plaster to ceiling height > 5m ......per
additional metre. ht
C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6
Providing & laying 15mm cement plaster on rough side of single or half-brick wall
PL0030
PL0031
PL0032
PL0033
C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6
sq.m
sq.m
sq.m
sq.m
140.69
125.06
116.57
109.35
Description
64
Units
PL
GP
SJ
TH
sq.m
sq.m
sq.m
sq.m
175.04
154.64
143.63
134.23
183.68
160.93
148.65
138.17
179.99
159.32
148.17
138.65
183.61
162.23
150.69
140.84
220.52
238.32
267.73
224.46
242.25
271.66
223.45
241.24
270.65
225.27
243.06
272.47
275.65
296.58
332.17
281.27
302.20
337.78
279.83
300.76
336.35
282.43
303.36
338.94
157.13
179.61
215.96
142.51
162.17
193.21
123.87
153.18
175.20
210.70
139.90
159.36
190.03
121.53
156.06
178.53
214.86
142.31
162.14
193.48
123.44
C.M 1:3
C.M 1:4
C.M 1:5
C.M 1:6
Providing & laying 12mm plain cement mortar band in C.M 1:4
PL0050
PL0051
PL0052
Flush band
Sunk band
Raised band
sq.m
sq.m
sq.m
Providing & laying 20mm plain cement mortar band in C.M 1:4
PL0060
PL0061
PL0062
Flush band
Sunk band
Raised band
sq.m
sq.m
sq.m
Providing & laying cement plaster, finished with floating coat of neat cement
PL0070
PL0071
PL0072
PL0073
PL0074
PL0075
PL0076
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
149.81
171.21
205.55
136.69
155.57
185.15
119.22
Rough cast plaster with a mixture of sand and gravel or crushed stone 2-12mm including plaster in 2 layers-12mm
1:4, & 10mm 1:3 hydrated lime cement
PL0080
PL0081
Grey cement
White cement
sq.m
sq.m
282.77
457.98
290.99
472.87
293.84
465.42
299.80
472.75
Pebble dash plaster with a mixture of washed pebble or crushed stone 6mm to 12mm nominal size dashed over fresh
plaster in the layers, under layer 12mm cement plaster 1:4 and top layer 10mm cement plaster mixed with finally
ground hydrated lime by volume of cement
PL0090
Grey cement
sq.m
281.27
289.49
292.34
298.31
82.49
82.55
82.55
82.58
65
Code
Description
Units
PL
GP
SJ
TH
Pl0092
82.45
82.51
82.51
82.53
179.11
182.98
175.25
183.76
179.75
184.39
175.15
185.31
PL0096
Extra for providing and mixing water-proofing materials in proportion recommended by the
manufacturers
PL0100
PL0101
PL0102
PL0103
PL0104
PL0105
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
21.46
17.14
23.62
19.36
28.83
23.16
18.22
14.63
20.02
16.48
24.36
19.64
20.58
16.45
22.64
18.58
27.61
22.20
26.77
21.27
29.53
24.11
36.17
28.94
sq.m
30.51
32.28
30.71
31.25
Plaster of Paris
Providing & fixing 12mm Plaster of Paris (gypsum anhydrous) tiles, rendered smooth with Plaster of
Paris
PL0120
sq.m
631.97
705.22
709.92
770.96
PL0121
31.96
31.96
31.96
31.96
White colour-wash
Dry oil bound distemper
sq.m
sq.m
4.44
5.48
4.44
5.48
4.44
5.48
4.44
5.48
sq.m
sq.m
27.63
23.19
26.40
23.66
26.10
21.39
29.20
25.17
Painting Items
Providing & applying one coat of primers
PT0010
PT0011
Cement primer
Metal work - synthetic red oxide primer
Description
Wood work - pink primer
Wood work - white primer
Red lead primer
66
Units
sq.m
sq.m
sq.m
PL
29.10
23.90
23.22
GP
