FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE

DESCRIPTION

PROJECT/JOB NO.

BITUMEN PLANT

PROJECT/JOB NAME

ACI

CLIENT NAME

MKS

SITE NAME

5-6

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

Solvent Tank Rev1

LOAD COMBINATION GROUP NAME


REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

FOUNDATION LISTS
Group Name

No.

F5

Description
F1

Copyright (c) GS E&C. All Rights Reserved

No.

Description

Page 1

9/28/2016

Calculation Sheet
of
Foundation

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 2

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318) [Metric]

Horizontal Force for Wind

AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02]

Horizontal Force for Seismic

AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-02]

Unit System

Input : MKS,

Output : MKS,

Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items

Value
2

Concrete (f'c : compressive strength)

250.000 kgf/cm

Lean Concrete (Lf'c : compressive strength)

0.000 kgf/cm

Reinforcement (D10 ~ D16 , yield strength)

4200.000 kgf/cm

Reinforcement (D19 ~ , yield strength)

4200.000 kgf/cm

Rs (Soil unit weight)

2.000 ton/m

Rc (Concrete unit weight)

2.400 ton/m

2
2
2

3
3

Es (Steel Modulus of Elasticity)

2.000 10 kgf/cm

Ec (Concrete Modulus of Elasticity)

250998.000 kgf/cm

- Soil Capacity
Items

Value

Soil Name

Unit-01

Footing List

F1

Qa (Soil Bearing Capacity)

7.5 tonf/m

Buoyancy

Not Consider

WL (Water Label from the EL = 0)

0 mm

FD (Frost Depth from the EL = 0)

0 mm

Internal Friction Angle

Passive Soil Pressure

Not Consider

Cu (Undrained cohesion)

Clay , 0 tonf/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description

Allowable Increase of Soil (Wind)

33.33 %

Allowable Increase of Soil (Seismic)

33.33 %

Allowable Increase of Soil (Test)

20 %

Safety factor against overturning for OVM1(FO1)

Safety factor against overturning for OVM2(FO2)

Safety factor against overturning for OVM3(FO3)

Safety factor against overturning for OVM4(FO4)

Copyright (c) GS E&C. All Rights Reserved

Page 3

9/28/2016

Calculation Sheet
of
Foundation
Safety factor against sliding for the SL1(FS1)

1.5

Safety factor against sliding for the SL2(FS2)

1.5

Safety factor against sliding for the SL3(FS3)

1.5

Safety factor against sliding for the SL4(FS4)

1.5

Friction factor (m)

0.35

1.4 LOAD COMBINATION


Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

Empty

EMPTY LOAD

Operation

OPERATION LOAD

Test

TEST LOAD

Wlx

WIND LOAD X DIRECTION

Wly

WIND LOAD Y DIRECTION

SLx2

SEISMIC LOAD (Operation) X Direction

SLy2

SEISMIC LOAD (Operation) Y Direction

Comb . ID

Load Combination for stability

11

1.0 SW + 1.0 Empty

12

1.0 SW + 1.0 Empty + 1.0 Wlx

13

1.0 SW + 1.0 Empty + 1.0 Wly

21

1.0 SW + 1.0 Operation

22

1.0 SW + 1.0 Operation + 1.0 Wlx

23

1.0 SW + 1.0 Operation + 1.0 Wly

24

1.0 SW + 1.0 Operation + 1.0 SLx2

25

1.0 SW + 1.0 Operation + 1.0 SLy2

31

1.0 SW + 1.0 Test

32

1.0 SW + 1.0 Test + 1.0 Wlx

33

1.0 SW + 1.0 Test + 1.0 Wly

Comb . ID

Load Combination for Reinforcement

101

1.4 SW + 1.4 Empty

102

.9 SW + .9 Empty + 1.3 Wlx

103

.9 SW + .9 Empty + 1.3 Wly

111

1.4 SW + 1.4 Operation

112

1.05 SW + 1.05 Operation + 1.7 Wlx

113

1.05 SW + 1.05 Operation + 1.7 Wly

114

1.05 SW + 1.05 Operation + 1.403 SLx2

115

1.05 SW + 1.05 Operation + 1.402 SLy2

116

.9 SW + .9 Operation + 1.3 Wlx

117

.9 SW + .9 Operation + 1.3 Wly

118

.9 SW + .9 Operation + 1.43 SLx2

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 4

9/28/2016

Calculation Sheet
of
Foundation
119

.9 SW + .9 Operation + 1.43 SLy2

121

1.4 SW + 1.4 Test + .32 Wlx

122

1.4 SW + 1.4 Test + .32 Wly

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 5

9/28/2016

Page 6

2. DRAWING

REFERENCE DWGS
A01

NO.

