TG4 GENERATION RECORD 2014

TIME

POWER

REASON

CORECTIVE

GENERATION

PROCCES

DEVIATION

TARGET 19.2 - 19.5

PROBLEM

PARAMETER

REMARK

ACTION

MW
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00

Sign
Shift 1

15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00

Sign
Shift 2

23:00
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00

Sign
Shift 3

LOG SHEET FOR POWER GENERATION DEVIATION TG 4


POWER
Set POINT
Actual
MW

MW

DECREASE IN POWER
Set POINT
Actual
MW

MW

DATED

Time Decrease
From
To
Total
Time
Time
Time
Hours

Hours

Hours

LOSS
Power

REASON

REMARK

MWH

SUPERVISOR REMARK
1

Sign

SHIFT 1

3
NOTE.

Sign

1. Any power decrese more than 5 minute to be recorded in logsheet

SHIFT 2

2. Operator to fill in data only if there is a power generation reduction


3. Boiler operator to be maintain steam temp. 488 - 490 degree and pressure 70 - 72 barg
4. Paramater TG (vacum, vibration, axial, winding temp. Etc), electric, instrument, mechanic fault, process steam demand less, Etc to be recorded

Sign

5. Target power generation is 20.2 - 20.4 MW (Boiler 130 T/h max,TG 4 Bleed 10 T/hmax, Extraction 90 t/h max, Condenser 30 T/h)

SHIFT 3

Note : 1. (Voltage Exiter TG 4 alarm High is 110 & High High is 115 V AND current Exiter TG 4 alarm high is 9.7 & High High is 10 A)
2. Load TG 4 can be reduce for safe our operation, IF Alarm Voltage & Current exiter is come (Included the othesr parameter if out of range)

LOG SHEET FOR POWER GENERATION DEVIATION TG 2 & TG3


POWER
Set POINT
Actual
MW

MW

DECREASE IN POWER
Set POINT
Actual
MW

MW

DATED

Time Decrease
From
To
Total
Time
Time
Time
Hours

Hours

Hours

LOSS
Power

REASON

REMARK

MWH

SUPERVISOR REMARK
1

Sign

SHIFT 1

3
NOTE.

Sign

1. Any power decrese more than 5 minute to be recorded in logsheet

SHIFT 2

2. Operator to fill in data only if there is a power generation reduction


3. Boiler operator to be maintain inlet steam TG temp. 410 - 440 degree and pressure 43 - 44 barg
4. Paramater TG (vacum, vibration, axial, winding temp. Etc), electric, instrument, mechanic fault, process steam demand less, Etc to be recorded

Sign

5. Target power generation TG2 is 5.2 MW & TG 3 is 11 MW (Boiler load 110 /H)

SHIFT 3

POWER GENERATION DEVIATION TG2, TG3 & TG 4


POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Weekly

Time Decrease
From
To
Total
Time
Time
Time

REASON

LOSS
Power

REMARK
(ACTION)

MW

MW

MW

MW

Hours

Hours

Hours

23.1.2015

11.00

10.80

9.00

8.90

12.00

14.00

2.00

Proses line 4 decreases

MWH

3.8

TG 3 reduse load

24.1.2015

11.00

11.00

11.00

8.50

17.50

19.30

1.80

Tie line 6 KV get tripp (information by electric

4.5

TG 3 on ishocrounous mode and back to

due to ligtening) kilat/ gledek

sinchronized on 19.30

24.1.2015

19.56

19.40

16.70

16.50

17.52

18.00

0.13

BFWP no. 1,2,3 boiler 9 can't run and PAFAN no.


1 get triipp due to effect tie line 6 KV PPL 1 get
tripp

0.387

Reset and start again on DCS and back


increasing to normal load TG 4

24.1.2015

19.56

19.30

19.10

18.90

5.28

6.00

0.53

Line spining pengurangan steam LP actuator 100


%

0.213

Boiler 9 decrease loan from 130 to 126 T/H,


and increases load again TG 4 (as per target
) after line process normal

25.1.2015

5.30

5.20

5.10

4.90

9.45

15.45

6.00

New WSA tripp. (bearing temperature blower get


high)

1.8

Increase TG 2 load back to normal 5.2 MW


after WSA normal suplai 55 > 10 bar

25.1.2015

11.00

11.00

8.10

8.10

9.45

16.45

7.00

New WSA tripp. (bearing temperature blower get


high)

20.30

Increase TG 3 load back to normal 11 MW


after WSA suplai steam 55 > 45 bar on
16.45

4.84

TG 4 decrease load due to supply steam 10


bar with flow 25 T/h and increase load again
after WSA suplay steam 55 > 10 bar start on
12.05

25.1.2015

19.56

19.30

17.18

16.88

9.55

12.05

2.00

New WSA tripp. (bearing temperature blower get


high)

26.1.2015

11.00

11.00

9.80

9.70

13.40

14.40

1.00

Spinning line 1 brekdown

1.3

26.1.2015

9.80

9.70

9.20

9.20

14.40

15.10

0.50

Spinning line 1 brekdown

0.25

26.1.2015

9.20

9.20

9.00

9.00

15.20

15.50

0.50

Spinning line 1 brekdown

0.1

26.1.2015

9.00

9.00

8.80

8.80

15.50

16.10

0.33

Spinning line 1 brekdown

0.07

26.1.2015

19.62

19.31

18.97

18.71

6.42

6.57

0.25

Spinning line 1 brekdown

0.15

26.1.2015

19.62

19.45

18.84

18.73

13.45

14.06

0.35

Spinning line 1 brekdown

0.25

26.1.2015

19.66

19.40

13.60

13.52

4.38

6.30

1.87

PPL2 ID Fan no. 1 trip (Current


unbalance/electrical problem)

10.98

Inform electric to checked ID fan

27.1.2015

11.00

11.00

10.00

9.90

6.25

10.48

4.38

PPL2 ID Fan no. 1 trip (Current


unbalance/electrical problem)

4.82

Arangement load TG 3 & TG 4 to control


extraction steam 4.5 bar

27.1.2015

10.00

9.90

9.80

9.80

10.48

14.30

3.70

Load boiler PPL 1 high due to coal ducthing PPL 2


get chocking (Boiler 9 reduce load and effet in
boiler PPl 1)

0.37

Increase load TG 3 as per target after get


inform ID FAN is normal operation by PPL 2

Decrease load and increase load


normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal

after L1
after L1
after L1
after L1
after L1
after L1

46.16

Increase load Tg 4 as per target after ID FAN


in normal operation & arrangement man
power to preventife breakdown to control
check and continue cleaning in coal ducthing
area

27.1.2015

19.66

19.40

13.80

13.63

6.30

14.33

8.00

PPL2 ID Fan no. 1 trip (Current


unbalance/electrical problem) & Ducthing coal
feeder often chok no. 1 & 2 due to wet coal)

28.1.2015

11.00

10.90

8.50

8.40

13.56

14.20

0.40

New WSA stop due to line gas problem

1.00

Decrease load TG3.

28.1.2015

5.20

5.10

4.30

4.20

13.56

14.20

0.40

New WSA breakdown

0.36

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

14.40

15.40

1.00

WSA breakdown

0.40

Decrease load TG3.

28.1.2015

5.20

5.10

4.90

4.80

22.30

6.30

8.00

WSA breakdown

2.40

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

22.30

6.30

8.00

WSA breakdown

3.20

Decrease load TG3.

28.1.2015

19.66

19.38

17.44

17.23

14.56

22.30

7.57

Boiler 9 over load 135 T/H

16.27

Decrease load TG4.

29.1.2015

19.66

19.56

13.62

13.53

6.30

15.55

9.42

Line 5 shutdown (PM: 1/2 Cleaning condenser


TG4)

56.78

Decrease load TG4.

29.1.2015

19.32

19.23

18.34

18.20

20.20

21.08

0.80

Boiler 9 over load 138 T/H, Bleed steam 23 T/H


(WSA stop)

0.82

Decrease load TG4 & start boiler house no.


4 for view menute and stop again after
arangement load to take boiler b9 max 130
t/H

29.1.2015

4.90

4.80

3.60

3.50

7.30

16.05

8.58

Line 5 shutdown

11.16

Decrease load TG2.

29.1.2015

11.00

11.00

8.50

8.00

18.20

17.20

1.00

Line 5 shutdown Boiler PPL 1 over load.

3.00

Decrease load TG3 & start boiler house no.


4 for view menute and stop again after
arangement load.

30.1.2015

5.20

5.10

5.00

4.90

16.28

17.46

1.14

WSA breakdown

0.23

Arrangement load TG 2 & 3

3.42

Arrangement load TG 2 & 4

3.06

Arrangement load boiler 9 to control max.


130 T/h

30.1.2015

11.00

11.00

8.00

8.00

16.28

17.46

1.14

WSA breakdown level mcoal bunker low due to


wet coal

30.1.2015

19.84

19.57

17.10

16.89

16.28

17.46

1.14

WSA stop & L-3 breakdown

31.1.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -112 degree & wet
coal come to bunker due to rainy session

31.1.2015

11.00

11.00

8.20

8.10

6.30

6.30

1.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

2.90

Continue cleaning coal screen

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

62.40

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

62.40

Continue cleaning coal screen

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

2.2.2015

2.2.2015

3.2.2015

19.80

11.00

11.00

19.55

11.00

11.00

15.10

8.50

8.50

15.06

8.40

8.40

9.11

6.30

6.30

9.20

6.30

6.30

0.15

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

0.67

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

62.40

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

4.2.2015

19.44

19.35

18.14

17.95

13.05

13.20

0.25

Coal blocking at ducthing feeder no. 2 Note: Boiler


9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

19.44

19.30

17.22

17.23

17.03

17.13

0.17

Coal blocking at ducthing feeder no. 1 Note: Boiler


9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.17

Coal blocking at ducthing feeder no. 2 Note: Boiler


9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

0.27

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

0.20

Coal blocking at ducthing feeder no. 1,2,3 , Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

1.11

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

Note : New WSA stop , TG 2 & TG 3 running on 5


& 8 MW due to arrangement load when level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

62.40

Continue cleaning coal screen

2.50

Decrease load TG3

0.44

Decrease load TG3

6.91

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

4.2.2015

17.22

19.66

17.23

19.45

15.63

14.00

15.62

13.88

17.54

6.24

18.04

6.37

4.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

5.2.2015

11.00

10.90

10.00

9.90

6.30

9.00

2.50

5.2.2015

11.00

11.00

10.50

10.50

14.42

15.35

0.88

New WSA problem.


L-4 decrease steam consumption (minimum
speed)

5.2.2015

19.48

19.27

15.14

15.08

6.21

8.00

1.65

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

5.2.2015

19.48

19.27

19.23

19.00

14.45

14.55

0.17

L-4 decrease steam consumption (minimum


speed)

0.04

Decrease load TG4.

6.2.2015

19.66

19.57

18.22

18.21

8.27

9.13

0.77

L-4 breakdown.

1.04

Decrease load TG4. ( Temperature winding


high T= 114 oC)

6.2.2015

11.00

10.90

10.00

10.00

8.16

8.42

0.43

L-4 breakdown.

0.39

Decrease load TG3.

6.2.2015

10.00

10.00

9.00

8.90

8.48

9.13

0.42

L-4 breakdown.

0.46

Decrease load TG3.

6.2.2015

9.00

8.90

8.50

8.50

9.13

9.35

0.37

L-4 breakdown.

0.15

Decrease load TG3.

6.2.2015

8.50

8.50

8.00

8.00

9.35

10.12

0.62

L-4 breakdown.

0.31

Decrease load TG3.

6.2.2015

8.00

8.00

7.50

7.50

10.17

10.27

0.17

L-4 breakdown.

0.08

Decrease load TG3.

6.2.2015

7.50

7.50

7.20

7.20

10.27

13.30

2.95

L-4 breakdown.

0.89

Decrease load TG3.

6.2.2015

11.00

10.90

9.20

7.20

13.30

13.53

0.38

Coal vibrating screen breakdown.

1.42

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.10

13.53

15.30

1.62

Coal vibrating screen breakdown.

2.91

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

10.00

15.30

16.55

0.58

Coal vibrating screen breakdown.

0.53

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

9.50

16.55

17.48

0.88

Coal vibrating screen breakdown.

1.24

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.00

17.48

20.32

2.73

Coal vibrating screen breakdown.

5.19

Decrease load TG3.

7.2.2015

11.00

11.00

10.80

10.70

9.45

9.52

0.12

Balling press L-4 trouble.

0.04

7.2.2015

5.10

5.10

4.10

4.00

0.05

0.28

0.38

Re-adjust extaction TG4 & TG3.

0.42

Decrease load TG3.


Reduce load TG 2 after normal increase
again.

7.2.2015

19.40

19.24

18.18

18.09

17.35

17.59

0.40

Extraction flow high, no comfirmation from


process, load boiler 9 is 137 TPH

0.46

Decrease load TG4.

7.2.2015

19.40

19.40

18.10

18.09

0.02

0.16

0.23

Re-adjust extaction TG4 & TG3.

0.31

Decrease load TG 4 after normal increase


again.

8.2.2015

11.00

10.90

9.00

8.00

6.10

6.30

0.33

New WSA trip due to trouble power.

0.97

Decrease load TG3.

8.2.2015

5.20

5.10

4.80

4.70

6.10

6.30

0.33

New WSA trip due to trouble power.

0.13

Decrease load TG2.

9.2.2015

19.53

19.45

18.66

18.50

8.54

9.46

0.87

WSA tipp & Coal crusher no. 1 & 2 choking due to


wet coal

0.82

Continue cleaning ducthing cruher screen


and coal feeder also every time due to wet
coal & Decrease load TG4.

9.00

New WSA tripp due to Temperatur bearing Lean


gas blower high (Note : wet coal difficult come to
screen CHS PPL 1 and effect to level bunker just
is 70 % but not distrub steam & power due to
preventive continue cleaning every time)

27.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

5.00

New WSA tripp due to Temperatur bearing Lean


gas blower high (Note : wet coal difficult come to
screen CHS PPL 1 and effect to level bunker just
is 70 % but not distrub steam & power due to
preventive continue cleaning every time)

1.50

Continue cleaning screen CHS PPL 1 every


time & Decrease load TG3.

10.00

New WSA stop due to Temperatur bearing Lean


gas blower high (Note : wet coal difficult come to
screen CHS PPL 1 and effect to level bunker just
is 70 % but not distrub steam & power due to
preventive continue cleaning every time)

30.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

9.2.2015

9.2.2015

9.2.2016

10.2.2015

11.00

8.00

11.00

11.00

8.00

11.00

8.00

7.70

8.00

8.00

7.70

8.00

6.15

15.16

20.54

15.16

20.54

6.30

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills, wet coal come to
bunker due to rainy session & BFWP no. 1 get trip
faulty inverter)

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

10.2.2015

11.00

11.00

7.80

7.70

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 7.7 MW due


to arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

79.20

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

11.2.2015

11.2.2015

11.00

11.00

8.00

7.90

6.30

4.46

22.27

11.2.2015

8.00

7.90

7.50

7.50

4.46

5.02

0.27

11.2.2015

11.00

11.00

8.00

7.90

5.02

6.30

1.47

Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due


to arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)
Boiler over load
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due
to arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

12.2.2015

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

12.2.2015

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

69.03

Decrease load TG3 and arrangement load

4.55

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour (Cleaning bunker
no. 1 & 2 as per schedule rainy seassion /
due to smoke come out from bunker)
72.00

5.20

5.20

5.00

5.00

6.37

6.57

0.33

Repair electric DME tranduser output (AQ)

0.07

13.2.2015

5.20

5.20

0.00

0.00

6.57

7.45

0.80

Repair electric DME tranduser output (AQ)

4.16

13.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 3 running 8 MW due to arrangement


load when new WSA stop & level bunker boiler
5,6,7, 8 get low average 60 % due to wet coal
(Rainy session)

72.00

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

14.2.2015

11.00

11.00

7.50

7.50

6.30

7.25

0.92

14.2.2015

11.00

11.00

8.00

8.00

7.25

6.30

23.08

Boiler over load


Note : TG 2 & TG 3 running on 5.2 & 8 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

Continue cleaning coal screen

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

13.2.2015

14.2.2015

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

0.11

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

13.2.2015

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

Decrease load TG2.


Loose synchronize TG2. TG 2 running on 5.2
MW after finish repaired DME trnsduser
output KW (AQ)
Continue cleaning coal screen

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour
3.21

Decrease load TG3.

69.25

Continue cleaning coal screen

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

15.2.2015

15.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due
to wet coal (Rainy session)

16.2.2015

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills, wet coal come to
bunker due to rainy session & BFWP no. 1 get trip
faulty "ID 12 -965V" inverter)

16.2.2015

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 70 % due
to wet coal (Rainy session)

11.00

11.00

8.00

8.00

6.30

6.30

24.00

17.2.2015

Note :Boiler 9 & TG 4 normal as per target 19.2 19.4 MW but winding alternator TG 4 on 110 -114
degree, axial 10 - 11 mills & wet coal come to
bunker due to rainy session

17.2.2015

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop (New
WSA start & synchronize steam at 04.36 am) &
level bunker boiler 5,6,7, 8 get low average 70 %
due to wet coal (Rainy session)

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

72.00

Continue cleaning coal screen

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

72.00

Continue cleaning coal screen

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

72.00

Continue cleaning coal screen

18.2.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -115 degree & wet
coal come to bunker due to rainy session

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

18.2.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 70 % due
to wet coal (Rainy session)

Continue cleaning coal screen

19.2.2015

19.61

19.45

18.83

18.67

9.05

17.45

8.67

Process L-4 breakdown.

6.76

Decrease load TG4 after normal increase


again.

19.2.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -112 degree & wet
coal come to bunker due to rainy session

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

19.2.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 70 % due
to wet coal (Rainy session)

Continue cleaning coal screen

20.2.2015

19.44

19.31

18.26

17.89

9.04

10.45

1.68

20.2.2015

19.44

19.27

18.78

18.40

18.20

19.10

0.83

20.2.2015

Spinning L-4 decrease steam consumption &


Spinbath L-3 breakdown.
Boiler 9 over load 132 T/H due to pressure droup
66 bar
Note : Winding alternator TG 4 on 110 -116
degree & wet coal come to bunker due to rainy
session

2.39
0.73

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour

20.2.2015

5.20

5.20

5.00

5.00

8.45

10.20

1.58

20.2.2015

11.00

11.00

9.20

9.20

8.20

12.45

4.42

20.2.2015

21.2.2015

19.53

19.34

18.92

18.88

16.34

16.41

0.12

21.2.2015
21.2.2015

11.00

11.00

10.60

10.50

13.50

14.37

0.78

Spinning L-4 decrease steam consumption &


Spinbath L-3 breakdown.
Spinning L-4 decrease steam consumption &
Spinbath L-3 breakdown.
Note : Level bunker boiler 5,6,7, 8 get low average
75 % due to wet coal (Rainy session)
Boiler 9 over load 132 T/H due to pressure droup
66 bar due to wet coal
Note : Winding alternator TG 4 on 110 -117
degree & wet coal come to bunker due to rainy
session
Vaccum TG3 droop -0.80 kg/cm

21.2.2015

Note : Level bunker boiler 5,6,7, 8 get low average


75 % due to wet coal (Rainy session)

22.2.2015

Coal blocking at ducthing feeder no. 2 Note: Boiler


9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

19.49

19.32

14.80

14.75

4.30

5.15

0.75

22.2.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 75 % due
to wet coal (Rainy session)

23.2.2015

Note : TG 2 & TG 3 normal as per target but at


11.27 to 13.22 L-1 decrease steam consumption
& level bunker boiler 5,6,7, 8 get low average 75
% due to wet coal (Rainy session)

11.00

11.00

10.80

10.80

11.27

13.22

1.92

0.32
7.95

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Continue cleaning coal screen

0.05

Decrease load TG4 after normal increase


again.
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour

0.39

Decrease load TG3 after normal increase


again.
Continue cleaning coal screen

3.43

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Continue cleaning coal screen

0.38

23.2.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -112 degree & wet
coal come to bunker due to rainy session

24.2.2015

19.45

19.35

18.91

18.75

9.30

9.41

0.18

Coal blocking at ducthing feeder no. 2 Note: Boiler


9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal
come to bunker due to rainy session

0.11

24.2.2015

19.45

19.35

18.48

18.41

13.23

13.36

0.22

Coal blocking at ducthing feeder no. 2

0.20

24.2.2015

19.38

19.44

18.70

18.60

1.30

3.17

1.78

L-3 break down

1.50

Decrease load TG3 after normal increase


again & Continue cleaning coal screen
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour
Decrease load TG4 after normal increase
again.

24.2.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 75 % due
to wet coal (Rainy session)

Continue cleaning coal screen

25.2.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -112 degree & wet
coal come to bunker due to rainy session

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

25.2.2015
25.2.2015

11.00

10.90

10.80

10.80

14.41

18.05

3.40

Vaccum pressure TG3 droop


Note : Level bunker boiler 5,6,7, 8 get low average
75 % due to wet coal (Rainy session)

0.34

Decrease load TG3 after normal increase


again.
Continue cleaning coal screen

26.2.2015

11.00

11.00

8.00

7.90

6.50

4.00

21.83

L-2 process shutdown position

26.2.2015

5.20

5.20

5.00

5.00

7.00

8.50

1.83

26.2.2015

5.00

5.00

4.80

4.80

8.50

16.00

7.83

19.53

19.27

18.35

18.02

6.50

4.00

21.83

L-2 process shutdown position

33.06

Change module of bed temperature boiler 6 & 7


by instrument
Balancing FD Fan "B" boiler 8 & cleaning online
1/2 condenser TG4

67.68
0.37
1.57
27.29

18.35

18.02

13.90

13.80

8.50

16.00

7.83

Cleaning online 1/2 condenser TG4 (Note and for


attention : When load already normal on 19.49
MW after cleaning online 1/2 condenser as per
target wending temperature on 116 degree alarm
and axial come on 10 - 11 mills alarm)

27.2.2015

19.53

19.46

18.88

18.61

11.00

12.26

1.43

Spinning L-5 decrease steam consumption

1.22

27.2.2015

19.35

19.16

18.57

18.41

13.20

16.31

3.18

L-5 breakdown

2.39

26.2.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)
28.2.2015

11.00

11.00

10.00

10.00

6.37

11.08

4.52

TG4 LP full open 100%

After normal increase load TG 3 as per


target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target

After normal increase load TG 4 as per


target

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Continue cleaning coal screen

4.52

After normal increase load TG 3 as per


target

28.2.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 112 -116.8 degree &
wet coal come to bunker due to rainy session

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

1.3.2015

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

Continue cleaning coal screen

1.3.2015

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 112 -116.8 degree &
wet coal come to bunker due to rainy session
(Coal feeder no. 2 get chock/block by coal)

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

2.3.2015

11.00

11.00

10.00

10.00

7.33

9.22

1.82

2.3.2015

11.00

11.00

10.80

10.80

12.35

13.07

0.53

2.3.2015

11.00

11.00

10.00

10.00

13.10

13.49

0.65

2.3.2015

5.30

5.20

5.10

5.00

13.09

13.23

0.23

Vaccum pressure TG3 droop till -0.75 bar and coal


bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low
Temperature winding high till 122 degree

1.82
0.11
0.65
0.05

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 112 -116.8 degree &
wet coal come to bunker due to rainy session
(Coal feeder no. 2 get chock/block by coal)

2.3.2015

Decrease load TG3 after normal increase


again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (Cleaning strainer water cooler no. 1
alternator TG 2)
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour

3.3.2015

11.00

11.00

10.80

10.80

9.00

9.38

0.63

Vaccum pressure TG3 droop < - 0.7 bar

0.13

3.3.2015

10.80

10.80

10.60

10.60

9.38

11.48

1.83

Vaccum pressure TG3 droop < - 0.7 bar

0.37

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

3.3.2015

10.80

10.80

10.60

10.60

11.48

14.37

3.18

Vaccum pressure TG3 droop < - 0.7 bar

0.64

3.3.2015

11.00

11.00

10.80

10.80

15.13

15.50

0.62

Dryer L-3 decrease steam consumption

0.12

3.3.2015

11.00

11.00

10.80

10.80

15.50

22.37

6.78

Dryer L-3 decrease steam consumption

1.36

3.3.2015

10.80

10.80

10.50

10.40

22.37

23.02

0.42

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.17

Decrease load TG3 after normal increase


again.

3.3.2015

10.50

10.50

10.00

10.00

23.02

1.08

2.10

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

1.05

Decrease load TG3 after normal increase


again.

3.3.2015

11.00

11.00

10.70

10.70

1.08

2.30

1.37

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.41

Decrease load TG3 after normal increase


again.

3.3.2015

5.30

5.20

5.20

5.10

11.54

22.37

11.28

Temperature winding high on 122 degree

1.13

3.3.2015

5.20

5.20

5.00

5.00

24.09

6.37

5.53

Temperature winding high on 122 degree

1.11

3.3.2015

19.40

19.22

18.35

18.12

22.25

22.46

0.35

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.39

After normal increase load TG 4 as per


target

3.3.2015

19.40

19.22

18.97

18.83

0.30

0.41

0.18

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.07

After normal increase load TG 4 as per


target

4.3.2015

19.53

19.45

19.22

19.10

9.55

12.30

2.58

L-4 & L-5 breakdown

0.90

4.3.2015

5.20

5.20

4.30

4.30

10.00

12.00

2.00

L-4 & L-5 breakdown

1.80

4.3.2015

5.20

5.20

5.00

5.00

14.00

16.00

2.00

L-1 minimum speed

0.40

4.3.2015

11.00

11.00

7.90

7.90

10.00

12.00

2.00

L-4 & L-5 breakdown

6.20

4.3.2015

11.00

11.00

10.00

10.00

14.00

16.00

2.00

L-1 minimum speed

2.00

0.23

Coal bunker no. 1 & 2 get chocking / not coming


down in feeder due to wet coal stuck at ducthing,
Note :Boiler 9 & TG 4 normal as per target but
winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session and also
motor PAFAN no. 1 get noise

1.06

5.3.2015

19.61

19.55

15.50

15.00

7.06

7.20

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

5.3.2015

6.3.2015

19.44

19.30

18.00

17.75

17.30

17.50

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Schedule cleaning bunker no. 1 & 2 , After


normal increase load TG 4 as per target

Continue cleaning coal screen

0.33

New WSA trip

0.52

Decrease load TG4

0.14

After normal increase load TG 4 as per


target

0.06

Decrease load TG3

6.3.2015

19.44

19.21

19.27

19.07

5.00

6.00

1.00

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session, motor
PAFAN no. 1 get noise (Under monitoring)

6.3.2015

11.00

11.00

10.80

10.80

9.13

9.20

0.28

LP TG4 100% (procees not inform reduce load)

6.3.2015

10.80

10.80

10.60

10.60

9.20

9.45

0.42

LP TG4 100% (procees not inform reduce load)

0.08

6.3.2015

11.00

11.00

9.50

9.50

15.14

16.59

1.75

LP TG4 100% (procees not inform reduce load)

2.63

6.3.2015

9.50

9.50

7.30

7.20

16.59

17.47

0.80

New WSA trip

1.84

6.3.2015

11.00

11.00

8.50

8.50

22.45

3.18

4.55

New WSA trip

11.38

6.3.2015

11.00

11.00

10.70

10.70

4.32

6.37

1.92

Vaccum pressure TG3 droop < - 0.7 bar

0.58

6.3.2015

5.20

5.20

5.00

5.00

11.40

6.37

19.00

Winding temperatureTG 2 high on 122 degree

3.80

7.3.2015

19.56

19.33

19.26

19.11

8.10

8.45

0.58

Spinning L-4 breakdown (dryer problem)

0.13

7.3.2015

19.44

19.35

18.00

18.00

19.50

20.52

1.03

New WSA get trip

1.40

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session, axial 11
- 12 mills

7.3.2015

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Continue preventife cleaning ducthing coal
feeder every 0.5 - 1 hour

7.3.2015

11.00

11.00

9.10

9.00

8.02

9.50

1.80

Spinning L-4 breakdown (dryer problem)

3.60

7.3.2015

10.90

10.90

10.80

10.80

17.00

19.51

1.85

LP TG4 100% Spinning L-4 breakdown (dryer


problem)

0.19

7.3.2015

10.80

10.80

8.00

8.00

19.00

20.52

1.03

New WSA get trip

2.88

7.3.2015

10.90

10.90

10.30

10.30

0.02

1.41

1.65

LP TG4 100% Spinning L-4 breakdown (dryer


problem)

0.99

7.3.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Winding temperature high on 122 degree

1.60

7.3.2015

5.00

5.00

4.40

4.30

19.00

20.52

1.03

New WSA get trip

0.72

8.3.2015

11.00

11.00

10.70

10.70

6.37

13.22

6.75

Vaccum pressure TG3 droop

2.03

8.3.2015

11.00

11.00

7.80

7.80

1.25

6.30

5.08

8.3.2015

5.30

5.20

4.50

4.50

1.25

6.30

5.08

8.3.2015

19.44

19.24

0.00

0.00

1.25

6.30

5.08

Boiler 9 breakdown due to water wall tube leak

97.80

9.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

9.3.2015

5.30

5.20

4.60

4.50

6.37

7.28

0.85

PPL-2, New WSA, NGBC stop

0.60

9.3.2015

5.30

5.20

4.00

4.00

8.04

14.37

6.55

PPL-2, New WSA, NGBC stop & L-2 shutdown

7.86

9.3.2015

5.20

5.20

4.50

4.40

14.37

6.37

16.00

PPL-2, New WSA, NGBC stop

12.80

9.3.2015

11.00

11.00

8.10

8.10

6.37

6.48

0.18

PPL-2, New WSA, NGBC stop

0.53

PPL-2, New WSA, NGBC, Boiler 4 trip (L-1, 2, 3,


4, 5 minimum speed)
PPL-2, New WSA, NGBC, Boiler 4 trip (L-1, 2, 3,
4, 5 minimum speed)

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

16.27
3.56

After normal increase load TG 3 as per


target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

Decrease load TG2 after normal increase


again.
After normal increase load TG 2 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

9.3.2015

11.00

11.00

8.70

8.60

7.58

14.37

7.35

PPL-2, New WSA, NGBC stop & L-2 shutdown

17.64

9.3.2015

11.00

11.00

8.50

8.50

14.37

6.37

16.00

PPL-2, New WSA, NGBC stop

40.00

10.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

10.3.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

10.3.2015

11.00

11.00

8.50

8.50

6.37

10.00

3.62

Boiler 9 breakdown due to water wall tube leak

9.04

10.3.2015

8.50

8.50

8.20

8.20

10.00

10.12

0.20

Boiler 9 breakdown due to water wall tube leak

0.06

10.3.2015

8.50

8.50

7.50

7.50

10.12

12.49

2.62

Boiler 9 breakdown due to water wall tube leak

2.62

10.3.2015

11.00

11.00

8.00

8.00

12.53

15.52

2.98

Boiler 9 breakdown due to water wall tube leak

8.95

10.3.2015

11.00

11.00

8.20

8.20

15.52

6.37

14.75

Boiler 9 breakdown due to water wall tube leak

41.30

11.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

11.3.2015

5.30

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

11.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

12.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

12.3.2015

5.20

5.20

5.00

5.00

6.37

17.00

10.38

Boiler 9 breakdown due to water wall tube leak

2.08

12.3.2015

5.10

5.00

4.50

4.40

17.00

6.37

13.62

Boiler 9 breakdown due to water wall tube leak

8.17

12.3.2015

11.00

11.00

9.00

9.00

6.37

17.13

10.60

Boiler 9 breakdown due to water wall tube leak

21.20

12.3.2015

9.00

9.00

7.30

7.30

17.13

6.37

13.40

Boiler 9 breakdown due to water wall tube leak

22.78

13.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

13.3.2015

5.20

5.20

4.70

4.70

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

12.00

13.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

14.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

14.3.2015

5.20

5.20

5.00

4.90

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

7.20

14.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

15.3.2015

19.44

19.24

0.00

0.00

6.30

11.00

4.50

Boiler 9 breakdown due to water wall tube leak

86.58

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 start up and synchronize steam at
11.00.

15.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

15.3.2015

11.00

11.00

10.80

10.80

6.37

14.37

8.00

Vaccum pressure TG3 droop

1.60

15.3.2015

10.80

10.80

10.50

10.50

14.37

6.37

16.00

Vaccum pressure TG3 droop

4.80

Note :Boiler 9 & TG 4 normal as per target (actual


load is 20.2 MW) but mange wet coal come to
bunker

16.3.2015
16.3.2015

5.30

5.20

5.10

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

16.3.2015

11.00

11.00

10.60

10.50

6.37

14.37

8.00

Vaccum pressure TG3 droop

4.00

16.3.2015

11.00

11.00

10.80

10.70

14.37

22.37

8.00

Vaccum pressure TG3 droop

2.40

16.3.2015

11.00

11.00

10.90

10.80

22.37

6.37

8.00

Vaccum pressure TG3 droop

1.60

Note :Boiler 9 & TG 4 normal as per target (actual


load is 20.2 MW) but mange wet coal come to
bunker

17.3.2015
17.3.2015

5.30

5.20

5.10

5.00

6.37

22.37

16.00

L-2 breakdown

3.20

17.3.2015

5.30

5.20

4.70

4.70

22.37

6.37

8.00

Winding temperature high on 122 degree

4.00

17.3.2015

11.00

11.00

10.80

10.70

6.37

10.37

4.00

Vaccum pressure TG3 droop

1.20

17.3.2015

10.80

10.70

10.20

10.20

10.37

14.37

4.00

Vaccum pressure TG3 droop

2.00

17.3.2015

10.50

10.50

8.50

8.50

22.37

6.37

8.00

Vaccum pressure TG3 droop

16.00

Note :Boiler 9 & TG 4 normal as per target (actual


load is 20.2 MW) but mange wet coal come to
bunker

18.3.2015

18.3.2015

Note : TG 2 normal as per target but level bunker


boiler 5,6,7, 8 get low average 70 % due to wet
coal (Rainy session)
TG3 stop for cleaning condenser & modification
jobs.

11.00

0.00

0.00

8.37

6.37

22.00

19.3.2015

5.30

5.20

5.20

5.10

11.00

14.37

3.62

19.3.2015

11.00

11.00

0.00

0.00

6.37

6.37

24.00

20.3.2015

20.49

20.45

19.10

19.00

14.36

15.00

0.40

New WSA trip

0.58

20.3.2015

5.20

5.20

5.00

4.90

23.00

5.00

6.00

Winding temperature high on 122 degree

1.80

20.3.2015

11.00

11.00

10.50

10.50

22.50

5.00

6.17

19.3.2015

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour and mange coal to
consumption boiler
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Continue cleaning coal screen

11.00

TG3 stop for cleaning condenser & modification


jobs.
Note : Boiler 9 & TG 4 normal as per target

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour and mange coal to
consumption boiler
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour and mange coal to
consumption boiler

18.3.2015

Winding temperature high on 122 degree

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

242.00

Planning 2 daysfinish the job and start up


again

Decrease load TG2 after normal increase


again.
TG3 stop. If breakdown finish TG3 start
264.00
again.
0.36

3.08

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG3.

21.3.2015

Note : Boiler 9 & TG 4 normal as per target


Note : TG 2 & TG 3 normal as per target but level
bunker boiler 5,6,7, 8 get low average 80 % due to
wet coal (Rainy session)

21.3.2015

22.3.2015

20.49

20.31

19.74

19.67

11.40

16.00

4.33

Belt conveyor of coal feeder no. 2 tear.

Continue cleaning coal screen

2.77

Note : TG 2 & TG 3 normal as per target but level


bunker boiler 5,6,7, 8 get low average 80 % due to
wet coal (Rainy session)

22.3.2015

Continue cleaning coal screen

23.3.2015

20.44

20.31

19.45

19.30

10.25

11.09

0.73

CEP cleaning TG 4

0.74

23.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

23.3.2015

After normal increase load TG 4 as per


target

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.

Note : TG 3 normal as per target

24.3.2015

20.44

20.28

19.26

19.10

7.00

14.30

7.50

Spinning L-1 shutdown

8.85

24.3.2015

20.31

20.15

19.57

19.26

14.30

21.09

6.65

Spinning L-1 shutdown

5.92

24.3.2015

5.20

5.20

4.90

4.80

6.37

22.37

16.00

Winding temperature high on 122 degree

6.40

24.3.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

24.3.2015

Note : TG 3 normal as per target

25.3.2015

Note : Boiler 9 & TG 4 normal as per target

25.3.2015

5.20

5.20

4.90

4.80

6.37

11.58

5.35

Winding temperature high on 123 degree

2.14

25.3.2015

5.20

5.20

4.60

4.60

11.58

14.37

2.65

Winding temperature high on 123 degree

1.59

25.3.2015

5.20

5.20

5.00

5.00

14.37

6.37

16.00

Winding temperature high on 123 degree

3.20

25.3.2015

11.00

11.00

10.50

10.50

10.07

11.40

1.55

Spinning L-1, L-5 decrease steam consumption

0.78

26.3.2015

20.45

20.36

19.00

19.00

14.07

14.30

0.38

WSA decrease load & steam 22>10 bar boiler


house close (mechanic jobs)

0.52

26.3.2015

5.20

5.20

5.00

4.90

7.51

8.06

0.25

Winding temperature high on 123 degree

0.07

26.3.2015

5.20

5.20

4.90

4.80

8.06

22.37

14.52

Winding temperature high on 123 degree

5.81

26.3.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 123 degree

2.40

26.3.2015

11.00

11.00

10.50

10.50

14.20

22.37

8.12

Pressure 10 bar drop due to New WSA decrease


load (PRDS 55><45 bar changed to PRDS
55><10 bar)

4.06

27.3.2015

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

Note : Boiler 9 & TG 4 normal as per target

27.3.2015

5.20

5.20

5.00

4.90

6.37

9.42

3.08

Winding temperature high on 123 degree

0.93

27.3.2015

5.20

5.20

4.90

4.80

9.42

14.37

4.92

Winding temperature high on 123 degree

1.97

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

27.3.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

Winding temperature high on 123 degree

1.60

27.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

27.3.2015

Note : TG 3 normal as per target

28.3.2015

20.44

20.31

19.49

19.29

0.14

4.48

4.57

Spinning L-4 decrease steam consumption (Fire)

4.66

28.3.2015

5.20

5.20

5.00

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

28.3.2015

5.20

5.20

4.90

4.80

14.37

23.45

9.13

Winding temperature high on 123 degree

3.65

28.3.2015

5.20

5.20

4.80

4.70

23.45

6.37

6.52

Spinning L-4 decrease steam consumption (Fire)

3.26

28.3.2015

11.00

11.00

10.30

10.30

22.45

6.37

6.87

Spinning L-4 decrease steam consumption (Fire)

4.81

29.3.2015

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

Note : Boiler 9 & TG 4 normal as per target

29.3.2015

5.20

5.20

4.80

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

29.3.2015

5.20

5.20

4.80

4.70

14.37

22.37

8.00

Winding temperature high on 123 degree

4.00

29.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

29.3.2015

11.00

11.00

10.50

10.50

22.37

3.55

5.30

L-4 decrease steam consumption

2.65

30.3.2015
30.3.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

Note : Boiler 9 & TG 4 normal as per target


5.20

5.20

4.80

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

30.3.2015

Note : TG 3 normal as per target

31.3.2015

Note : Boiler 9 & TG 4 normal as per target

9.60

31.3.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

31.3.2015

11.00

11.00

10.90

10.80

6.37

0.50

18.22

L-4 decrease steam consumption

3.64

31.3.2015

11.00

11.00

10.50

10.50

0.50

5.12

4.37

Pressure 10 bar drop (PRDS 55><45 bar changed


to PRDS 55><10 bar)

2.18

31.3.2015

11.00

11.00

10.80

10.80

5.12

6.37

1.42

Proses decrease steam not confirm

0.28

1.4.2015

20.40

20.21

19.18

18.76

15.30

16.39

1.15

10 bar steam consumption high

1.67

1.4.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

1.4.2015

11.00

11.00

10.80

10.70

6.37

8.18

1.68

Request of PPL2

0.51

1.4.2015

11.00

11.00

10.50

10.50

8.18

15.36

7.90

L-4 decrease steam consumption

3.95

1.4.2015

11.00

11.00

10.10

10.00

15.36

17.06

1.70

Load boiler PPL1 high (process not confirm)

1.70

1.4.2015

11.00

11.00

10.50

10.50

17.06

21.11

4.08

L-4 decrease steam consumption

2.04

Decrease load TG2 after normal increase


again.

Decrease load TG2 after normal increase


again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

After normal increase load TG 3 as per


target

1.4.2015

11.00

11.00

10.90

10.90

22.37

6.37

8.00

L-4 decrease steam consumption

0.80

2.4.2015

20.31

20.10

18.44

18.23

6.50

14.30

7.83

Process L-5 shutdown

14.65

2.4.2015

5.20

5.20

4.80

4.70

6.37

9.37

3.00

Process L-5 shutdown

1.50

2.4.2015

5.20

5.20

2.80

2.80

9.37

14.37

3.00

Process L-5 shutdown

7.20

2.4.2015

5.20

5.20

3.30

3.20

14.37

19.10

4.55

Process L-5 shutdown

9.10

2.4.2015

5.20

5.20

5.00

4.90

19.10

22.37

5.45

Process L-5 shutdown

1.64

2.4.2015

5.20

5.20

5.00

5.00

33.37

6.37

8.00

Process L-5 shutdown

1.60

2.4.2015

11.00

11.00

10.50

10.50

6.37

8.00

2.62

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

1.31

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

8.00

8.00

8.00

10.00

2.00

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

6.00

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

5.20

5.20

10.00

16.00

4.00

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

23.20

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

5.50

5.50

16.00

18.44

2.73

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

15.03

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

7.30

7.30

18.44

21.20

2.57

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

9.50

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

9.00

9.00

21.20

22.00

1.33

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

2.67

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

9.30

9.30

22.00

22.37

0.62

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

1.05

After normal increase load TG 3 as per


target

2.4.2015

11.00

11.00

10.80

10.80

22.37

6.37

8.00

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)

1.60

After normal increase load TG 3 as per


target

3.4.2015

Note : Boiler 9 & TG 4 normal as per target

3.4.2015

5.20

5.20

5.10

5.00

6.37

7.13

0.60

Winding temperature high on 122 degree

0.12

3.4.2015

5.20

5.20

4.90

4.80

7.13

6.37

23.40

Winding temperature high on 122 degree

9.36

3.4.2015

Note : TG 3 normal as per target

4.4.2015

Note : Boiler 9 & TG 4 normal as per target

4.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

4.4.2015
5.4.2015

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high on 122 degree

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

9.60

Decrease load TG2 after normal increase


again.

19.44

After normal increase load TG 4 as per


target

Note : TG 3 normal as per target


20.49

20.36

18.18

17.93

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

5.4.2016

5.20

5.20

4.80

4.70

6.37

22.37

16.00

Winding temperature high on 122 degree

8.00

5.4.2017

5.20

5.20

3.50

3.40

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

14.40

5.4.2015

11.00

11.00

7.00

7.00

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

32.00

6.4.2015

20.49

20.36

18.98

18.85

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

36.24

6.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

6.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

7.4.2015

20.49

20.36

18.27

18.06

6.37

14.37

8.00

Boiler 8 breakdown (inbed tube leakage)

18.40

7.4.2015

20.49

20.36

18.40

18.20

14.37

22.37

8.00

Boiler 8 breakdown (inbed tube leakage)

17.28

7.4.2015

20.49

20.36

18.53

18.42

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

15.52

7.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

7.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

8.4.2015

20.49

20.36

18.53

18.42

6.37

14.51

8.23

8.4.2015

20.49

20.36

0.00

0.00

14.51

6.37

15.77

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

8.4.2015

5.20

5.20

3.50

3.40

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

8.4.2015

5.20

5.20

5.10

5.00

14.37

6.37

18.38

Winding temperature high on 122 degree

8.4.2015

11.00

11.00

7.00

6.90

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

After normal increase load TG 4 as per


target
TG 4 stop. After normal increase load TG 4
321.08
as per target
After normal increase load TG 2 as per
10.11
target
After normal increase load TG 2 as per
3.68
target
After normal increase load TG 3 as per
23.04
target

9.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

9.4.2015

5.20

5.20

5.10

5.00

6.37

22.37

16.00

9.4.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

9.4.2015

11.00

11.00

8.80

8.80

7.23

14.37

7.23

9.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

9.4.2015

11.00

11.00

10.50

10.50

22.37

6.37

8.00

10.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

10.4.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

15.97

488.64
3.20
4.00
15.91
3.20
4.00

488.64
1.60

TG 4 stop. After normal increase load TG 4


as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

10.4.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

10.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

10.4.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

10.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

11.4.2015

20.49

20.36

0.00

0.00

6.37

8.00

1.62

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)

11.4.2015

20.49

20.36

11.00

11.00

8.00

6.37

22.38

TG4 radial vibration indicate high on HP bearing

11.4.2015

5.20

5.20

5.00

4.90

6.37

22.37

16.00

11.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

12.4.2015

20.49

20.36

11.00

11.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

12.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

11.4.2015

12.4.2015

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Note : TG 3 normal as per target

2.40
4.00
3.20

After normal increase load TG 2 as per


target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

TG 4 stop. After normal increase load TG 4


as per target
After normal increase load TG 4 as per
209.48
target
After normal increase load TG 2 as per
4.80
target
After normal increase load TG 2 as per
3.20
target
32.92

224.64
9.60

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.

Note : TG 3 normal as per target

13.4.2015

20.49

20.36

12.23

12.15

6.37

19.25

8.20

TG4 radial vibration indicate high on HP bearing

13.4.2015

20.49

20.36

0.00

0.00

19.25

6.37

15.80

TG4 radial vibration indicate high on HP bearing

13.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

13.4.2015

After normal increase load TG 4 as per


target
TG 4 stop. After normal increase load TG 4
321.69
as per target
Decrease load TG2 after normal increase
9.60
again.
67.32

Note : TG 3 normal as per target

14.4.2015

20.49

20.36

0.00

0.00

6.37

14.26

7.82

TG4 radial vibration indicate high on HP bearing

14.4.2015

20.49

20.36

7.00

7.00

14.26

15.51

1.42

TG4 radial vibration indicate high on HP bearing

14.4.2015

20.49

20.36

0.00

0.00

15.51

6.37

14.77

TG4 radial vibration indicate high on HP bearing

14.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

16.00

Winding temperature high on 122 degree

14.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

14.4.2015

TG 4 stop. After normal increase load TG 4


as per target
After normal increase load TG 4 as per
18.93
target
TG 4 stop. After normal increase load TG 4
300.72
as per target
Decrease load TG2 after normal increase
6.40
again.
Decrease load TG2 after normal increase
2.40
again.
159.15

Note : TG 3 normal as per target

15.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

15.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

15.4.2015
16.4.2015

3.20

488.64
9.60

TG 4 stop. After normal increase load TG 4


as per target
Decrease load TG2 after normal increase
again.

Note : TG 3 normal as per target


20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

488.64

TG 4 stop. After normal increase load TG 4


as per target

16.4.2015

5.20

5.20

4.70

4.70

6.37

22.37

16.00

L-3 shuthdown.

8.00

16.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

16.4.2015

Note : TG 3 normal as per target

17.4.2015

20.57

20.43

19.70

19.55

17.00

17.49

0.82

Duthing coal feeder no. 1 get chocking (Manage


wet coal come to bunker)

0.72

17.4.2015

20.57

20.51

19.20

19.10

2.46

3.07

0.35

New WSA trip & Boiler 9 over load 136 T/H

0.49

17.4.2015

5.20

5.20

4.90

4.80

6.37

8.55

2.30

Winding temperature high on 122 degree

0.92

17.4.2015

5.20

5.20

4.00

4.00

8.55

12.37

3.70

New WSA stop cause burner trable

4.44

17.4.2015

5.20

5.20

4.80

4.70

12.37

14.37

10.00

Winding temperature high on 122 degree

5.00

17.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

18.4.2015

Cleaning /checking every hour, After normal


increase load TG 4 as per target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

18.4.2015

5.20

5.20

5.10

5.00

6.37

8.32

1.92

Winding temperature high on 122 degree

0.38

18.4.2015

5.20

5.20

4.00

4.00

8.32

12.00

4.53

New WSA trip

5.44

18.4.2015

5.20

5.20

4.90

4.80

12.00

22.37

9.55

Winding temperature high on 122 degree

3.82

18.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

18.4.2015

Note : TG 3 normal as per target

19.4.2015

Note : Boiler 9 & TG 4 normal as per target

19.4.2015

5.20

5.20

5.10

5.00

6.37

10.07

3.50

Winding temperature high on 122 degree

0.70

19.4.2015

5.20

5.20

5.00

4.90

10.07

11.03

0.93

Winding temperature high on 122 degree

0.28

19.4.2015

5.20

5.20

4.90

4.80

11.03

16.50

5.78

Winding temperature high on 122 degree

2.31

19.4.2015

5.20

5.20

5.00

5.00

16.50

6.37

13.78

Winding temperature high on 122 degree

2.76

19.4.2015

Note : TG 3 normal as per target

20.4.2015

Note : Boiler 9 & TG 4 normal as per target

20.4.2015

5.20

5.20

5.00

4.90

6.37

14.55

8.30

Winding temperature high on 122 degree

2.49

20.4.2015

5.20

5.20

4.80

4.70

14.55

17.58

3.02

Spinning decrease steam consumption

1.51

20.4.2015

5.20

5.20

5.10

5.00

17.58

22.37

4.68

Winding temperature high on 122 degree

0.94

20.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

20.4.2016
21.4.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 3 normal as per target


20.57

20.50

17.05

17.00

9.17

9.27

0.17

Coal blocking at ducthing feeder

0.58

After normal increase load TG 4 as per


target

21.4.2015

5.20

5.20

4.90

4.80

6.37

19.27

12.83

Winding temperature high on 122 degree

5.13

21.4.2015

5.20

5.20

5.00

4.90

19.27

6.37

11.17

Winding temperature high on 122 degree

3.35

21.4.2015

Note : TG 3 normal as per target

22.4.2015

Note : Boiler 9 & TG 4 normal as per target

22.4.2015

5.20

5.20

4.90

4.80

6.37

20.08

13.52

Winding temperature high on 122 degree

5.41

22.4.2015

5.20

5.20

4.60

4.50

20.08

0.38

4.50

L-4 breakdown

3.15

22.4.2015

5.20

5.20

5.00

4.90

0.38

6.37

5.98

L-4 breakdown

1.79

22.4.2015

11.00

11.00

10.80

10.80

18.48

20.50

2.03

L-4 breakdown

0.41

22.4.2015

11.00

11.00

10.50

10.50

20.50

21.33

0.72

L-4 breakdown

0.36

22.4.2015

11.00

11.00

10.00

10.00

21.33

21.52

0.32

L-4 breakdown

0.32

22.4.2015

11.00

11.00

10.20

10.20

21.52

22.37

1.25

L-4 breakdown

1.00

22.4.2015

11.00

11.00

10.00

10.00

22.37

1.40

3.05

L-4 breakdown

3.05

23.4.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

Note : Boiler 9 & TG 4 normal as per target

23.4.2015

5.20

5.20

4.90

4.90

6.37

8.00

1.62

Winding temperature high on 122 degree

0.49

23.4.2015

5.20

5.20

4.00

4.00

8.00

16.30

8.50

Boiler 6 breakdown.

10.20

23.4.2015

5.20

5.20

5.00

4.90

16.30

22.37

6.12

Boiler 6 breakdown.

1.84

23.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

23.4.2015

11.00

11.00

9.30

9.20

8.00

16.30

8.50

Boiler 6 breakdown.

