maah kI p`NaalaI p`caalana irpaoTSystem Operation Report Of
Western Region
For the month of
August -2015

Paavar isasTma Aa^prooSana karpaoroSana ilaimaToD


(pavariga`D` kI ek pUUNa- svaaima%va vaalaI kMpnaI)

piScama xaoi~ya Baar p`oYaNa kond`,mauumba[ba[Power System Operation Corporation Ltd.


(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch Centre,Mumbai

INDEX
*HIGHLIGHTS OF WR GRID
*SUMMARY
SUMMARY REPORT
INSTALLED CAPACITY
POWER SUPPLY POSITION
FREQUENCY PROFILE
VOLTAGE PROFILE
ADDITION OF NEW ELEMENTS
a) GENERATING UNITS
b) TRANSMISSION LINES
c) LINE /BUS REACTORS AND ICTS
SCHEDULE Vs DRAWAL
UNIT OUTAGES
GENERATION
RESERVOIR LEVEL IN FEET
INTERREGIONAL EXCHANGE
REVISED AUFLS SCHEME
PROGRESS OF NEW GENERATION AND TRANSMISSION PROJECTS
OPEN ACCESS TRANSACTIONS

* ANNEXURES
ANNEXURES

LOAD DURATION CURVE


FREQUENCY DURATION CURVE
LOAD CURVE ON PEAK DEMAND DAY AND MINIMUM DEMAND DAY
LIST OF GRID INCIDENCES AND DISTURBANCES
UNITWISE INSTALLED CAPACITY

Highlights of WR Grid in the month of


August -2015
Power Supply Position:
(i)

Unrestricted Demand: The maximum unrestricted Demand was 43996 MW at 16:00 Hrs on 27th
Aug15 which was 3.41% more as compared to last year (42544 MW). Average peak unrestricted
demand was 37921 MW which was 8.71% more than the last year Aug14 (34844 MW).

(ii)

Peak Demand Met: The Maximum Peak Demand of 43754 MW was observed at 16:00hrs on
27.08.2015. It was 9.21 % more as compared to Aug14 (40063 MW) & 2.34% less as compared to
July15 (44803 MW at 15:00hrs on 15.07.2015). Average peak demand met (37819 MW)
increased by 9.97 % as compared to the last year Aug14 (34390 MW).

(iii)

Total Energy Consumption was 28138 MUs in the month of Aug at the average of 908 MUs/day &
Maximum was 995 MUs on 27.08.15. In the month of July, the total energy consumption was at
the average of 913 MUs/day & Maximum was 1032 MUs on 15.07.15.

(iv)

Total Energy requirement was 28213 MUs in the month at the average of 910 MUs/day &
Maximum was 997MUs on 27.08.2015. Compared to last year average energy requirement
increased by 8.71%.

Frequency Profile:

Voltage Profile: Voltage profile during the month of August was in the IEGC band at most of the

System frequency was in IEGC band (49.9 50.05 Hz) for 70.00 % of time
against 70.29 % of the time in the last month. Maximum frequency of 50.25 Hz was observed on 23rd
Aug at 17:06 hrs. Minimum frequency of 49.55 Hz was observed on 3rd Aug at 19:27 hrs due to O/D by
West Bengal, Bihar, DVC, and Gujarat. The Average frequency of the grid was 49.98 Hz in the month.
Frequency remained in 80.39 % of time (so far highest) in IEGC band on 16th Aug 2015. Frequency
Variation Index for August15 was 0.06.

400 KV and 765 KV nodes of WR. Highest voltage was observed at Dhule 440 KV on 15.08.2015. High
voltage nodes of WR were Karad, Dhule, Kolhapur, Bhadravati, Kasor, Nagda and Khandwa.

Element Addition in Aug15 into the WR Grid:


o
o

500 MW unit at VSTPS stage-V was first time synchronized on 06.08.15. Total 1400 MW
capacity synchronized from April15 to Aug15 in WR Grid.
Total 854 ckt Km added into the grid. There was total 2776 ckt Km of transmission lines added
in WR grid from April15 to Aug15.

Hydro Generation:

Wind Generation:

Total hydro generation of 1372 MUs was generated at the average of 44.25
MUs/day. Hydro generation increased by 85 % compared to last month (741.81 MUs).
Total wind generation in the month was 1596 MUs at the average of 51.48

MUs/day. Wind Generation was decreased by 37.55% compared to last month (2556 Mus). Maximum
wind generation was 4661 MW at 14:00 hrs on 5th Aug 2015.

Solar Generation:

Solar Generation of 200.55 Mus generated in the month of Aug15 at the

average of 6.46 MUs/day compared to 183 MUs in last month (average of 5.90 Mus/day). Maximum
solar generation was 1017 MW at 14:00 hrs on 31st Aug 2015.

INSTALLED CAPACITY OF WR
idnaaMk 31.08.2015 kao rajyaanausaar saMsqaaipt xamata
INSTALLED GENERATION CAPCITY OF THE STATES INCLUDING SHARES AS ON 31.08.2015
(All fig. in M W)
State
Gujarat

Madhya Pradesh

O wne rship

Hydro

C oal

Gas

Nuclear

Total

Diesel

772.00

4720.00

2321.82

0.00

7813.82

0.00

Private

0.00

8642.00

4060.00

0.00 12702.00

Central(firm allo)

State

3725.31

0.00

0.00

3725.31

772

16104

6806

559

24241

4802

29044

State

1703.66
0.00
1520.00
3223.66

4320.00
4550.00
2384.25
11254.25

0.00
0.00
257.18
257.18

0.00
83.96
0.00 1586.38
0.00
0.00
0.00 1670.34

6107.62
6136.38
4434.67
16678.67

120.00

2780.00

0.00

0.00

2900.00

0.00

11.05

2911.05

0.00
0.00

8923.00
1530.69

0.00
0.00

0.00
47.52

8923.00
1578.21

0.00
0.00

316.13
0.00

9239.13
1578.21

T otal

120.00

13233.69

0.00

47.52 13401.21

0.00

327.18

13728.39

State

2884.84

9560.00

672.00

0.00 13116.84

0.00

208.13

13324.97

447.00

11796.00

180.00

0.00 12423.00

0.00 5997.52

18420.52

0.00
3331.84

3462.16
24818.16

2623.93
3475.93

690.14 6776.23
690.14 32316.07

0.00
0.00
0.00 6205.65

6776.23
38521.72

State

0.00

0.00

0.00

0.00

0.00

0.00

0.05

0.05

Private

0.00

0.00

48.00

0.00

48.00

0.00

0.00

48.00

Central(firm allo)