DWG NO.

DWG TITLE

NOTES
* OUTPUT UNIT : mm

01
ACI PROJECT

1
F1

SQUAD CHECK

FOUNDATION LOCATION PLAN


Solvent Tank Rev1

PROCESS PIPING VESSELS STRUCT.

SCALE

JOB NO.

AS SHOWN BITUMEN PLANT

Copyright (c) GS E&C. All Rights Reserved

ELEC.

INST.

MICROFILM NO.

9/28/2016

Page 7

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

9/28/2016

Page 8

DWG TITLE

50
TYP.

DWG NO.

D13@200

TOP

NO.

D13@200

2550

REFERENCE DWGS

CL FOOTING
BOTTOM

NOTES
* ANCHOR BOLT
1X12-M36 ANC. BOLTS (TYPE TYPE J)

D13@200
* OUTPUT UNIT : mm

D13@200

2250
75

75
15

ACI PROJECT

30

D10

300

50
100

D13

2400

D13@2

100 75
D10
@200

350

600

TOG EL. + 250

FOOTING REINF. PLAN

390 PROJ.

25 GR.

FOUNDATION PLAN

FOUNDATION DETAIL FOR


F1

PEDESTAL
SQUAD CHECK

80

200-D13
D13@2

LEAN CONC. 50 THK


CRUSHED STONE 100 THK

SECTION

PROCESS PIPING VESSELS STRUCT.

SCALE
REV. DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

DRWNCHKDAPPDAPPD APPD

JOB NO.

AS SHOWN BITUMEN PLANT

ELEC.

INST.

MICROFILM NO.

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 9

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name

F1

Ft. Type
Area

2550

Ft. Thickness

300.00 mm

Ft. Volume

f2400

Ft. Weight

3.878 tonf

Soil Height

350.00 mm

Soil Volume
0.430 tonf

Buoyancy

Not Consider

Self Weight (except Pr.SW)

4.308 tonf

300

350
600

Soil Weight

The Origin coordinate


The Center of gravity (0,0) mm

Section Data
( mm )

Ft.Name

Direction

F1

All Direct

Sec.Name

Section Area

Ft. Volume

Soil Volume

Pier Wt

Ft. Weight

Soil Weight

Total Weight

S1

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )

Ft.Name

Pr.Name

Shape

F1

Octagonal

3.3 LOAD CASE

Copyright (c) GS E&C. All Rights Reserved

Pl
2400.000

Pw
2400.000

Ph
600.000

Area

Weight
6.871

Off X
0.000

Off Y
0.000

9/28/2016

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 10

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.

Fz
Mz

Fy
My
Fx
Mx

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation
Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

Empty

EMPTY LOAD

Operation

OPERATION LOAD

Test

TEST LOAD

Wlx

WIND LOAD X DIRECTION

Wly

WIND LOAD Y DIRECTION

SLx2

SEISMIC LOAD (Operation) X Direction

SLy2

SEISMIC LOAD (Operation) Y Direction

Project No. : BITUMEN PLANT


Client : MKS

Page 11

Unit( tonf , tonf-m )

Ft.Name

Pr.Name

Load Case

F1

Fx

Fy

Fz

Mx

My

-6.87

-13.57

-23.72

-23.72

0.26

0.35

0.26

-0.35

2.12

2.87

8
Footing SW

2.12

-2.87

0.000

0.000

-4.308

0.000

0.000

3.4 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,

In Footing Bottom Center


with Pier & Footing Self Weight & Soil Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Ft.Name
F1

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

SMy

11

0.000

0.000

-13.570

0.000

0.000

12

0.260

0.000

-13.570

0.000

0.350

13

0.000

0.260

-13.570

-0.350

0.000

21

0.000

0.000

-23.720

0.000

0.000

22

0.260

0.000

-23.720

0.000

0.350

23

0.000

0.260

-23.720

-0.350

0.000

24

2.120

0.000

-23.720

0.000

2.870

25

0.000

2.120

-23.720

-2.870

0.000

31

0.000

0.000

-23.720

0.000

0.000

32

0.260

0.000

-23.720

0.000

0.350

Pr.Name L.Comb.