15.30

24.4.2015

20.57

20.45

17.31

17.01

15.10

4.00

7.83

New WSA problem

26.95

24.4.2015

20.57

20.45

18.21

18.49

4.00

6.37

2.62

New WSA problem

5.13

24.4.2015

5.20

5.20

4.20

4.10

10.40

14.37

3.95

New WSA problem

4.35

24.4.2015

5.20

5.20

4.30

4.20

14.37

6.37

16.00

New WSA problem

16.00

24.4.2015

11.00

11.00

10.00

10.00

10.40

14.37

3.95

New WSA problem

3.95

24.4.2015

11.00

11.00

9.00

8.90

14.37

6.37

16.00

New WSA problem

33.60

25.4.2015

20.57

20.45

18.18

17.94

6.37

9.00

2.62

New WSA problem

6.57

25.4.2015

20.57

20.45

19.66

19.46

9.00

11.00

2.00

New WSA problem

1.98

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

25.4.2015

5.20

5.20

4.30

4.20

6.37

14.37

8.00

New WSA problem

8.00

25.4.2015

5.20

5.20

4.90

4.80

14.37

6.37

16.00

Winding temperature high on 122 degree

6.40

25.4.2015

11.00

11.00

9.00

9.00

6.37

14.37

8.00

New WSA problem

16.00

26.4.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

26.4.2015

5.20

5.20

5.00

4.90

6.37

8.25

1.80

New WSA trip due to truble burner

0.54

26.4.2015

5.20

5.20

4.30

4.20

8.25

13.25

5.00

New WSA trip due to truble burner

5.00

26.4.2015

5.20

5.20

4.80

4.80

13.25

6.37

17.20

Winding temperature high on 122 degree

6.88

26.4.2015

11.00

11.00

9.20

9.10

6.37

13.25

6.80

New WSA trip due to truble burner

12.92

27.4.2015

20.50

20.50

19.50

19.50

12.58

13.06

0.13

Coal blocking at ducthing feeder

0.13

27.4.2015

20.50

20.50

17.80

17.50

14.19

14.37

0.30

Boiler 8 overhaul

0.90

27.4.2015

20.50

20.50

18.31

18.30

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

20.50

20.50

20.01

19.86

22.37

6.37

8.00

Boiler 8 overhaul

5.12

27.4.2015

5.20

5.20

4.80

4.80

6.37

14.15

7.63

Boiler 8 overhaul

3.05

27.4.2015

5.20

5.20

3.30

3.20

14.15

14.37

0.37

Boiler 8 overhaul

0.73

27.4.2015

5.20

5.20

3.10

3.00

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

5.20

5.20

3.40

3.30

22.37

6.37

8.00

Boiler 8 overhaul

15.20

27.4.2015

11.00

11.00

6.70

6.70

14.15

14.37

0.37

Boiler 8 overhaul

1.58

27.4.2015

11.00

11.00

6.80

6.70

14.37

22.37

8.00

Boiler 8 overhaul

34.40

27.4.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

20.33

20.30

18.35

18.28

12.00

22.37

10.62

Boiler 8 overhaul

21.45

28.4.2015

20.33

20.30

18.18

18.09

22.37

6.37

8.00

Boiler 8 overhaul

17.68

28.4.2015

5.20

5.20

3.30

3.20

6.37

22.37

16.00

Boiler 8 overhaul

32.00

28.4.2015

5.20

5.20

3.20

3.10

22.37

6.37

8.00

Boiler 8 overhaul

16.80

28.4.2015

11.00

11.00

6.70

6.70

6.37

14.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

11.00

11.00

6.80

6.80

14.37

22.37

8.00

Boiler 8 overhaul

33.60

28.4.2015

11.00

11.00

6.60

6.50

22.37

6.37

8.00

Boiler 8 overhaul

36.00

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

29.4.2015

20.33

20.30

18.61

18.47

6.37

14.37

8.00

Boiler 8 overhaul

14.64

29.4.2015

20.33

20.33

17.66

17.53

14.37

6.37

16.00

Boiler 8 overhaul

44.80

29.4.2015

5.20

5.20

3.20

3.20

6.37

6.37

24.00

Boiler 8 overhaul

48.00

29.4.2015

11.00

11.00

6.30

6.20

6.37

14.37

8.00

Boiler 8 overhaul

38.40

29.4.2015

11.00

11.00

6.40

6.40

14.37

15.10

0.55

Boiler 8 overhaul

2.53

29.4.2015

11.00

11.00

6.60

6.60

15.10

6.37

15.45

Boiler 8 overhaul

67.98

30.4.2015

20.33

20.33

17.23

17.05

6.37

14.37

8.00

Boiler 8 overhaul

30.4.2015

20.33

20.33

17.50

17.49

14.37

22.37

8.00

Boiler 8 overhaul

30.4.2015

20.33

20.33

17.35

17.22

22.37

6.37

8.00

Boiler 8 overhaul

30.4.2015

5.20

5.20

3.10

3.10

6.37

22.37

16.00

Boiler 8 overhaul

30.4.2015

5.20

5.20

3.30

3.20

22.37

6.37

8.00

Boiler 8 overhaul

30.4.2015

11.00

11.00

6.60

6.50

6.37

6.37

24.00

Boiler 8 overhaul

1.5.2015

20.33

20.33

17.18

17.07

6.37

14.37

8.00

Boiler 8 overhaul

26.08

1.5.2015

20.33

20.33

17.31

17.15

14.37

6.37

16.00

Boiler 8 overhaul

50.88

1.5.2015

5.20

5.20

3.30

3.20

6.37

13.37

7.00

Boiler 8 overhaul

14.00

1.5.2015

5.20

5.20

2.20

2.20

13.37

6.37

17.00

Boiler 8 overhaul

51.00

1.5.2015

11.00

11.00

6.60

6.50

6.37

13.37

7.00

Boiler 8 overhaul

31.50

1.5.2015

11.00

11.00

6.00

6.00

13.30

6.37

17.00

Boiler 8 overhaul

85.00

2.5.2015

20.33

20.33

17.49

17.24

6.37

14.37

8.00

Boiler 8 overhaul

2.5.2015

20.33

20.33

18.36

18.16

14.37

22.37

8.00

Boiler 8 overhaul

2.5.2015

20.33

20.33

17.90

17.80

22.37

6.37

8.00

Boiler 8 overhaul

2.5.2015

5.20

5.20

2.20

2.10

6.37

6.37

24.00

Boiler 8 overhaul

2.5.2015

11.00

11.00

6.00

6.00

6.37

6.37

24.00

Boiler 8 overhaul

3.5.2015

20.33

20.33

18.27

18.24

6.37

14.37

8.00

Boiler 8 overhaul

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
22.72
target
After normal increase load TG 4 as per
24.88
target
Decrease load TG2 after normal increase
33.60
again.
Decrease load TG2 after normal increase
16.00
again.
Decrease load TG3 after normal increase
108.00
again.
26.24

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
17.36
target
After normal increase load TG 4 as per
20.24
target
Decrease load TG2 after normal increase
74.40
again.
Decrease load TG3 after normal increase
120.00
again.
24.72

16.72

After normal increase load TG 4 as per


target

3.5.2015

20.33

20.33

17.71

17.45

14.37

22.37

8.00

Boiler 8 overhaul

23.04

3.5.2015

20.33

20.33

17.71

17.58

22.37

6.37

8.00

Boiler 8 overhaul

22.00

3.5.2015

5.20

5.20

2.20

2.10

6.37

14.37

8.00

Boiler 8 overhaul

24.80

3.5.2015

5.20

5.20

6.60

3.50

3.50

22.37

8.00

Boiler 8 overhaul

13.60

3.5.2015

5.20

5.20

3.60

3.60

22.37

6.37

8.00

Boiler 8 overhaul

12.80

3.5.2015

11.00

11.00

6.00

6.00

6.37

14.37

8.00

Boiler 8 overhaul

40.00

3.5.2015

11.00

11.00

6.60

6.50

14.37

6.37

16.00

Boiler 8 overhaul

72.00

4.5.2015

20.33

20.33

18.01

17.77

6.37

14.37

8.00

Boiler 8 overhaul

20.48

4.5.2015

20.33

20.33

18.88

18.72

14.37

22.37

8.00

Boiler 8 overhaul

12.88

4.5.2015

20.33

20.33

18.53

18.44

22.37

6.37

8.00

Boiler 8 overhaul

15.12

4.5.2015

5.20

5.20

3.70

3.60

6.37

22.37

16.00

Boiler 8 overhaul

25.60

4.5.2015

5.20

5.20

3.80

3.70

22.37

6.37

8.00

Boiler 8 overhaul

12.00

4.5.2015

11.00

11.00

6.60

6.50

6.37

22.37

16.00

Boiler 8 overhaul

72.00

4.5.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

Boiler 8 overhaul

34.40

5.5.2015

20.33

20.33

18.35

18.12

6.37

19.37

13.00

5.5.2015

5.20

5.20

3.80

3.70

6.37

17.35

10.97

5.5.2015

5.20

5.20

4.80

4.70

17.57

18.26

1.52

Winding temperature high on 122 degree

0.76

5.5.2015

5.20

5.20

5.00

4.90

20.28

22.37

1.85

Winding temperature high on 122 degree

0.56

5.5.2015

5.20

5.20

4.90

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

5.5.2015

11.00

11.00

6.60

6.60

6.37

17.45

11.13

5.5.2015

11.00

11.00

9.00

9.00

17.45

19.08

1.38

6.5.2015

Boiler 8 overhaul (Boiler 8 start up & Syncronize


steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)

Boiler 8 overhaul (Boiler 8 start up & Syncronize


steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)

28.73
16.45

48.99
2.77

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

6.5.2015

5.20

5.20

5.00

4.90

6.37

9.44

2.88

Winding temperature high on 122 degree

0.87

6.5.2015

5.20

5.20

4.90

4.80

9.44

12.12

2.47

Winding temperature high on 122 degree

0.99

6.5.2015

5.20

5.20

4.80

4.70

12.12

22.37

10.42

Winding temperature high on 122 degree

5.21

6.5.2015

5.20

5.20

5.00

4.90

22.37

0.04

1.45

Winding temperature high on 122 degree

0.44

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

6.5.2015

5.20

5.20

4.50

4.90

0.04

1.52

1.80

New WSA 55-45 close (boiler over load)

0.54

6.5.2015

5.20

5.20

4.20

4.20

1.52

6.37

4.75

New WSA 55-45 close (boiler over load)

4.75

6.5.2015

11.00

11.00

10.00

10.00

9.14

11.21

2.12

Damper FD fan boiler 7 broken.

2.12

6.5.2015

11.00

11.00

9.50

9.50

1.45

6.37

4.87

New WSA 55-45 close (boiler over load)

7.30

7.5.2015

Note : Boiler 9 & TG 4 normal as per target

7.5.2015

5.20

5.20

4.30

4.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

7.20

7.5.2015

5.20

5.20

4.10

4.00

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

9.16

7.5.2015

5.20

5.20

4.70

4.70

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.18

7.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

4.00

7.5.2015

11.00

11.00

9.30

9.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

13.60

7.5.2015

11.00

11.00

7.50

7.50

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

26.71

7.5.2015

11.00

11.00

9.40

9.30

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.63

7.5.2015

11.00

11.00

9.30

9.20

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

14.40

8.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

8.5.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

Boiler 7 overhaul

9.60

8.5.2015

11.00

11.00

10.30

10.20

6.37

14.37

8.00

Boiler 7 overhaul

6.40

8.5.2015

11.00

11.00

10.50

10.50

14.37

6.37

16.00

Boiler 7 overhaul

8.00

9.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

9.5.2015

5.20

5.20

4.70

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

9.5.2015

5.20

5.20

4.50

4.50

14.37

22.37

8.00

Boiler 7 overhaul

5.60

9.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Boiler 7 overhaul

4.00

9.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

10.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

10.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

10.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

11.5.2015
11.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target


5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

Decrease load TG2 after normal increase


again.

11.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

12.5.2015

Boiler 7 overhaul

12.00

Note : Boiler 9 & TG 4 normal as per target

12.5.2015

5.20

5.20

4.80

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

5.20

5.20

4.60

4.60

14.37

6.37

16.00

Boiler 7 overhaul

9.60

12.5.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

11.00

11.00

10.60

10.60

14.37

6.37

16.00

Boiler 7 overhaul

6.40

13.5.2015
5.20

5.20

4.70

4.60

6.37

6.37

24.00

Boiler 7 overhaul

14.40

13.5.2015

11.00

11.00

10.80

10.70

6.37

6.37

24.00

Boiler 7 overhaul

7.20

14.5.2015
14.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

14.5.2015

11.00

11.00

10.90

10.90

6.37

8.23

1.77

15.5.2015
5.20

5.20

4.80

4.70

6.37

6.37

24.00

5.20

5.20

4.80

4.70

6.37

6.37

24.00

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

Decrease load TG2 after normal increase


again.

Winding temperature high on 122 degree

12.00

Decrease load TG2 after normal increase


again.

Winding temperature high on 122 degree

14.40

Decrease load TG2 after normal increase


again.

14.40

Decrease load TG2 after normal increase


again.

14.40

Decrease load TG2 after normal increase


again.

Note : TG 4 & TG3 normal as per target


5.20

5.20

4.70

4.60

6.37

6.37

24.00

19.5.2015
19.5.2015

0.18

Winding temperature high on 122 degree


Note : TG 4 & TG3 normal as per target

5.20

5.20

4.70

4.60

6.37

6.37

24.00

20.5.2015

Winding temperature high on 122 degree


Note : TG 4 & TG3 normal as per target

20.5.2015

5.20

5.20

4.70

4.60

6.37

5.20

22.72

Winding temperature high on 122 degree

13.63

20.5.2015

5.20

5.20

4.40

4.40

5.20

6.37

1.28

Winding temperature high on 122 degree

1.03

21.5.2015
21.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.

Note : TG 4 & TG3 normal as per target

18.5.2015
18.5.2015

14.40

Note : TG 4 & TG3 normal as per target

17.5.2015
17.5.2015

Note : Boiler 9 & TG 4 normal as per target


Boiler 7 overhaul (Boiler 7 start up & Syncronize
steam at 08.00)
Boiler 7 overhaul (Boiler 7 start up & Syncronize
steam at 08.00)

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.

Note : TG 4 & TG3 normal as per target

16.5.2015
16.5.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target

13.5.2015

15.5.2015

Decrease load TG3 after normal increase


again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target


5.20

5.20

2.70

2.60

6.37

8.45

2.13

L-2 shutdown

5.55

Decrease load TG2 after normal increase


again.

21.5.2015

5.20

5.20

2.00

2.00

8.45

9.04

0.32

L-2 shutdown

1.01

Decrease load TG2 after normal increase


again.

21.5.2015

5.20

5.20

0.00

0.00

9.04

15.37

6.55

L-2 shutdown (PM Jobs : TG2 stop for Cleaning


cooler winding gen & install tapping at pipe line
make up filter water)

34.06

TG2 stop.

21.5.2015

5.20

5.20

2.20

2.20

15.37

22.37

7.00

L-2 shutdown

21.00

21.5.2015

5.20

5.20

3.80

3.80

22.37

2.03

3.43

L-2 shutdown

4.81

21.5.2015

5.20

5.20

4.50

4.50

2.03

2.26

0.38

L-2 shutdown

0.27

21.5.2015

11.00

11.00

9.00

9.00

7.13

8.57

1.73

L-2 shutdown

3.47

21.5.2015

11.00

11.00

10.50

10.50

8.57

11.40

3.28

L-2 shutdown

1.64

21.5.2015

11.00

11.00

10.30

10.30

11.40

13.37

2.05

L-2 shutdown

1.44

21.5.2015

11.00

11.00

8.50

8.50

15.32

19.52

4.33

L-2 shutdown

10.83

21.5.2015

11.00

11.00

9.30

9.30

19.52

0.30

5.37

L-2 shutdown

9.12

21.5.2015

11.00

11.00

10.10

10.10

0.30

2.30

2.00

L-2 shutdown

1.80

22.5.2015
22.5.2015

5.20

5.20

4.80

4.70

11.13

13.27

2.23

22.5.2015

5.20

5.20

4.20

4.20

13.27

17.17

3.83

22.5.2015

5.20

5.20

4.90

4.90

17.17

20.10

2.88

22.5.2015

5.20

5.20

4.70

4.70

20.10

20.37

0.45

22.5.2015

5.20

5.20

5.00

5.00

20.37

6.37

10.00

22.5.2015

11.00

11.00

10.60

10.50

11.10

13.25

2.25

22.5.2015

11.00

11.00

10.00

10.00

13.25

14.37

1.20

22.5.2015

11.00

11.00

10.10

10.10

14.37

16.39

2.03

22.5.2015

11.00

11.00

10.50

10.40

16.39

18.53

2.23

22.5.2015

11.00

11.00

10.20

10.10

20.07

23.37

3.50

22.5.2015

11.00

11.00

9.90

9.80

23.37

1.04

1.45

22.5.2015

11.00

11.00

9.50

9.50

1.04

5.30

4.87

22.5.2015

11.00

11.00

10.10

10.10

5.30

6.37

1.12

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)

1.12
3.83
0.87
0.23
2.00
1.13
1.20
1.83
1.34
3.15
1.74
7.30
1.01

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

23.5.2015
23.5.2015

5.20

5.20

5.00

5.00

6.37

20.00

13.38

23.5.2015

5.20

5.20

4.90

4.90

20.00

6.37

10.62

23.5.2015

11.00

11.00

10.30

10.20

6.37

12.00

5.38

23.5.2015

11.00

11.00

9.90

9.90

12.00

6.37

18.62

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)
Boiler 6 break down (economizer tube get
leakage)

2.68
3.19
4.31
20.48

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

24.5.2015
24.5.2015

5.20

5.20

5.10

5.00

6.37

21.00

14.38

Boiler 6 & L-1 breakdown

2.88

24.5.2015

5.20

5.20

4.60

4.50

21.00

6.37

9.62

L-1 break down

6.73

24.5.2015

11.00

11.00

10.30

10.20

21.30

6.37

9.12

L-1 break down

7.29

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : TG2, TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

25.5.2015

26.5.2015
26.5.2015

5.20

5.20

5.10

5.00

12.10

14.37

1.55

26.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

26.5.2015

5.20

5.20

5.00

4.90

22.37

1.00

2.38

26.5.2015

5.20

5.20

4.80

4.70

1.00

4.54

3.90

26.5.2015

5.20

5.20

4.90

4.80

4.55

5.14

1.68

26.5.2015

5.20

5.20

5.00

4.90

5.15

6.37

1.37

26.5.2015

11.20

11.20

11.00

10.90

13.10

14.00

0.83

26.5.2015

11.20

11.20

10.00

10.00

14.37

5.53

15.27

26.5.2015

11.20

11.20

10.20

10.20

5.53

6.37

0.73

27.5.2015
27.5.2015

5.20

5.20

4.80

4.70

6.37

10.37

4.00

27.5.2015

5.20

5.20

4.70

4.60

10.37

14.37

4.00

27.5.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

27.5.2015

5.20

5.20

5.10

5.10

22.37

6.37

8.00

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Note : Boiler 9 & TG 4 normal as per target but
winding temperature alternator TG 4 high
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300

0.31
3.20
0.72
1.95
0.67
0.41
0.25
18.32
0.73

2.00
2.40
1.60
0.80

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

27.5.2015

11.00

11.00

10.20

10.20

6.37

10.37

4.00

27.5.2015

11.00

11.00

9.90

9.80

10.37

14.37

4.00

27.5.2015

11.00

11.00

9.10

9.10

14.37

22.37

8.00

27.5.2015

11.00

11.00

10.70

10.70

22.37

23.00

8.00

Pressure vacum TG3 drop & Repairing support


pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support
pipe line steam 4.5 bar NB 300

3.20
4.80
15.20
2.40

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

28.5.2015
28.5.2015

5.20

5.20

5.10

5.10

6.37

10.01

3.40

Steam consumption L-4 & L-5 not maximum

0.34

28.5.2015

5.20

5.20

4.80

4.70

10.01

10.29

0.47

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

5.20

5.20

4.50

4.50

10.29

14.37

4.13

Steam consumption L-4 & L-5 not maximum

2.89

28.5.2015

5.20

5.20

4.80

4.80

14.37

22.37

8.00

Steam consumption L-4 & L-5 not maximum

3.20

28.5.2015

11.00

11.00

10.80

10.80

9.25

10.34

1.15

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

11.00

11.00

10.50

10.50

11.14

12.10

0.93

Steam consumption L-4 & L-5 not maximum

0.47

29.5.2015
29.5.2015

5.20

5.20

5.10

5.00

6.37

14.00

7.38

29.5.2015

5.20

5.20

4.80

4.70

14.00

14.37

0.62

29.5.2015

5.20

5.20

4.60

4.50

14.37

15.25

0.80

29.5.2015

5.20

5.20

5.10

5.00

15.25

6.37

15.20

30.5.2015
30.5.2015

5.20

5.20

5.10

5.00

6.37

13.45

7.13

30.5.2015

5.20

5.20

4.90

4.80

13.45

14.37

0.87

30.5.2015

5.20

5.20

5.00

4.90

14.37

22.37

8.00

30.5.2015

5.20

5.20

5.10

5.00

22.37

6.37

8.00

Note : TG3 & TG 4 normal as per target but


Pressure vacum TG3 dropp & winding
temperature alternator TG 4 high
Pressure vacum TG3 drop & process L-1
decrease steam consumption
Pressure vacum TG3 drop & process L-1
decrease steam consumption
Pressure vacum TG3 drop & process L-1
decrease steam consumption
Pressure vacum TG3 drop & process L-1
decrease steam consumption
Note : TG3 & TG 4 normal as per target but
winding temperature alternator TG 4 high
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator

1.48
0.31
0.56
3.04

1.43
0.35
2.40
1.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high (115)

31.5.2015
31.5.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Pressure vacum TG3 drop

1.60

31.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

Pressure vacum TG3 drop

3.20

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

31.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Pressure vacum TG3 drop

4.00

Decrease load TG2 after normal increase


again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high (117.5)

1.6.2015
1.6.2015

5.20

5.20

4.80

4.80

6.37

13.30

6.88

L-3 breakdown

2.75

1.6.2015

5.20

5.20

4.80

4.70

13.30

14.37

1.12

Pressure vacum TG3 drop

0.56

1.6.2015

5.20

5.20

4.90

4.80

14.37

14.46

0.15

Pressure vacum TG3 drop

0.06

1.6.2015

5.20

5.20

4.80

4.70

14.46

17.00

2.23

Pressure vacum TG3 drop

1.12

1.6.2015

5.20

5.20

4.90

4.80

17.00

19.24

2.40

Pressure vacum TG3 drop

0.96

1.6.2015

5.20

5.20

5.00

4.90

19.24

6.37

10.78

Pressure vacum TG3 drop

3.24

1.6.2015

11.00

11.00

10.90

10.80

6.26

13.30

7.07

L-3 breakdown

1.41

1.6.2015

11.00

11.00

9.00

8.90

13.30

15.47

2.28

Pressure vacum TG3 drop

4.80

1.6.2015

11.00

11.00

8.50

8.50

15.47

17.10

1.38

Pressure vacum TG3 drop

3.46

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high (117.5)

2.6.2015
2.6.2015

5.20

5.20

5.00

4.90

6.37

0.34

17.95

5.39

2.6.2015

5.20

5.20

4.90

4.80

0.34

5.02

4.47

1.79

2.6.2015

5.20

5.20

5.10

5.00

5.02

6.37

1.42

0.28

2.6.2015

11.00

11.00

10.80

10.80

23.23

6.37

7.23

1.45

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high (117.5)

3.6.2015
3.6.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

3.6.2015

5.20

5.20

0.00

0.00

3.22

6.37

3.25

3.6.2015

11.00

11.00

10.90

10.90

22.37

4.18

5.68

1.60
PLC failure

16.90
0.57

Decrease load TG2 after normal increase


again.
TG2 trip
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high (117.5)

4.6.2015
4.6.2015

5.20

5.20

0.00

0.00

6.37

9.15

2.63

PLC failure

13.69

4.6.2015

5.20

5.20

3.30

3.20

9.15

14.37

5.37

L-4 shuth down

10.73

4.6.2015

5.20

5.20

3.50

3.50

20.09

21.17

1.13

L-4 shuth down

1.93

TG2 trip
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

4.6.2015

5.20

5.20

4.00

3.90

22.17

22.37

0.33

L-4 shuth down

0.43

4.6.2015

5.20

5.20

4.70

4.60

0.43

3.42

2.98

WSA 2 stop

1.79

4.6.2015

5.20

5.20

5.00

5.00

3.42

6.37

2.92

WSA 2 stop

0.58

4.6.2015

11.00

11.00

8.80

8.80

9.24

14.37

5.22

L-4 shuth down

11.48

4.6.2015

11.00

11.00

9.30

9.30

15.54

20.54

5.00

L-4 shuth down

8.50

4.6.2015

11.00

11.00

10.90

10.90

20.54

22.37

2.28

L-4 shuth down

0.23

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

5.6.2015
5.6.2015

5.20

5.20

5.20

5.10

6.37

7.44

1.12

New acid plant stop

0.11

5.6.2015

5.20

5.20

4.70

4.60

7.44

8.10

0.43

L-4 spinning baling press truble

0.26

5.6.2015

5.20

5.20

5.00

5.00

18.33

6.37

12.07

New acid plant stop

2.41

5.6.2015

11.00

11.00

10.40

10.30

16.46

18.37

1.85

New acid plant stop

1.30

5.6.2015

11.00

11.00

9.90

9.80

18.37

22.37

4.00

New acid plant stop

4.80

5.6.2015

11.00

11.00

9.70

9.60

22.37

6.37

8.00

New acid plant stop

11.20

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : TG 2 & TG 4 normal as per target but


winding temperature alternator TG 4 high

6.6.2015
6.6.2015

11.00

11.00

9.80

9.80

6.37

8.58

2.35

L-5 decrease steam consumption

2.82

6.6.2015

11.00

11.00

10.30

10.30

8.58

14.37

6.35

L-5 decrease steam consumption

4.45

6.6.2015

11.00

11.00

10.40

10.30

14.37

6.37

16.00

L-5 decrease steam consumption

11.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : TG 2 & TG 4 normal as per target but


winding temperature alternator TG 4 high

7.6.2015
7.6.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.00

11.00

10.30

10.30

6.37

6.37

24.00

L-5 decrease steam consumption

16.80

Decrease load TG3 after normal increase


again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

8.6.2015
8.6.2015

5.20

5.20

4.50

4.40

15.00

22.10

7.17

L-5 shutdown

5.73

8.6.2015

11.00

11.00

10.20

10.20

6.37

14.37

8.00

L-5 shutdown

6.40

8.6.2015

11.00

11.00

10.20

10.10

14.37

15.30

0.88

L-5 shutdown

0.80

8.6.2015

11.00

11.00

9.30

9.30

15.30

17.00

1.50

L-5 shutdown

2.55

8.6.2015

11.00

11.00

9.00

9.00

17.00

22.37

5.62

L-5 shutdown

11.23

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

8.6.2015

11.00

11.00

9.40

9.40

22.37

6.37

8.00

12.80

Decrease load TG3 after normal increase


again.

16.80

Decrease load TG3 after normal increase


again.

Decrease load TG3 after normal increase


again.

Note : TG 2 & TG 4 normal as per target but


winding temperature alternator TG 4 high

9.6.2015
9.6.2015

L-5 shutdown

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop


Note : TG 2 & TG 4 normal as per target but
winding temperature alternator TG 4 high

10.6.2015
10.6.2016

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop

16.80

11.6.2015

19.50

19.40

19.50

0.00

11.00

15.00

4.00

Boiler 9 & TG4 trip due to PLN trip

77.60

11.6.2015

19.50

19.40

9.00

0.00

15.00

16.30

1.50

TG4 trip due to exhaust pressure drop

29.10

11.6.2015

19.50

19.40

14.40

14.00

17.20

21.20

4.00

ID Fan boiler 9 trip (replace cooling fan motor)

21.60

11.6.2015

5.20

5.20

4.50

4.50

7.20

8.31

1.18

L-1 spinning stop

0.83

11.6.2015

5.20

5.20

4.00

4.00

8.31

11.48

3.28

L-1 spinning stop

3.94

11.6.2015

5.20

5.20

4.50

4.50

11.48

14.37

2.82

L-1 spinning stop

1.97

11.6.2015

5.20

5.20

4.70

4.60

22.37

0.34

1.95

L-5 breakdown

1.17

11.6.2015

5.20

5.20

4.60

4.50

0.34

0.49

0.25

L-5 breakdown

0.18

11.6.2015

5.20

5.20

4.50

4.40

0.49

5.31

4.70

L-5 breakdown

3.76

11.6.2015

5.20

5.20

5.00

4.90

5.41

6.37

0.93

L-5 breakdown

0.28

11.6.2015

11.00

11.00

9.10

9.00

7.10

11.00

3.83

Boiler 9 & TG4 trip due to PLN trip

7.67

11.6.2015

11.00

11.00

8.80

8.70

11.00

14.37

3.62

Boiler 9 & TG4 trip due to PLN trip

8.32

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

12.6.2015
12.6.2015

5.20

5.20

4.90

4.80

6.37

7.45

1.13

L-5 breakdown

0.45

12.6.2015

5.20

5.20

5.00

5.00

7.45

19.15

11.50

L-4 decrease steam consumption

2.30

12.6.2015

11.00

11.00

8.90

8.90

6.37

8.09

1.53

L-5 breakdown

3.22

12.6.2015

11.00

11.00

9.50

9.40

8.09

10.40

2.52

L-4 decrease steam consumption

4.03

12.6.2015

11.00

11.00

9.00

9.00

10.40

13.31

2.85

L-4 decrease steam consumption

5.70

12.6.2015

11.00

11.00

9.50

9.50

13.31

6.37

17.10

L-4 decrease steam consumption

25.65

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

13.6.2015
13.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

14.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

15.6.2015

Note : TG2 & TG 4 normal as per target but


winding temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
vacum drop
Note : TG2 & TG 4 normal as per target but
winding temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high

24.00

Decrease load TG3 after normal increase


again.

24.00

Decrease load TG3 after normal increase


again.

21.60

Decrease load TG3 after normal increase


again.

15.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

16.6.2015

19.75

19.60

19.20

19.10

12.00

17.00

5.00

Winding temperature TG get high

2.50

16.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

L-5 shutdown

21.60

16.6.2015

Note : TG2 normal as per target

17.6.2015
17.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

18.6.2015

19.75

19.70

19.20

19.10

12.00

17.00

6.00

18.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

19.6.2015
19.6.2015

After normal increase load TG 4 as per


target
Decrease load TG3 after normal increase
again.

11.00

11.00

10.00

10.00

6.37

6.37

24.00

20.6.2015
20.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

20.6.2015

19.50

19.40

19.20

19.00

11.00

17.00

6.00

21.6.2015
21.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

21.6.2015

19.50

19.40

19.20

19.10

11.00

17.00

6.00

22.6.2015
22.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

23.6.2015

19.61

19.58

19.18

19.03

13.30

14.30

1.00

Note : TG2 & TG 4 normal as per target but


winding temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
Winding Temp. Tg 4 get high 117,5 degree
condensate get high & vacum drop & Winding get
high
Note : TG2 & TG 4 normal as per target but
winding temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
Note : TG2 normal as per target but winding
temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
Winding Temp. Tg 4 get high 117,5 degree
Note : TG2 normal as per target but winding
temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
winding temperature alternator TG 4 high
Note : TG2 & TG 4 normal as per target but
winding temperature alternator TG 4 high
condensate get high & vacum drop & Winding get
high
winding temperature alternator TG 4 high

21.60
3.60
24.00

24.00

21.60
2.40

21.60
1.80

Decrease load TG3 after normal increase


again.
Control winding temprature max. 117.5
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.

Decrease load TG3 after normal increase


again.
Control winding temprature max. 117.5

Decrease load TG3 after normal increase


again.
After normal increase load TG 4 as per
target (control max. 117.5 degree)
Control winding temp. TG 4 max 117.5

24.00

Decrease load TG3 after normal increase


again.

0.55

After normal increase load TG 4 as per


target

23.6.2015

11.00

11.00

10.00

10.00

6.37

15.56

9.32

23.6.2015
23.6.2015

11.00

11.00

0.00

0.00

15.56

6.37

14.68

24.6.2015
24.6.2015

11.00

11.00

0.00

0.00

6.37

6.37

24.00

11.00

11.00

0.00

0.00

6.37

9.35

2.97

27.6.2015
19.40

19.30

18.90

18.80

11.00

17.00

6.00

264.00 TG3 stop

TG3 start up & Syncronize power

Control winding temp. TG 4 max 117.5


32.63

Note : TG2 & TG3 normal as per target but


winding temperature alternator TG 4 high
winding temperature alternator TG 4 high

19.40

19.30

19.10

18.90

11.00

17.00

6.00

29.6.2015

winding temperature alternator TG 4 high

Note : TG3 normal as per target


Fan C/T no. 1 stop & winding temperature
alternator TG 4 high
Fan C/T no. 1 stop & winding temperature
alternator TG 4 high
Fan C/T no. 1 stop & winding temperature
alternator TG 4 high

Control winding temp. TG 4 max 117.5


3.00

2.40

Control winding temprature max. 117.5 and


planning change cooling tower water with
filter water

3.78

Control winding temprature max. 117.5

6.32

Control winding temprature max. 117.5

3.52

Control winding temprature max. 117.5

19.40

19.30

18.96

18.67

8.30

14.30

6.00

29.6.2015

19.40

19.30

18.83

18.51

14.30

22.30

8.00

29.6.2015

19.40

19.30

18.96

18.86

22.30

6.30

8.00

29.6.2015

5.20

5.20

5.20

5.10

6.37

10.10

3.55

Temperature journal turbine NDE bearing high

0.36

29.6.2015

5.20

5.20

4.90

4.80

10.10

10.58

0.80

Temperature journal turbine NDE bearing high

0.32

29.6.2015

5.20

5.20

5.20

5.10

10.58

14.37

3.65

Temperature journal turbine NDE bearing high

0.37

29.6.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Temperature journal turbine NDE bearing high

0.80

30.6.2015
30.6.2015
30.6.2015

19.40
19.40

19.30
19.30

19.01
19.44

18.91
19.25

6.30
14.30

14.30
6.30

8.00
16.00

Note : TG3 normal as per target


Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high

3.12
0.80

30.6.2015

5.20

5.20

5.20

5.10

6.30

14.30

8.00

30.6.2015

5.20

5.20

5.10

5.00

14.30

22.30

8.00

1.7.2015

0.80

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

Control winding temprature max. 117.5


Control winding temp. TG 4 max 117.5

29.6.2015

L-4 break down

Decrease load TG3 after normal increase


again.
Control winding temp. TG 4 max 117.5

Note : TG2, TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

28.6.2015
28.6.2015

Control winding temp. TG 4 max 117.5

Note : TG2, TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

26.6.2015

27.6.2015

Note : TG2 & TG 4 normal as per target but


winding temperature alternator TG 4 high
TG3 shutdown

Decrease load TG3 after normal increase


again.
161.48 TG3 stop
9.32

Note : TG2 & TG 4 normal as per target but


winding temperature alternator TG 4 high

25.6.2015
25.6.2015

condensate get high & vacum drop & Winding get


high
TG3 shutdown
Note : TG2 normal as per target

1.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Control winding temprature max. 117.5


Control winding temprature max. 117.5
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

1.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

2.7.2015
2.7.2015

19.40

19.30

19.35

19.17

6.30

14.30

8.00

2.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Note : TG3 normal as per target


Winding temperature alternator TG 4 high

1.04
2.40

Decrease load TG2 after normal increase


again.

Control winding temprature max. 117.5


Decrease load TG2 after normal increase
again.

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

3.7.2015
3.7.2015

2.40

5.20

5.20

5.20

5.10

6.30

6.30

24.00

4.7.2015

Note : TG3 normal as per target


TG4 trip due to PA Fan no. 2 trip (winding motor
burn).

4.7.2015

19.40

19.30

0.00

0.00

5.00

6.30

1.50

4.7.2015

5.20

5.20

5.20

5.10

6.30

5.30

23.00

4.7.2015

5.20

5.20

4.50

4.40

5.30

6.00

0.50

4.7.2015

5.20

5.20

5.20

5.10

6.00

6.30

0.50

5.7.2015
5.7.2015
5.7.2015

19.40
19.40

19.30
19.30

0.00
10.14

0.00
10.10

6.30
1.21

1.21
6.30

18.85
5.15

5.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

6.7.2015

19.40

19.30

10.62

10.53

6.30

10.30

4.00

Cleaning online 1/2 condenser TG4

6.7.2015

19.40

19.30

11.50

11.40

10.30

13.30

3.00

L-2 break down & Cleaning online 1/2 condenser


TG4

6.7.2015

19.40

19.30

12.14

12.06

13.30

14.30

1.00

Cleaning online 1/2 condenser TG4

6.7.2015

19.40

19.30

13.40

1.36

14.30

22.30

8.00

Cleaning online 1/2 condenser TG4

6.7.2015

19.40

19.30

14.14

14.09

22.30

6.30

8.00

Cleaning online 1/2 condenser TG4

6.7.2015

11.00

11.00

10.80

10.80

10.10

10.40

0.50

Cleaning online 1/2 condenser TG4

6.7.2015

11.00

11.00

10.00

10.00

10.40

14.30

3.83

Cleaning online 1/2 condenser TG4

6.7.2015

11.00

11.00

10.50

10.50

14.30

6.30

16.00

Cleaning online 1/2 condenser TG4

6.7.2015

5.20

5.20

5.20

5.10

6.30

9.13

2.72

Cleaning online 1/2 condenser TG4

6.7.2015

5.20

5.20

4.90

4.80

9.13

10.24

1.18

Cleaning online 1/2 condenser TG4

6.7.2015

5.20

5.20

4.00

4.00

10.24

13.30

3.10

L-2 break down

6.7.2015

5.20

5.20

5.20

5.10

13.30

22.30

9.00

Cleaning online 1/2 condenser TG4

2.40

Decrease load TG2 after normal increase


again.

28.95

TG4 stop

2.30
TG4 trip due to PA Fan no. 2 trip (winding motor
burn).

0.40
0.05

Note : TG3 normal as per target


Clening condenser TG4
TG4 start up & Syncronize power

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

363.81 TG4 stop


47.38 Monitoring syncronize
Decrease load TG2 after normal increase
2.40
again.
Decrease load TG4 after normal increase
again.
TG4 restricted load due to cleaning
23.70
condenser cell 1 phase
Decrease load TG4 after normal increase
7.24
again.
Decrease load TG4 after normal increase
143.52
again.
Decrease load TG4 after normal increase
41.68
again.
Decrease load TG3 after normal increase
0.10
again.
Decrease load TG3 after normal increase
3.83
again.
Decrease load TG3 after normal increase
8.00
again.
Decrease load TG2 after normal increase
0.27
again.
Decrease load TG2 after normal increase
0.47
again.
Decrease load TG2 after normal increase
3.72
again.
Decrease load TG2 after normal increase
0.90
again.
35.08

7.7.2015

19.40

19.30

15.80

14.83

6.30

10.00

3.50

Cleaning online 1/2 condenser TG4

15.65

7.7.2016

11.00

11.00

10.50

10.50

6.30

11.22

4.87

Cleaning online 1/2 condenser TG4

2.43

7.7.2017

11.00

11.00

9.00

9.00

11.36

14.30

3.10

SPG L-4 decrease steam consumption.

6.20

7.7.2018

11.00

11.00

10.90

10.90

22.30

6.30

8.00

Clening condenser TG4 & SPG L-4 decrease


steam consumption.

0.80

7.7.2019

5.20

5.20

5.10

5.00

6.30

13.48

7.30

Winding temperature high

1.46

7.7.2020

5.20

5.20

4.50

4.50

13.48

14.06

0.30

SPG L-4 decrease steam consumption.

0.21

7.7.2021

5.20

5.20

5.10

5.00

14.06

14.30

0.40

Winding temperature high

0.08

7.7.2022

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

8.7.2015

Control winding temprature max. 117.5

8.7.2015

11.00

11.00

10.90

10.90

6.30

8.15

1.75

8.7.2015

11.00

11.00

10.80

10.80

16.00

6.30

9.50

PPL2 request decrease load TG3 (LP TG4 100%)

1.90

8.7.2015

5.20

5.20

4.80

4.70

6.30

7.20

0.83

Winding temperature high

0.42

8.7.2015

5.20

5.20

5.10

5.00

7.20

12.00

4.67

Winding temperature high

0.93

8.7.2015

5.20

5.20

5.00

4.90

12.00

6.30

18.50

Winding temperature high

5.55

0.18

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

9.7.2015

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

9.7.2015

11.00

11.00

10.90

10.80

6.30

7.15

0.75

L-3 shutdown

0.15

9.7.2015

11.00

11.00

9.00

9.00

7.15

10.39

3.40

L-3 shutdown

6.80

9.7.2015

11.00

11.00

10.00

10.00

11.47

13.05

1.30

L-3 shutdown

1.30

9.7.2015

11.00

11.00

9.40

9.30

13.45

14.30

0.75

L-3 shutdown

1.28

9.7.2015

11.00

11.00

9.00

9.00

14.30

21.44

7.23

L-3 shutdown

14.47

9.7.2015

11.00

11.00

9.80

9.80

21.44

22.30

0.77

L-3 shutdown

0.92

9.7.2015

11.00

11.00

10.30

10.30

22.30

23.26

0.93

L-3 shutdown

0.65

9.7.2015

11.00

11.00

10.80

10.70

23.26

0.21

0.92

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.90

4.80

6.30

6.54

0.40

L-3 shutdown

0.16

9.7.2015

5.20

5.20

4.30

4.20

7.05

10.54

3.82

L-3 shutdown

3.82

9.7.2015

5.20

5.20

4.50

4.40

10.54

14.30

3.77

L-3 shutdown

3.01

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

9.7.2015

5.20

5.20

4.00

4.00

14.30

14.44

0.23

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.50

4.50

14.44

16.43

1.98

L-3 shutdown

1.39

9.7.2015

5.20

5.20

4.20

4.20

16.43

16.52

0.18

L-3 shutdown

0.18

9.7.2015

5.20

5.20

4.80

4.80

16.52

18.52

2.00

L-3 shutdown

0.80

9.7.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-3 shutdown

1.60

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

10.7.2015

Control winding temprature max. 117.5

10.7.2015

5.20

5.20

5.10

5.00

6.30

10.54

4.23

Winding temperature high

0.85

10.7.2015

5.20

5.20

5.00

4.90

10.54

12.44

1.82

Winding temperature high

0.55

10.7.2015

5.20

5.20

4.90

4.80

12.44

13.08

0.40

Winding temperature high

0.16

10.7.2015

5.20

5.20

4.80

4.70

13.08

14.30

1.37

Winding temperature high

0.68

10.7.2015

5.20

5.20

5.10

5.00

15.37

15.41

0.07

Winding temperature high

0.01

10.7.2015

5.20

5.20

5.20

5.10

15.42

18.12

2.50

Winding temperature high

0.25

10.7.2015

5.20

5.20

5.10

5.00

18.12

6.30

13.30

Winding temperature high

2.66

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

11.7.2015
11.00

11.00

10.50

10.50

9.30

10.50

1.33

L-1, 2, 3 minimum speed

0.67

11.7.2015

5.20

5.20

5.10

5.00

6.30

8.45

2.25

L-1, 2, 3 minimum speed

0.45

11.7.2015

5.20

5.20

4.90

4.80

8.45

11.51

3.10

L-1, 2, 3 minimum speed

1.24

11.7.2015

5.20

5.20

5.10

5.00

12.04

14.30

2.43

Winding temperature high

0.49

11.7.2015

5.20

5.20

5.20

5.10

14.30

15.02

0.53

Winding temperature high

0.05

11.7.2015

5.20

5.20

5.10

5.00

15.02

21.33

6.52

Winding temperature high

1.30

11.7.2015

5.20

5.20

5.20

5.10

21.33

6.30

8.95

Winding temperature high

0.90

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high
5.20

5.20

5.10

5.00

6.30

22.30

16.00

Winding temperature high

3.20

12.7.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Winding temperature high

0.80

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

12.7.2015

13.7.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

11.7.2015

12.7.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

13.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

4.80

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

14.7.2015
14.7.2015

Winding temperature high

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Winding temperature high

Control winding temprature max. 117.5


4.80

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high

15.7.2015
11.00

11.00

11.00

10.90

17.00

21.35

4.58

PRV 22-10 boiler house leakage

0.46

15.7.2015

5.20

5.20

5.10

5.00

6.30

16.45

10.25

Winding temperature high

2.05

15.7.2015

5.20

5.20

4.90

4.80

16.45

17.43

0.97

PRV 22-10 boiler house leakage

0.39

15.7.2015

5.20

5.20

5.10

5.00

17.43

6.30

12.78

Winding temperature high

2.56

Note : Boiler 9 & TG 4 normal as per target but


winding temperature alternator TG 4 high
11.00

11.00

11.00

10.90

8.14

14.30

6.27

Inlet flow steam high

0.63

16.7.2015

5.20

5.20

5.10

5.00

6.30

10.56

4.43

Winding temperature high

0.89

16.7.2015

5.20

5.20

5.00

4.90

10.56

14.30

3.57

Winding temperature high

1.07

16.7.2015

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

17.7.2015

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high
5.20

5.20

5.00

4.90

6.30

6.30

24.00

5.20

5.20

5.00

4.90

6.30

6.30

24.00

Winding temperature high

7.20

Decrease load TG2 after normal increase


again.
Control winding temprature max. 117.5

7.20

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

19.7.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

18.7.2015
18.7.2015

Winding temperature high

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Control winding temprature max. 117.5

16.7.2015

17.7.2015

Decrease load TG2 after normal increase


again.
Control winding temprature max. 117.5

15.7.2015

16.7.2015

Decrease load TG2 after normal increase


again.

Decrease load TG2 after normal increase


again.
Control winding temprature max. 117.5

19.7.2015

5.20

5.20

5.00

4.90

6.30

10.40

4.17

Winding temperature high

1.25

19.7.2015

5.20

5.20

4.90

4.80

10.40

13.22

2.70

Winding temperature high

1.08

19.7.2015

5.20

5.20

5.00

4.90

13.22

14.59

1.62

Winding temperature high

0.49

19.7.2015

5.20

5.20

4.90

4.80

14.59

22.30

7.52

Winding temperature high

3.01

19.7.2015

5.20

5.20

5.00

4.90

22.30

6.30

8.00

Winding temperature high

2.40

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG3 & TG 4 normal as per target but


winding temperature alternator TG 4 high

20.7.2015
20.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

21.7.2015

19.40

19.30

0.00

0.00

23.30

6.30

7.00

TG4 trip due to overspeed protection relay active


(EXITER /ELECTRIC PROBLEM).

21.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

21.7.2015

Control winding temprature max. 117.5


9.60

Decrease load TG2 after normal increase


again.

135.10 TG4 stop


9.60

Decrease load TG2 after normal increase


again.

Note : TG3 normal as per target

22.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

22.7.2015

5.20

5.20

4.90

4.80

6.30

14.39

8.15

Winding temperature high

22.7.2015

5.20

5.20

4.80

4.70

14.39

19.23

4.73

Winding temperature high

22.7.2015

5.20

5.20

4.90

4.80

19.23

6.30

11.12

Winding temperature high

22.7.2015

463.20 TG4 stop


Decrease load TG2 after normal increase
3.26
again.
Decrease load TG2 after normal increase
2.37
again.
Decrease load TG2 after normal increase
4.45
again.

Note : TG3 normal as per target

23.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

23.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

23.7.2015

463.20 TG4 stop


Decrease load TG2 after normal increase
9.60
again.

Note : TG3 normal as per target

24.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

24.7.2015

5.20

5.20

4.90

4.80

6.30

12.30

6.00

Winding temperature high

24.7.2015

5.20

5.20

4.80

4.70

12.30

14.30

2.00

Winding temperature high

24.7.2015

5.20

5.20

4.90

4.80

14.30

6.30

16.00

Winding temperature high

24.7.2015

463.20 TG4 stop


Decrease load TG2 after normal increase
2.40
again.
Decrease load TG2 after normal increase
1.00
again.
Decrease load TG2 after normal increase
6.40
again.

Note : TG3 normal as per target

25.7.2015
25.7.2015
25.7.2015

19.40
19.40
19.40

19.30
19.30
19.30

0.00
5.00
0.00

0.00
5.00
0.00

6.30
10.08
13.45

10.08
13.45
6.30

3.63
3.62
16.75

TG4 break down Exiter problem


TG4 start up & synchronize
TG4 Cooling down planning install new diodes.

25.7.2015

5.20

5.20

4.90

4.80

6.30

9.40

3.17

Winding temperature high

25.7.2015

5.20

5.20

4.60

4.50

9.40

13.45

4.08

Winding temperature high

25.7.2015

5.20

5.20

4.80

4.70

13.45

4.45

15.00

Winding temperature high

25.7.2015

5.20

5.20

4.60

4.50

4.45

6.30

1.75

26.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

26.7.2016

5.20

5.20

4.70

4.60

6.30

14.30

8.00

Winding temperature high

26.7.2017

5.20

5.20

4.60

4.50

14.30

19.10

4.67

Winding temperature high

26.7.2018

5.20

5.20

4.70

4.60

19.10

20.40

1.50

Winding temperature high

25.7.2015

L-4 decrease steam consumption & Winding


temperature high
Note : TG3 normal as per target

70.12 TG4 stop


51.72 Increase and hold load until 5 MW
323.28 TG4 stop
Decrease load TG2 after normal increase
1.27
again.
Decrease load TG2 after normal increase
2.86
again.
Decrease load TG2 after normal increase
7.50
again.
Decrease load TG2 after normal increase
1.23
again.

463.20 TG4 stop


Decrease load TG2 after normal increase
4.80
again.
Decrease load TG2 after normal increase
3.27
again.
Decrease load TG2 after normal increase
0.90
again.

26.7.2019

5.20

5.20

4.80

4.70

20.40

6.30

9.83

26.7.2015

Winding temperature high

4.92

Decrease load TG2 after normal increase


again.

Note : TG3 normal as per target

27.7.2015
27.7.2015
27.7.2015

19.40
19.40
19.40

19.30
19.30
19.30

0.00
16.00
0.00

0.00
16.00
0.00

6.30
10.25
15.25

10.25
15.25
6.30

3.92
5.00
15.08

TG4 break down Exiter problem


TG4 start up & synchronize
TG4 TRIP

27.7.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

Winding temperature high

5.60

27.7.2015

5.20

5.20

4.70

4.60

14.30

17.17

2.78

TG4 & New WSA trip

1.67

27.7.2015

5.20

5.20

4.00

3.90

15.29

16.39

1.17

Winding temperature high

1.52

27.7.2015

5.20

5.20

4.80

4.70

17.17

21.22

4.08

Winding temperature high

2.04

27.7.2015

5.20

5.20

4.70

4.60

21.22

6.30

7.97

Winding temperature high

4.78

27.7.2015

75.59
16.50
291.11

TG4 stop
Increase and hold load until 16 MW
TG4 stop
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG3 normal as per target

28.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

28.7.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

463.20 TG4 stop


Decrease load TG2 after normal increase
16.80
again.

Note : TG3 normal as per target


29.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

29.7.2015

5.20

5.20

4.60

4.60

6.30

22.30

16.00

Winding temperature high

29.7.2015

5.20

5.20

4.70

4.70

22.30

6.30

8.00

Winding temperature high

463.20 TG4 stop


Decrease load TG2 after normal increase
9.60
again.
Decrease load TG2 after normal increase
4.00
again.

Note : TG3 normal as per target


30.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

30.7.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

Winding temperature high

30.7.2015

5.20

5.20

4.70

4.60

14.30

6.30

16.00

Winding temperature high

463.20 TG4 stop


Decrease load TG2 after normal increase
4.00
again.
Decrease load TG2 after normal increase
9.60
again.

Note : TG3 normal as per target


31.7.2015

19.40

19.30

0.00

0.00

6.30

6.30

24.00

TG4 break down Exiter problem

31.7.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

Winding temperature high

463.20 TG4 stop


Decrease load TG2 after normal increase
14.40
again.

Note : TG3 normal as per target


1.8.2015
1.8.2015

19.40
19.40

19.30
19.30

0.00
15.00

0.00
15.00

6.30
8.47

8.47
6.30

2.28
21.72

TG4 break down Exiter problem


TG4 start up & synchronize

44.07
93.38

1.8.2015

5.20

5.20

4.70

4.60

6.30

10.40

4.17

Winding temperature high

2.50

1.8.2015

5.20

5.20

4.50

4.40

10.40

14.30

3.83

Winding temperature high

3.06

1.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

TG4 stop
under observation: load keep 15 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG3 normal as per target


2.8.2015

19.40

19.40

16.00

16.00

6.30

6.30

24.00

TG4 break down Exiter problem

81.60

load keep 16 MW

2.8.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

16.80

Decrease load TG2 after normal increase


again.

Note : TG3 normal as per target


3.8.2015
3.8.2015
3.8.2015

19.40
19.40
19.40

19.40
19.40
19.40

17.10
18.10
19.18

17.00
18.00
19.00

6.30
14.30
15.30

14.30
15.30
6.30

8.00
1.00
15.00

TG4 under observation (Exiter problem)


TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)

19.20
1.40
6.00

3.8.2015

5.20

5.20

4.50

4.50

6.30

14.30

8.00

Winding temperature high

5.60

3.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

load keep 17 MW
load keep 18 MW
load keep 19 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG3 normal as per target


4.8.2015

Note : TG3 & TG 4 normal as per target

4.8.2015

5.20

5.20

4.50

4.40

6.30

13.30

7.00

Winding temperature high

5.60

4.8.2015

5.20

5.20

4.00

4.00

13.30

17.40

4.17

Winding temperature high

5.00

4.8.2015

5.20

5.20

4.60

4.50

17.40

6.30

12.83

Winding temperature high

8.98

5.8.2015
5.8.2015

Note : TG3 & TG 4 normal as per target


5.20

5.20

4.50

4.40

6.30

6.30

24.00

6.8.2015
6.8.2015

5.20

5.20

4.40

4.40

6.30

6.30

24.00

5.20

5.20

4.40

4.30

6.30

6.30

24.00

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

19.20

Decrease load TG2 after normal increase


again.

Winding temperature high

21.60

Decrease load TG2 after normal increase


again.

Winding temperature high

21.60

Decrease load TG2 after normal increase


again.

21.60

Decrease load TG2 after normal increase


again.

21.60

Decrease load TG2 after normal increase


again.

Note : TG3 & TG 4 normal as per target


5.20

5.20

4.40

4.30

6.30

6.30

24.00

10.8.2015
10.8.2015

Decrease load TG2 after normal increase


again.

Note : TG3 & TG 4 normal as per target

9.8.2015
9.8.2015

19.20

Note : TG3 & TG 4 normal as per target

8.8.2015
8.8.2015

Winding temperature high


Note : TG3 & TG 4 normal as per target

7.8.2015
7.8.2015

Winding temperature high


Note : TG3 & TG 4 normal as per target

5.20

5.20

4.40

4.30

6.30

6.30

24.00

11.8.2015

Winding temperature high


Note : TG3 & TG 4 normal as per target

11.8.2015

5.20

5.20

4.30

4.30

6.30

14.30

8.00

Winding temperature high

7.20

11.8.2015

5.20

5.20

4.20

4.10

14.30

16.15

1.75

Winding temperature high

1.93

11.8.2015

5.20

5.20

4.30

4.30

16.15

6.30

14.25

Winding temperature high

12.83

12.8.2015

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

12.8.2015

11.00

11.00

10.70

10.70

17.03

22.30

5.45

Boiler 5 shutdown

1.64

12.8.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 5 shutdown

4.00

12.8.2015

5.20

5.20

4.30

4.20

6.30

14.30

8.00

Winding temperature high

8.00

12.8.2015

5.20

5.20

4.20

4.10

14.30

16.34

2.07

Boiler 5 shutdown

2.27

12.8.2015

5.20

5.20

4.00

3.90

15.24

22.30

5.93

Boiler 5 shutdown

7.71

12.8.2015

5.20

5.20

3.90

3.80

22.30

6.30

8.00

Boiler 5 shutdown

11.20

13.8.2015

19.40

19.40

15.23

14.96

9.00

11.00

2.00

PPL1 Black out due to electric problem

8.88

13.8.2015

19.40

19.40

17.05

16.97

11.00

13.00

2.00

PPL1 Black out due to electric problem

4.86

13.8.2015

19.40

19.40

17.48

17.32

13.00

15.00

2.00

PPL1 Black out due to electric problem

4.16

13.8.2015

19.40

19.40

18.80

18.80

15.00

18.00

3.00

PPL1 Black out due to electric problem

1.80

13.8.2015

11.00

11.00

10.50

10.50

6.30

9.00

2.50

L-2 shutdown & Boiler 5 shutdown

1.25

13.8.2015
13.8.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

9.00
17.29

12.14
22.28

3.23
4.98

PPL1 Black out due to electric problem


Replace ejector valve (effect PPL1 black out)

35.57
54.82

13.8.2015

11.00

11.00

10.70

10.70

22.28

6.37

8.15

effect PPL1 black out

2.45

13.8.2015

5.20

5.20

3.90

3.80

6.30

7.15

0.75

Boiler 5 shutdown

1.05

13.8.2015

5.20

5.20

0.00

0.00

7.15

17.15

10.00

TG2 shutdown (cleaning alternator cooler & oil


cooler)

52.00

TG2 stop (shutdown)

13.8.2015

5.20

5.20

5.00

5.00

17.15

6.30

13.25

Observation after shutdown

2.65

Monitoring load and winding temperature


TG2

4.80

Monitoring load and winding temperature


TG2

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

0.73

Decrease load TG3 after normal increase


again.

14.8.2015
14.8.2015

Note : TG3 & TG 4 normal as per target


5.20

5.20

5.10

5.00

6.30

6.30

24.00

15.8.2015
15.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

16.8.2015
16.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

17.8.2015
17.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

18.8.2015
18.8.2015

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 trip
TG3 stop (breakdown)
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Observation after shutdown


Note : TG3 & TG 4 normal as per target
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 & TG 4 normal as per target
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 & TG 4 normal as per target
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 & TG 4 normal as per target

11.00

11.00

10.50

10.50

15.22

16.50

1.47

L-5 decrease steam consumption

18.8.2015

5.20

5.20

5.10

5.00

6.30

15.34

9.07

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4

1.81

load TG2 keep 5 MW

18.8.2015

5.20

5.20

4.80

4.70

15.30

16.41

1.18

L-5 decrease steam consumption

0.59

Decrease load TG2 after normal increase


again.

18.8.2015

5.20

5.20

5.10

5.00

16.41

6.30

13.75

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4

2.75

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

19.8.2015
19.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

20.8.2015
20.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

21.8.2015
21.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

22.8.2015

Note : TG3 & TG 4 normal as per target


Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 & TG 4 normal as per target
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 & TG 4 normal as per target
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG 4 normal as per target

22.8.2015

11.00

11.00

10.60

10.50

10.26

14.37

4.18

L-2 brekdown

2.09

Decrease load TG3 after normal increase


again.

22.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4

4.80

load TG2 keep 5 MW

7.20

Decrease load TG4 after normal increase


again.

4.80

load TG2 keep 5 MW

23.8.2015
23.8.2015

20.20

20.20

20.18

19.90

6.30

6.30

24.00

23.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

24.8.2015

Note : TG3 normal as per target


Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Note : TG3 normal as per target
Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)

20.20

20.20

20.14

19.97

22.30

6.30

8.00

24.8.2015

11.00

11.00

10.10

10.00

17.35

18.44

1.15

L-3 Minimum speed

1.15

24.8.2015

5.20

5.20

5.10

5.00

6.30

9.03

2.55

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4

0.51

load TG2 keep 5 MW

24.8.2015

5.20

5.20

5.00

4.90

9.03

10.00

0.95

L-2 spinning dryer decrease steam consumption

0.29

Decrease load TG2 after normal increase


again.

