*HIGHLIGHTS OF WR GRID
*SUMMARY
SUMMARY REPORT
INSTALLED CAPACITY
POWER SUPPLY POSITION
FREQUENCY PROFILE
VOLTAGE PROFILE
ADDITION OF NEW ELEMENTS
a) GENERATING UNITS
b) TRANSMISSION LINES
c) LINE /BUS REACTORS AND ICTS
SCHEDULE Vs DRAWAL
UNIT OUTAGES
GENERATION
RESERVOIR LEVEL IN FEET
INTERREGIONAL EXCHANGE
REVISED AUFLS SCHEME
PROGRESS OF NEW GENERATION AND TRANSMISSION PROJECTS
OPEN ACCESS TRANSACTIONS
* ANNEXURES
ANNEXURES
Unrestricted Demand: The maximum unrestricted Demand was 43996 MW at 16:00 Hrs on 27th
Aug15 which was 3.41% more as compared to last year (42544 MW). Average peak unrestricted
demand was 37921 MW which was 8.71% more than the last year Aug14 (34844 MW).
(ii)
Peak Demand Met: The Maximum Peak Demand of 43754 MW was observed at 16:00hrs on
27.08.2015. It was 9.21 % more as compared to Aug14 (40063 MW) & 2.34% less as compared to
July15 (44803 MW at 15:00hrs on 15.07.2015). Average peak demand met (37819 MW)
increased by 9.97 % as compared to the last year Aug14 (34390 MW).
(iii)
Total Energy Consumption was 28138 MUs in the month of Aug at the average of 908 MUs/day &
Maximum was 995 MUs on 27.08.15. In the month of July, the total energy consumption was at
the average of 913 MUs/day & Maximum was 1032 MUs on 15.07.15.
(iv)
Total Energy requirement was 28213 MUs in the month at the average of 910 MUs/day &
Maximum was 997MUs on 27.08.2015. Compared to last year average energy requirement
increased by 8.71%.
Frequency Profile:
Voltage Profile: Voltage profile during the month of August was in the IEGC band at most of the
System frequency was in IEGC band (49.9 50.05 Hz) for 70.00 % of time
against 70.29 % of the time in the last month. Maximum frequency of 50.25 Hz was observed on 23rd
Aug at 17:06 hrs. Minimum frequency of 49.55 Hz was observed on 3rd Aug at 19:27 hrs due to O/D by
West Bengal, Bihar, DVC, and Gujarat. The Average frequency of the grid was 49.98 Hz in the month.
Frequency remained in 80.39 % of time (so far highest) in IEGC band on 16th Aug 2015. Frequency
Variation Index for August15 was 0.06.
400 KV and 765 KV nodes of WR. Highest voltage was observed at Dhule 440 KV on 15.08.2015. High
voltage nodes of WR were Karad, Dhule, Kolhapur, Bhadravati, Kasor, Nagda and Khandwa.
500 MW unit at VSTPS stage-V was first time synchronized on 06.08.15. Total 1400 MW
capacity synchronized from April15 to Aug15 in WR Grid.
Total 854 ckt Km added into the grid. There was total 2776 ckt Km of transmission lines added
in WR grid from April15 to Aug15.
Hydro Generation:
Wind Generation:
Total hydro generation of 1372 MUs was generated at the average of 44.25
MUs/day. Hydro generation increased by 85 % compared to last month (741.81 MUs).
Total wind generation in the month was 1596 MUs at the average of 51.48
MUs/day. Wind Generation was decreased by 37.55% compared to last month (2556 Mus). Maximum
wind generation was 4661 MW at 14:00 hrs on 5th Aug 2015.
Solar Generation:
average of 6.46 MUs/day compared to 183 MUs in last month (average of 5.90 Mus/day). Maximum
solar generation was 1017 MW at 14:00 hrs on 31st Aug 2015.
INSTALLED CAPACITY OF WR
idnaaMk 31.08.2015 kao rajyaanausaar saMsqaaipt xamata
INSTALLED GENERATION CAPCITY OF THE STATES INCLUDING SHARES AS ON 31.08.2015
(All fig. in M W)
State
Gujarat
Madhya Pradesh
O wne rship
Hydro
C oal
Gas
Nuclear
Total
Diesel
772.00
4720.00
2321.82
0.00
7813.82
0.00
Private
0.00
8642.00
4060.00
0.00 12702.00
Central(firm allo)
State
3725.31
0.00
0.00
3725.31
772
16104
6806
559
24241
4802
29044
State
1703.66
0.00
1520.00
3223.66
4320.00
4550.00
2384.25
11254.25
0.00
0.00
257.18
257.18
0.00
83.96
0.00 1586.38
0.00
0.00
0.00 1670.34
6107.62
6136.38
4434.67
16678.67
120.00
2780.00
0.00
0.00
2900.00
0.00
11.05
2911.05
0.00
0.00
8923.00
1530.69
0.00
0.00
0.00
47.52
8923.00
1578.21
0.00
0.00
316.13
0.00
9239.13
1578.21
T otal
120.00
13233.69
0.00
47.52 13401.21
0.00
327.18
13728.39
State
2884.84
9560.00
672.00
0.00 13116.84
0.00
208.13
13324.97
447.00
11796.00
