Professional Documents
Culture Documents
DIM
8.1
18.98
RESULT
Description
a) Excavation 200mm top soil (m2)
Width :
7500 + 600 = 8100mm
Length:
18375 + 0600 = 18975mm
UNIT
m2
0.6
0.6
1.18
5.95
m3
Length : 5800mm
Width : 200mm
Thickness : 600mm
5.8
0.2
0.6
3.48
4
m3
Length : 2900mm
Width : 200mm
Thickness : 600mm
2.9
0.2
0.6
1.74
2
m3
Length : 2400mm
Width : 200mm
Thickness : 600mm
2.4
0.2
0.6
0.576
m3
TIMES
DIM
RESULT
2
4.8
0.2
0.6
DESCRIPTION
Length: 4800mm
Width : 200mm
Thickness : 600mm
1.15
2
UNIT
m3
Length : 3825mm
Width : 200mm
Thickness: 600mm
3.83
0.2
0.6
0.92
2
m3
Length : 1500mm
Width: 200mm
Thickness : 600mm
1.5
0.2
0.6
0.36
2
m3
Length : 1425mm
Width : 200mm
Thickness: 600mm
1.43
0.2
0.6
0.34
m3
ii) Size beam: 200 x 500
Length : 15600mm
Width : 200mm
Thickness: 500mm
1
15.6
0.2
0.5
m3
1.56
iii) Size Beam : 200 x 450
Length: 2775mm
Width : 200mm
Thickness: 450mm
2.78
0.2
0.45
0.5
6
1.65
0.2
m3
Length : 1650mm
Width: 200mm
Thickness: 450mm
0.45
0.89
TIMES
DIM
RESULT
m3
DESCRIPTION
a) DPM: hardcore for ground slab,
UNIT
m3
length
2400+4800+3825+1500+1650+1425+2775
= 18375mm
width= 2900+2900+1350
=7150mm
depth of excavation= 200mm
18.38
7.15
131.42
m2
QTY
TIMES
DIM
RESULT
DESCRIPTION
1) Foundation
Length:
600+2(450)-(6X50)= 1200mm
2/14/12/
1.2
403.2
2) Stump
153.74
Stump C1
4/8/
2.61
Length:
875+450-50+600+275-(2x12)+280+200
83.52 2606mm
link:
125x4 - 8(25) = 300mm
11/8/
no of link =
(875+450-50-2(16))/125 + 1= 11 nos
0.3
5.95
26.4
Stump C2
2/6/
Length:2606mm
2.61
31.32
link:
(100x2) + (450x2) - (8x25) = 900mm
3.48 2/11/
no. of link:
875 + 450 - 50 - (2x12) / 125 + 1 = 11 nos
0.9
19.8
Stump C3
1.74 4/6/
Length: 2606mm
2.61
62.64
Link:
(125x2) + (230x2) - (8x25) = 510mm
0.576 4/11/
no. of link:
0.51
QTY
TIMES
DIM
DESCRIPTION
3) Beam
Beam size : 200 x 600
Length : 5800 - (2x25x5) + (2x200) = 5950
4/5/
5.95
1.15
119
Link:
(200x2) + (600x2)-(8x25)= 1400
5/30/
0.92
no. of link:
5800/200 + 1 = 30 nos
1.4
210
4/4/
0.36
Link:
(200x2) + (600x2) - (8x25) = 1400
4/16/
no. of link:
2900/200 + 1 = 16 nos
1.4
0.34
89.6
4/2/
1.56 2/20/
1.4
Link = 1400
No. of Link:
56 3820/200 + 1 = 20 nos
4/2/
0.5 2/12/
1.4
33.6
0.89
QTY
TIMES
DIM
RESULT
14
DESCRIPTION
a) Formwork for Footing
Length
600 x 4 = 2400 mm
2.4
0.45
Stump C1
8
Length:
125 x 4 = 500mm
0.5
0.88
Length: 1100mm