28.99
24.45
23.01
SJ
27.09
23.11
22.98
TH
31.62
25.78
23.80
sq.m
sq.m
sq.m
sq.m
21.86
13.56
7.43
21.86
22.11
13.72
7.52
22.11
20.63
12.73
7.02
20.63
21.94
13.61
7.46
21.94
sq.m
sq.m
13.56
7.43
13.72
7.52
12.73
7.02
13.61
7.46
sq.m
sq.m
58.29
27.04
54.23
25.40
73.50
33.15
82.75
36.88
sq.m
43.74
42.70
47.50
50.47
sq.m
sq.m
16.69
60.94
16.77
64.63
16.28
59.76
16.72
66.96
sq.m
sq.m
19.78
55.98
23.05
54.61
20.01
61.85
22.74
63.66
sq.m
35.50
34.68
39.02
40.11
sq.m
39.08
40.40
39.28
41.20
sq.m
62.18
64.37
62.51
65.70
sq.m
69.14
62.79
64.01
75.74
sq.m
46.09
41.86
42.67
50.50
sq.m
52.08
51.65
50.81
54.02
sq.m
32.63
32.39
31.90
33.75
sq.m
70.26
69.84
71.81
109.43
sq.m
sq.m
sq.m
36.15
35.46
57.21
36.74
35.66
57.56
39.70
33.88
54.53
53.28
37.84
61.27
sq.m
sq.m
57.91
75.37
57.06
74.21
75.11
69.19
35.46
80.04
Description
Units
Synthetic varnish (clear) - two coats, including coat of sq.m
wood filler on new work
French polish - one coat, on old work
sq.m
French polish - two coats, on new work
sq.m
67
PL
133.83
GP
131.92
SJ
123.75
TH
141.43
75.78
134.49
73.65
131.01
71.87
128.12
79.26
140.16
sq.m
sq.m
sq.m
sq.m
37.03
29.36
53.23
27.02
34.10
26.99
42.40
22.36
26.30
20.67
42.12
22.23
36.53
28.95
60.88
30.29
sq.m
sq.m
406.96
550.64
410.76
555.84
400.71
538.14
410.76
555.84
460.62
319.83
234.33
462.80
326.72
241.22
457.96
323.97
238.46
457.17
314.33
228.83
630.02
462.34
319.83
632.02
469.23
326.72
628.71
466.48
323.97
624.53
456.84
314.33
509.64
379.01
284.96
504.27
378.53
284.48
503.64
378.46
284.40
515.36
384.72
290.67
sq.m
sq.m
sq.m
643.60
484.32
353.21
638.23
483.81
352.70
637.60
483.69
352.58
649.32
490.01
358.90
sq.m
sq.m
133.67
109.45
133.18
108.26
133.05
108.73
139.28
113.93
Wood Preservatives
Providing and applying wood preservatives
PT0070
PT0071
PT0072
PT0073
Wall Paper
Providing & fixing wall paper
PT0080
PT0081
Standard Quality
High Quality
Traditional
Painting
Rab
Ding
Thamar
sq.m
sq.m
sq.m
Rab
Ding
Thamar
sq.m
sq.m
sq.m
Rab
Ding
Thamar
sq.m
sq.m
sq.m
Rab
Ding
Thamar
Washable
Not Washable
68
Code
Description
Units
PL
GP
SJ
TH
Providing, preparing and applying flower natural painting for wall decoration design such as Tashitagey symbols,
Tashi Zeegay, Za-Tshering, etc.
PT0140
PT0141
Dangtshon - Rab
Sumdang - Rab
sq.m
sq.m
109.65
105.38
97.46
93.19
103.12
98.85
142.85
138.57
sq.m
159.88
164.94
163.64
165.98
Glass Panes
Providing & fixing glass panes with putty, nails including remaining. broken glass panes
AA0005
AA0006
AA0007
AA0008
AA0009
sq.m
sq.m
sq.m
sq.m
sq.m
710.18
761.96
945.77
742.53
1066.35
718.12
729.94
973.35
693.85
947.17
725.21
821.45
1074.13
803.21
1125.19
764.05
833.09
1040.19
833.09
1247.30
each
210.18
204.76
216.78
247.70
each
107.62
107.85
108.05
108.20
56.34
56.40
57.08
57.24
Cutting Walls
AA0015 Cutting holes < 300x300mm in brick walls including
repair wall
AA0016 Cutting holes < 150x150mm in R.C floors or roof
including making leak proofing with concrete 1:2:4,
20mm aggregates
AA0017 Making chases < 75x75mm in walls including repair
after fixing G.I pipe etc.
