Resume of Civil, Water & Electrical works

Aburin Research Center


Compound B00 - Aburiin Research Center Compound
Building B01 - Laboratory Building
Building B02 - Male Guest House
Building B03 - Female Guest House
Activity B04 - Basketball Playground
Total Aburin Research Center civil works

V.Total Cost

Cod

Description

Unit

Building B00 - Compound


B00

A. Earth works & demolitions


Demolitions Of Underground Berkad
A.1. Site clearance
A.1.1 Site clearance: excavation and removal of top soil, wheel and deposit
on site as directed
A.1.4 Large section backfill/ landfill an earthwork with hardcore with stones
thickness of 1500-6000 mm with selected materail such letaritesoil with
boulders, and compacted by layers each layer is 50cm deep, degree of
compaction 90%

m2

m3

Total for Compound Clearence Activities


Water Har vesting Tank
B00
B00
B00

A. Earth works & demolitions


A.1. Site clearance
A.1.1 Site clearance: excavation and removal of top soil, wheel and deposit
on site as directed

B00
B00

A.2. Excavations & backfillings


A.2.1 Restricted section earthwork in excavation for Strip foundation of wall,
in all kinds of soil including dressing of bottom and sides of trenches.
Stack excavated soil clear from edges of excavation and subsequent
back filling around masonry in 15cm layers with compaction and
including disposal of surplus soil out of site as directed by engineer.
Not exceeding 1500 mm depth and 1000 mm width

B00

A.2.3 Earthwork section in excavation in all kinds of soil for bottom floor slab
of 200mm. disposal of surplus soil out of site as directed by engineer.

m2

m3

m3
B00
B00
B00
B00

A.3. Imported filling


A.3.2 Hardcore filling Gravel with stones maximum of 100 mm size with
selected materail such letaritesoil with boulders, and compacted by
layers each layer is 15cm deep, degree of compaction 90% well
compacted

B00

A.3.3 Sand blinding 50 mm thick on hardcore fillings

B00

B00

m3
m2

B. Construction works
B.1 Footing
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding of 5cm
thick under wall.

Page 2 of 20

m2

Unit rate

B
B00

B00

Cod
Description
B.1.2.2 R.C.C Strip foundation with cement concrete 1:1.5:3 (1 cement : 2
clean coarse sand : 4 stone aggregate of 25mm down) , including 10
numbers 14mm dia steel bars (BS 4461) and 6mm stirrups @200 mm
centers including centering complete. No: 00.04.2

Unit

m3

B.1.3 Construct stone wall in foundation, 40cm thickness bedded and jointed
with cement sand mortar of 1:3 proportion (1 cement: 3 clean coarse
sand). Face of wall should be in plumb. Corner stone should be good
stones dressed to correct angles and laid as headers and stretchers.
Bond stones shall be provided 100cm c/c vertically and horizontally.
Wall should be laid in courses of 40cm height. All the gaps between
stones shall be filled with cement mortar and wall should be kept moist
and protected from sun for a period of at least 10 days. Up to a height
of 150 cm
m3

B00

B.2 Reinforced concrete


B.2.5 R.C.C. work in Cover beam 300x200 mm with cement concrete 1:2:4
(1 cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including high yield deformed 4x12mm dia steel bars (BS 4461) as
principle reinforcement and 8 mm dia stirrups @200 mm c/c including
centering and shuttering complete.

m3

B.2.7 R.C.C.work for cover slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with mesh fabric BRC A252 (BS 4483:2005)
wires 10 mm dia @200x200 mm c/c, weight of bar 0.617Kg/m with
30mm side and end laps including centering and shuttering complete.
m3
B00

B.2.8 R.C.C.work for floor slab 200mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with mesh fabric BRC A252 (BS 4483:2005)
wires 12 mm dia @150x150 mm c/c, weight of bar 0888kg/m with
30mm side and end laps including centering and shuttering complete.
m3
B.4 Dressed Stone Wall
B.4.3 Squared stone masonry 400 mm thick bedded and jointed with cement
sand mortar of 1:3 proportion (1 cement: 3 clean coarse sand). Face of
wall should be in plumb. Corner stone should be good stones dressed
to correct angles and laid as headers and stretchers. Bond stones shall
be provided 1000 mm c/c vertically and horizontally well dressed . Wall
should be laid in courses of 400 mm height. All the gaps between
stones shall be filled with cement mortar and wall should be kept moist
and protected from sun for a period of at least 10 days. Up to a height
of 2000 mm
m3
B.3. Footing treatment

B00

B00
B00
B00

B.3.1 1000g polythene damp proof membrane laid under floor bed with
30mm side and end laps.

m2

B.3.5 Chemical anti-termite treatment to surfaces of hardcore to be executed


by specialist

m2

B5 Plastering

Page 3 of 20

Unit rate

B
B00

Cod
Description
B.5.4 Apply three layers of plastering each layer is 20mm thick on internal
faces of the walls of retaining water structures, first two layers are
cement mortar, Cement type : ordinary portland cement with design
mix with cement sand mortar (1:3) Clean, dry sand should be used. It
should be well-graded,comprising particles of different sizes.
Cement should have been recently manufactured and have
been protected from water vapour during storage and transport.
The water used in the mix needs to be clean, preferably of
drinking-water quality. third layer of water proofing materail shoul be
used as finishing

Unit

B00

B.5.5 Floor screed gently sloping towards the center( 30mm of edge and
10mm of the center

m2

B00

H.1.1 Man hole cover:Supply and locable steel door of 0.5m x0.5 using
appropriate frames and a metal plate 4mm

No

B00

H.1.2 Tap chamber; Supply materials and construct a masonry or block


chamber with a locable steel door of 0.5m x0.5 using appropriate
frames and a metal plate 4mm. Ensure the steel lid is water proof,
walls of the chamber is 15cm thickmade of concrete blocks, and the
inner dimensions are 50cmx50cmx50cm,Mortar mix ratio of 1:3 .

m2

Lsum

B00

H.1.3 Make provision for all form work and curing of concrete and masonry
work

No

B00

H.1.4 Gate valve and draw-off pipe: Supply 3/4 inch sockect , elbow ,nonreturn (original peggler) , elbow ,1.5m long 3/4'' pipe and extend the
draw off out of the chamber.

