BEFORE PLASTERING

Check Drg./ Number/ Date & Revision for all other service like electrical,
plumbing etc.,

Safety access platform

Check for hacking/ Button marking / Mortar thickness

Provision of chicken mesh for conduits, column brick work joints & other

Preparation of Surface - Remove moss/ efflorescence & Dampen Surface

Material stacked - Cement, sand at various locations

Prewetting of surface

Quality of Sand - screening silt

Check the Beam, B/W joints packing with Nito Bond AR

10

check for Door Frame Projections


DURING PLASTERING

Platform for mortar mixing on tray

Check for thickness/ level & line & right angle

Proportion of mix

Addition of water proofing compound

Proper roughing of first coat

Check for collection of mortar spills

Cleaning of dead mortar

Check for waviness

Check for grooves/ drip moulds

10

Application of cement slurry on concrete surface/Space for tile area, cutting for
skirting area

11

Check for loft thickness and top surface in dead level W/Robe size
AFTER PLASTERING

Curing water distribution for various locations

Check for hollowness

Check for cracks

Check of plastering date for curing

Remarks of Quality Assurance Engineer:

Signature
Checked By:
Approved By:

Date

roject Location

e electrical,

nts & other

pen Surface

QA/CL-MSN/

:
DATE

YES

NO

NA

e area, cutting for

e size

Remarks/ Comments

You might also like