0.00
0.00

331.35
331.35

0.00
48.00

25.80
25.80

357.15
405.15

0.00
0.00

0.00
0.05

357.15
405.20

0.00
0.00
0.00
0.00
0.00

0.00
0.00
40.58
40.58
0.00

0.00
0.00
4.20
4.20
0.00

0.00
0.00
7.38
7.38
0.00

0.00
0.00
52.16
52.16
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
52.16
52.16
0.00

0.00
0.00

0.00
49.92

0.00
27.10

0.00
8.46

0.00
85.48

0.00
0.00

0.00
0.00

0.00
85.48

T otal

0.00

49.92

27.10

8.46

85.48

0.00

0.00

85.48

State

5480.50

21380.00

2993.82

0.00 29854.32

0.00

481.24

30335.56

447.00

33911.00

4288.00

0.00 38646.00

0.00 10789.83

49435.83

1840.00 18808.95

0.00

0.00

18808.95

State

Private
Central(firm allo)
T otal

T otal
State
Private
Central(firm allo)
T otal
State
Private
Central(firm allo)

WR

17496.40

559.32

Central(firm allo)

DNH

0.00 4794.40

424.27

Private

DD

7821.82

2741.72

T otal

Goa

8.00

0.00

Central(firm allo)

Maharashtra

Total

T otal

Private

Chhattisgarh

RES

Private
Central(firm allo)*

0.00 6023.66
0.00 4550.00
273.24 4434.67
273.24 15008.33

1697.35

11738.01

3533.59

Unallocated

0.00

1697.35

196.91

228.14

2122.40

0.00

0.00

2122.40

T otal

7625

67029

10815

1840

87309

11271

100638

Source: CEA website

POWER SUPPLY POSITION Aug 2015


Energy Requirement and Availability
Aug'15
Requirement Availability
(MUs)
(MUs)

Shortage
(%)

April'15 to Aug'15
Requirement Availability Shortage (%)
(MUs)
(MUs)

Gujarat

8457

8448

0.11

42869

42847

0.05

Madhya
Pradesh

4370

4463

-2.11

21948

22050

-0.46

Chattisgarh

2433

2389

1.83

11780

11617

1.38

Maharashtra

11798

11776

0.19

60742

60533

0.34

Goa

250

220

11.83

1324

1294

2.30

D&D

198

198

0.00

974

974

0.00

DNH

489

487

0.40

2438

2431

0.31

ESIL

198

197

0.43

1222

1222

0.00

28193

28177

0.06

143298

142969

0.23

Western
Region

Peak Demand / Demand Met (MW)


Aug'15
Requirement Availability
(MW)
(MW)

Shortage
(%)

April'15 to Aug'15
Requirement Availability Shortage (%)
(MW)
(MW)

14901

14870

0.21

14912

14886

0.17

7750

7743

0.09

7750

7743

0.09

3784

3656

3.38

3943

3832

2.82

19075

18951

0.65

20428

20265

0.80

Goa

422

393

6.87

507

477

5.92

D&D

304

304

0.00

304

304

0.00

DNH

719

719

0.00

745

745

0.00

ESIL

466

466

0.00

597

597

0.00

43996

43754

0.55

45506

45208

0.65

Gujarat
Madhya
Pradesh
Chattisgarh
Maharashtra

Western
**Region

Requirement (MW)

Aug'15
Availability (MW)

Shortage (%)

Gujarat

14901 on 28.08.2015 at 15:00 hrs

14870 on 28.08.2015 at 15:00 hrs

0.21

Madhya
Pradesh

7750 on 26.08.2015 at 20:30 hrs

7743 on 27.08.2015 at 19:45 hrs

0.09

3784 on 24.08.2015 at 20:00 hrs

3656 on 24.08.2015 at 19:00 hrs

3.38

19075 on 26.08.2015 at 12:00 hrs

18951 on 26.08.2015 at 12:00 hrs

0.65

Goa

422 on 25.08.2015 at 20:00 hrs

393 on 17.08.2015 at 15:00 hrs

6.87

D&D

304 on 28.08.2015 at 15:00 hrs

304 on 28.08.2015 at 15:00 hrs

0.00

DNH

719 on 13.08.2015 at 12:00 hrs

719 on 13.08.2015 at 12:00 hrs

0.00

ESIL

466 on 09.08.2015 at 08:00 hrs

466 on 09.08.2015 at 08:00 hrs

0.00

43996 on 27.08.2015 at 16:00 hrs

43754 on 27.08.2015 at 16:00 hrs

0.55

Chattisgarh
Maharashtra

Western
**Region

 2015 
State

idva dmaNa DD
pMjaIkRt Registered
dadra nagar hvaol aI DNH
pMjaIkRt Registered
gaaov aa GOA
pMjaIkRt Registered
AsaIimat Unrestricted
[esaAayaela ESIL
pMjaIkRt Registered
gauj arat GUJARAT
pMjaIkRt Registered
AsaIimat Unrestricted

Catered

GROSS PEAK DEMAND FOR AUG.2015


UNSCHL
FC
PC
Total
S+SCHLS

Date

Time

Freq.

304

304

28.08.15

16:00:00

49.96

719

719

13.08.15

12:00:00

49.92

393

393

17.08.15

15:00:00

49.89

385

35.00

1.62

0.00

422

25.08.15

20:00:00

49.88

466

466

09.08.15

08:00:00

50.02

14870

14870

28.08.15

15:00:00

49.94

14870

31.23

14901

28.08.15

15:00:00

49.94

pMjaIkRt Registered

3656

3656

24.08.15

19:00:00

49.93

AsaIimat Unrestricted

3219

546.2

19.15

3784

24.08.15

20:00:00

49.83

pMjaIkRt Registered

7743

7743

27.08.15

19:45:00

50.00

AsaIimat Unrestricted

7739

0.00

11.37

7750

26.08.15

20:30:00

49.95

pMjaIkRt Registered

18951

18951

26.08.15

12:00:00

49.86

AsaIimat Unrestricted

18951

31

92.86

19075

26.08.15

12:00:00

49.86

piScama xao~ WESTERN REGION


pMjaIkRt Registered

43754

43754

27.08.15

16:00:00

49.86

AsaIimat Unrestricted

43754

28

214

43996

27.08.15

16:00:00

49.86

C<aIsagaZ ra.iva
- hhattisgarh
ra iva.baao
iva baaoD C

maQya p`d So a ra.iva


ra iva.baao
iva baaoD Madhy Pradesh

maharaYT/ ra.iva
ra iva.baao
iva baaoD MAHARASHTRA

Demand Chart Demand Chart from Apr'15 to Jun'15


Month
Apr'15
May'15
Jun'15
Jul'15
Aug'15

Unrest. Dmd (MW)


45114
45506
44298
45448
43996
46000

Demand Met (MW)


44668
45208
43735
44803
43754

Shortage
0.99%
0.65%
1.27%
1.42%
0.55%

DEMAND CHART Apr-15 to Aug-15

1.60%
1.40%

45500

1.20%

45000

1.00%
44500
MW

0.80%
44000
0.60%
43500

0.40%

43000

42500
Unrest. Dmd (MW)
Demand Met (MW)
Shortage

0.20%

Apr'15
45114
44668
0.99%

May'15
45506
45208
0.65%

Jun'15
44298
43735
1.27%

Jul'15
45448
44803
1.42%

Aug'15
43996
43754
0.55%

0.00%

Demand Met

Aug-15

Jul-15

Aug-14

% Change w.r.t
last month

% Change w.r.t
last Year

Average

37819

38138

34390

-0.84

9.97

Max
Date when
Max.