Aluminium Strip Edging
Providing & fixing Aluminium strip edging to staircases including rawl plugs and screws, a thin layer
of cement mortar 1:3
AA0025 57mm x 12mm x 3mm
AA0026 38mm x 12mm x 3mm
m
m
498.31
173.24
489.73
151.16
item
Lumpsum
485.81
150.11
530.98
277.50
69
PL
GP
SJ
TH
Lumpsum
Excavation
Earthwork in excavation over areas, exceeding 300mm in depth, 1.5 m in width as well as 10 sq.m on plan including
disposal of excavated earth (disposed earth to be levelled and neatly dressed)
RW0006
RW0007
RW0008
RW0009
RW0010
Ordinary Soil
cu.m
Hard Soil
cu.m
Ordinary Rock with or without blasting
cu.m
Hard rock requiring blasting
cu.m
Hard rock requiring chiselling (where blasting is prohibi cu.m
Excavation of road formation/trace/box cutting, with bull-dozer including separate deposition of soil, rocks and
stones within 50m for reuse
RW0011 All types of soil
RW0012 All types of rock
Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil, rocks and
stones within 50m for reuse
RW0013 All types of soil
RW0014 All types of rock
cu.m
cu.m
59.35
219.04
59.35
216.45
59.35
214.31
59.35
216.10
Earthwork in Excavation in foundation trenches or drains including dressing of sides and ramming of bottom,
disposal of surplus excavated soil within 50m lead
RW0015
RW0016
RW0017
RW0018
Ordinary Soil
Hard Soil
Ordinary Rock with or without blasting
Hard rock requiring blasting
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
Embankments
70
PL
GP
SJ
TH
Filling of Trenches
RW0035 Filling of trenches, sides of foundations, walls, etc
including filter material (600mm wide) with 100 to
200mm stones wherever applicable including filling
with selected suitable excavated
cu.m
material in layer not exceeding 200mm in depth
(compacted), consolidating each layer with power
roller or portable compactor, watering etc. within 50m
lead
Quarries
RW0040 Opening, running and restoration of quarries according item
to environmental code of practice and as per technical
specifications
item
RW0041 Opening, running and restoration of sand quarries
according to environmental code of practice for
Highways and Roads, and as per the technical
specification
Lumpsum
Lumpsum
cu.m
1177.26
1082.00
1113.84
1377.35
RW0045 75 mm
cu.m
1135.55
1040.30
1119.13
1335.64
RW0046 50 mm
cu.m
1145.98
1050.72
1168.30
1346.07
RW0047 63 - 40 mm
cu.m
1145.98
1047.70
1169.04
1346.07
RW0048 20 mm
cu.m
1326.21
1166.72
1432.57
1402.66
RW0049 12 - 6 mm
cu.m
1336.64
1195.58
1391.68
1418.33
RW0050 50 - 20 mm
cu.m
1219.11
1095.38
1262.70
1369.75
cu.m
248.06
246.08
249.05
247.60
cu.m
560.25
556.19
554.82
556.19
RW0057 Boulder
cu.m
291.35
291.21
291.67
291.14
Walls
Construction of Gabion wall as per drawings, including excavation of foundations in all types of soils, sides and
backfilling, delivery of materials etc. complete
Description
RW0065
RW0066
RW0067
RW0068
RW0069
RW0070
RW0071
Height up to 1.0m
Height up to 2.0m
Height up to 3.0m
Height up to 4.0m
Height up to 5.0m
Height up to 6.0m
Height up to 7.0m
Units
71
PL
GP
SJ
TH
m
m
m
m
m
m
m
2906.67
5839.10
10365.32
16130.01
25398.21
34816.41
42524.86
3036.64
6104.17
10844.60
16869.22
26466.70
36276.93
44480.01
2959.66
5946.38
10556.98
16427.64
25856.11
35443.82
43311.13
3039.59
6109.61
10852.75
16883.27
26507.09
36333.23
44516.48
m
m
53774.52
67013.74
56223.88
70074.92
54766.24 56274.43
68250.76 70136.34
sq.m
14516.71
14265.68
14251.89 14264.03
sq.m
1050.52
1088.68
1055.73
1116.74
727.79
717.63
743.42
731.74
Construction of French drain, including jungle clearance, earthwork in excavation, levelling of excavated earth to
the sides, filling drain with 50-100 mm stones, complete as per design
RW0095 Drain Size 0.6m X 1.0m
RW0096 Drain Size 1.0m X 1.5m
m
m
972.60
2090.50
910.92
1945.12
961.96
2065.43
1102.16
2395.90
203.22
198.81
202.46
212.48
Construction of V-shaped stone pitched drain including excavation, levelling and disposal of surplus
earth within 50m
RW0105 depth 300mm, width 600 mm
RW0106 depth 300 mm and width 450 mm
m
m