Copyright (c) GS E&C. All Rights Reserved

9/28/2016

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 12

33

0.000

0.260

-23.720

-0.350

0.000

101

0.000

0.000

-18.998

0.000

0.000

102

0.338

0.000

-12.213

0.000

0.455

103

0.000

0.338

-12.213

-0.455

0.000

111

0.000

0.000

-33.208

0.000

0.000

112

0.442

0.000

-24.906

0.000

0.595

113

0.000

0.442

-24.906

-0.595

0.000

114

2.973

0.000

-24.906

0.000

4.025

115

0.000

2.973

-24.906

-4.025

0.000

116

0.338

0.000

-21.348

0.000

0.455

117

0.000

0.338

-21.348

-0.455

0.000

118

3.032

0.000

-21.348

0.000

4.104

119

0.000

3.032

-21.348

-4.104

0.000

121

0.083

0.000

-33.208

0.000

0.112

122

0.000

0.083

-33.208

-0.112

0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name

F1

SFx

SFy

SFz

SMx

SMy

11

0.000

0.000

-20.441

0.000

0.000

12

0.260

0.000

-20.441

0.000

0.584

13

0.000

0.260

-20.441

-0.584

0.000

21

0.000

0.000

-30.591

0.000

0.000

22

0.260

0.000

-30.591

0.000

0.584

23

0.000

0.260

-30.591

-0.584

0.000

24

2.120

0.000

-30.591

0.000

4.778

25

0.000

2.120

-30.591

-4.778

0.000

31

0.000

0.000

-30.591

0.000

0.000

32

0.260

0.000

-30.591

0.000

0.584

33

0.000

0.260

-30.591

-0.584

0.000

101

0.000

0.000

-28.618

0.000

0.000

102

0.338

0.000

-18.397

0.000

0.759

103

0.000

0.338

-18.397

-0.759

0.000

111

0.000

0.000

-42.828

0.000

0.000

112

0.442

0.000

-32.121

0.000

0.993

113

0.000

0.442

-32.121

-0.993

0.000

114

2.973

0.000

-32.121

0.000

6.701

115

0.000

2.973

-32.121

-6.701

0.000

116

0.338

0.000

-27.532

0.000

0.759

117

0.000

0.338

-27.532

-0.759

0.000

118

3.032

0.000

-27.532

0.000

6.833

119

0.000

3.032

-27.532

-6.833

0.000

121

0.083

0.000

-42.828

0.000

0.187

122

0.000

0.083

-42.828

-0.187

0.000

Pr.Name L.Comb.

Unit( tonf , tonf-m )

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 13

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

F1

L.Comb.

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

11

0.000

0.000

-24.750

12

0.260

0.000

13

0.000

0.260

21

0.000

22

SMy

C.G. of Loads

0.000

0.000

1275.0 , 1275.0

-24.750

0.000

0.584

1275.0 , 1275.0

-24.750

-0.584

0.000

1275.0 , 1275.0

0.000

-34.900

0.000

0.000

1275.0 , 1275.0

0.260

0.000

-34.900

0.000

0.584

1275.0 , 1275.0

23

0.000

0.260

-34.900

-0.584

0.000

1275.0 , 1275.0

24

2.120

0.000

-34.900

0.000

4.778

1275.0 , 1275.0

25

0.000

2.120

-34.900

-4.778

0.000

1275.0 , 1275.0

31

0.000

0.000

-34.900

0.000

0.000

1275.0 , 1275.0

32

0.260

0.000

-34.900

0.000

0.584

1275.0 , 1275.0

33

0.000

0.260

-34.900

-0.584

0.000

1275.0 , 1275.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

F1

Sec.Na

L.Comb.