Lsum

B00

H.1.5 Down Pipes : Supply and install 3 inch down pipes and Make provision
for a elbows , skill fully connecting the down pipes to the gutters using
the elbows

B00

H.1.6 Supply removable external steel ladder( 3.0m long and 0.4m wide),
The steps should be at 0.4m interval

No

B00

H.1.7 Over Flow Pipes : Supply and install 1.5 inch pipe and Make provision
for a elbows
H.1.8 Gutters: Supply and install 28gauge galvanized iron sheet gutters
200mmx150mmx150mm and
hooks/gutter holders and other
accessories on roof eave of total length 30m long.The contractor is
advised to make provision for a minimum overlap of 30cm. Make
provision for ordinary end gutters (closed end without opening) and end
gutters with opening for down pipe to direct the water into the tank. The
gutter holders must be spaced at intervals of not more than 1m apart.

No

m
H.1.9 Wash Out :Supply and install 2m long 1.5 inch G.I. pipe with a plug
and an elbow at the centre . The wash out pipe should pass through
the tap chamber and fitted with a non-return valve located withing the
tap chamber
Total one water harvesting tank
Total of Three water Harvesting Tank

Page 4 of 20

Lsum

No

Unit rate

Cod

Description

Unit

Building B01 - Laboratory


B01
B01
B01
B01
B01
B01

A. Earth works & demolitions


A.1. Site clearance
A.1.1 Site clearance: excavation and removal of top soil, wheel and
deposit on site as directed

m2

A.2. Excavations & backfillings


A.2.1 Restricted section earthwork in excavation for Strip foundation
of wall, in all kinds of soil including dressing of bottom and
sides of trenches. Stack excavated soil clear from edges of
excavation and subsequent back filling around masonry in
15cm layers with compaction and including disposal of surplus
soil out of site as directed by engineer.
Not exceeding 1500 mm depth and 1000 mm width
m3

B01
B01

A.3. Imported filling


A.3.2 Hardcore filling Gravel with stones maximum of 100 mm size
with selected materail such letaritesoil with boulders, and
compacted by layers each layer is 15cm deep, degree of
compaction 90% well compacted

M3

B01
B01
B01
B01
B01

B. Construction works
B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding
of 5cm thick under wall.

m2

B01

B.1.2 Vibrated mass concrete under stone wall foundatins


with
cement concrete 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down) complete.

m3

B01

B.1.3 Construct stone wall in foundation, 40cm thickness bedded


and jointed with cement sand mortar of 1:3 proportion (1
cement: 3 clean coarse sand). Face of wall should be in
plumb. Corner stone should be good stones dressed to correct
angles and laid as headers and stretchers. Bond stones shall
be provided 100cm c/c vertically and horizontally. Wall should
be laid in courses of 40cm height. All the gaps between stones
shall be filled with cement mortar and wall should be kept
moist and protected from sun for a period of at least 10 days.
Up to a height of 150 cm
m3

B01
B01

B.2. Reinforced concrete


B.2.1 R.C.C. work for columns footing, insitu vibrated concrete with
mix proportion 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down) Class 20/20 reinforced with
12 ReBars (BS 4461) links in both directions @200 mm
centers including centering and shuttering complete.
B.2.2 R.C.C. work for ground beam 400x200mm with cement
concrete 1:2:4 (1 cement : 2 clean coarse sand : 4 stone
aggregate of 25mm down) , including 6 numbers 12mm dia
steel bars (BS 4461) and 6mm stirrups @200 mm centers
including centering and shuttering complete.

B01

B.2.3 R.C.C. work for column with mix proportion of 1:2:4 (1


cement : 2 clean coarse sand : 4 stone aggregate of 25mm
down) and including high yield deformed steel, 4 numbers
14mm dia vertical bar (BS 4461) and 8mm dia stirrup @200
mm c/c including centering and shuttering complete.

B01

B.2.4 R.C.C. work in lintel continuous over doors and windows


150x200 mm with cement concrete 1:2:4 (1 cement : 2 clean
coarse sand : 4 stone aggregate of 25mm down), including
high yield deformed 2x10mm dia steel bars (BS 4461) and
6mmdia stirrups @200 mm c/c including centering and
shuttering complete.

Page 5 of 20

m3

m3

m3

m3

Unit rate

B
B01

Cod
Description
B.2.6 R.C.C. work in ring beam 200x200 mm with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including high yield deformed 6x12mm dia steel
bars (BS 4461) as principle reinforcement and 8 mm dia
stirrups @200 mm c/c including centering and shuttering
complete.

B01

B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.

