Contractor: RR Constructions
0.1
Starting time:
Sketch:
10.55 A.M
End time:
(At given Length)
Wether Condition:
Sunny
Labour & Equipments
Mason(Nos)
Labour S/Sk(Nos)
Labour(U/Sk)(Nos)
Cement(Bags)
Aggregate (19mm),(Cu.m)
Sand(Cu.m)
Hire of Concrete Mixer(Rs./day)
Hire of Poker vibrator(Rs./day)
If readymix Concrete Used,
Readymix Concrete(Rs./ Cu.m)
Hire for Lorry with Concrete Drum(Rs./day)
(If Applicable)
1.92
12.04PM
Rate
Clock Time
Observed Time
Concrete Laying
Mason-2
100%
10.55-12.04
69
Labor U/Sk-4
100%
10.55-12.04
69
11.01-12.04
63
Poker Vibrator
=
=
=
=
=
=
=
=
=
PFD Allowance
Standard Time
Total time for Mason 2Nos.
Unskilled Labor
Observed Time
Performance Rate
By using Equation (1)
Normal Time
=
=
=
=
=
=
=
PFD Allowance
Standard Time
Total time for U/Sk Labor 4Nos.
=
=
=
=
=
=
=
=
2
69
100%
69*1
69 min
13%
69x (1+0.13)
77.97 min
77.97x2
155.94 min
0.325 days
4
69 min
100%
69x1
69 min
14%
69x (1+0.14)
78.66 min
78.66x4
314.64 min
0.656 days
16*2
32
0.6
0.1
32x0.6x0.1
1.92 m3
Quantity Unit
0.325 Day
0.656 Day
1.05 Hr
1.92 m3
Rate
1350
1050
290
12970
Amount
438.58
688.28
28.17
304.50
24902.40
26361.93
13730.17
Quantity Unit
1.438 Day
Rate
1350
Amount
1941.64
Labor U/Sk
Allow 2.5% Labor for tools
Hire of Poker Vibrator
Ready Mix Concrete (G20)
Cost per 8.5 m3
Cost per 1 m3
2.902 Day
1050
4.648 Hr
8.5 m3
290
12970
3047.05
124.72
1348.05
110245.00
116706.45
13730.17
0.1
Starting time:
Sketch:
9.41 A.M
End time:
(At given Length)
Wether Condition:
Sunny
Labour & Equipments
Mason(Nos)
Labour S/Sk(Nos)
Labour(U/Sk)(Nos)
Cement(Bags)
Aggregate (19mm),(Cu.m)
Sand(Cu.m)
Hire of Concrete Mixer(Rs./day)
Hire of Poker vibrator(Rs./day)
If readymix Concrete Used,
Readymix Concrete(Rs./ Cu.m)
Hire for Lorry with Concrete Drum(Rs./day)
(If Applicable)
1.96
10.32AM
Rate
Clock Time
Observed Time
Concrete Laying
Mason-2
110%
9.41-10.32
51
Labor U/Sk-5
95%
9.41-10.32
51
9.50-10.32
42
Poker Vibrator
Unskilled Labor
Observed Time
Performance Rate
By using Equation (1)
Normal Time
2
51
110%
=
=
=
=
=
=
51*1.1
56.1 min
14%
69x (1+0.14)
63.95 min
63.95x2
127.91 min
0.266 days
5
51 min
95%
=
=
=
=
=
=
=
PFD Allowance
Standard Time
Total time for U/Sk Labor 5Nos.
=
=
=
=
=
=
=
=
=
=
=
51x0.95
48.45 min
14%
48.5x (1+0.14)
55.233 min
55.23x5
220.932 min
0.460 days
14*2
28
0.7
0.1
28x0.6x0.1
1.96 m3
Quantity Unit
0.266 Day
0.460 Day
0.7 Hr
1.96 m3
Rate
1275
975
250
12200
Amount
339.76
448.77
19.71
175.00
23912.00
24895.24
12701.65
Quantity Unit
1.156 Day
1.996 Day
3.036 Hr
8.5 m3
Rate
1275
975
250
12200
Amount
1473.43
1946.19
85.49
758.93
103700.00
107964.04
12701.65
Observed Time
69
69
63
Observed Time
51
51
42
-5+186)