43754

44803

40063

-2.34

9.21

27-Aug-15

15-Jul-15

21-Aug-14

Day-wise Demand Plot-

Energy
Consumption
MU/Day

Aug-15

Jul-15

Aug-14

% Change w.r.t
last month

% Change
w.r.t last
Year

Average

908

913

825

-0.57

9.97

Max

995

1032

909

-3.58

9.49

Date

27-Aug-15

15-Jul-15

21-Aug-14

Energy ChartMonth

Requirement

Availibilty

Shortage

Apr'15

29026

28946

0.28%

May'15

30676

30594

0.27%

Jun'15

26909

26851

0.21%

Jul'15

28495

28397

0.34%

Aug'15

28213

28138

0.27%

Energy pattern Apr-15 to Aug-15


31000

0.40%

30000
0.30%

29000

0.20%

Mus

28000
27000
26000

0.10%

25000
24000
Requirement
Availibilty
Shortage

Apr'15
29026
28946
0.28%

May'15
30676
30594
0.27%

Jun'15
26909
26851
0.21%

Jul'15
28495
28397
0.34%

Aug'15
28213
28138
0.27%

0.00%

Day-wise Frequency band- Aug15


Date
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug

<49.9
4.41
3.04
15.89
22.34
10.12
6.06
4.12
6.02
9.62
30.15
15.79
18.40
20.98
23.56
10.59

49.9-50.05
72.42
61.88
72.47
71.52
71.92
69.01
75.10
75.46
70.57
60.97
71.72
66.31
70.17
66.56
63.76

>50.05
23.17
35.08
11.64
6.14
17.96
24.93
20.78
18.52
19.81
8.88
12.49
15.29
8.85
9.88
25.65

16-Aug

7.06

80.39

12.55

17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
Max
Average

11.49
6.17
16.22
13.69
10.09
3.10
3.32
22.41
31.35
36.66
24.75
11.20
5.13
27.65
34.43
36.66
15.03

74.81
78.68
71.70
71.36
74.62
79.30
75.78
74.09
63.06
58.48
65.69
77.99
57.64
66.46
60.16
80.39
70.00

13.70
15.15
12.08
14.95
15.29
17.60
20.90
3.50
5.59
4.86
9.56
10.81
37.23
5.89
5.41
37.23
14.97

April'15

May'15

June'15

July'15

Aug'15

<49.9

14.93

15.82

9.29

10.64

15.03

49.9-50.05 (IEGC
Band)

60.20

64.74

65.01

70.29

70.00

>50.05

24.86

19.44

25.70

19.07

14.97

FVI

0.08

0.08

0.07

0.06

0.06

Voltage Profile (Important Nodes)-Aug15




Date

Indore

Itarsi

Karad

Dhule

Asoj

Kasor

Bhilai

Jetpur

              
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

420
421
419
420
420
421
417
420
419
417
418
419
421
420
420
419
416
415
415
416
416
417
416
416
417
415
417
416

409
407
404
405
405
407
406
406
408
405
404
407
407
406
410
406
405
403
403
400
403
401
406
402
402
400
400
401

417
417
414
416
416
418
413
416
418
414
416
417
420
419
421
417
415
416
416
416
416
417
415
413
413
412
413
411

406
403
402
403
403
404
403
403
404
402
402
406
405
405
408
405
404
403
403
398
402
401
403
397
399
397
399
400

437
437
433
435
435
437
435
434
436
435
437
435
437
438
438
436
434
431
431
431
436
434
435
433
434
430
432
434

416
412
413
414
414
414
414
414
415
410
413
412
415
414
420
414
410
408
408
404
409
411
410
410
411
408
407
410

439
437
432
434
434
431
437
436
439
433
433
436
436
436
440
434
435
432
432
430
434
433
435
432
433
432
432
435

408
405
400
401
401
400
410
411
412
406
401
407
409
410
416
406
405
401
401
398
401
400
403
400
402
396
392
403

421
421
420
419
419
418
416
417
415
416
415
415
420
418
419
420
418
416
416
416
416
416
416
416
416
415
417
417

405
405
402
405
405
405
405
403
407
408
403
403
405
406
413
407
405
403
403
401
403
402
406
402
402
399
398
402

419
419
420
420
420
417
417
416
423
421
415
410
415
417
416
418
417
417
417
416
416
417
416
415
415
416
416
417

408
408
406
408
408
408
408
406
412
411
406
410
407
408
412
407
407
407
407
405
406
406
408
406
408
403
402
406

422
422
421
422
422
421
419
416
416
420
417
421
419
422
424
420
420
418
418
419
419
419
419
417
417
417
417
418

412
410
413
414
414
413
412
416
413
413
410
413
413
411
416
413
413
411
411
410
409
410
411
406
408
407
408
411

417
417
416
414
414
412
412
411
410
409
406
408
408
408
408
408
408
408
408
409
407
410
408
408
405
409
406
404

403
399
401
403
403
402
400
397
395
385
388
390
385
395
396
398
393
396
396
394
394
388
391
389
382
384
381
384

419
416
412
421

409
402
402
400

417
414
410
421

406
401
399
397

438
433
433
438

411
410
413
404

432
429
429
440

409
400
397
392

420
420
416
421

409
405
404
398

417
418
415
423

411
406
406
402

422
421
418
424

413
412
412
406

405
405
401
417

391
382
386
381

#

%

#

Date

Bina

Gwalior

Nagda

Khandwa

Sipat

seoni

Gwalior

Bina

              
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

Max. Kv

Min. Kv

417
417
416
422
423
416
413
415
418
414
417
419
421
419
423
419
417
417
418
416
419
417
416
413
414
411
412
413