24.8.2015

5.20

5.20

5.10

5.00

10.00

17.35

7.58

L-2 spinning dryer decrease steam consumption

1.52

load TG2 keep 5 MW

24.8.2015

5.20

5.20

4.40

4.30

17.35

18.44

1.15

L-3 Minimum speed

1.04

Decrease load TG2 after normal increase


again.

24.8.2015

5.20

5.20

5.10

5.00

18.44

6.30

11.77

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4

2.35

load TG2 keep 5 MW

1.68

Decrease load TG4 after normal increase


again.

4.80

load TG2 keep 5 MW

25.8.2015
25.8.2015

20.40

20.40

20.26

20.19

6.30

14.30

8.00

25.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.8.2015

Note : TG3 normal as per target


Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
Arrangement load to balance condenser flow & LP
actuator TG 3 & TG 4
Note : TG 4 normal as per target

1.84

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.

24.8.2015

26.8.2015

11.00

11.00

10.50

10.50

10.29

11.27

0.97

L-2 breakdown

0.48

26.8.2015

11.00

11.00

10.80

10.80

12.00

12.38

0.63

L-4 decrease steam consumption

0.13

26.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Arrangement load to balance condenser flow &


LP actuator TG 3 & TG 4

4.80

27.8.2015

20.40

20.40

18.50

18.40

7.00

7.30

0.50

Any jobs electric --> Trafo 1, 2, 3

1.00

27.8.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

27.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

28.8.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

PRDS 10 bar steam consumption more

2.01

28.8.2017

11.00

11.00

9.00

9.00

20.48

22.30

2.70

L-4 breakdown

5.40

28.8.2018

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 breakdown

20.00

28.8.2019

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

28.8.2020

5.20

5.20

4.00

4.00

22.30

4.30

6.00

PRDS 10 bar steam consumption more

7.20

28.8.2021

5.20

5.20

5.00

5.00

4.30

6.30

2.00

L-4 breakdown

0.40

29.8.2015
29.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Note : TG3 & TG4 normal as per target


PRDS 10 bar steam consumption more

4.80

load TG2 keep 5 MW

30.8.2015
30.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Note : TG3 & TG4 normal as per target


PRDS 10 bar steam consumption more

4.80

load TG2 keep 5 MW

31.8.2015

Note : TG3 normal as per target

31.8.2015

20.40

20.40

19.87

19.50

6.56

13.00

4.07

L-1 breakdown

3.66

31.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

1.9.2015

Decrease load TG4 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target

1.9.2015

11.00

11.00

10.60

10.50

6.30

7.00

0.50

L-1 shutdown

0.25

1.9.2015

11.00

11.00

10.00

10.00

7.00

10.28

3.47

L-1 shutdown

3.47

1.9.2015

11.00

11.00

9.50

9.50

10.28

12.11

1.72

L-1 shutdown

2.58

1.9.2015

11.00

11.00

8.50

8.50

12.12

14.30

2.30

L-1 shutdown

5.75

1.9.2015

11.00

11.00

8.70

8.70

16.05

22.37

6.53

L-1 shutdown

15.03

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

1.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

2.9.2015

20.40

20.40

18.61

18.45

19.19

22.30

3.18

WSA-2 trip

6.21

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG4 after normal increase
again.

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5.1 MW
load TG2 keep 5 MW

2.9.2015

20.40

20.40

18.92

18.79

22.30

6.30

8.00

Safety VN WSA-2 problem (10 bar)

12.88

2.9.2015

11.00

11.00

10.50

10.50

6.30

8.15

1.75

L-1 minimum speed

0.88

2.9.2015

11.00

11.00

9.70

9.70

11.37

17.00

5.38

L-4 breakdown

7.00

2.9.2015

11.00

11.00

10.00

10.00

17.00

18.55

1.92

PRDS 10 bar steam consumption more

1.92

2.9.2015

11.00

11.00

9.50

9.50

18.55

22.30

3.58

WSA-2 trip

5.38

2.9.2015

5.20

5.20

5.00

4.90

6.30

8.25

1.92

L-1 minimum speed

0.58

2.9.2015
2.9.2015

5.20
5.20

5.20
5.20

5.20
5.10

5.10
5.00

8.25
11.29

10.58
6.30

2.55
18.98

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

0.26
3.80

3.9.2015

20.40

20.40

19.74

19.56

17.54

18.37

0.72

Spinning L-4 stop

0.60

3.9.2015

11.00

11.00

10.50

10.50

6.30

7.58

1.47

PRDS 10 bar steam consumption more

0.73

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

PRDS 10 bar steam consumption more

0.25

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

PRDS 10 bar steam consumption more

0.50

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

PRDS 10 bar steam consumption more

3.78

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

PRDS 10 bar steam consumption more

0.86

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

PRDS 10 bar steam consumption more

9.53

3.9.2015
3.9.2015
3.9.2015

5.20
5.20
5.20

5.20
5.20
5.20

5.10
5.20
5.10

5.00
5.10
5.00

6.30
13.17
14.30

13.17
14.30
17.44

6.78
1.22
3.23

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more
PRDS 10 bar steam consumption more

1.36
0.12
0.65

3.9.2015

5.20

5.20

4.80

4.80

17.44

22.30

4.77

L-1 & L-4 breakdown

1.91

3.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

4.9.2015
4.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Note : TG3 & TG4 normal as per target


PRDS 10 bar steam consumption more

4.80

load TG2 keep 5 MW

5.9.2015
5.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Note : TG3 & TG4 normal as per target


PRDS 10 bar steam consumption more

4.80

load TG2 keep 5 MW

3.9.2015

6.9.2015

Note : TG3 & TG4 normal as per target

6.9.2015

11.00

11.00

8.40

8.40

6.30

7.10

0.67

L-4 long shutdown

1.73

6.9.2015

11.00

11.00

9.10

9.00

7.10

10.00

2.83

L-4 long shutdown

5.67

6.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

7.9.2015

20.20

20.00

0.00

0.00

9.40

6.30

20.83

TG4 & Boiler 9 O/H

7.9.2015

11.00

11.00

8.50

8.50

6.30

9.35

3.08

L-4 long shutdown

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

416.67 TG4 & Boiler 9 stop


Decrease load TG3 after normal increase
7.71
again.

7.9.2015

11.00

11.00

10.10

10.10

9.35

14.30

4.92

L-4 long shutdown

4.43

7.9.2015

11.00

11.00

9.00

9.00

14.30

6.30

16.00

L-4 long shutdown

32.00

7.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

8.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

8.9.2015

11.00

11.00

9.00

9.00

6.30

10.47

4.28

L-4 long shutdown

8.9.2015

11.00

11.00

8.50

8.40

10.47

6.30

19.72

L-4 long shutdown

8.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

9.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

10.9.2015

11.00

11.00

8.40

8.40

6.30

8.56

2.43

L-4 long shutdown

10.9.2015

11.00

11.00

9.00

9.00

8.56

9.14

0.30

L-4 long shutdown

10.9.2015

11.00

11.00

8.50

8.50

9.14

10.25

1.18

L-4 long shutdown

10.9.2015

11.00

11.00

9.00

9.00

10.25

6.30

20.08

L-4 long shutdown

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

10.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

10.9.2015

11.00

11.00

9.10

9.00

6.30

14.30

8.00

L-4 long shutdown

10.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

11.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

11.9.2015

11.00

11.00

9.50

9.50

6.30

14.30

8.00

L-4 long shutdown

11.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

11.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

12.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

12.9.2015

11.00

11.00

9.50

9.40

6.30

8.30

2.00

L-4 long shutdown

12.9.2015

11.00

11.00

8.50

8.40

8.30

14.30

6.00

L-4 long shutdown

12.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

L-4 long shutdown

12.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

13.9.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

480.00 TG4 & Boiler 9 stop


Decrease load TG3 after normal increase
8.57
again.
Decrease load TG3 after normal increase
51.27
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
6.33
again.
Decrease load TG3 after normal increase
0.60
again.
Decrease load TG3 after normal increase
2.96
again.
Decrease load TG3 after normal increase
40.16
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
16.00
again.
Decrease load TG3 after normal increase
30.40
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
12.00
again.
Decrease load TG3 after normal increase
30.40
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
3.20
again.
Decrease load TG3 after normal increase
15.60
again.
Decrease load TG3 after normal increase
40.00
again.
Decrease load TG2 after normal increase
4.80
again.

13.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

13.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

13.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

14.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

14.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

14.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

15.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

15.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

15.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

16.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

16.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

16.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

17.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

17.9.2015

11.00

11.00

8.10

8.00

6.30

10.34

4.07

L-4 long shutdown

17.9.2015

11.00

11.00

7.80

7.80

10.34

14.30

3.93

L-4 long shutdown

17.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

17.9.2015

5.20

5.20

5.00

5.00

6.30

10.34

4.07

L-4 long shutdown

17.9.2015

5.20

5.20

4.90

4.80

10.34

14.30

3.93

L-4 long shutdown

17.9.2015

5.20

5.20

5.00

4.90

14.30

6.30

16.00

L-4 long shutdown

18.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

18.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

18.9.2015

11.00

11.00

8.30

8.30

14.30

6.30

16.00

L-4 long shutdown

18.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

19.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

19.9.2015

11.00

11.00

8.30

8.30

6.30

13.45

7.25

L-4 long shutdown

19.9.2015

11.00

11.00

8.50

8.50

13.45

6.30

16.75

L-4 long shutdown

19.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

480.00 TG4 & Boiler 9 stop


Decrease load TG3 after normal increase
60.00
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
60.00
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
60.00
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
60.00
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
12.20
again.
Decrease load TG3 after normal increase
12.58
again.
Decrease load TG3 after normal increase
48.00
again.
Decrease load TG2 after normal increase
0.81
again.
Decrease load TG2 after normal increase
1.57
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
20.00
again.
Decrease load TG3 after normal increase
43.20
again.
Decrease load TG2 after normal increase
4.80
again.
480.00 TG4 & Boiler 9 stop
Decrease load TG3 after normal increase
19.58
again.
Decrease load TG3 after normal increase
41.88
again.
Decrease load TG2 after normal increase
4.80
again.

20.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

480.00 TG4 & Boiler 9 stop


Decrease load TG3 after normal increase
60.00
again.
Decrease load TG2 after normal increase
4.80
again.

20.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

20.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

21.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

21.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

21.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

21.9.2015

5.20

5.20

5.10

5.00

6.30

17.00

10.50

L-4 long shutdown

21.9.2015

5.20

5.20

4.80

4.70

17.00

6.30

13.50

L-4 long shutdown & WSA-2 stop

22.9.2015

20.20

20.00

0.00

0.00

6.30

15.00

8.50

TG4 & Boiler 9 O/H

170.00 TG4 & Boiler 9 stop

22.9.2015

20.20

20.00

0.00

0.00

20.00

6.30

10.50

TG4 oil leakage from High Speed coupling guard

210.00 TG4 stop

22.9.2015

11.00

11.00

8.00

8.00

6.30

22.30

16.00

L-4 long shutdown

48.00

22.9.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 long shutdown

20.00

22.9.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-4 long shutdown

6.40

22.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-4 long shutdown

1.60

23.9.2015

20.20

20.00

0.00

0.00

6.30

14.25

7.92

TG4 oil leakage from High Speed coupling guard

23.9.2015

11.00

11.00

11.00

10.90

6.30

14.30

8.00

WSA-2 stop

0.80

23.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

WSA-2 stop

40.00

23.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

24.9.2015

20.20

20.00

19.14

18.96

6.30

14.30

8.00

TG4 oil leakage from High Speed coupling guard

8.32

24.9.2015

20.20

20.00

19.14

19.00

14.30

6.30

16.00

TG4 oil leakage from High Speed coupling guard

16.00

24.9.2015

11.00

11.00

8.60

8.60

6.30

6.30

24.00

WSA-2 stop

57.60

24.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

480.00 TG4 & Boiler 9 stop


Decrease load TG3 after normal increase
20.00
again.
Decrease load TG3 after normal increase
48.00
again.
Decrease load TG2 after normal increase
2.10
again.
Decrease load TG2 after normal increase
6.75
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

158.33 TG4 stop


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

25.9.2015
25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

55.20

25.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

26.9.2015
26.9.2015

11.00

11.00

9.50

9.50

10.34

19.37

L-4 minimum speed

0.00

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

PRDS 10 bar steam consumption more

0.00

26.9.2015

5.20

5.20

5.10

5.00

6.30

10.05

3.58

PRDS 10 bar steam consumption more

0.72

26.9.2015

5.20

5.20

4.90

4.80

10.05

14.30

4.42

L-4 minimum speed

1.77

26.9.2015

5.20

5.20

5.10

5.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

27.9.2015
27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

5.60

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

27.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

28.9.2015
28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

PRDS 10 bar steam consumption more

3.48

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

PRDS 10 bar steam consumption more

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

PRDS 10 bar steam consumption more

16.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

PRDS 10 bar steam consumption more

5.56

28.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

29.9.2015
29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

29.9.2015

11.00

11.00

9.00

9.00

14.30

17.48

3.30

L-4 Minimum speed

6.60

29.9.2015

11.00

11.00

7.80

7.80

17.48

19.25

1.62

L-5 break down

5.17

29.9.2015

11.00

11.00

8.50

8.50

19.25

22.30

3.08

L-5 break down

7.70

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

29.9.2015

5.20

5.20

5.00

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

29.9.2015

5.20

5.20

4.60

4.50

14.30

17.55

3.42

L-4 Minimum speed

2.39

29.9.2015

5.20

5.20

4.50

4.40

18.05

21.31

3.43

L-5 break down

2.75

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

29.9.2015

5.20

5.20

5.00

5.00

21.31

6.30

9.15

PRDS 10 bar steam consumption more

1.83

load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

30.9.2015
30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

1.50

30.9.2015

11.00

11.00

8.00

8.00

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

15.00

30.9.2015

5.20

5.20

5.00

5.00

6.30

1.30

19.00

PRDS 10 bar steam consumption more

3.80

30.9.2015

5.20

5.20

4.80

4.80

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

2.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

1.10.2015
1.10.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

Boiler 7 B/D (eco tube leakage)

72.00

1.10.2015

5.20

5.20

4.50

4.40

6.30

14.30

8.00

Boiler 7 B/D (eco tube leakage)

6.40

1.10.2015

5.20

5.20

4.80

4.80

14.30

6.30

16.00

Boiler 7 B/D (eco tube leakage)

6.40

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

2.10.2015
2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

PRDS 10 bar steam consumption more

11.20

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.80

2.10.2015

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

2.10.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

2.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

3.10.2015
3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

3.10.2015

5.20

5.20

4.80

4.80

21.31

6.30

24.00

PRDS 10 bar steam consumption more

9.60

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

4.10.2015
4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

4.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

5.10.2015
5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

5.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

6.10.2015
6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

6.10.2015

5.20

5.20

5.00

5.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

1.40

6.10.2016

5.20

5.20

4.50

4.50

13.30

14.30

1.00

Spinning L-3 breakdown

0.70

6.10.2015
6.10.2016

5.20
5.20

5.20
5.20

4.80
5.00

4.80
5.00

14.30
22.30

22.30
6.30

8.00
8.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

3.20
1.60

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

7.10.2015
7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

7.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

8.10.2015

11.00

11.00

10.20

10.20

6.30

12.00

5.50

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard
Spinning L-4 breakdown

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

PRDS 10 bar steam consumption more

27.75

8.10.2015

5.20

5.20

5.00

5.00

6.30

13.35

7.08

Spinning L-4 breakdown

1.42

8.10.2015

5.20

5.20

4.90

4.80

13.35

5.42

16.12

PRDS 10 bar steam consumption more

6.45

8.10.2015

5.20

5.20

5.10

5.00

5.42

6.30

0.80

PRDS 10 bar steam consumption more

0.16

8.10.2015

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

9.10.2015
9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

PRDS 10 bar steam consumption more

2.38

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

PRDS 10 bar steam consumption more

7.20

9.10.2015

11.00

11.00

9.00

9.00

14.05

14.30

0.42

L-4 breakdown

0.83

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

PRDS 10 bar steam consumption more

3.75

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

PRDS 10 bar steam consumption more

4.40

9.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

9.10.2015

5.20

5.20

4.90

4.80

22.30

1.00

2.50

PRDS 10 bar steam consumption more

1.00

9.10.2015

5.20

5.20

5.10

5.00

1.00

6.30

5.50

PRDS 10 bar steam consumption more

1.10

Decrease load TG2 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

10.10.2015
10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

PRDS 10 bar steam consumption more

11.20

10.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

11.10.2015
11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

PRDS 10 bar steam consumption more

24.00

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

11.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

12.10.2015
12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

12.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

13.10.2015
13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

7.00

13.10.2015

11.00

11.00

8.50

8.40

13.30

15.50

2.33

L-4 breakdown

6.07

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

14.67

13.10.2015

5.20

5.20

5.00

5.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

1.40

13.10.2015

5.20

5.20

4.80

4.70

13.30

15.50

2.33

L-4 breakdown

1.17

13.10.2015

5.20

5.20

5.00

5.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

2.93

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

14.10.2015
14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

PRDS 10 bar steam consumption more

4.07

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

PRDS 10 bar steam consumption more

12.87

14.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

15.10.2015
15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

7.20

15.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

16.10.2015
16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

PRDS 10 bar steam consumption more

0.30

16.10.2015

11.00

11.00

8.40

8.40

6.50

9.25

2.58

L-3 shutdown

6.72

16.10.2015

11.00

11.00

7.50

7.50

9.25

17.30

8.08

L-3 shutdown

28.29

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

13.00

16.10.2015

5.20

5.20

5.00

5.00

6.30

7.00

0.50

PRDS 10 bar steam consumption more

0.10

16.10.2015

5.20

5.20

4.80

4.80

7.00

17.30

10.50

L-3 shutdown

4.20

16.10.2015

5.20

5.20

5.10

5.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

2.60

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

17.10.2015
17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

17.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

18.10.2015
18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

18.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

19.10.2015
19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

PRDS 10 bar steam consumption more

8.80

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.10.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

20.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

21.10.2015
21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

21.10.2015

11.00

11.00

7.50

7.50

14.30

20.09

5.65

L-5 break down

19.78

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

PRDS 10 bar steam consumption more

2.82

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.80

21.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

22.10.2015
22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

11.00

11.00

8.20

8.20

14.30

15.15

0.75

L-4 minimum speed

2.10

22.10.2015

11.00

11.00

7.80

7.80

15.15

17.45

2.50

L-4 breakdown

8.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

PRDS 10 bar steam consumption more

3.92

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

PRDS 10 bar steam consumption more

1.45

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

PRDS 10 bar steam consumption more

2.03

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

5.20

5.20

5.00

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

22.10.2015

5.20

5.20

4.60

4.50

14.30

17.52

3.37

L-4 minimum speed

2.36

22.10.2015

5.20

5.20

5.10

5.00

17.52

18.19

0.45

L-4 breakdown

0.09

22.10.2015

5.20

5.20

4.80

4.80

18.19

22.12

3.88

PRDS 10 bar steam consumption more

1.55

22.10.2015

5.20

5.20

5.10

5.00

22.12

6.30

8.30

PRDS 10 bar steam consumption more

1.66

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

23.10.2015
23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

23.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

24.10.2015
24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

24.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

25.10.2015
25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

PRDS 10 bar steam consumption more

1.40

25.10.2015

11.00

11.00

9.00

9.00

15.26

17.20

1.90

L-5 break down

3.80

25.10.2015

11.00

11.00

9.40

9.40

17.20

18.22

0.97

L-5 break down

1.55

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

PRDS 10 bar steam consumption more

1.67

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

PRDS 10 bar steam consumption more

2.43

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

PRDS 10 bar steam consumption more

3.70

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

PRDS 10 bar steam consumption more

2.71

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

PRDS 10 bar steam consumption more

11.34

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

PRDS 10 bar steam consumption more

1.84

25.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

3.20

25.10.2015

5.20

5.20

4.90

4.80

22.30

23.33

1.05

PRDS 10 bar steam consumption more

0.42

25.10.2015

5.20

5.20

5.10

5.00

23.33

6.30

6.95

PRDS 10 bar steam consumption more

1.39

26.10.2015

20.40

20.20

16.40

16.20

16.00

16.30

0.50

PA FAN 2 GET TRIPP due to local field alarm

2.00

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

PRDS 10 bar steam consumption more

10.95

26.10.2015

11.00

11.00

9.00

9.00

13.48

22.30

8.70

L-5 decrease steam consumption (trable)

17.40

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

26.10.2015

5.20

5.20

5.00

5.00

6.30

13.48

7.30

PRDS 10 bar steam consumption more

1.46

26.10.2015

5.20

5.20

4.60

4.60

13.48

22.30

8.70

L-5 decrease steam consumption (trable)

5.22

26.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target but continue


monitoring TG4 oil leakage from High Speed
coupling guard

27.10.2015
27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

13.60

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

PRDS 10 bar steam consumption more

24.00

27.10.2015

5.20

5.20

5.00

5.00

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.20

27.10.2015

5.20

5.20

4.90

4.90

7.30

14.30

7.00

L-3 decrease steam consumption

2.10

27.10.2015

5.20

5.20

5.00

5.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW

Electric cable power to tie line 11KV at line-4 get


shoot
Electric cable power to tie line 11KV at line-4 get
shoot

28.10.2015

20.20

20.20

0.00

0.00

7.40

18.06

10.43

28.10.2015

20.20

20.20

15.00

15.00

18.06

6.30

12.40

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

PRDS 10 bar steam consumption more

1.75

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

PRDS 10 bar steam consumption more

14.35

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

28.10.2015

5.20

5.20

5.10

5.00

6.00

7.40

1.17

PRDS 10 bar steam consumption more

0.23

28.10.2015

5.20

5.20

4.90

4.80

7.40

14.30

6.83

PRDS 10 bar steam consumption more

2.73

28.10.2015

5.20

5.20

5.00

5.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

28.10.2015

5.20

5.20

4.90

4.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

29.10.2015

20.20

20.20

16.00

16.00

6.30

6.30

24.00

Electric cable power to tie line 11KV at line-4 get


shoot

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

PRDS 10 bar steam consumption more

0.08

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

4.80

29.10.2015

5.20

5.20

4.90

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

30.10.2015

20.20

20.20

16.00

16.00

6.30

13.00

6.50

Electric cable power to tie line 11KV at line-4 get


shoot

27.30

30.10.2015

20.20

20.20

10.10

10.00

13.00

15.00

2.00

Trafo 11 KV stop (Install electric cable power)

20.40

30.10.2015

20.20

20.20

3.50

3.50

15.00

22.00

7.00

Trafo 11 KV stop (Install electric cable power)

116.90

30.10.2015

11.00

11.00

9.60

9.60

21.24

6.30

9.10

PRDS 10 bar steam consumption more

12.74

30.10.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

31.10.2015

210.75 TG4 trip


64.48

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

100.80 Keep TG4 load 16 MW


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Keep TG4 load 16 MW
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

31.10.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

1.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

1.11.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

2.11.2015

Keep TG4 load 15 MW

Note : TG 4 normal as per target

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

2.11.2015

5.20

5.20

4.90

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

2.11.2015

5.20

5.20

4.80

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

3.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

3.11.2015

5.20

5.20

4.40

4.40

6.30

14.30

8.00

PRDS 10 bar steam consumption more

6.40

3.11.2015

5.20

5.20

4.70

4.60

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

3.11.2015

5.20

5.20

4.50

4.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

6.40

4.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

3.20

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

4.11.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

PRDS 10 bar steam consumption more

19.20

5.11.2015

20.20

20.20

18.78

18.20

7.16

17.15

10.00

L-2 shutdown & PLN stop

20.00

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

5.11.2015

11.00

11.00

9.30

9.30

7.30

14.30

7.00

L-2 shutdown & PLN stop

11.90

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

24.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

5.11.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

L-2 shutdown & PLN stop

5.60

5.11.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

5.11.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

6.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

PRDS 10 bar steam consumption more

4.04

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

PRDS 10 bar steam consumption more

6.46

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

PRDS 10 bar steam consumption more

12.27

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

4.50

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

PRDS 10 bar steam consumption more

6.50

6.11.2015

5.20

5.20

4.80

4.70

6.30

14.50

8.33

PRDS 10 bar steam consumption more

4.17

6.11.2015

5.20

5.20

4.70

4.60

14.50

22.30

7.67

PRDS 10 bar steam consumption more

4.60

6.11.2015

5.20

5.20

4.50

4.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

2.10

6.11.2015

5.20

5.20

4.90

4.80

1.30

6.30

5.00

PRDS 10 bar steam consumption more

2.00

7.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

PRDS 10 bar steam consumption more

22.40

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

PRDS 10 bar steam consumption more

16.68

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

PRDS 10 bar steam consumption more

2.00

7.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

8.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

8.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

9.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

PRDS 10 bar steam consumption more

9.60

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

PRDS 10 bar steam consumption more

22.40

9.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

10.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

PRDS 10 bar steam consumption more

1.40

10.11.2015

11.00

11.00

8.30

8.20

7.30

19.00

11.50

L-4 shutdown

32.20

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

4.20

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

10.11.2015

5.20

5.20

4.80

4.70

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

10.11.2015

5.20

5.20

4.10

4.00

7.30

19.00

11.50

L-4 shutdown

13.80

10.11.2015

5.20

5.20

4.90

4.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

1.40

10.11.2015

5.20

5.20

4.80

4.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

11.11.2015

Note : TG 4 normal as per target

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

PRDS 10 bar steam consumption more

27.90

11.11.2015

11.00

11.00

9.40

9.40

5.15

6.30

0.75

L-3 spinning minimum speed

1.20

11.11.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

11.11.2015

5.20

5.20

4.70

4.60

14.30

5.15

15.25

PRDS 10 bar steam consumption more

9.15

11.11.2015

5.20

5.20

4.50

4.50

5.15

6.30

0.75

L-2 spinning truble

0.53

12.11.2015

Note : TG 4 normal as per target

12.11.2015

11.00

11.00

9.20

9.20

6.30

8.58

2.47

L-3 minimum speed

4.44

12.11.2015

11.00

11.00

8.50

8.50

8.58

11.17

2.32

L-2 trable

5.79

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

PRDS 10 bar steam consumption more

5.80

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

12.11.2015

5.20

5.20

4.60

4.50

6.30

8.58

2.47

L-3 minimum speed

1.73

12.11.2015

5.20

5.20

4.00

4.00

8.58

11.17

2.32

L-2 trable

2.78

12.11.2015

5.20

5.20

4.60

4.50

11.17

14.30

3.22

PRDS 10 bar steam consumption more

2.25

12.11.2015

5.20

5.20

4.70

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

13.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

13.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

14.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

14.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

15.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

15.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

16.11.2015
16.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target


11.00

11.00

9.70

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

Decrease load TG3 after normal increase


again.

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

PRDS 10 bar steam consumption more

16.61

16.11.2015

11.00

11.00

9.60

9.50

0.44

6.30

6.23

L-4 & L-5 Minimum speed

9.35

16.11.2015

5.20

5.20

4.70

4.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.80

16.11.2015

5.20

5.20

4.60

4.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

5.60

16.11.2015

5.20

5.20

4.60

4.50

22.30

6.30

8.00

L-4 & L-5 Minimum speed

5.60

17.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

17.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

18.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target


Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

18.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

18.11.2015

5.20

5.20

4.40

4.30

14.30

6.30

16.00

PRDS 10 bar steam consumption more

14.40

19.11.2015

20.20

20.20

16.18

16.04

7.00

14.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is


loss connection (Electric replace new cable power.
Ok)

24.96

Decrease load TG4 after normal increase


again.

19.11.2015

20.20

20.20

15.92

15.76

14.00

20.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is


loss connection (Electric replace new cable power.
Ok)

26.64

Decrease load TG4 after normal increase


again.

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

20.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

10.62

20.11.2015

11.00

11.00

8.50

8.50

13.35

14.30

0.92

L-4 minimum speed

2.29

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

20.11.2015

5.20

5.20

4.50

4.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

4.96

20.11.2015

5.20

5.20

4.00

4.00

13.35

14.30

0.92

L-4 minimum speed

1.10

20.11.2015

5.20

5.20

4.50

4.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

20.11.2015

5.20

5.20

4.50

4.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

21.11.2015

Note : TG 4 normal as per target

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

21.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

22.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

22.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

23.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

PRDS 10 bar steam consumption more

5.25

23.11.2015

11.00

11.00

9.10

9.10

10.00

6.30

20.50

Boiler 6 O/H

38.95

23.11.2015

5.20

5.20

4.40

4.30

6.30

10.00

3.50

PRDS 10 bar steam consumption more

3.15

23.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

20.50

Boiler 6 O/H

24.60

24.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

24.11.2015

11.00

11.00

9.10

9.10

10.00

11.41

1.68

Boiler 6 O/H

3.20

24.11.2015

11.00

11.00

9.50

9.50

11.41

16.31

8.33

Boiler 6 O/H

12.50

24.11.2015

11.00

11.00

9.10

9.10

16.31

6.30

13.98

Boiler 6 O/H

26.57

24.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

25.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

25.11.2015

11.00

11.00

9.10

9.10

6.30

6.41

0.18

Boiler 6 O/H

0.35

25.11.2015

11.00

11.00

9.30

9.20

6.41

10.13

3.53

Boiler 6 O/H

6.36

25.11.2015

11.00

11.00

9.50

9.50

10.13

11.54

1.68

Boiler 6 O/H

2.53

25.11.2015

11.00

11.00

9.00

9.00

11.54

12.20

0.43

Boiler 6 O/H

0.87

25.11.2015

11.00

11.00

8.50

8.50

12.20

6.30

18.17

Boiler 6 O/H

45.43

25.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

26.11.2015

20.20

20.20

19.57

19.57

2.00

6.30

4.50

NGBC problem

2.84

26.11.2015

11.00

11.00

9.30

9.30

6.30

16.00

9.50

Boiler 6 O/H

16.15

26.11.2015

11.00

11.00

9.10

9.10

16.00

18.00

2.00

Boiler 6 O/H

3.80

26.11.2015

11.00

11.00

8.50

8.50

18.00

20.00

2.00

Boiler 6 O/H

5.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

26.11.2015

11.00

11.00

7.50

7.50

20.00

22.30

2.50

Boiler 6 O/H

8.75

26.11.2015

11.00

11.00

7.00

7.00

22.30

5.30

7.00

Boiler 6 O/H

28.00

26.11.2015

11.00

11.00

6.50

6.50

5.30

6.30

1.00

Boiler 6 O/H & NGBC problem

4.50

26.11.2015

5.20

5.20

4.00

4.00

6.30

7.40

1.17

Boiler 6 O/H

1.40

26.11.2015

5.20

5.20

0.00

0.00

7.40

15.40

8.00

Boiler 6 O/H, L1- shutdown (PMJ : TG2 Alternator


cooler cleaning)

41.60

5.20

5.20

4.00

4.00

15.40

18.00

2.33

Boiler 6 O/H

2.80

26.11.2015

5.2

5.2

4.9

18

22.3

4.5

Boiler 6 O/H

1.35

26.11.2015

5.20

5.20

4.70

4.60

22.30

0.37

2.12

Boiler 6 O/H

1.27

26.11.2015

5.20

5.20

4.10

4.00

0.37

3.27

2.83

Boiler 6 O/H & NGBC problem

3.40

26.11.2015

5.20

5.20

4.20

4.10

3.27

6.30

3.05

Boiler 6 O/H & NGBC problem

3.36

27.11.2015

20.20

20.20

19.57

19.35

6.30

11.00

4.50

NGBC problem

3.82

27.11.2015

11.00

11.00

6.50

6.50

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

20.25

27.11.2015

11.00

11.00

8.20

8.20

11.00

13.19

2.32

Boiler 6 O/H

6.49

27.11.2015

11.00

11.00

8.00

8.00

13.19

14.30

1.18

Boiler 6 O/H

3.54

27.11.2015

11.00

11.00

7.50

7.50

14.30

6.30

16.00

Boiler 6 O/H

56.00

27.11.2015

5.20

5.20

4.20

4.10

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

4.95

27.11.2015

5.20

5.20

5.10

5.00

11.00

6.30

19.50

Boiler 6 O/H

3.90

28.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG2 stop
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

28.11.2015

11.00

11.00

7.50

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

28.11.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

29.11.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

29.11.2015

11.00

11.00

7.60

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

29.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

30.11.2015

20.20

20.20

0.00

0.00

16.44

6.30

13.77

Moog Servo Controller (MSC) of TG4 failure

30.11.2015

11.00

11.00

7.60

7.50

6.30

16.30

10.00

Boiler 6 O/H

30.11.2015

11.00

11.00

10.30

10.30

16.30

6.30

14.00

Boiler 6 O/H

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

278.09 TG4 trip


Decrease load TG3 after normal increase
35.00
again.
Decrease load TG3 after normal increase
9.80
again.

30.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

01.12.2015

20.20

20.20

0.00

0.00

6.30

6.30

24.00

Moog Servo Controller (MSC) of TG4 failure

01.12.2015

11.00

11.00

10.70

10.70

14.30

21.54

7.40

Boiler 6 O/H

01.12.2015

11.00

11.00

10.60

10.60

21.54

22.30

0.60

Boiler 6 O/H

01.12.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 6 O/H

01.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

02.12.2015

20.20

20.20

0.00

0.00

6.30

17.40

11.17

Moog Servo Controller (MSC) of TG4 failure

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

PRDS 10 bar steam consumption more

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

PRDS 10 bar steam consumption more

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

PRDS 10 bar steam consumption more

02.12.2015

5.20

5.20

5.10

5.00

6.30

10.00

3.50

Boiler 6 O/H

02.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

20.50

PRDS 10 bar steam consumption more

03.12.2015

4.80

484.80 TG4 stop for repair


Decrease load TG3 after normal increase
2.22
again.
Decrease load TG3 after normal increase
0.24
again.
Decrease load TG3 after normal increase
4.00
again.
Decrease load TG2 after normal increase
4.80
again.
225.57 TG4 stop for repair
Decrease load TG3 after normal increase
0.62
again.
Decrease load TG3 after normal increase
1.10
again.
Decrease load TG3 after normal increase
1.51
again.
Decrease load TG2 after normal increase
0.70
again.
Decrease load TG2 after normal increase
4.10
again.

Note : TG 4 normal as per target

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

03.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

04.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

PRDS 10 bar steam consumption more

1.30

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

PRDS 10 bar steam consumption more

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

PRDS 10 bar steam consumption more

5.07

04.12.2015

11.00

11.00

9.50

9.50

3.34

4.34

1.00

Topsoe 1 trip

1.50

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

PRDS 10 bar steam consumption more

2.32

04.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

05.12.2015
05.12.2015

Decrease load TG2 after normal increase


again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target


11.00

11.00

9.80

9.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

10.40

Decrease load TG3 after normal increase


again.

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

16.00

05.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

06.12.2015

20.20

20.20

0.00

0.00

14.38

16.29

1.85

PPL2 black out effet from traformer 70 kv failure

37.37

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

PRDS 10 bar steam consumption more

0.37

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

PRDS 10 bar steam consumption more

9.16

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

06.12.2015

11.00

11.00

8.40

8.30

22.30

6.30

8.00

New WSA trip

21.60

06.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

49.83

07.12.2015

20.20

20.20

0.00

0.00

12.00

14.28

2.47

TG4 loow-low inlet steam press ( Boiler-9 trip due


to Both IDF trip) effect from lift valve of bag filter
get close it self due to pressure compressor get
low less than 4.5 bar

07.12.2015

11.00

11.00

8.40

8.30

6.30

14.30

8.00

New WSA stop

21.60

07.12.2015

11.00

11.00

10.10

10.10

14.30

16.13

1.72

New WSA stop

1.55

07.12.2015

11.00

11.00

7.90

7.80

16.13

6.30

14.28

New WSA stop

45.70

07.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

08.12.2015

20.20

20.20

17.31

17.28

6.30

14.30

8.00

New WSA stop

23.36

08.12.2015

20.20

20.20

17.48

17.39

14.30

22.30

8.00

New WSA stop

22.48

08.12.2015

20.20

20.20

18.79

18.57

22.30

6.30

8.00

New WSA stop

13.04

08.12.2015

11.00

11.00

7.90

7.80

6.30

6.30

24.00

New WSA stop

76.80

08.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

09.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
TG4 trip
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

TG4 trip
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

09.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

10.12.2015

20.20

20.20

19.87

19.71

6.30

14.30

8.00

L-3 shutdown & New WSA stop

3.92

10.12.2015

20.20

20.20

17.55

17.50

14.30

22.30

8.00

New WSA stop

21.60

10.12.2015

20.20

20.20

17.53

17.45

22.30

6.30

8.00

New WSA stop

22.00

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

11.00

11.00

7.80

7.80

22.30

6.30

8.00

New WSA stop

25.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

10.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

New WSA stop

1.60

11.12.2015

20.20

20.20

17.66

17.52

6.30

10.30

4.00

New WSA stop

10.72

11.12.2015

20.20

20.20

19.60

19.40

10.30

6.30

20.00

New WSA stop

16.00

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

PRDS 10 bar steam consumption more

46.40

11.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

12.12.2015

20.20

20.20

19.60

19.40

6.30

10.30

4.00

New WSA stop

3.20

12.12.2015

20.20

20.20

18.40

18.30

10.30

6.30

20.00

New WSA stop

38.00

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

12.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

13.12.2015

20.20

20.20

18.40

18.30

6.30

17.30

11.00

New WSA stop

20.90

13.12.2015

20.20

20.20

17.90

17.60

17.30

22.30

5.00

New WSA stop

13.00

13.12.2015

20.20

20.20

18.70

18.50

22.30

6.30

8.00

New WSA stop

13.60

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

13.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

14.12.2015

20.20

20.20

18.40

18.30

6.30

15.40

9.17

New WSA stop

17.42

14.12.2015

20.20

20.20

0.00

0.00

15.40

19.00

3.33

Boiler # 9 & TG#4 TRIP Due to air prss low for


bag filter jetting

67.33

14.12.2015

20.20

20.20

18.40

18.30

19.00

6.30

11.50

New WSA stop

21.85

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

PRDS 10 bar steam consumption more

7.15

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

PRDS 10 bar steam consumption more

4.97

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

PRDS 10 bar steam consumption more

57.39

14.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

15.12.2015

20.20

20.20

19.09

19.09

6.30

17.48

11.30

New WSA stop

12.54

15.12.2015

20.20

20.20

18.26

18.01

17.48

6.30

12.70

New WSA stop

27.81

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

31.00

15.12.2015

11.00

11.00

7.50

7.50

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

47.85

15.12.2015

5.20

5.20

5.00

5.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

2.07

15.12.2015

5.20

5.20

4.00

3.90

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

17.77

16.12.2015

20.20

20.20

18.52

18.50

6.30

20.47

14.28

New WSA stop

24.28

16.12.2015

11.00

11.00

7.50

7.50

6.30

19.20

12.83

Boiler 6 break down (eco snake tube get leakage)

44.91

16.12.2015

11.00

11.00

7.80

7.80

19.20

5.05

9.75

Boiler 6 break down (eco snake tube get leakage)

31.20

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

PRDS 10 bar steam consumption more

2.98

16.12.2015

5.20

5.20

4.00

3.90

6.30

19.00

12.50

Boiler 6 break down (eco snake tube get leakage)

16.25

16.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

11.50

PRDS 10 bar steam consumption more

2.30

17.12.2015

20.20

20.20

0.00

0.00

14.50

18.40

3.83

Boiler 9 & TG 4 get tripp due to PLN transformer


500 MVA 150 KV / 70 KV get triip (Tie 70 KV on
manual mode)

77.43

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

PRDS 10 bar steam consumption more

48.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

20.00

17.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

18.12.2015

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

18.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

19.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

PRDS 10 bar steam consumption more

26.45

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

PRDS 10 bar steam consumption more


(Temperature vaccum high)

9.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

PRDS 10 bar steam consumption more


(Temperature vaccum high)

1.20

20.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

21.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

PRDS 10 bar steam consumption more

16.15

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

PRDS 10 bar steam consumption more

18.75

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

21.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

22.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

22.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

23.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

PRDS 10 bar steam consumption more

7.10

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

PRDS 10 bar steam consumption more

0.70

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

PRDS 10 bar steam consumption more

6.52

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

PRDS 10 bar steam consumption more

12.60

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

PRDS 10 bar steam consumption more

20.50

23.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

24.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

32.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

15.20

24.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

25.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

PRDS 10 bar steam consumption more

10.16

25.12.2015

11.00

11.00

7.00

7.00

12.51

14.30

1.65

L-4 & 5 spinning minimum speed

6.60

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

PRDS 10 bar steam consumption more

1.50

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

25.12.2015

11.00

11.00

6.50

6.50

15.20

17.35

2.25

L-1,2 & 3 minimum speed

10.13

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

PRDS 10 bar steam consumption more

12.29

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

25.12.2015

5.20

5.20

5.00

4.90

6.30

15.33

9.05

PRDS 10 bar steam consumption more

2.72

25.12.2015

5.20

5.20

3.00

3.00

15.33

17.41

2.13

L-1,2 & 3 minimum speed

4.69

25.12.2015

5.20

5.20

5.00

5.00

17.41

6.30

12.82

PRDS 10 bar steam consumption more

2.56

26.12.2015

Note : TG 4 normal as per target

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

8.80

8.80

14.30

15.30

1.00

New Acid stop

2.20

26.12.2015

11.00

11.00

8.90

8.90

15.30

17.30

2.00

New Acid stop

4.20

26.12.2015

11.00

11.00

8.70

8.70

17.30

18.30

1.00

New Acid stop

2.30

26.12.2015

11.00

11.00

8.50

8.50

18.30

19.30

1.00

New Acid stop

2.50

26.12.2015

11.00

11.00

8.90

8.90

19.30

22.30

3.00

New Acid stop

6.30

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

5.20

5.20

5.00

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

26.12.2015

5.20

5.20

4.90

4.80

14.30

15.30

9.00

New Acid stop

3.60

26.12.2015

5.20

5.20

5.10

5.00

15.30

6.30

7.00

PRDS 10 bar steam consumption more

1.40

27.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

PRDS 10 bar steam consumption more

30.40

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.80

27.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

28.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

PRDS 10 bar steam consumption more

13.60

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

28.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

29.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

PRDS 10 bar steam consumption more

6.30

29.12.2015

11.00

11.00

8.50

8.50

10.00

22.30

12.50

New Acid Stop

31.25

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

PRDS 10 bar steam consumption more

13.60

29.12.2015

5.20

5.20

5.00

5.00

6.30

13.45

13.25

PRDS 10 bar steam consumption more

2.65

29.12.2015

5.20

5.20

4.80

4.80

13.45

22.30

2.75

New Acid Stop

1.10

29.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

30.12.2015

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Note : TG 4 normal as per target

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

PRDS 10 bar steam consumption more

5.40

30.12.2015

11.00

11.00

8.80

8.80

9.30

10.30

1.00

L-2 spinning decrease steam consumption

2.20

30.12.2015

11.00

11.00

8.50

8.50

10.30

13.42

3.20

L-2 spinning decrease steam consumption

8.00

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

PRDS 10 bar steam consumption more

1.68

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

30.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

31.12.2015

20.30

20.20

18.50

18.40

23.00

6.30

7.30

Note : TG 4 normal as per target but LP TG4 high

13.14

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

PRDS 10 bar steam consumption more

6.00

31.12.2015

11.00

11.00

9.00

9.00

9.50

14.30

4.67

L-3 decrease steam consumption

9.34

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

PRDS 10 bar steam consumption more

3.30

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

PRDS 10 bar steam consumption more

10.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

PRDS 10 bar steam consumption more

2.20

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

PRDS 10 bar steam consumption more

19.00

31.12.2015

5.20

5.20

5.10

5.00

6.30

9.45

3.25

PRDS 10 bar steam consumption more

0.65

31.12.2015

5.20

5.20

5.00

4.90

9.45

6.30

20.75

PRDS 10 bar steam consumption more

6.23

Total

36180.57

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG 4 actual load more than set poin when
LP actualtor increasing more than 35 % (Still
progress check by electric and instrument
WED) decrease load max 18.5 MW and LP
actuator max. 35%
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

POWER GENERATION DEVIATION TG2, TG3 & TG 4


POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Weekly (2015)

Time Decrease
From
To
Total
Time
Time
Time

REASON

LOSS
Power

REMARK
(ACTION)

MW

MW

MW

MW

Hours

Hours

Hours

23.1.2015

11.00

10.80

9.00

8.90

12.00

14.00

2.00

Proses line 4 decreases

MWH

3.8

TG 3 reduse load

5.2.2015

11.00

11.00

10.50

10.50

14.42

15.35

0.88

L-4 decrease steam consumption (minimum speed)

0.44

Decrease load TG3

5.2.2015

19.48

19.27

19.23

19.00

14.45

14.55

0.17

L-4 decrease steam consumption (minimum speed)

0.04

Decrease load TG4.

6.2.2015

19.66

19.57

18.22

18.21

8.27

9.13

0.77

L-4 breakdown.

1.04

Decrease load TG4. ( Temperature winding


high T= 114 oC)

6.2.2015

11.00

10.90

10.00

10.00

8.16

8.42

0.43

L-4 breakdown.

0.39

Decrease load TG3.

6.2.2015

10.00

10.00

9.00

8.90

8.48

9.13

0.42

L-4 breakdown.

0.46

Decrease load TG3.

6.2.2015

9.00

8.90

8.50

8.50

9.13

9.35

0.37

L-4 breakdown.

0.15

Decrease load TG3.

6.2.2015

8.50

8.50

8.00

8.00

9.35

10.12

0.62

L-4 breakdown.

0.31

Decrease load TG3.

6.2.2015

8.00

8.00

7.50

7.50

10.17

10.27

0.17

L-4 breakdown.

0.08

Decrease load TG3.

6.2.2015

7.50

7.50

7.20

7.20

10.27

13.30

2.95

L-4 breakdown.

0.89

Decrease load TG3.

7.2.2015

11.00

11.00

10.80

10.70

9.45

9.52

0.12

Balling press L-4 trouble.

0.04

Decrease load TG3.

19.2.2015

19.61

19.45

18.83

18.67

9.05

17.45

8.67

Process L-4 breakdown.

6.76

20.2.2015

19.44

19.31

18.26

17.89

9.04

10.45

1.68

20.2.2015

5.20

5.20

5.00

5.00

8.45

10.20

1.58

20.2.2015

11.00

11.00

9.20

9.20

8.20

12.45

4.42

7.3.2015

19.56

19.33

19.26

19.11

8.10

8.45

0.58

Spinning L-4 breakdown (dryer problem)

0.13

7.3.2015

11.00

11.00

9.10

9.00

8.02

9.50

1.80

Spinning L-4 breakdown (dryer problem)

3.60

7.3.2015

10.90

10.90

10.80

10.80

17.00

19.51

1.85

7.3.2015

10.90

10.90

10.30

10.30

0.02

1.41

1.65

28.3.2015

20.44

20.31

19.49

19.29

0.14

4.48

4.57

Spinning L-4 decrease steam consumption (Fire)

4.66

28.3.2015

5.20

5.20

4.80

4.70

23.45

6.37

6.52

Spinning L-4 decrease steam consumption (Fire)

3.26

28.3.2015

11.00

11.00

10.30

10.30

22.45

6.37

6.87

Spinning L-4 decrease steam consumption (Fire)

4.81

29.3.2015

11.00

11.00

10.50

10.50

22.37

3.55

5.30

L-4 decrease steam consumption

2.65

31.3.2015

11.00

11.00

10.90

10.80

6.37

0.50

18.22

L-4 decrease steam consumption

3.64

1.4.2015

11.00

11.00

10.50

10.50

8.18

15.36

7.90

L-4 decrease steam consumption

3.95

1.4.2015

11.00

11.00

10.50

10.50

17.06

21.11

4.08

L-4 decrease steam consumption

2.04

1.4.2015

11.00

11.00

10.90

10.90

22.37

6.37

8.00

L-4 decrease steam consumption

0.80

Spinning L-4 decrease steam consumption &


Spinbath L-3 breakdown.
Spinning L-4 decrease steam consumption &
Spinbath L-3 breakdown.
Spinning L-4 decrease steam consumption &
Spinbath L-3 breakdown.

LP TG4 100% Spinning L-4 breakdown (dryer


problem)
LP TG4 100% Spinning L-4 breakdown (dryer
problem)

2.39
0.32
7.95

0.19
0.99

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

20.4.2015

5.20

5.20

4.80

4.70

14.55

17.58

3.02

Spinning decrease steam consumption

1.51

22.4.2015

5.20

5.20

4.60

4.50

20.08

0.38

4.50

L-4 breakdown

3.15

22.4.2015

5.20

5.20

5.00

4.90

0.38

6.37

5.98

L-4 breakdown

1.79

22.4.2015

11.00

11.00

10.80

10.80

18.48

20.50

2.03

L-4 breakdown

0.41

22.4.2015

11.00

11.00

10.50

10.50

20.50

21.33

0.72

L-4 breakdown

0.36

22.4.2015

11.00

11.00

10.00

10.00

21.33

21.52

0.32

L-4 breakdown

0.32

22.4.2015

11.00

11.00

10.20

10.20

21.52

22.37

1.25

L-4 breakdown

1.00

22.4.2015

11.00

11.00

10.00

10.00

22.37

1.40

3.05

L-4 breakdown

3.05

28.5.2015

5.20

5.20

5.10

5.10

6.37

10.01

3.40

Steam consumption L-4 & L-5 not maximum

0.34

28.5.2015

5.20

5.20

4.80

4.70

10.01

10.29

0.47

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

5.20

5.20

4.50

4.50

10.29

14.37

4.13

Steam consumption L-4 & L-5 not maximum

2.89

28.5.2015

5.20

5.20

4.80

4.80

14.37

22.37

8.00

Steam consumption L-4 & L-5 not maximum

3.20

28.5.2015

11.00

11.00

10.80

10.80

9.25

10.34

1.15

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

11.00

11.00

10.50

10.50

11.14

12.10

0.93

Steam consumption L-4 & L-5 not maximum

0.47

30.5.2015

5.20

5.20

5.10

5.00

6.37

13.45

7.13

30.5.2015

5.20

5.20

4.90

4.80

13.45

14.37

0.87

30.5.2015

5.20

5.20

5.00

4.90

14.37

22.37

8.00

30.5.2015

5.20

5.20

5.10

5.00

22.37

6.37

8.00

4.6.2015

5.20

5.20

3.30

3.20

9.15

14.37

5.37

L-4 shuth down

10.73

4.6.2015

5.20

5.20

3.50

3.50

20.09

21.17

1.13

L-4 shuth down

1.93

4.6.2015

5.20

5.20

4.00

3.90

22.17

22.37

0.33

L-4 shuth down

0.43

4.6.2015

11.00

11.00

8.80

8.80

9.24

14.37

5.22

L-4 shuth down

11.48

4.6.2015

11.00

11.00

9.30

9.30

15.54

20.54

5.00

L-4 shuth down

8.50

4.6.2015

11.00

11.00

10.90

10.90

20.54

22.37

2.28

L-4 shuth down

0.23

5.6.2015

5.20

5.20

4.70

4.60

7.44

8.10

0.43

L-4 spinning baling press truble

0.26

12.6.2015

5.20

5.20

5.00

5.00

7.45

19.15

11.50

L-4 decrease steam consumption

2.30

12.6.2015

11.00

11.00

9.50

9.40

8.09

10.40

2.52

L-4 decrease steam consumption

4.03

Spinbath decrease steam consumption 5 TPH,


changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator

1.43
0.35
2.40
1.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

12.6.2015

11.00

11.00

9.00

9.00

10.40

13.31

2.85

L-4 decrease steam consumption

5.70

12.6.2015

11.00

11.00

9.50

9.50

13.31

6.37

17.10

L-4 decrease steam consumption

25.65

30.6.2015

5.20

5.20

5.20

5.10

6.30

14.30

8.00

L-4 decrease steam consumption

0.80

30.6.2015

5.20

5.20

5.10

5.00

14.30

22.30

8.00

L-4 break down

1.60

7.7.2017

11.00

11.00

9.00

9.00

11.36

14.30

3.10

SPG L-4 decrease steam consumption.

6.20

7.7.2018

11.00

11.00

10.90

10.90

22.30

6.30

8.00

Clening condenser TG4 & SPG L-4 decrease steam


consumption.

0.80

26.8.2015

11.00

11.00

10.80

10.80

12.00

12.38

0.63

L-4 decrease steam consumption

0.13

28.8.2017

11.00

11.00

9.00

9.00

20.48

22.30

2.70

L-4 breakdown

5.40

28.8.2018

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 breakdown

20.00

28.8.2021

5.20

5.20

5.00

5.00

4.30

6.30

2.00

L-4 breakdown

0.40

2.9.2015

11.00

11.00

9.70

9.70

11.37

17.00

5.38

L-4 breakdown

7.00

2.9.2015

11.00

11.00

10.00

10.00

17.00

18.55

1.92

Effect WSA, PRDS 10 bar steam consumption more

1.92

3.9.2015

20.40

20.40

19.74

19.56

17.54

18.37

0.72

Spinning L-4 stop

0.60

3.9.2015

11.00

11.00

10.50

10.50

6.30

7.58

1.47

Effeci L-4, PRDS 10 bar steam consumption more

0.73

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

Effeci L-4, PRDS 10 bar steam consumption more

0.25

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

Effeci L-4, PRDS 10 bar steam consumption more

0.50

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

Effeci L-4, PRDS 10 bar steam consumption more

3.78

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

Effeci L-4, PRDS 10 bar steam consumption more

0.86

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

Effeci L-4, PRDS 10 bar steam consumption more

9.53

3.9.2015

5.20

5.20

5.10

5.00

6.30

13.17

6.78

Effeci L-4, PRDS 10 bar steam consumption more

1.36

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.20

5.10

13.17

14.30

1.22

Effeci L-4, PRDS 10 bar steam consumption more

0.12

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.10

5.00

14.30

17.44

3.23

Effeci L-4, PRDS 10 bar steam consumption more

0.65

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

Effeci L-4, PRDS 10 bar steam consumption more

1.60

load TG2 keep 5 MW

6.9.2015

11.00

11.00

8.40

8.40

6.30

7.10

0.67

L-4 long shutdown

1.73

6.9.2015

11.00

11.00

9.10

9.00

7.10

10.00

2.83

L-4 long shutdown

5.67

6.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

7.9.2015

11.00

11.00

8.50

8.50

6.30

9.35

3.08

L-4 long shutdown

7.71

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

7.9.2015

11.00

11.00

10.10

10.10

9.35

14.30

4.92

L-4 long shutdown

4.43

7.9.2015

11.00

11.00

9.00

9.00

14.30

6.30

16.00

L-4 long shutdown

32.00

7.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

8.9.2015

11.00

11.00

9.00

9.00

6.30

10.47

4.28

L-4 long shutdown

8.57

8.9.2015

11.00

11.00

8.50

8.40

10.47

6.30

19.72

L-4 long shutdown

51.27

8.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

10.9.2015

11.00

11.00

8.40

8.40

6.30

8.56

2.43

L-4 long shutdown

6.33

10.9.2015

11.00

11.00

9.00

9.00

8.56

9.14

0.30

L-4 long shutdown

0.60

10.9.2015

11.00

11.00

8.50

8.50

9.14

10.25

1.18

L-4 long shutdown

2.96

10.9.2015

11.00

11.00

9.00

9.00

10.25

6.30

20.08

L-4 long shutdown

40.16

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

10.9.2015

11.00

11.00

9.10

9.00

6.30

14.30

8.00

L-4 long shutdown

16.00

10.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

30.40

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

11.9.2015

11.00

11.00

9.50

9.50

6.30

14.30

8.00

L-4 long shutdown

12.00

11.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

30.40

11.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

12.9.2015

11.00

11.00

9.50

9.40

6.30

8.30

2.00

L-4 long shutdown

3.20

12.9.2015

11.00

11.00

8.50

8.40

8.30

14.30

6.00

L-4 long shutdown

15.60

12.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

L-4 long shutdown

40.00

12.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

13.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

13.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

14.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

14.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

15.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

15.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

16.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

16.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

17.9.2015

11.00

11.00

8.10

8.00

6.30

10.34

4.07

L-4 long shutdown

12.20

17.9.2015

11.00

11.00

7.80

7.80

10.34

14.30

3.93

L-4 long shutdown

12.58

17.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

48.00

17.9.2015

5.20

5.20

5.00

5.00

6.30

10.34

4.07

L-4 long shutdown

0.81

17.9.2015

5.20

5.20

4.90

4.80

10.34

14.30

3.93

L-4 long shutdown

1.57

17.9.2015

5.20

5.20

5.00

4.90

14.30

6.30

16.00

L-4 long shutdown

4.80

18.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

20.00

18.9.2015

11.00

11.00

8.30

8.30

14.30

6.30

16.00

L-4 long shutdown

43.20

18.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

19.9.2015

11.00

11.00

8.30

8.30

6.30

13.45

7.25

L-4 long shutdown

19.58

19.9.2015

11.00

11.00

8.50

8.50

13.45

6.30

16.75

L-4 long shutdown

41.88

19.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

20.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

20.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

21.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

20.00

21.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

48.00

21.9.2015

5.20

5.20

5.10

5.00

6.30

17.00

10.50

L-4 long shutdown

2.10

21.9.2015

5.20

5.20

4.80

4.70

17.00

6.30

13.50

L-4 long shutdown & WSA-2 stop

6.75

22.9.2015

11.00

11.00

8.00

8.00

6.30

22.30

16.00

L-4 long shutdown

48.00

22.9.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 long shutdown

20.00

22.9.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-4 long shutdown

6.40

22.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-4 long shutdown

1.60

26.9.2015

11.00

11.00

9.50

9.50

10.34

19.37

L-4 minimum speed

0.00

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

PRDS 10 bar steam consumption more (effect L-4)

0.00

26.9.2015

5.20

5.20

5.10

5.00

6.30

10.05

PRDS 10 bar steam consumption more (effect L-4)

0.72

3.58

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

26.9.2015

5.20

5.20

4.90

4.80

10.05

14.30

4.42

L-4 minimum speed

1.77

Decrease load TG2 after normal increase


again.