Depth: 875mm
1.1
0.88
1.94
131.42
Stump C3
4
Length: 710mm
Depth: 875mm
0.71
0.88
2.5
UNIT
QTY
TIMES
2/4/
DIM
RESULT
4.5
36
403.2 2/25/
1.4
70
2/4/
1.2
9.6
83.52 2/9/
1.4
25.2
2/4/
1.13
9.04
26.4
2/8/
1.4
22.4
31.32
2/4/
2.48
19.84
19.8
2/15/
1.1
33
6/4/
62.64
1.35
32.4
6/10/
1.1
UNIT
22.44
QTY
TIMES
DIM
66
RESULT
4/1/
15.35
m
119
51.4
4/79/
0.51
155.04
2210
49.6
89.6
89.6
56
16
33.6
UNIT
QTY
TIMES
DIM
RESULT
4
5.56
0.6
13.34
m2
15.12
7.34
0.6
8.81
m2
3.52
2
4.56
0.6
m2
1.94
5.47
2
m2
2.5
9.36
0.6
11.23
2
2.76
0.6
3.31
m2
33.96
DESCRIPTION
Length: 4800 - (2x25x2) - (8x25) = 4500mm
UNIT
QTY
TIMES
DIM
36
Link: 1400mm
No. of link:
4800/200 + 1 = 25 nos
14/
70
0.36
0.45
9.6
Link: 1400
No. of link:
1500/200 + 1 = 9 nos
25.2 14/
0.03
0.875
9.04
Link: 1400mm
No.of link:
1425/200 + 1 = 8 nos
22.4
Beam Size : 200x450
Length: 2775 - (2x25x2) - (8x25) = 2475mm
m
19.84
5.55
33
32.4
1650/200 + 1 = 10
66
DESCRIPTION
Beam Size : 200x500
UNIT
QTY
TIMES
4.93
m
Link: 510
No. of link:
15600/200 + 1 = 79
DIM
51.4
155.04
14
0.36
DESCRIPTION
UNIT
QTY
TIMES
DIM
2
2.6
0.6
m2
3.34
2
5.3
0.45
[formwork for beam]
length = 2400 - 2(125)/2
= 2280mm
length = 2280 x 2
= 4560mm
depth = 600mm
m2
8.81
6
3.06
0.45
[formwork for beam]
length = 4800 - 2(125)/2
= 4680mm
length = 4800 x 2
= 9360
depth = 600mm
m2
5.47
30.96
0.5
[formwork for beam]
length = 1500 - 2(125)/2
= 1380mm
length = 1380 x 2
= 2760mm
depth = 600mm
m2
11.23
m2
3.31
RESULT
DESCRIPTION
a) concrete work foundation
Area of pad footing
length x width = 0.6 x 0.6
= 0.36m
UNIT
QTY
m2
m3
2.27
m3
0.37
m3
5.55
area of stump
length x width = 0.125 x 0.23
= 0.03m
[pouring the concrete grade 25 into the
formwork of stump
0.37 and all the reinforcement in it]
c) concrete work ground beam
volume of horizontal beam
15.60 x 0.2 x 0.5 = 1.56 m
volume of horizontal beam
(15.6 + 15.6 ) x 0.2 x 0.6 = 3.74m
volume of horizontal beam
2.775 x 0.2 x 0.45 = 0.25m
Total length for horizontal beam
1.56 + 3.74 + 0.25 = 5.55m
[pouring the concrete grade 25 into the
formwork foe beam
5.55 not exceed the level of beam formwork]
c) concrete work ground beam
volume of vertical beam = 7.15 x 0.2 x 0.45
7.15 x 0.2 x 0.45 = 0.64 m
volume of vertical beam
(7.15 x 5) x 0.2 x 0.6 = 4.29 m
RESULT
UNIT
QTY
m3
4.93
m2
5.04
RESULT
DESCRIPTION
UNIT
QTY
m2
3.12
m2
4.77
m2
8.26
m2
15.48