405
405
405
405
407
403
407
404
405
404
405
407
406
406
409
407
404
407
402
404
408
406
406
402
401
401
401
404

408
407
407
405
405
404
403
406
409
403
410
412
410
410
415
412
409
408
413
409
409
410
412
408
407
405
404
408

395
392
393
392
391
390
395
393
393
390
397
394
394
394
397
395
391
395
393
395
398
398
399
395
391
396
393
392

423
423
421
423
423
421
420
423
421
420
420
422
425
422
423
424
421
421
420
421
420
420
419
419
419
418
420
420

410
408
408
406
406
407
406
408
410
407
407
417
408
409
414
410
409
413
403
403
407
404
409
404
403
403
403
404

431
430
427
423
423
428
427
430
431
428
427
430
431
430
431
428
428
427
427
426
428
427
428
426
426
426
426
426

416
413
409
419
419
415
411
416
417
411
416
415
417
414
421
415
412
410
410
407
408
410
412
407
408
407
407
411

769
770
766
765
765
766
761
761
762
765
765
769
767
766
771
764
766
763
763
763
762
765
765
761
764
760
760
763

756
755
754
756
756
757
761
761
755
755
761
757
754
753
758
753
753
752
752
752
750
750
755
750
750
749
749
752

785
787
784
781
785
784
779
779
787
780
782
793
791
788
796
780
788
784
783
783
784
786
789
782
786
774
774
779

776
767
762
769
769
764
764
764
767
765
763
771
770
767
769
763
762
764
762
764
764
763
770
761
762
752
758
762

788
785
787
783
785
782
782
788
790
781
794
794
795
793
804
798
791
794
797
792
789
792
796
790
788
782
782
786

764
759
761
759
760
757
764
761
762
756
766
767
765
764
768
766
756
771
760
766
768
770
771
763
754
758
760
757

786
785
787
784
789
787
781
784
791
783
788
792
796
791
801
790
786
785
789
789
793
791
789
783
785
779
780
784

764
765
765
765
768
765
768
764
765
754
765
768
769
764
768
767
759
766
757
757
771
768
767
760
759
761
761
764

419
415
415
423

409
405
405
401

414
412
412
415

398
393
393
390

422
420
416
425

412
404
403
403

430
426
424
431

416
410
409
407

768
767
767
771

757
757
737
737

787
787
787
796

771
768
768
752

786
793
793
804

757
760
760
754

795
788
788
801

771
767
767
754

Commissioning of New Elements


a) GENERATING UNITS
SL.NO.

STATE/ISGS/IPP

NTPC

STATION
NAME
VSTPS Stage-V

CAPACITY
(MW)
500

Date of
Synchronization
06.08.15

UNIT
13

Date of
CoD
`

b) TRANSMISSION LINES
SL.NO.

CONSTITUENT

LINE NAME

CKT
NO

KV

DATE

Line
Length (in
Km)

Powergrid

Vindhyachal PS - Satna

II

765

09.08.15

237

Powergrid

Gwalior - Jaipur

765

11.08.15

306

Powergrid

Gwalior - Jaipur

II

765

11.08.15

311

Total

854

c) ICTS
SL.NO.

CONSTITUENT

STATION NAME

KV RATIO

CAPACITY
(MVA)

DATE

NIL

d)LINE REACTORS
SL.NO. CONSTITUENT

STATION
NAME

Line Name

KV

CAPACITY
(MVAR)

DATE

Power Grid

Jabalpur Pooling
Stn.

Jabalpur PSDharamjaigadh 3

765

240

15.08.15

Power Grid

Jabalpur Pooling
Stn

Jabalpur PS
Dharamjaigadh 4

765

240

15.08.15

e) BUS REACTORS
SL.NO. CONSTITUENT
1

Power Grid

STATION NAME

KV

CAPACITY
(MVAR)

DATE

Vindhyachal Pooling

765

240

22.08.15

Generation Outages:

DATE
1-Aug-15
2-Aug-15
3-Aug-15
4-Aug-15
5-Aug-15
6-Aug-15
7-Aug-15
8-Aug-15
9-Aug-15
10-Aug-15
11-Aug-15
12-Aug-15
13-Aug-15
14-Aug-15
15-Aug-15
16-Aug-15
17-Aug-15
18-Aug-15
19-Aug-15
20-Aug-15
21-Aug-15
22-Aug-15
23-Aug-15
24-Aug-15
25-Aug-15
26-Aug-15
27-Aug-15
28-Aug-15
29-Aug-15
30-Aug-15
31-Aug-15
MAX
AVG

PLANNED OUTAGE

FORCED OUTAGE

TOTAL OUTAGE-Aug'15

TOTAL OUTAGE-July'15

18891
17811
16576
16576
14871
15073
14330
14083
13213
12414
12414
12620
13345
14023
14683
14683
13504
13397
12799
12589
12779
13037
13037
12348
13369
13359
12452
12127
12337
12337
11615
18891
13764

15373
15195
15105
15890
16010
15250
14610
14280
15225
15845
15845
16256
13511
13301
14481
16376
16516
16346
15893
15703
16134
16581
15576
17291
14615
13713
13478
12460
13330
13055
12635
17291
15028

34264
33006
31681
32466
30881
30323
28940
28363
28438
28259
28259
28876
26856
27324
29164
31059
30020
29743
28692
28292
28913
29618
28613
29639
27984
27072
25930
24587
25667
25392
24250
34264
28793

30127
29605
28914
29514
30064
29889
30549
30839
29419
27961
28391
28318
26132
26064
27091
27074
27288
28192
26960
25740
27801
28692
29612
28285
29169
30819
30159
31894
33489
32553
33613
33613
29020

Generation of Western Region Aug 2015


Fuel Wise Generation(in Mus) of Western Region Aug 2015

Hydro Generation 2015-16-

Thermal Generation 2015-16

Neuclear Generation-

Renewables in WR-

Wind Generation:

Maximum Wind Generation 4661 MW on 5th Aug at 14:00 hrs.

Solar Generation:

Maximum Solar Generation 1017 MW on 31st Aug at 14:00 hrs.