26.9.2015

5.20

5.20

5.10

5.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more (effect L-4)

3.20

load TG2 keep 5 MW

29.9.2015

11.00

11.00

9.00

9.00

14.30

17.48

3.30

L-4 Minimum speed

6.60

29.9.2015

5.20

5.20

4.60

4.50

14.30

17.55

3.42

L-4 Minimum speed

2.39

8.10.2015

11.00

11.00

10.20

10.20

6.30

12.00

5.50

Spinning L-4 breakdown

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

PRDS 10 bar steam consumption more (effect L-4)

27.75

8.10.2015

5.20

5.20

5.00

5.00

6.30

13.35

7.08

Spinning L-4 breakdown

1.42

8.10.2015

5.20

5.20

4.90

4.80

13.35

5.42

16.12

PRDS 10 bar steam consumption more (effect L-4)

6.45

8.10.2015

5.20

5.20

5.10

5.00

5.42

6.30

0.80

PRDS 10 bar steam consumption more (effect L-4)

0.16

9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

PRDS 10 bar steam consumption more (effect L-4)

2.38

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

PRDS 10 bar steam consumption more (effect L-4)

7.20

9.10.2015

11.00

11.00

9.00

9.00

14.05

14.30

0.42

L-4 breakdown

0.83

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-4)

6.40

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

3.75

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

4.40

9.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more (effect L-4)

3.20

load TG2 keep 5 MW

9.10.2015

5.20

5.20

4.90

4.80

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

1.00

Decrease load TG2 after normal increase


again.

9.10.2015

5.20

5.20

5.10

5.00

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

1.10

load TG2 keep 5 MW

13.10.2015

11.00

11.00

8.50

8.40

13.30

15.50

2.33

L-4 breakdown

6.07

13.10.2015

11.00

11.00

8.50

8.40

13.30

15.50

2.33

L-4 breakdown

6.07

13.10.2015

5.20

5.20

4.80

4.70

13.30

15.50

2.33

L-4 breakdown

1.17

22.10.2015

11.00

11.00

8.20

8.20

14.30

15.15

0.75

L-4 minimum speed

2.10

22.10.2015

11.00

11.00

7.80

7.80

15.15

17.45

2.50

L-4 breakdown

8.00

22.10.2015

5.20

5.20

4.60

4.50

14.30

17.52

3.37

L-4 minimum speed

2.36

22.10.2015

5.20

5.20

5.10

5.00

17.52

18.19

0.45

L-4 breakdown

0.09

10.11.2015

11.00

11.00

8.30

8.20

7.30

19.00

11.50

L-4 shutdown

32.20

10.11.2015

5.20

5.20

4.10

4.00

7.30

19.00

11.50

L-4 shutdown

13.80

20.11.2015

11.00

11.00

8.50

8.50

13.35

14.30

0.92

L-4 minimum speed

2.29

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

20.11.2015

5.20

5.20

4.00

4.00

13.35

14.30

0.92

L-4 minimum speed

1.10

25.12.2015

11.00

11.00

7.00

7.00

12.51

14.30

1.65

L-4 & 5 spinning minimum speed

6.60

TOTAL LINE - 4 SHUTDOWN / BREAKDOWN


24.1.2015

11.00

11.00

11.00

8.50

17.50

19.30

8.88
1.80

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.

1412.18
Tie line 6 KV get tripp (information by electric

4.5

due to ligtening) kilat/ gledek

TG 3 on ishocrounous mode and back to


sinchronized on 19.30

19.56

19.40

16.70

16.50

17.52

18.00

0.13

BFWP no. 1,2,3 boiler 9 can't run and PAFAN no. 1


get triipp due to effect tie line 6 KV PPL 1 get tripp

0.387

Reset and start again on DCS and back


increasing to normal load TG 4

26.1.2015

19.66

19.40

13.60

13.52

4.38

6.30

1.87

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem)

10.98

Inform electric to checked ID fan

27.1.2015

11.00

11.00

10.00

9.90

6.25

10.48

4.38

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem)

4.82

Arangement load TG 3 & TG 4 to control


extraction steam 4.5 bar

46.16

Increase load Tg 4 as per target after ID FAN


in normal operation & arrangement man
power to preventife breakdown to control
check and continue cleaning in coal ducthing
area

24.1.2015

27.1.2015

19.66

19.40

13.80

13.63

6.30

14.33

8.00

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem) & Ducthing coal feeder often chok no. 1 &
2 due to wet coal)

13.2.2015

5.20

5.20

5.00

5.00

6.37

6.57

0.33

Repair electric DME tranduser output (AQ)

0.07

13.2.2015

5.20

5.20

0.00

0.00

6.57

7.45

0.80

Repair electric DME tranduser output (AQ)

4.16

11.6.2015

19.50

19.40

19.50

0.00

11.00

15.00

4.00

Boiler 9 & TG4 trip due to PLN trip

77.60

11.6.2015

19.50

19.40

9.00

0.00

15.00

16.30

1.50

TG4 trip due to exhaust pressure drop

29.10

11.6.2015

19.50

19.40

14.40

14.00

17.20

21.20

4.00

ID Fan boiler 9 trip (replace cooling fan motor)

21.60

11.6.2015

11.00

11.00

9.10

9.00

7.10

11.00

3.83

Boiler 9 & TG4 trip due to PLN trip

7.67

11.6.2015

11.00

11.00

8.80

8.70

11.00

14.37

3.62

Boiler 9 & TG4 trip due to PLN trip

8.32

4.7.2015

19.40

19.30

0.00

0.00

5.00

6.30

1.50

4.7.2015

5.20

5.20

4.50

4.40

5.30

6.00

0.50

21.7.2015

19.40

19.30

0.00

0.00

23.30

6.30

7.00

22.7.2015
23.7.2015
24.7.2015
25.7.2015
25.7.2015
25.7.2015
26.7.2015
27.7.2015
27.7.2015
27.7.2015

19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30

0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
16.00
0.00

0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
16.00
0.00

6.30
6.30
6.30
6.30
10.08
13.45
6.30
6.30
10.25
15.25

6.30
6.30
6.30
10.08
13.45
6.30
6.30
10.25
15.25
6.30

24.00
24.00
24.00
3.63
3.62
16.75
24.00
3.92
5.00
15.08

TG4 trip due to PA Fan no. 2 trip (winding motor


burn).
TG4 trip due to PA Fan no. 2 trip (winding motor
burn).
TG4 trip due to overspeed protection relay active
(EXITER /ELECTRIC PROBLEM).
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 Cooling down planning install new diodes.
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 TRIP

27.7.2015

5.20

5.20

4.70

4.60

14.30

17.17

2.78

TG4 & New WSA trip

Decrease load TG2.


Loose synchronize TG2. TG 2 running on 5.2
MW after finish repaired DME trnsduser
output KW (AQ)
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

28.95

TG4 stop

0.40

Decrease load TG2 after normal increase


again.

135.10

TG4 stop

463.20
463.20
463.20
70.12
51.72
323.28
463.20
75.59
16.50
291.11

TG4 stop
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 5 MW
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 16 MW
TG4 stop
Decrease load TG2 after normal increase
again.

1.67

28.7.2015
29.7.2015
30.7.2015
31.7.2015
1.8.2015
1.8.2015
2.8.2015
3.8.2015
3.8.2015
3.8.2015

19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30
19.30
19.40
19.40
19.40
19.40

0.00
0.00
0.00
0.00
0.00
15.00
16.00
17.10
18.10
19.18

0.00
0.00
0.00
0.00
0.00
15.00
16.00
17.00
18.00
19.00

6.30
6.30
6.30
6.30
6.30
8.47
6.30
6.30
14.30
15.30

6.30
6.30
6.30
6.30
8.47
6.30
6.30
14.30
15.30
6.30

24.00
24.00
24.00
24.00
2.28
21.72
24.00
8.00
1.00
15.00

TG4 break down Exiter problem


TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 break down Exiter problem
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)

463.20
463.20
463.20
463.20
44.07
93.38
81.60
19.20
1.40
6.00

13.8.2015

19.40

19.40

15.23

14.96

9.00

11.00

2.00

PPL1 Black out due to electric problem

8.88

13.8.2015

19.40

19.40

17.05

16.97

11.00

13.00

2.00

PPL1 Black out due to electric problem

4.86

13.8.2015

19.40

19.40

17.48

17.32

13.00

15.00

2.00

PPL1 Black out due to electric problem

4.16

13.8.2015

19.40

19.40

18.80

18.80

15.00

18.00

3.00

PPL1 Black out due to electric problem

1.80

13.8.2015

11.00

11.00

10.50

10.50

6.30

9.00

2.50

L-2 shutdown & Boiler 5 shutdown

1.25

13.8.2015
13.8.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

9.00
17.29

12.14
22.28

3.23
4.98

PPL1 Black out due to electric problem


Replace ejector valve (effect PPL1 black out)

35.57
54.82

13.8.2015

11.00

11.00

10.70

10.70

22.28

6.37

8.15

effect PPL1 black out

2.45

27.8.2015

20.40

20.40

18.50

18.40

7.00

7.30

0.50

Any jobs electric --> Trafo 1, 2, 3

1.00

26.10.2015

20.40

20.20

16.40

16.20

16.00

16.30

0.50

PA FAN 2 GET TRIPP due to local field alarm

2.00

28.10.2015

20.20

20.20

0.00

0.00

7.40

18.06

10.43

28.10.2015

20.20

20.20

15.00

15.00

18.06

6.30

12.40

29.10.2015

20.20

20.20

16.00

16.00

6.30

6.30

24.00

30.10.2015

20.20

20.20

16.00

16.00

6.30

13.00

6.50

30.10.2015

20.20

20.20

10.10

10.00

13.00

15.00

2.00

Trafo 11 KV stop (Install electric cable power)

20.40

30.10.2015

20.20

20.20

3.50

3.50

15.00

22.00

7.00

Trafo 11 KV stop (Install electric cable power)

116.90

19.11.2015

20.20

20.20

16.18

16.04

7.00

14.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

24.96

Decrease load TG4 after normal increase


again.

19.11.2015

20.20

20.20

15.92

15.76

14.00

20.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

26.64

Decrease load TG4 after normal increase


again.

17.12.2015

20.20

20.20

0.00

0.00

14.50

18.40

3.83

77.43

Decrease load TG4 after normal increase


again.

30.11.2015
01.12.2015
02.12.2015
06.12.2015

20.20
20.20
20.20
20.20

20.20
20.20
20.20
20.20

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

16.44
6.30
6.30
14.38

6.30
6.30
17.40
16.29

13.77
24.00
11.17
1.85

278.09
484.80
225.57
37.37

TG4 trip
TG4 stop for repair
TG4 stop for repair
TG4 trip

Electric cable power to tie line 11KV at line-4 get


shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot

Boiler 9 & TG 4 get tripp due to PLN transformer


500 MVA 150 KV / 70 KV get triip (Tie 70 KV on
manual mode)
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure
PPL2 black out effet from traformer 70 kv failure

TG4 stop
TG4 stop
TG4 stop
TG4 stop
TG4 stop
under observation: load keep 15 MW
load keep 16 MW
load keep 17 MW
load keep 18 MW
load keep 19 MW
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 trip
TG3 stop (breakdown)
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

210.75

TG4 trip

64.48

Keep TG4 load 15 MW

100.80

Keep TG4 load 16 MW

27.30

Keep TG4 load 16 MW


Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

TOTAL ELECTRIC SHUTDOWN / BREAKDOWN

16.18

6973.31

19.56

19.30

19.10

18.90

5.28

6.00

0.53

Line 1 spining pengurangan steam LP actuator 100


%

26.1.2015

11.00

11.00

9.80

9.70

13.40

14.40

1.00

Spinning line 1 brekdown

1.3

26.1.2015

9.80

9.70

9.20

9.20

14.40

15.10

0.50

Spinning line 1 brekdown

0.25

26.1.2015

9.20

9.20

9.00

9.00

15.20

15.50

0.50

Spinning line 1 brekdown

0.1

26.1.2015

9.00

9.00

8.80

8.80

15.50

16.10

0.33

Spinning line 1 brekdown

0.07

26.1.2015

19.62

19.31

18.97

18.71

6.42

6.57

0.25

Spinning line 1 brekdown

0.15

26.1.2015

19.62

19.45

18.84

18.73

13.45

14.06

0.35

Spinning line 1 brekdown

0.25

0.38

24.1.2015

0.213

23.2.2015

11.00

11.00

10.80

10.80

11.27

13.22

1.92

Note : TG 2 & TG 3 normal as per target but at 11.27


to 13.22 L-1 decrease steam consumption & level
bunker boiler 5,6,7, 8 get low average 75 % due to
wet coal (Rainy session)

4.3.2015

5.20

5.20

5.00

5.00

14.00

16.00

2.00

L-1 minimum speed

0.40

4.3.2015

11.00

11.00

10.00

10.00

14.00

16.00

2.00

L-1 minimum speed

2.00

24.3.2015

20.44

20.28

19.26

19.10

7.00

14.30

7.50

Spinning L-1 shutdown

8.85

24.3.2015

20.31

20.15

19.57

19.26

14.30

21.09

6.65

Spinning L-1 shutdown

5.92

25.3.2015

11.00

11.00

10.50

10.50

10.07

11.40

1.55

Spinning L-1, L-5 decrease steam consumption

0.78

24.5.2015

5.20

5.20

5.10

5.00

6.37

21.00

14.38

Boiler 6 & L-1 breakdown

2.88

24.5.2015

5.20

5.20

4.60

4.50

21.00

6.37

9.62

L-1 break down

6.73

24.5.2015

11.00

11.00

10.30

10.20

21.30

6.37

9.12

L-1 break down

7.29

29.5.2015

5.20

5.20

5.10

5.00

6.37

14.00

7.38

29.5.2015

5.20

5.20

4.80

4.70

14.00

14.37

0.62

29.5.2015

5.20

5.20

4.60

4.50

14.37

15.25

0.80

29.5.2015

5.20

5.20

5.10

5.00

15.25

6.37

15.20

11.6.2015

5.20

5.20

4.50

4.50

7.20

8.31

1.18

L-1 spinning stop

0.83

11.6.2015

5.20

5.20

4.00

4.00

8.31

11.48

3.28

L-1 spinning stop

3.94

11.6.2015

5.20

5.20

4.50

4.50

11.48

14.37

2.82

L-1 spinning stop

1.97

11.7.2015

11.00

11.00

10.50

10.50

9.30

10.50

1.33

L-1, 2, 3 minimum speed

0.67

Pressure vacum TG3 drop


steam consumption
Pressure vacum TG3 drop
steam consumption
Pressure vacum TG3 drop
steam consumption
Pressure vacum TG3 drop
steam consumption

& process L-1 decrease


& process L-1 decrease
& process L-1 decrease
& process L-1 decrease

1.48
0.31
0.56
3.04

Boiler 9 decrease loan from 130 to 126 T/H,


and increases load again TG 4 (as per target
) after line process normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal

after L1
after L1
after L1
after L1
after L1
after L1

Decrease load TG3 after normal increase


again & Continue cleaning coal screen
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.7.2015

5.20

5.20

5.10

5.00

6.30

8.45

2.25

L-1, 2, 3 minimum speed

0.45

11.7.2015

5.20

5.20

4.90

4.80

8.45

11.51

3.10

L-1, 2, 3 minimum speed

1.24

31.8.2015

20.40

20.40

19.87

19.50

6.56

13.00

4.07

L-1 breakdown

3.66

1.9.2015

11.00

11.00

10.60

10.50

6.30

7.00

0.50

L-1 shutdown

0.25

1.9.2015

11.00

11.00

10.00

10.00

7.00

10.28

3.47

L-1 shutdown

3.47

1.9.2015

11.00

11.00

9.50

9.50

10.28

12.11

1.72

L-1 shutdown

2.58

1.9.2015

11.00

11.00

8.50

8.50

12.12

14.30

2.30

L-1 shutdown

5.75

1.9.2015

11.00

11.00

8.70

8.70

16.05

22.37

6.53

L-1 shutdown

15.03

2.9.2015

11.00

11.00

10.50

10.50

6.30

8.15

1.75

L-1 minimum speed

0.88

2.9.2015

5.20

5.20

5.00

4.90

6.30

8.25

1.92

L-1 minimum speed

0.58

3.9.2015

5.20

5.20

4.80

4.80

17.44

22.30

4.77

L-1 & L-4 breakdown

1.91

TOTAL LINE - 1 SPINNING SHUTDOWN / BREAK DOWN

3.47

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

86.13

25.1.2015

5.30

5.20

5.10

4.90

9.45

15.45

6.00

New WSA tripp. (bearing temperature blower get


high)

1.8

Increase TG 2 load back to normal 5.2 MW


after WSA normal suplai 55 > 10 bar

25.1.2015

11.00

11.00

8.10

8.10

9.45

16.45

7.00

New WSA tripp. (bearing temperature blower get


high)

20.30

Increase TG 3 load back to normal 11 MW


after WSA suplai steam 55 > 45 bar on
16.45

4.84

TG 4 decrease load due to supply steam 10


bar with flow 25 T/h and increase load again
after WSA suplay steam 55 > 10 bar start on
12.05

25.1.2015

19.56

19.30

17.18

16.88

9.55

12.05

2.00

New WSA tripp. (bearing temperature blower get


high)

28.1.2015

11.00

10.90

8.50

8.40

13.56

14.20

0.40

New WSA stop due to line gas problem

1.00

Decrease load TG3.

28.1.2015

5.20

5.10

4.30

4.20

13.56

14.20

0.40

New WSA breakdown

0.36

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

14.40

15.40

1.00

WSA breakdown

0.40

Decrease load TG3.

28.1.2015

5.20

5.10

4.90

4.80

22.30

6.30

8.00

WSA breakdown

2.40

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

22.30

6.30

8.00

WSA breakdown

3.20

Decrease load TG3.

28.1.2015

19.66

19.38

17.44

17.23

14.56

22.30

7.57

WSA breakdown & Boiler 9 over load 135 T/H

16.27

Decrease load TG4.

29.1.2015

19.32

19.23

18.34

18.20

20.20

21.08

0.80

Boiler 9 over load 138 T/H, Bleed steam 23 T/H


(WSA stop)

0.82

Decrease load TG4 & start boiler house no.


4 for view menute and stop again after
arangement load to take boiler b9 max 130
t/H

30.1.2015

5.20

5.10

5.00

4.90

16.28

17.46

1.14

WSA breakdown

0.23

Arrangement load TG 2 & 3

30.1.2015

11.00

11.00

8.00

8.00

16.28

17.46

1.14

WSA breakdown level mcoal bunker low due to wet


coal

3.42

Arrangement load TG 2 & 4

30.1.2015

19.84

19.57

17.10

16.89

16.28

17.46

1.14

WSA stop & L-3 breakdown

3.06

Arrangement load boiler 9 to control max.


130 T/h

31.1.2015

1.2.2015

11.00

11.00

11.00

11.00

8.20

8.50

8.10

8.40

6.30

6.30

6.30

6.30

1.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

2.90

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

2.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

4.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : New WSA stop , TG 2 & TG 3 running on 5 &


8 MW due to arrangement load when level bunker
boiler 5,6,7, 8 get low average 60 % due to wet coal
(Rainy session)

62.40

Continue cleaning coal screen

5.2.2015

11.00

10.90

10.00

9.90

6.30

9.00

2.50

New WSA problem.

2.50

Decrease load TG3

8.2.2015

11.00

10.90

9.00

8.00

6.10

6.30

0.33

New WSA trip due to trouble power.

0.97

Decrease load TG3.

8.2.2015

5.20

5.10

4.80

4.70

6.10

6.30

0.33

New WSA trip due to trouble power.

0.13

Decrease load TG2.

9.2.2015

19.53

19.45

18.66

18.50

8.54

9.46

0.87

WSA tipp & Coal crusher no. 1 & 2 choking due to


wet coal

0.82

Continue cleaning ducthing cruher screen


and coal feeder also every time due to wet
coal & Decrease load TG4.

9.00

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

27.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

5.00

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

1.50

Continue cleaning screen CHS PPL 1 every


time & Decrease load TG3.

10.00

New WSA stop due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

30.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

9.2.2015

9.2.2015

9.2.2016

11.00

8.00

11.00

11.00

8.00

11.00

8.00

7.70

8.00

8.00

7.70

8.00

6.15

15.16

20.54

15.16

20.54

6.30

10.2.2015

11.00

11.00

7.80

7.70

6.30

6.30

24.00

11.2.2015

11.00

11.00

8.00

7.90

6.30

4.46

22.27

11.2.2015

8.00

7.90

7.50

7.50

4.46

5.02

0.27

11.2.2015

11.00

11.00

8.00

7.90

5.02

6.30

1.47

12.2.2015

13.2.2015

11.00

11.00

11.00

11.00

8.00

8.00

8.00

8.00

6.30

6.30

6.30

6.30

Note : TG 2 & TG 3 running on 5.2 & 7.7 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Boiler over load due to effect WSA stop
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

79.20

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

69.03

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

0.11

Decrease load TG3 and arrangement load

4.55

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

24.00

Note : TG 3 running 8 MW due to arrangement load


when new WSA stop & level bunker boiler 5,6,7, 8
get low average 60 % due to wet coal (Rainy
session)

72.00

Continue cleaning coal screen

69.25

Continue cleaning coal screen

14.2.2015

11.00

11.00

8.00

8.00

7.25

6.30

23.08

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

15.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

16.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

72.00

Continue cleaning coal screen

Decrease load TG4


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

17.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop (New WSA
start & synchronize steam at 04.36 am) & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

6.3.2015

19.44

19.30

18.00

17.75

17.30

17.50

0.33

New WSA trip

0.52

6.3.2015

9.50

9.50

7.30

7.20

16.59

17.47

0.80

New WSA trip

1.84

6.3.2015

11.00

11.00

8.50

8.50

22.45

3.18

4.55

New WSA trip

11.38

7.3.2015

19.44

19.35

18.00

18.00

19.50

20.52

1.03

New WSA get trip

1.40

7.3.2015

10.80

10.80

8.00

8.00

19.00

20.52

1.03

New WSA get trip

2.88

7.3.2015

5.00

5.00

4.40

4.30

19.00

20.52

1.03

New WSA get trip

0.72

20.3.2015

20.49

20.45

19.10

19.00

14.36

15.00

0.40

New WSA trip

0.58

26.3.2015

20.45

20.36

19.00

19.00

14.07

14.30

0.38

WSA decrease load & steam 22>10 bar boiler house


close (mechanic jobs)

0.52

26.3.2015

11.00

11.00

10.50

10.50

14.20

22.37

8.12

Pressure 10 bar drop due to New WSA decrease


load (PRDS 55><45 bar changed to PRDS 55><10
bar)

4.06

17.4.2015

20.57

20.51

19.20

19.10

2.46

3.07

0.35

New WSA trip & Boiler 9 over load 136 T/H

0.49

17.4.2015

5.20

5.20

4.00

4.00

8.55

12.37

3.70

New WSA stop cause burner trable

4.44

18.4.2015

5.20

5.20

4.00

4.00

8.32

12.00

4.53

New WSA trip

5.44

24.4.2015

20.57

20.45

17.31

17.01

15.10

4.00

7.83

New WSA problem

26.95

24.4.2015

20.57

20.45

18.21

18.49

4.00

6.37

2.62

New WSA problem

5.13

24.4.2015

5.20

5.20

4.20

4.10

10.40

14.37

3.95

New WSA problem

4.35

24.4.2015

5.20

5.20

4.30

4.20

14.37

6.37

16.00

New WSA problem

16.00

24.4.2015

11.00

11.00

10.00

10.00

10.40

14.37

3.95

New WSA problem

3.95

24.4.2015

11.00

11.00

9.00

8.90

14.37

6.37

16.00

New WSA problem

33.60

25.4.2015

20.57

20.45

18.18

17.94

6.37

9.00

2.62

New WSA problem

6.57

25.4.2015

20.57

20.45

19.66

19.46

9.00

11.00

2.00

New WSA problem

1.98

25.4.2015

5.20

5.20

4.30

4.20

6.37

14.37

8.00

New WSA problem

8.00

25.4.2015

11.00

11.00

9.00

9.00

6.37

14.37

8.00

New WSA problem

16.00

26.4.2015

5.20

5.20

5.00

4.90

6.37

8.25

1.80

New WSA trip due to truble burner

0.54

26.4.2015

5.20

5.20

4.30

4.20

8.25

13.25

5.00

New WSA trip due to truble burner

5.00

26.4.2015

11.00

11.00

9.20

9.10

6.37

13.25

6.80

New WSA trip due to truble burner

12.92

6.5.2015

5.20

5.20

4.50

4.90

0.04

1.52

1.80

New WSA 55-45 close (boiler over load)

0.54

6.5.2015

5.20

5.20

4.20

4.20

1.52

6.37

4.75

New WSA 55-45 close (boiler over load)

4.75

6.5.2015

11.00

11.00

9.50

9.50

1.45

6.37

4.87

New WSA 55-45 close (boiler over load)

7.30

7.5.2015

5.20

5.20

4.30

4.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

7.20

7.5.2015

5.20

5.20

4.10

4.00

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

9.16

7.5.2015

5.20

5.20

4.70

4.70

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.18

7.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

4.00

7.5.2015

11.00

11.00

9.30

9.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

13.60

7.5.2015

11.00

11.00

7.50

7.50

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

26.71

After normal increase load TG 3 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.

7.5.2015

11.00

11.00

9.40

9.30

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.63

7.5.2015

11.00

11.00

9.30

9.20

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

14.40

4.6.2015

5.20

5.20

4.70

4.60

0.43

3.42

2.98

WSA 2 stop

1.79

4.6.2015

5.20

5.20

5.00

5.00

3.42

6.37

2.92

WSA 2 stop

0.58

5.6.2015

5.20

5.20

5.20

5.10

6.37

7.44

1.12

New acid plant stop

0.11

5.6.2015

5.20

5.20

5.00

5.00

18.33

6.37

12.07

New acid plant stop

2.41

5.6.2015

11.00

11.00

10.40

10.30

16.46

18.37

1.85

New acid plant stop

1.30

5.6.2015

11.00

11.00

9.90

9.80

18.37

22.37

4.00

New acid plant stop

4.80

5.6.2015

11.00

11.00

9.70

9.60

22.37

6.37

8.00

New acid plant stop

11.20

9.6.2015

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop

16.80

10.6.2016

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop

16.80

2.9.2015

20.40

20.40

18.61

18.45

19.19

22.30

3.18

WSA-2 trip

6.21

2.9.2015

20.40

20.40

18.92

18.79

22.30

6.30

8.00

Safety VN WSA-2 problem (10 bar)

12.88

2.9.2015

11.00

11.00

9.50

9.50

18.55

22.30

3.58

WSA-2 trip

5.38

2.9.2015

5.20

5.20

5.20

5.10

8.25

10.58

2.55

Effek WSA, PRDS 10 bar steam consumption more

0.26

load TG2 keep 5.1 MW

2.9.2015

5.20

5.20

5.10

5.00

11.29

6.30

18.98

Effek WSA, PRDS 10 bar steam consumption more

3.80

load TG2 keep 5 MW

23.9.2015

11.00

11.00

11.00

10.90

6.30

14.30

8.00

WSA-2 stop

0.80

23.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

WSA-2 stop

40.00

23.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

24.9.2015

11.00

11.00

8.60

8.60

6.30

6.30

24.00

WSA-2 stop

57.60

24.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

06.12.2015

11.00

11.00

8.40

8.30

22.30

6.30

8.00

New WSA trip

21.60

07.12.2015

11.00

11.00

8.40

8.30

6.30

14.30

8.00

New WSA stop

21.60

07.12.2015

11.00

11.00

10.10

10.10

14.30

16.13

1.72

New WSA stop

1.55

07.12.2015

11.00

11.00

7.90

7.80

16.13

6.30

14.28

New WSA stop

45.70

08.12.2015

20.20

20.20

17.31

17.28

6.30

14.30

8.00

New WSA stop

23.36

08.12.2015

20.20

20.20

17.48

17.39

14.30

22.30

8.00

New WSA stop

22.48

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

08.12.2015

20.20

20.20

18.79

18.57

22.30

6.30

8.00

New WSA stop

13.04

08.12.2015

11.00

11.00

7.90

7.80

6.30

6.30

24.00

New WSA stop

76.80

10.12.2015

20.20

20.20

17.55

17.50

14.30

22.30

8.00

New WSA stop

21.60

10.12.2015

20.20

20.20

17.53

17.45

22.30

6.30

8.00

New WSA stop

22.00

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

11.00

11.00

7.80

7.80

22.30

6.30

8.00

New WSA stop

25.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

10.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

New WSA stop

1.60

11.12.2015

20.20

20.20

17.66

17.52

6.30

10.30

4.00

New WSA stop

10.72

11.12.2015

20.20

20.20

19.60

19.40

10.30

6.30

20.00

New WSA stop

16.00

12.12.2015

20.20

20.20

19.60

19.40

6.30

10.30

4.00

New WSA stop

3.20

12.12.2015

20.20

20.20

18.40

18.30

10.30

6.30

20.00

New WSA stop

38.00

13.12.2015

20.20

20.20

18.40

18.30

6.30

17.30

11.00

New WSA stop

20.90

13.12.2015

20.20

20.20

17.90

17.60

17.30

22.30

5.00

New WSA stop

13.00

13.12.2015

20.20

20.20

18.70

18.50

22.30

6.30

8.00

New WSA stop

13.60

14.12.2015

20.20

20.20

18.40

18.30

6.30

15.40

9.17

New WSA stop

17.42

14.12.2015

20.20

20.20

18.40

18.30

19.00

6.30

11.50

New WSA stop

21.85

15.12.2015

20.20

20.20

19.09

19.09

6.30

17.48

11.30

New WSA stop

12.54

15.12.2015

20.20

20.20

18.26

18.01

17.48

6.30

12.70

New WSA stop

27.81

16.12.2015

20.20

20.20

18.52

18.50

6.30

20.47

14.28

New WSA stop

24.28

TOTAL NEW WSA SHUTDOWN / BREAKDOWN 192.75

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

2124.71

27.1.2015

10.00

9.90

9.80

9.80

10.48

14.30

3.70

Load boiler PPL 1 high due to coal ducthing PPL 2


get chocking (Boiler 9 reduce load and effet in boiler
PPl 1)

0.37

Increase load TG 3 as per target after get


inform ID FAN is normal operation by PPL 2

2.2.2015

19.80

19.55

15.10

15.06

9.11

9.20

0.15

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

0.67

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

19.44

19.35

18.14

17.95

13.05

13.20

0.25

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

19.44

19.30

17.22

17.23

17.03

17.13

0.17

Coal blocking at ducthing feeder no. 1 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.27

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

4.2.2015

17.22

17.23

15.63

15.62

17.54

18.04

0.17

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

4.2.2015

19.66

19.45

14.00

13.88

6.24

6.37

0.20

Coal blocking at ducthing feeder no. 1,2,3 , Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

1.11

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

5.2.2015

19.48

19.27

15.14

15.08

6.21

8.00

1.65

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

6.91

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

6.2.2015

11.00

10.90

9.20

7.20

13.30

13.53

0.38

Coal vibrating screen breakdown.

1.42

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.10

13.53

15.30

1.62

Coal vibrating screen breakdown.

2.91

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

10.00

15.30

16.55

0.58

Coal vibrating screen breakdown.

0.53

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

9.50

16.55

17.48

0.88

Coal vibrating screen breakdown.

1.24

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.00

17.48

20.32

2.73

Coal vibrating screen breakdown.

5.19

Decrease load TG3.

20.2.2015

19.44

19.27

18.78

18.40

18.20

19.10

0.83

21.2.2015

19.53

19.34

18.92

18.88

16.34

16.41

0.12

22.2.2015

19.49

19.32

14.80

14.75

4.30

5.15

Boiler 9 over load 132 T/H due to pressure droup 66


bar due to wet coal chock at dusthing feeder
Boiler 9 over load 132 T/H due to pressure droup 66
bar due to wet coal

0.73
0.05

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.

0.75

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

3.43

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.11

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.20

24.2.2015

19.45

19.35

18.91

18.75

9.30

9.41

0.18

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

24.2.2015

19.45

19.35

18.48

18.41

13.23

13.36

0.22

Coal blocking at ducthing feeder no. 2

2.3.2015

11.00

11.00

10.00

10.00

7.33

9.22

1.82

2.3.2015

11.00

11.00

10.80

10.80

12.35

13.07

0.53

2.3.2015

11.00

11.00

10.00

10.00

13.10

13.49

0.65

Vaccum pressure TG3 droop till -0.75 bar and coal


bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low

5.3.2015

19.61

19.55

15.50

15.00

7.06

7.20

0.23

Coal bunker no. 1 & 2 get chocking / not coming


down in feeder due to wet coal stuck at ducthing,
Note :Boiler 9 & TG 4 normal as per target but
winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session and also
motor PAFAN no. 1 get noise

6.3.2015

19.44

19.21

19.27

19.07

5.00

6.00

1.00

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session, motor
PAFAN no. 1 get noise (Under monitoring)

1.82
0.11
0.65

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)

1.06

Schedule cleaning bunker no. 1 & 2 , After


normal increase load TG 4 as per target

0.14

After normal increase load TG 4 as per


target

17.4.2015

20.57

20.43

19.70

19.55

17.00

17.49

0.82

Duthing coal feeder no. 1 get chocking (Manage wet


coal come to bunker)

0.72

21.4.2015

20.57

20.50

17.05

17.00

9.17

9.27

0.17

Coal blocking at ducthing feeder

0.58

27.4.2015

20.50

20.50

19.50

19.50

12.58

13.06

0.13

Coal blocking at ducthing feeder

0.13

TOTAL WET COAL PROBLEM

12.48

Cleaning /checking every hour, After normal


increase load TG 4 as per target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

31.05

29.1.2015

19.66

19.56

13.62

13.53

6.30

15.55

9.42

Line 5 shutdown (PM: 1/2 Cleaning condenser TG4)

56.78

Decrease load TG4.

29.1.2015

4.90

4.80

3.60

3.50

7.30

16.05

8.58

Line 5 shutdown

11.16

Decrease load TG2.

29.1.2015

11.00

11.00

8.50

8.00

18.20

17.20

1.00

Line 5 shutdown Boiler PPL 1 over load.

3.00

Decrease load TG3 & start boiler house no.


4 for view menute and stop again after
arangement load.

27.2.2015

19.53

19.46

18.88

18.61

11.00

12.26

1.43

Spinning L-5 decrease steam consumption

1.22

27.2.2015

19.35

19.16

18.57

18.41

13.20

16.31

3.18

L-5 breakdown

2.39

3.3.2015

10.80

10.80

10.50

10.40

22.37

23.02

0.42

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.17

Decrease load TG3 after normal increase


again.

3.3.2015

10.50

10.50

10.00

10.00

23.02

1.08

2.10

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

1.05

Decrease load TG3 after normal increase


again.

3.3.2015

11.00

11.00

10.70

10.70

1.08

2.30

1.37

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.41

Decrease load TG3 after normal increase


again.

3.3.2015

19.40

19.22

18.35

18.12

22.25

22.46

0.35

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.39

After normal increase load TG 4 as per


target

3.3.2015

19.40

19.22

18.97

18.83

0.30

0.41

0.18

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.07

After normal increase load TG 4 as per


target

4.3.2015

19.53

19.45

19.22

19.10

9.55

12.30

2.58

L-4 & L-5 breakdown

0.90

4.3.2015

5.20

5.20

4.30

4.30

10.00

12.00

2.00

L-4 & L-5 breakdown

1.80

4.3.2015

11.00

11.00

7.90

7.90

10.00

12.00

2.00

L-4 & L-5 breakdown

6.20

2.4.2015

20.31

20.10

18.44

18.23

6.50

14.30

7.83

Process L-5 shutdown

14.65

2.4.2015

5.20

5.20

4.80

4.70

6.37

9.37

3.00

Process L-5 shutdown

1.50

2.4.2015

5.20

5.20

2.80

2.80

9.37

14.37

3.00

Process L-5 shutdown

7.20

2.4.2015

5.20

5.20

3.30

3.20

14.37

19.10

4.55

Process L-5 shutdown

9.10

2.4.2015

5.20

5.20

5.00

4.90

19.10

22.37

5.45

Process L-5 shutdown

1.64

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

2.4.2015

5.20

5.20

5.00

5.00

33.37

6.37

8.00

Process L-5 shutdown

1.60

6.6.2015

11.00

11.00

9.80

9.80

6.37

8.58

2.35

L-5 decrease steam consumption

2.82

6.6.2015

11.00

11.00

10.30

10.30

8.58

14.37

6.35

L-5 decrease steam consumption

4.45

6.6.2015

11.00

11.00

10.40

10.30

14.37

6.37

16.00

L-5 decrease steam consumption

11.20

7.6.2015

11.00

11.00

10.30

10.30

6.37

6.37

24.00

L-5 decrease steam consumption

16.80

8.6.2015

5.20

5.20

4.50

4.40

15.00

22.10

7.17

L-5 shutdown

5.73

8.6.2015

11.00

11.00

10.20

10.20

6.37

14.37

8.00

L-5 shutdown

6.40

8.6.2015

11.00

11.00

10.20

10.10

14.37

15.30

0.88

L-5 shutdown

0.80

8.6.2015

11.00

11.00

9.30

9.30

15.30

17.00

1.50

L-5 shutdown

2.55

8.6.2015

11.00

11.00

9.00

9.00

17.00

22.37

5.62

L-5 shutdown

11.23

8.6.2015

11.00

11.00

9.40

9.40

22.37

6.37

8.00

L-5 shutdown

12.80

11.6.2015

5.20

5.20

4.70

4.60

22.37

0.34

1.95

L-5 breakdown

1.17

11.6.2015

5.20

5.20

4.60

4.50

0.34

0.49

0.25

L-5 breakdown

0.18

11.6.2015

5.20

5.20

4.50

4.40

0.49

5.31

4.70

L-5 breakdown

3.76

11.6.2015

5.20

5.20

5.00

4.90

5.41

6.37

0.93

L-5 breakdown

0.28

12.6.2015

5.20

5.20

4.90

4.80

6.37

7.45

1.13

L-5 breakdown

0.45

12.6.2015

11.00

11.00

8.90

8.90

6.37

8.09

1.53

L-5 breakdown

3.22

16.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

L-5 shutdown

21.60

18.8.2015

11.00

11.00

10.50

10.50

15.22

16.50

1.47

L-5 decrease steam consumption

0.73

18.8.2015

5.20

5.20

4.80

4.70

15.30

16.41

1.18

L-5 decrease steam consumption

0.59

29.9.2015

11.00

11.00

7.80

7.80

17.48

19.25

1.62

L-5 break down

5.17

29.9.2015

11.00

11.00

8.50

8.50

19.25

22.30

3.08

L-5 break down

7.70

29.9.2015

5.20

5.20

4.50

4.40

18.05

21.31

3.43

L-5 break down

2.75

21.10.2015

11.00

11.00

7.50

7.50

14.30

20.09

5.65

L-5 break down

19.78

25.10.2015

11.00

11.00

9.00

9.00

15.26

17.20

1.90

L-5 break down

3.80

25.10.2015

11.00

11.00

9.40

9.40

17.20

18.22

0.97

L-5 break down

1.55

26.10.2015

11.00

11.00

9.00

9.00

13.48

22.30

8.70

L-5 decrease steam consumption (trable)

17.40

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

26.10.2015

5.20

5.20

4.60

4.60

13.48

22.30

TOTAL LINE - 5 SHUTDOWN / BREAK DOWN

8.70

L-5 decrease steam consumption (trable)

19.00

5.22

Decrease load TG2 after normal increase


again.

291.34

7.2.2015

5.10

5.10

4.10

4.00

0.05

0.28

0.38

Re-adjust extaction TG4 & TG3.

0.42

Reduce load TG 2 after normal increase


again.

7.2.2015

19.40

19.24

18.18

18.09

17.35

17.59

0.40

Extraction flow high, no comfirmation from process,


load boiler 9 is 137 TPH

0.46

Decrease load TG4.

7.2.2015

19.40

19.40

18.10

18.09

0.02

0.16

0.23

Re-adjust extaction TG4 & TG3.

0.31

14.2.2015

11.00

11.00

7.50

7.50

6.30

7.25

0.92

Boiler over load

3.21

28.2.2015

11.00

11.00

10.00

10.00

6.37

11.08

4.52

TG4 LP full open 100%

4.52

6.3.2015

11.00

11.00

10.80

10.80

9.13

9.20

0.28

LP TG4 100% (procees not inform reduce load)

0.06

6.3.2015

10.80

10.80

10.60

10.60

9.20

9.45

0.42

LP TG4 100% (procees not inform reduce load)

0.08

6.3.2015

11.00

11.00

9.50

9.50

15.14

16.59

1.75

LP TG4 100% (procees not inform reduce load)

2.63

31.3.2015

11.00

11.00

10.50

10.50

0.50

5.12

4.37

Pressure 10 bar drop (PRDS 55><45 bar changed to


PRDS 55><10 bar)

2.18

31.3.2015

11.00

11.00

10.80

10.80

5.12

6.37

1.42

Proses decrease steam not confirm

0.28

1.4.2015

20.40

20.21

19.18

18.76

15.30

16.39

1.15

10 bar steam consumption high

1.67

1.4.2015

11.00

11.00

10.80

10.70

6.37

8.18

1.68

LP TG4 100% (procees not inform reduce load)

0.51

1.4.2015

11.00

11.00

10.10

10.00

15.36

17.06

1.70

Load boiler PPL1 high (process not confirm)

1.70

15.7.2015

11.00

11.00

11.00

10.90

17.00

21.35

4.58

PRV 22-10 boiler house leakage

0.46

15.7.2015

5.20

5.20

4.90

4.80

16.45

17.43

0.97

PRV 22-10 boiler house leakage

0.39

27.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

PRDS 10 bar steam consumption more

2.01

28.8.2019

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

28.8.2020

5.20

5.20

4.00

4.00

22.30

4.30

6.00

PRDS 10 bar steam consumption more

7.20

29.8.2015
30.8.2015
31.8.2015

5.20
5.20
5.20

5.20
5.20
5.20

5.10
5.10
5.10

5.00
5.00
5.00

6.30
6.30
6.30

6.30
6.30
6.30

24.00
24.00
24.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more
PRDS 10 bar steam consumption more

4.80
4.80
4.80

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

1.9.2015
4.9.2015
5.9.2015

5.20
5.20
5.20

5.20
5.20
5.20

5.10
5.10
5.10

5.00
5.00
5.00

6.30
6.30
6.30

6.30
6.30
6.30

24.00
24.00
24.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more
PRDS 10 bar steam consumption more

4.80
4.80
4.80

25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

55.20

25.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

5.60

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG 4 after normal increase


again.
Decrease load TG3.
After normal increase load TG 3 as per
target
Decrease load TG3
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

27.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

PRDS 10 bar steam consumption more

3.48

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

PRDS 10 bar steam consumption more

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

PRDS 10 bar steam consumption more

16.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

PRDS 10 bar steam consumption more

5.56

28.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

29.9.2015
29.9.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
21.31

14.30
6.30

8.00
9.15

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

1.60
1.83

30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

1.50

30.9.2015

5.20

5.20

5.00

5.00

6.30

1.30

19.00

PRDS 10 bar steam consumption more

3.80

2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

PRDS 10 bar steam consumption more

11.20

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.80

2.10.2015

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

2.10.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

2.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

3.10.2015

5.20

5.20

4.80

4.80

21.31

6.30

24.00

PRDS 10 bar steam consumption more

9.60

4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

4.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

5.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

7.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

PRDS 10 bar steam consumption more

11.20

10.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

PRDS 10 bar steam consumption more

24.00

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

11.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

12.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

7.00

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

14.67

13.10.2015
13.10.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
15.50

13.30
6.30

7.00
14.67

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

1.40
2.93

14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

PRDS 10 bar steam consumption more

4.07

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

PRDS 10 bar steam consumption more

12.87

14.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

7.20

15.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

PRDS 10 bar steam consumption more

0.30

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

13.00

16.10.2015
16.10.2015

5.20
5.20

5.20
5.20

5.00
5.10

5.00
5.00

6.30
17.30

7.00
6.30

0.50
13.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

0.10
2.60

17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

17.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

18.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

PRDS 10 bar steam consumption more

8.80

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

20.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

PRDS 10 bar steam consumption more

2.82

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.80

21.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

PRDS 10 bar steam consumption more

3.92

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

PRDS 10 bar steam consumption more

1.45

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

PRDS 10 bar steam consumption more

2.03

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

5.20

5.20

5.00

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

22.10.2015

5.20

5.20

4.80

4.80

18.19

22.12

3.88

PRDS 10 bar steam consumption more

1.55

22.10.2015

5.20

5.20

5.10

5.00

22.12

6.30

8.30

PRDS 10 bar steam consumption more

1.66

23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

23.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

24.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

PRDS 10 bar steam consumption more

1.40

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

PRDS 10 bar steam consumption more

1.67

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

PRDS 10 bar steam consumption more

2.43

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

PRDS 10 bar steam consumption more

3.70

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

PRDS 10 bar steam consumption more

2.71

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

PRDS 10 bar steam consumption more

11.34

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

PRDS 10 bar steam consumption more

1.84

25.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

3.20

25.10.2015

5.20

5.20

4.90

4.80

22.30

23.33

1.05

PRDS 10 bar steam consumption more

0.42

25.10.2015

5.20

5.20

5.10

5.00

23.33

6.30

6.95

PRDS 10 bar steam consumption more

1.39

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

PRDS 10 bar steam consumption more

10.95

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

26.10.2015

5.20

5.20

5.00

5.00

6.30

13.48

7.30

PRDS 10 bar steam consumption more

1.46

26.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

13.60

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

PRDS 10 bar steam consumption more

24.00

27.10.2015
27.10.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
14.30

7.30
6.30

1.00
16.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

0.20
3.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

PRDS 10 bar steam consumption more

1.75

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

PRDS 10 bar steam consumption more

14.35

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

28.10.2015

5.20

5.20

5.10

5.00

6.00

7.40

1.17

PRDS 10 bar steam consumption more

0.23

28.10.2015

5.20

5.20

4.90

4.80

7.40

14.30

6.83

PRDS 10 bar steam consumption more

2.73

28.10.2015

5.20

5.20

5.00

5.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

28.10.2015

5.20

5.20

4.90

4.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

PRDS 10 bar steam consumption more

0.08

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

4.80

29.10.2015

5.20

5.20

4.90

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

31.10.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

1.11.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

2.11.2015

5.20

5.20

4.90

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

2.11.2015

5.20

5.20

4.80

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

3.11.2015

5.20

5.20

4.40

4.40

6.30

14.30

8.00

PRDS 10 bar steam consumption more

6.40

3.11.2015

5.20

5.20

4.70

4.60

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

3.11.2015

5.20

5.20

4.50

4.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

6.40

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

3.20

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

4.11.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

PRDS 10 bar steam consumption more

19.20

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

24.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

5.11.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

5.11.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

PRDS 10 bar steam consumption more

4.04

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

PRDS 10 bar steam consumption more

6.46

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

PRDS 10 bar steam consumption more

12.27

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

4.50

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

PRDS 10 bar steam consumption more

6.50

6.11.2015

5.20

5.20

4.80

4.70

6.30

14.50

8.33

PRDS 10 bar steam consumption more

4.17

6.11.2015

5.20

5.20

4.70

4.60

14.50

22.30

7.67

PRDS 10 bar steam consumption more

4.60

6.11.2015

5.20

5.20

4.50

4.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

2.10

6.11.2015

5.20

5.20

4.90

4.80

1.30

6.30

5.00

PRDS 10 bar steam consumption more

2.00

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

PRDS 10 bar steam consumption more

22.40

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

PRDS 10 bar steam consumption more

16.68

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

PRDS 10 bar steam consumption more

2.00

7.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

8.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

PRDS 10 bar steam consumption more

9.60

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

PRDS 10 bar steam consumption more

22.40

9.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

PRDS 10 bar steam consumption more

1.40

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

4.20

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

10.11.2015

5.20

5.20

4.80

4.70

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

10.11.2015

5.20

5.20

4.90

4.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

1.40

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

10.11.2015

5.20

5.20

4.80

4.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.00

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

PRDS 10 bar steam consumption more

27.90

11.11.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

11.11.2015

5.20

5.20

4.70

4.60

14.30

5.15

15.25

PRDS 10 bar steam consumption more

9.15

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

PRDS 10 bar steam consumption more

5.80

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

12.11.2015

5.20

5.20

4.60

4.50

11.17

14.30

3.22

PRDS 10 bar steam consumption more

2.25

12.11.2015

5.20

5.20

4.70

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

13.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

14.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

15.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

16.11.2015

11.00

11.00

9.70

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

PRDS 10 bar steam consumption more

16.61

16.11.2015

5.20

5.20

4.70

4.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.80

16.11.2015

5.20

5.20

4.60

4.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

5.60

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

17.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

18.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

18.11.2015

5.20

5.20

4.40

4.30

14.30

6.30

16.00

PRDS 10 bar steam consumption more

14.40

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

10.62

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

20.11.2015

5.20

5.20

4.50

4.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

4.96

20.11.2015

5.20

5.20

4.50

4.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

20.11.2015

5.20

5.20

4.50

4.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

21.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

22.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

PRDS 10 bar steam consumption more

5.25

23.11.2015

5.20

5.20

4.40

4.30

6.30

10.00

3.50

PRDS 10 bar steam consumption more

3.15

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

PRDS 10 bar steam consumption more

0.62

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

PRDS 10 bar steam consumption more

1.10

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

PRDS 10 bar steam consumption more

1.51

02.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

20.50

PRDS 10 bar steam consumption more

4.10

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

03.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

PRDS 10 bar steam consumption more

1.30

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

PRDS 10 bar steam consumption more

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

PRDS 10 bar steam consumption more

5.07

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

PRDS 10 bar steam consumption more

2.32

04.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

05.12.2015

11.00

11.00

9.80

9.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

10.40

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

16.00

05.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

PRDS 10 bar steam consumption more

0.37

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

PRDS 10 bar steam consumption more

9.16

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

06.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

07.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

08.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

09.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

PRDS 10 bar steam consumption more

46.40

11.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

12.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

13.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

PRDS 10 bar steam consumption more

7.15

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

PRDS 10 bar steam consumption more

4.97

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

PRDS 10 bar steam consumption more

57.39

14.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

31.00

15.12.2015

5.20

5.20

5.00

5.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

2.07

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

PRDS 10 bar steam consumption more

2.98

16.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

11.50

PRDS 10 bar steam consumption more

2.30

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

PRDS 10 bar steam consumption more

48.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

20.00

17.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

18.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

PRDS 10 bar steam consumption more

26.45

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

20.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

PRDS 10 bar steam consumption more

16.15

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

PRDS 10 bar steam consumption more

18.75

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more


(Temperature vaccum high)
PRDS 10 bar steam consumption more
(Temperature vaccum high)

9.80
1.20

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

21.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

22.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

PRDS 10 bar steam consumption more

7.10

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

PRDS 10 bar steam consumption more

0.70

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

PRDS 10 bar steam consumption more

6.52

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

PRDS 10 bar steam consumption more

12.60

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

PRDS 10 bar steam consumption more

20.50

23.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

32.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

15.20

24.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

PRDS 10 bar steam consumption more

10.16

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

PRDS 10 bar steam consumption more

1.50

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

PRDS 10 bar steam consumption more

12.29

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

25.12.2015

5.20

5.20

5.00

4.90

6.30

15.33

9.05

PRDS 10 bar steam consumption more

2.72

25.12.2015

5.20

5.20

5.00

5.00

17.41

6.30

12.82

PRDS 10 bar steam consumption more

2.56

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

5.20

5.20

5.00

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

26.12.2015

5.20

5.20

5.10

5.00

15.30

6.30

7.00

PRDS 10 bar steam consumption more

1.40

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

PRDS 10 bar steam consumption more

30.40

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.80

27.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

PRDS 10 bar steam consumption more

13.60

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

28.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

PRDS 10 bar steam consumption more

6.30

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

PRDS 10 bar steam consumption more

13.60

29.12.2015

5.20

5.20

5.00

5.00

6.30

13.45

13.25

PRDS 10 bar steam consumption more

2.65

29.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

PRDS 10 bar steam consumption more

5.40

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

PRDS 10 bar steam consumption more

1.68

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

30.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

PRDS 10 bar steam consumption more

6.00

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

PRDS 10 bar steam consumption more

3.30

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

PRDS 10 bar steam consumption more

10.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

PRDS 10 bar steam consumption more

2.20

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

PRDS 10 bar steam consumption more

19.00

31.12.2015

5.20

5.20

5.10

5.00

6.30

9.45

3.25

PRDS 10 bar steam consumption more

0.65

31.12.2015

5.20

5.20

5.00

4.90

9.45

6.30

20.75

PRDS 10 bar steam consumption more

6.23

OTHERS/ PROCESS NOT CONFIRM / LINE BOILER HOUSE PROBLEM

1.02

3254.12

26.2.2015

5.20

5.20

5.00

5.00

7.00

8.50

1.83

Change module of bed temperature boiler 6 & 7 by


instrument

3.6.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

PLC failure

1.60

3.6.2015

5.20

5.20

0.00

0.00

3.22

6.37

3.25

PLC failure

16.90

3.6.2015

11.00

11.00

10.90

10.90

22.37

4.18

5.68

PLC failure

0.57

4.6.2015

5.20

5.20

0.00

0.00

6.37

9.15

2.63

PLC failure

13.69

TOTAL INSTRUMENT SHUTDOWN / BREAK DOWN

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

0.37

33.13

After normal increase load TG 2 as per


target
Decrease load TG2 after normal increase
again.
TG2 trip
Decrease load TG3 after normal increase
again.
TG2 trip