180.00
0.00 12423.00
0.00 5997.52
18420.52
0.00
3331.84
3462.16
24818.16
2623.93
3475.93
690.14 6776.23
690.14 32316.07
0.00
0.00
0.00 6205.65
6776.23
38521.72
State
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
Private
0.00
0.00
48.00
0.00
48.00
0.00
0.00
48.00
Central(firm allo)
0.00
0.00
331.35
331.35
0.00
48.00
25.80
25.80
357.15
405.15
0.00
0.00
0.00
0.05
357.15
405.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.58
40.58
0.00
0.00
0.00
4.20
4.20
0.00
0.00
0.00
7.38
7.38
0.00
0.00
0.00
52.16
52.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.16
52.16
0.00
0.00
0.00
0.00
49.92
0.00
27.10
0.00
8.46
0.00
85.48
0.00
0.00
0.00
0.00
0.00
85.48
T otal
0.00
49.92
27.10
8.46
85.48
0.00
0.00
85.48
State
5480.50
21380.00
2993.82
0.00 29854.32
0.00
481.24
30335.56
447.00
33911.00
4288.00
0.00 38646.00
0.00 10789.83
49435.83
1840.00 18808.95
0.00
0.00
18808.95
State
Private
Central(firm allo)
T otal
T otal
State
Private
Central(firm allo)
T otal
State
Private
Central(firm allo)
WR
17496.40
559.32
Central(firm allo)
DNH
0.00 4794.40
424.27
Private
DD
7821.82
2741.72
T otal
Goa
8.00
0.00
Central(firm allo)
Maharashtra
Total
T otal
Private
Chhattisgarh
RES
Private
Central(firm allo)*
0.00 6023.66
0.00 4550.00
273.24 4434.67
273.24 15008.33
1697.35
11738.01
3533.59
Unallocated
0.00
1697.35
196.91
228.14
2122.40
0.00
0.00
2122.40
T otal
7625
67029
10815
1840
87309
11271
100638
Shortage
(%)
April'15 to Aug'15
Requirement Availability Shortage (%)
(MUs)
(MUs)
Gujarat
8457
8448
0.11
42869
42847
0.05
Madhya
Pradesh
4370
4463
-2.11
21948
22050
-0.46
Chattisgarh
2433
2389
1.83
11780
11617
1.38
Maharashtra
11798
11776
0.19
60742
60533
0.34
Goa
250
220
11.83
1324
1294
2.30
D&D
198
198
0.00
974
974
0.00
DNH
489
487
0.40
2438
2431
0.31
ESIL
198
197
0.43
1222
1222
0.00
28193
28177
0.06
143298
142969
0.23
Western
Region
Shortage
(%)
April'15 to Aug'15
Requirement Availability Shortage (%)
(MW)
(MW)
14901
14870
0.21
14912
14886
0.17
7750
7743
0.09
7750
7743
0.09
3784
3656
3.38
3943
3832
2.82
19075
18951
0.65
20428
20265
0.80
Goa
422
393
6.87
507
477
5.92
D&D
304
304
0.00
304
304
0.00
DNH
719
719
0.00
745
745
0.00
ESIL
466
466
0.00
597
597
0.00
43996
43754
0.55
45506
45208
0.65
Gujarat
Madhya
Pradesh
Chattisgarh
Maharashtra
Western
**Region
Requirement (MW)
Aug'15
Availability (MW)
Shortage (%)
Gujarat
0.21
Madhya
Pradesh
0.09
3.38
0.65
Goa
6.87
D&D
0.00
DNH
0.00
ESIL
0.00
0.55
Chattisgarh
Maharashtra
Western
**Region
2015
State
idva dmaNa DD
pMjaIkRt Registered
dadra nagar hvaol aI DNH
pMjaIkRt Registered
gaaov aa GOA
pMjaIkRt Registered
AsaIimat Unrestricted
[esaAayaela ESIL
pMjaIkRt Registered
gauj arat GUJARAT
pMjaIkRt Registered
AsaIimat Unrestricted
Catered
Date
Time
Freq.
304
304
28.08.15
16:00:00
49.96
719
719
13.08.15
12:00:00
49.92
393
393
17.08.15
15:00:00
49.89
385
35.00
1.62
0.00
422
25.08.15
20:00:00
49.88
466
466
09.08.15
08:00:00
50.02
14870
14870
28.08.15
15:00:00
49.94
14870
31.23
14901
28.08.15
15:00:00
49.94
pMjaIkRt Registered
3656
3656
24.08.15
19:00:00
49.93
AsaIimat Unrestricted
3219
546.2
19.15
3784
24.08.15
20:00:00
49.83
pMjaIkRt Registered
7743
7743
27.08.15
19:45:00
50.00
AsaIimat Unrestricted
7739
0.00
11.37
7750
26.08.15
20:30:00
49.95
pMjaIkRt Registered
18951
18951
26.08.15
12:00:00
49.86
AsaIimat Unrestricted
18951
31
92.86
19075
26.08.15
12:00:00
49.86
43754
43754
27.08.15
16:00:00
49.86
AsaIimat Unrestricted
43754
28
214
43996
27.08.15
16:00:00
49.86
C<aIsagaZ ra.iva
- hhattisgarh
ra iva.baao
iva baaoD C
maharaYT/ ra.iva
ra iva.baao
iva baaoD MAHARASHTRA
Shortage
0.99%
0.65%
1.27%
1.42%
0.55%
1.60%
1.40%
45500
1.20%
45000
1.00%
44500
MW
0.80%
44000
0.60%
43500
0.40%
43000
42500
Unrest. Dmd (MW)
Demand Met (MW)
Shortage
0.20%
Apr'15
45114
44668
0.99%
May'15
45506
45208
0.65%
Jun'15
44298
43735
1.27%
Jul'15
45448
44803
1.42%
Aug'15
43996
43754
0.55%
0.00%
Demand Met
Aug-15
Jul-15
Aug-14
% Change w.r.t
last month
% Change w.r.t
last Year
Average
37819
38138
34390
-0.84
9.97
Max
Date when
Max.