Unit

m3

m3
External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
Work top Desk / Table for the Laboratory
B.2.10 R.C.C. worktop slab of 80 mm thick with cement concrete
1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate of
25mm down), including high yield deformed 8mm dia steel
bars (BS 4461) @100 mm c/c in both directions including
formation of manholes and RCC covers as per drawings,
centering and shuttering complete.
B01
B01

B01
B01
B01

B.3. Treatments & waterproofing


B.3.1 1000g polythene damp proof membrane laid under floor bed
with 30mm side and end laps.

B.4. Walls
B.4.2 Concrete hollow block walling (strength not less than
12N/sqcm) in super structure 200 mm thick up to a heigth of
4000 mm with cement sand mortar Ratio(1:3) for walls and
gables

B01

Work top/Table wall


B.4.1 Sancrete solid block walling (strength not less than 12N/sqcm)
in super structure 200 mm thick up to a heigth of 4000 mm
with cement sand mortar Ratio (1:3) for walls and gables

B01
B01

B.5. Plasters
B.5.1 36mm thick plastering on internal & External faces of the
walls, columns & beams with cement sand mortar (1:3)
gauged in three coats included surface smoothing

m3

m3

m2

m2

m2

B01
B01
B01
B01
B01

m2

C. Roof construction & coverings


C.1. Roof construction
C.1.1 Roof structure build according to drawings using 150x50 mm
rafters, 100x50 mm tie and struts, 75x50 purlins, 25x250
fascia or barge board; all trusses tied and bolted to the ring
beam and all purlins ties to the trusses with hook iron strips;
prime, knot, prepare and apply two coats anti thermites
protection to all wood surfaces before assembly, 200-300mm
girth; covering with 26 gauge factory painted IT4 roof sheets
nailed on timber trusses and purlins included GI roof nails and
nail washers, matching ridges and cappings. Measured for
final size, all cuttings and wastages deemed as included
m2

B01
B01

D. Doors & windows

B01
B01

D.2. Aluminium Windows

Page 6 of 20

Unit rate

B
B01

Cod
Description
D.2.1 Supply and fix of purpose made aluminium casement windows
complete with opening accessories, steel hinges, iron
mongery with matching screws and burglar proofing with min.
10mm dia bars including bedding and pointing around frames
in cement mortar. Completed with 6 mm thick clear sheet
glass, cutting and glasing to aluminium casement in panes
and steel mosquito net with aluminium frame (ID A1 in the
drawings). Measured for actual surfaces with minimum
500x500 mm size.

Unit

m2
B01

Under Worktop Table / Worktop Shelfs


D.4.1 Supply and fix Aluminium panels shelf doors with aluminium
frame and clips,complete with opening accessories, and steel
hinges.

m2

B01

D.5 Windowsills
D.5.1 Provide and fix precast concrete sill ( 0.25m X 0.10m x 1.2
wide ) thick on all external windows as per the design
drawings for Windows

m3

B01
B01

D.6. Metal frame doors


D.6.11 Supply and fix purposed made steel grilled door fit for external
use with two leaf about 45-50 mm thick with SHS frame and
steel grille made with min 10 mm dia bars 200x200 spacing
c/c, three steel hinges, ironmongeries with cylinder lock.
Bedded, jointed and pointed in cement mortar; included
priming, two coats of red oxide and two coats of oil paint; final
thorough cleaning. Width between 1200-1800 mm heigth
between 1900-2100 mm. Actual dimension to be verified on
site. (ID A5 on the drawings)

B02

Supply and fix standard flush wooden door internal quality;


single leaf with three steel hinges, ironmongeries with cylinder
lock.
Bedded, jointed and pointed in cement mortar. Width between
600-900 mm
heigth between 1900-2100 mm. Actual dimension to be
E. verified
Finishes
on site.

No

B01
B01
B01

E.1. Floorings & tilings

B01

E.1.3 Supply and placing of porcelain tiles 400x400 mm 10 mm thick


on floors, with skirting of 100 mm high, 400mm wide. Type
colour and finishing to be agreed with the contracting authority
before purchase.

B01

E.1.4 Supply and placing of porcelain tiles 300x150 mm 10 mm thick


on walls and desktops as shown in the drawings. Type colour
and finishing to be agreed with the contracting authority before
purchase.
E.2. Ceiling
E.2.2 Supply and fix approved 12 mm thick plasterboard ceiling on
steel structure brandering at 600 centres both ways

B01
B01

No

E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with
filler, prime and apply three coat of acrilic matte emulsion to
internal and external plastered walls & concrete until all
surfaces are perfectly uniform. Thorough cleaning of all
surfaces after painting. Colour to be agreed with the
contracting authority before painting.

m2

m2

m2

m2

F. Water supply & Sewerage System


F.1.1 Construction of 900x900 mm (internal dimensions) sewage
inspection chamber as per detailed drawing, the chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, formation of internal benchings and
slopes, RCC cover slab with manhole and cover, thorough
connection of all the pipes.
each

Page 7 of 20

Unit rate

Cod
Description
F.1.3 Construction of 600x600 mm (internal dimensions) water
supply or drainage system inspection chamber. The chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, RCC cover slab with manhole and
cover, thorough connection of all the pipes.