2.3.2015

5.30

5.20

5.10

5.00

13.09

13.23

0.23

Temperature winding high till 122 degree

0.05

3.3.2015

5.30

5.20

5.20

5.10

11.54

22.37

11.28

Temperature winding high on 122 degree

1.13

3.3.2015

5.20

5.20

5.00

5.00

24.09

6.37

5.53

Temperature winding high on 122 degree

1.11

6.3.2015

5.20

5.20

5.00

5.00

11.40

6.37

19.00

Winding temperatureTG 2 high on 122 degree

3.80

7.3.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Winding temperature high on 122 degree

1.60

15.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

16.3.2015

5.30

5.20

5.10

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

17.3.2015

5.30

5.20

4.70

4.70

22.37

6.37

8.00

Winding temperature high on 122 degree

4.00

19.3.2015

5.30

5.20

5.20

5.10

11.00

14.37

3.62

Winding temperature high on 122 degree

0.36

20.3.2015

5.20

5.20

5.00

4.90

23.00

5.00

6.00

Winding temperature high on 122 degree

1.80

23.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

24.3.2015

5.20

5.20

4.90

4.80

6.37

22.37

16.00

Winding temperature high on 122 degree

6.40

24.3.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

25.3.2015

5.20

5.20

4.90

4.80

6.37

11.58

5.35

Winding temperature high on 123 degree

2.14

25.3.2015

5.20

5.20

4.60

4.60

11.58

14.37

2.65

Winding temperature high on 123 degree

1.59

25.3.2015

5.20

5.20

5.00

5.00

14.37

6.37

16.00

Winding temperature high on 123 degree

3.20

26.3.2015

5.20

5.20

5.00

4.90

7.51

8.06

0.25

Winding temperature high on 123 degree

0.07

26.3.2015

5.20

5.20

4.90

4.80

8.06

22.37

14.52

Winding temperature high on 123 degree

5.81

26.3.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 123 degree

2.40

27.3.2015

5.20

5.20

5.00

4.90

6.37

9.42

3.08

Winding temperature high on 123 degree

0.93

27.3.2015

5.20

5.20

4.90

4.80

9.42

14.37

4.92

Winding temperature high on 123 degree

1.97

27.3.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

Winding temperature high on 123 degree

1.60

27.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

28.3.2015

5.20

5.20

5.00

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

28.3.2015

5.20

5.20

4.90

4.80

14.37

23.45

9.13

Winding temperature high on 123 degree

3.65

29.3.2015

5.20

5.20

4.80

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

Decrease load TG2 after normal increase


again. (Cleaning strainer water cooler no. 1
alternator TG 2)
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

29.3.2015

5.20

5.20

4.80

4.70

14.37

22.37

8.00

Winding temperature high on 123 degree

4.00

29.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

30.3.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

31.3.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

1.4.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

3.4.2015

5.20

5.20

5.10

5.00

6.37

7.13

0.60

Winding temperature high on 122 degree

0.12

3.4.2015

5.20

5.20

4.90

4.80

7.13

6.37

23.40

Winding temperature high on 122 degree

9.36

4.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

5.4.2016

5.20

5.20

4.80

4.70

6.37

22.37

16.00

Winding temperature high on 122 degree

8.00

8.4.2015

5.20

5.20

5.10

5.00

14.37

6.37

18.38

Winding temperature high on 122 degree

3.68

12.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

13.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

14.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

16.00

Winding temperature high on 122 degree

6.40

14.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

15.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

16.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

17.4.2015

5.20

5.20

4.90

4.80

6.37

8.55

2.30

Winding temperature high on 122 degree

0.92

17.4.2015

5.20

5.20

4.80

4.70

12.37

14.37

10.00

Winding temperature high on 122 degree

5.00

17.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

18.4.2015

5.20

5.20

5.10

5.00

6.37

8.32

1.92

Winding temperature high on 122 degree

0.38

18.4.2015

5.20

5.20

4.90

4.80

12.00

22.37

9.55

Winding temperature high on 122 degree

3.82

18.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

19.4.2015

5.20

5.20

5.10

5.00

6.37

10.07

3.50

Winding temperature high on 122 degree

0.70

19.4.2015

5.20

5.20

5.00

4.90

10.07

11.03

0.93

Winding temperature high on 122 degree

0.28

19.4.2015

5.20

5.20

4.90

4.80

11.03

16.50

5.78

Winding temperature high on 122 degree

2.31

19.4.2015

5.20

5.20

5.00

5.00

16.50

6.37

13.78

Winding temperature high on 122 degree

2.76

20.4.2015

5.20

5.20

5.00

4.90

6.37

14.55

8.30

Winding temperature high on 122 degree

2.49

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 2 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

20.4.2015

5.20

5.20

5.10

5.00

17.58

22.37

4.68

Winding temperature high on 122 degree

0.94

20.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

21.4.2015

5.20

5.20

4.90

4.80

6.37

19.27

12.83

Winding temperature high on 122 degree

5.13

21.4.2015

5.20

5.20

5.00

4.90

19.27

6.37

11.17

Winding temperature high on 122 degree

3.35

22.4.2015

5.20

5.20

4.90

4.80

6.37

20.08

13.52

Winding temperature high on 122 degree

5.41

23.4.2015

5.20

5.20

4.90

4.90

6.37

8.00

1.62

Winding temperature high on 122 degree

0.49

23.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

25.4.2015

5.20

5.20

4.90

4.80

14.37

6.37

16.00

Winding temperature high on 122 degree

6.40

26.4.2015

5.20

5.20

4.80

4.80

13.25

6.37

17.20

Winding temperature high on 122 degree

6.88

5.5.2015

5.20

5.20

4.80

4.70

17.57

18.26

1.52

Winding temperature high on 122 degree

0.76

5.5.2015

5.20

5.20

5.00

4.90

20.28

22.37

1.85

Winding temperature high on 122 degree

0.56

5.5.2015

5.20

5.20

4.90

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

6.5.2015

5.20

5.20

5.00

4.90

6.37

9.44

2.88

Winding temperature high on 122 degree

0.87

6.5.2015

5.20

5.20

4.90

4.80

9.44

12.12

2.47

Winding temperature high on 122 degree

0.99

6.5.2015

5.20

5.20

4.80

4.70

12.12

22.37

10.42

Winding temperature high on 122 degree

5.21

6.5.2015

5.20

5.20

5.00

4.90

22.37

0.04

1.45

Winding temperature high on 122 degree

0.44

15.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

16.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

17.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

18.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

19.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

20.5.2015

5.20

5.20

4.70

4.60

6.37

5.20

22.72

Winding temperature high on 122 degree

13.63

20.5.2015

5.20

5.20

4.40

4.40

5.20

6.37

1.28

Winding temperature high on 122 degree

1.03

2.6.2015

5.20

5.20

5.00

4.90

6.37

0.34

17.95

Winding temperature high on 122 degree

5.39

2.6.2015

5.20

5.20

4.90

4.80

0.34

5.02

4.47

Winding temperature high on 122 degree

1.79

2.6.2015

5.20

5.20

5.10

5.00

5.02

6.37

1.42

Winding temperature high on 122 degree

0.28

29.6.2015

5.20

5.20

5.20

5.10

6.37

10.10

3.55

Temperature journal turbine NDE bearing high

0.36

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

29.6.2015

5.20

5.20

4.90

4.80

10.10

10.58

0.80

Temperature journal turbine NDE bearing high

0.32

29.6.2015

5.20

5.20

5.20

5.10

10.58

14.37

3.65

Temperature journal turbine NDE bearing high

0.37

29.6.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Temperature journal turbine NDE bearing high

0.80

1.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

2.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

3.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

4.7.2015

5.20

5.20

5.20

5.10

6.30

5.30

23.00

Winding temperature high

2.30

4.7.2015

5.20

5.20

5.20

5.10

6.00

6.30

0.50

Winding temperature high

0.05

5.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

7.7.2019

5.20

5.20

5.10

5.00

6.30

13.48

7.30

Winding temperature high

1.46

7.7.2020

5.20

5.20

4.50

4.50

13.48

14.06

0.30

SPG L-4 decrease steam consumption.

0.21

7.7.2021

5.20

5.20

5.10

5.00

14.06

14.30

0.40

Winding temperature high

0.08

7.7.2022

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

8.7.2015

5.20

5.20

4.80

4.70

6.30

7.20

0.83

Winding temperature high

0.42

8.7.2015

5.20

5.20

5.10

5.00

7.20

12.00

4.67

Winding temperature high

0.93

8.7.2015

5.20

5.20

5.00

4.90

12.00

6.30

18.50

Winding temperature high

5.55

10.7.2015

5.20

5.20

5.10

5.00

6.30

10.54

4.23

Winding temperature high

0.85

10.7.2015

5.20

5.20

5.00

4.90

10.54

12.44

1.82

Winding temperature high

0.55

10.7.2015

5.20

5.20

4.90

4.80

12.44

13.08

0.40

Winding temperature high

0.16

10.7.2015

5.20

5.20

4.80

4.70

13.08

14.30

1.37

Winding temperature high

0.68

10.7.2015

5.20

5.20

5.10

5.00

15.37

15.41

0.07

Winding temperature high

0.01

10.7.2015

5.20

5.20

5.20

5.10

15.42

18.12

2.50

Winding temperature high

0.25

10.7.2015

5.20

5.20

5.10

5.00

18.12

6.30

13.30

Winding temperature high

2.66

11.7.2015

5.20

5.20

5.10

5.00

12.04

14.30

2.43

Winding temperature high

0.49

11.7.2015

5.20

5.20

5.20

5.10

14.30

15.02

0.53

Winding temperature high

0.05

11.7.2015

5.20

5.20

5.10

5.00

15.02

21.33

6.52

Winding temperature high

1.30

11.7.2015

5.20

5.20

5.20

5.10

21.33

6.30

8.95

Winding temperature high

0.90

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

12.7.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

Winding temperature high

3.20

12.7.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Winding temperature high

0.80

13.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Winding temperature high

4.80

14.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Winding temperature high

4.80

15.7.2015

5.20

5.20

5.10

5.00

6.30

16.45

10.25

Winding temperature high

2.05

15.7.2015

5.20

5.20

5.10

5.00

17.43

6.30

12.78

Winding temperature high

2.56

16.7.2015

5.20

5.20

5.10

5.00

6.30

10.56

4.43

Winding temperature high

0.89

16.7.2015

5.20

5.20

5.00

4.90

10.56

14.30

3.57

Winding temperature high

1.07

16.7.2015

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

17.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

Winding temperature high

7.20

18.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

Winding temperature high

7.20

19.7.2015

5.20

5.20

5.00

4.90

6.30

10.40

4.17

Winding temperature high

1.25

19.7.2015

5.20

5.20

4.90

4.80

10.40

13.22

2.70

Winding temperature high

1.08

19.7.2015

5.20

5.20

5.00

4.90

13.22

14.59

1.62

Winding temperature high

0.49

19.7.2015

5.20

5.20

4.90

4.80

14.59

22.30

7.52

Winding temperature high

3.01

19.7.2015

5.20

5.20

5.00

4.90

22.30

6.30

8.00

Winding temperature high

2.40

20.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

21.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

22.7.2015

5.20

5.20

4.90

4.80

6.30

14.39

8.15

Winding temperature high

3.26

22.7.2015

5.20

5.20

4.80

4.70

14.39

19.23

4.73

Winding temperature high

2.37

22.7.2015

5.20

5.20

4.90

4.80

19.23

6.30

11.12

Winding temperature high

4.45

23.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

24.7.2015

5.20

5.20

4.90

4.80

6.30

12.30

6.00

Winding temperature high

2.40

24.7.2015

5.20

5.20

4.80

4.70

12.30

14.30

2.00

Winding temperature high

1.00

24.7.2015

5.20

5.20

4.90

4.80

14.30

6.30

16.00

Winding temperature high

6.40

25.7.2015

5.20

5.20

4.90

4.80

6.30

9.40

3.17

Winding temperature high

1.27

25.7.2015

5.20

5.20

4.60

4.50

9.40

13.45

4.08

Winding temperature high

2.86

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

25.7.2015

5.20

5.20

4.80

4.70

13.45

4.45

15.00

Winding temperature high

7.50

25.7.2015

5.20

5.20

4.60

4.50

4.45

6.30

1.75

L-4 decrease steam consumption & Winding


temperature high

1.23

26.7.2016

5.20

5.20

4.70

4.60

6.30

14.30

8.00

Winding temperature high

4.80

26.7.2017

5.20

5.20

4.60

4.50

14.30

19.10

4.67

Winding temperature high

3.27

26.7.2018

5.20

5.20

4.70

4.60

19.10

20.40

1.50

Winding temperature high

0.90

26.7.2019

5.20

5.20

4.80

4.70

20.40

6.30

9.83

Winding temperature high

4.92

27.7.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

Winding temperature high

5.60

27.7.2015

5.20

5.20

4.00

3.90

15.29

16.39

1.17

Winding temperature high

1.52

27.7.2015

5.20

5.20

4.80

4.70

17.17

21.22

4.08

Winding temperature high

2.04

27.7.2015

5.20

5.20

4.70

4.60

21.22

6.30

7.97

Winding temperature high

4.78

28.7.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

16.80

29.7.2015

5.20

5.20

4.60

4.60

6.30

22.30

16.00

Winding temperature high

9.60

29.7.2015

5.20

5.20

4.70

4.70

22.30

6.30

8.00

Winding temperature high

4.00

30.7.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

Winding temperature high

4.00

30.7.2015

5.20

5.20

4.70

4.60

14.30

6.30

16.00

Winding temperature high

9.60

31.7.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

Winding temperature high

14.40

1.8.2015

5.20

5.20

4.70

4.60

6.30

10.40

4.17

Winding temperature high

2.50

1.8.2015

5.20

5.20

4.50

4.40

10.40

14.30

3.83

Winding temperature high

3.06

1.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

2.8.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

16.80

3.8.2015

5.20

5.20

4.50

4.50

6.30

14.30

8.00

Winding temperature high

5.60

3.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

4.8.2015

5.20

5.20

4.50

4.40

6.30

13.30

7.00

Winding temperature high

5.60

4.8.2015

5.20

5.20

4.00

4.00

13.30

17.40

4.17

Winding temperature high

5.00

4.8.2015

5.20

5.20

4.60

4.50

17.40

6.30

12.83

Winding temperature high

8.98

5.8.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

Winding temperature high

19.20

6.8.2015

5.20

5.20

4.40

4.40

6.30

6.30

24.00

Winding temperature high

19.20

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

7.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

8.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

9.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

10.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

11.8.2015

5.20

5.20

4.30

4.30

6.30

14.30

8.00

Winding temperature high

7.20

11.8.2015

5.20

5.20

4.20

4.10

14.30

16.15

1.75

Winding temperature high

1.93

11.8.2015

5.20

5.20

4.30

4.30

16.15

6.30

14.25

Winding temperature high

12.83

12.8.2015

5.20

5.20

4.30

4.20

6.30

14.30

8.00

Winding temperature high

8.00

13.8.2015

5.20

5.20

0.00

0.00

7.15

17.15

10.00

TG2 shutdown (cleaning alternator cooler & oil


cooler)

52.00

13.8.2015

5.20

5.20

5.00

5.00

17.15

6.30

13.25

Observation after shutdown

2.65

14.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Observation after shutdown

4.80

15.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

16.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

17.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

18.8.2015

5.20

5.20

5.10

5.00

6.30

15.34

9.07

18.8.2015

5.20

5.20

5.10

5.00

16.41

6.30

13.75

19.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

20.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

21.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

22.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

23.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

24.8.2015

20.20

20.20

20.14

19.97

22.30

6.30

8.00

24.8.2015

5.20

5.20

5.10

5.00

6.30

9.03

2.55

24.8.2015

5.20

5.20

5.10

5.00

18.44

6.30

11.77

25.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.11.2015

5.20

5.20

0.00

0.00

7.40

15.40

8.00

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balance condenser flow & LP
actuator TG 3 & TG 4
Boiler 6 O/H, L1- shutdown (PMJ : TG2 Alternator
cooler cleaning)

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG2 stop (shutdown)
Monitoring load and winding temperature
TG2
Monitoring load and winding temperature
TG2

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

1.81

load TG2 keep 5 MW

2.75

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

1.84

Decrease load TG4 after normal increase


again.

0.51

load TG2 keep 5 MW

2.35

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

41.60

TG2 stop

TOTAL TG 2 PROBLEM (SHUTDOWN / BREAK DOWN)

906.81

21.2.2015

11.00

11.00

10.60

10.50

13.50

14.37

0.78

Vaccum TG3 droop

0.39

25.2.2015

11.00

10.90

10.80

10.80

14.41

18.05

3.40

Vaccum pressure TG3 droop

0.34

3.3.2015

11.00

11.00

10.80

10.80

9.00

9.38

0.63

Vaccum pressure TG3 droop < - 0.7 bar

0.13

3.3.2015

10.80

10.80

10.60

10.60

9.38

11.48

1.83

Vaccum pressure TG3 droop < - 0.7 bar

0.37

3.3.2015

10.80

10.80

10.60

10.60

11.48

14.37

3.18

Vaccum pressure TG3 droop < - 0.7 bar

0.64

6.3.2015

11.00

11.00

10.70

10.70

4.32

6.37

1.92

Vaccum pressure TG3 droop < - 0.7 bar

0.58

8.3.2015

11.00

11.00

10.70

10.70

6.37

13.22

6.75

Vaccum pressure TG3 droop

2.03

15.3.2015

11.00

11.00

10.80

10.80

6.37

14.37

8.00

Vaccum pressure TG3 droop

1.60

15.3.2015

10.80

10.80

10.50

10.50

14.37

6.37

16.00

Vaccum pressure TG3 droop

4.80

16.3.2015

11.00

11.00

10.60

10.50

6.37

14.37

8.00

Vaccum pressure TG3 droop

4.00

16.3.2015

11.00

11.00

10.80

10.70

14.37

22.37

8.00

Vaccum pressure TG3 droop

2.40

16.3.2015

11.00

11.00

10.90

10.80

22.37

6.37

8.00

Vaccum pressure TG3 droop

1.60

17.3.2015

11.00

11.00

10.80

10.70

6.37

10.37

4.00

Vaccum pressure TG3 droop

1.20

17.3.2015

10.80

10.70

10.20

10.20

10.37

14.37

4.00

Vaccum pressure TG3 droop

2.00

17.3.2015

10.50

10.50

8.50

8.50

22.37

6.37

8.00

Vaccum pressure TG3 droop

16.00

18.3.2015

11.00

11.00

0.00

0.00

8.37

6.37

22.00

TG3 stop for cleaning condenser & modification jobs.

242.00

19.3.2015

11.00

11.00

0.00

0.00

6.37

6.37

24.00

TG3 stop for cleaning condenser & modification jobs.

264.00

20.3.2015

11.00

11.00

10.50

10.50

22.50

5.00

6.17

2.4.2015

11.00

11.00

10.50

10.50

6.37

8.00

2.62

2.4.2015

11.00

11.00

8.00

8.00

8.00

10.00

2.00

2.4.2015

11.00

11.00

5.20

5.20

10.00

16.00

4.00

2.4.2015

11.00

11.00

5.50

5.50

16.00

18.44

2.73

2.4.2015

11.00

11.00

7.30

7.30

18.44

21.20

2.57

2.4.2015

11.00

11.00

9.00

9.00

21.20

22.00

1.33

2.4.2015

11.00

11.00

9.30

9.30

22.00

22.37

0.62

2.4.2015

11.00

11.00

10.80

10.80

22.37

6.37

8.00

3.08
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)

1.31
6.00
23.20
15.03
9.50
2.67
1.05
1.60

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Planning 2 daysfinish the job and start up
again
TG3 stop. If breakdown finish TG3 start
again.
Decrease load TG3.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

Pressure vacum TG3 drop & Repairing support pipe


line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300

26.5.2015

5.20

5.20

5.10

5.00

12.10

14.37

1.55

0.31

26.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

26.5.2015

5.20

5.20

5.00

4.90

22.37

1.00

2.38

26.5.2015

5.20

5.20

4.80

4.70

1.00

4.54

3.90

26.5.2015

5.20

5.20

4.90

4.80

4.55

5.14

1.68

26.5.2015

5.20

5.20

5.00

4.90

5.15

6.37

1.37

26.5.2015

11.20

11.20

11.00

10.90

13.10

14.00

0.83

26.5.2015

11.20

11.20

10.00

10.00

14.37

5.53

15.27

26.5.2015

11.20

11.20

10.20

10.20

5.53

6.37

0.73

27.5.2015

5.20

5.20

4.80

4.70

6.37

10.37

4.00

27.5.2015

5.20

5.20

4.70

4.60

10.37

14.37

4.00

27.5.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

27.5.2015

5.20

5.20

5.10

5.10

22.37

6.37

8.00

27.5.2015

11.00

11.00

10.20

10.20

6.37

10.37

4.00

27.5.2015

11.00

11.00

9.90

9.80

10.37

14.37

4.00

27.5.2015

11.00

11.00

9.10

9.10

14.37

22.37

8.00

27.5.2015

11.00

11.00

10.70

10.70

22.37

23.00

8.00

31.5.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Pressure vacum TG3 drop

1.60

31.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

Pressure vacum TG3 drop

3.20

31.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Pressure vacum TG3 drop

4.00

1.6.2015

5.20

5.20

4.80

4.70

13.30

14.37

1.12

Pressure vacum TG3 drop

0.56

1.6.2015

5.20

5.20

4.90

4.80

14.37

14.46

0.15

Pressure vacum TG3 drop

0.06

1.6.2015

5.20

5.20

4.80

4.70

14.46

17.00

2.23

Pressure vacum TG3 drop

1.12

1.6.2015

5.20

5.20

4.90

4.80

17.00

19.24

2.40

Pressure vacum TG3 drop

0.96

1.6.2015

5.20

5.20

5.00

4.90

19.24

6.37

10.78

Pressure vacum TG3 drop

3.24

1.6.2015

11.00

11.00

9.00

8.90

13.30

15.47

2.28

Pressure vacum TG3 drop

4.80

1.6.2015

11.00

11.00

8.50

8.50

15.47

17.10

1.38

Pressure vacum TG3 drop

3.46

3.20
0.72
1.95
0.67
0.41
0.25
18.32
0.73
2.00
2.40
1.60
0.80
3.20
4.80
15.20
2.40

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

2.6.2015

11.00

11.00

10.80

10.80

23.23

6.37

7.23

Pressure vacum TG3 drop

1.45

13.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

condensate get high & vacum drop & Winding get


high

24.00

14.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

vacum drop

24.00

15.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

17.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

18.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

19.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

20.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

21.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

22.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

23.6.2015

11.00

11.00

10.00

10.00

6.37

15.56

9.32

23.6.2015
24.6.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

15.56
6.37

6.37
6.37

25.6.2015

11.00

11.00

0.00

0.00

6.37

8.7.2015

11.00

11.00

10.90

10.90

8.7.2015

11.00

11.00

10.80

16.7.2015

11.00

11.00

27.8.2015

11.00

3.9.2015

14.68
24.00

condensate get high & vacum drop & Winding get


high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
TG3 shutdown
TG3 shutdown

161.48
264.00

9.35

2.97

TG3 start up & Syncronize power

32.63

6.30

8.15

1.75

10.80

16.00

6.30

9.50

PPL2 request decrease load TG3 (LP TG4 100%)

1.90

11.00

10.90

8.14

14.30

6.27

Inlet flow steam high

0.63

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

11.00

11.00

10.50

10.50

6.30

7.58

1.47

Effeci L-4, PRDS 10 bar steam consumption more

0.73

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

Effeci L-4, PRDS 10 bar steam consumption more

0.25

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

Effeci L-4, PRDS 10 bar steam consumption more

0.50

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

Effeci L-4, PRDS 10 bar steam consumption more

3.78

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

Effeci L-4, PRDS 10 bar steam consumption more

0.86

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

Effeci L-4, PRDS 10 bar steam consumption more

9.53

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

PRDS 10 bar steam consumption more (effect L-4)

0.00

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

PRDS 10 bar steam consumption more (effect L-4)

27.75

9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

PRDS 10 bar steam consumption more (effect L-4)

2.38

21.60
21.60
24.00
24.00
21.60
21.60
24.00
9.32

0.18

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 stop
TG3 stop
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

PRDS 10 bar steam consumption more (effect L-4)

7.20

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-4)

6.40

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

3.75

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

4.40

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

PRDS 10 bar steam consumption more

2.01

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

55.20

27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

5.60

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

PRDS 10 bar steam consumption more

3.48

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

PRDS 10 bar steam consumption more

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

PRDS 10 bar steam consumption more

16.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

PRDS 10 bar steam consumption more

5.56

29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

1.50

2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

PRDS 10 bar steam consumption more

11.20

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.80

3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

PRDS 10 bar steam consumption more

11.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

PRDS 10 bar steam consumption more

24.00

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

27.8.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

7.00

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

14.67

14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

PRDS 10 bar steam consumption more

4.07

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

PRDS 10 bar steam consumption more

12.87

15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

7.20

16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

PRDS 10 bar steam consumption more

0.30

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

13.00

17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

PRDS 10 bar steam consumption more

8.80

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

PRDS 10 bar steam consumption more

2.82

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.80

22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

PRDS 10 bar steam consumption more

3.92

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

PRDS 10 bar steam consumption more

1.45

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

PRDS 10 bar steam consumption more

2.03

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

12.00

23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

PRDS 10 bar steam consumption more

1.40

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

PRDS 10 bar steam consumption more

1.67

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

PRDS 10 bar steam consumption more

2.43

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

PRDS 10 bar steam consumption more

3.70

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

PRDS 10 bar steam consumption more

2.71

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

PRDS 10 bar steam consumption more

11.34

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

PRDS 10 bar steam consumption more

1.84

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

PRDS 10 bar steam consumption more

10.95

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

13.60

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

PRDS 10 bar steam consumption more

24.00

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

PRDS 10 bar steam consumption more

1.75

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

PRDS 10 bar steam consumption more

14.35

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

PRDS 10 bar steam consumption more

0.08

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

4.80

30.10.2015

11.00

11.00

9.60

9.60

21.24

6.30

9.10

PRDS 10 bar steam consumption more

12.74

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

3.20

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

24.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

PRDS 10 bar steam consumption more

4.04

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

PRDS 10 bar steam consumption more

6.46

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

PRDS 10 bar steam consumption more

12.27

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

4.50

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

PRDS 10 bar steam consumption more

6.50

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

PRDS 10 bar steam consumption more

22.40

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

PRDS 10 bar steam consumption more

16.68

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

PRDS 10 bar steam consumption more

2.00

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

PRDS 10 bar steam consumption more

9.60

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

PRDS 10 bar steam consumption more

22.40

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

PRDS 10 bar steam consumption more

1.40

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

4.20

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

PRDS 10 bar steam consumption more

27.90

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

PRDS 10 bar steam consumption more

5.80

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

16.11.2015

11.00

11.00

9.70

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

PRDS 10 bar steam consumption more

16.61

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

10.62

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

PRDS 10 bar steam consumption more

5.25

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

PRDS 10 bar steam consumption more

0.62

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

PRDS 10 bar steam consumption more

1.10

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

PRDS 10 bar steam consumption more

1.51

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

PRDS 10 bar steam consumption more

1.30

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

PRDS 10 bar steam consumption more

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

PRDS 10 bar steam consumption more

5.07

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

PRDS 10 bar steam consumption more

2.32

05.12.2015

11.00

11.00

9.80

9.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

10.40

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

16.00

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

PRDS 10 bar steam consumption more

0.37

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

PRDS 10 bar steam consumption more

9.16

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

PRDS 10 bar steam consumption more

46.40

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

PRDS 10 bar steam consumption more

7.15

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

PRDS 10 bar steam consumption more

4.97

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

PRDS 10 bar steam consumption more

57.39

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

31.00

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

PRDS 10 bar steam consumption more

2.98

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

PRDS 10 bar steam consumption more

48.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

20.00

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

PRDS 10 bar steam consumption more

26.45

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

PRDS 10 bar steam consumption more

16.15

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

PRDS 10 bar steam consumption more

18.75

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

PRDS 10 bar steam consumption more

7.10

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

PRDS 10 bar steam consumption more

0.70

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

PRDS 10 bar steam consumption more

6.52

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

PRDS 10 bar steam consumption more

12.60

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

PRDS 10 bar steam consumption more

20.50

PRDS 10 bar steam consumption more


(Temperature vaccum high)
PRDS 10 bar steam consumption more
(Temperature vaccum high)

9.80
1.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

32.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

15.20

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

PRDS 10 bar steam consumption more

10.16

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

PRDS 10 bar steam consumption more

1.50

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

PRDS 10 bar steam consumption more

12.29

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

PRDS 10 bar steam consumption more

30.40

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.80

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

PRDS 10 bar steam consumption more

13.60

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

PRDS 10 bar steam consumption more

6.30

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

PRDS 10 bar steam consumption more

13.60

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

PRDS 10 bar steam consumption more

5.40

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

PRDS 10 bar steam consumption more

1.68

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

PRDS 10 bar steam consumption more

6.00

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

PRDS 10 bar steam consumption more

3.30

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

PRDS 10 bar steam consumption more

10.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

PRDS 10 bar steam consumption more

2.20

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

PRDS 10 bar steam consumption more

19.00

TOTAL TG 3 PROBLEM (SHUTDOWN / BREAK DOWN)

4048.89

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

26.2.2015

18.35

18.02

13.90

13.80

8.50

16.00

7.83

Cleaning online 1/2 condenser TG4 (Note and for


attention : When load already normal on 19.49 MW
after cleaning online 1/2 condenser as per target
wending temperature on 116 degree alarm and axial
come on 10 - 11 mills alarm)

23.3.2015

20.44

20.31

19.45

19.30

10.25

11.09

0.73

CEP cleaning

11.4.2015

20.49

20.36

11.00

11.00

8.00

6.37

22.38

TG4 radial vibration indicate high on HP bearing

209.48

12.4.2015

20.49

20.36

11.00

11.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

224.64

13.4.2015

20.49

20.36

12.23

12.15

6.37

19.25

8.20

TG4 radial vibration indicate high on HP bearing

67.32

13.4.2015

20.49

20.36

0.00

0.00

19.25

6.37

15.80

TG4 radial vibration indicate high on HP bearing

321.69

14.4.2015

20.49

20.36

0.00

0.00

6.37

14.26

7.82

TG4 radial vibration indicate high on HP bearing

159.15

14.4.2015

20.49

20.36

7.00

7.00

14.26

15.51

1.42

TG4 radial vibration indicate high on HP bearing

18.93

14.4.2015

20.49

20.36

0.00

0.00

15.51

6.37

14.77

TG4 radial vibration indicate high on HP bearing

300.72

15.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

488.64

16.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

488.64

16.6.2015

19.75

19.60

19.20

19.10

12.00

17.00

5.00

Winding temperature TG get high

2.50

18.6.2015
20.6.2015

19.75
19.50

19.70
19.40

19.20
19.20

19.10
19.00

12.00
11.00

17.00
17.00

6.00
6.00

Winding Temp. Tg 4 get high 117,5 degree


Winding Temp. Tg 4 get high 117,5 degree

3.60
2.40

21.6.2015

19.50

19.40

19.20

19.10

11.00

17.00

6.00

winding temperature alternator TG 4 high

1.80

23.6.2015

19.61

19.58

19.18

19.03

13.30

14.30

1.00

winding temperature alternator TG 4 high

0.55

27.6.2015

19.40

19.30

18.90

18.80

11.00

17.00

6.00

winding temperature alternator TG 4 high

3.00

28.6.2015

19.40

19.30

19.10

18.90

11.00

17.00

6.00

winding temperature alternator TG 4 high

2.40

29.6.2015

19.40

19.30

18.96

18.67

8.30

14.30

6.00

29.6.2015

19.40

19.30

18.83

18.51

14.30

22.30

8.00

29.6.2015

19.40

19.30

18.96

18.86

22.30

6.30

8.00

30.6.2015
30.6.2015
2.7.2015
5.7.2015
5.7.2015

19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30

19.01
19.44
19.35
0.00
10.14

18.91
19.25
19.17
0.00
10.10

6.30
14.30
6.30
6.30
1.21

14.30
6.30
14.30
1.21
6.30

6.7.2015

19.40

19.30

10.62

10.53

6.30

6.7.2015

19.40

19.30

11.50

11.40

6.7.2015

19.40

19.30

12.14

12.06

33.06

0.74

8.00
16.00
8.00
18.85
5.15

Fan C/T no. 1 stop & winding temperature alternator


TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Clening condenser TG4
TG4 start up & Syncronize power

3.12
0.80
1.04
363.81
47.38

10.30

4.00

Cleaning online 1/2 condenser TG4

35.08

10.30

13.30

3.00

L-2 break down & Cleaning online 1/2 condenser


TG4

23.70

13.30

14.30

1.00

Cleaning online 1/2 condenser TG4

7.24

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5
After normal increase load TG 4 as per
target (control max. 117.5 degree)
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5 and
planning change cooling tower water with
filter water

3.78

Control winding temprature max. 117.5

6.32

Control winding temprature max. 117.5

3.52

Control winding temprature max. 117.5


Control winding temprature max. 117.5
Control winding temprature max. 117.5
Control winding temprature max. 117.5
TG4 stop
Monitoring syncronize
Decrease load TG4 after normal increase
again.
TG4 restricted load due to cleaning
condenser cell 1 phase
Decrease load TG4 after normal increase
again.

10.50

Winding temperature high 117 degree (Boiler 131


T/H and suplly steam bleed is 13 T/H)
Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
TG4 oil leakage from High Speed coupling guard

210.00

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
TG4 stop

7.92

TG4 oil leakage from High Speed coupling guard

158.33

TG4 stop

14.30

8.00

TG4 oil leakage from High Speed coupling guard

8.32

6.30

16.00

TG4 oil leakage from High Speed coupling guard

16.00

1.57

6.7.2015

19.40

19.30

13.40

1.36

14.30

22.30

8.00

Cleaning online 1/2 condenser TG4

143.52

6.7.2015

19.40

19.30

14.14

14.09

22.30

6.30

8.00

Cleaning online 1/2 condenser TG4

41.68

6.7.2015

11.00

11.00

10.80

10.80

10.10

10.40

0.50

Cleaning online 1/2 condenser TG4

0.10

6.7.2015

11.00

11.00

10.00

10.00

10.40

14.30

3.83

Cleaning online 1/2 condenser TG4

3.83

6.7.2015

11.00

11.00

10.50

10.50

14.30

6.30

16.00

Cleaning online 1/2 condenser TG4

8.00

6.7.2015

5.20

5.20

5.20

5.10

6.30

9.13

2.72

Cleaning online 1/2 condenser TG4

0.27

6.7.2015

5.20

5.20

4.90

4.80

9.13

10.24

1.18

Cleaning online 1/2 condenser TG4

0.47

6.7.2015

5.20

5.20

4.00

4.00

10.24

13.30

3.10

L-2 break down

3.72

6.7.2015

5.20

5.20

5.20

5.10

13.30

22.30

9.00

Cleaning online 1/2 condenser TG4

0.90

7.7.2015

19.40

19.30

15.80

14.83

6.30

10.00

3.50

Cleaning online 1/2 condenser TG4

15.65

7.7.2016

11.00

11.00

10.50

10.50

6.30

11.22

4.87

Cleaning online 1/2 condenser TG4

2.43

23.8.2015

20.20

20.20

20.18

19.90

6.30

6.30

24.00

25.8.2015

20.40

20.40

20.26

20.19

6.30

14.30

8.00

22.9.2015

20.20

20.00

0.00

0.00

20.00

6.30

23.9.2015

20.20

20.00

0.00

0.00

6.30

14.25

24.9.2015

20.20

20.00

19.14

18.96

6.30

24.9.2015

20.20

20.00

19.14

19.00

14.30

TOTAL TG 4 PROBLEM (SHUTDOWN / BREAK DOWN)

7.20
1.68

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.

3447.14

26.2.2015

5.00

5.00

4.80

4.80

8.50

16.00

7.83

Balancing FD Fan "B" boiler 8 & cleaning online 1/2


condenser TG4

5.4.2015

20.49

20.36

18.18

17.93

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

19.44

5.4.2017

5.20

5.20

3.50

3.40

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

14.40

5.4.2015

11.00

11.00

7.00

7.00

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

32.00

After normal increase load TG 2 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target

6.4.2015

20.49

20.36

18.98

18.85

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

36.24

6.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

6.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

7.4.2015

20.49

20.36

18.27

18.06

6.37

14.37

8.00

Boiler 8 breakdown (inbed tube leakage)

18.40

7.4.2015

20.49

20.36

18.40

18.20

14.37

22.37

8.00

Boiler 8 breakdown (inbed tube leakage)

17.28

7.4.2015

20.49

20.36

18.53

18.42

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

15.52

7.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

7.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

8.4.2015

5.20

5.20

3.50

3.40

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

10.11

8.4.2015

11.00

11.00

7.00

6.90

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

23.04

27.4.2015

20.50

20.50

17.80

17.50

14.19

14.37

0.30

Boiler 8 overhaul

0.90

27.4.2015

20.50

20.50

18.31

18.30

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

20.50

20.50

20.01

19.86

22.37

6.37

8.00

Boiler 8 overhaul

5.12

27.4.2015

5.20

5.20

4.80

4.80

6.37

14.15

7.63

Boiler 8 overhaul

3.05

27.4.2015

5.20

5.20

3.30

3.20

14.15

14.37

0.37

Boiler 8 overhaul

0.73

27.4.2015

5.20

5.20

3.10

3.00

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

5.20

5.20

3.40

3.30

22.37

6.37

8.00

Boiler 8 overhaul

15.20

27.4.2015

11.00

11.00

6.70

6.70

14.15

14.37

0.37

Boiler 8 overhaul

1.58

27.4.2015

11.00

11.00

6.80

6.70

14.37

22.37

8.00

Boiler 8 overhaul

34.40

27.4.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

20.33

20.30

18.35

18.28

12.00

22.37

10.62

Boiler 8 overhaul

21.45

28.4.2015

20.33

20.30

18.18

18.09

22.37

6.37

8.00

Boiler 8 overhaul

17.68

28.4.2015

5.20

5.20

3.30

3.20

6.37

22.37

16.00

Boiler 8 overhaul

32.00

28.4.2015

5.20

5.20

3.20

3.10

22.37

6.37

8.00

Boiler 8 overhaul

16.80

28.4.2015

11.00

11.00

6.70

6.70

6.37

14.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

11.00

11.00

6.80

6.80

14.37

22.37

8.00

Boiler 8 overhaul

33.60

28.4.2015

11.00

11.00

6.60

6.50

22.37

6.37

8.00

Boiler 8 overhaul

36.00

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

29.4.2015

20.33

20.30

18.61

18.47

6.37

14.37

8.00

Boiler 8 overhaul

14.64

29.4.2015

20.33

20.33

17.66

17.53

14.37

6.37

16.00

Boiler 8 overhaul

44.80

29.4.2015

5.20

5.20

3.20

3.20

6.37

6.37

24.00

Boiler 8 overhaul

48.00

29.4.2015

11.00

11.00

6.30

6.20

6.37

14.37

8.00

Boiler 8 overhaul

38.40

29.4.2015

11.00

11.00

6.40

6.40

14.37

15.10

0.55

Boiler 8 overhaul

2.53

29.4.2015

11.00

11.00

6.60

6.60

15.10

6.37

15.45

Boiler 8 overhaul

67.98

30.4.2015

20.33

20.33

17.23

17.05

6.37

14.37

8.00

Boiler 8 overhaul

26.24

30.4.2015

20.33

20.33

17.50

17.49

14.37

22.37

8.00

Boiler 8 overhaul

22.72

30.4.2015

20.33

20.33

17.35

17.22

22.37

6.37

8.00

Boiler 8 overhaul

24.88

30.4.2015

5.20

5.20

3.10

3.10

6.37

22.37

16.00

Boiler 8 overhaul

33.60

30.4.2015

5.20

5.20

3.30

3.20

22.37

6.37

8.00

Boiler 8 overhaul

16.00

30.4.2015

11.00

11.00

6.60

6.50

6.37

6.37

24.00

Boiler 8 overhaul

108.00

1.5.2015

20.33

20.33

17.18

17.07

6.37

14.37

8.00

Boiler 8 overhaul

26.08

1.5.2015

20.33

20.33

17.31

17.15

14.37

6.37

16.00

Boiler 8 overhaul

50.88

1.5.2015

5.20

5.20

3.30

3.20

6.37

13.37

7.00

Boiler 8 overhaul

14.00

1.5.2015

5.20

5.20

2.20

2.20

13.37

6.37

17.00

Boiler 8 overhaul

51.00

1.5.2015

11.00

11.00

6.60

6.50

6.37

13.37

7.00

Boiler 8 overhaul

31.50

1.5.2015

11.00

11.00

6.00

6.00

13.30

6.37

17.00

Boiler 8 overhaul

85.00

2.5.2015

20.33

20.33

17.49

17.24

6.37

14.37

8.00

Boiler 8 overhaul

24.72

2.5.2015

20.33

20.33

18.36

18.16

14.37

22.37

8.00

Boiler 8 overhaul

17.36

2.5.2015

20.33

20.33

17.90

17.80

22.37

6.37

8.00

Boiler 8 overhaul

20.24

2.5.2015

5.20

5.20

2.20

2.10

6.37

6.37

24.00

Boiler 8 overhaul

74.40

2.5.2015

11.00

11.00

6.00

6.00

6.37

6.37

24.00

Boiler 8 overhaul

120.00

3.5.2015

20.33

20.33

18.27

18.24

6.37

14.37

8.00

Boiler 8 overhaul

16.72

3.5.2015

20.33

20.33

17.71

17.45

14.37

22.37

8.00

Boiler 8 overhaul

23.04

3.5.2015

20.33

20.33

17.71

17.58

22.37

6.37

8.00

Boiler 8 overhaul

22.00

3.5.2015

5.20

5.20

2.20

2.10

6.37

14.37

8.00

Boiler 8 overhaul

24.80

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.

3.5.2015

5.20

5.20

6.60

3.50

3.50

22.37

8.00

Boiler 8 overhaul

13.60

3.5.2015

5.20

5.20

3.60

3.60

22.37

6.37

8.00

Boiler 8 overhaul

12.80

3.5.2015

11.00

11.00

6.00

6.00

6.37

14.37

8.00

Boiler 8 overhaul

40.00

3.5.2015

11.00

11.00

6.60

6.50

14.37

6.37

16.00

Boiler 8 overhaul

72.00

4.5.2015

20.33

20.33

18.01

17.77

6.37

14.37

8.00

Boiler 8 overhaul

20.48

4.5.2015

20.33

20.33

18.88

18.72

14.37

22.37

8.00

Boiler 8 overhaul

12.88

4.5.2015

20.33

20.33

18.53

18.44

22.37

6.37

8.00

Boiler 8 overhaul

15.12

4.5.2015

5.20

5.20

3.70

3.60

6.37

22.37

16.00

Boiler 8 overhaul

25.60

4.5.2015

5.20

5.20

3.80

3.70

22.37

6.37

8.00

Boiler 8 overhaul

12.00

4.5.2015

11.00

11.00

6.60

6.50

6.37

22.37

16.00

Boiler 8 overhaul

72.00

4.5.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

Boiler 8 overhaul

34.40

5.5.2015

20.33

20.33

18.35

18.12

6.37

19.37

13.00

5.5.2015

5.20

5.20

3.80

3.70

6.37

17.35

10.97

5.5.2015

11.00

11.00

6.60

6.60

6.37

17.45

11.13

5.5.2015

11.00

11.00

9.00

9.00

17.45

19.08

1.38

Boiler 8 overhaul (Boiler 8 start up & Syncronize


steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)

TOTAL BOILER 8 PROBLEM (SHUTDOWN / BREAK DOWN)

28.73
16.45
48.99
2.77

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

2266.25
Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler
4 trip (L-1, 2, 3, 4, 5 minimum speed)
Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler
4 trip (L-1, 2, 3, 4, 5 minimum speed)

8.3.2015

11.00

11.00

7.80

7.80

1.25

6.30

5.08

16.27

8.3.2015

5.30

5.20

4.50

4.50

1.25

6.30

5.08

8.3.2015

19.44

19.24

0.00

0.00

1.25

6.30

5.08

Boiler 9 breakdown due to water wall tube leak

97.80

9.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

9.3.2015

5.30

5.20

4.60

4.50

6.37

7.28

0.85

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.60

9.3.2015

5.30

5.20

4.00

4.00

8.04

14.37

6.55

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

7.86

9.3.2015

5.20

5.20

4.50

4.40

14.37

6.37

16.00

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

12.80

9.3.2015

11.00

11.00

8.10

8.10

6.37

6.48

0.18

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.53

9.3.2015

11.00

11.00

8.70

8.60

7.58

14.37

7.35

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

17.64

3.56

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

9.3.2015

11.00

11.00

8.50

8.50

14.37

6.37

16.00

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

40.00

10.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

10.3.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

10.3.2015

11.00

11.00

8.50

8.50

6.37

10.00

3.62

Boiler 9 breakdown due to water wall tube leak

9.04

10.3.2015

8.50

8.50

8.20

8.20

10.00

10.12

0.20

Boiler 9 breakdown due to water wall tube leak

0.06

10.3.2015

8.50

8.50

7.50

7.50

10.12

12.49

2.62

Boiler 9 breakdown due to water wall tube leak

2.62

10.3.2015

11.00

11.00

8.00

8.00

12.53

15.52

2.98

Boiler 9 breakdown due to water wall tube leak

8.95

10.3.2015

11.00

11.00

8.20

8.20

15.52

6.37

14.75

Boiler 9 breakdown due to water wall tube leak

41.30

11.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

11.3.2015

5.30

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

11.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

12.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

12.3.2015

5.20

5.20

5.00

5.00

6.37

17.00

10.38

Boiler 9 breakdown due to water wall tube leak

2.08

12.3.2015

5.10

5.00

4.50

4.40

17.00

6.37

13.62

Boiler 9 breakdown due to water wall tube leak

8.17

12.3.2015

11.00

11.00

9.00

9.00

6.37

17.13

10.60

Boiler 9 breakdown due to water wall tube leak

21.20

12.3.2015

9.00

9.00

7.30

7.30

17.13

6.37

13.40

Boiler 9 breakdown due to water wall tube leak

22.78

13.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

13.3.2015

5.20

5.20

4.70

4.70

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

12.00

13.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

14.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

14.3.2015

5.20

5.20

5.00

4.90

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

7.20

14.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

15.3.2015

19.44

19.24

0.00

0.00

6.30

11.00

4.50

Boiler 9 breakdown due to water wall tube leak

86.58

22.3.2015

20.49

20.31

19.74

19.67

11.40

16.00

4.33

Boiler 9 Belt conveyor of coal feeder no. 2 tear.

2.77

8.4.2015

20.49

20.36

18.53

18.42

6.37

14.51

8.23

8.4.2015

20.49

20.36

0.00

0.00

14.51

6.37

15.77

9.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

15.97
321.08
488.64

Decrease load TG3 after normal increase


again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 start up and synchronize steam at
11.00.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target

9.4.2015

5.20

5.20

5.10

5.00

6.37

22.37

16.00

9.4.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

9.4.2015

11.00

11.00

8.80

8.80

7.23

14.37

7.23

9.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

9.4.2015

11.00

11.00

10.50

10.50

22.37

6.37

8.00

10.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

10.4.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

10.4.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

10.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

10.4.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

10.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

11.4.2015

20.49

20.36

0.00

0.00

6.37

8.00

1.62

11.4.2015

5.20

5.20

5.00

4.90

6.37

22.37

16.00

11.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

07.12.2015

20.20

20.20

0.00

0.00

12.00

14.28

2.47

14.12.2015

20.20

20.20

0.00

0.00

15.40

19.00

3.33

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld
to Start up
vent
valvepress
leakage)
TG4 loow-low
inlet
steam
( Boiler-9 trip due to
Both IDF trip) effect from lift valve of bag filter get
close it self due to pressure compressor get low less
than
Boiler4.5
# 9bar
& TG#4 TRIP Due to air prss low for bag
filter jetting

TOTAL BOILER 9 PROBLEM BREAKDOWN (PPL)

3.20
4.00
15.91
3.20
4.00
488.64
1.60
3.20
2.40
4.00
3.20
32.92
4.80
3.20

After normal increase load TG 2 as per


target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target

49.83

TG4 trip

67.33

Decrease load TG4 after normal increase


again.

4944.68

26.2.2015

11.00

11.00

8.00

7.90

6.50

4.00

21.83

L-2 process shutdown position

67.68

26.2.2015

19.53

19.27

18.35

18.02

6.50

4.00

21.83

L-2 process shutdown position

27.29

17.3.2015

5.30

5.20

5.10

5.00

6.37

22.37

16.00

L-2 breakdown

3.20

21.5.2015

5.20

5.20

2.70

2.60

6.37

8.45

2.13

L-2 shutdown

5.55

21.5.2015

5.20

5.20

2.00

2.00

8.45

9.04

0.32

L-2 shutdown

1.01

21.5.2015

5.20

5.20

0.00

0.00

9.04

15.37

6.55

L-2 shutdown (PM Jobs : TG2 stop for Cleaning


cooler winding gen & install tapping at pipe line
make up filter water)

34.06

21.5.2015

5.20

5.20

2.20

2.20

15.37

22.37

7.00

L-2 shutdown

21.00

21.5.2015

5.20

5.20

3.80

3.80

22.37

2.03

3.43

L-2 shutdown

4.81

21.5.2015

5.20

5.20

4.50

4.50

2.03

2.26

0.38

L-2 shutdown

0.27

After normal increase load TG 3 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG2 stop.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

21.5.2015

11.00

11.00

9.00

9.00

7.13

8.57

1.73

L-2 shutdown

3.47

21.5.2015

11.00

11.00

10.50

10.50

8.57

11.40

3.28

L-2 shutdown

1.64

21.5.2015

11.00

11.00

10.30

10.30

11.40

13.37

2.05

L-2 shutdown

1.44

21.5.2015

11.00

11.00

8.50

8.50

15.32

19.52

4.33

L-2 shutdown

10.83

21.5.2015

11.00

11.00

9.30

9.30

19.52

0.30

5.37

L-2 shutdown

9.12

21.5.2015

11.00

11.00

10.10

10.10

0.30

2.30

2.00

L-2 shutdown

1.80

22.8.2015

11.00

11.00

10.60

10.50

10.26

14.37

4.18

L-2 brekdown

2.09

24.8.2015
24.8.2015

5.20
5.20

5.20
5.20

5.00
5.10

4.90
5.00

9.03
10.00

10.00
17.35

0.95
7.58

L-2 spinning dryer decrease steam consumption


L-2 spinning dryer decrease steam consumption

0.29
1.52

26.8.2015

11.00

11.00

10.50

10.50

10.29

11.27

0.97

L-2 breakdown

0.48

5.11.2015

20.20

20.20

18.78

18.20

7.16

17.15

10.00

L-2 shutdown & PLN stop

20.00

5.11.2015

11.00

11.00

9.30

9.30

7.30

14.30

7.00

L-2 shutdown & PLN stop

11.90

5.11.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

L-2 shutdown & PLN stop

5.60

11.11.2015

5.20

5.20

4.50

4.50

5.15

6.30

0.75

L-2 spinning truble

0.53

12.11.2015

11.00

11.00

8.50

8.50

8.58

11.17

2.32

L-2 trable

5.79

12.11.2015

5.20

5.20

4.00

4.00

8.58

11.17

2.32

L-2 trable

2.78

30.12.2015

11.00

11.00

8.80

8.80

9.30

10.30

1.00

L-2 spinning decrease steam consumption

2.20

30.12.2015

11.00

11.00

8.50

8.50

10.30

13.42

3.20

L-2 spinning decrease steam consumption

8.00

TOTAL LINE - 2 PROCES SHUTDOWN / BREAKDOWN

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

254.34

24.2.2015

19.38

19.44

18.70

18.60

1.30

3.17

1.78

L-3 break down

1.50

3.3.2015

11.00

11.00

10.80

10.80

15.13

15.50

0.62

Dryer L-3 decrease steam consumption

0.12

3.3.2015

11.00

11.00

10.80

10.80

15.50

22.37

6.78

Dryer L-3 decrease steam consumption

1.36

16.4.2015

5.20

5.20

4.70

4.70

6.37

22.37

16.00

L-3 shuthdown.

8.00

1.6.2015

5.20

5.20

4.80

4.80

6.37

13.30

6.88

L-3 breakdown

2.75

1.6.2015

11.00

11.00

10.90

10.80

6.26

13.30

7.07

L-3 breakdown

1.41

9.7.2015

11.00

11.00

10.90

10.80

6.30

7.15

0.75

L-3 shutdown

0.15

9.7.2015

11.00

11.00

9.00

9.00

7.15

10.39

3.40

L-3 shutdown

6.80

9.7.2015

11.00

11.00

10.00

10.00

11.47

13.05

1.30

L-3 shutdown

1.30

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

9.7.2015

11.00

11.00

9.40

9.30

13.45

14.30

0.75

L-3 shutdown

1.28

9.7.2015

11.00

11.00

9.00

9.00

14.30

21.44

7.23

L-3 shutdown

14.47

9.7.2015

11.00

11.00

9.80

9.80

21.44

22.30

0.77

L-3 shutdown

0.92

9.7.2015

11.00

11.00

10.30

10.30

22.30

23.26

0.93

L-3 shutdown

0.65

9.7.2015

11.00

11.00

10.80

10.70

23.26

0.21

0.92

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.90

4.80

6.30

6.54

0.40

L-3 shutdown

0.16

9.7.2015

5.20

5.20

4.30

4.20

7.05

10.54

3.82

L-3 shutdown

3.82

9.7.2015

5.20

5.20

4.50

4.40

10.54

14.30

3.77

L-3 shutdown

3.01

9.7.2015

5.20

5.20

4.00

4.00

14.30

14.44

0.23

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.50

4.50

14.44

16.43

1.98

L-3 shutdown

1.39

9.7.2015

5.20

5.20

4.20

4.20

16.43

16.52

0.18

L-3 shutdown

0.18

9.7.2015

5.20

5.20

4.80

4.80

16.52

18.52

2.00

L-3 shutdown

0.80

9.7.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-3 shutdown

1.60

24.8.2015

11.00

11.00

10.10

10.00

17.35

18.44

1.15

L-3 Minimum speed

1.15

24.8.2015

5.20

5.20

4.40

4.30

17.35

18.44

1.15

L-3 Minimum speed

1.04

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

6.10.2015

5.20

5.20

5.00

5.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more (effect L-3)

1.40

6.10.2016

5.20

5.20

4.50

4.50

13.30

14.30

1.00

Spinning L-3 breakdown

0.70

6.10.2015

5.20

5.20

4.80

4.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

3.20

Decrease load TG2 after normal increase


again.
load TG2 keep 5 MW

6.10.2016

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

1.60

load TG2 keep 5 MW

16.10.2015

11.00

11.00

8.40

8.40

6.50

9.25

2.58

L-3 shutdown

6.72

16.10.2015

11.00

11.00

7.50

7.50

9.25

17.30

8.08

L-3 shutdown

28.29

16.10.2015

5.20

5.20

4.80

4.80

7.00

17.30

10.50

L-3 shutdown

4.20

27.10.2015

5.20

5.20

4.90

4.90

7.30

14.30

7.00

L-3 decrease steam consumption

2.10

11.11.2015

11.00

11.00

9.40

9.40

5.15

6.30

0.75

L-3 spinning minimum speed

1.20

12.11.2015

11.00

11.00

9.20

9.20

6.30

8.58

2.47

L-3 minimum speed

4.44

12.11.2015

5.20

5.20

4.60

4.50

6.30

8.58

2.47

L-3 minimum speed

1.73

load TG2 keep 5 MW

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

10.12.2015

20.20

20.20

19.87

19.71

6.30

14.30

8.00

L-3 shutdown & New WSA stop

3.92

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

25.12.2015

11.00

11.00

6.50

6.50

15.20

17.35

2.25

L-1,2 & 3 minimum speed

10.13

25.12.2015

5.20

5.20

3.00

3.00

15.33

17.41

2.13

L-1,2 & 3 minimum speed

4.69

31.12.2015

11.00

11.00

9.00

9.00

9.50

14.30

4.67

L-3 decrease steam consumption

9.34

TOTAL LINE - 3 PROCES SHUTDOWN / BREAKDOWN

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

226.86

23.4.2015

5.20

5.20

4.00

4.00

8.00

16.30

8.50

Boiler 6 breakdown.

