Professional Documents
Culture Documents
INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
PRE-INSPECTION MEETING
DOCUMENTATION REVIEW
Vendor Quality Plan (To be submitted prior to Pre-Inspection Meeting)
Manufacturing Schedule
Initial Receiving Inspection Report
QA/QC Manual
Coating Procedure
Surface Preparation Procedure
Repair Procedure
Coating Procedure Qualification Report
Certificate of Composition of Coating Materials
In-Process Inspection Reports
Traceability Procedure
Marking / Identification Procedure
Cleaning & Handling Procedure
Personnel Qualification List
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
W
W
W
W
W
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
W
W
W
W
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
W
W
W
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR INTERNAL COATING OF LINE PIPE
NO.
7
INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
REPAIR INSPECTION
Removal of Defective Area
Reinspection & Testing of Repaired Area
W
W
SW/R
SW/R
SW/R
SW/R
W
W
W
SW
SW
SW
SW
SW
SW
COMMENTS
Inspection shall be conducted on a random sampling basis of 5-10%. If
discrepancies are detected during random sampling, additional inspection
shall be conducted to verify compliance.
If a discrepancy exists between this document and the applicable purchase
order, the information listed on the purchase order shall take precedent.
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR INTERNAL COATING OF LINE PIPE
Level 4
N/A
R
R
R
R
R
R
R
R
R
R
R
R
R
R
H
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
R
R
R
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR INTERNAL COATING OF LINE PIPE
Level 4
N/A
R
SW
SW
SW
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable