You are on page 1of 2

What you dont want to miss out on.

CONFERENCE

Pre-Conference certified training


ABSA PESL
Pressure Relief Devices Requirements and
Recommended Practices Seminar
CSA B51 / ASME B31.3 Process Piping
Essentials
TSASK PESL
Industry Group Meetings
ARPIA
CCIA
GUAC
SIA
Industry Inspectors
Workshops to attend
Two floors of exhibit booths to view
Three speaker streams
Social functions to attend
Welcome Lunch
Exhibitors Appreciation Event
Working Lunch
Thursday Evening Social Event

As a conference delegate, you can attend any presentation you


choose. All the presentations are on the 3rd floor of the Kinnear
Centre.
Delegate Fee:

Early Bird - to January 22, 2016 - $677.25 incl GST


Starting January 23, 2016 - $782.25 incl GST

Dates:

Noon, Wednesday, February 24, 2016 to


Noon, Friday, February 26, 2016

Register:

Online at www.ipeia.com

February 24 26, 2016


The Banff Centre
Banff, Alberta, Canada
IPEIA
An Association of Pressure Equipment Integrity Professionals

20th ANNUAL IPEIA CONFERENCE


Speaker Presentations In Alpha Order:

A U.S. Jurisdictional Use of the NBIC - National Board


Applying a Childlike Mindset to Root Cause Analysis - Beyond
Connections Consulting
Are End of Life Bottom Plate Corrosion Rates Effective? - Recon
Inspection
Brittle Fracture Assessments on Downstream Industry Piping
Systems - Stress Engineering
Case Study: Statistical Analysis of Pressure Relief Device Field
Deficiencies - Canadian Engineering and Inspection
Compressor Fire - Threaded Fitting - Talisman Energy
Considerations When Establishing a Piping Integrity Program Group 10 Engineering
Cyclic Service Analysis - Crack Growth vs. Crack Initiation - Becht
Engineering
Do You Know Your Options When it Comes to Storage Tank
Inspections? - Lloyd's Register Energy Canada
Explanation of ASME UT in Lieu of Radiography Fracture
Mechanics as Stated from the 2013 Edition - TUV SUD America
Fitness-for-Service Assessment and Field Strain Gauging of a Heat
Exchanger - Skystone Engineering
Harmonizing Safety Practices in B.C. - BC Safety Authority
High Temperature Hydrogen Attach: Historical Review, Current
Status and Future Perspective - The Equity Engineering Group
How Asset-Intensive Organizations Employ Predictive Analytics to
Monitor, Maintain and Optimize Assets for Better Availability,
Utilization and Performance - Bow River Solutions
How Equipment Integrity Improves Overall System Performance Quantified Approach - Fidelis Group
HTHA Failure Analysis Case Study and In-Situ Metallography Steel Image
Hydrogen in Steels: A Critical Review and Recommended Practices
- Stantec Consulting
Integrity Management: More Than Just Paperwork - RAE
Engineering and Inspection
Integrity Management of Pressure Equipment at the Influence of
Compliance Assessment - ASME

Making Sense of Measuring Integrity Management Performance Energy Inspections


Monitoring Asset Integrity Using Installed Ultrasonic Sensors - Sensor
Networks, Inc.
MTR Turnover - What is it good for? Absolutely Nothin'! - Christensen
Qualityworks Inc.
NDT Inspections of Piping Systems - IRISNDT
New Practical HTHA Prioritization Method for Inspection and
Replacement and User Experience with this Method - Becht
Engineering
Optimizing Inspections Through Representative Sampling - Suncor
Energy
Phased Array UT vs Radiography for Welded Joints: A Critical
Assessment - Stantec Consulting Ltd.
Practical Insight into UG101 Test Methods to Establish Component
Pressure Ratings - SGS Canada Inc.
Practical Introduction to Root Cause Analysis - Enbridge Pipelines Inc.
Pre-Development of a Proactive Comprehensive Asset Integrity
Program - Mistras Group
PSV 102, Repair from the Service Provider's Point of View - Corix
Control Systems
Recommended Guidance for Local Post Weld Heat Treatment
Configurations Based on Thermal-Mechanical Finite Element Analysis
- The Equity Engineering Group
Reliability Management of Fixed Equipment Assets - Quest Integrity
Restoration of Canadian Pacific Railway Steam Crane #414328 Heritage Park Historical Village
Rupture in Once Through Steam Generator Tubing - Skystone
Engineering
The Building Blocks of Bourdon Effect on Pipe Elbows Due to Internal
Pressure - University of Alberta
Storage Tank Process Upset Events: Causes and Effects - Young
EnergyServe
Turnaround Excellence is Achievable - Mobideo
Use of Thermal-Sprayed Coatings as Heat Tracers and De-Icing
Elements - University of Alberta
Vibration Induced Fatigue Failure (and Approaches to Manage this
Integrity Risk) - Wood Group Kenny / BETA Machinery
Weld Repair of Aged Alloy 800H Component - Shell Scotford

Make new and renew old friendships..Join us!


www.ipeia.com

You might also like