10.20

23.4.2015

5.20

5.20

5.00

4.90

16.30

22.37

6.12

Boiler 6 breakdown.

1.84

23.4.2015

11.00

11.00

9.30

9.20

8.00

16.30

8.50

Boiler 6 breakdown.

15.30

22.5.2015

5.20

5.20

4.80

4.70

11.13

13.27

2.23

Boiler 6 break down (economizer tube get leakage)

1.12

22.5.2015

5.20

5.20

4.20

4.20

13.27

17.17

3.83

Boiler 6 break down (economizer tube get leakage)

3.83

22.5.2015

5.20

5.20

4.90

4.90

17.17

20.10

2.88

Boiler 6 break down (economizer tube get leakage)

0.87

22.5.2015

5.20

5.20

4.70

4.70

20.10

20.37

0.45

Boiler 6 break down (economizer tube get leakage)

0.23

22.5.2015

5.20

5.20

5.00

5.00

20.37

6.37

10.00

Boiler 6 break down (economizer tube get leakage)

2.00

22.5.2015

11.00

11.00

10.60

10.50

11.10

13.25

2.25

Boiler 6 break down (economizer tube get leakage)

1.13

22.5.2015

11.00

11.00

10.00

10.00

13.25

14.37

1.20

Boiler 6 break down (economizer tube get leakage)

1.20

22.5.2015

11.00

11.00

10.10

10.10

14.37

16.39

2.03

Boiler 6 break down (economizer tube get leakage)

1.83

22.5.2015

11.00

11.00

10.50

10.40

16.39

18.53

2.23

Boiler 6 break down (economizer tube get leakage)

1.34

22.5.2015

11.00

11.00

10.20

10.10

20.07

23.37

3.50

Boiler 6 break down (economizer tube get leakage)

3.15

22.5.2015

11.00

11.00

9.90

9.80

23.37

1.04

1.45

Boiler 6 break down (economizer tube get leakage)

1.74

22.5.2015

11.00

11.00

9.50

9.50

1.04

5.30

4.87

Boiler 6 break down (economizer tube get leakage)

7.30

22.5.2015

11.00

11.00

10.10

10.10

5.30

6.37

1.12

Boiler 6 break down (economizer tube get leakage)

1.01

23.5.2015

5.20

5.20

5.00

5.00

6.37

20.00

13.38

Boiler 6 break down (economizer tube get leakage)

2.68

23.5.2015

5.20

5.20

4.90

4.90

20.00

6.37

10.62

Boiler 6 break down (economizer tube get leakage)

3.19

23.5.2015

11.00

11.00

10.30

10.20

6.37

12.00

5.38

Boiler 6 break down (economizer tube get leakage)

4.31

23.5.2015

11.00

11.00

9.90

9.90

12.00

6.37

18.62

Boiler 6 break down (economizer tube get leakage)

20.48

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

23.11.2015

11.00

11.00

9.10

9.10

10.00

6.30

20.50

Boiler 6 O/H

38.95

23.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

20.50

Boiler 6 O/H

24.60

24.11.2015

11.00

11.00

9.10

9.10

10.00

11.41

1.68

Boiler 6 O/H

3.20

24.11.2015

11.00

11.00

9.50

9.50

11.41

16.31

8.33

Boiler 6 O/H

12.50

24.11.2015

11.00

11.00

9.10

9.10

16.31

6.30

13.98

Boiler 6 O/H

26.57

24.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

25.11.2015

11.00

11.00

9.10

9.10

6.30

6.41

0.18

Boiler 6 O/H

0.35

25.11.2015

11.00

11.00

9.30

9.20

6.41

10.13

3.53

Boiler 6 O/H

6.36

25.11.2015

11.00

11.00

9.50

9.50

10.13

11.54

1.68

Boiler 6 O/H

2.53

25.11.2015

11.00

11.00

9.00

9.00

11.54

12.20

0.43

Boiler 6 O/H

0.87

25.11.2015

11.00

11.00

8.50

8.50

12.20

6.30

18.17

Boiler 6 O/H

45.43

25.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

26.11.2015

11.00

11.00

9.30

9.30

6.30

16.00

9.50

Boiler 6 O/H

16.15

26.11.2015

11.00

11.00

9.10

9.10

16.00

18.00

2.00

Boiler 6 O/H

3.80

26.11.2015

11.00

11.00

8.50

8.50

18.00

20.00

2.00

Boiler 6 O/H

5.00

26.11.2015

11.00

11.00

7.50

7.50

20.00

22.30

2.50

Boiler 6 O/H

8.75

26.11.2015

11.00

11.00

7.00

7.00

22.30

5.30

7.00

Boiler 6 O/H

28.00

26.11.2015

11.00

11.00

6.50

6.50

5.30

6.30

1.00

Boiler 6 O/H & NGBC problem

4.50

26.11.2015

5.20

5.20

4.00

4.00

6.30

7.40

1.17

Boiler 6 O/H

1.40

26.11.2015

5.20

5.20

4.00

4.00

15.40

18.00

2.33

Boiler 6 O/H

2.80

26.11.2015

5.2

5.2

4.9

18

22.3

4.5

Boiler 6 O/H

1.35

26.11.2015

5.20

5.20

4.70

4.60

22.30

0.37

2.12

Boiler 6 O/H

1.27

26.11.2015

5.20

5.20

4.10

4.00

0.37

3.27

2.83

Boiler 6 O/H & NGBC problem

3.40

26.11.2015

5.20

5.20

4.20

4.10

3.27

6.30

3.05

Boiler 6 O/H & NGBC problem

3.36

27.11.2015

11.00

11.00

6.50

6.50

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

20.25

27.11.2015

11.00

11.00

8.20

8.20

11.00

13.19

2.32

Boiler 6 O/H

6.49

27.11.2015

11.00

11.00

8.00

8.00

13.19

14.30

1.18

Boiler 6 O/H

3.54

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

27.11.2015

11.00

11.00

7.50

7.50

14.30

6.30

16.00

Boiler 6 O/H

56.00

27.11.2015

5.20

5.20

4.20

4.10

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

4.95

27.11.2015

5.20

5.20

5.10

5.00

11.00

6.30

19.50

Boiler 6 O/H

3.90

28.11.2015

11.00

11.00

7.50

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

28.11.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

29.11.2015

11.00

11.00

7.60

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

29.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

30.11.2015

11.00

11.00

7.60

7.50

6.30

16.30

10.00

Boiler 6 O/H

35.00

30.11.2015

11.00

11.00

10.30

10.30

16.30

6.30

14.00

Boiler 6 O/H

9.80

30.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

01.12.2015

11.00

11.00

10.70

10.70

14.30

21.54

7.40

Boiler 6 O/H

2.22

01.12.2015

11.00

11.00

10.60

10.60

21.54

22.30

0.60

Boiler 6 O/H

0.24

01.12.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 6 O/H

4.00

01.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

15.12.2015

11.00

11.00

7.50

7.50

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

47.85

15.12.2015

5.20

5.20

4.00

3.90

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

17.77

16.12.2015

11.00

11.00

7.50

7.50

6.30

19.20

12.83

Boiler 6 break down (eco snake tube get leakage)

44.91

16.12.2015

11.00

11.00

7.80

7.80

19.20

5.05

9.75

Boiler 6 break down (eco snake tube get leakage)

31.20

16.12.2015

5.20

5.20

4.00

3.90

6.30

19.00

12.50

Boiler 6 break down (eco snake tube get leakage)

16.25

TOTAL BOILER 6 SHUTDOWN / BREAKDOWN

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

874.99

6.5.2015

11.00

11.00

10.00

10.00

9.14

11.21

2.12

Damper FD fan boiler 7 broken.

2.12

8.5.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

Boiler 7 overhaul

9.60

8.5.2015

11.00

11.00

10.30

10.20

6.37

14.37

8.00

Boiler 7 overhaul

6.40

8.5.2015

11.00

11.00

10.50

10.50

14.37

6.37

16.00

Boiler 7 overhaul

8.00

9.5.2015

5.20

5.20

4.70

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

9.5.2015

5.20

5.20

4.50

4.50

14.37

22.37

8.00

Boiler 7 overhaul

5.60

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

9.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Boiler 7 overhaul

4.00

9.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

10.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

10.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

11.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

11.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

12.5.2015

5.20

5.20

4.80

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

5.20

5.20

4.60

4.60

14.37

6.37

16.00

Boiler 7 overhaul

9.60

12.5.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

11.00

11.00

10.60

10.60

14.37

6.37

16.00

Boiler 7 overhaul

6.40

13.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Boiler 7 overhaul

14.40

13.5.2015

11.00

11.00

10.80

10.70

6.37

6.37

24.00

Boiler 7 overhaul

7.20

14.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

14.5.2015

11.00

11.00

10.90

10.90

6.37

8.23

1.77

30.9.2015

11.00

11.00

8.00

8.00

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

15.00

30.9.2015

5.20

5.20

4.80

4.80

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

2.00

1.10.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

Boiler 7 B/D (eco tube leakage)

72.00

1.10.2015

5.20

5.20

4.50

4.40

6.30

14.30

8.00

Boiler 7 B/D (eco tube leakage)

6.40

1.10.2015

5.20

5.20

4.80

4.80

14.30

6.30

16.00

Boiler 7 B/D (eco tube leakage)

6.40

Boiler 7 overhaul (Boiler 7 start up & Syncronize


steam at 08.00)
Boiler 7 overhaul (Boiler 7 start up & Syncronize
steam at 08.00)

TOTAL BOILER 7 SHUTDOWN / BREAKDOWN

14.40
0.18

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

271.29

12.8.2015

11.00

11.00

10.70

10.70

17.03

22.30

5.45

Boiler 5 shutdown

1.64

12.8.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 5 shutdown

4.00

12.8.2015

5.20

5.20

4.20

4.10

14.30

16.34

2.07

Boiler 5 shutdown

2.27

12.8.2015

5.20

5.20

4.00

3.90

15.24

22.30

5.93

Boiler 5 shutdown

7.71

12.8.2015

5.20

5.20

3.90

3.80

22.30

6.30

8.00

Boiler 5 shutdown

11.20

13.8.2015

5.20

5.20

3.90

3.80

6.30

7.15

0.75

Boiler 5 shutdown

1.05

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

7.9.2015
8.9.2015
9.9.2015
10.9.2015
11.9.2015
12.9.2015
13.9.2015
14.9.2015
15.9.2015
16.9.2015
17.9.2015
18.9.2015
19.9.2015
20.9.2015

20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20

TOTAL BOILER 5 SHUTDOWN / BREAKDOWN


20.00
0.00
0.00
9.40
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30

20.83
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00

TG4 & Boiler 9 O/H


TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H

27.87
416.67
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00

TG4 & Boiler 9 stop


TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop

21.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

22.9.2015

20.20

20.00

0.00

0.00

6.30

15.00

8.50

TG4 & Boiler 9 O/H

170.00

TG4 & Boiler 9 stop

TOTAL BOILER 9& TG 4 SHUTDOWN

7306.67
Total

38781.77

GRAFIK
No.
Problem
(Shutdown / Breakdown)
1
L- 1
2
L- 2
3
L- 3
4
L- 4
5
L- 5
6
Electric
7
Instrument
8
New WSA
9
Wet Coal
10 Boiler 5
11 Boiler 6
12 Boiler 7
13 Boiler 8
14 Boiler 9 (Breakdown)
15 Boiler 9 & TG 4 Shutdown
16 TG 2
17 TG 3
18 TG 4
19 Others( Process not confirm to reduce steam)
Total

Update on 12 October 2015


Total loss Power Plant
(MWH)
86.13
254.34
226.86
1412.18
291.34
6973.31
33.13
2124.71
31.05
27.87
874.99
271.29
2266.25
4944.68
7306.67
906.81
4048.89
3447.14
3254.12
38781.77

Total loss Power Plant (MWH)

8000.00

7000.00

6000.00

5000.00

4000.00

3000.00

2000.00

1000.00

to reduce steam)

TG 4

TG 3

TG 2

& TG 4 Shutdown

iler 9 (Breakdown)

Boiler 8

Boiler 7

Boiler 6

Boiler 5

Wet Coal

New WSA

Instrument

Electric

L- 5

L- 4

L- 3

L- 2

L- 1

0.00

1000.00

No.
1
2
14
18
13
8
17
4
16
19
12
5
1
2
11
3
7
9
10

Problem
(Shutdown / Breakdown)
Boiler 9 & TG 4 Shutdown
Electric
Boiler 9 (Breakdown)
TG 4
Boiler 8
New WSA
TG 3
L- 4
TG 2
Others( Process not confirm to reduce steam)
Boiler 7
L- 5
L- 1
L- 2
Boiler 6
L- 3
Instrument
Wet Coal
Boiler 5

Total loss Power Plant


(MWH)
7306.67
6973.31
4944.68
3447.14
2266.25
2124.71
4048.89
5.75
906.81
3254.12
271.29
291.34
86.13
254.34
874.99
226.86
33.13
31.05
27.87

Others( Process not confrm to reduce steam)

9 10 11 12 13 14 15 16 17 18 19

TG 4

Wet Coal

TG 3

New WSA

TG 2

Instrument

Boiler 9 & TG 4 Shutdown

Electric

Boiler 9 (Breakdown)

L- 5

Boiler 8

L- 4

Boiler 7

L- 3

Boiler 6

L- 2

Boiler 5

L- 1

0.00

MWH)

8000.00
6000.00
4000.00
2000.00
0.00

(MWH)

B o ile r 9 & T G 4 S h u t d o w n
E le c t ric
B o ile r 9 ( B re a k d o w n )
TG 4
B o ile r 8
N ew WS A
TG 3
L- 4
TG 2
O t h e rs ( P ro c e s s n o t c o n f rm t o re d u c e s t e a m )
B o ile r 7
L- 5
L- 1
L- 2
B o ile r 6
L- 3
In s t ru m e n t
We t C o a l
B o ile r 5

(MWH)

We t C o a l
B o ile r 5
(MWH)

POWER GENERATION DEVIATION TG2, TG3 & TG 4


POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Weekly (2015)

Time Decrease
From
To
Total
Time
Time
Time

REASON

LOSS
Power

REMARK
(ACTION)

MW

MW

MW

MW

Hours

Hours

Hours

23.1.2015

11.00

10.80

9.00

8.90

12.00

14.00

2.00

Proses line 4 decreases

MWH

3.8

TG 3 reduse load

5.2.2015

11.00

11.00

10.50

10.50

14.42

15.35

0.88

L-4 decrease steam consumption (minimum speed)

0.44

Decrease load TG3

5.2.2015

19.48

19.27

19.23

19.00

14.45

14.55

0.17

L-4 decrease steam consumption (minimum speed)

0.04

Decrease load TG4.

6.2.2015

19.66

19.57

18.22

18.21

8.27

9.13

0.77

L-4 breakdown.

1.04

Decrease load TG4. ( Temperature winding


high T= 114 oC)

6.2.2015

11.00

10.90

10.00

10.00

8.16

8.42

0.43

L-4 breakdown.

0.39

Decrease load TG3.

6.2.2015

10.00

10.00

9.00

8.90

8.48

9.13

0.42

L-4 breakdown.

0.46

Decrease load TG3.

6.2.2015

9.00

8.90

8.50

8.50

9.13

9.35

0.37

L-4 breakdown.

0.15

Decrease load TG3.

6.2.2015

8.50

8.50

8.00

8.00

9.35

10.12

0.62

L-4 breakdown.

0.31

Decrease load TG3.

6.2.2015

8.00

8.00

7.50

7.50

10.17

10.27

0.17

L-4 breakdown.

0.08

Decrease load TG3.

6.2.2015

7.50

7.50

7.20

7.20

10.27

13.30

2.95

L-4 breakdown.

0.89

Decrease load TG3.

7.2.2015

11.00

11.00

10.80

10.70

9.45

9.52

0.12

Balling press L-4 trouble.

0.04

Decrease load TG3.

19.2.2015

19.61

19.45

18.83

18.67

9.05

17.45

8.67

Process L-4 breakdown.

6.76

20.2.2015

19.44

19.31

18.26

17.89

9.04

10.45

1.68

20.2.2015

5.20

5.20

5.00

5.00

8.45

10.20

1.58

20.2.2015

11.00

11.00

9.20

9.20

8.20

12.45

4.42

7.3.2015

19.56

19.33

19.26

19.11

8.10

8.45

0.58

Spinning L-4 breakdown (dryer problem)

0.13

7.3.2015

11.00

11.00

9.10

9.00

8.02

9.50

1.80

Spinning L-4 breakdown (dryer problem)

3.60

7.3.2015

10.90

10.90

10.80

10.80

17.00

19.51

1.85

7.3.2015

10.90

10.90

10.30

10.30

0.02

1.41

1.65

28.3.2015

20.44

20.31

19.49

19.29

0.14

4.48

4.57

Spinning L-4 decrease steam consumption (Fire)

4.66

28.3.2015

5.20

5.20

4.80

4.70

23.45

6.37

6.52

Spinning L-4 decrease steam consumption (Fire)

3.26

28.3.2015

11.00

11.00

10.30

10.30

22.45

6.37

6.87

Spinning L-4 decrease steam consumption (Fire)

4.81

29.3.2015

11.00

11.00

10.50

10.50

22.37

3.55

5.30

L-4 decrease steam consumption

2.65

31.3.2015

11.00

11.00

10.90

10.80

6.37

0.50

18.22

L-4 decrease steam consumption

3.64

1.4.2015

11.00

11.00

10.50

10.50

8.18

15.36

7.90

L-4 decrease steam consumption

3.95

1.4.2015

11.00

11.00

10.50

10.50

17.06

21.11

4.08

L-4 decrease steam consumption

2.04

1.4.2015

11.00

11.00

10.90

10.90

22.37

6.37

8.00

L-4 decrease steam consumption

0.80

Spinning L-4 decrease steam consumption &


Spinbath L-3 breakdown.
Spinning L-4 decrease steam consumption &
Spinbath L-3 breakdown.
Spinning L-4 decrease steam consumption &
Spinbath L-3 breakdown.

LP TG4 100% Spinning L-4 breakdown (dryer


problem)
LP TG4 100% Spinning L-4 breakdown (dryer
problem)

2.39
0.32
7.95

0.19
0.99

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

20.4.2015

5.20

5.20

4.80

4.70

14.55

17.58

3.02

Spinning decrease steam consumption

1.51

22.4.2015

5.20

5.20

4.60

4.50

20.08

0.38

4.50

L-4 breakdown

3.15

22.4.2015

5.20

5.20

5.00

4.90

0.38

6.37

5.98

L-4 breakdown

1.79

22.4.2015

11.00

11.00

10.80

10.80

18.48

20.50

2.03

L-4 breakdown

0.41

22.4.2015

11.00

11.00

10.50

10.50

20.50

21.33

0.72

L-4 breakdown

0.36

22.4.2015

11.00

11.00

10.00

10.00

21.33

21.52

0.32

L-4 breakdown

0.32

22.4.2015

11.00

11.00

10.20

10.20

21.52

22.37

1.25

L-4 breakdown

1.00

22.4.2015

11.00

11.00

10.00

10.00

22.37

1.40

3.05

L-4 breakdown

3.05

28.5.2015

5.20

5.20

5.10

5.10

6.37

10.01

3.40

Steam consumption L-4 & L-5 not maximum

0.34

28.5.2015

5.20

5.20

4.80

4.70

10.01

10.29

0.47

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

5.20

5.20

4.50

4.50

10.29

14.37

4.13

Steam consumption L-4 & L-5 not maximum

2.89

28.5.2015

5.20

5.20

4.80

4.80

14.37

22.37

8.00

Steam consumption L-4 & L-5 not maximum

3.20

28.5.2015

11.00

11.00

10.80

10.80

9.25

10.34

1.15

Steam consumption L-4 & L-5 not maximum

0.23

28.5.2015

11.00

11.00

10.50

10.50

11.14

12.10

0.93

Steam consumption L-4 & L-5 not maximum

0.47

30.5.2015

5.20

5.20

5.10

5.00

6.37

13.45

7.13

30.5.2015

5.20

5.20

4.90

4.80

13.45

14.37

0.87

30.5.2015

5.20

5.20

5.00

4.90

14.37

22.37

8.00

30.5.2015

5.20

5.20

5.10

5.00

22.37

6.37

8.00

4.6.2015

5.20

5.20

3.30

3.20

9.15

14.37

5.37

L-4 shuth down

10.73

4.6.2015

5.20

5.20

3.50

3.50

20.09

21.17

1.13

L-4 shuth down

1.93

4.6.2015

5.20

5.20

4.00

3.90

22.17

22.37

0.33

L-4 shuth down

0.43

4.6.2015

11.00

11.00

8.80

8.80

9.24

14.37

5.22

L-4 shuth down

11.48

4.6.2015

11.00

11.00

9.30

9.30

15.54

20.54

5.00

L-4 shuth down

8.50

4.6.2015

11.00

11.00

10.90

10.90

20.54

22.37

2.28

L-4 shuth down

0.23

5.6.2015

5.20

5.20

4.70

4.60

7.44

8.10

0.43

L-4 spinning baling press truble

0.26

12.6.2015

5.20

5.20

5.00

5.00

7.45

19.15

11.50

L-4 decrease steam consumption

2.30

12.6.2015

11.00

11.00

9.50

9.40

8.09

10.40

2.52

L-4 decrease steam consumption

4.03

Spinbath decrease steam consumption 5 TPH,


changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator
Spinbath decrease steam consumption 5 TPH,
changed evaporator

1.43
0.35
2.40
1.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

12.6.2015

11.00

11.00

9.00

9.00

10.40

13.31

2.85

L-4 decrease steam consumption

5.70

12.6.2015

11.00

11.00

9.50

9.50

13.31

6.37

17.10

L-4 decrease steam consumption

25.65

30.6.2015

5.20

5.20

5.20

5.10

6.30

14.30

8.00

L-4 decrease steam consumption

0.80

30.6.2015

5.20

5.20

5.10

5.00

14.30

22.30

8.00

L-4 break down

1.60

7.7.2017

11.00

11.00

9.00

9.00

11.36

14.30

3.10

SPG L-4 decrease steam consumption.

6.20

7.7.2018

11.00

11.00

10.90

10.90

22.30

6.30

8.00

Clening condenser TG4 & SPG L-4 decrease steam


consumption.

0.80

26.8.2015

11.00

11.00

10.80

10.80

12.00

12.38

0.63

L-4 decrease steam consumption

0.13

28.8.2017

11.00

11.00

9.00

9.00

20.48

22.30

2.70

L-4 breakdown

5.40

28.8.2018

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 breakdown

20.00

28.8.2021

5.20

5.20

5.00

5.00

4.30

6.30

2.00

L-4 breakdown

0.40

2.9.2015

11.00

11.00

9.70

9.70

11.37

17.00

5.38

L-4 breakdown

7.00

2.9.2015

11.00

11.00

10.00

10.00

17.00

18.55

1.92

Effect WSA, PRDS 10 bar steam consumption more

1.92

3.9.2015

20.40

20.40

19.74

19.56

17.54

18.37

0.72

Spinning L-4 stop

0.60

3.9.2015

11.00

11.00

10.50

10.50

6.30

7.58

1.47

Effeci L-4, PRDS 10 bar steam consumption more

0.73

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

Effeci L-4, PRDS 10 bar steam consumption more

0.25

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

Effeci L-4, PRDS 10 bar steam consumption more

0.50

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

Effeci L-4, PRDS 10 bar steam consumption more

3.78

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

Effeci L-4, PRDS 10 bar steam consumption more

0.86

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

Effeci L-4, PRDS 10 bar steam consumption more

9.53

3.9.2015

5.20

5.20

5.10

5.00

6.30

13.17

6.78

Effeci L-4, PRDS 10 bar steam consumption more

1.36

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.20

5.10

13.17

14.30

1.22

Effeci L-4, PRDS 10 bar steam consumption more

0.12

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.10

5.00

14.30

17.44

3.23

Effeci L-4, PRDS 10 bar steam consumption more

0.65

load TG2 keep 5 MW

3.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

Effeci L-4, PRDS 10 bar steam consumption more

1.60

load TG2 keep 5 MW

6.9.2015

11.00

11.00

8.40

8.40

6.30

7.10

0.67

L-4 long shutdown

1.73

6.9.2015

11.00

11.00

9.10

9.00

7.10

10.00

2.83

L-4 long shutdown

5.67

6.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

7.9.2015

11.00

11.00

8.50

8.50

6.30

9.35

3.08

L-4 long shutdown

7.71

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

7.9.2015

11.00

11.00

10.10

10.10

9.35

14.30

4.92

L-4 long shutdown

4.43

7.9.2015

11.00

11.00

9.00

9.00

14.30

6.30

16.00

L-4 long shutdown

32.00

7.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

8.9.2015

11.00

11.00

9.00

9.00

6.30

10.47

4.28

L-4 long shutdown

8.57

8.9.2015

11.00

11.00

8.50

8.40

10.47

6.30

19.72

L-4 long shutdown

51.27

8.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

10.9.2015

11.00

11.00

8.40

8.40

6.30

8.56

2.43

L-4 long shutdown

6.33

10.9.2015

11.00

11.00

9.00

9.00

8.56

9.14

0.30

L-4 long shutdown

0.60

10.9.2015

11.00

11.00

8.50

8.50

9.14

10.25

1.18

L-4 long shutdown

2.96

10.9.2015

11.00

11.00

9.00

9.00

10.25

6.30

20.08

L-4 long shutdown

40.16

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

10.9.2015

11.00

11.00

9.10

9.00

6.30

14.30

8.00

L-4 long shutdown

16.00

10.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

30.40

10.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

11.9.2015

11.00

11.00

9.50

9.50

6.30

14.30

8.00

L-4 long shutdown

12.00

11.9.2015

11.00

11.00

9.20

9.10

14.30

6.30

16.00

L-4 long shutdown

30.40

11.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

12.9.2015

11.00

11.00

9.50

9.40

6.30

8.30

2.00

L-4 long shutdown

3.20

12.9.2015

11.00

11.00

8.50

8.40

8.30

14.30

6.00

L-4 long shutdown

15.60

12.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

L-4 long shutdown

40.00

12.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

13.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

13.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

14.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

14.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

15.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

15.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

16.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

16.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

17.9.2015

11.00

11.00

8.10

8.00

6.30

10.34

4.07

L-4 long shutdown

12.20

17.9.2015

11.00

11.00

7.80

7.80

10.34

14.30

3.93

L-4 long shutdown

12.58

17.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

48.00

17.9.2015

5.20

5.20

5.00

5.00

6.30

10.34

4.07

L-4 long shutdown

0.81

17.9.2015

5.20

5.20

4.90

4.80

10.34

14.30

3.93

L-4 long shutdown

1.57

17.9.2015

5.20

5.20

5.00

4.90

14.30

6.30

16.00

L-4 long shutdown

4.80

18.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

20.00

18.9.2015

11.00

11.00

8.30

8.30

14.30

6.30

16.00

L-4 long shutdown

43.20

18.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

19.9.2015

11.00

11.00

8.30

8.30

6.30

13.45

7.25

L-4 long shutdown

19.58

19.9.2015

11.00

11.00

8.50

8.50

13.45

6.30

16.75

L-4 long shutdown

41.88

19.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

20.9.2015

11.00

11.00

8.50

8.50

6.30

6.30

24.00

L-4 long shutdown

60.00

20.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

L-4 long shutdown

4.80

21.9.2015

11.00

11.00

8.50

8.50

6.30

14.30

8.00

L-4 long shutdown

20.00

21.9.2015

11.00

11.00

8.00

8.00

14.30

6.30

16.00

L-4 long shutdown

48.00

21.9.2015

5.20

5.20

5.10

5.00

6.30

17.00

10.50

L-4 long shutdown

2.10

21.9.2015

5.20

5.20

4.80

4.70

17.00

6.30

13.50

L-4 long shutdown & WSA-2 stop

6.75

22.9.2015

11.00

11.00

8.00

8.00

6.30

22.30

16.00

L-4 long shutdown

48.00

22.9.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

L-4 long shutdown

20.00

22.9.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-4 long shutdown

6.40

22.9.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-4 long shutdown

1.60

26.9.2015

11.00

11.00

9.50

9.50

10.34

19.37

L-4 minimum speed

0.00

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

PRDS 10 bar steam consumption more (effect L-4)

0.00

26.9.2015

5.20

5.20

5.10

5.00

6.30

10.05

PRDS 10 bar steam consumption more (effect L-4)

0.72

3.58

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

26.9.2015

5.20

5.20

4.90

4.80

10.05

14.30

4.42

L-4 minimum speed

1.77

Decrease load TG2 after normal increase


again.

26.9.2015

5.20

5.20

5.10

5.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more (effect L-4)

3.20

load TG2 keep 5 MW

29.9.2015

11.00

11.00

9.00

9.00

14.30

17.48

3.30

L-4 Minimum speed

6.60

29.9.2015

5.20

5.20

4.60

4.50

14.30

17.55

3.42

L-4 Minimum speed

2.39

8.10.2015

11.00

11.00

10.20

10.20

6.30

12.00

5.50

Spinning L-4 breakdown

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

PRDS 10 bar steam consumption more (effect L-4)

27.75

8.10.2015

5.20

5.20

5.00

5.00

6.30

13.35

7.08

Spinning L-4 breakdown

1.42

8.10.2015

5.20

5.20

4.90

4.80

13.35

5.42

16.12

PRDS 10 bar steam consumption more (effect L-4)

6.45

8.10.2015

5.20

5.20

5.10

5.00

5.42

6.30

0.80

PRDS 10 bar steam consumption more (effect L-4)

0.16

9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

PRDS 10 bar steam consumption more (effect L-4)

2.38

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

PRDS 10 bar steam consumption more (effect L-4)

7.20

9.10.2015

11.00

11.00

9.00

9.00

14.05

14.30

0.42

L-4 breakdown

0.83

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-4)

6.40

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

3.75

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

4.40

9.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more (effect L-4)

3.20

load TG2 keep 5 MW

9.10.2015

5.20

5.20

4.90

4.80

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

1.00

Decrease load TG2 after normal increase


again.

9.10.2015

5.20

5.20

5.10

5.00

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

1.10

load TG2 keep 5 MW

13.10.2015

11.00

11.00

8.50

8.40

13.30

15.50

2.33

L-4 breakdown

6.07

13.10.2015

11.00

11.00

8.50

8.40

13.30

15.50

2.33

L-4 breakdown

6.07

13.10.2015

5.20

5.20

4.80

4.70

13.30

15.50

2.33

L-4 breakdown

1.17

22.10.2015

11.00

11.00

8.20

8.20

14.30

15.15

0.75

L-4 minimum speed

2.10

22.10.2015

11.00

11.00

7.80

7.80

15.15

17.45

2.50

L-4 breakdown

8.00

22.10.2015

5.20

5.20

4.60

4.50

14.30

17.52

3.37

L-4 minimum speed

2.36

22.10.2015

5.20

5.20

5.10

5.00

17.52

18.19

0.45

L-4 breakdown

0.09

10.11.2015

11.00

11.00

8.30

8.20

7.30

19.00

11.50

L-4 shutdown

32.20

10.11.2015

5.20

5.20

4.10

4.00

7.30

19.00

11.50

L-4 shutdown

13.80

20.11.2015

11.00

11.00

8.50

8.50

13.35

14.30

0.92

L-4 minimum speed

2.29

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

20.11.2015

5.20

5.20

4.00

4.00

13.35

14.30

0.92

L-4 minimum speed

1.10

25.12.2015

11.00

11.00

7.00

7.00

12.51

14.30

1.65

L-4 & 5 spinning minimum speed

6.60

24.1.2015

11.00

11.00

TOTAL LINE - 4 SHUTDOWN / BREAKDOWN


11.00

8.50

17.50

19.30

8.88
1.80

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.

1412.18
Tie line 6 KV get tripp (information by electric

4.5

due to ligtening) kilat/ gledek

TG 3 on ishocrounous mode and back to


sinchronized on 19.30

19.56

19.40

16.70

16.50

17.52

18.00

0.13

BFWP no. 1,2,3 boiler 9 can't run and PAFAN no. 1


get triipp due to effect tie line 6 KV PPL 1 get tripp

0.387

Reset and start again on DCS and back


increasing to normal load TG 4

26.1.2015

19.66

19.40

13.60

13.52

4.38

6.30

1.87

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem)

10.98

Inform electric to checked ID fan

27.1.2015

11.00

11.00

10.00

9.90

6.25

10.48

4.38

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem)

4.82

Arangement load TG 3 & TG 4 to control


extraction steam 4.5 bar

46.16

Increase load Tg 4 as per target after ID FAN


in normal operation & arrangement man
power to preventife breakdown to control
check and continue cleaning in coal ducthing
area

24.1.2015

27.1.2015

19.66

19.40

13.80

13.63

6.30

14.33

8.00

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem) & Ducthing coal feeder often chok no. 1 &
2 due to wet coal)

13.2.2015

5.20

5.20

5.00

5.00

6.37

6.57

0.33

Repair electric DME tranduser output (AQ)

0.07

13.2.2015

5.20

5.20

0.00

0.00

6.57

7.45

0.80

Repair electric DME tranduser output (AQ)

4.16

11.6.2015

19.50

19.40

19.50

0.00

11.00

15.00

4.00

Boiler 9 & TG4 trip due to PLN trip

77.60

11.6.2015

19.50

19.40

9.00

0.00

15.00

16.30

1.50

TG4 trip due to exhaust pressure drop

0.00

11.6.2015

19.50

19.40

14.40

14.00

17.20

21.20

4.00

ID Fan boiler 9 trip (replace cooling fan motor)

21.60

11.6.2015

11.00

11.00

9.10

9.00

7.10

11.00

3.83

Boiler 9 & TG4 trip due to PLN trip

7.67

11.6.2015

11.00

11.00

8.80

8.70

11.00

14.37

3.62

Boiler 9 & TG4 trip due to PLN trip

8.32

4.7.2015

19.40

19.30

0.00

0.00

5.00

6.30

1.50

4.7.2015

5.20

5.20

4.50

4.40

5.30

6.00

0.50

21.7.2015

19.40

19.30

0.00

0.00

23.30

6.30

7.00

22.7.2015
23.7.2015
24.7.2015
25.7.2015
25.7.2015
25.7.2015
26.7.2015
27.7.2015
27.7.2015
27.7.2015

19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30
19.30

0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
16.00
0.00

0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
16.00
0.00

6.30
6.30
6.30
6.30
10.08
13.45
6.30
6.30
10.25
15.25

6.30
6.30
6.30
10.08
13.45
6.30
6.30
10.25
15.25
6.30

24.00
24.00
24.00
3.63
3.62
16.75
24.00
3.92
5.00
15.08

TG4 trip due to PA Fan no. 2 trip (winding motor


burn).
TG4 trip due to PA Fan no. 2 trip (winding motor
burn).
TG4 trip due to overspeed protection relay active
(EXITER /ELECTRIC PROBLEM).
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 Cooling down planning install new diodes.
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 TRIP

Decrease load TG2.


Loose synchronize TG2. TG 2 running on 5.2
MW after finish repaired DME trnsduser
output KW (AQ)
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

28.95

TG4 stop

0.40

Decrease load TG2 after normal increase


again.

135.10

TG4 stop

463.20
463.20
463.20
70.12
51.72
323.28
463.20
75.59
16.50
291.11

TG4 stop
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 5 MW
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 16 MW
TG4 stop

5.20

5.20

4.70

4.60

14.30

17.17

2.78

TG4 & New WSA trip

28.7.2015
29.7.2015
30.7.2015
31.7.2015
1.8.2015
1.8.2015
2.8.2015
3.8.2015
3.8.2015
3.8.2015

19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30
19.30
19.40
19.40
19.40
19.40

0.00
0.00
0.00
0.00
0.00
15.00
16.00
17.10
18.10
19.18

0.00
0.00
0.00
0.00
0.00
15.00
16.00
17.00
18.00
19.00

6.30
6.30
6.30
6.30
6.30
8.47
6.30
6.30
14.30
15.30

6.30
6.30
6.30
6.30
8.47
6.30
6.30
14.30
15.30
6.30

24.00
24.00
24.00
24.00
2.28
21.72
24.00
8.00
1.00
15.00

TG4 break down Exiter problem


TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 break down Exiter problem
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)

463.20
463.20
463.20
463.20
44.07
93.38
81.60
19.20
1.40
6.00

13.8.2015

19.40

19.40

15.23

14.96

9.00

11.00

2.00

PPL1 Black out due to electric problem

8.88

13.8.2015

19.40

19.40

17.05

16.97

11.00

13.00

2.00

PPL1 Black out due to electric problem

4.86

13.8.2015

19.40

19.40

17.48

17.32

13.00

15.00

2.00

PPL1 Black out due to electric problem

4.16

13.8.2015

19.40

19.40

18.80

18.80

15.00

18.00

3.00

PPL1 Black out due to electric problem

1.80

13.8.2015

11.00

11.00

10.50

10.50

6.30

9.00

2.50

L-2 shutdown & Boiler 5 shutdown

1.25

13.8.2015
13.8.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

9.00
17.29

12.14
22.28

3.23
4.98

PPL1 Black out due to electric problem


Replace ejector valve (effect PPL1 black out)

35.57
54.82

13.8.2015

11.00

11.00

10.70

10.70

22.28

6.37

8.15

effect PPL1 black out

2.45

27.8.2015

20.40

20.40

18.50

18.40

7.00

7.30

0.50

Any jobs electric --> Trafo 1, 2, 3

1.00

26.10.2015

20.40

20.20

16.40

16.20

16.00

16.30

0.50

PA FAN 2 GET TRIPP due to local field alarm

2.00

28.10.2015

20.20

20.20

0.00

0.00

7.40

18.06

10.43

28.10.2015

20.20

20.20

15.00

15.00

18.06

6.30

12.40

29.10.2015

20.20

20.20

16.00

16.00

6.30

6.30

24.00

30.10.2015

20.20

20.20

16.00

16.00

6.30

13.00

6.50

30.10.2015

20.20

20.20

10.10

10.00

13.00

15.00

2.00

Trafo 11 KV stop (Install electric cable power)

20.40

30.10.2015

20.20

20.20

3.50

3.50

15.00

22.00

7.00

Trafo 11 KV stop (Install electric cable power)

116.90

19.11.2015

20.20

20.20

16.18

16.04

7.00

14.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

24.96

Decrease load TG4 after normal increase


again.

19.11.2015

20.20

20.20

15.92

15.76

14.00

20.00

6.00

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

26.64

Decrease load TG4 after normal increase


again.

17.12.2015

20.20

20.20

0.00

0.00

14.50

18.40

3.83

77.43

Decrease load TG4 after normal increase


again.

30.11.2015
01.12.2015
02.12.2015

20.20
20.20
20.20

20.20
20.20
20.20

0.00
0.00
0.00

0.00
0.00
0.00

16.44
6.30
6.30

6.30
6.30
17.40

13.77
24.00
11.17

278.09
484.80
225.57

TG4 trip
TG4 stop for repair
TG4 stop for repair

Electric cable power to tie line 11KV at line-4 get


shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot

Boiler 9 & TG 4 get tripp due to PLN transformer


500 MVA 150 KV / 70 KV get triip (Tie 70 KV on
manual mode)
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure

1.67

Decrease load TG2 after normal increase


again.
TG4 stop
TG4 stop
TG4 stop
TG4 stop
TG4 stop
under observation: load keep 15 MW
load keep 16 MW
load keep 17 MW
load keep 18 MW
load keep 19 MW
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 trip
TG3 stop (breakdown)
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

27.7.2015

210.75

TG4 trip

64.48

Keep TG4 load 15 MW

100.80

Keep TG4 load 16 MW

27.30

Keep TG4 load 16 MW


Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

06.12.2015

20.20

20.20

0.00

0.00

14.38

16.29

TOTAL ELECTRIC SHUTDOWN / BREAKDOWN

1.85

PPL2 black out effet from traformer 70 kv failure

16.18

37.37

6944.21

19.56

19.30

19.10

18.90

5.28

6.00

0.53

Line 1 spining pengurangan steam LP actuator 100


%

26.1.2015

11.00

11.00

9.80

9.70

13.40

14.40

1.00

Spinning line 1 brekdown

1.3

26.1.2015

9.80

9.70

9.20

9.20

14.40

15.10

0.50

Spinning line 1 brekdown

0.25

26.1.2015

9.20

9.20

9.00

9.00

15.20

15.50

0.50

Spinning line 1 brekdown

0.1

26.1.2015

9.00

9.00

8.80

8.80

15.50

16.10

0.33

Spinning line 1 brekdown

0.07

26.1.2015

19.62

19.31

18.97

18.71

6.42

6.57

0.25

Spinning line 1 brekdown

0.15

26.1.2015

19.62

19.45

18.84

18.73

13.45

14.06

0.35

Spinning line 1 brekdown

0.25

0.38

24.1.2015

TG4 trip

0.213

23.2.2015

11.00

11.00

10.80

10.80

11.27

13.22

1.92

Note : TG 2 & TG 3 normal as per target but at 11.27


to 13.22 L-1 decrease steam consumption & level
bunker boiler 5,6,7, 8 get low average 75 % due to
wet coal (Rainy session)

4.3.2015

5.20

5.20

5.00

5.00

14.00

16.00

2.00

L-1 minimum speed

0.40

4.3.2015

11.00

11.00

10.00

10.00

14.00

16.00

2.00

L-1 minimum speed

2.00

24.3.2015

20.44

20.28

19.26

19.10

7.00

14.30

7.50

Spinning L-1 shutdown

8.85

24.3.2015

20.31

20.15

19.57

19.26

14.30

21.09

6.65

Spinning L-1 shutdown

5.92

25.3.2015

11.00

11.00

10.50

10.50

10.07

11.40

1.55

Spinning L-1, L-5 decrease steam consumption

0.78

24.5.2015

5.20

5.20

5.10

5.00

6.37

21.00

14.38

Boiler 6 & L-1 breakdown

2.88

24.5.2015

5.20

5.20

4.60

4.50

21.00

6.37

9.62

L-1 break down

6.73

24.5.2015

11.00

11.00

10.30

10.20

21.30

6.37

9.12

L-1 break down

7.29

29.5.2015

5.20

5.20

5.10

5.00

6.37

14.00

7.38

29.5.2015

5.20

5.20

4.80

4.70

14.00

14.37

0.62

29.5.2015

5.20

5.20

4.60

4.50

14.37

15.25

0.80

29.5.2015

5.20

5.20

5.10

5.00

15.25

6.37

15.20

11.6.2015

5.20

5.20

4.50

4.50

7.20

8.31

1.18

L-1 spinning stop

0.83

11.6.2015

5.20

5.20

4.00

4.00

8.31

11.48

3.28

L-1 spinning stop

3.94

11.6.2015

5.20

5.20

4.50

4.50

11.48

14.37

2.82

L-1 spinning stop

1.97

Pressure vacum TG3 drop


steam consumption
Pressure vacum TG3 drop
steam consumption
Pressure vacum TG3 drop
steam consumption
Pressure vacum TG3 drop
steam consumption

& process L-1 decrease


& process L-1 decrease
& process L-1 decrease
& process L-1 decrease

1.48
0.31
0.56
3.04

Boiler 9 decrease loan from 130 to 126 T/H,


and increases load again TG 4 (as per target
) after line process normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal
Decrease load and increase load
normal

after L1
after L1
after L1
after L1
after L1
after L1

Decrease load TG3 after normal increase


again & Continue cleaning coal screen
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

11.7.2015

11.00

11.00

10.50

10.50

9.30

10.50

1.33

L-1, 2, 3 minimum speed

0.67

11.7.2015

5.20

5.20

5.10

5.00

6.30

8.45

2.25

L-1, 2, 3 minimum speed

0.45

11.7.2015

5.20

5.20

4.90

4.80

8.45

11.51

3.10

L-1, 2, 3 minimum speed

1.24

31.8.2015

20.40

20.40

19.87

19.50

6.56

13.00

4.07

L-1 breakdown

3.66

1.9.2015

11.00

11.00

10.60

10.50

6.30

7.00

0.50

L-1 shutdown

0.25

1.9.2015

11.00

11.00

10.00

10.00

7.00

10.28

3.47

L-1 shutdown

3.47

1.9.2015

11.00

11.00

9.50

9.50

10.28

12.11

1.72

L-1 shutdown

2.58

1.9.2015

11.00

11.00

8.50

8.50

12.12

14.30

2.30

L-1 shutdown

5.75

1.9.2015

11.00

11.00

8.70

8.70

16.05

22.37

6.53

L-1 shutdown

15.03

2.9.2015

11.00

11.00

10.50

10.50

6.30

8.15

1.75

L-1 minimum speed

0.88

2.9.2015

5.20

5.20

5.00

4.90

6.30

8.25

1.92

L-1 minimum speed

0.58

3.9.2015

5.20

5.20

4.80

4.80

17.44

22.30

4.77

L-1 & L-4 breakdown

1.91

TOTAL LINE - 1 SPINNING SHUTDOWN / BREAK DOWN

3.47

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

86.13

25.1.2015

5.30

5.20

5.10

4.90

9.45

15.45

6.00

New WSA tripp. (bearing temperature blower get


high)

1.8

Increase TG 2 load back to normal 5.2 MW


after WSA normal suplai 55 > 10 bar

25.1.2015

11.00

11.00

8.10

8.10

9.45

16.45

7.00

New WSA tripp. (bearing temperature blower get


high)

20.30

Increase TG 3 load back to normal 11 MW


after WSA suplai steam 55 > 45 bar on
16.45

4.84

TG 4 decrease load due to supply steam 10


bar with flow 25 T/h and increase load again
after WSA suplay steam 55 > 10 bar start on
12.05

25.1.2015

19.56

19.30

17.18

16.88

9.55

12.05

2.00

New WSA tripp. (bearing temperature blower get


high)

28.1.2015

11.00

10.90

8.50

8.40

13.56

14.20

0.40

New WSA stop due to line gas problem

1.00

Decrease load TG3.

28.1.2015

5.20

5.10

4.30

4.20

13.56

14.20

0.40

New WSA breakdown

0.36

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

14.40

15.40

1.00

WSA breakdown

0.40

Decrease load TG3.

28.1.2015

5.20

5.10

4.90

4.80

22.30

6.30

8.00

WSA breakdown

2.40

Decrease load TG2.

28.1.2015

8.50

8.40

8.00

8.00

22.30

6.30

8.00

WSA breakdown

3.20

Decrease load TG3.

28.1.2015

19.66

19.38

17.44

17.23

14.56

22.30

7.57

WSA breakdown & Boiler 9 over load 135 T/H

16.27

Decrease load TG4.

29.1.2015

19.32

19.23

18.34

18.20

20.20

21.08

0.80

Boiler 9 over load 138 T/H, Bleed steam 23 T/H


(WSA stop)

0.82

Decrease load TG4 & start boiler house no.


4 for view menute and stop again after
arangement load to take boiler b9 max 130
t/H

30.1.2015

5.20

5.10

5.00

4.90

16.28

17.46

1.14

WSA breakdown

0.23

Arrangement load TG 2 & 3

30.1.2015

11.00

11.00

8.00

8.00

16.28

17.46

1.14

WSA breakdown level mcoal bunker low due to wet


coal

3.42

Arrangement load TG 2 & 4

30.1.2015

19.84

19.57

17.10

16.89

16.28

17.46

1.14

WSA stop & L-3 breakdown

3.06

Arrangement load boiler 9 to control max.


130 T/h

31.1.2015

1.2.2015

11.00

11.00

11.00

11.00

8.20

8.50

8.10

8.40

6.30

6.30

6.30

6.30

1.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

2.90

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

2.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

4.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

Note : New WSA stop , TG 2 & TG 3 running on 5 &


8 MW due to arrangement load when level bunker
boiler 5,6,7, 8 get low average 60 % due to wet coal
(Rainy session)

62.40

Continue cleaning coal screen

5.2.2015

11.00

10.90

10.00

9.90

6.30

9.00

2.50

New WSA problem.

2.50

Decrease load TG3

8.2.2015

11.00

10.90

9.00

8.00

6.10

6.30

0.33

New WSA trip due to trouble power.

0.97

Decrease load TG3.

8.2.2015

5.20

5.10

4.80

4.70

6.10

6.30

0.33

New WSA trip due to trouble power.

0.13

Decrease load TG2.

9.2.2015

19.53

19.45

18.66

18.50

8.54

9.46

0.87

WSA tipp & Coal crusher no. 1 & 2 choking due to


wet coal

0.82

Continue cleaning ducthing cruher screen


and coal feeder also every time due to wet
coal & Decrease load TG4.

9.00

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

27.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

5.00

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

1.50

Continue cleaning screen CHS PPL 1 every


time & Decrease load TG3.

10.00

New WSA stop due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

30.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

9.2.2015

9.2.2015

9.2.2016

11.00

8.00

11.00

11.00

8.00

11.00

8.00

7.70

8.00

8.00

7.70

8.00

6.15

15.16

20.54

15.16

20.54

6.30

10.2.2015

11.00

11.00

7.80

7.70

6.30

6.30

24.00

11.2.2015

11.00

11.00

8.00

7.90

6.30

4.46

22.27

11.2.2015

8.00

7.90

7.50

7.50

4.46

5.02

0.27

11.2.2015

11.00

11.00

8.00

7.90

5.02

6.30

1.47

12.2.2015

13.2.2015

11.00

11.00

11.00

11.00

8.00

8.00

8.00

8.00

6.30

6.30

6.30

6.30

Note : TG 2 & TG 3 running on 5.2 & 7.7 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Boiler over load due to effect WSA stop
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

79.20

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

69.03

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

0.11

Decrease load TG3 and arrangement load

4.55

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

24.00

Note : TG 3 running 8 MW due to arrangement load


when new WSA stop & level bunker boiler 5,6,7, 8
get low average 60 % due to wet coal (Rainy
session)

72.00

Continue cleaning coal screen

69.25

Continue cleaning coal screen

14.2.2015

11.00

11.00

8.00

8.00

7.25

6.30

23.08

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

15.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

16.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

72.00

Continue cleaning coal screen

Decrease load TG4


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

17.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop (New WSA
start & synchronize steam at 04.36 am) & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

6.3.2015

19.44

19.30

18.00

17.75

17.30

17.50

0.33

New WSA trip

0.52

6.3.2015

9.50

9.50

7.30

7.20

16.59

17.47

0.80

New WSA trip

1.84

6.3.2015

11.00

11.00

8.50

8.50

22.45

3.18

4.55

New WSA trip

11.38

7.3.2015

19.44

19.35

18.00

18.00

19.50

20.52

1.03

New WSA get trip

1.40

7.3.2015

10.80

10.80

8.00

8.00

19.00

20.52

1.03

New WSA get trip

2.88

7.3.2015

5.00

5.00

4.40

4.30

19.00

20.52

1.03

New WSA get trip

0.72

20.3.2015

20.49

20.45

19.10

19.00

14.36

15.00

0.40

New WSA trip

0.58

26.3.2015

20.45

20.36

19.00

19.00

14.07

14.30

0.38

WSA decrease load & steam 22>10 bar boiler house


close (mechanic jobs)

0.52

26.3.2015

11.00

11.00

10.50

10.50

14.20

22.37

8.12

Pressure 10 bar drop due to New WSA decrease


load (PRDS 55><45 bar changed to PRDS 55><10
bar)

4.06

17.4.2015

20.57

20.51

19.20

19.10

2.46

3.07

0.35

New WSA trip & Boiler 9 over load 136 T/H

0.49

17.4.2015

5.20

5.20

4.00

4.00

8.55

12.37

3.70

New WSA stop cause burner trable

4.44

18.4.2015

5.20

5.20

4.00

4.00

8.32

12.00

4.53

New WSA trip

5.44

24.4.2015

20.57

20.45

17.31

17.01

15.10

4.00

7.83

New WSA problem

26.95

24.4.2015

20.57

20.45

18.21

18.49

4.00

6.37

2.62

New WSA problem

5.13

24.4.2015

5.20

5.20

4.20

4.10

10.40

14.37

3.95

New WSA problem

4.35

24.4.2015

5.20

5.20

4.30

4.20

14.37

6.37

16.00

New WSA problem

16.00

24.4.2015

11.00

11.00

10.00

10.00

10.40

14.37

3.95

New WSA problem

3.95

24.4.2015

11.00

11.00

9.00

8.90

14.37

6.37

16.00

New WSA problem

33.60

25.4.2015

20.57

20.45

18.18

17.94

6.37

9.00

2.62

New WSA problem

6.57

25.4.2015

20.57

20.45

19.66

19.46

9.00

11.00

2.00

New WSA problem

1.98

25.4.2015

5.20

5.20

4.30

4.20

6.37

14.37

8.00

New WSA problem

8.00

25.4.2015

11.00

11.00

9.00

9.00

6.37

14.37

8.00

New WSA problem

16.00

26.4.2015

5.20

5.20

5.00

4.90

6.37

8.25

1.80

New WSA trip due to truble burner

0.54

26.4.2015

5.20

5.20

4.30

4.20

8.25

13.25

5.00

New WSA trip due to truble burner

5.00

26.4.2015

11.00

11.00

9.20

9.10

6.37

13.25

6.80

New WSA trip due to truble burner

12.92

6.5.2015

5.20

5.20

4.50

4.90

0.04

1.52

1.80

New WSA 55-45 close (boiler over load)

0.54

6.5.2015

5.20

5.20

4.20

4.20

1.52

6.37

4.75

New WSA 55-45 close (boiler over load)

4.75

6.5.2015

11.00

11.00

9.50

9.50

1.45

6.37

4.87

New WSA 55-45 close (boiler over load)

7.30

7.5.2015

5.20

5.20

4.30

4.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

7.20

7.5.2015

5.20

5.20

4.10

4.00

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

9.16

7.5.2015

5.20

5.20

4.70

4.70

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.18

7.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

4.00

7.5.2015

11.00

11.00

9.30

9.30

6.37

14.37

8.00

New WSA 55-45 close (boiler over load)

13.60

7.5.2015

11.00

11.00

7.50

7.50

14.37

22.15

7.63

New WSA 55-45 close (boiler over load)

26.71

After normal increase load TG 3 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.