256.80
137.99
254.56
136.97
260.24
139.55
257.67
138.38
18.39
18.39
Construction of V-shaped earthen drain including excavation, levelling and disposal of surplus
excavated earth within 50m
RW0107 depth 500 mm and width 600 mm
18.39
18.39
72
PL
588.72
GP
599.87
SJ
608.00
TH
613.23
63.34
62.87
64.06
63.52
Subgrade
Preparation of sub grade with proper camber by excavating earth to depth equal to pavement thickness,
consolidation with roller, disposal of surplus earth up to 50m
RW0121 All kinds of soil
RW0122 Blasted Rock
cu.m
cu.m
31.72
107.54
31.72
107.54
31.72
107.54
31.72
107.54
7.28
7.28
7.28
7.28
15.17
15.17
15.17
15.17
cu.m
1367.76
1363.15
1408.43
1445.07
cu.m
1759.65
1701.02
1826.36
1840.74
Granular Sub-base
RW0130 Providing and laying Granular sub-base course (GSB)
to required degree of compaction with proper
formation of cross fall using motor grader for laying
and compacted to required density as per material
gradation and aggregate quality specified
Wet Mix Macadam
RW0131 Providing and laying wet mix macadam graded
aggregate base course to required degree of
compaction with proper formation of cross fall by
using well graded crushed aggregates premixed with
OMC using suitable mixer, motor grader as per
material gradation and a aggregates quality specified
sq.m
576.46
578.47
589.87
595.86
Description
RW0133 60 mm
RW0134 70 mm
RW0135 80 mm
73
Units
PL
GP
SJ
TH
sq.m
sq.m
sq.m
671.96
766.65
861.67
674.22
769.15
864.43
687.90
785.11
882.66
694.98
793.28
891.92
Asphalt/Bituminous Concrete
Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job mixture
design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller etc. as per material
gradation and aggregate quality specified
RW0136
RW0137
RW0138
RW0139
25 mm
30 mm
35 mm
40 mm
sq.m
sq.m
sq.m
sq.m
339.58
394.66
449.75
504.05
341.68
397.12
452.58
507.23
346.67
403.11
459.56
515.21
350.54
407.71
464.89
521.27
sq.m
RW0145 Scarifying metalled (water bound) road surface
disposal of rubbish up to 50m and consolidation of the
aggregate received from scarifying
31.02
31.02
31.02
31.02
162.18
166.61
Scarifying
Repair of Roads
Cutting and repairing of roads, including supply of required quantities of aggregates complete
RW0146 Water bound macadam road
sq.m
161.61
159.21
Wearing Course
Laying wearing course including screening, sorting, spreading to template and consolidation (measurement of
wearing course to be taken equal to the quantity of aggregate used, excluding blinding materials)- With stone
aggregates and blinding materials
cu.m
651.57
651.57
651.57
651.57
cu.m
519.07
518.29
523.86
531.88
Cutting bituminous road along with W.B.M layer & soling and making good the same including supply of extra
quantities of aggregate, grit & bitumen emulsion required complete
RW0151 Manually
sq.m
925.75
915.58
934.86
957.55
Painting two coats with bitumen emulsion (coat 1 - 12 kg emulsion and 0.1 cu.m, 12 mm aggregates per 10 sq.m,
coat 2 - 1.6 kg emulsion 0.06 cu.m, 10 mm aggregates per 10 sq.m) complete
RW0152 Mechanized
sq.m
212.50
212.82
215.96
219.85
Description
Units
74
PL
GP
SJ
TH
Repainting one coat with bitumen emulsion @ 2.3 kg of emulsion and 0.002 cu.m of 10 mm nominal size stone chips
per sq.m of surface area complete
RW0153 Mechanized
sq.m
160.05
161.89
162.28
165.18
Premix consolidated carpet surfacing including a tack coat @ 0.75 kg bitumen emulsion per sq.m of road
surface
RW0154 50mm thick with 6.0 cu.m of aggregate 10mm nominal sq.m
size per 100 sq.m using 96 kg of emulsion of approved
quality per cu.m of stone aggregate (Mechanized)
442.80
442.59
450.92
466.36
344.22
344.38
350.26
356.96
279.99
280.13
284.84
290.21
sq.m
104.26
104.33
105.90
107.72
sq.m
51.65
52.03
52.87
53.68
sq.m
573.72
568.71
578.10
588.07
Cutting bituminous road and making good the same including supply of extra quantities of aggregate, grit &
bitumen required complete
RW0161 Bituminous road along with W.B.M layer & soling
(mechanized)
sq.m
929.45
917.56
938.15
961.88