Unit

each

F.2.1 Supply and fix best quality porcelain European sitting type with
built in P trap included porcelain wall flush tank, water supply
gate valves, side handheld bidet faucet with flex pipe,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 75mm PVC pipe with
inspection Y, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.2 Supply and fix best quality porcelain wasbasin approx 600 mm
wide included P trap, mixer type tap, water supply gate valves,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all
special pieces included to achieve a perfectly functioning
assembly.
F.2.3 Supply and fix best quality porcelain shower tray approx
700x700 mm wide included mixer type tap and shower
stainless steel shower head, connection with water supply
using uPVC high density (PPR), connection with sewage
system using 50 mm PVC pipe, all special pieces included to
achieve a perfectly functioning assembly.

each

each

F.2.6 Supply and fix stainless steel sink with two bowls approx size
340x400x210 mm and side worktop approx size 400x500 mm,
included stainless steel P trap, mixer type tap, water supply
gate valves, connection with water supply using uPVC high
density (PPR), connection with sewage system using 50 mm
PVC pipe, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.9 supply and install 6 inch pipe for sewerage work connecting
between the Champers with all accessories and connection
W-01 Supply materials and erect steel frame structure 4 m Height
with all foundation (1x1x0.2)m3 works for steel tower legs (Min
50x30 concrete anchoring of the Steel tower legs ), painting
the Steel frames with anti-rust paint and with 3 coats finishing
oil paint. The work shall include water tanks erection.

each
W-02 Supply and install Two PVC water tanks on top of the steel
tower price including all piping and fittings, Valves, float valves
and drain pipe, with a capacity of: each one is1000 LT
each
W-04 Supply materials and erect two water pump (1 horse Power)
with steel cage and cover for protection. The work includes the
connection between water tanks and main water collection
point using all accessories and according engineer
instructions.

each

I. Electrical Supply
I.0.1 Supply of materials and works testing electrical l wiring for all
the building as per the design drawings. All wiring shall be
through PVC electrical conduit pipes (Dia. 12mm) with all
needed connecting fixtures and PVC boxes. Switches types
(European origin or equivalent) wiring shall be single core PVC
insulated wire (European origin or equivalent) size (1.5mm2)
for lighting lines and 2.5 mm2 for main feeder from distribution
board.. The price shall include fixing the pipe in the wall or
roofing with good plaster finishing ,as per electrical drawing
details.
Ls

I.0.2 Supply of material and works to fix and operate single tube 4

ft. fluorescent light fitting ordinary type without reflector of


(European origin or equivalent) complete with starter and
fluorescent tube (European origin or equivalent).

Unit

I.0.3 Supply and fix 20 amp switch one way one gang complete
with wiring as per the drawing

Unit

I.0.4 Supply and fix 35 amp single socket outlet complete with
wiring as per the design drawings

Unit

Page 8 of 20

Unit rate

Cod

Unit

Description
Building B02 Male GuestHouse

B02
B02
B02
B02
B02
B02

A. Earth works & demolitions


A.1. Site clearance
A.1.1 Site clearance: excavation and removal of top soil, wheel and
deposit on site as directed

m2

A.2. Excavations & backfillings


A.2.1 Restricted section earthwork in excavation for Strip foundation
of wall, in all kinds of soil including dressing of bottom and
sides of trenches. Stack excavated soil clear from edges of
excavation and subsequent back filling around masonry in
15cm layers with compaction and including disposal of surplus
soil out of site as directed by engineer.
Not exceeding 1500 mm depth and 1000 mm width
m3

B02
B02

B02
B02
B02
B02

A.3. Imported filling


A.3.2 Hardcore filling Gravel with stones maximum of 100 mm size
with selected materail such letaritesoil with boulders, and
compacted by layers each layer is 15cm deep, degree of
compaction 90% well compacted

M3

B. Construction works
B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding
of 5cm thick under wall.

m2

B02

B.1.2 Vibrated mass concrete under stone wall foundatins


with
cement concrete 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down) complete.

m3

B02

B.1.3 Construct stone wall in foundation, 40cm thickness bedded


and jointed with cement sand mortar of 1:3 proportion (1
cement: 3 clean coarse sand). Face of wall should be in
plumb. Corner stone should be good stones dressed to correct
angles and laid as headers and stretchers. Bond stones shall
be provided 100cm c/c vertically and horizontally. Wall should
be laid in courses of 40cm height. All the gaps between stones
shall be filled with cement mortar and wall should be kept
moist and protected from sun for a period of at least 10 days.
Up to a height of 150 cm
m3

B02
B02

B02

B.2. Reinforced concrete


B.2.1 R.C.C. work for columns footing, insitu vibrated concrete with
mix proportion 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down) Class 20/20 reinforced with
12 ReBars (BS 4461) links in both directions @200 mm
centers including centering and shuttering complete.
B.2.2 R.C.C. work for ground beam 400x200mm with cement
concrete 1:2:4 (1 cement : 2 clean coarse sand : 4 stone
aggregate of 25mm down) , including 6 numbers 12mm dia
steel bars (BS 4461) and 6mm stirrups @200 mm centers
including centering and shuttering complete.
B.2.3 R.C.C. work for column with mix proportion of 1:2:4 (1
cement : 2 clean coarse sand : 4 stone aggregate of 25mm
down) and including high yield deformed steel, 4 numbers
14mm dia vertical bar (BS 4461) and 8mm dia stirrup @200
mm c/c including centering and shuttering complete.

Page 9 of 20

m3

m3

m3

Unit rate

B
B02

Cod
Description
B.2.4 R.C.C. work in lintel continuous over doors and windows
150x200 mm with cement concrete 1:2:4 (1 cement : 2 clean
coarse sand : 4 stone aggregate of 25mm down), including
high yield deformed 2x10mm dia steel bars (BS 4461) and
6mmdia stirrups @200 mm c/c including centering and
shuttering complete.