43754
44803
40063
-2.34
9.21
27-Aug-15
15-Jul-15
21-Aug-14
Energy
Consumption
MU/Day
Aug-15
Jul-15
Aug-14
% Change w.r.t
last month
% Change
w.r.t last
Year
Average
908
913
825
-0.57
9.97
Max
995
1032
909
-3.58
9.49
Date
27-Aug-15
15-Jul-15
21-Aug-14
Energy ChartMonth
Requirement
Availibilty
Shortage
Apr'15
29026
28946
0.28%
May'15
30676
30594
0.27%
Jun'15
26909
26851
0.21%
Jul'15
28495
28397
0.34%
Aug'15
28213
28138
0.27%
0.40%
30000
0.30%
29000
0.20%
Mus
28000
27000
26000
0.10%
25000
24000
Requirement
Availibilty
Shortage
Apr'15
29026
28946
0.28%
May'15
30676
30594
0.27%
Jun'15
26909
26851
0.21%
Jul'15
28495
28397
0.34%
Aug'15
28213
28138
0.27%
0.00%
<49.9
4.41
3.04
15.89
22.34
10.12
6.06
4.12
6.02
9.62
30.15
15.79
18.40
20.98
23.56
10.59
49.9-50.05
72.42
61.88
72.47
71.52
71.92
69.01
75.10
75.46
70.57
60.97
71.72
66.31
70.17
66.56
63.76
>50.05
23.17
35.08
11.64
6.14
17.96
24.93
20.78
18.52
19.81
8.88
12.49
15.29
8.85
9.88
25.65
16-Aug
7.06
80.39
12.55
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
Max
Average
11.49
6.17
16.22
13.69
10.09
3.10
3.32
22.41
31.35
36.66
24.75
11.20
5.13
27.65
34.43
36.66
15.03
74.81
78.68
71.70
71.36
74.62
79.30
75.78
74.09
63.06
58.48
65.69
77.99
57.64
66.46
60.16
80.39
70.00
13.70
15.15
12.08
14.95
15.29
17.60
20.90
3.50
5.59
4.86
9.56
10.81
37.23
5.89
5.41
37.23
14.97
April'15
May'15
June'15
July'15
Aug'15
<49.9
14.93
15.82
9.29
10.64
15.03
49.9-50.05 (IEGC
Band)
60.20
64.74
65.01
70.29
70.00
>50.05
24.86
19.44
25.70
19.07
14.97
FVI
0.08
0.08
0.07
0.06
0.06
Date
Indore
Itarsi
Karad
Dhule
Asoj
Kasor
Bhilai
Jetpur
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
420
421
419
420
420
421
417
420
419
417
418
419
421
420
420
419
416
415
415
416
416
417
416
416
417
415
417
416
409
407
404
405
405
407
406
406
408
405
404
407
407
406
410
406
405
403
403
400
403
401
406
402
402
400
400
401
417
417
414
416
416
418
413
416
418
414
416
417
420
419
421
417
415
416
416
416
416
417
415
413
413
412
413
411
406
403
402
403
403
404
403
403
404
402
402
406
405
405
408
405
404
403
403
398
402
401
403
397
399
397
399
400
437
437
433
435
435
437
435
434
436
435
437
435
437
438
438
436
434
431
431
431
436
434
435
433
434
430
432
434
416
412
413
414
414
414
414
414
415
410
413
412
415
414
420
414
410
408
408
404
409
411
410
410
411
408
407
410
439
437
432
434
434
431
437
436
439
433
433
436
436
436
440
434
435
432
432
430
434
433
435
432
433
432
432
435
408
405
400
401
401
400
410
411
412
406
401
407
409
410
416
406
405
401
401
398
401
400
403
400
402
396
392
403
421
421
420
419
419
418
416
417
415
416
415
415
420
418
419
420
418
416
416
416
416
416
416
416
416
415
417
417
405
405
402
405
405
405
405
403
407
408
403
403
405
406
413
407
405
403
403
401
403
402
406
402
402
399
398
402
419
419
420
420
420
417
417
416
423
421
415
410
415
417
416
418
417
417
417
416
416
417
416
415
415
416
416
417
408
408
406
408
408
408
408
406
412
411
406
410
407
408
412
407
407
407
407
405
406
406
408
406
408
403
402
406
422
422
421
422
422
421
419
416
416
420
417
421
419
422
424
420
420
418
418
419
419
419
419
417
417
417
417
418
412
410
413
414
414
413
412
416
413
413
410
413
413
411
416
413
413
411
411
410
409
410
411
406
408
407
408
411
417
417
416
414
414
412
412
411
410
409
406
408
408
408
408
408
408
408
408
409
407
410
408
408
405
409
406
404
403
399
401
403
403
402
400
397
395
385
388
390
385
395
396
398
393
396
396
394
394
388
391
389
382
384
381
384
419
416
412
421
409
402
402
400
417
414
410
421
406
401
399
397
438
433
433
438