Painting two coats of bitumen 80\100 (coat 1 - 2 kg of bitumen, 0.015 cu.m, 12.5mm aggregate per sq.m; coat 2 - 1
kg of bitumen, 0.009 cu.m, 10 mm aggregates, per sq.m complete)
RW0165 Mechanized
sq.m
225.82
225.42
230.13
232.94
RW0166 Manually
sq.m
264.60
262.24
268.25
273.72
75
Code
Description
Units
PL
GP
Premix carpet surfacing including a tack coat @ 0.75 kg bitumen per sq.m of road surface
RW0167 50mm thick with 6 cu.m of aggregate 10mm nominal
size per 100 sq.m using 51.5 kg of bitumen 80/100
grade per cu.m of stone aggregate (Mechanized)
SJ
TH
sq.m
329.60
324.96
336.73
341.11
1808.04
1837.94
1837.94
1859.67
56.61
54.10
57.80
61.41
sq.m
Premix Carpeting with 64 kg of bitumen 80\100 per cu.m of aggregates including a tack coat with bitumen of same
quality @ 0.75 kg per sq.m of road surface
RW0170 20 mm thick with 2.4 cu.m, 10mm aggregate per 100
sq.m (Manually)
RW0171 25 mm thick with 3.0 cu.m, 10mm aggregate per 100
sq.m (Manually)
sq.m
74.49
69.59
75.30
77.99
sq.m
89.15
83.16
90.21
93.40
Repainting, one coat of bitumen 80\100 @ 1 kg of bitumen; 0.009 cu.m, 10mm aggregate per sq.m of
road surface
RW0175 Manually
sq.m
31.12
29.19
31.39
32.52
RW0176 Mechanised
sq.m
74.68
74.41
76.18
77.14
Providing seal coat with bitumen 80/100 grade of approved quality using 1.12 cu.m of stone aggregate 10mm size
per 100 sq.m and 56 kg of bitumen 80/100 grade per cu.m of stone aggregate with a tack coat of 0.75 kg of bitumen
per sq.m of road surface complete
RW0177 Mechanized
sq.m
106.45
106.24
108.44
109.74
Providing seal coat with bitumen 80\100 using 1.5 kg of bitumen per sq.m with 1.05 cu.m, 10mm aggregate per 100
sq.m of road surface
RW0178 Manually
sq.m
124.32
123.35
126.06
128.76
Providing seal coat of premixed sand with bitumen 80\100 using 128 kg of bitumen per cu.m of sand and 0.75 cu.m
of coarse sand per 100 sq.m of road surface
RW0179 Manually
sq.m
80.45
80.60
82.42
84.22
Providing & fixing RC name board including primer and white zinc paint
RW0180 Rectangular with post
RW0181 Flat without post for one direction only
each
each
1672.45
2462.83
1728.07
2527.78
1786.99
2593.06
1791.89
2634.36
each
2641.98
2713.06
2784.82
2834.01
76
Code
Description
Road Signs
Units
PL
GP
SJ
TH
each
3.45
3.45
3.45
3.45
Providing & fixing precast boundary stone of RC 1:2:4 (20mm aggregate) including finishing with mortar 1:3 (cost
of excavation, refilling etc to be paid separately)
RW0185 150mm dia x 900mm high
each
374.42
385.47
397.07
398.33
Providing & fixing precast kilometre stone of RC 1:2:4 (20mm aggregate) including finishing with mortar 1:3
complete as per standard design (cost of excavation, concreting, painting etc. shall be paid separately)
RW0186 35cm x 111cm x 25cm
RW0187 50cm x 152.5cm x 25cm
RW0188 35cm x 93.5cm x 18cm
each
each
each
1209.88
2135.03
780.91
1252.30
2214.73
807.01
1294.43
2293.68
832.58
1298.63
2300.40
835.80
each
1.09
1.09
1.09
1.10
each
0.84
0.85
0.84
0.85
m
each
each
each
m
m
67.70
159.40
779.01
587.22
1060.36
643.96
67.68
159.35
806.26
604.61
1088.52
649.31
67.02
158.17
836.19
624.28
1127.66
730.19
72.43
167.91
837.51
626.30
1148.25
689.08
Letterings
RW0189 Lettering with paint of approved brand and
manufacture......per letter per centimetre ht
RW0190 Relettering with paint of approved brand and
manufacture......per letter per centimetre ht
Fencing
Supplying posts & struts
RW0195
RW0196
RW0197
RW0198
RW0199
RW0200
Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of
ballies complete (posts/struts, earthwork, concrete paid separately)
RW0202 2.5mm , (12 SWG), 4 barbs form by twisting two point
wires, each two turns, pitch of barbs 75mm
18.66
21.32
20.70
23.77
Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in case of
ballies complete (excluding the cost of posts/struts, earthwork, concrete)
RW0205
RW0206
RW0207
RW0208
sq.m
sq.m
sq.m
sq.m
265.36
226.17
248.21
217.59
333.37
257.55
226.92
203.59
345.91
309.87
345.91
243.78
Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of
posts/struts, earthwork, concrete etc.)