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

SMy

C.G. of Loads

101

0.000

0.000

-34.650

0.000

0.000

1275.0 , 1275.0

102

0.338

0.000

-22.275

0.000

0.759

1275.0 , 1275.0

103

0.000

0.338

-22.275

-0.759

0.000

1275.0 , 1275.0

111

0.000

0.000

-48.860

0.000

0.000

1275.0 , 1275.0

112

0.442

0.000

-36.645

0.000

0.993

1275.0 , 1275.0

113

0.000

0.442

-36.645

-0.993

0.000

1275.0 , 1275.0

114

2.973

0.000

-36.645

0.000

6.701

1275.0 , 1275.0

115

0.000

2.973

-36.645

-6.701

0.000

1275.0 , 1275.0

116

0.338

0.000

-31.410

0.000

0.759

1275.0 , 1275.0

117

0.000

0.338

-31.410

-0.759

0.000

1275.0 , 1275.0

118

3.032

0.000

-31.410

0.000

6.833

1275.0 , 1275.0

119

0.000

3.032

-31.410

-6.833

0.000

1275.0 , 1275.0

121

0.083

0.000

-48.860

0.000

0.187

1275.0 , 1275.0

122

0.000

0.083

-48.860

-0.187

0.000

1275.0 , 1275.0

S1

Copyright (c) GS E&C. All Rights Reserved

9/28/2016

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 14

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F
> Fs -> OK (Bi-Axial)
2
2
SFx + SFy
P.F = Passive Force (apply only in case checked passive force, mark by P )
Formula :

Ft.Name

Dir.

L.Comb.

F1

Bi-Axial

25

Unit ( tonf )

( mSFz + P.F ) / SFx + SFy


2

Fs(i)

Result

1.5

OK

0.35 34.9 / 2.12 = 5.76

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK

Ft.Name

Dir.

L.Comb.

25

25

F1

Unit ( tonf-m )

SMry / SMoy = OVM or SMrx / SMox = OVM

OVM(i)

Result

SMo = 0 , Then N/A

OK

44.5 / 4.78 = 9.31

OK

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


Af
Iy
Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
q(x) width(x) dx
0
P = L0 q(x) width(x) dx
q1,q2 =

4.3.2 Input Data


2

Ft.Name

Af (m )

Fl (m )

Fw (m )

Ix (m )

Iy (m )

F1

5.387

2.550

2.550

2.3146

2.3146

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 15

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial)

Unit( tonf , tonf-m , tonf/m )

Ft.Name

L.Comb.

q1

q2

ci

cj

Qmax

Qa

Cont.A.R

Result

F1

25

3.847

9.111

0.000

2.550

9.111

10.000(gross)

100 / 80 %

OK

Copyright (c) GS E&C. All Rights Reserved

9/28/2016

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 16

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name, Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction, L.Comb. : Load Combination Index, Fl or Fw : Footing Length or Footing Width, Sl or Sw : Strip X or Y width

5.1.1 Data
Ft.Name

Unit( mm , tonf , tonf-m )

Sec.Na

S1

Dir.

L.Comb.