411
410
413
404
432
429
429
440
409
400
397
392
420
420
416
421
409
405
404
398
417
418
415
423
411
406
406
402
422
421
418
424
413
412
412
406
405
405
401
417
391
382
386
381
#
%
#
Date
Bina
Gwalior
Nagda
Khandwa
Sipat
seoni
Gwalior
Bina
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
417
417
416
422
423
416
413
415
418
414
417
419
421
419
423
419
417
417
418
416
419
417
416
413
414
411
412
413
405
405
405
405
407
403
407
404
405
404
405
407
406
406
409
407
404
407
402
404
408
406
406
402
401
401
401
404
408
407
407
405
405
404
403
406
409
403
410
412
410
410
415
412
409
408
413
409
409
410
412
408
407
405
404
408
395
392
393
392
391
390
395
393
393
390
397
394
394
394
397
395
391
395
393
395
398
398
399
395
391
396
393
392
423
423
421
423
423
421
420
423
421
420
420
422
425
422
423
424
421
421
420
421
420
420
419
419
419
418
420
420
410
408
408
406
406
407
406
408
410
407
407
417
408
409
414
410
409
413
403
403
407
404
409
404
403
403
403
404
431
430
427
423
423
428
427
430
431
428
427
430
431
430
431
428
428
427
427
426
428
427
428
426
426
426
426
426
416
413
409
419
419
415
411
416
417
411
416
415
417
414
421
415
412
410
410
407
408
410
412
407
408
407
407
411
769
770
766
765
765
766
761
761
762
765
765
769
767
766
771
764
766
763
763
763
762
765
765
761
764
760
760
763
756
755
754
756
756
757
761
761
755
755
761
757
754
753
758
753
753
752
752
752
750
750
755
750
750
749
749
752
785
787
784
781
785
784
779
779
787
780
782
793
791
788
796
780
788
784
783
783
784
786
789
782
786
774
774
779
776
767
762
769
769
764
764
764
767
765
763
771
770
767
769
763
762
764
762
764
764
763
770
761
762
752
758
762
788
785
787
783
785
782
782
788
790
781
794
794
795
793
804
798
791
794
797
792
789
792
796
790
788
782
782
786
764
759
761
759
760
757
764
761
762
756
766
767
765
764
768
766
756
771
760
766
768
770
771
763
754
758
760
757
786
785
787
784
789
787
781
784
791
783
788
792
796
791
801
790
786
785
789
789
793
791
789
783
785
779
780
784
764
765
765
765
768
765
768
764
765
754
765
768
769
764
768
767
759
766
757
757
771
768
767
760
759
761
761
764
419
415
415
423
409
405
405
401
414
412
412
415
398
393
393
390
422
420
416
425
412
404
403
403
430
426
424
431
416
410
409
407
768
767
767
771
757
757
737
737
787
787
787
796
771
768
768
752
786
793
793
804
757
760
760
754
795
788
788
801
771
767
767
754
STATE/ISGS/IPP
NTPC
STATION
NAME
VSTPS Stage-V
CAPACITY
(MW)
500
Date of
Synchronization
06.08.15
UNIT
13
Date of
CoD
`
b) TRANSMISSION LINES
SL.NO.
CONSTITUENT
LINE NAME
CKT
NO
KV
DATE
Line
Length (in
Km)
Powergrid
Vindhyachal PS - Satna
II
765
09.08.15
237
Powergrid
Gwalior - Jaipur
765
11.08.15
306
Powergrid
Gwalior - Jaipur
II
765
11.08.15
311
Total
854
c) ICTS
SL.NO.
CONSTITUENT
STATION NAME
KV RATIO
CAPACITY
(MVA)
DATE
NIL
d)LINE REACTORS
SL.NO. CONSTITUENT
STATION
NAME
Line Name
KV
CAPACITY
(MVAR)
DATE
Power Grid
Jabalpur Pooling
Stn.
Jabalpur PSDharamjaigadh 3
765
240
15.08.15
Power Grid
Jabalpur Pooling
Stn
Jabalpur PS
Dharamjaigadh 4
765
240
15.08.15
e) BUS REACTORS
SL.NO. CONSTITUENT
1
Power Grid
STATION NAME
KV
CAPACITY
(MVAR)
DATE
Vindhyachal Pooling
765
240
22.08.15
Generation Outages:
DATE
1-Aug-15
2-Aug-15
3-Aug-15
4-Aug-15
5-Aug-15
6-Aug-15
7-Aug-15
8-Aug-15
9-Aug-15
10-Aug-15
11-Aug-15
12-Aug-15
13-Aug-15
14-Aug-15
15-Aug-15
16-Aug-15
17-Aug-15
18-Aug-15
19-Aug-15
20-Aug-15
21-Aug-15
22-Aug-15
23-Aug-15
24-Aug-15
25-Aug-15
26-Aug-15
27-Aug-15
28-Aug-15
29-Aug-15
30-Aug-15
31-Aug-15
MAX
AVG
PLANNED OUTAGE
FORCED OUTAGE
TOTAL OUTAGE-Aug'15