WR constituent- Reservoir Level in feet


Madhya Pradesh

Gujarat

Maharashtra

Gandhi Sagar

Indira sagar

Ukai

Kadana

Koyna

Apr'15

1286.52

821.36

306.48

409.80

2106.80

May'15

1285.89

814.30

297.45

406.11

2082.90

Jun'15

1286.25

813.28

302.30

405.11

2107.90

Jul'15

1309.06

831.69

307.09

413.80

2129.50

Aug'15

1309.86

853.54

333.48

413.80

2141.50

Interregional Exchange of Western Region

REVISED AUFLS SETTING OF WR:


Western Region
Stage - I 49.2 Hz

States

Stage - II 49.0 Hz

Stage - III 48.8 Hz

Stage - IV 48.6 Hz

Implement Required Implement Required Implemen


Required Implemented Required
ed Load
Load
ed Load
Load
ted Load
Load relief Load relief Load relief
relief
relief
relief
relief
relief

GUJARAT

580

773

580

726

580

1117

590

1025

MADHYA PRADESH

460

468

460

450

460

460

465

490

CHATTISGARH

150

110

150

114

155

117

155

91

MAHARASHTRA

805

1122

810

1215

815

1044

820

1071

UT: DD

25
10

25
*

25
15

25
*

25
15

25
*

25
15

25
*

UT: DNH

30

30

35

35

2060

2497

2070

2530

2085

2763

2105

2702

GOA

Total load relief

* UFRs under procurement

DF/DT Scheme
DF/DT Scheme in Western Region
Stage - I 49.9/0.1 Hz/sec
Required
Load relief

STATE

Implemented
Load relief

MADHYA PRADESH
CHATTISGARH
MAHARASHTRA
**TPC
Total load re lie f

Required
Load relief

Implemented
Load relief

905

1454

361

475

355

27

120

37

546

370

621

965

82
2000

1006

GUJARAT

Stage - II 49.9/0.2 Hz/sec

60
2000

Stage - III 49.9/0.4 Hz/sec


Required
Load relief

Implemented
Load relief

1001

1610

415

392

445

40

120

40

1131

686

522

3040

273
2472

2617

* Gujarat changed the setting of 49.9/0.1Hz/sec to 49.9/0.2 Hz/sec as per discussion in 119th Protection Committee.
The other stage is set at 49.9 /0.3 Hz/sec - Total Load Relief 399 MW
** TPC -Load Relief of 931 MW at 49.9 Hz/0.5 Hz/sec

Progress of Ongoing Generation Projects in Western Region


Name of the Power Projects

Unit No.

Capacity
(MW)

Date
of
/Schedule Date

Commissioning

GUJARAT
SIKKA TPS EXT

250

Sept 2015

SIKKA TPS EXT

250

Dec 2015

CHHATTISGARH
Marwa

500

Dec 2015

Marwa

500

Dec 2015

MAHARASHTRA
CHANDRAPUR

500

September 2016

KORADI

660

Nov 2015

KORADI

10

660

March 2016

PARLI

250

Jan 2016

600

December 2015

600

December 2015

600

October 2015

CENTRAL SECTOR/IPP
Vindhyachal

13

500

Commissioned on 6th August 2015.

KSK

600

September 2015

KSK

600

December 2015

RKM

360

September 2015

RKM

360

December 2015

RKM

360

March 2016

MADHYA PRADESH
M/s Jhabua Power, Seoni
Moser Baer (Hindustan Power)
Essar Power MP Limited (Mahan)

Status of Ongoing Transmission Projects in Western Region


Sr.
No.

Constituents

Name of Transmission line

Length
in Ckt
Km

GETCO

400 kV D/C Mundra-Zerda line No.


1 (Package - I)

160.00

December-15

WIP(Work is in
progress)

GETCO

400 kV D/C Mundra-Zerda line No.


1 (Package - II)

190.00

December-15

WIP

GETCO

400 kV D/C Mundra-Zerda line No.


2 (Package - III)

314.00

December-15

WIP

GETCO

400 kV D/C Mundra-Zerda line No.


2

664.00

December-15

WIP

GETCO

400 kV D/C Vadinar-Amreli line


(Package I)

116.85

GETCO

400 kV D/C Vadinar-Amreli line


(Package II)

118.22

GETCO

400 kV D/C Vadinar-Amreli line


(Package III)

120.94

GETCO

400kV Mundra-Hadala LILO to


Halvad

89.40

GETCO

400 kV D/C Amreli-Kasor line(Part1)


(Amreli Gantry to AP-28)

160.95

10

GETCO

400 kV Charanka-Veloda

11

MPPTCL

Satpura TPH-Ashta 400 kV DCDS


Line

12

MSETCL

400 KV D/C line from Koradi-II to


Wardha S/S(PG)

13
14
15

MSETCL
MSETCL
MSETCL

LILO of 400 kV Korba(W)Khedamara at Marwa

17

CSPTCL

400 kV DCDS Raipur(Raita)Jagdalpur(DCDS)

18
19
20

21

CSPTCL
CSPTCL

400 KV D/C Aurangabad -Boisar


line (Quad)

POWERGRID

765kV S/C Gwalior- Jaipur(RVPN)


line 1st ckt & ckt-II.

WIP
December-15
WIP
December-15
WIP
December-15

Work in
progress

December-15

Ckt 1
commissioned
on 30th Mar 15.
Ckt 2 is
expected in
Sept 2015.
Work in
progress.

Aug-2015

239

December 2015
December 2015

Aug-16

October-15

Commissioned
on 13.06.2015

March-16

Nov-15

220 kV DCDS lines Chhuri to Mopka


(Bilaspur), (DCDS)
LILO of 220 kV Raigarh-Budipadar
at 400 kV PGCIL S/s Raigarh

POWERGRID

WIP
December-15

400 kV IEPL-Warora

CSPTCL

Remark

December-15

LILO of 400 kV Chandrapur-Parli at


Nanded
400 kV Bableshwar-Kudus D/C
(Quad)

16

Anticipated
completion
Target

Sept-15
700

300

Nov-15
Commissioned
on 11th Aug
2015

Sr.
No.

Constituents

22

POWERGRID

23

POWERGRID

24

POWERGRID

25

POWERGRID

26

Name of Transmission line

Length
in Ckt
Km

Anticipated
completion
Target

Remark

Dec-15

400 kV Navsari Kudus D/C Line


765 kV Wardha NizamabadHyderabad D/C
HVDC Raigarh(Kotra)-Pugalur
Bipole

Mar-16

Mar-16

765 kV Narendra-Kolhapur D/C

Dec-15

POWERGRID

765 kV Aurangabad(PG)Padghe(PG) D/C

Sept-15

27

POWERGRID

800 kV HVDC ChampaKurukshetra Bipole

Dec-15

28

POWERGRID

765 kV Aurangabad-Solapur D/C

Oct-15

29

STERLITE(JTCL)

765 kV Dhramjaygarh - Jabalpur


(JTCL)D/C line

Commissioned
12th Sept-15

30

STERLITE(JTCL)

400 kV Sujalpur-Kota (IR by RTCL)