7.5.2015

11.00

11.00

9.40

9.30

22.15

22.37

0.37

New WSA 55-45 close (boiler over load)

0.63

7.5.2015

11.00

11.00

9.30

9.20

22.37

6.37

8.00

New WSA 55-45 close (boiler over load)

14.40

4.6.2015

5.20

5.20

4.70

4.60

0.43

3.42

2.98

WSA 2 stop

1.79

4.6.2015

5.20

5.20

5.00

5.00

3.42

6.37

2.92

WSA 2 stop

0.58

5.6.2015

5.20

5.20

5.20

5.10

6.37

7.44

1.12

New acid plant stop

0.11

5.6.2015

5.20

5.20

5.00

5.00

18.33

6.37

12.07

New acid plant stop

2.41

5.6.2015

11.00

11.00

10.40

10.30

16.46

18.37

1.85

New acid plant stop

1.30

5.6.2015

11.00

11.00

9.90

9.80

18.37

22.37

4.00

New acid plant stop

4.80

5.6.2015

11.00

11.00

9.70

9.60

22.37

6.37

8.00

New acid plant stop

11.20

9.6.2015

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop

16.80

10.6.2016

11.00

11.00

10.30

10.30

6.37

6.37

24.00

New acid plant stop

16.80

2.9.2015

20.40

20.40

18.61

18.45

19.19

22.30

3.18

WSA-2 trip

6.21

2.9.2015

20.40

20.40

18.92

18.79

22.30

6.30

8.00

Safety VN WSA-2 problem (10 bar)

12.88

2.9.2015

11.00

11.00

9.50

9.50

18.55

22.30

3.58

WSA-2 trip

5.38

2.9.2015

5.20

5.20

5.20

5.10

8.25

10.58

2.55

Effek WSA, PRDS 10 bar steam consumption more

0.26

load TG2 keep 5.1 MW

2.9.2015

5.20

5.20

5.10

5.00

11.29

6.30

18.98

Effek WSA, PRDS 10 bar steam consumption more

3.80

load TG2 keep 5 MW

23.9.2015

11.00

11.00

11.00

10.90

6.30

14.30

8.00

WSA-2 stop

0.80

23.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

WSA-2 stop

40.00

23.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

24.9.2015

11.00

11.00

8.60

8.60

6.30

6.30

24.00

WSA-2 stop

57.60

24.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

WSA-2 stop

4.80

06.12.2015

11.00

11.00

8.40

8.30

22.30

6.30

8.00

New WSA trip

21.60

07.12.2015

11.00

11.00

8.40

8.30

6.30

14.30

8.00

New WSA stop

21.60

07.12.2015

11.00

11.00

10.10

10.10

14.30

16.13

1.72

New WSA stop

1.55

07.12.2015

11.00

11.00

7.90

7.80

16.13

6.30

14.28

New WSA stop

45.70

08.12.2015

20.20

20.20

17.31

17.28

6.30

14.30

8.00

New WSA stop

23.36

08.12.2015

20.20

20.20

17.48

17.39

14.30

22.30

8.00

New WSA stop

22.48

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

08.12.2015

20.20

20.20

18.79

18.57

22.30

6.30

8.00

New WSA stop

13.04

08.12.2015

11.00

11.00

7.90

7.80

6.30

6.30

24.00

New WSA stop

76.80

10.12.2015

20.20

20.20

17.55

17.50

14.30

22.30

8.00

New WSA stop

21.60

10.12.2015

20.20

20.20

17.53

17.45

22.30

6.30

8.00

New WSA stop

22.00

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

11.00

11.00

7.80

7.80

22.30

6.30

8.00

New WSA stop

25.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

10.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

New WSA stop

1.60

11.12.2015

20.20

20.20

17.66

17.52

6.30

10.30

4.00

New WSA stop

10.72

11.12.2015

20.20

20.20

19.60

19.40

10.30

6.30

20.00

New WSA stop

16.00

12.12.2015

20.20

20.20

19.60

19.40

6.30

10.30

4.00

New WSA stop

3.20

12.12.2015

20.20

20.20

18.40

18.30

10.30

6.30

20.00

New WSA stop

38.00

13.12.2015

20.20

20.20

18.40

18.30

6.30

17.30

11.00

New WSA stop

20.90

13.12.2015

20.20

20.20

17.90

17.60

17.30

22.30

5.00

New WSA stop

13.00

13.12.2015

20.20

20.20

18.70

18.50

22.30

6.30

8.00

New WSA stop

13.60

14.12.2015

20.20

20.20

18.40

18.30

6.30

15.40

9.17

New WSA stop

17.42

14.12.2015

20.20

20.20

18.40

18.30

19.00

6.30

11.50

New WSA stop

21.85

15.12.2015

20.20

20.20

19.09

19.09

6.30

17.48

11.30

New WSA stop

12.54

15.12.2015

20.20

20.20

18.26

18.01

17.48

6.30

12.70

New WSA stop

27.81

16.12.2015

20.20

20.20

18.52

18.50

6.30

20.47

14.28

New WSA stop

24.28

TOTAL NEW WSA SHUTDOWN / BREAKDOWN 192.75

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

2124.71

27.1.2015

10.00

9.90

9.80

9.80

10.48

14.30

3.70

Load boiler PPL 1 high due to coal ducthing PPL 2


get chocking (Boiler 9 reduce load and effet in boiler
PPl 1)

0.37

Increase load TG 3 as per target after get


inform ID FAN is normal operation by PPL 2

2.2.2015

19.80

19.55

15.10

15.06

9.11

9.20

0.15

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

0.67

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

19.44

19.35

18.14

17.95

13.05

13.20

0.25

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

4.2.2015

19.44

19.30

17.22

17.23

17.03

17.13

0.17

Coal blocking at ducthing feeder no. 1 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.27

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

4.2.2015

17.22

17.23

15.63

15.62

17.54

18.04

0.17

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

4.2.2015

19.66

19.45

14.00

13.88

6.24

6.37

0.20

Coal blocking at ducthing feeder no. 1,2,3 , Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

1.11

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

5.2.2015

19.48

19.27

15.14

15.08

6.21

8.00

1.65

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

6.91

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

6.2.2015

11.00

10.90

9.20

7.20

13.30

13.53

0.38

Coal vibrating screen breakdown.

1.42

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.10

13.53

15.30

1.62

Coal vibrating screen breakdown.

2.91

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

10.00

15.30

16.55

0.58

Coal vibrating screen breakdown.

0.53

Decrease load TG3.

6.2.2015

11.00

10.90

10.80

9.50

16.55

17.48

0.88

Coal vibrating screen breakdown.

1.24

Decrease load TG3.

6.2.2015

11.00

10.90

10.00

9.00

17.48

20.32

2.73

Coal vibrating screen breakdown.

5.19

Decrease load TG3.

20.2.2015

19.44

19.27

18.78

18.40

18.20

19.10

0.83

21.2.2015

19.53

19.34

18.92

18.88

16.34

16.41

0.12

22.2.2015

19.49

19.32

14.80

14.75

4.30

5.15

Boiler 9 over load 132 T/H due to pressure droup 66


bar due to wet coal chock at dusthing feeder
Boiler 9 over load 132 T/H due to pressure droup 66
bar due to wet coal

0.73
0.05

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.

0.75

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

3.43

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.11

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

0.20

24.2.2015

19.45

19.35

18.91

18.75

9.30

9.41

0.18

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

24.2.2015

19.45

19.35

18.48

18.41

13.23

13.36

0.22

Coal blocking at ducthing feeder no. 2

2.3.2015

11.00

11.00

10.00

10.00

7.33

9.22

1.82

2.3.2015

11.00

11.00

10.80

10.80

12.35

13.07

0.53

2.3.2015

11.00

11.00

10.00

10.00

13.10

13.49

0.65

Vaccum pressure TG3 droop till -0.75 bar and coal


bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low

5.3.2015

19.61

19.55

15.50

15.00

7.06

7.20

0.23

Coal bunker no. 1 & 2 get chocking / not coming


down in feeder due to wet coal stuck at ducthing,
Note :Boiler 9 & TG 4 normal as per target but
winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session and also
motor PAFAN no. 1 get noise

6.3.2015

19.44

19.21

19.27

19.07

5.00

6.00

1.00

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session, motor
PAFAN no. 1 get noise (Under monitoring)

1.82
0.11
0.65

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)

1.06

Schedule cleaning bunker no. 1 & 2 , After


normal increase load TG 4 as per target

0.14

After normal increase load TG 4 as per


target

17.4.2015

20.57

20.43

19.70

19.55

17.00

17.49

0.82

Duthing coal feeder no. 1 get chocking (Manage wet


coal come to bunker)

0.72

21.4.2015

20.57

20.50

17.05

17.00

9.17

9.27

0.17

Coal blocking at ducthing feeder

0.58

27.4.2015

20.50

20.50

19.50

19.50

12.58

13.06

0.13

Coal blocking at ducthing feeder

0.13

TOTAL WET COAL PROBLEM

12.48

Cleaning /checking every hour, After normal


increase load TG 4 as per target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

31.05

29.1.2015

19.66

19.56

13.62

13.53

6.30

15.55

9.42

Line 5 shutdown (PM: 1/2 Cleaning condenser TG4)

56.78

Decrease load TG4.

29.1.2015

4.90

4.80

3.60

3.50

7.30

16.05

8.58

Line 5 shutdown

11.16

Decrease load TG2.

29.1.2015

11.00

11.00

8.50

8.00

18.20

17.20

1.00

Line 5 shutdown Boiler PPL 1 over load.

3.00

Decrease load TG3 & start boiler house no.


4 for view menute and stop again after
arangement load.

27.2.2015

19.53

19.46

18.88

18.61

11.00

12.26

1.43

Spinning L-5 decrease steam consumption

1.22

27.2.2015

19.35

19.16

18.57

18.41

13.20

16.31

3.18

L-5 breakdown

2.39

3.3.2015

10.80

10.80

10.50

10.40

22.37

23.02

0.42

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.17

Decrease load TG3 after normal increase


again.

3.3.2015

10.50

10.50

10.00

10.00

23.02

1.08

2.10

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

1.05

Decrease load TG3 after normal increase


again.

3.3.2015

11.00

11.00

10.70

10.70

1.08

2.30

1.37

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.41

Decrease load TG3 after normal increase


again.

3.3.2015

19.40

19.22

18.35

18.12

22.25

22.46

0.35

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.39

After normal increase load TG 4 as per


target

3.3.2015

19.40

19.22

18.97

18.83

0.30

0.41

0.18

Spinning L-4 & L-5 decrease speed (CS2 from


NGBC to Spinning L-4 & L-5 leak) & load PLN get
low on 1.3 MW

0.07

After normal increase load TG 4 as per


target

4.3.2015

19.53

19.45

19.22

19.10

9.55

12.30

2.58

L-4 & L-5 breakdown

0.90

4.3.2015

5.20

5.20

4.30

4.30

10.00

12.00

2.00

L-4 & L-5 breakdown

1.80

4.3.2015

11.00

11.00

7.90

7.90

10.00

12.00

2.00

L-4 & L-5 breakdown

6.20

2.4.2015

20.31

20.10

18.44

18.23

6.50

14.30

7.83

Process L-5 shutdown

14.65

2.4.2015

5.20

5.20

4.80

4.70

6.37

9.37

3.00

Process L-5 shutdown

1.50

2.4.2015

5.20

5.20

2.80

2.80

9.37

14.37

3.00

Process L-5 shutdown

7.20

2.4.2015

5.20

5.20

3.30

3.20

14.37

19.10

4.55

Process L-5 shutdown

9.10

2.4.2015

5.20

5.20

5.00

4.90

19.10

22.37

5.45

Process L-5 shutdown

1.64

2.4.2015

5.20

5.20

5.00

5.00

33.37

6.37

8.00

Process L-5 shutdown

1.60

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target

After normal increase load TG 4 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

6.6.2015

11.00

11.00

9.80

9.80

6.37

8.58

2.35

L-5 decrease steam consumption

2.82

6.6.2015

11.00

11.00

10.30

10.30

8.58

14.37

6.35

L-5 decrease steam consumption

4.45

6.6.2015

11.00

11.00

10.40

10.30

14.37

6.37

16.00

L-5 decrease steam consumption

11.20

7.6.2015

11.00

11.00

10.30

10.30

6.37

6.37

24.00

L-5 decrease steam consumption

16.80

8.6.2015

5.20

5.20

4.50

4.40

15.00

22.10

7.17

L-5 shutdown

5.73

8.6.2015

11.00

11.00

10.20

10.20

6.37

14.37

8.00

L-5 shutdown

6.40

8.6.2015

11.00

11.00

10.20

10.10

14.37

15.30

0.88

L-5 shutdown

0.80

8.6.2015

11.00

11.00

9.30

9.30

15.30

17.00

1.50

L-5 shutdown

2.55

8.6.2015

11.00

11.00

9.00

9.00

17.00

22.37

5.62

L-5 shutdown

11.23

8.6.2015

11.00

11.00

9.40

9.40

22.37

6.37

8.00

L-5 shutdown

12.80

11.6.2015

5.20

5.20

4.70

4.60

22.37

0.34

1.95

L-5 breakdown

1.17

11.6.2015

5.20

5.20

4.60

4.50

0.34

0.49

0.25

L-5 breakdown

0.18

11.6.2015

5.20

5.20

4.50

4.40

0.49

5.31

4.70

L-5 breakdown

3.76

11.6.2015

5.20

5.20

5.00

4.90

5.41

6.37

0.93

L-5 breakdown

0.28

12.6.2015

5.20

5.20

4.90

4.80

6.37

7.45

1.13

L-5 breakdown

0.45

12.6.2015

11.00

11.00

8.90

8.90

6.37

8.09

1.53

L-5 breakdown

3.22

16.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

L-5 shutdown

21.60

18.8.2015

11.00

11.00

10.50

10.50

15.22

16.50

1.47

L-5 decrease steam consumption

0.73

18.8.2015

5.20

5.20

4.80

4.70

15.30

16.41

1.18

L-5 decrease steam consumption

0.59

29.9.2015

11.00

11.00

7.80

7.80

17.48

19.25

1.62

L-5 break down

5.17

29.9.2015

11.00

11.00

8.50

8.50

19.25

22.30

3.08

L-5 break down

7.70

29.9.2015

5.20

5.20

4.50

4.40

18.05

21.31

3.43

L-5 break down

2.75

21.10.2015

11.00

11.00

7.50

7.50

14.30

20.09

5.65

L-5 break down

19.78

25.10.2015

11.00

11.00

9.00

9.00

15.26

17.20

1.90

L-5 break down

3.80

25.10.2015

11.00

11.00

9.40

9.40

17.20

18.22

0.97

L-5 break down

1.55

26.10.2015

11.00

11.00

9.00

9.00

13.48

22.30

8.70

L-5 decrease steam consumption (trable)

17.40

26.10.2015

5.20

5.20

4.60

4.60

13.48

22.30

8.70

L-5 decrease steam consumption (trable)

5.22

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

TOTAL LINE - 5 SHUTDOWN / BREAK DOWN

19.00

291.34

7.2.2015

5.10

5.10

4.10

4.00

0.05

0.28

0.38

Re-adjust extaction TG4 & TG3.

0.42

Reduce load TG 2 after normal increase


again.

7.2.2015

19.40

19.24

18.18

18.09

17.35

17.59

0.40

Extraction flow high, no comfirmation from process,


load boiler 9 is 137 TPH

0.46

Decrease load TG4.

7.2.2015

19.40

19.40

18.10

18.09

0.02

0.16

0.23

Re-adjust extaction TG4 & TG3.

0.31

14.2.2015

11.00

11.00

7.50

7.50

6.30

7.25

0.92

Boiler over load

3.21

28.2.2015

11.00

11.00

10.00

10.00

6.37

11.08

4.52

TG4 LP full open 100%

4.52

6.3.2015

11.00

11.00

10.80

10.80

9.13

9.20

0.28

LP TG4 100% (procees not inform reduce load)

0.06

6.3.2015

10.80

10.80

10.60

10.60

9.20

9.45

0.42

LP TG4 100% (procees not inform reduce load)

0.08

6.3.2015

11.00

11.00

9.50

9.50

15.14

16.59

1.75

LP TG4 100% (procees not inform reduce load)

2.63

31.3.2015

11.00

11.00

10.50

10.50

0.50

5.12

4.37

Pressure 10 bar drop (PRDS 55><45 bar changed to


PRDS 55><10 bar)

2.18

31.3.2015

11.00

11.00

10.80

10.80

5.12

6.37

1.42

Proses decrease steam not confirm

0.28

1.4.2015

20.40

20.21

19.18

18.76

15.30

16.39

1.15

10 bar steam consumption high

1.67

1.4.2015

11.00

11.00

10.80

10.70

6.37

8.18

1.68

LP TG4 100% (procees not inform reduce load)

0.51

1.4.2015

11.00

11.00

10.10

10.00

15.36

17.06

1.70

Load boiler PPL1 high (process not confirm)

1.70

15.7.2015

11.00

11.00

11.00

10.90

17.00

21.35

4.58

PRV 22-10 boiler house leakage

0.46

15.7.2015

5.20

5.20

4.90

4.80

16.45

17.43

0.97

PRV 22-10 boiler house leakage

0.39

27.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

PRDS 10 bar steam consumption more

2.01

28.8.2019

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

28.8.2020

5.20

5.20

4.00

4.00

22.30

4.30

6.00

PRDS 10 bar steam consumption more

7.20

29.8.2015
30.8.2015
31.8.2015

5.20
5.20
5.20

5.20
5.20
5.20

5.10
5.10
5.10

5.00
5.00
5.00

6.30
6.30
6.30

6.30
6.30
6.30

24.00
24.00
24.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more
PRDS 10 bar steam consumption more

4.80
4.80
4.80

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

1.9.2015
4.9.2015
5.9.2015

5.20
5.20
5.20

5.20
5.20
5.20

5.10
5.10
5.10

5.00
5.00
5.00

6.30
6.30
6.30

6.30
6.30
6.30

24.00
24.00
24.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more
PRDS 10 bar steam consumption more

4.80
4.80
4.80

25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

55.20

25.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

5.60

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

Decrease load TG 4 after normal increase


again.
Decrease load TG3.
After normal increase load TG 3 as per
target
Decrease load TG3
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

27.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

PRDS 10 bar steam consumption more

3.48

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

PRDS 10 bar steam consumption more

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

PRDS 10 bar steam consumption more

16.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

PRDS 10 bar steam consumption more

5.56

28.9.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

29.9.2015
29.9.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
21.31

14.30
6.30

8.00
9.15

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

1.60
1.83

30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

1.50

30.9.2015

5.20

5.20

5.00

5.00

6.30

1.30

19.00

PRDS 10 bar steam consumption more

3.80

2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

PRDS 10 bar steam consumption more

11.20

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.80

2.10.2015

5.20

5.20

5.10

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

2.10.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

2.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

3.10.2015

5.20

5.20

4.80

4.80

21.31

6.30

24.00

PRDS 10 bar steam consumption more

9.60

4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

4.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

5.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

7.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

PRDS 10 bar steam consumption more

11.20

10.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

PRDS 10 bar steam consumption more

24.00

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

11.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

load TG2 keep 5 MW


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW

12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

12.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

7.00

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

14.67

13.10.2015
13.10.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
15.50

13.30
6.30

7.00
14.67

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

1.40
2.93

14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

PRDS 10 bar steam consumption more

4.07

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

PRDS 10 bar steam consumption more

12.87

14.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

7.20

15.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

PRDS 10 bar steam consumption more

0.30

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

13.00

16.10.2015
16.10.2015

5.20
5.20

5.20
5.20

5.00
5.10

5.00
5.00

6.30
17.30

7.00
6.30

0.50
13.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

0.10
2.60

17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

17.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

18.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

PRDS 10 bar steam consumption more

8.80

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

20.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

PRDS 10 bar steam consumption more

2.82

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.80

21.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

PRDS 10 bar steam consumption more

3.92

Decrease load TG3 after normal increase


again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

PRDS 10 bar steam consumption more

1.45

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

PRDS 10 bar steam consumption more

2.03

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

5.20

5.20

5.00

5.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

1.60

22.10.2015

5.20

5.20

4.80

4.80

18.19

22.12

3.88

PRDS 10 bar steam consumption more

1.55

22.10.2015

5.20

5.20

5.10

5.00

22.12

6.30

8.30

PRDS 10 bar steam consumption more

1.66

23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

23.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

24.10.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

PRDS 10 bar steam consumption more

1.40

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

PRDS 10 bar steam consumption more

1.67

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

PRDS 10 bar steam consumption more

2.43

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

PRDS 10 bar steam consumption more

3.70

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

PRDS 10 bar steam consumption more

2.71

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

PRDS 10 bar steam consumption more

11.34

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

PRDS 10 bar steam consumption more

1.84

25.10.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

3.20

25.10.2015

5.20

5.20

4.90

4.80

22.30

23.33

1.05

PRDS 10 bar steam consumption more

0.42

25.10.2015

5.20

5.20

5.10

5.00

23.33

6.30

6.95

PRDS 10 bar steam consumption more

1.39

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

PRDS 10 bar steam consumption more

10.95

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

26.10.2015

5.20

5.20

5.00

5.00

6.30

13.48

7.30

PRDS 10 bar steam consumption more

1.46

26.10.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

13.60

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

PRDS 10 bar steam consumption more

24.00

27.10.2015
27.10.2015

5.20
5.20

5.20
5.20

5.00
5.00

5.00
5.00

6.30
14.30

7.30
6.30

1.00
16.00

PRDS 10 bar steam consumption more


PRDS 10 bar steam consumption more

0.20
3.20

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

PRDS 10 bar steam consumption more

1.75

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

PRDS 10 bar steam consumption more

14.35

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
load TG2 keep 5 MW
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

28.10.2015

5.20

5.20

5.10

5.00

6.00

7.40

1.17

PRDS 10 bar steam consumption more

0.23

28.10.2015

5.20

5.20

4.90

4.80

7.40

14.30

6.83

PRDS 10 bar steam consumption more

2.73

28.10.2015

5.20

5.20

5.00

5.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

28.10.2015

5.20

5.20

4.90

4.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

PRDS 10 bar steam consumption more

0.08

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

4.80

29.10.2015

5.20

5.20

4.90

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

31.10.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

1.11.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

PRDS 10 bar steam consumption more

9.60

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

2.11.2015

5.20

5.20

4.90

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

2.11.2015

5.20

5.20

4.80

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

3.11.2015

5.20

5.20

4.40

4.40

6.30

14.30

8.00

PRDS 10 bar steam consumption more

6.40

3.11.2015

5.20

5.20

4.70

4.60

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

3.11.2015

5.20

5.20

4.50

4.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

6.40

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

3.20

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

4.11.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

PRDS 10 bar steam consumption more

19.20

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

24.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

5.11.2015

5.20

5.20

4.80

4.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.00

5.11.2015

5.20

5.20

4.80

4.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

3.20

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

PRDS 10 bar steam consumption more

4.04

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

PRDS 10 bar steam consumption more

6.46

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

PRDS 10 bar steam consumption more

12.27

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

4.50

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

PRDS 10 bar steam consumption more

6.50

6.11.2015

5.20

5.20

4.80

4.70

6.30

14.50

8.33

PRDS 10 bar steam consumption more

4.17

6.11.2015

5.20

5.20

4.70

4.60

14.50

22.30

7.67

PRDS 10 bar steam consumption more

4.60

6.11.2015

5.20

5.20

4.50

4.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

2.10

6.11.2015

5.20

5.20

4.90

4.80

1.30

6.30

5.00

PRDS 10 bar steam consumption more

2.00

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

PRDS 10 bar steam consumption more

22.40

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

PRDS 10 bar steam consumption more

16.68

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

PRDS 10 bar steam consumption more

2.00

7.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

8.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

PRDS 10 bar steam consumption more

9.60

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

PRDS 10 bar steam consumption more

22.40

9.11.2015

5.20

5.20

4.80

4.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

12.00

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

PRDS 10 bar steam consumption more

1.40

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

4.20

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

10.11.2015

5.20

5.20

4.80

4.70

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

10.11.2015

5.20

5.20

4.90

4.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

1.40

10.11.2015

5.20

5.20

4.80

4.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.00

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

PRDS 10 bar steam consumption more

27.90

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.11.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

11.11.2015

5.20

5.20

4.70

4.60

14.30

5.15

15.25

PRDS 10 bar steam consumption more

9.15

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

PRDS 10 bar steam consumption more

5.80

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

12.11.2015

5.20

5.20

4.60

4.50

11.17

14.30

3.22

PRDS 10 bar steam consumption more

2.25

12.11.2015

5.20

5.20

4.70

4.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

13.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

14.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

15.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

16.11.2015

11.00

11.00

9.70

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

PRDS 10 bar steam consumption more

16.61

16.11.2015

5.20

5.20

4.70

4.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.80

16.11.2015

5.20

5.20

4.60

4.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

5.60

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

17.11.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

14.40

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

18.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

18.11.2015

5.20

5.20

4.40

4.30

14.30

6.30

16.00

PRDS 10 bar steam consumption more

14.40

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.11.2015

5.20

5.20

4.50

4.50

6.30

14.30

24.00

PRDS 10 bar steam consumption more

16.80

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

10.62

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

20.11.2015

5.20

5.20

4.50

4.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

4.96

20.11.2015

5.20

5.20

4.50

4.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

20.11.2015

5.20

5.20

4.50

4.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

21.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

22.11.2015

5.20

5.20

4.50

4.40

6.30

14.30

24.00

PRDS 10 bar steam consumption more

19.20

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

PRDS 10 bar steam consumption more

5.25

23.11.2015

5.20

5.20

4.40

4.30

6.30

10.00

3.50

PRDS 10 bar steam consumption more

3.15

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

PRDS 10 bar steam consumption more

0.62

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

PRDS 10 bar steam consumption more

1.10

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

PRDS 10 bar steam consumption more

1.51

02.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

20.50

PRDS 10 bar steam consumption more

4.10

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

03.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

PRDS 10 bar steam consumption more

1.30

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

PRDS 10 bar steam consumption more

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

PRDS 10 bar steam consumption more

5.07

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

PRDS 10 bar steam consumption more

2.32

04.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

05.12.2015

11.00

11.00

9.80

9.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

10.40

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

16.00

05.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

PRDS 10 bar steam consumption more

0.37

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

PRDS 10 bar steam consumption more

9.16

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

06.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

07.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

08.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

09.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

PRDS 10 bar steam consumption more

46.40

11.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

12.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

13.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

PRDS 10 bar steam consumption more

7.15

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

PRDS 10 bar steam consumption more

4.97

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

PRDS 10 bar steam consumption more

57.39

14.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

31.00

15.12.2015

5.20

5.20

5.00

5.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

2.07

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

PRDS 10 bar steam consumption more

2.98

16.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

11.50

PRDS 10 bar steam consumption more

2.30

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

PRDS 10 bar steam consumption more

48.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

20.00

17.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

18.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

PRDS 10 bar steam consumption more

26.45

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

20.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

PRDS 10 bar steam consumption more

16.15

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

PRDS 10 bar steam consumption more

18.75

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

21.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

22.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

PRDS 10 bar steam consumption more

7.10

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

PRDS 10 bar steam consumption more

0.70

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

PRDS 10 bar steam consumption more

6.52

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

PRDS 10 bar steam consumption more

12.60

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

PRDS 10 bar steam consumption more

20.50

23.12.2015

5.20

5.20

5.00

5.00

19.00

6.30

24.00

PRDS 10 bar steam consumption more

4.80

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

32.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

15.20

24.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

PRDS 10 bar steam consumption more

10.16

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

PRDS 10 bar steam consumption more

1.50

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

PRDS 10 bar steam consumption more

12.29

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more


(Temperature vaccum high)
PRDS 10 bar steam consumption more
(Temperature vaccum high)

9.80
1.20

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

25.12.2015

5.20

5.20

5.00

4.90

6.30

15.33

9.05

PRDS 10 bar steam consumption more

2.72

25.12.2015

5.20

5.20

5.00

5.00

17.41

6.30

12.82

PRDS 10 bar steam consumption more

2.56

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

5.20

5.20

5.00

4.90

6.30

14.30

8.00

PRDS 10 bar steam consumption more

2.40

26.12.2015

5.20

5.20

5.10

5.00

15.30

6.30

7.00

PRDS 10 bar steam consumption more

1.40

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

PRDS 10 bar steam consumption more

30.40

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.80

27.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

PRDS 10 bar steam consumption more

13.60

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

28.12.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

PRDS 10 bar steam consumption more

7.20

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

PRDS 10 bar steam consumption more

6.30

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

PRDS 10 bar steam consumption more

13.60

29.12.2015

5.20

5.20

5.00

5.00

6.30

13.45

13.25

PRDS 10 bar steam consumption more

2.65

29.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

PRDS 10 bar steam consumption more

5.40

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

PRDS 10 bar steam consumption more

1.68

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

30.12.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

4.80

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

PRDS 10 bar steam consumption more

6.00

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

PRDS 10 bar steam consumption more

3.30

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

PRDS 10 bar steam consumption more

10.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

PRDS 10 bar steam consumption more

2.20

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

PRDS 10 bar steam consumption more

19.00

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

31.12.2015

5.20

5.20

5.10

5.00

6.30

9.45

3.25

PRDS 10 bar steam consumption more

0.65

31.12.2015

5.20

5.20

5.00

4.90

9.45

6.30

20.75

PRDS 10 bar steam consumption more

6.23

OTHERS/ PROCESS NOT CONFIRM / LINE BOILER HOUSE PROBLEM

1.02

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.

3254.12

26.2.2015

5.20

5.20

5.00

5.00

7.00

8.50

1.83

Change module of bed temperature boiler 6 & 7 by


instrument

0.37

3.6.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

PLC failure

1.60

3.6.2015

5.20

5.20

0.00

0.00

3.22

6.37

3.25

PLC failure

16.90

3.6.2015

11.00

11.00

10.90

10.90

22.37

4.18

5.68

PLC failure

0.57

4.6.2015

5.20

5.20
0.00
0.00
6.37
9.15
TOTAL INSTRUMENT SHUTDOWN / BREAK DOWN

2.63

PLC failure

13.69
33.13

2.3.2015

5.30

5.20

5.10

5.00

13.09

13.23

0.23

Temperature winding high till 122 degree

0.05

3.3.2015

5.30

5.20

5.20

5.10

11.54

22.37

11.28

Temperature winding high on 122 degree

1.13

3.3.2015

5.20

5.20

5.00

5.00

24.09

6.37

5.53

Temperature winding high on 122 degree

1.11

6.3.2015

5.20

5.20

5.00

5.00

11.40

6.37

19.00

Winding temperatureTG 2 high on 122 degree

3.80

7.3.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Winding temperature high on 122 degree

1.60

15.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

16.3.2015

5.30

5.20

5.10

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

17.3.2015

5.30

5.20

4.70

4.70

22.37

6.37

8.00

Winding temperature high on 122 degree

4.00

19.3.2015

5.30

5.20

5.20

5.10

11.00

14.37

3.62

Winding temperature high on 122 degree

0.36

20.3.2015

5.20

5.20

5.00

4.90

23.00

5.00

6.00

Winding temperature high on 122 degree

1.80

23.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

Winding temperature high on 122 degree

4.80

24.3.2015

5.20

5.20

4.90

4.80

6.37

22.37

16.00

Winding temperature high on 122 degree

6.40

24.3.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

25.3.2015

5.20

5.20

4.90

4.80

6.37

11.58

5.35

Winding temperature high on 123 degree

2.14

25.3.2015

5.20

5.20

4.60

4.60

11.58

14.37

2.65

Winding temperature high on 123 degree

1.59

25.3.2015

5.20

5.20

5.00

5.00

14.37

6.37

16.00

Winding temperature high on 123 degree

3.20

26.3.2015

5.20

5.20

5.00

4.90

7.51

8.06

0.25

Winding temperature high on 123 degree

0.07

After normal increase load TG 2 as per


target
Decrease load TG2 after normal increase
again.
TG2 trip
Decrease load TG3 after normal increase
again.
TG2 trip
Decrease load TG2 after normal increase
again. (Cleaning strainer water cooler no. 1
alternator TG 2)
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

26.3.2015

5.20

5.20

4.90

4.80

8.06

22.37

14.52

Winding temperature high on 123 degree

5.81

26.3.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 123 degree

2.40

27.3.2015

5.20

5.20

5.00

4.90

6.37

9.42

3.08

Winding temperature high on 123 degree

0.93

27.3.2015

5.20

5.20

4.90

4.80

9.42

14.37

4.92

Winding temperature high on 123 degree

1.97

27.3.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

Winding temperature high on 123 degree

1.60

27.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

28.3.2015

5.20

5.20

5.00

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

28.3.2015

5.20

5.20

4.90

4.80

14.37

23.45

9.13

Winding temperature high on 123 degree

3.65

29.3.2015

5.20

5.20

4.80

4.80

6.37

14.37

8.00

Winding temperature high on 123 degree

3.20

29.3.2015

5.20

5.20

4.80

4.70

14.37

22.37

8.00

Winding temperature high on 123 degree

4.00

29.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 123 degree

3.20

30.3.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

31.3.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

1.4.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

3.4.2015

5.20

5.20

5.10

5.00

6.37

7.13

0.60

Winding temperature high on 122 degree

0.12

3.4.2015

5.20

5.20

4.90

4.80

7.13

6.37

23.40

Winding temperature high on 122 degree

9.36

4.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

5.4.2016

5.20

5.20

4.80

4.70

6.37

22.37

16.00

Winding temperature high on 122 degree

8.00

8.4.2015

5.20

5.20

5.10

5.00

14.37

6.37

18.38

Winding temperature high on 122 degree

3.68

12.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

13.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

14.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

16.00

Winding temperature high on 122 degree

6.40

14.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

15.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

Winding temperature high on 122 degree

9.60

16.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

17.4.2015

5.20

5.20

4.90

4.80

6.37

8.55

2.30

Winding temperature high on 122 degree

0.92

17.4.2015

5.20

5.20

4.80

4.70

12.37

14.37

10.00

Winding temperature high on 122 degree

5.00

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 2 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

17.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

18.4.2015

5.20

5.20

5.10

5.00

6.37

8.32

1.92

Winding temperature high on 122 degree

0.38

18.4.2015

5.20

5.20

4.90

4.80

12.00

22.37

9.55

Winding temperature high on 122 degree

3.82

18.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

Winding temperature high on 122 degree

1.60

19.4.2015

5.20

5.20

5.10

5.00

6.37

10.07

3.50

Winding temperature high on 122 degree

0.70

19.4.2015

5.20

5.20

5.00

4.90

10.07

11.03

0.93

Winding temperature high on 122 degree

0.28

19.4.2015

5.20

5.20

4.90

4.80

11.03

16.50

5.78

Winding temperature high on 122 degree

2.31

19.4.2015

5.20

5.20

5.00

5.00

16.50

6.37

13.78

Winding temperature high on 122 degree

2.76

20.4.2015

5.20

5.20

5.00

4.90

6.37

14.55

8.30

Winding temperature high on 122 degree

2.49

20.4.2015

5.20

5.20

5.10

5.00

17.58

22.37

4.68

Winding temperature high on 122 degree

0.94

20.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

21.4.2015

5.20

5.20

4.90

4.80

6.37

19.27

12.83

Winding temperature high on 122 degree

5.13

21.4.2015

5.20

5.20

5.00

4.90

19.27

6.37

11.17

Winding temperature high on 122 degree

3.35

22.4.2015

5.20

5.20

4.90

4.80

6.37

20.08

13.52

Winding temperature high on 122 degree

5.41

23.4.2015

5.20

5.20

4.90

4.90

6.37

8.00

1.62

Winding temperature high on 122 degree

0.49

23.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Winding temperature high on 122 degree

3.20

25.4.2015

5.20

5.20

4.90

4.80

14.37

6.37

16.00

Winding temperature high on 122 degree

6.40

26.4.2015

5.20

5.20

4.80

4.80

13.25

6.37

17.20

Winding temperature high on 122 degree

6.88

5.5.2015

5.20

5.20

4.80

4.70

17.57

18.26

1.52

Winding temperature high on 122 degree

0.76

5.5.2015

5.20

5.20

5.00

4.90

20.28

22.37

1.85

Winding temperature high on 122 degree

0.56

5.5.2015

5.20

5.20

4.90

4.90

22.37

6.37

8.00

Winding temperature high on 122 degree

2.40

6.5.2015

5.20

5.20

5.00

4.90

6.37

9.44

2.88

Winding temperature high on 122 degree

0.87

6.5.2015

5.20

5.20

4.90

4.80

9.44

12.12

2.47

Winding temperature high on 122 degree

0.99

6.5.2015

5.20

5.20

4.80

4.70

12.12

22.37

10.42

Winding temperature high on 122 degree

5.21

6.5.2015

5.20

5.20

5.00

4.90

22.37

0.04

1.45

Winding temperature high on 122 degree

0.44

15.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

16.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

Winding temperature high on 122 degree

12.00

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

17.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

18.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

19.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Winding temperature high on 122 degree

14.40

20.5.2015

5.20

5.20

4.70

4.60

6.37

5.20

22.72

Winding temperature high on 122 degree

13.63

20.5.2015

5.20

5.20

4.40

4.40

5.20

6.37

1.28

Winding temperature high on 122 degree

1.03

2.6.2015

5.20

5.20

5.00

4.90

6.37

0.34

17.95

Winding temperature high on 122 degree

5.39

2.6.2015

5.20

5.20

4.90

4.80

0.34

5.02

4.47

Winding temperature high on 122 degree

1.79

2.6.2015

5.20

5.20

5.10

5.00

5.02

6.37

1.42

Winding temperature high on 122 degree

0.28

29.6.2015

5.20

5.20

5.20

5.10

6.37

10.10

3.55

Temperature journal turbine NDE bearing high

0.36

29.6.2015

5.20

5.20

4.90

4.80

10.10

10.58

0.80

Temperature journal turbine NDE bearing high

0.32

29.6.2015

5.20

5.20

5.20

5.10

10.58

14.37

3.65

Temperature journal turbine NDE bearing high

0.37

29.6.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Temperature journal turbine NDE bearing high

0.80

1.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

2.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

3.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

4.7.2015

5.20

5.20

5.20

5.10

6.30

5.30

23.00

Winding temperature high

2.30

4.7.2015

5.20

5.20

5.20

5.10

6.00

6.30

0.50

Winding temperature high

0.05

5.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

Winding temperature high

2.40

7.7.2019

5.20

5.20

5.10

5.00

6.30

13.48

7.30

Winding temperature high

1.46

7.7.2020

5.20

5.20

4.50

4.50

13.48

14.06

0.30

SPG L-4 decrease steam consumption.

0.21

7.7.2021

5.20

5.20

5.10

5.00

14.06

14.30

0.40

Winding temperature high

0.08

7.7.2022

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

8.7.2015

5.20

5.20

4.80

4.70

6.30

7.20

0.83

Winding temperature high

0.42

8.7.2015

5.20

5.20

5.10

5.00

7.20

12.00

4.67

Winding temperature high

0.93

8.7.2015

5.20

5.20

5.00

4.90

12.00

6.30

18.50

Winding temperature high

5.55

10.7.2015

5.20

5.20

5.10

5.00

6.30

10.54

4.23

Winding temperature high

0.85

10.7.2015

5.20

5.20

5.00

4.90

10.54

12.44

1.82

Winding temperature high

0.55

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

10.7.2015

5.20

5.20

4.90

4.80

12.44

13.08

0.40

Winding temperature high

0.16

10.7.2015

5.20

5.20

4.80

4.70

13.08

14.30

1.37

Winding temperature high

0.68

10.7.2015

5.20

5.20

5.10

5.00

15.37

15.41

0.07

Winding temperature high

0.01

10.7.2015

5.20

5.20

5.20

5.10

15.42

18.12

2.50

Winding temperature high

0.25

10.7.2015

5.20

5.20

5.10

5.00

18.12

6.30

13.30

Winding temperature high

2.66

11.7.2015

5.20

5.20

5.10

5.00

12.04

14.30

2.43

Winding temperature high

0.49

11.7.2015

5.20

5.20

5.20

5.10

14.30

15.02

0.53

Winding temperature high

0.05

11.7.2015

5.20

5.20

5.10

5.00

15.02

21.33

6.52

Winding temperature high

1.30

11.7.2015

5.20

5.20

5.20

5.10

21.33

6.30

8.95

Winding temperature high

0.90

12.7.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

Winding temperature high

3.20

12.7.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

Winding temperature high

0.80

13.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Winding temperature high

4.80

14.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Winding temperature high

4.80

15.7.2015

5.20

5.20

5.10

5.00

6.30

16.45

10.25

Winding temperature high

2.05

15.7.2015

5.20

5.20

5.10

5.00

17.43

6.30

12.78

Winding temperature high

2.56

16.7.2015

5.20

5.20

5.10

5.00

6.30

10.56

4.43

Winding temperature high

0.89

16.7.2015

5.20

5.20

5.00

4.90

10.56

14.30

3.57

Winding temperature high

1.07

16.7.2015

5.20

5.20

5.00

5.00

14.30

6.30

16.00

Winding temperature high

3.20

17.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

Winding temperature high

7.20

18.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

Winding temperature high

7.20

19.7.2015

5.20

5.20

5.00

4.90

6.30

10.40

4.17

Winding temperature high

1.25

19.7.2015

5.20

5.20

4.90

4.80

10.40

13.22

2.70

Winding temperature high

1.08

19.7.2015

5.20

5.20

5.00

4.90

13.22

14.59

1.62

Winding temperature high

0.49

19.7.2015

5.20

5.20

4.90

4.80

14.59

22.30

7.52

Winding temperature high

3.01

19.7.2015

5.20

5.20

5.00

4.90

22.30

6.30

8.00

Winding temperature high

2.40

20.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

21.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

22.7.2015

5.20

5.20

4.90

4.80

6.30

14.39

8.15

Winding temperature high

3.26

22.7.2015

5.20

5.20

4.80

4.70

14.39

19.23

4.73

Winding temperature high

2.37

22.7.2015

5.20

5.20

4.90

4.80

19.23

6.30

11.12

Winding temperature high

4.45

23.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

Winding temperature high

9.60

24.7.2015

5.20

5.20

4.90

4.80

6.30

12.30

6.00

Winding temperature high

2.40

24.7.2015

5.20

5.20

4.80

4.70

12.30

14.30

2.00

Winding temperature high

1.00

24.7.2015

5.20

5.20

4.90

4.80

14.30

6.30

16.00

Winding temperature high

6.40

25.7.2015

5.20

5.20

4.90

4.80

6.30

9.40

3.17

Winding temperature high

1.27

25.7.2015

5.20

5.20

4.60

4.50

9.40

13.45

4.08

Winding temperature high

2.86

25.7.2015

5.20

5.20

4.80

4.70

13.45

4.45

15.00

Winding temperature high

7.50

25.7.2015

5.20

5.20

4.60

4.50

4.45

6.30

1.75

L-4 decrease steam consumption & Winding


temperature high

1.23

26.7.2016

5.20

5.20

4.70

4.60

6.30

14.30

8.00

Winding temperature high

4.80

26.7.2017

5.20

5.20

4.60

4.50

14.30

19.10

4.67

Winding temperature high

3.27

26.7.2018

5.20

5.20

4.70

4.60

19.10

20.40

1.50

Winding temperature high

0.90

26.7.2019

5.20

5.20

4.80

4.70

20.40

6.30

9.83

Winding temperature high

4.92

27.7.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

Winding temperature high

5.60

27.7.2015

5.20

5.20

4.00

3.90

15.29

16.39

1.17

Winding temperature high

1.52

27.7.2015

5.20

5.20

4.80

4.70

17.17

21.22

4.08

Winding temperature high

2.04

27.7.2015

5.20

5.20

4.70

4.60

21.22

6.30

7.97

Winding temperature high

4.78

28.7.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

16.80

29.7.2015

5.20

5.20

4.60

4.60

6.30

22.30

16.00

Winding temperature high

9.60

29.7.2015

5.20

5.20

4.70

4.70

22.30

6.30

8.00

Winding temperature high

4.00

30.7.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

Winding temperature high

4.00

30.7.2015

5.20

5.20

4.70

4.60

14.30

6.30

16.00

Winding temperature high

9.60

31.7.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

Winding temperature high

14.40

1.8.2015

5.20

5.20

4.70

4.60

6.30

10.40

4.17

Winding temperature high

2.50

1.8.2015

5.20

5.20

4.50

4.40

10.40

14.30

3.83

Winding temperature high

3.06

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

1.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

2.8.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

Winding temperature high

16.80

3.8.2015

5.20

5.20

4.50

4.50

6.30

14.30

8.00

Winding temperature high

5.60

3.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

Winding temperature high

11.20

4.8.2015

5.20

5.20

4.50

4.40

6.30

13.30

7.00

Winding temperature high

5.60

4.8.2015

5.20

5.20

4.00

4.00

13.30

17.40

4.17

Winding temperature high

5.00

4.8.2015

5.20

5.20

4.60

4.50

17.40

6.30

12.83

Winding temperature high

8.98

5.8.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

Winding temperature high

19.20

6.8.2015

5.20

5.20

4.40

4.40

6.30

6.30

24.00

Winding temperature high

19.20

7.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

8.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

9.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

10.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

Winding temperature high

21.60

11.8.2015

5.20

5.20

4.30

4.30

6.30

14.30

8.00

Winding temperature high

7.20

11.8.2015

5.20

5.20

4.20

4.10

14.30

16.15

1.75

Winding temperature high

1.93

11.8.2015

5.20

5.20

4.30

4.30

16.15

6.30

14.25

Winding temperature high

12.83

12.8.2015

5.20

5.20

4.30

4.20

6.30

14.30

8.00

Winding temperature high

8.00

13.8.2015

5.20

5.20

0.00

0.00

7.15

17.15

10.00

TG2 shutdown (cleaning alternator cooler & oil


cooler)

52.00

13.8.2015

5.20

5.20

5.00

5.00

17.15

6.30

13.25

Observation after shutdown

2.65

14.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Observation after shutdown

4.80

15.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

16.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

17.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

18.8.2015

5.20

5.20

5.10

5.00

6.30

15.34

9.07

18.8.2015

5.20

5.20

5.10

5.00

16.41

6.30

13.75

19.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

20.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG2 stop (shutdown)
Monitoring load and winding temperature
TG2
Monitoring load and winding temperature
TG2

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

1.81

load TG2 keep 5 MW

2.75

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

21.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

22.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

23.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

24.8.2015

5.20

5.20

5.10

5.00

6.30

9.03

2.55

24.8.2015

5.20

5.20

5.10

5.00

18.44

6.30

11.77

25.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.11.2015

5.20

5.20

0.00

0.00

7.40

15.40

8.00

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balance condenser flow & LP
actuator TG 3 & TG 4
Boiler 6 O/H, L1- shutdown (PMJ : TG2 Alternator
cooler cleaning)

TOTAL TG 2 PROBLEM (SHUTDOWN / BREAK DOWN)

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

0.51

load TG2 keep 5 MW

2.35

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

41.60

TG2 stop

946.57

21.2.2015

11.00

11.00

10.60

10.50

13.50

14.37

0.78

Vaccum TG3 droop

0.39

25.2.2015

11.00

10.90

10.80

10.80

14.41

18.05

3.40

Vaccum pressure TG3 droop

0.34

3.3.2015

11.00

11.00

10.80

10.80

9.00

9.38

0.63

Vaccum pressure TG3 droop < - 0.7 bar

0.13

3.3.2015

10.80

10.80

10.60

10.60

9.38

11.48

1.83

Vaccum pressure TG3 droop < - 0.7 bar

0.37

3.3.2015

10.80

10.80

10.60

10.60

11.48

14.37

3.18

Vaccum pressure TG3 droop < - 0.7 bar

0.64

6.3.2015

11.00

11.00

10.70

10.70

4.32

6.37

1.92

Vaccum pressure TG3 droop < - 0.7 bar

0.58

8.3.2015

11.00

11.00

10.70

10.70

6.37

13.22

6.75

Vaccum pressure TG3 droop

2.03

15.3.2015

11.00

11.00

10.80

10.80

6.37

14.37

8.00

Vaccum pressure TG3 droop

1.60

15.3.2015

10.80

10.80

10.50

10.50

14.37

6.37

16.00

Vaccum pressure TG3 droop

4.80

16.3.2015

11.00

11.00

10.60

10.50

6.37

14.37

8.00

Vaccum pressure TG3 droop

4.00

16.3.2015

11.00

11.00

10.80

10.70

14.37

22.37

8.00

Vaccum pressure TG3 droop

2.40

16.3.2015

11.00

11.00

10.90

10.80

22.37

6.37

8.00

Vaccum pressure TG3 droop

1.60

17.3.2015

11.00

11.00

10.80

10.70

6.37

10.37

4.00

Vaccum pressure TG3 droop

1.20

17.3.2015

10.80

10.70

10.20

10.20

10.37

14.37

4.00

Vaccum pressure TG3 droop

2.00

17.3.2015

10.50

10.50

8.50

8.50

22.37

6.37

8.00

Vaccum pressure TG3 droop

16.00

18.3.2015

11.00

11.00

0.00

0.00

8.37

6.37

22.00

TG3 stop for cleaning condenser & modification jobs.

242.00

19.3.2015

11.00

11.00

0.00

0.00

6.37

6.37

24.00

TG3 stop for cleaning condenser & modification jobs.

264.00

20.3.2015

11.00

11.00

10.50

10.50

22.50

5.00

6.17

3.08

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Planning 2 daysfinish the job and start up
again
TG3 stop. If breakdown finish TG3 start
again.
Decrease load TG3.

