Specification No.

*conforms
Yes/No

*Deviations

Noted

Yes/No

Yes/No

@ clarification or
Reasons for
Deviations

SPECIFICATION FOR PIPELINE


ANCHOR FLANGE (Doc. No.
11.76.12.0606)
30.99.37.0013Rev.2
SPECIFICATION FOR PAINTING,
PROTECTIVE COATINGS AND
COLOR CODING
EP 30.99.90.024 Rev.3
PROCEDURE FOR PREPARATION
OF SUPPLIER'S/VENDOR'S
ENGINEERING DRAWINGS AND
DOCUMENTS
EP 30.99.90.001 Rev 8
ENGINEERING PROCEDURE FOR
DRAWING, DESIGN AND
NUMBERING SYSTEMS
ES 30.99.00.001 Rev 4
ENGINEERING SPECIFICATION
TAG PLATES FOR FIELD AND
INDOOR EQUIPMENT
ES 30.99.00.0102-1 Rev 2
CORROSION AND MATERIALS
SELECTION PHILOSOPHY
ALL THE ADCO & SHELL
SPECIFICATIONS AS LISTED IN
SECTION 4.0
SCOPE OF SUPPLY AS LISTED IN
SECTION 5.0
DATA SHEETS FOR PIPELINE
ANCHOR FLANGE (DOC.NO.
11.76.18.0605)
Note:
1.

*Acceptance (i.e. yes) implies total compliance to the specification.


@ provide additional explanatory sheets if required.
DOCUMENT TITLE:

ADCO DOCUMENT NO.:


11.76.23.0606

MATERIAL REQUISITION FOR PIPELINE ANCHOR


FLANGES
CONTRACT NO.:15882.01
L:\PROJ\11248-00 AL ASAB\MR\19\1983006-1.docx

ADCO PROJECT NO.:P 90187

PAGE 39 OF 45
REV.1

DATE:14-01-2016

You might also like