Dec-15

OPEN ACCESS TRANSACTION DETAILS


WRLDC AS NODAL
1. CATEGORISED ON THE BASIS OF 'TRANSACTION TYPE'
No. of approvals
Day Ahead

Apr15
60

May15
50

Jun15
57

90

Aug15
127

Contingency

225

104

76

44

125

574
415

Jul-15

Sep15

Oct15

Nov15

Dec15

Jan16

Feb16

Mar16

TOTAL
384

FCFS

92

98

106

58

61

Advance

10

TOTAL

387

260

246

198

Day Ahead

Apr15
50.01

May15
13.41

Jun15
9.45

120.31

Aug15
71.33

Contingency

54.86

74.78

74.27

49.15

92.92

345.98
1441.29

38

320
0
0
0
Energy approved (MUs)

Jul-15

FCFS

283.94

307.58

501.56

174.66

173.54

Advance

358.72

159.57

168.64

405.15

449.53

TOTAL

747.53

555.34

753.92

749.28

787.33

Sep15

Oct15

Nov15

1411

Dec15

Jan16

Feb16

Mar16

TOTAL
264.52

1541.61
0.00

0.00

0.00

0.00

0.00

0.00

0.00

3593.39

Mar16

TOTAL

2. CATEGORISED ON THE BASIS OF INTRA/INTER REGIONAL TRANSACTIONS


No. of approvals
Intraregional
Interregional

TOTAL

Intraregional
Interregional
TOTAL

Apr15

May15

Jun15

Jul-15

Aug15

Sep15

Oct15

Nov15

284

170

168

107

210

939

103

90

78

91

110

472

387

260

246

198

Apr15

May15

Jun15

Jul-15

Aug15

548.94

306.23

611.10

596.13

700.95

2763.35

198.59

249.11

142.82

153.15

86.38

830.05

747.53

555.34

753.92

749.28

787.33

320
0
0
0
Energy Approved (MUs)
Sep15

0.00

Oct15

0.00

Nov15

0.00

Dec15

Jan16

Feb16

1411

Dec15

Jan16

Feb16

Mar16

TOTAL

0.00

0.00

0.00

0.00

3593.39

ANNEXURES

piScama xao~ ka carma Baar idna ko p`itGaMT a Baar vak


HOURLY DEMAND CURVES ON REGIONAL PEAK DAY 27.08.2015 AT 16:00 HRS

piScama xao~ WR

45,000

43754

44,000
43,000
MW

42,000
41,000
40,000
39,000
38,000
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

maharaYT MAHARASHTRA

20,000

18156

19,000

MW

18,000
17,000
16,000
15,000
14,000
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

gauj arat GUJARAT

14,300

14278

MW

13,300

12,300

11,300
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

maQya p`d So a MADHYA

8,400

7,400

PRADESH

MW

6839

6,400

5,400
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

piScama xao~ ka carma Baar idna ko p`itGaMT a Baar vak


HOURLY DEMAND CURVES ON REGIONAL PEAK DAY 27.08.2015 AT 16:00 HRS

Ci<asagaZ CHHATISGARH

3700

3200

MW

2796

2700

2200
1

9 10 11 12Hrs
13 14 15 16 17 18 19 20 21 22 23 24

gaaov aa GOA

450
400

MW

316

350
300
250
1

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

dadranagar hvaolaI DADRANAGAR

750

HAVALI

696
MW

700
650
600
1

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

idva AaOr dmaNa DIV DAMAN

325

291

MW

300
275
250
1

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

ESIL

440

382

390
MW

340
290
240
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

piScama xao~ ka nyua natma Baar idna ko p`i tGaMT a Baar vak
HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 05.08.2015 AT 04:00 HRS

piScama xao~ WR

38000
36000
34000

30647

MW

32000
30000
28000
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

maharaYT/ MAHARASHTRA

17000
16000

MW

15000
14000

12579

13000
12000
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

gauj arat GUJARAT

11400
10900
MW

10400
9900

8970

9400
8900
8400
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

maQya p`dSo a MADHYA PRADESH

6500

MW

5033

5500

4500
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

piScama xao~ ka nyua natma Baar idna ko p`i tGaMT a Baar vak
HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 28.07.2015 AT 04:00 HRS

Ci<asagaZ CHHATISGARH

4000
3500
MW

2682

3000
2500
2000
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

gaaovaa GOA

365

MW

315

232

265
215
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

dadranagar hvaolaI DADRANAGAR

720
670

HAVALI

MW

627

620
570
520

MW

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Hrs

idva AaOr dmaNa DIV DAMAN

350
300
250
200
150
100

259

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

400

ESIL

MW

350
265

300
250
200
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs

List of Grid Disturbances and Grid incidents (GD/GI) in Aug-2015: Western Region
Sr.
No.

Details of incident (Elements /


Generation Tripped)

Owner
Utility

Date

Time

CT burst at 220kV Malanpur

MPPTCL

18-Aug-15

17:25

CB Burst at 400kV Karad

MSETCL

28-Aug-15

16:11

Multiple tripping near 220kV


Satna (MP)

MPPTCL

20-Aug-15
19:01

Effect (Loss of
generation/
Load), if any
Load Loss :140
MW, Gen Loss:
NIL MW
Load Loss :NIL
MW, Gen Loss:
NIL MW
Load Loss :NIL
MW, Gen Loss:
NIL MW

Category as
per CEA Grid
Standards
GD-1

GI-2

GD-1

Generating Station Details in Western Region


CENTRAL SECTOR GENERATING STATIONS

TYPE

STATION

KSTPS
VSTPS
Sipat STPS-II
Mauda
NSPCL Bhilai TPP(*)
TOTAL Coal
KAWAS

Coal

GAS
GANDHAR
TOTAL GAS

NTPC
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
3x200+3x500+1x
500
2600
6x210+2x500+2x
500+3x500
4760
2X500+3X660
2980
2x500
1000
2x250
500
11840
4x106+2x116.1
656.20
3x144.3+1x224.4
9
657.39
1314

GRAND TOTAL

TYPE

13154
NPCIL
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
2x160+2x540
1400
2x220
440
1840

STATION
TAPS
KAPS
TOTAL NUCLEAR

NUCLEAR

EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
3x200+3x500+1x
500
2600
6x210+2x500+2x
500+3x500
4760
2X500+3X660
2980
2x500
1000
2x250
500
11840
4x106+2x116.1
656.20
3x144.3+1x224.4
9
657.39
1314
13154
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
2x160+2x540
1400
2x220
440
1840