362.40
378.40
364.12
333.19
77
Code
Description
Units
PL
GP
SJ
TH
RW0209
RW0210
RW0211
RW0212
RW0213
RW0214
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
450.32
413.57
376.83
352.33
413.57
226.17
444.40
426.90
334.34
320.73
321.75
257.55
426.86
443.19
426.86
422.19
405.30
309.87
411.91
392.66
440.85
372.77
428.92
378.40
7252.19
7252.19
7323.14
7790.47
RW0216 1.2 m high fencing with 1.8 m balli posts 250 mm girth
( min) placed every 2.5 m apart, embedded in cement
concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end
post one side only, provided with six horizontal lines
and two diagonals of barbed wire between two posts
fitted and fixed with GI staples driven into the posts
complete (cost of RCC posts, struts, earthwork and
concrete to be paid for separately)
5311.88
5309.04
5360.75
5706.73
RW0217 2.4 m high fencing with 3.3 m balli posts 250 mm girth
( min) placed every 2.5 m apart, embedded in cement
concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end
post one side only,
provided with twelve horizontal lines and two
diagonals of barbed wire between two post fitted and
fixed with GI staples
driven into the posts complete (cost of RCC posts,
struts, earthwork and concrete to be paid for
separately)
RW0218 1.3 m high concrete rail and pale fencing with 1.8 m
R.C.C posts 2.2 m rails and 1.25 m pales placed every
2.5 m apart, embedded in cement concrete blocks
(450 mm x 450 mm x 700 mm), of mix 1:5:10 (1
cement : 5 sand : 10 graded crushed rock 40 mm
nominal size) (cost of earthwork in excavation,
concrete work, posts, rails and pales to be paid for
separately)
9532.85
9527.99
9620.86 10241.79
88.34
88.34
88.34
88.34
78
PL
GP
SJ
TH
197.97
227.53
220.61
254.66
258.30
296.30
287.40
331.18
kg
372.51
372.51
372.51
373.65
sq.m
35.45
35.45
35.45
35.45
35.45
35.45
35.45
35.45
43.32
43.37
43.37
43.50
51.76
51.94
51.94
52.41
Bioengineering
Seeds Collection, treatment and storage
RW0230 Grass and pioneer plant seed collection, including
separation, drying in the sun & storing
Broadcasting
RW0231 Broadcasting of grass/pioneer plants seeds on slopes;
seeding rate 25 gm per m2
Direct Seeding
Live Stacking/Palisade
RW0233 Preparation of materials (woody cuttings 2-4 cm
diameter and 50 cm length) and staking them of the
cuttings in the soil
Brush layer/Hedge Brush Layer
RW0234 Collection and preparation of materials (woody
cuttings 2-4 cm diameter and 60 cm length) and
staking them of the cuttings in the soil
Units
79
PL
GP
SJ
TH
140.21
150.47
150.47
144.64
43.81
43.35
43.35
45.26
sq.m
80.58
80.98
80.98
80.98
20.93
20.93
20.93
20.93
sq.m
38.12
38.60
39.13
39.97
sq.m
1432.93
1560.97
1701.35
1667.59
120.97
124.21
121.30
128.00
474.76
477.49
474.76
485.69
no
Sodding/Turfing
RW0241 Supply and apply permanent road marking on the road sq.m
surface as per technicial specification,(manually)
sq.m
4. COST INDICES
5. APPROVED MATERIAL BRANDS
Any rates calculated adding cost index shall not be used for making payment to contractors or parties
Payment to contractors shall be strictly as per the contract agreement only
The six examples, that follow, are for purpose of guidance and engineers are encouraged to calculate
cost indices on their own.