TOTAL OUTAGE-July'15
18891
17811
16576
16576
14871
15073
14330
14083
13213
12414
12414
12620
13345
14023
14683
14683
13504
13397
12799
12589
12779
13037
13037
12348
13369
13359
12452
12127
12337
12337
11615
18891
13764
15373
15195
15105
15890
16010
15250
14610
14280
15225
15845
15845
16256
13511
13301
14481
16376
16516
16346
15893
15703
16134
16581
15576
17291
14615
13713
13478
12460
13330
13055
12635
17291
15028
34264
33006
31681
32466
30881
30323
28940
28363
28438
28259
28259
28876
26856
27324
29164
31059
30020
29743
28692
28292
28913
29618
28613
29639
27984
27072
25930
24587
25667
25392
24250
34264
28793
30127
29605
28914
29514
30064
29889
30549
30839
29419
27961
28391
28318
26132
26064
27091
27074
27288
28192
26960
25740
27801
28692
29612
28285
29169
30819
30159
31894
33489
32553
33613
33613
29020
Neuclear Generation-
Renewables in WR-
Wind Generation:
Solar Generation:
Gujarat
Maharashtra
Gandhi Sagar
Indira sagar
Ukai
Kadana
Koyna
Apr'15
1286.52
821.36
306.48
409.80
2106.80
May'15
1285.89
814.30
297.45
406.11
2082.90
Jun'15
1286.25
813.28
302.30
405.11
2107.90
Jul'15
1309.06
831.69
307.09
413.80
2129.50
Aug'15
1309.86
853.54
333.48
413.80
2141.50
States
Stage - II 49.0 Hz
Stage - IV 48.6 Hz
GUJARAT
580
773
580
726
580
1117
590
1025
MADHYA PRADESH
460
468
460
450
460
460
465
490
CHATTISGARH
150
110
150
114
155
117
155
91
MAHARASHTRA
805
1122
810
1215
815
1044
820
1071
UT: DD
25
10
25
*
25
15
25
*
25
15
25
*
25
15
25
*
UT: DNH
30
30
35
35
2060
2497
2070
2530
2085
2763
2105
2702
GOA
DF/DT Scheme
DF/DT Scheme in Western Region
Stage - I 49.9/0.1 Hz/sec
Required
Load relief
STATE
Implemented
Load relief
MADHYA PRADESH
CHATTISGARH
MAHARASHTRA
**TPC
Total load re lie f
Required
Load relief
Implemented
Load relief
905
1454
361
475
355
27
120
37
546
370
621
965
82
2000
1006
GUJARAT
60
2000
Implemented
Load relief
1001
1610
415
392
445
40
120
40
1131
686
522
3040
273
2472
2617
* Gujarat changed the setting of 49.9/0.1Hz/sec to 49.9/0.2 Hz/sec as per discussion in 119th Protection Committee.
The other stage is set at 49.9 /0.3 Hz/sec - Total Load Relief 399 MW
** TPC -Load Relief of 931 MW at 49.9 Hz/0.5 Hz/sec
Unit No.
Capacity
(MW)
Date
of
/Schedule Date
Commissioning
GUJARAT
SIKKA TPS EXT
250
Sept 2015
250
Dec 2015
CHHATTISGARH
Marwa
500
Dec 2015
Marwa
500
Dec 2015
MAHARASHTRA
CHANDRAPUR
500
September 2016
KORADI
660
Nov 2015
KORADI
10
660
March 2016
PARLI
250
Jan 2016
600
December 2015
600
December 2015
600
October 2015
CENTRAL SECTOR/IPP
Vindhyachal
13
500
KSK
600
September 2015
KSK
600
December 2015
RKM
360
September 2015
RKM
360
December 2015
RKM
360
March 2016
MADHYA PRADESH
M/s Jhabua Power, Seoni
Moser Baer (Hindustan Power)
Essar Power MP Limited (Mahan)
Constituents
Length
in Ckt
Km
GETCO
160.00
December-15
WIP(Work is in
progress)
GETCO
190.00
December-15
WIP
GETCO
314.00
December-15
WIP
GETCO
664.00
December-15
WIP
GETCO
116.85
GETCO
118.22
GETCO
120.94
GETCO
89.40
GETCO
160.95
10
GETCO
400 kV Charanka-Veloda
11
MPPTCL
12
MSETCL
13
14
15
MSETCL
MSETCL
MSETCL
17
CSPTCL
18
19
20
21
CSPTCL
CSPTCL
POWERGRID
WIP
December-15
WIP
December-15
WIP
December-15
Work in
progress
December-15
Ckt 1
commissioned
on 30th Mar 15.
Ckt 2 is
expected in
Sept 2015.
Work in
progress.
Aug-2015
239
December 2015
December 2015
Aug-16
October-15
Commissioned
on 13.06.2015
March-16
Nov-15
POWERGRID
WIP
December-15
400 kV IEPL-Warora
CSPTCL
Remark
December-15
16
Anticipated
completion
Target
Sept-15
700
300
Nov-15
Commissioned
on 11th Aug
2015
Sr.
No.