CENTRAL SECTOR SUMMARY

TOTAL CENTRAL
SECTOR

Coal

11840

11840

GAS

1313.59

1313.59

1840

1840

14994

14994

NUCLEAR
GRAND TOTAL (CENTRAL SECTOR)

STATE SECTOR GENERATING STATIONS


GUJARAT

TYPE

STATION
UKAI
UKAI (LBCH)
KADANA
MADHUBAN DAM
KARJAN DAM
PANAM CANAL

HYDRO

SARDAR SAROVAR
TOTAL HYDRO
A.E.Co.(Torrent Power)
DHUVARAN
UKAI
GANDHI NAGAR
WANAKBORI
SIKKA
KUTCH LIGNITE
SURAT LIGNITE
AKRIMOTA

Coal

*CGPL
*Mundra(APL)
Hazira CPP Extn

16% of 1450
1x60+2x121+120
2x140+1*376
2x120+2x200+1x
210+ 1x500
2x120+3x210
7x210
2x120+1x250
2x70+2x75+1x68
4x125
2x125
**3x830 +1x830+
1x830
**4*330
+3*660+2*660
1x351

TOTAL
(MW)
300
5
240
5.6
3
2
232
787.6
422
656

UNITS
4x75
2x2.5
4x60
2*1.5+2.6
3
2x1
16% of 1450

2620
351

1x60+2x110+120
2x140+1*376
2x120+2x200+1x
210+ 1x500
2x120+3x210
7x210
2x120+1*250
2x70+2x75+1x68
4x125
2x125
**3x830 +1x830+
1x830
**4*330
+3*660+2*660
1x351

1350
870
1470
490
358
500
250
1971

TOTAL
(MW)
300
5
240
5.6
3
2
232
787.6
422
656
1350
870
1470
490
358
500
250
1971
2620
351

2x600

1200

2x600

1200

Pipavav CCPP- GPCL


& GSPC joint venture

1x350

350

1x350

350

1x382.5

382.5

1x382.5

382.5

TOTAL Coal
DHUVARAN
TORRENT POWER
UTRAN-I
UTRAN-II
GIPCL I
GIPCL II
ESSAR
GPEC
DGEN
GSEG HAZIRA
SUGEN
TOTAL GAS
Diesel
WIND+RES
TOTAL GUJARAT

UNITS
4x75
2x2.5
4x60
2*1.5+2.6
3
2x1

EFFECTIVE
CAPACITY

Essar Vadinar

UNO, Sugen

GAS

INSTALLED
CAPACITY

HYDRO
COAL
GAS

GRAND TOTAL (GUJARAT)

1x218.62
2X32.5+35.0(ST)
3x30+1x45
1X229+1X146(S
T)
3x32+49(ST)
111+54(ST)
3x110+1x185
(ST)
3x138+1x241(ST)
3x400
2x52+1x52.1 (ST)
3X382.5

13240.5
218.62
100
144
375
145
165
515
655
1200
156.1
1147.5

1x218.62
2X32.5+35(ST)
3x33+1x45
1X229+1X146(S
T)
3x32+49
111+54
3x110+1x185
(ST)
3x138+1x241(ST)
3x400
2x52+1x52.1 (ST)
3X382.5

13240.5
218.62
100
144
375
145
165
515
655
1200
156.1
1147.5

4821
17.48
4802
787.6
13240.5
4821.22

4821
17.48
4802
787.6
13240.5
4821.22

23669

23669

MADHYA PRADESH
TYPE

STATION
GANDHI NAGAR
R P SAGAR
J SAGAR
PENCH SHARE
BANASAGAR TONS
BARGI
BANASAGAR
HYDRO
BIRSINGHPUR
RAJGHAT
INDIRA SAGAR
MADHIKHEDA HEP
MINI & MICRO
HYDRO
Omkareswar Hydro
SARDAR SAROVAR
TOTAL HYDRO
AMARKANTAK
SATPURA-II
SATPURA-III & IV
S GANDHI TPS I & II
S GANDHI TPS III
Jaypee Bina
Coal
*SASAN (Unit 1-5)
Jayprakash Nigrie(IPP)
SSTP(Shri Singhaji
Thermal Power Station)
M B Power
TOTAL THERMAL

INSTALLED CAPACITY
TOTAL
UNITS
(MW)
5x23 (50%)
57.5
4x43 (50%)
86
3x33 (50%)
49.5
2x80 (66.67%)
106.672
3x105
315
2x45
90
2x15+3x20+2x10
110
1x20
20
3x15(50%)
22.5
8x125
1000
3X20
60
13.5
8x65
57% of 1450
2X120+1X210
1x200+1x210
2x210+2x250
4x210
1x500
2x250
**6x660
2x660

13.5
520
826.5
3277
450
410
920
840
500
500
1485
1320

2X120+1X210
1x200+1x210
2x210+2x250
4x210
1x500
2x250
**6x660
2x660

13.5
520
826.5
3277
450
410
920
840
500
500
1485
1320

2x600

1200

2x600

1200

1x600

600

1x600

600

STATION

HASDEO BANGO
Gangrel
HYDRO

Coal

3.25
8x65
57% of 1450

7625
0
1670
3277
7625
12573

Diesel
RES
HYDRO
TOTAL MADHYA
PRADESH
THERMAL
GRAND TOTAL (MADHYA PRADESH)
TYPE

EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
5x23 (50%)
57.5
4x43 (50%)
86
3x33 (50%)
49.5
2x80 (66.67%)
106.672
3x105
315
2x45
90
2x15+3x20+2x10
110
1x20
20
3X15(50%)
22.5
8x125
1000
3X20
60

CHHATISGARH
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
3x40
120
4x2.5
10

Korba West Mini Micro


Hydel
Sikasar
TOTAL HYDRO
KORBA (E)
KORBA (W)
KORBA (E) ext-I
Korba West Power
Corp. Ltd. (IPP)
JINDAL Stage I, IPP
JINDAL(JSPL
TPP)unit3
LANCO-Amarkantak
SVPL TPP

8225
0
1670
3277
8225
13173
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
3x40
120
4x2.5
10

1x1.7

1.7

1x1.7

1.7

2x3.5

2x3.5

4x50+2x120
4x210+1x500
2x250

7
138.7
440
1340
500

4X50+2X120
4x210+1x500
2x250

7
138.7
440
1340
500

2x600
4x250

1200
1000

2x600
4x250

1200
1000

1x135
2x300
1x63

135
600
63

1x135
2x300
1x63

135
600
63

Spectrum Coal Private


Ltd.
ESSAR Mahan
GMR-Chhatisgarh
Energy Ltd
ACBIL,IPP
KSK
Mahanadi,IPP(Unit 1
and Unit 4)
Vandana Vidyut,IPP
DB Power,IPP
JPL Stage II,IPP
Balco
RKM Powergrn ltd
Marwa TPS
TOTAL THERMAL
HYDRO
CHHATTISGARH
TOTAL
THERMAL
Diesel
RES+Wind