I
a)
b)
c)
d)
e)
Col.(4) =
Col.(5) =
Col.(6) =
Col.(7) =
Col.(8) =
II
Weightage
Weightage of a particular material is the percentage of its cost from the total cost of the project.
II
a)
b)
II
a)
To derive the approximate item rate at any location, the BSR item rates of the nearest base town shall be enhanced by the
cost index calculated above.
b)
c)
Weightage differs for different kinds of projects and engineers can calculate weightages using rates of items of the nearest
base towns
80
81
Sl.No. Description
(1)
1
(2)
Cement
Unit
(3)
MT
Cost at Project
Location
(5)
4770.00
5689.00
% Increase
Weightage
Cost Index
(6)
(7)
(8)
19.27
17.00
3.28
Steel Reinforcement
MT
31500.00
33500.00
6.35
14.00
0.89
Rolled Steel
MT
32300.00
34400.00
6.50
3.00
0.20
C.G.I Sheet
MT
44000.00
50600.00
15.00
5.00
0.75
Brick /ICEB
Nos
4650.00
6830.00
46.88
9.50
4.45
Stone Boulders
cu.m
180.00
530.00
194.44
1.50
2.92
Rough SawnTimber
cu.m
7800.66
8122.45
4.13
17.00
0.70
Stone Aggregates
(20mm)
cu.m
618.00
883.00
42.88
4.50
1.93
Sand
cu.m
180.00
534.00
196.67
2.00
3.93
10
Labour : Average
Cat. I to IV
each
208.75
208.75
0.00
11.50
0.00
Cat. V
each
165.00
165.00
0.00
15.00
0.00
Remarks
(9)
100.00
Cost Index =
19.04 %
(2)
Unit
(3)
Cost at Project
Location
(5)
% Increase
Weightage
(6)
(7)
Cost Index
Remarks
(8)
Cement
MT
4770.00
5689.00
19.27
17.00
3.28
Steel Reinforcement
MT
31500.00
33500.00
6.35
14.00
0.89
C.G.I Sheet
MT
46000.00
50600.00
10.00
5.00
0.50
Brick /ICEB
Nos
4630.00
6830.00
47.52
10.50
4.99
Stone Boulders
cu.m
180.00
530.00
194.44
1.50
2.92
Rough SawnTimber
cu.m
7800.66
8122.45
4.13
19.00
0.78
Stone Aggregates
(20mm)
cu.m
618.00
883.00
42.88
4.50
1.93
Sand
cu.m
180.00
534.00
196.67
2.00
3.93
Labour : Average
Cat. I to IV
each
208.75
208.75
0.00
11.50
0.00
Cat. V
each
165.00
165.00
0.00
15.00
0.00
100.00
Cost Index =
19.22 %
(9)
82
Sl.No. Description
(1)
(2)
Unit
(3)
Cost at base
town
Cost at Project
Location
% Increase
Weightage
(4)
(5)
(6)
(7)
(8)
Cement
MT
4770.00
5689.00
19.27
17.00
3.28
Steel Reinforcement
MT
31500.00
33500.00
6.35
5.00
0.32
C.G.I Sheet
MT
46000.00
50600.00
10.00
8.00
0.80
Stone boulders
cu.m
180.00
534.00
196.67
6.00
11.80
Bricks/ICEB
1000#
4650.00
6830.00
46.88
1.00
0.47
Rough SawnTimber
cu.m
7800.66
8122.45
4.13
22.00
0.91
Stone Aggregates
(20mm)
cu.m
618.00
883.00
42.88
3.00
1.29
Sand
cu.m
180.00
530.00
194.44
3.00
5.83
Labour : Average
Cat. I to IV
each
208.75
208.75
0.00
20.00
0.00
Cat. V
each
165.00
165.00
0.00
15.00
0.00
(9)
100.00
Cost Index =
24.69 %
Weightage
Unit
Cost at a base
town
(4)
32189.00
3928.00
535.00
(1)
1
2
3
(2)
Bitumen***
Road Roller (8-10T)
Fire wood**
(3)
MT
day
cu.m
Stone Aggregates .