B02

B.2.6 R.C.C. work in ring beam 200x200 mm with cement concrete


1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including high yield deformed 6x12mm dia steel
bars (BS 4461) as principle reinforcement and 8 mm dia
stirrups @200 mm c/c including centering and shuttering
complete.

B02

Unit

m3

m3

B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
m3

B02

External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
m3

B02
B02

B02
B02

B02
B02
B02

B02
B02
B02
B02
B02

B.3. Treatments & waterproofing


B.3.1 1000g polythene damp proof membrane laid under floor bed
with 30mm side and end laps.
B.4. Walls
B.4.2 Concrete hollow block walling (strength not less than
12N/sqcm) in super structure 200 mm thick up to a heigth of
4000 mm with cement sand mortar Ratio(1:3) for walls and
gables
B.5. Plasters
B.5.1 36mm thick plastering on internal & External faces of the
walls, columns & beams with cement sand mortar (1:3)
gauged in three coats included surface smoothing

m2

m2

m2

C. Roof construction & coverings


C.1. Roof construction
C.1.1 Roof structure build according to drawings using 150x50 mm
rafters, 100x50 mm tie and struts, 75x50 purlins, 25x250
fascia or barge board; all trusses tied and bolted to the ring
beam and all purlins ties to the trusses with hook iron strips;
prime, knot, prepare and apply two coats anti thermites
protection to all wood surfaces before assembly, 200-300mm
girth; covering with 26 gauge factory painted IT4 roof sheets
nailed on timber trusses and purlins included GI roof nails and
nail washers, matching ridges and cappings. Measured for
final size, all cuttings and wastages deemed as included
m2

B02
B02
B02

D. Doors & windows


D.2. Aluminium Windows

Page 10 of 20

Unit rate

B
B02

Cod
Description
D.2.1 Supply and fix of purpose made aluminium casement windows
complete with opening accessories, steel hinges, iron
mongery with matching screws and burglar proofing with min.
10mm dia bars including bedding and pointing around frames
in cement mortar. Completed with 6 mm thick clear sheet
glass, cutting and glasing to aluminium casement in panes
and steel mosquito net with aluminium frame (ID A1 in the
drawings). Measured for actual surfaces with minimum
500x500 mm size.

B02

D.5 Windowsills
D.5.1 Provide and fix precast concrete sill ( 0.25m X 0.10m x 1.2
wide ) thick on all external windows as per the design
drawings for Windows

B02
B02

D.6. Metal frame doors


D.6.2 Supply and fix purposed made steel frame door fit for external
use with two plain shutters about 45-50 mm thick with SHS
frame and double metal sheeting min 5/10 mm thickness,
thermo-insulated internal cellular core, three steel hinges,
ironmongeries with cylinder lock. Bedded, jointed and pointed
in cement mortar; included priming, two coats of red oxide and
two coats of oil paint; final thorough cleaning. Width between
1200-1800 mm heigth between 1900-2100 mm. Actual
dimension to be verified on site. (ID A1 on the drawings)

B02

Supply and fix standard flush wooden door internal quality;


single leaf with three steel hinges, ironmongeries with cylinder
lock.
Bedded, jointed and pointed in cement mortar. Width between
600-900 mm
heigth between 1900-2100 mm. Actual dimension to be
verified on site.

B02
B02

E.1. Floorings & tilings


E.1.3 Supply and placing of porcelain tiles 400x400 mm 10 mm thick
on floors, with skirting of 100 mm high, 400mm wide. Type
colour and finishing to be agreed with the contracting authority
before purchase.

Unit

m2

m3

No

E.1.4 Supply and placing of porcelain tiles 300x150 mm 10 mm thick


on walls and desktops as shown in the drawings. Type colour
and finishing to be agreed with the contracting authority before
purchase.
B02

E.12 Supply and fix approved 12 mm thick plasterboard ceiling on


steel structure brading at 600 bath ways

B02
B02

E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with
filler, prime and apply three coat of acrilic matte emulsion to
internal and external plastered walls & concrete until all
surfaces are perfectly uniform. Thorough cleaning of all
surfaces after painting. Colour to be agreed with the
contracting authority before painting.

No

m2

m2
m2

m2

F. Water supply & Sewarage System


F.1.1 Construction of 900x900 mm (internal dimensions) sewage
inspection chamber as per detailed drawing, the chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, formation of internal benchings and
slopes, RCC cover slab with manhole and cover, thorough
connection of all the pipes.
each

Page 11 of 20

Unit rate

Cod
Description
F.1.3 Construction of 600x600 mm (internal dimensions) water
supply or drainage system inspection chamber. The chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, RCC cover slab with manhole and
cover, thorough connection of all the pipes.

Unit

each
F.2.1 Supply and fix best quality porcelain European sitting type with
built in P trap included porcelain wall flush tank, water supply
gate valves, side handheld bidet faucet with flex pipe,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 75mm PVC pipe with
inspection Y, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.2 Supply and fix best quality porcelain wasbasin approx 600 mm
wide included P trap, mixer type tap, water supply gate valves,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all
special pieces included to achieve a perfectly functioning
assembly.
F.2.3 Supply and fix best quality porcelain shower tray approx
700x700 mm wide included mixer type tap and shower
stainless steel shower head, connection with water supply
using uPVC high density (PPR), connection with sewage
system using 50 mm PVC pipe, all special pieces included to
achieve a perfectly functioning assembly.

each

each

F.2.6 Supply and fix stainless steel sink with two bowls approx size
340x400x210 mm and side worktop approx size 400x500 mm,
included stainless steel P trap, mixer type tap, water supply
gate valves, connection with water supply using uPVC high
density (PPR), connection with sewage system using 50 mm
PVC pipe, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.7 supply and install 6 inch pipe for sewerage work connecting
between the Champers with all accessories and connection