Constituents
22
POWERGRID
23
POWERGRID
24
POWERGRID
25
POWERGRID
26
Length
in Ckt
Km
Anticipated
completion
Target
Remark
Dec-15
Mar-16
Mar-16
Dec-15
POWERGRID
Sept-15
27
POWERGRID
Dec-15
28
POWERGRID
Oct-15
29
STERLITE(JTCL)
Commissioned
12th Sept-15
30
STERLITE(JTCL)
Dec-15
Apr15
60
May15
50
Jun15
57
90
Aug15
127
Contingency
225
104
76
44
125
574
415
Jul-15
Sep15
Oct15
Nov15
Dec15
Jan16
Feb16
Mar16
TOTAL
384
FCFS
92
98
106
58
61
Advance
10
TOTAL
387
260
246
198
Day Ahead
Apr15
50.01
May15
13.41
Jun15
9.45
120.31
Aug15
71.33
Contingency
54.86
74.78
74.27
49.15
92.92
345.98
1441.29
38
320
0
0
0
Energy approved (MUs)
Jul-15
FCFS
283.94
307.58
501.56
174.66
173.54
Advance
358.72
159.57
168.64
405.15
449.53
TOTAL
747.53
555.34
753.92
749.28
787.33
Sep15
Oct15
Nov15
1411
Dec15
Jan16
Feb16
Mar16
TOTAL
264.52
1541.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3593.39
Mar16
TOTAL
TOTAL
Intraregional
Interregional
TOTAL
Apr15
May15
Jun15
Jul-15
Aug15
Sep15
Oct15
Nov15
284
170
168
107
210
939
103
90
78
91
110
472
387
260
246
198
Apr15
May15
Jun15
Jul-15
Aug15
548.94
306.23
611.10
596.13
700.95
2763.35
198.59
249.11
142.82
153.15
86.38
830.05
747.53
555.34
753.92
749.28
787.33
320
0
0
0
Energy Approved (MUs)
Sep15
0.00
Oct15
0.00
Nov15
0.00
Dec15
Jan16
Feb16
1411
Dec15
Jan16
Feb16
Mar16
TOTAL
0.00
0.00
0.00
0.00
3593.39
ANNEXURES
piScama xao~ WR
45,000
43754
44,000
43,000
MW
42,000
41,000
40,000
39,000
38,000
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
maharaYT MAHARASHTRA
20,000
18156
19,000
MW
18,000
17,000
16,000
15,000
14,000
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
14,300
14278
MW
13,300
12,300
11,300
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
8,400
7,400
PRADESH
MW
6839
6,400
5,400
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
Ci<asagaZ CHHATISGARH
3700
3200
MW
2796
2700
2200
1
9 10 11 12Hrs
13 14 15 16 17 18 19 20 21 22 23 24
gaaov aa GOA
450
400
MW
316
350
300
250
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
750
HAVALI
696
MW
700
650
600
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
325
291
MW
300
275
250
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
ESIL
440
382
390
MW
340
290
240
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
piScama xao~ ka nyua natma Baar idna ko p`i tGaMT a Baar vak
HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 05.08.2015 AT 04:00 HRS
piScama xao~ WR
38000
36000
34000
30647
MW
32000
30000
28000
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
maharaYT/ MAHARASHTRA
17000
16000
MW
15000
14000
12579
13000
12000
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
11400
10900
MW
10400
9900
8970
9400
8900
8400
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
6500
MW
5033
5500
4500
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
piScama xao~ ka nyua natma Baar idna ko p`i tGaMT a Baar vak
HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 28.07.2015 AT 04:00 HRS
Ci<asagaZ CHHATISGARH
4000
3500
MW
2682
3000
2500
2000
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
gaaovaa GOA
365
MW
315
232
265
215
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
720
670
HAVALI
MW
627
620
570
520
MW
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Hrs
350
300
250
200
150
100
259
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
400
ESIL
MW
350
265
300
250
200
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hrs
List of Grid Disturbances and Grid incidents (GD/GI) in Aug-2015: Western Region
Sr.
No.
Owner
Utility
Date
Time
MPPTCL
18-Aug-15
17:25
MSETCL
28-Aug-15
16:11
MPPTCL
20-Aug-15
19:01
Effect (Loss of
generation/
Load), if any
Load Loss :140
MW, Gen Loss:
NIL MW
Load Loss :NIL
MW, Gen Loss:
NIL MW
Load Loss :NIL
MW, Gen Loss:
NIL MW
Category as
per CEA Grid
Standards
GD-1
GI-2
GD-1
TYPE
STATION
KSTPS
VSTPS
Sipat STPS-II
Mauda
NSPCL Bhilai TPP(*)
TOTAL Coal
KAWAS
Coal
GAS
GANDHAR
TOTAL GAS
NTPC