20mm
cu.m
618.00
each
each
Labour : Average
Cat. I to IV
Cat. V
Cost at Project
Location
(5)
34389.00
3928.00
650.00
% Increase
(6)
6.83
0.00
21.50
(7)
63.00
9.00
3.00
(8)
4.31
0.00
0.64
635.70
2.86
14.00
0.40
208.75
208.75
165.00
165.00
0.00
0.00
0.50
10.50
0.00
0.00
100.00
Cost Index =
***
**
5.35 %
(9)
83
5. Road Permanent Works - Retaining Walls, Culvert and other similar works
Sl.No. Description
(1)
1
(2)
Unit
Cement
(3)
MT
(4)
4770.00
Stone boulder
cu.m
Stone Aggregates
(20mm)
Sand
Labour : Average
Cost at Project
Location
(5)
% Increase
Weightage
5689.00
(6)
19.27
(7)
30.00
(8)
5.78
180.00
205.00
13.89
20.00
2.78
cu.m
618.00
700.00
13.27
3.00
0.40
cu.m
180.00
534.00
196.67
5.00
9.83
Cat. I to IV
each
208.75
208.75
0.00
16.00
0.00
Cat. V
each
165.00
165.00
0.00
26.00
0.00
(9)
100.00
Cost Index =
18.79 %
Weightage
(2)
Unit
(3)
Stone Boulder
cu.m
Blinding materials
Stone Aggregates 20
mm
Labour : Average
Cat. I to IV
Cat. V
4
5
Cost at Project
Location
(5)
% Increase
(6)
(7)
(8)
180.00
205.00
13.89
5.00
0.69
day
3440.00
3440.00
0.00
32.00
0.00
cu.m
70.00
70.00
0.00
3.75
0.00
cu.m
618.00
700.00
13.27
42.00
5.57
each
each
208.75
208.75
165.00
165.00
0.00
0.00
0.25
17.00
0.00
0.00
100.00
Cost Index =
6.27 %
(9)
Materials
Approved Brands
Pipes
a.
GI
Bansal Skipper
b.
c.
DWC HDPE
d.
e.
PPR
CPVC (potable water)
Umex
Raksha, Astral, Ori-plast
f.
g.
u-PVC(SWR)
h.
i.
Bansal Skipper
Pipe Fittings (Union, Socket, Elbow, Tee, Plug, Bend, Tank nipple, Barrel nipple, Flanges)
a.
GI
NVR
b.
HDPE
c.
PPR
d.
CPVC
Raksha, Astral
e.
DI
Electrosteel
a.
Sanitary Appliances
a.
PIC, Essco
Ori-Plast
Materials
LAMPS
Incandescent/GLS lamps
Fluorescent tube light
CFLs
LUMINARIES/FIXTURES
Outdoor lighting/Indoor Lighting
Approved Brands
b.
a.
MCB
b.
c.
d.
RCCB/ELCB/RCBO
Distribution Board
Isolators
e.
Control Panels(LT)
FANS
a.
Celing/exhaust/pedestral/wall/
table fans
a.
9
Richa
PVC CONDUIT & FITTINGS
a.
10
a
11
Richa
HDPE PIPES AND FITTINGS
DWC HDPE pipes and fittings
ELECTRICAL EARTHING
Gee Slab
Materials
Approved Brands
Reinforcement Steel
a.
Fe 415
b.
Fe 500
KARMA TMX
PELDEN TMX TMT, Electrosteel, PERFECT TMX TMT
CGI
c.
SHERA
Bitumen/Emulsion
a.
Cationic Emulsion
b.
Solid/hollow blocks
c. Biltech-ACE-AAC (Aerated)-625x250x100-300
D.Bhutan Concrete Bricks (Phuntsholing) - 240x114x80
E. Yangjung Sonam Bricks (Gelephu)
1.solid bricks-16x8x4 & 16x8x8
2. hollow blocks- 16x8x4 & 16x8x6
Boards/Ply
a.
SHERA
b.
8
9
10
11
Cements
a.
33 Grade
Penden Ordinary
b.
43 Grade
c.
PSC
d.
PPC
e.
OPC 53
Tata Wiron, Gabions & Gabion Materess (Zn and Zn+PVC coated),
Terramesh, Green Terramesh (Maccaferri)
Dendrite (Denseal & yamapoxy)
Paralink and Paraweb (Maccaferri)
Note:
1. The above lists of approved brands are the products for which the approval certificates are still valid
and those brands for which the certificates are expired and not renewed will not feature in the list.
2. The Brand Bhubit manufactured by M/s Bhutan Bitumen Industries and OPC 43 grade cement
manufactured by M/s Druk Cement are certified as per the requirements of ISO/IEC17065:2012