Fl or Fw

Sl or Sw

SFz

SM

SQ

101

2550.00

2550.00

34.650

0.00

28.618

102

2550.00

2550.00

22.275

0.76

18.397

103

2550.00

2550.00

22.275

0.00

18.397

111

2550.00

2550.00

48.860

0.00

42.828

112

2550.00

2550.00

36.645

0.99

32.121

113

2550.00

2550.00

36.645

0.00

32.121

114

2550.00

2550.00

36.645

6.70

32.121

115

2550.00

2550.00

36.645

0.00

32.121

116

2550.00

2550.00

31.410

0.76

27.532

117

2550.00

2550.00

31.410

0.00

27.532

118

2550.00

2550.00

31.410

6.83

27.532

119

2550.00

2550.00

31.410

0.00

27.532

121

2550.00

2550.00

48.860

0.19

42.828

122

2550.00

2550.00

48.860

0.00

42.828

101

2550.00

2550.00

34.650

0.000

28.618

102

2550.00

2550.00

22.275

0.000

18.397

103

2550.00

2550.00

22.275

-0.759

18.397

111

2550.00

2550.00

48.860

0.000

42.828

112

2550.00

2550.00

36.645

0.000

32.121

113

2550.00

2550.00

36.645

-0.993

32.121

114

2550.00

2550.00

36.645

0.000

32.121

115

2550.00

2550.00

36.645

-6.701

32.121

116

2550.00

2550.00

31.410

0.000

27.532

117

2550.00

2550.00

31.410

-0.759

27.532

118

2550.00

2550.00

31.410

0.000

27.532

119

2550.00

2550.00

31.410

-6.833

27.532

121

2550.00

2550.00

48.860

0.000

42.828

122

2550.00

2550.00

48.860

-0.187

42.828

F1

S1

Copyright (c) GS E&C. All Rights Reserved

9/28/2016

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : BITUMEN PLANT
Client : MKS

Page 17

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing
2

Unit(kgf/cm ,mm)

f(Flexure)

f(Shear)

f'c

fy1

fy2

f_cl

f_clt

f_clb

0.9

0.85

250.00

4200.00

4200.00

50.0

50.0

80.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
---- ACI CODE 7.12.2
As = fac b h
, fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4
---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 =
bd
fy
3 fck
As5 =
bd
fy
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.9
fbd
fy
0.85fck

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 18

5.2.2 Check of Footing Reinforcement


Footing Name : F1
GroupType : Octagonal
- X direction (Unit Width)

Sec.Nam

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

122

top

5 - D13 @ 200

1.275

1.000

24.365

6.334

114

botom

5 - D13 @ 200

2.367

1.000

21.365

6.334

S1

Sec.Nam

L.Comb.

Mu (tonf-m)

Rn

r.Req

122

top

114

bottom

0.143

0.348

0.0001

S1

Sec.Nam

Using Bar (mm)

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

122

top

2.700

8.157

7.296

46.228

114

bottom

2.700

0.177

0.236

7.153

6.398

40.536

S1

Sec.Nam

L.Comb.

Using As(cm )

Select As(cm )

Result

122

top

6.334

2.700

OK

114

bottom

6.334

2.700

OK

S1

- Y direction (Unit Width)

Sec.Nam

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

122

top

5 - D13 @ 200

1.275

1.000

23.095

6.334

115

botom

5 - D13 @ 200

2.367

1.000

20.095

6.334

S1

Sec.Nam

L.Comb.
122

top

115

bottom

Mu (tonf-m)

S1

Sec.Nam
S1

Sec.Nam
S1

Using Bar (mm)

L.Comb.

r.Req

Rn

0.143

0.393

0.0001

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

122

top

2.700

7.732

6.916

43.819

115

bottom

2.700

0.188

0.251

6.728

6.018

38.127

L.Comb.

Using As(cm )

Select As(cm )

Result

122

top

6.334

2.700

OK

115

bottom

6.334

2.700

OK

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 19

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.85 2 fck B'w d
(eq 11-3)
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F1

GroupType : Octagonal

PileType : False
Unit : mm

2550

- X direction One-Way Shear (Unit Width)

Sec.Nam

L.Comb.

S1

101

Loc. (mm)
0

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

213.65

1000

15.227

OK

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

200.95

1000

14.322

OK

- Y direction One-Way Shear (Unit Width)

Sec.Nam

L.Comb.

S1

101

Loc. (mm)
0

Copyright (c) GS E&C. All Rights Reserved

9/28/2016
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : BITUMEN PLANT


Client : MKS

Page 20

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/bc) fck bo d
(eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d
(eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear


Ft.Name
2550

Pr.Name

F1 Punching Area
1 Ratio Shade

53869.150 cm

Octagonal f Vc1

0.000 tonf

122 f Vc2

0.000 tonf

Pl

2400 mm f Vc3

0.000 tonf

Pw

2400 mm f Vc

0.000 tonf

Shape
L.Comb.

bo / d
bc / as

Copyright (c) GS E&C. All Rights Reserved

0 / 213.65 mm Vu
1 / 20 Result

0.001 tonf

OK