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
3x200+3x500+1x
500
2600
6x210+2x500+2x
500+3x500
4760
2X500+3X660
2980
2x500
1000
2x250
500
11840
4x106+2x116.1
656.20
3x144.3+1x224.4
9
657.39
1314
GRAND TOTAL
TYPE
13154
NPCIL
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
2x160+2x540
1400
2x220
440
1840
STATION
TAPS
KAPS
TOTAL NUCLEAR
NUCLEAR
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
3x200+3x500+1x
500
2600
6x210+2x500+2x
500+3x500
4760
2X500+3X660
2980
2x500
1000
2x250
500
11840
4x106+2x116.1
656.20
3x144.3+1x224.4
9
657.39
1314
13154
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
2x160+2x540
1400
2x220
440
1840
TOTAL CENTRAL
SECTOR
Coal
11840
11840
GAS
1313.59
1313.59
1840
1840
14994
14994
NUCLEAR
GRAND TOTAL (CENTRAL SECTOR)
TYPE
STATION
UKAI
UKAI (LBCH)
KADANA
MADHUBAN DAM
KARJAN DAM
PANAM CANAL
HYDRO
SARDAR SAROVAR
TOTAL HYDRO
A.E.Co.(Torrent Power)
DHUVARAN
UKAI
GANDHI NAGAR
WANAKBORI
SIKKA
KUTCH LIGNITE
SURAT LIGNITE
AKRIMOTA
Coal
*CGPL
*Mundra(APL)
Hazira CPP Extn
16% of 1450
1x60+2x121+120
2x140+1*376
2x120+2x200+1x
210+ 1x500
2x120+3x210
7x210
2x120+1x250
2x70+2x75+1x68
4x125
2x125
**3x830 +1x830+
1x830
**4*330
+3*660+2*660
1x351
TOTAL
(MW)
300
5
240
5.6
3
2
232
787.6
422
656
UNITS
4x75
2x2.5
4x60
2*1.5+2.6
3
2x1
16% of 1450
2620
351
1x60+2x110+120
2x140+1*376
2x120+2x200+1x
210+ 1x500
2x120+3x210
7x210
2x120+1*250
2x70+2x75+1x68
4x125
2x125
**3x830 +1x830+
1x830
**4*330
+3*660+2*660
1x351
1350
870
1470
490
358
500
250
1971
TOTAL
(MW)
300
5
240
5.6
3
2
232
787.6
422
656
1350
870
1470
490
358
500
250
1971
2620
351
2x600
1200
2x600
1200
1x350
350
1x350
350
1x382.5
382.5
1x382.5
382.5
TOTAL Coal
DHUVARAN
TORRENT POWER
UTRAN-I
UTRAN-II
GIPCL I
GIPCL II
ESSAR
GPEC
DGEN
GSEG HAZIRA
SUGEN
TOTAL GAS
Diesel
WIND+RES
TOTAL GUJARAT
UNITS
4x75
2x2.5
4x60
2*1.5+2.6
3
2x1
EFFECTIVE
CAPACITY
Essar Vadinar
UNO, Sugen
GAS
INSTALLED
CAPACITY
HYDRO
COAL
GAS
1x218.62
2X32.5+35.0(ST)
3x30+1x45
1X229+1X146(S
T)
3x32+49(ST)
111+54(ST)
3x110+1x185
(ST)
3x138+1x241(ST)
3x400
2x52+1x52.1 (ST)
3X382.5
13240.5
218.62
100
144
375
145
165
515
655
1200
156.1
1147.5
1x218.62
2X32.5+35(ST)
3x33+1x45
1X229+1X146(S
T)
3x32+49
111+54
3x110+1x185
(ST)
3x138+1x241(ST)
3x400
2x52+1x52.1 (ST)
3X382.5
13240.5
218.62
100
144
375
145
165
515
655
1200
156.1
1147.5
4821
17.48
4802
787.6
13240.5
4821.22
4821
17.48
4802
787.6
13240.5
4821.22
23669
23669
MADHYA PRADESH
TYPE
STATION
GANDHI NAGAR
R P SAGAR
J SAGAR
PENCH SHARE
BANASAGAR TONS
BARGI
BANASAGAR
HYDRO
BIRSINGHPUR
RAJGHAT
INDIRA SAGAR
MADHIKHEDA HEP
MINI & MICRO
HYDRO
Omkareswar Hydro
SARDAR SAROVAR
TOTAL HYDRO
AMARKANTAK
SATPURA-II
SATPURA-III & IV
S GANDHI TPS I & II
S GANDHI TPS III
Jaypee Bina
Coal
*SASAN (Unit 1-5)
Jayprakash Nigrie(IPP)
SSTP(Shri Singhaji
Thermal Power Station)
M B Power
TOTAL THERMAL
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
5x23 (50%)
57.5
4x43 (50%)
86
3x33 (50%)
49.5
2x80 (66.67%)
106.672
3x105
315
2x45
90
2x15+3x20+2x10
110
1x20
20
3x15(50%)
22.5
8x125
1000
3X20
60
13.5
8x65
57% of 1450
2X120+1X210
1x200+1x210
2x210+2x250
4x210
1x500
2x250
**6x660
2x660
13.5
520
826.5
3277
450
410
920
840
500
500
1485
1320
2X120+1X210
1x200+1x210
2x210+2x250
4x210
1x500
2x250
**6x660
2x660
13.5
520
826.5
3277
450
410
920
840
500
500
1485
1320
2x600
1200
2x600
1200
1x600
600
1x600
600
STATION
HASDEO BANGO
Gangrel
HYDRO
Coal
3.25
8x65
57% of 1450
7625
0
1670
3277
7625
12573
Diesel
RES
HYDRO
TOTAL MADHYA
PRADESH
THERMAL
GRAND TOTAL (MADHYA PRADESH)
TYPE
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
5x23 (50%)
57.5
4x43 (50%)
86
3x33 (50%)
49.5
2x80 (66.67%)
106.672
3x105
315
2x45
90
2x15+3x20+2x10
110
1x20
20
3X15(50%)
22.5
8x125
1000
3X20
60
CHHATISGARH
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
3x40
120
4x2.5
10
8225
0
1670
3277
8225
13173
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
3x40
120
4x2.5
10
1x1.7
1.7
1x1.7
1.7