HYDRO

1x50

1x600

50
600

1x600

50
600

2x685
2x135+2*30

1370
330

2x685
2x135+2*30

1370
330

2x600
1x135
2x600
4x600
1x300
1x360
1x500

1200
135
1200
2400
300
360
500
13723
138.7
13723
0

2x600
1x135
2x600
4x600
1x300
1x360
1x500

1200
135
1200
2400
300
360
500
13723
138.7
13723
0

327

GRAND TOTAL (CHHATISGARH)


TYPE

1x50

14189
MAHARASHTRA
INSTALLED CAPACITY
STATION
TOTAL
UNITS
(MW)
4x(65+5)+4x(75+
KOYNA I & II
5)
600
KOYNA III
4x80
320
KOYNA DPH
2x20
40
KOYNA IV
4x250
1000
96
KHOPOLI
1 TO 8
75
BHIVPURI
1 TO 5
150
BHIRA
6x25
150
BHIRA PSS
1x150
VAITHARNA
1x60
60
ELDARI
3x7.5
22.5
VEER & BHATGAR
2x4.5+1x16
25
PAITHAN
1x12
12
TILLARI
1x66
66
RADHANAGRI
4x1.2
4.8
BHIRA T/R
2x40
80
BHANDARDHARA
1 &2
46
DUDHGANGA
2x12
24
PENCH DRAWAL
2x80 (33.33%)
53.328
PAWANA
1x10
10
BHATSA
1x15
15
DHOM
2x1
2
KANHAR
1x4
4
MANIKDOH
1x6
6
UJJANI
1x12
12
DIMBHE
1x5
5
SURYA
1X6+1X0.75
6.75
PANSHET
1x8
8
VARASGAON
1x8
8
WARNA
2x8
16
YEOTESHWAR
1x0.08
0.08
TERWANMEDHE
1x0.2
0.2

327
14189
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
4x(65+5)+4x(75+
5)
600
4x80
320
2X18
36
4x250
1000
96
1 TO 8
75
1 TO 5
150
6x25
150
1x150
1x60
60
3x7.5
22.5
2x4.5+1x16
25
1x12
12
1x66
66
4x1.2
4.8
2x40
80
1 &2
46
2x12
24
2x80 (33.33%)
53.328
1x10
10
1x15
15
2x1
2
1x4
4
1x6
6
1x12
12
1x5
5
1x0.75+1x6
6.75
1x8
8
1x8
8
2x8
16
1x0.08
0.08
1x0.2
0.2

GHATGHAR
SARDAR SAROVAR
TOTAL HYDRO
CHANDRAPUR
CHANDRAPUR
Extension
TROMBAY
KORADI
KORADI
NASIK
KHAPERKHEDA

Coal

GAS

PARLI
BHUSAWAL
REL DAHANU
PARAS
NEW PARLI
JSW Ratnagiri(Jaigad)
Mihan TPP(Abhijit)
Wardha Warora Power
Co Ltd.
Vidharbha Industry,
Butibori
APML,Tiroda-Ph-I(400
kV)
APML,Tiroda-Ph-II(
765 kV)
IEPL (Ideal Energy
Power Ltd, Belapur)
IBL (India Bulls
Limited, Amravati)
EMCO
Indrajeet
Indorama
Finolex, Ratnagiri
JSW Boisar, Vashi
Circle
Uttam Galwa
Gupta Energy ltd
Topworth Urja
Ultratech Cement ltd.
Vayunandana Power ltd
Dhariwal-I& II (STU)
Ratan India Pvt Ltd.
TOTAL COAL
TROMBAY-7A & 7B
URAN (G)
URAN-DPH
RATNAGIRI PHASE I
RATNAGIRI PHASE II
RATNAGIRI PHASEIII
TOTAL GAS

2x125

250

2x125

250

27% of 1450

391.5
3559
2840

27% of 1450

391.5
3555
2840

4x210+4x500
1x500
1x150+2x500+1X
250
1x200+2x210
2x660
3x210
4x210+1x500
2x0+3x210+2x25
0
2x210+ 2x500
2x250
2x250
2x250
4x300
4x62.5

500

4x210+4x500

1130
1420
500
500
500
1200
246

1x500
1x150+2x500+1X
250
1x200+2x210
2x660
3x210
4x210 +1x500
2x0+3x210+2x25
0
2x210+ 2x500
2x250
2x250
2x250
4x300
4x62.5

4x135

540

4x135

540

2x300

600

2x300

600

3x660

1980

3x660

1980

2x660

1320

2x660

1320

1x270

270

1x270

270

2x270

540

2x270

540

2x300
1x77
1x49
1x43

600
77
49
43

2x300
1x77
1x49
1x43

600
77
49
43

1x37.6
1x60
1x120
1x30
1x46
1x10
2x300
5x270

1x37.6
1x60
1x120
1x30
1x46
1x10
2x300
5x270

120+60
4x108
2x120

37.6
60
120
30
46
10
600
1350
22418.6
180
432
240

120+60
4x108
2x120

37.6
60
120
30
46
10
600
1350
22418.6
180
432
240

2x205+1x230

640

2x205+1x230

640

2x213 + 237.54

663.54

2x213 + 237.54

663.54

2x213 + 237.55

663.54
2819

2x213 + 237.55

663.54
2819

1400
620
1320
630
1340

500
1400
620
1320
630
1340
1130
1420
500
500
500
1200
246

Diesel
WIND+RES
MAHARASHTRA

Diesel
WIND+RES
HYDRO
COAL
GAS
WIND+RES

GRAND TOTAL
(MAHARASHTRA)

0
6206
3559
22418.6
2819.08
5630

0
6206
3555
22418.6
2819.08
5630

34427

34423

GOA
TYPE

STATION

Diesel
RES
GAS

RELIANCE,
SALGAONKAR
GRAND TOTAL (GOA)

INSTALLED CAPACITY
TOTAL
UNITS
(MW)
0
30

EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
0
30

1x39.82+1x8.2

1x39.82+1x8.2

48.02
78

48.02
78

**Total 6 units of 660 MW each are installed at SASAN but only 37.5% of 3960 MW is allocated to MP in Western
Region.
** CGPL have 47.5 % (1971 MW) share to Gujarat and 20% (830 MW) share to Maharashtra out of total installed
capacity 4150 MW.
** APL have 2000 MW share to Gujarat out of total installed capacity 2640 MW.