W-01 Supply materials and erect steel frame structure 4 m Height


with all foundation (1x1x0.2)m3 works for steel tower legs (Min
50x30 concrete anchoring of the Steel tower legs ), painting
the Steel frames with anti-rust paint and with 3 coats finishing
oil paint. The work shall include water tanks erection.
Unit
W-02 Supply and install 0ne PVC water tanks on top of the steel
tower price including all piping and fittings, Valves, float valves
and drain pipe, with a capacity of:1000 litre

W-04 Supply materials and erect two water pump (1 horse Power)
with steel cage and cover for protection. The work includes the
connection between water tanks and main water collection
point using all accessories and according engineer
instructions.

No

Unit

I. Electrical Supply

I.0.1 Supply of materials and works testing electrical l wiring for all

the building as per the design drawings. All wiring shall be


through PVC electrical conduit pipes (Dia. 12mm) with all
needed connecting fixtures and PVC boxes. Switches types
(European origin or equivalent) wiring shall be single core PVC
insulated wire (European origin or equivalent) size (1.5mm2)
for lighting lines and 2.5 mm2 for main feeder from distribution
board.. The price shall include fixing the pipe in the wall or
roofing with good plaster finishing ,as per electrical drawing
details.
Ls

Page 12 of 20

Unit rate

Cod

Description

Unit

Unit rate

V. Qty

V.Total CoSt

B02 Female Guest House


B03
B03
B03
B03
B03
B03

B03
B03

A. Earth works & demolitions


A.1. Site clearance
A.1.1 Site clearance: excavation and removal of top soil, wheel and deposit
on site as directed

m2

131.32 $

131.32

m3

39.756 $

278.29

m3

32.83 $

820.75

A.2. Excavations & backfilling's


A.2.1 Restricted section earthwork in excavation for Strip foundation of
wall, in all kinds of soil including dressing of bottom and sides of
trenches. Stack excavated soil clear from edges of excavation and
subsequent back filling around masonry in 15cm layers with
compaction and including disposal of surplus soil out of site as
directed by engineer.
Not exceeding 1500 mm depth and 1000 mm width

A.3. Imported filling


A.3.2 Hardcore filling Gravel with stones maximum of 100 mm size with
selected materail such letaritesoil with boulders, and compacted by
layers each layer is 15cm deep, degree of compaction 90% well
compacted

B03
B03

B. Construction works

B03
B03

B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding of 5cm
thick under wall.

m2

49.8 $

2,241.00

B03

B.1.2 Vibrated mass concrete under stone wall foundatins with cement
concrete 1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate
of 25mm down) complete.

m3

9.96 $

498.00

B03

B.1.3 Construct stone wall in foundation, 40cm thickness bedded and


jointed with cement sand mortar of 1:3 proportion (1 cement: 3 clean
coarse sand). Face of wall should be in plumb. Corner stone should
be good stones dressed to correct angles and laid as headers and
stretchers. Bond stones shall be provided 100cm c/c vertically and
horizontally. Wall should be laid in courses of 40cm height. All the
gaps between stones shall be filled with cement mortar and wall
should be kept moist and protected from sun for a period of at least
10 days. Up to a height of 150 cm
m3

16.6 $

747.00

m3

0.4 $

m3

6.64 $

m3

1.08 $

m3

2.49 $

m3

3.32 $

m3

11.42 $

m3

4.46 $

B03

B.2. Reinforced concrete


B.2.1 R.C.C. work for columns footing, insitu vibrated concrete with mix
proportion 1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate
of 25mm down) Class 20/20 reinforced with 12 ReBars (BS 4461)
links in both directions @200 mm centers including centering and
shuttering complete.

B03

B.2.2 R.C.C. work for ground beam 400x200mm with cement concrete
1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate of 25mm
down) , including 6 numbers 12mm dia steel bars (BS 4461) and
6mm stirrups @200 mm centers including centering and shuttering
complete.

B03

B.2.3 R.C.C. work for column with mix proportion of 1:2:4 (1 cement : 2
clean coarse sand : 4 stone aggregate of 25mm down) and including
high yield deformed steel, 4 numbers 14mm dia vertical bar (BS
4461) and 8mm dia stirrup @200 mm c/c including centering and
shuttering complete.

B03

B.2.4 R.C.C. work in lintel continuous over doors and windows 150x200
mm with cement concrete 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down), including high yield deformed
2x10mm dia steel bars (BS 4461) and 6mmdia stirrups @200 mm c/c
including centering and shuttering complete.

B03

B.2.6 R.C.C. work in ring beam 200x200 mm with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including high yield deformed 6x12mm dia steel bars (BS 4461) as
principle reinforcement and 8 mm dia stirrups @200 mm c/c including
centering and shuttering complete.

B03

B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with 2 layers of mesh fabric BRC A252 (BS
4483:2005) wires 8mm dia @300x300m c/c, weight 3.95 Kg/m2 with
30mm side and end laps including scum baffle and weir as per
drawings, centering and shuttering complete.

B03

External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with 2 layers of mesh fabric BRC A252 (BS
4483:2005) wires 8mm dia @300x300m c/c, weight 3.95 Kg/m2 with
30mm side and end laps including scum baffle and weir as per
drawings, centering and shuttering complete.