2x3.5
2x3.5
4x50+2x120
4x210+1x500
2x250
7
138.7
440
1340
500
4X50+2X120
4x210+1x500
2x250
7
138.7
440
1340
500
2x600
4x250
1200
1000
2x600
4x250
1200
1000
1x135
2x300
1x63
135
600
63
1x135
2x300
1x63
135
600
63
HYDRO
1x50
1x600
50
600
1x600
50
600
2x685
2x135+2*30
1370
330
2x685
2x135+2*30
1370
330
2x600
1x135
2x600
4x600
1x300
1x360
1x500
1200
135
1200
2400
300
360
500
13723
138.7
13723
0
2x600
1x135
2x600
4x600
1x300
1x360
1x500
1200
135
1200
2400
300
360
500
13723
138.7
13723
0
327
1x50
14189
MAHARASHTRA
INSTALLED CAPACITY
STATION
TOTAL
UNITS
(MW)
4x(65+5)+4x(75+
KOYNA I & II
5)
600
KOYNA III
4x80
320
KOYNA DPH
2x20
40
KOYNA IV
4x250
1000
96
KHOPOLI
1 TO 8
75
BHIVPURI
1 TO 5
150
BHIRA
6x25
150
BHIRA PSS
1x150
VAITHARNA
1x60
60
ELDARI
3x7.5
22.5
VEER & BHATGAR
2x4.5+1x16
25
PAITHAN
1x12
12
TILLARI
1x66
66
RADHANAGRI
4x1.2
4.8
BHIRA T/R
2x40
80
BHANDARDHARA
1 &2
46
DUDHGANGA
2x12
24
PENCH DRAWAL
2x80 (33.33%)
53.328
PAWANA
1x10
10
BHATSA
1x15
15
DHOM
2x1
2
KANHAR
1x4
4
MANIKDOH
1x6
6
UJJANI
1x12
12
DIMBHE
1x5
5
SURYA
1X6+1X0.75
6.75
PANSHET
1x8
8
VARASGAON
1x8
8
WARNA
2x8
16
YEOTESHWAR
1x0.08
0.08
TERWANMEDHE
1x0.2
0.2
327
14189
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
4x(65+5)+4x(75+
5)
600
4x80
320
2X18
36
4x250
1000
96
1 TO 8
75
1 TO 5
150
6x25
150
1x150
1x60
60
3x7.5
22.5
2x4.5+1x16
25
1x12
12
1x66
66
4x1.2
4.8
2x40
80
1 &2
46
2x12
24
2x80 (33.33%)
53.328
1x10
10
1x15
15
2x1
2
1x4
4
1x6
6
1x12
12
1x5
5
1x0.75+1x6
6.75
1x8
8
1x8
8
2x8
16
1x0.08
0.08
1x0.2
0.2
GHATGHAR
SARDAR SAROVAR
TOTAL HYDRO
CHANDRAPUR
CHANDRAPUR
Extension
TROMBAY
KORADI
KORADI
NASIK
KHAPERKHEDA
Coal
GAS
PARLI
BHUSAWAL
REL DAHANU
PARAS
NEW PARLI
JSW Ratnagiri(Jaigad)
Mihan TPP(Abhijit)
Wardha Warora Power
Co Ltd.
Vidharbha Industry,
Butibori
APML,Tiroda-Ph-I(400
kV)
APML,Tiroda-Ph-II(
765 kV)
IEPL (Ideal Energy
Power Ltd, Belapur)
IBL (India Bulls
Limited, Amravati)
EMCO
Indrajeet
Indorama
Finolex, Ratnagiri
JSW Boisar, Vashi
Circle
Uttam Galwa
Gupta Energy ltd
Topworth Urja
Ultratech Cement ltd.
Vayunandana Power ltd
Dhariwal-I& II (STU)
Ratan India Pvt Ltd.
TOTAL COAL
TROMBAY-7A & 7B
URAN (G)
URAN-DPH
RATNAGIRI PHASE I
RATNAGIRI PHASE II
RATNAGIRI PHASEIII
TOTAL GAS
2x125
250
2x125
250
27% of 1450
391.5
3559
2840
27% of 1450
391.5
3555
2840
4x210+4x500
1x500
1x150+2x500+1X
250
1x200+2x210
2x660
3x210
4x210+1x500
2x0+3x210+2x25
0
2x210+ 2x500
2x250
2x250
2x250
4x300
4x62.5
500
4x210+4x500
1130
1420
500
500
500
1200
246
1x500
1x150+2x500+1X
250
1x200+2x210
2x660
3x210
4x210 +1x500
2x0+3x210+2x25
0
2x210+ 2x500
2x250
2x250
2x250
4x300
4x62.5
4x135
540
4x135
540
2x300
600
2x300
600
3x660
1980
3x660
1980
2x660
1320
2x660
1320
1x270
270
1x270
270
2x270
540
2x270
540
2x300
1x77
1x49
1x43
600
77
49
43
2x300
1x77
1x49
1x43
600
77
49
43
1x37.6
1x60
1x120
1x30
1x46
1x10
2x300
5x270
1x37.6
1x60
1x120
1x30
1x46
1x10
2x300
5x270
120+60
4x108
2x120
37.6
60
120
30
46
10
600
1350
22418.6
180
432
240
120+60
4x108
2x120
37.6
60
120
30
46
10
600
1350
22418.6
180
432
240
2x205+1x230
640
2x205+1x230
640
2x213 + 237.54
663.54
2x213 + 237.54
663.54
2x213 + 237.55
663.54
2819
2x213 + 237.55
663.54
2819
1400
620
1320
630
1340
500
1400
620
1320
630
1340
1130
1420
500
500
500
1200
246
Diesel
WIND+RES
MAHARASHTRA
Diesel
WIND+RES
HYDRO
COAL
GAS
WIND+RES
GRAND TOTAL
(MAHARASHTRA)
0
6206
3559
22418.6
2819.08
5630
0
6206
3555
22418.6
2819.08
5630
34427
34423
GOA
TYPE
STATION
Diesel
RES
GAS
RELIANCE,
SALGAONKAR
GRAND TOTAL (GOA)
INSTALLED CAPACITY
TOTAL
UNITS
(MW)
0
30
EFFECTIVE CAPACITY
TOTAL
UNITS
(MW)
0
30
1x39.82+1x8.2
1x39.82+1x8.2
48.02
78
48.02
78
**Total 6 units of 660 MW each are installed at SASAN but only 37.5% of 3960 MW is allocated to MP in Western
Region.
** CGPL have 47.5 % (1971 MW) share to Gujarat and 20% (830 MW) share to Maharashtra out of total installed
capacity 4150 MW.
** APL have 2000 MW share to Gujarat out of total installed capacity 2640 MW.