312.20

B03
B03

B.3. Treatments & waterproofing


B.3.1 1000g polythene damp proof membrane laid under floor bed with
30mm side and end laps.

m2

114.2 $

571.00

B03
B03

B.4. Walls
B.4.2 Concrete hollow block walling (strength not less than 12N/sqcm) in
super structure 200 mm thick up to a heigth of 4000 mm with cement
sand mortar Ratio(1:3) for walls and gables

m2

197.62 $

3,161.92

B.5. Plasters
B.5.1 36mm thick plastering on internal & External faces of the walls,
columns & beams with cement sand mortar (1:3) gauged in three
coats included surface smoothing

m2

408.92 $

1,226.76

m2

143 $

1,859.00

m2

18.2 $

1,820.00

m3

0.315 $

22.05

No

1 $

200.00

No

5 $

600.00

m2

157 $

2,355.00

m2

114.2 $

913.60

m2

395.24 $

790.48

B03
B03

B03
B03
B03
B03

B03
B03
B03
B03

C. Roof construction & coverings


C.1. Roof construction
C.1.1 Roof structure build according to drawings using 150x50 mm rafters,
100x50 mm tie and struts, 75x50 purlins, 25x250 fascia or barge
board; all trusses tied and bolted to the ring beam and all purlins ties
to the trusses with hook iron strips; prime, knot, prepare and apply
two coats anti thermites protection to all wood surfaces before
assembly, 200-300mm girth; covering with 26 gauge factory painted
IT4 roof sheets nailed on timber trusses and purlins included GI roof
nails and nail washers, matching ridges and cappings. Measured for
final size, all cuttings and wastages deemed as included

D. Doors & windows


D.2. Aluminium Windows
D.2.1 Supply and fix of purpose made aluminium casement windows
complete with opening accessories, steel hinges, iron mongery with
matching screws and burglar proofing with min. 10mm dia bars
including bedding and pointing around frames in cement mortar.
Completed with 6 mm thick clear sheet glass, cutting and glasing to
aluminium casement in panes and steel mosquito net with aluminium
frame (ID A1 in the drawings). Measured for actual surfaces with
minimum 500x500 mm size.
D.5 Windowsills
D.5.1 Provide and fix precast concrete sill ( 0.25m X 0.10m x 1.2 wide )
thick on all external windows as per the design drawings for
Windows

B03
B03

D.6. Metal frame doors


D.6.9 Supply and fit security door and frame, 45mm door leaf, constructed
of 2mm steel, with internal reinforcing and an insulated core.
Overhanging flanges to three edges for security and weatherproofing.
Three security pegs to hinge edge. Frame construction of 2mm steel
with internal reinforcing, integral frame adjusting screws, flexible
weather seals, tamper-resistant lock jamb and full height continuous
stainless steel hinge. 12 fixing points through jambs, 3 though
threshold. Heavy duty 3-point surface mounted locking system with
lever handles, deadlatch and drill resistant lock cylinder. Size
1000x2100 mm. (ID A4 in the drawings)

Supply and fix standard flush wooden door internal quality; single leaf
with three steel hinges, ironmongeries with cylinder lock.
Bedded, jointed and pointed in cement mortar. Width between 600900 mm
heigth between 1900-2100 mm. Actual dimension to be verified on
site.

B03
B03
B03
B03
B03

E. Finishes
E.1. Floorings & tilings
E.1.3 Supply and placing of porcelain tiles 400x400 mm 10 mm thick on
floors, with skirting of 100 mm high, 400mm wide. Type colour and
finishing to be agreed with the contracting authority before purchase.

B03
B03

E.2 Ceiling
E.2.2 Supply and fix approved 12 mm thick plasterboard ceiling on steel
structure brandering at 600 centres both ways

B03
B03

E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with filler,
prime and apply three coat of acrilic matte emulsion to internal and
external plastered walls & concrete until all surfaces are perfectly
uniform. Thorough cleaning of all surfaces after painting. Colour to be
agreed with the contracting authority before painting.

F. Water supply & Sewarage System


F.1.1 Construction of 900x900 mm (internal dimensions) sewage
inspection chamber as per detailed drawing, the chamber depth will
be appraised on site according with the mandatory slopes of the
pipes. Including excavations, 50 mm sand blinding, mass concrete
footing, sandcrete solid blocks walling, internal rendering, formation
of internal benchings and slopes, RCC cover slab with manhole and
cover, thorough connection of all the pipes.

B03

B03

each

3 $

each

2 $

each

2 $

each

2 $

each

2 $

each

2 $

70 $

F.1.3 Construction of 600x600 mm (internal dimensions) water supply or


drainage system inspection chamber. The chamber depth will be
appraised on site according with the mandatory slopes of the pipes.
Including excavations, 50 mm sand blinding, mass concrete footing,
sandcrete solid blocks walling, internal rendering, RCC cover slab
with manhole and cover, thorough connection of all the pipes.
F.2.1 Supply and fix best quality porcelain European sitting type with built
in P trap included porcelain wall flush tank, water supply gate valves,
side handheld bidet faucet with flex pipe, connection with water
supply using uPVC high density (PPR), connection with sewage
system using 75mm PVC pipe with inspection Y, all special pieces
included to achieve a perfectly functioning assembly.
F.2.2 Supply and fix best quality porcelain wasbasin approx 600 mm wide
included P trap, mixer type tap, water supply gate valves, connection
with water supply using uPVC high density (PPR), connection with
sewage system using 50 mm PVC pipe, all special pieces included to
achieve a perfectly functioning assembly.
F.2.3 Supply and fix best quality porcelain shower tray approx 700x700 mm
wide included mixer type tap and shower stainless steel shower
head, connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all special
pieces included to achieve a perfectly functioning assembly.
F.2.6 Supply and fix stainless steel sink with two bowls approx size
340x400x210 mm and side worktop approx size 400x500 mm,
included stainless steel P trap, mixer type tap, water supply gate
valves, connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all special
pieces included to achieve a perfectly functioning assembly.
F.2.9 supply and install 4inch pipe for sewerage work connecting between
the Champers with all accesesories and connection
W-01 Supply materials and erect steel frame structure 4 m Height with all
foundation (1x1x0.2)m3 works for steel tower legs (Min 50x30
concrete anchoring of the Steel tower legs ), painting the Steel
frames with anti-rust paint and with 3 coats finishing oil paint. The
work shall include water tanks erection.

W-02

W-04

I.0.1

Supply and install 0ne PVC water tanks on top of the steel tower
price including all piping and fittings, Valves, float valves and drain
pipe, with a capacity of:1000 litre
Supply materials and erect two water pump (1 horse Power) with
steel cage and cover for protection. The work includes the connection
between water tanks and main water collection point using all
accessories and according engineer instructions.
Supply of materials and works testing electrical l wiring for all the
building as per the design drawings. All wiring shall be through PVC
electrical conduit pipes (Dia. 12mm) with all needed connecting
fixtures and PVC boxes. Switches types (European origin or
equivalent) wiring shall be single core PVC insulated wire (European
origin or equivalent) size (1.5mm2) for lighting lines and 2.5 mm2 for
main feeder from distribution board.. The price shall include fixing
the pipe in the wall or roofing with good plaster finishing ,as per
electrical drawing details.

I.0.2

Supply of material and works to fix and operate single tube 4 ft.
fluorescent light fitting ordinary type without reflector of (European
origin or equivalent) complete with starter and fluorescent tube
(European origin or equivalent).

I.0.3

Supply and fix 20 amp switch one way one gang complete with wiring
as per the drawing

I.0.4

Supply and fix 35 amp single socket outlet complete with wiring as
per the design drawings

I.0.5
I.0.6
I.0.7
I.0.8

Supply and fix telephone outlet


Supply and fix a meter board
Supply and fix ceiling fans a per the drawing
Supply, install, connect wiring, testing and operating MDB main
distribution board ( circuit breaker) contains 1 phase circuit isolator
(100 Amp capacity) and 10 circuit breaker with capacities limited in
the drawings and engineer supervision, the MDB should be installed
in a Steel Box with locks for protection.

Unit

No

Unit

150

Ls

1 $

Unit

11 $

Unit

11 $

Unit
Unit
Unit
Unit

12
2
1
5

$
$
$
$

1 $

Unit

I.0.9

Supply of material and works to connect, test and operate complete


ear thing system, the price shall include wiring of the building using
copper wire Diam10mm driven into the ground at 1.5m depth.
ls

1 $

ls

1 $

I.0.10 Provide and fix all the necessary connections to connect the MDB to
the Main electricity Network Supply.
Total B03

27,312.27

Cod

Description

Unit Unit rate

Building B04 - Basketball court


A. Earth works & demolitions
B04
B04
B04
B04

A.1. Site clearance


A.1.1 Site clearance: excavation and removal of top soil, wheel and
deposit on site as directed
A.2. Excavations & backfillings
A.2.3 Earthwork section in excavation in all kinds of soil for bottom
floor slab of 200mm. disposal of surplus soil out of site as
directed by engineer.

B04
B04
B04

B04

m2

A.3. Imported filling


A.3.2 Hardcore filling Gravel with stones maximum of 100 mm size
with selected materail such letaritesoil with boulders, and
compacted by layers each layer is 15cm deep, degree of
compaction 90% well compacted
A.3.3 Sand blinding 50 mm thick on hardcore fillings

m3

m3
m2

B. Construction works
B04
B04

B.2. Reinforced concrete


B.2.8 R.C.C.work for floor slab 200mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with mesh fabric BRC
A252 (BS 4483:2005) wires 12 mm dia @150x150 mm c/c,
weight of bar 0888kg/m with 30mm side and end laps
including centering and shuttering complete.
m3

B04
B04
B04
B04
B04
B04
B04
B04
B04
B04
B04

B.3. Treatments & waterproofing


B.3.1 1000g polythene damp proof membrane laid under floor bed
with 30mm side and end laps.

m2

E. Finishes
E.1. Floorings & tilings
E.1.2 30mm thick cement and sand screed on floor slab, trowelled
smooth
E.3. Paintings

m2

B04

E.3.6 Prepare surfaces with thorough claning and smoothing with


filler, prime and apply three coat of waterproof paint certified
for floor usage to the basket court concrete floor until all
surfaces are perfectly uniform. Included the use fo
contrasting colours for the backgroud of basketball court,
valleyball court and outside space; tracing of court lines
complyant with olympic regulations. Thorough cleaning of all
surroundings after painting. Colour to be agreed with the
contracting authority before painting.
m2

B04
B04
B04

B04
B04

E.4. Other finishings and supplies


E.4.1 Supply and fix factory made basketball backboard stands
compliant with olypic regulations. Minimum overhanging 2250
mm, main structural members minimum RHS 3" diameter;
strutts and ties minimum RHS 2" diameter; included rust
protection and factory paint.
Basketball Court B04

No
Total

cod

Description

Unit

Qty

Page 20 of 20

Eng rate

Eng tot