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300

2.4.2015

11.00

11.00

10.50

10.50

6.37

8.00

2.62

1.31

2.4.2015

11.00

11.00

8.00

8.00

8.00

10.00

2.00

2.4.2015

11.00

11.00

5.20

5.20

10.00

16.00

4.00

2.4.2015

11.00

11.00

5.50

5.50

16.00

18.44

2.73

2.4.2015

11.00

11.00

7.30

7.30

18.44

21.20

2.57

2.4.2015

11.00

11.00

9.00

9.00

21.20

22.00

1.33

2.4.2015

11.00

11.00

9.30

9.30

22.00

22.37

0.62

2.4.2015

11.00

11.00

10.80

10.80

22.37

6.37

8.00

26.5.2015

5.20

5.20

5.10

5.00

12.10

14.37

1.55

26.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

26.5.2015

5.20

5.20

5.00

4.90

22.37

1.00

2.38

26.5.2015

5.20

5.20

4.80

4.70

1.00

4.54

3.90

26.5.2015

5.20

5.20

4.90

4.80

4.55

5.14

1.68

26.5.2015

5.20

5.20

5.00

4.90

5.15

6.37

1.37

26.5.2015

11.20

11.20

11.00

10.90

13.10

14.00

0.83

26.5.2015

11.20

11.20

10.00

10.00

14.37

5.53

15.27

26.5.2015

11.20

11.20

10.20

10.20

5.53

6.37

0.73

27.5.2015

5.20

5.20

4.80

4.70

6.37

10.37

4.00

27.5.2015

5.20

5.20

4.70

4.60

10.37

14.37

4.00

27.5.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

27.5.2015

5.20

5.20

5.10

5.10

22.37

6.37

8.00

27.5.2015

11.00

11.00

10.20

10.20

6.37

10.37

4.00

27.5.2015

11.00

11.00

9.90

9.80

10.37

14.37

4.00

27.5.2015

11.00

11.00

9.10

9.10

14.37

22.37

8.00

27.5.2015

11.00

11.00

10.70

10.70

22.37

23.00

8.00

31.5.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

Pressure vacum TG3 drop

1.60

31.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

Pressure vacum TG3 drop

3.20

6.00
23.20
15.03
9.50
2.67
1.05
1.60
0.31
3.20
0.72
1.95
0.67
0.41
0.25
18.32
0.73
2.00
2.40
1.60
0.80
3.20
4.80
15.20
2.40

After normal increase load TG 3 as per


target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

31.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Pressure vacum TG3 drop

4.00

1.6.2015

5.20

5.20

4.80

4.70

13.30

14.37

1.12

Pressure vacum TG3 drop

0.56

1.6.2015

5.20

5.20

4.90

4.80

14.37

14.46

0.15

Pressure vacum TG3 drop

0.06

1.6.2015

5.20

5.20

4.80

4.70

14.46

17.00

2.23

Pressure vacum TG3 drop

1.12

1.6.2015

5.20

5.20

4.90

4.80

17.00

19.24

2.40

Pressure vacum TG3 drop

0.96

1.6.2015

5.20

5.20

5.00

4.90

19.24

6.37

10.78

Pressure vacum TG3 drop

3.24

1.6.2015

11.00

11.00

9.00

8.90

13.30

15.47

2.28

Pressure vacum TG3 drop

4.80

1.6.2015

11.00

11.00

8.50

8.50

15.47

17.10

1.38

Pressure vacum TG3 drop

3.46

2.6.2015

11.00

11.00

10.80

10.80

23.23

6.37

7.23

Pressure vacum TG3 drop

1.45

13.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

condensate get high & vacum drop & Winding get


high

24.00

14.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

vacum drop

24.00

15.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

17.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

18.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

19.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

20.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

21.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

22.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

23.6.2015

11.00

11.00

10.00

10.00

6.37

15.56

9.32

23.6.2015
24.6.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

15.56
6.37

6.37
6.37

25.6.2015

11.00

11.00

0.00

0.00

6.37

8.7.2015

11.00

11.00

10.90

10.90

8.7.2015

11.00

11.00

10.80

16.7.2015

11.00

11.00

27.8.2015

11.00

3.9.2015

14.68
24.00

condensate get high & vacum drop & Winding get


high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
TG3 shutdown
TG3 shutdown

161.48
264.00

9.35

2.97

TG3 start up & Syncronize power

32.63

6.30

8.15

1.75

10.80

16.00

6.30

9.50

PPL2 request decrease load TG3 (LP TG4 100%)

1.90

11.00

10.90

8.14

14.30

6.27

Inlet flow steam high

0.63

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

11.00

11.00

10.50

10.50

6.30

7.58

1.47

Effeci L-4, PRDS 10 bar steam consumption more

0.73

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

Effeci L-4, PRDS 10 bar steam consumption more

0.25

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

Effeci L-4, PRDS 10 bar steam consumption more

0.50

21.60
21.60
24.00
24.00
21.60
21.60
24.00
9.32

0.18

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 stop
TG3 stop
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

Effeci L-4, PRDS 10 bar steam consumption more

3.78

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

Effeci L-4, PRDS 10 bar steam consumption more

0.86

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

Effeci L-4, PRDS 10 bar steam consumption more

9.53

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

PRDS 10 bar steam consumption more (effect L-4)

0.00

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

PRDS 10 bar steam consumption more (effect L-4)

27.75

9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

PRDS 10 bar steam consumption more (effect L-4)

2.38

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

PRDS 10 bar steam consumption more (effect L-4)

7.20

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-4)

6.40

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

PRDS 10 bar steam consumption more (effect L-4)

3.75

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

PRDS 10 bar steam consumption more (effect L-4)

4.40

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

PRDS 10 bar steam consumption more

2.01

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

55.20

27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

5.60

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

PRDS 10 bar steam consumption more

1.60

28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

PRDS 10 bar steam consumption more

3.48

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

PRDS 10 bar steam consumption more

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

PRDS 10 bar steam consumption more

16.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

PRDS 10 bar steam consumption more

5.56

29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

PRDS 10 bar steam consumption more

4.80

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

1.50

2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

PRDS 10 bar steam consumption more

11.20

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

PRDS 10 bar steam consumption more

4.80

3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more

16.80

10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

PRDS 10 bar steam consumption more

11.20

11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

PRDS 10 bar steam consumption more

24.00

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

27.8.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more

7.00

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

PRDS 10 bar steam consumption more

14.67

14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

PRDS 10 bar steam consumption more

4.07

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

PRDS 10 bar steam consumption more

12.87

15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

PRDS 10 bar steam consumption more

12.80

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

7.20

16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

PRDS 10 bar steam consumption more

0.30

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

PRDS 10 bar steam consumption more

13.00

17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

PRDS 10 bar steam consumption more

8.80

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.00

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

24.00

21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

8.00

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

PRDS 10 bar steam consumption more

2.82

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

8.80

22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

12.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

PRDS 10 bar steam consumption more

3.92

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

PRDS 10 bar steam consumption more

1.45

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

PRDS 10 bar steam consumption more

2.03

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

12.00

23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

PRDS 10 bar steam consumption more

1.40

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

PRDS 10 bar steam consumption more

1.67

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

PRDS 10 bar steam consumption more

2.43

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

PRDS 10 bar steam consumption more

3.70

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

PRDS 10 bar steam consumption more

2.71

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

PRDS 10 bar steam consumption more

11.34

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

PRDS 10 bar steam consumption more

1.84

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

PRDS 10 bar steam consumption more

10.95

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

PRDS 10 bar steam consumption more

13.60

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

PRDS 10 bar steam consumption more

24.00

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

PRDS 10 bar steam consumption more

1.75

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

PRDS 10 bar steam consumption more

14.35

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

PRDS 10 bar steam consumption more

0.08

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

PRDS 10 bar steam consumption more

4.80

30.10.2015

11.00

11.00

9.60

9.60

21.24

6.30

9.10

PRDS 10 bar steam consumption more

12.74

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

PRDS 10 bar steam consumption more

43.20

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

PRDS 10 bar steam consumption more

4.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more

1.60

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

2.40

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

3.20

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

PRDS 10 bar steam consumption more

8.00

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

PRDS 10 bar steam consumption more

0.50

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

24.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

PRDS 10 bar steam consumption more

4.04

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

PRDS 10 bar steam consumption more

6.46

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

PRDS 10 bar steam consumption more

12.27

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

PRDS 10 bar steam consumption more

4.50

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

PRDS 10 bar steam consumption more

6.50

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

PRDS 10 bar steam consumption more

22.40

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

PRDS 10 bar steam consumption more

16.68

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

PRDS 10 bar steam consumption more

2.00

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

PRDS 10 bar steam consumption more

9.60

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

PRDS 10 bar steam consumption more

22.40

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

PRDS 10 bar steam consumption more

1.40

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

PRDS 10 bar steam consumption more

4.20

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

PRDS 10 bar steam consumption more

27.90

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

PRDS 10 bar steam consumption more

5.80

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

PRDS 10 bar steam consumption more

31.20

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

16.11.2015

11.00

11.00

9.70

9.60

6.30

14.30

8.00

PRDS 10 bar steam consumption more

11.20

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

PRDS 10 bar steam consumption more

16.61

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

PRDS 10 bar steam consumption more

10.62

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

PRDS 10 bar steam consumption more

12.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

PRDS 10 bar steam consumption more

5.25

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

PRDS 10 bar steam consumption more

0.62

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

PRDS 10 bar steam consumption more

1.10

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

PRDS 10 bar steam consumption more

1.51

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

PRDS 10 bar steam consumption more

7.20

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

5.60

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

PRDS 10 bar steam consumption more

1.30

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

PRDS 10 bar steam consumption more

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

PRDS 10 bar steam consumption more

6.40

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

PRDS 10 bar steam consumption more

5.07

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

PRDS 10 bar steam consumption more

2.32

05.12.2015

11.00

11.00

9.80

9.70

6.30

14.30

8.00

PRDS 10 bar steam consumption more

10.40

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

PRDS 10 bar steam consumption more

16.00

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

PRDS 10 bar steam consumption more

0.37

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

PRDS 10 bar steam consumption more

9.16

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

PRDS 10 bar steam consumption more

46.40

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

PRDS 10 bar steam consumption more

72.00

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

PRDS 10 bar steam consumption more

7.15

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

PRDS 10 bar steam consumption more

4.97

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

PRDS 10 bar steam consumption more

57.39

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

PRDS 10 bar steam consumption more

31.00

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

PRDS 10 bar steam consumption more

2.98

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

PRDS 10 bar steam consumption more

48.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

PRDS 10 bar steam consumption more

20.00

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

PRDS 10 bar steam consumption more

33.60

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

PRDS 10 bar steam consumption more

36.00

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

PRDS 10 bar steam consumption more

26.45

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

PRDS 10 bar steam consumption more

16.15

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

PRDS 10 bar steam consumption more

18.75

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

PRDS 10 bar steam consumption more

10.40

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

24.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

PRDS 10 bar steam consumption more

16.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

PRDS 10 bar steam consumption more

13.60

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

PRDS 10 bar steam consumption more

7.10

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

PRDS 10 bar steam consumption more

0.70

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

PRDS 10 bar steam consumption more

6.52

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

PRDS 10 bar steam consumption more

12.60

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

PRDS 10 bar steam consumption more

20.50

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

PRDS 10 bar steam consumption more

32.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

PRDS 10 bar steam consumption more

15.20

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

PRDS 10 bar steam consumption more

10.16

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

PRDS 10 bar steam consumption more

1.50

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

PRDS 10 bar steam consumption more

12.29

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.00

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

PRDS 10 bar steam consumption more

30.40

PRDS 10 bar steam consumption more


(Temperature vaccum high)
PRDS 10 bar steam consumption more
(Temperature vaccum high)

9.80
1.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

PRDS 10 bar steam consumption more

16.80

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

PRDS 10 bar steam consumption more

16.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

PRDS 10 bar steam consumption more

13.60

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

PRDS 10 bar steam consumption more

6.30

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

PRDS 10 bar steam consumption more

13.60

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

PRDS 10 bar steam consumption more

5.40

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

PRDS 10 bar steam consumption more

1.68

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

PRDS 10 bar steam consumption more

18.40

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

PRDS 10 bar steam consumption more

14.40

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

PRDS 10 bar steam consumption more

6.00

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

PRDS 10 bar steam consumption more

3.30

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

PRDS 10 bar steam consumption more

10.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

PRDS 10 bar steam consumption more

2.20

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

PRDS 10 bar steam consumption more

19.00

33.06

0.74

TOTAL TG 3 PROBLEM (SHUTDOWN / BREAK DOWN)

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

4048.89

26.2.2015

18.35

18.02

13.90

13.80

8.50

16.00

7.83

Cleaning online 1/2 condenser TG4 (Note and for


attention : When load already normal on 19.49 MW
after cleaning online 1/2 condenser as per target
wending temperature on 116 degree alarm and axial
come on 10 - 11 mills alarm)

23.3.2015

20.44

20.31

19.45

19.30

10.25

11.09

0.73

CEP cleaning

11.4.2015

20.49

20.36

11.00

11.00

8.00

6.37

22.38

TG4 radial vibration indicate high on HP bearing

209.48

12.4.2015

20.49

20.36

11.00

11.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

224.64

13.4.2015

20.49

20.36

12.23

12.15

6.37

19.25

8.20

TG4 radial vibration indicate high on HP bearing

67.32

13.4.2015

20.49

20.36

0.00

0.00

19.25

6.37

15.80

TG4 radial vibration indicate high on HP bearing

321.69

14.4.2015

20.49

20.36

0.00

0.00

6.37

14.26

7.82

TG4 radial vibration indicate high on HP bearing

159.15

14.4.2015

20.49

20.36

7.00

7.00

14.26

15.51

1.42

TG4 radial vibration indicate high on HP bearing

18.93

14.4.2015

20.49

20.36

0.00

0.00

15.51

6.37

14.77

TG4 radial vibration indicate high on HP bearing

300.72

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target

15.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

488.64

16.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

TG4 radial vibration indicate high on HP bearing

488.64

16.6.2015

19.75

19.60

19.20

19.10

12.00

17.00

5.00

Winding temperature TG get high

2.50

18.6.2015
20.6.2015

19.75
19.50

19.70
19.40

19.20
19.20

19.10
19.00

12.00
11.00

17.00
17.00

6.00
6.00

Winding Temp. Tg 4 get high 117,5 degree


Winding Temp. Tg 4 get high 117,5 degree

3.60
2.40

21.6.2015

19.50

19.40

19.20

19.10

11.00

17.00

6.00

winding temperature alternator TG 4 high

1.80

23.6.2015

19.61

19.58

19.18

19.03

13.30

14.30

1.00

winding temperature alternator TG 4 high

0.55

27.6.2015

19.40

19.30

18.90

18.80

11.00

17.00

6.00

winding temperature alternator TG 4 high

3.00

28.6.2015

19.40

19.30

19.10

18.90

11.00

17.00

6.00

winding temperature alternator TG 4 high

2.40

29.6.2015

19.40

19.30

18.96

18.67

8.30

14.30

6.00

29.6.2015

19.40

19.30

18.83

18.51

14.30

22.30

8.00

29.6.2015

19.40

19.30

18.96

18.86

22.30

6.30

8.00

30.6.2015
30.6.2015
2.7.2015
5.7.2015
5.7.2015

19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30

19.01
19.44
19.35
0.00
10.14

18.91
19.25
19.17
0.00
10.10

6.30
14.30
6.30
6.30
1.21

14.30
6.30
14.30
1.21
6.30

6.7.2015

19.40

19.30

10.62

10.53

6.30

6.7.2015

19.40

19.30

11.50

11.40

6.7.2015

19.40

19.30

12.14

6.7.2015

19.40

19.30

6.7.2015

19.40

6.7.2015

8.00
16.00
8.00
18.85
5.15

Fan C/T no. 1 stop & winding temperature alternator


TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Clening condenser TG4
TG4 start up & Syncronize power

3.12
0.80
1.04
363.81
47.38

10.30

4.00

Cleaning online 1/2 condenser TG4

35.08

10.30

13.30

3.00

L-2 break down & Cleaning online 1/2 condenser


TG4

23.70

12.06

13.30

14.30

1.00

Cleaning online 1/2 condenser TG4

7.24

13.40

1.36

14.30

22.30

8.00

Cleaning online 1/2 condenser TG4

143.52

19.30

14.14

14.09

22.30

6.30

8.00

Cleaning online 1/2 condenser TG4

41.68

11.00

11.00

10.80

10.80

10.10

10.40

0.50

Cleaning online 1/2 condenser TG4

0.10

6.7.2015

11.00

11.00

10.00

10.00

10.40

14.30

3.83

Cleaning online 1/2 condenser TG4

3.83

6.7.2015

11.00

11.00

10.50

10.50

14.30

6.30

16.00

Cleaning online 1/2 condenser TG4

8.00

6.7.2015

5.20

5.20

5.20

5.10

6.30

9.13

2.72

Cleaning online 1/2 condenser TG4

0.27

6.7.2015

5.20

5.20

4.90

4.80

9.13

10.24

1.18

Cleaning online 1/2 condenser TG4

0.47

6.7.2015

5.20

5.20

4.00

4.00

10.24

13.30

3.10

L-2 break down

3.72

6.7.2015

5.20

5.20

5.20

5.10

13.30

22.30

9.00

Cleaning online 1/2 condenser TG4

0.90

7.7.2015

19.40

19.30

15.80

14.83

6.30

10.00

3.50

Cleaning online 1/2 condenser TG4

15.65

TG 4 stop. After normal increase load TG 4


as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5
After normal increase load TG 4 as per
target (control max. 117.5 degree)
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5 and
planning change cooling tower water with
filter water

3.78

Control winding temprature max. 117.5

6.32

Control winding temprature max. 117.5

3.52

Control winding temprature max. 117.5


Control winding temprature max. 117.5
Control winding temprature max. 117.5
Control winding temprature max. 117.5
TG4 stop
Monitoring syncronize
Decrease load TG4 after normal increase
again.
TG4 restricted load due to cleaning
condenser cell 1 phase
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.

7.7.2016

11.00

11.00

10.50

10.50

6.30

11.22

4.87

23.8.2015

20.20

20.20

20.18

19.90

6.30

6.30

24.00

25.8.2015

20.40

20.40

20.26

20.19

6.30

14.30

8.00

22.9.2015
23.9.2015
24.9.2015

20.20
20.20
20.20

20.00
20.00
20.00

0.00
0.00
19.14

0.00
0.00
18.96

20.00
6.30
6.30

6.30
14.25
14.30

24.9.2015

20.20

20.00

19.14

19.00

14.30

6.30

Cleaning online 1/2 condenser TG4

2.43

10.50
7.92
8.00

Winding temperature high 117 degree (Boiler 131


T/H and suplly steam bleed is 13 T/H)
Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
TG4 oil leakage from High Speed coupling guard
TG4 oil leakage from High Speed coupling guard
TG4 oil leakage from High Speed coupling guard

210.00
158.33
8.32

16.00

TG4 oil leakage from High Speed coupling guard

16.00

1.57

TOTAL TG 4 PROBLEM (SHUTDOWN / BREAK DOWN)

7.20
1.68

Decrease load TG3 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
TG4 stop
TG4 stop
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

3447.14

26.2.2015

5.00

5.00

4.80

4.80

8.50

16.00

7.83

Balancing FD Fan "B" boiler 8 & cleaning online 1/2


condenser TG4

5.4.2015

20.49

20.36

18.18

17.93

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

19.44

5.4.2017

5.20

5.20

3.50

3.40

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

14.40

5.4.2015

11.00

11.00

7.00

7.00

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

32.00

6.4.2015

20.49

20.36

18.98

18.85

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

36.24

6.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

6.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

7.4.2015

20.49

20.36

18.27

18.06

6.37

14.37

8.00

Boiler 8 breakdown (inbed tube leakage)

18.40

7.4.2015

20.49

20.36

18.40

18.20

14.37

22.37

8.00

Boiler 8 breakdown (inbed tube leakage)

17.28

7.4.2015

20.49

20.36

18.53

18.42

22.37

6.37

8.00

Boiler 8 breakdown (inbed tube leakage)

15.52

7.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

43.20

7.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

Boiler 8 breakdown (inbed tube leakage)

96.00

8.4.2015

5.20

5.20

3.50

3.40

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

10.11

8.4.2015

11.00

11.00

7.00

6.90

6.37

12.00

5.62

Boiler 8 breakdown (inbed tube leakage)

23.04

27.4.2015

20.50

20.50

17.80

17.50

14.19

14.37

0.30

Boiler 8 overhaul

0.90

27.4.2015

20.50

20.50

18.31

18.30

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

20.50

20.50

20.01

19.86

22.37

6.37

8.00

Boiler 8 overhaul

5.12

27.4.2015

5.20

5.20

4.80

4.80

6.37

14.15

7.63

Boiler 8 overhaul

3.05

27.4.2015

5.20

5.20

3.30

3.20

14.15

14.37

0.37

Boiler 8 overhaul

0.73

27.4.2015

5.20

5.20

3.10

3.00

14.37

22.37

8.00

Boiler 8 overhaul

17.60

27.4.2015

5.20

5.20

3.40

3.30

22.37

6.37

8.00

Boiler 8 overhaul

15.20

After normal increase load TG 2 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

27.4.2015

11.00

11.00

6.70

6.70

14.15

14.37

0.37

Boiler 8 overhaul

1.58

27.4.2015

11.00

11.00

6.80

6.70

14.37

22.37

8.00

Boiler 8 overhaul

34.40

27.4.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

20.33

20.30

18.35

18.28

12.00

22.37

10.62

Boiler 8 overhaul

21.45

28.4.2015

20.33

20.30

18.18

18.09

22.37

6.37

8.00

Boiler 8 overhaul

17.68

28.4.2015

5.20

5.20

3.30

3.20

6.37

22.37

16.00

Boiler 8 overhaul

32.00

28.4.2015

5.20

5.20

3.20

3.10

22.37

6.37

8.00

Boiler 8 overhaul

16.80

28.4.2015

11.00

11.00

6.70

6.70

6.37

14.37

8.00

Boiler 8 overhaul

34.40

28.4.2015

11.00

11.00

6.80

6.80

14.37

22.37

8.00

Boiler 8 overhaul

33.60

28.4.2015

11.00

11.00

6.60

6.50

22.37

6.37

8.00

Boiler 8 overhaul

36.00

29.4.2015

20.33

20.30

18.61

18.47

6.37

14.37

8.00

Boiler 8 overhaul

14.64

29.4.2015

20.33

20.33

17.66

17.53

14.37

6.37

16.00

Boiler 8 overhaul

44.80

29.4.2015

5.20

5.20

3.20

3.20

6.37

6.37

24.00

Boiler 8 overhaul

48.00

29.4.2015

11.00

11.00

6.30

6.20

6.37

14.37

8.00

Boiler 8 overhaul

38.40

29.4.2015

11.00

11.00

6.40

6.40

14.37

15.10

0.55

Boiler 8 overhaul

2.53

29.4.2015

11.00

11.00

6.60

6.60

15.10

6.37

15.45

Boiler 8 overhaul

67.98

30.4.2015

20.33

20.33

17.23

17.05

6.37

14.37

8.00

Boiler 8 overhaul

26.24

30.4.2015

20.33

20.33

17.50

17.49

14.37

22.37

8.00

Boiler 8 overhaul

22.72

30.4.2015

20.33

20.33

17.35

17.22

22.37

6.37

8.00

Boiler 8 overhaul

24.88

30.4.2015

5.20

5.20

3.10

3.10

6.37

22.37

16.00

Boiler 8 overhaul

33.60

30.4.2015

5.20

5.20

3.30

3.20

22.37

6.37

8.00

Boiler 8 overhaul

16.00

30.4.2015

11.00

11.00

6.60

6.50

6.37

6.37

24.00

Boiler 8 overhaul

108.00

1.5.2015

20.33

20.33

17.18

17.07

6.37

14.37

8.00

Boiler 8 overhaul

26.08

1.5.2015

20.33

20.33

17.31

17.15

14.37

6.37

16.00

Boiler 8 overhaul

50.88

1.5.2015

5.20

5.20

3.30

3.20

6.37

13.37

7.00

Boiler 8 overhaul

14.00

1.5.2015

5.20

5.20

2.20

2.20

13.37

6.37

17.00

Boiler 8 overhaul

51.00

1.5.2015

11.00

11.00

6.60

6.50

6.37

13.37

7.00

Boiler 8 overhaul

31.50

1.5.2015

11.00

11.00

6.00

6.00

13.30

6.37

17.00

Boiler 8 overhaul

85.00

2.5.2015

20.33

20.33

17.49

17.24

6.37

14.37

8.00

Boiler 8 overhaul

24.72

2.5.2015

20.33

20.33

18.36

18.16

14.37

22.37

8.00

Boiler 8 overhaul

17.36

2.5.2015

20.33

20.33

17.90

17.80

22.37

6.37

8.00

Boiler 8 overhaul

20.24

2.5.2015

5.20

5.20

2.20

2.10

6.37

6.37

24.00

Boiler 8 overhaul

74.40

2.5.2015

11.00

11.00

6.00

6.00

6.37

6.37

24.00

Boiler 8 overhaul

120.00

3.5.2015

20.33

20.33

18.27

18.24

6.37

14.37

8.00

Boiler 8 overhaul

16.72

3.5.2015

20.33

20.33

17.71

17.45

14.37

22.37

8.00

Boiler 8 overhaul

23.04

3.5.2015

20.33

20.33

17.71

17.58

22.37

6.37

8.00

Boiler 8 overhaul

22.00

3.5.2015

5.20

5.20

2.20

2.10

6.37

14.37

8.00

Boiler 8 overhaul

24.80

3.5.2015

5.20

5.20

6.60

3.50

3.50

22.37

8.00

Boiler 8 overhaul

13.60

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

3.5.2015

5.20

5.20

3.60

3.60

22.37

6.37

8.00

Boiler 8 overhaul

12.80

3.5.2015

11.00

11.00

6.00

6.00

6.37

14.37

8.00

Boiler 8 overhaul

40.00

3.5.2015

11.00

11.00

6.60

6.50

14.37

6.37

16.00

Boiler 8 overhaul

72.00

4.5.2015

20.33

20.33

18.01

17.77

6.37

14.37

8.00

Boiler 8 overhaul

20.48

4.5.2015

20.33

20.33

18.88

18.72

14.37

22.37

8.00

Boiler 8 overhaul

12.88

4.5.2015

20.33

20.33

18.53

18.44

22.37

6.37

8.00

Boiler 8 overhaul

15.12

4.5.2015

5.20

5.20

3.70

3.60

6.37

22.37

16.00

Boiler 8 overhaul

25.60

4.5.2015

5.20

5.20

3.80

3.70

22.37

6.37

8.00

Boiler 8 overhaul

12.00

4.5.2015

11.00

11.00

6.60

6.50

6.37

22.37

16.00

Boiler 8 overhaul

72.00

Boiler 8 overhaul
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam 8atoverhaul
17.30) (Boiler 8 start up & Syncronize
Boiler

34.40

4.5.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

5.5.2015

20.33

20.33

18.35

18.12

6.37

19.37

13.00

5.5.2015

5.20

5.20

3.80

3.70

6.37

17.35

10.97

5.5.2015

11.00

11.00

6.60

6.60

6.37

17.45

11.13

5.5.2015

11.00

11.00

9.00

9.00

17.45

19.08

1.38

steam
17.30) (Boiler 8 start up & Syncronize
Boiler 8atoverhaul
steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)

TOTAL BOILER 8 PROBLEM (SHUTDOWN / BREAK DOWN)

28.73
16.45
48.99
2.77

Decrease load TG2 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

2266.25
Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler
4 trip (L-1, 2, 3, 4, 5 minimum speed)
Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler
4 trip (L-1, 2, 3, 4, 5 minimum speed)

8.3.2015

11.00

11.00

7.80

7.80

1.25

6.30

5.08

16.27

8.3.2015

5.30

5.20

4.50

4.50

1.25

6.30

5.08

8.3.2015

19.44

19.24

0.00

0.00

1.25

6.30

5.08

Boiler 9 breakdown due to water wall tube leak

97.80

9.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

9.3.2015

5.30

5.20

4.60

4.50

6.37

7.28

0.85

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.60

9.3.2015

5.30

5.20

4.00

4.00

8.04

14.37

6.55

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

7.86

9.3.2015

5.20

5.20

4.50

4.40

14.37

6.37

16.00

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

12.80

9.3.2015

11.00

11.00

8.10

8.10

6.37

6.48

0.18

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.53

9.3.2015

11.00

11.00

8.70

8.60

7.58

14.37

7.35

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

17.64

9.3.2015

11.00

11.00

8.50

8.50

14.37

6.37

16.00

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

40.00

10.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

10.3.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

10.3.2015

11.00

11.00

8.50

8.50

6.37

10.00

3.62

Boiler 9 breakdown due to water wall tube leak

9.04

10.3.2015

8.50

8.50

8.20

8.20

10.00

10.12

0.20

Boiler 9 breakdown due to water wall tube leak

0.06

10.3.2015

8.50

8.50

7.50

7.50

10.12

12.49

2.62

Boiler 9 breakdown due to water wall tube leak

2.62

10.3.2015

11.00

11.00

8.00

8.00

12.53

15.52

2.98

Boiler 9 breakdown due to water wall tube leak

8.95

10.3.2015

11.00

11.00

8.20

8.20

15.52

6.37

14.75

Boiler 9 breakdown due to water wall tube leak

41.30

3.56

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

11.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

11.3.2015

5.30

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

16.80

11.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

12.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

12.3.2015

5.20

5.20

5.00

5.00

6.37

17.00

10.38

Boiler 9 breakdown due to water wall tube leak

2.08

12.3.2015

5.10

5.00

4.50

4.40

17.00

6.37

13.62

Boiler 9 breakdown due to water wall tube leak

8.17

12.3.2015

11.00

11.00

9.00

9.00

6.37

17.13

10.60

Boiler 9 breakdown due to water wall tube leak

21.20

12.3.2015

9.00

9.00

7.30

7.30

17.13

6.37

13.40

Boiler 9 breakdown due to water wall tube leak

22.78

13.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

13.3.2015

5.20

5.20

4.70

4.70

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

12.00

13.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

14.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

Boiler 9 breakdown due to water wall tube leak

461.76

14.3.2015

5.20

5.20

5.00

4.90

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

7.20

14.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

Boiler 9 breakdown due to water wall tube leak

67.20

15.3.2015

19.44

19.24

0.00

0.00

6.30

11.00

4.50

Boiler 9 breakdown due to water wall tube leak

86.58

22.3.2015

20.49

20.31

19.74

19.67

11.40

16.00

4.33

Boiler 9 Belt conveyor of coal feeder no. 2 tear.

2.77

8.4.2015

20.49

20.36

18.53

18.42

6.37

14.51

8.23

8.4.2015

20.49

20.36

0.00

0.00

14.51

6.37

15.77

9.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

9.4.2015

5.20

5.20

5.10

5.00

6.37

22.37

16.00

9.4.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

9.4.2015

11.00

11.00

8.80

8.80

7.23

14.37

7.23

9.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

9.4.2015

11.00

11.00

10.50

10.50

22.37

6.37

8.00

10.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

10.4.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

10.4.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

10.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

15.97
321.08
488.64
3.20
4.00
15.91
3.20
4.00
488.64
1.60
3.20
2.40

TG4 stop (Boiler 9 brekdown water tube get


leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 start up and synchronize steam at
11.00.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target

10.4.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

10.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

11.4.2015

20.49

20.36

0.00

0.00

6.37

8.00

1.62

11.4.2015

5.20

5.20

5.00

4.90

6.37

22.37

16.00

11.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

32.92

49.83

TG4 trip

67.33

Decrease load TG4 after normal increase


again.

4.00
3.20

4.80
3.20

07.12.2015

20.20

20.20

0.00

0.00

12.00

14.28

2.47

TG4 loow-low inlet steam press ( Boiler-9 trip due to


Both IDF trip) effect from lift valve of bag filter get
close it self due to pressure compressor get low less
than 4.5 bar

14.12.2015

20.20

20.20

0.00

0.00

15.40

19.00

3.33

Boiler # 9 & TG#4 TRIP Due to air prss low for bag
filter jetting

26.2.2015

11.00

TOTAL BOILER 9 PROBLEM BREAKDOWN (PPL)


11.00
8.00
7.90
6.50
4.00

21.83

L-2 process shutdown position

26.2.2015

19.53

19.27

18.35

18.02

6.50

4.00

21.83

L-2 process shutdown position

17.3.2015

5.30

5.20

5.10

5.00

6.37

22.37

16.00

L-2 breakdown

21.5.2015

5.20

5.20

2.70

2.60

6.37

8.45

2.13

L-2 shutdown

21.5.2015

5.20

5.20

2.00

2.00

8.45

9.04

0.32

L-2 shutdown

21.5.2015

5.20

5.20

0.00

0.00

9.04

15.37

6.55

L-2 shutdown (PM Jobs : TG2 stop for Cleaning


cooler winding gen & install tapping at pipe line
make up filter water)

34.06

21.5.2015

5.20

5.20

2.20

2.20

15.37

22.37

7.00

L-2 shutdown

21.00

21.5.2015

5.20

5.20

3.80

3.80

22.37

2.03

3.43

L-2 shutdown

4.81

21.5.2015

5.20

5.20

4.50

4.50

2.03

2.26

0.38

L-2 shutdown

0.27

21.5.2015

11.00

11.00

9.00

9.00

7.13

8.57

1.73

L-2 shutdown

3.47

21.5.2015

11.00

11.00

10.50

10.50

8.57

11.40

3.28

L-2 shutdown

1.64

21.5.2015

11.00

11.00

10.30

10.30

11.40

13.37

2.05

L-2 shutdown

1.44

21.5.2015

11.00

11.00

8.50

8.50

15.32

19.52

4.33

L-2 shutdown

10.83

21.5.2015

11.00

11.00

9.30

9.30

19.52

0.30

5.37

L-2 shutdown

9.12

21.5.2015

11.00

11.00

10.10

10.10

0.30

2.30

2.00

L-2 shutdown

1.80

22.8.2015

11.00

11.00

10.60

10.50

10.26

14.37

4.18

L-2 brekdown

2.09

24.8.2015

5.20

5.20

5.00

4.90

9.03

10.00

0.95

L-2 spinning dryer decrease steam consumption

0.29

24.8.2015

5.20

5.20

5.10

5.00

10.00

17.35

7.58

L-2 spinning dryer decrease steam consumption

1.52

26.8.2015

11.00

11.00

10.50

10.50

10.29

11.27

0.97

L-2 breakdown

0.48

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

After normal increase load TG 3 as per


target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target

4944.68
After normal increase load TG 3 as per
67.68
target
After normal increase load TG 4 as per
27.29
target
Decrease load TG2 after normal increase
3.20
again.
Decrease load TG2 after normal increase
5.55
again.
Decrease load TG2 after normal increase
1.01
again.
TG2 stop.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
load TG2 keep 5 MW
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

6.10.2015

5.20

5.20

5.00

5.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more (effect L-3)

1.40

load TG2 keep 5 MW

6.10.2016

5.20

5.20

4.50

4.50

13.30

14.30

1.00

Spinning L-3 breakdown

0.70

Decrease load TG2 after normal increase


again.

6.10.2015

5.20

5.20

4.80

4.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

3.20

load TG2 keep 5 MW

6.10.2016

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

1.60

load TG2 keep 5 MW

16.10.2015

11.00

11.00

8.40

8.40

6.50

9.25

2.58

L-3 shutdown

6.72

16.10.2015

11.00

11.00

7.50

7.50

9.25

17.30

8.08

L-3 shutdown

28.29

16.10.2015

5.20

5.20

4.80

4.80

7.00

17.30

10.50

L-3 shutdown

4.20

27.10.2015

5.20

5.20

4.90

4.90

7.30

14.30

7.00

L-3 decrease steam consumption

2.10

11.11.2015

11.00

11.00

9.40

9.40

5.15

6.30

0.75

L-3 spinning minimum speed

1.20

12.11.2015

11.00

11.00

9.20

9.20

6.30

8.58

2.47

L-3 minimum speed

4.44

12.11.2015

5.20

5.20

4.60

4.50

6.30

8.58

2.47

L-3 minimum speed

1.73

10.12.2015

20.20

20.20

19.87

19.71

6.30

14.30

8.00

L-3 shutdown & New WSA stop

3.92

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

25.12.2015

11.00

11.00

6.50

6.50

15.20

17.35

2.25

L-1,2 & 3 minimum speed

10.13

25.12.2015

5.20

5.20

3.00

3.00

15.33

17.41

2.13

L-1,2 & 3 minimum speed

4.69

31.12.2015

11.00

11.00

9.00

9.00

9.50

14.30

4.67

L-3 decrease steam consumption

9.34

TOTAL LINE - 2 PROCES SHUTDOWN / BREAKDOWN

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

370.00

24.2.2015

19.38

19.44

18.70

18.60

1.30

3.17

1.78

L-3 break down

1.50

3.3.2015

11.00

11.00

10.80

10.80

15.13

15.50

0.62

Dryer L-3 decrease steam consumption

0.12

3.3.2015

11.00

11.00

10.80

10.80

15.50

22.37

6.78

Dryer L-3 decrease steam consumption

1.36

16.4.2015

5.20

5.20

4.70

4.70

6.37

22.37

16.00

L-3 shuthdown.

8.00

1.6.2015

5.20

5.20

4.80

4.80

6.37

13.30

6.88

L-3 breakdown

2.75

1.6.2015

11.00

11.00

10.90

10.80

6.26

13.30

7.07

L-3 breakdown

1.41

9.7.2015

11.00

11.00

10.90

10.80

6.30

7.15

0.75

L-3 shutdown

0.15

9.7.2015

11.00

11.00

9.00

9.00

7.15

10.39

3.40

L-3 shutdown

6.80

9.7.2015

11.00

11.00

10.00

10.00

11.47

13.05

1.30

L-3 shutdown

1.30

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

9.7.2015

11.00

11.00

9.40

9.30

13.45

14.30

0.75

L-3 shutdown

1.28

9.7.2015

11.00

11.00

9.00

9.00

14.30

21.44

7.23

L-3 shutdown

14.47

9.7.2015

11.00

11.00

9.80

9.80

21.44

22.30

0.77

L-3 shutdown

0.92

9.7.2015

11.00

11.00

10.30

10.30

22.30

23.26

0.93

L-3 shutdown

0.65

9.7.2015

11.00

11.00

10.80

10.70

23.26

0.21

0.92

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.90

4.80

6.30

6.54

0.40

L-3 shutdown

0.16

9.7.2015

5.20

5.20

4.30

4.20

7.05

10.54

3.82

L-3 shutdown

3.82

9.7.2015

5.20

5.20

4.50

4.40

10.54

14.30

3.77

L-3 shutdown

3.01

9.7.2015

5.20

5.20

4.00

4.00

14.30

14.44

0.23

L-3 shutdown

0.28

9.7.2015

5.20

5.20

4.50

4.50

14.44

16.43

1.98

L-3 shutdown

1.39

9.7.2015

5.20

5.20

4.20

4.20

16.43

16.52

0.18

L-3 shutdown

0.18

9.7.2015

5.20

5.20

4.80

4.80

16.52

18.52

2.00

L-3 shutdown

0.80

9.7.2015

5.20

5.20

5.10

5.00

22.30

6.30

8.00

L-3 shutdown

1.60

24.8.2015

11.00

11.00

10.10

10.00

17.35

18.44

1.15

L-3 Minimum speed

1.15

24.8.2015

5.20

5.20

4.40

4.30

17.35

18.44

1.15

L-3 Minimum speed

1.04

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

6.10.2015

5.20

5.20

5.00

5.00

6.30

13.30

7.00

PRDS 10 bar steam consumption more (effect L-3)

1.40

load TG2 keep 5 MW

6.10.2016

5.20

5.20

4.50

4.50

13.30

14.30

1.00

Spinning L-3 breakdown

0.70

Decrease load TG2 after normal increase


again.

6.10.2015

5.20

5.20

4.80

4.80

14.30

22.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

3.20

load TG2 keep 5 MW

6.10.2016

5.20

5.20

5.00

5.00

22.30

6.30

8.00

PRDS 10 bar steam consumption more (effect L-3)

1.60

load TG2 keep 5 MW

16.10.2015

11.00

11.00

8.40

8.40

6.50

9.25

2.58

L-3 shutdown

6.72

16.10.2015

11.00

11.00

7.50

7.50

9.25

17.30

8.08

L-3 shutdown

28.29

16.10.2015

5.20

5.20

4.80

4.80

7.00

17.30

10.50

L-3 shutdown

4.20

27.10.2015

5.20

5.20

4.90

4.90

7.30

14.30

7.00

L-3 decrease steam consumption

2.10

11.11.2015

11.00

11.00

9.40

9.40

5.15

6.30

0.75

L-3 spinning minimum speed

1.20

12.11.2015

11.00

11.00

9.20

9.20

6.30

8.58

2.47

L-3 minimum speed

4.44

12.11.2015

5.20

5.20

4.60

4.50

6.30

8.58

2.47

L-3 minimum speed

1.73

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

10.12.2015

20.20

20.20

19.87

19.71

6.30

14.30

8.00

L-3 shutdown & New WSA stop

3.92

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

L-3 shutdown & New WSA stop

65.60

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

L-3 shutdown & New WSA stop

6.40

25.12.2015

11.00

11.00

6.50

6.50

15.20

17.35

2.25

L-1,2 & 3 minimum speed

10.13

25.12.2015

5.20

5.20

3.00

3.00

15.33

17.41

2.13

L-1,2 & 3 minimum speed

4.69

31.12.2015

11.00

11.00

9.00

9.00

9.50

14.30

4.67

L-3 decrease steam consumption

9.34

TOTAL LINE - 3 PROCES SHUTDOWN / BREAKDOWN

Decrease load TG4 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

226.86

23.4.2015

5.20

5.20

4.00

4.00

8.00

16.30

8.50

Boiler 6 breakdown.

10.20

23.4.2015

5.20

5.20

5.00

4.90

16.30

22.37

6.12

Boiler 6 breakdown.

1.84

23.4.2015

11.00

11.00

9.30

9.20

8.00

16.30

8.50

Boiler 6 breakdown.

15.30

22.5.2015

5.20

5.20

4.80

4.70

11.13

13.27

2.23

Boiler 6 break down (economizer tube get leakage)

1.12

22.5.2015

5.20

5.20

4.20

4.20

13.27

17.17

3.83

Boiler 6 break down (economizer tube get leakage)

3.83

22.5.2015

5.20

5.20

4.90

4.90

17.17

20.10

2.88

Boiler 6 break down (economizer tube get leakage)

0.87

22.5.2015

5.20

5.20

4.70

4.70

20.10

20.37

0.45

Boiler 6 break down (economizer tube get leakage)

0.23

22.5.2015

5.20

5.20

5.00

5.00

20.37

6.37

10.00

Boiler 6 break down (economizer tube get leakage)

2.00

22.5.2015

11.00

11.00

10.60

10.50

11.10

13.25

2.25

Boiler 6 break down (economizer tube get leakage)

1.13

22.5.2015

11.00

11.00

10.00

10.00

13.25

14.37

1.20

Boiler 6 break down (economizer tube get leakage)

1.20

22.5.2015

11.00

11.00

10.10

10.10

14.37

16.39

2.03

Boiler 6 break down (economizer tube get leakage)

1.83

22.5.2015

11.00

11.00

10.50

10.40

16.39

18.53

2.23

Boiler 6 break down (economizer tube get leakage)

1.34

22.5.2015

11.00

11.00

10.20

10.10

20.07

23.37

3.50

Boiler 6 break down (economizer tube get leakage)

3.15

22.5.2015

11.00

11.00

9.90

9.80

23.37

1.04

1.45

Boiler 6 break down (economizer tube get leakage)

1.74

22.5.2015

11.00

11.00

9.50

9.50

1.04

5.30

4.87

Boiler 6 break down (economizer tube get leakage)

7.30

22.5.2015

11.00

11.00

10.10

10.10

5.30

6.37

1.12

Boiler 6 break down (economizer tube get leakage)

1.01

23.5.2015

5.20

5.20

5.00

5.00

6.37

20.00

13.38

Boiler 6 break down (economizer tube get leakage)

2.68

23.5.2015

5.20

5.20

4.90

4.90

20.00

6.37

10.62

Boiler 6 break down (economizer tube get leakage)

3.19

23.5.2015

11.00

11.00

10.30

10.20

6.37

12.00

5.38

Boiler 6 break down (economizer tube get leakage)

4.31

23.5.2015

11.00

11.00

9.90

9.90

12.00

6.37

18.62

Boiler 6 break down (economizer tube get leakage)

20.48

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

23.11.2015

11.00

11.00

9.10

9.10

10.00

6.30

20.50

Boiler 6 O/H

38.95

23.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

20.50

Boiler 6 O/H

24.60

24.11.2015

11.00

11.00

9.10

9.10

10.00

11.41

1.68

Boiler 6 O/H

3.20

24.11.2015

11.00

11.00

9.50

9.50

11.41

16.31

8.33

Boiler 6 O/H

12.50

24.11.2015

11.00

11.00

9.10

9.10

16.31

6.30

13.98

Boiler 6 O/H

26.57

24.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

25.11.2015

11.00

11.00

9.10

9.10

6.30

6.41

0.18

Boiler 6 O/H

0.35

25.11.2015

11.00

11.00

9.30

9.20

6.41

10.13

3.53

Boiler 6 O/H

6.36

25.11.2015

11.00

11.00

9.50

9.50

10.13

11.54

1.68

Boiler 6 O/H

2.53

25.11.2015

11.00

11.00

9.00

9.00

11.54

12.20

0.43

Boiler 6 O/H

0.87

25.11.2015

11.00

11.00

8.50

8.50

12.20

6.30

18.17

Boiler 6 O/H

45.43

25.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

Boiler 6 O/H

28.80

26.11.2015

11.00

11.00

9.30

9.30

6.30

16.00

9.50

Boiler 6 O/H

16.15

26.11.2015

11.00

11.00

9.10

9.10

16.00

18.00

2.00

Boiler 6 O/H

3.80

26.11.2015

11.00

11.00

8.50

8.50

18.00

20.00

2.00

Boiler 6 O/H

5.00

26.11.2015

11.00

11.00

7.50

7.50

20.00

22.30

2.50

Boiler 6 O/H

8.75

26.11.2015

11.00

11.00

7.00

7.00

22.30

5.30

7.00

Boiler 6 O/H

28.00

26.11.2015

11.00

11.00

6.50

6.50

5.30

6.30

1.00

Boiler 6 O/H & NGBC problem

4.50

26.11.2015

5.20

5.20

4.00

4.00

6.30

7.40

1.17

Boiler 6 O/H

1.40

26.11.2015

5.20

5.20

4.00

4.00

15.40

18.00

2.33

Boiler 6 O/H

2.80

26.11.2015

5.2

5.2

4.9

18

22.3

4.5

Boiler 6 O/H

1.35

26.11.2015

5.20

5.20

4.70

4.60

22.30

0.37

2.12

Boiler 6 O/H

1.27

26.11.2015

5.20

5.20

4.10

4.00

0.37

3.27

2.83

Boiler 6 O/H & NGBC problem

3.40

26.11.2015

5.20

5.20

4.20

4.10

3.27

6.30

3.05

Boiler 6 O/H & NGBC problem

3.36

27.11.2015

11.00

11.00

6.50

6.50

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

20.25

27.11.2015

11.00

11.00

8.20

8.20

11.00

13.19

2.32

Boiler 6 O/H

6.49

27.11.2015

11.00

11.00

8.00

8.00

13.19

14.30

1.18

Boiler 6 O/H

3.54

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

27.11.2015

11.00

11.00

7.50

7.50

14.30

6.30

16.00

Boiler 6 O/H

56.00

27.11.2015

5.20

5.20

4.20

4.10

6.30

11.00

4.50

Boiler 6 O/H & NGBC problem

4.95

27.11.2015

5.20

5.20

5.10

5.00

11.00

6.30

19.50

Boiler 6 O/H

3.90

28.11.2015

11.00

11.00

7.50

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

28.11.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

29.11.2015

11.00

11.00

7.60

7.50

6.30

6.30

24.00

Boiler 6 O/H

84.00

29.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

30.11.2015

11.00

11.00

7.60

7.50

6.30

16.30

10.00

Boiler 6 O/H

35.00

30.11.2015

11.00

11.00

10.30

10.30

16.30

6.30

14.00

Boiler 6 O/H

9.80

30.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

01.12.2015

11.00

11.00

10.70

10.70

14.30

21.54

7.40

Boiler 6 O/H

2.22

01.12.2015

11.00

11.00

10.60

10.60

21.54

22.30

0.60

Boiler 6 O/H

0.24

01.12.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 6 O/H

4.00

01.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

Boiler 6 O/H

4.80

15.12.2015

11.00

11.00

7.50

7.50

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

47.85

15.12.2015

5.20

5.20

4.00

3.90

16.50

6.30

13.67

Boiler 6 break down (eco snake tube get leakage)

17.77

16.12.2015

11.00

11.00

7.50

7.50

6.30

19.20

12.83

Boiler 6 break down (eco snake tube get leakage)

44.91

16.12.2015

11.00

11.00

7.80

7.80

19.20

5.05

9.75

Boiler 6 break down (eco snake tube get leakage)

31.20

16.12.2015

5.20

5.20

4.00

3.90

6.30

19.00

12.50

Boiler 6 break down (eco snake tube get leakage)

16.25

TOTAL BOILER 6 SHUTDOWN / BREAKDOWN

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

874.99

6.5.2015

11.00

11.00

10.00

10.00

9.14

11.21

2.12

Damper FD fan boiler 7 broken.

2.12

8.5.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

Boiler 7 overhaul

9.60

8.5.2015

11.00

11.00

10.30

10.20

6.37

14.37

8.00

Boiler 7 overhaul

6.40

8.5.2015

11.00

11.00

10.50

10.50

14.37

6.37

16.00

Boiler 7 overhaul

8.00

9.5.2015

5.20

5.20

4.70

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

9.5.2015

5.20

5.20

4.50

4.50

14.37

22.37

8.00

Boiler 7 overhaul

5.60

9.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

Boiler 7 overhaul

4.00

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

9.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

10.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

10.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

11.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

Boiler 7 overhaul

16.80

11.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

Boiler 7 overhaul

12.00

12.5.2015

5.20

5.20

4.80

4.70

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

5.20

5.20

4.60

4.60

14.37

6.37

16.00

Boiler 7 overhaul

9.60

12.5.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

Boiler 7 overhaul

4.00

12.5.2015

11.00

11.00

10.60

10.60

14.37

6.37

16.00

Boiler 7 overhaul

6.40

13.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

Boiler 7 overhaul

14.40

13.5.2015

11.00

11.00

10.80

10.70

6.37

6.37

24.00

Boiler 7 overhaul

7.20

14.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

14.5.2015

11.00

11.00

10.90

10.90

6.37

8.23

1.77

30.9.2015

11.00

11.00

8.00

8.00

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

15.00

30.9.2015

5.20

5.20

4.80

4.80

1.30

6.30

5.00

Boiler 7 B/D (eco tube leakage)

2.00

1.10.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

Boiler 7 B/D (eco tube leakage)

72.00

1.10.2015

5.20

5.20

4.50

4.40

6.30

14.30

8.00

Boiler 7 B/D (eco tube leakage)

6.40

1.10.2015

5.20

5.20

4.80

4.80

14.30

6.30

16.00

Boiler 7 B/D (eco tube leakage)

6.40

Boiler 7 overhaul (Boiler 7 start up & Syncronize


steam at 08.00)
Boiler 7 overhaul (Boiler 7 start up & Syncronize
steam at 08.00)

TOTAL BOILER 7 SHUTDOWN / BREAKDOWN

14.40
0.18

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

271.29

12.8.2015

11.00

11.00

10.70

10.70

17.03

22.30

5.45

Boiler 5 shutdown

1.64

12.8.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

Boiler 5 shutdown

4.00

12.8.2015

5.20

5.20

4.20

4.10

14.30

16.34

2.07

Boiler 5 shutdown

2.27

12.8.2015

5.20

5.20

4.00

3.90

15.24

22.30

5.93

Boiler 5 shutdown

7.71

12.8.2015

5.20

5.20

3.90

3.80

22.30

6.30

8.00

Boiler 5 shutdown

11.20

13.8.2015

5.20

5.20

3.90

3.80

6.30

7.15

0.75

Boiler 5 shutdown

1.05

7.9.2015
8.9.2015
9.9.2015
10.9.2015

20.20
20.20
20.20
20.20

TOTAL BOILER 5 SHUTDOWN / BREAKDOWN


20.00
0.00
0.00
9.40
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30
20.00
0.00
0.00
6.30
6.30

20.83
24.00
24.00
24.00

TG4 & Boiler 9 O/H


TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H

27.87
416.67
480.00
480.00
480.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop

11.9.2015
12.9.2015
13.9.2015
14.9.2015
15.9.2015
16.9.2015
17.9.2015
18.9.2015
19.9.2015
20.9.2015
21.9.2015
22.9.2015

20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.20

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
6.30
0.00
0.00
6.30
15.00
TOTAL BOILER 9& TG 4 SHUTDOWN

24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
8.50

Total

TG4 & Boiler 9 O/H


TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H
TG4 & Boiler 9 O/H

480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
480.00
170.00
7306.67
38908.09

TG4 & Boiler 9 stop


TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop
TG4 & Boiler 9 stop

POWER
Set POINT
Actual

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

DATED
24.1.2015

11

11

11

8.5

17.5

19.3

1.8

24.1.2015

19.56

19.4

16.7

16.5

17.52

18

0.13333

26.1.2015

19.66

19.4

13.6

13.52

4.38

6.3

1.86667

27.1.2015

11

11

10

9.9

6.25

10.48

4.38333

27.1.2015

19.66

19.4

13.8

13.63

6.3

14.33

13.2.2015

5.2

5.2

6.37

6.57

0.33333

13.2.2015

5.2

5.2

6.57

7.45

0.8

11.6.2015

19.5

19.4

19.5

11

15

11.6.2015

19.5

19.4

15

16.3

1.5

11.6.2015

19.5

19.4

14.4

14

17.2

21.2

11.6.2015

11

11

9.1

7.1

11

3.83333

11.6.2015

11

11

8.8

8.7

11

14.37

3.61667

4.7.2015

19.4

19.3

6.3

1.5

4.7.2015

5.2

5.2

4.5

4.4

5.3

0.5

21.7.2015

19.4

19.3

23.3

6.3

22.7.2015
23.7.2015
24.7.2015
25.7.2015
25.7.2015
25.7.2015
26.7.2015
27.7.2015
27.7.2015
27.7.2015

19.4
19.4
19.4
19.4
19.4
19.4
19.4
19.4
19.4
19.4

19.3
19.3
19.3
19.3
19.3
19.3
19.3
19.3
19.3
19.3

0
0
0
0
5
0
0
0
16
0

0
0
0
0
5
0
0
0
16
0

6.3
6.3
6.3
6.3
10.08
13.45
6.3
6.3
10.25
15.25

6.3
6.3
6.3
10.08
13.45
6.3
6.3
10.25
15.25
6.3

24
24
24
3.63333
3.61667
16.75
24
3.91667
5
15.0833

27.7.2015

5.2

5.2

4.7

4.6

14.3

17.17

2.78333

28.7.2015

19.4

19.3

6.3

6.3

24

MW

MW

MW

MW

Hours

Hours

Hours

29.7.2015
30.7.2015
31.7.2015
1.8.2015
1.8.2015
2.8.2015
3.8.2015
3.8.2015
3.8.2015

19.4
19.4
19.4
19.4
19.4
19.4
19.4
19.4
19.4

19.3
19.3
19.3
19.3
19.3
19.4
19.4
19.4
19.4

0
0
0
0
15
16
17.1
18.1
19.18

0
0
0
0
15
16
17
18
19

6.3
6.3
6.3
6.3
8.47
6.3
6.3
14.3
15.3

6.3
6.3
6.3
8.47
6.3
6.3
14.3
15.3
6.3

24
24
24
2.28333
21.7167
24
8
1
15

13.8.2015

19.4

19.4

15.23

14.96

11

13.8.2015

19.4

19.4

17.05

16.97

11

13

13.8.2015

19.4

19.4

17.48

17.32

13

15

13.8.2015

19.4

19.4

18.8

18.8

15

18

13.8.2015

11

11

10.5

10.5

6.3

2.5

13.8.2015
13.8.2015

11
11

11
11

0
0

0
0

9
17.29

12.14
22.28

3.23333
4.98333

13.8.2015

11

11

10.7

10.7

22.28

6.37

8.15

27.8.2015

20.4

20.4

18.5

18.4

7.3

0.5

26.10.2015 20.4

20.2

16.4

16.2

16

16.3

0.5

28.10.2015 20.2

20.2

7.4

18.06

10.4333

28.10.2015 20.2

20.2

15

15

18.06

6.3

12.4

29.10.2015 20.2

20.2

16

16

6.3

6.3

24

30.10.2015 20.2

20.2

16

16

6.3

13

6.5

30.10.2015 20.2

20.2

10.1

10

13

15

30.10.2015 20.2

20.2

3.5

3.5

15

22

19.11.2015 20.2

20.2

16.18

16.04

14

19.11.2015 20.2

20.2

15.92

15.76

14

20

17.12.2015 20.2

20.2

14.5

18.4

3.83333

30.11.2015
01.12.2015
02.12.2015
06.12.2015

20.2
20.2
20.2
20.2

0
0
0
0

0
0
0
0

16.44
6.3
6.3
14.38

6.3
6.3
17.4
16.29

13.7667
24
11.1667
1.85

20.2
20.2
20.2
20.2

TOTAL ELECTRIC SHUTDOWN / BREAKDOWN

16.18

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Tie line 6 KV get tripp (information by electric


due to ligtening) kilat/ gledek
BFWP no. 1,2,3 boiler 9 can't run and PAFAN no. 1
get triipp due to effect tie line 6 KV PPL 1 get tripp

4.50

TG 3 on ishocrounous mode and back to


sinchronized on 19.30

0.39

Reset and start again on DCS and back


increasing to normal load TG 4

10.98

Inform electric to checked ID fan

4.82

Arangement load TG 3 & TG 4 to control


extraction steam 4.5 bar

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem) & Ducthing coal feeder often chok no. 1 &
2 due to wet coal)

46.16

Increase load Tg 4 as per target after ID FAN


in normal operation & arrangement man
power to preventife breakdown to control
check and continue cleaning in coal ducthing
area

Repair electric DME tranduser output (AQ)

0.07

Repair electric DME tranduser output (AQ)

4.16

Boiler 9 & TG4 trip due to PLN trip

77.60

TG4 trip due to exhaust pressure drop

0.00

ID Fan boiler 9 trip (replace cooling fan motor)

21.60

Boiler 9 & TG4 trip due to PLN trip

7.67

Boiler 9 & TG4 trip due to PLN trip

8.32

PPL2 ID Fan no. 1 trip (Current unbalance/electrical


problem)
PPL2 ID Fan no. 1 trip (Current unbalance/electrical
problem)

TG4 trip due to PA Fan no. 2 trip (winding motor


burn).
TG4 trip due to PA Fan no. 2 trip (winding motor
burn).
TG4 trip due to overspeed protection relay active
(EXITER /ELECTRIC PROBLEM).
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 Cooling down planning install new diodes.
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 TRIP
TG4 & New WSA trip
TG4 break down Exiter problem

Decrease load TG2.


Loose synchronize TG2. TG 2 running on 5.2
MW after finish repaired DME trnsduser
output KW (AQ)
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

28.95

TG4 stop

0.40

Decrease load TG2 after normal increase


again.

135.10

TG4 stop

463.20
463.20
463.20
70.12
51.72
323.28
463.20
75.59
16.50
291.11

TG4 stop
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 5 MW
TG4 stop
TG4 stop
TG4 stop
Increase and hold load until 16 MW
TG4 stop
Decrease load TG2 after normal increase
again.
TG4 stop

1.67
463.20

TG4 break down Exiter problem


TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 break down Exiter problem
TG4 start up & synchronize
TG4 break down Exiter problem
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)
TG4 under observation (Exiter problem)

463.20
463.20
463.20
44.07
93.38
81.60
19.20
1.40
6.00

PPL1 Black out due to electric problem

8.88

PPL1 Black out due to electric problem

4.86

PPL1 Black out due to electric problem

4.16

PPL1 Black out due to electric problem

1.80

L-2 shutdown & Boiler 5 shutdown

1.25

PPL1 Black out due to electric problem


Replace ejector valve (effect PPL1 black out)

35.57
54.82

effect PPL1 black out

2.45

Any jobs electric --> Trafo 1, 2, 3

1.00

PA FAN 2 GET TRIPP due to local field alarm

2.00

Electric cable power to tie line 11KV at line-4 get


shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot
Electric cable power to tie line 11KV at line-4 get
shoot

TG4 stop
TG4 stop
TG4 stop
TG4 stop
under observation: load keep 15 MW
load keep 16 MW
load keep 17 MW
load keep 18 MW
load keep 19 MW
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 trip
TG3 stop (breakdown)
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

210.75

TG4 trip

64.48

Keep TG4 load 15 MW

100.80

Keep TG4 load 16 MW

27.30

Keep TG4 load 16 MW


Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

Trafo 11 KV stop (Install electric cable power)

20.40

Trafo 11 KV stop (Install electric cable power)

116.90

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

24.96

Decrease load TG4 after normal increase


again.

ID Fan No. 1 boiler-9 trip; indicatin on inverter is loss


connection (Electric replace new cable power. Ok)

26.64

Decrease load TG4 after normal increase


again.

77.43

Decrease load TG4 after normal increase


again.

278.09
484.80
225.57
37.37

TG4 trip
TG4 stop for repair
TG4 stop for repair
TG4 trip

Boiler 9 & TG 4 get tripp due to PLN transformer


500 MVA 150 KV / 70 KV get triip (Tie 70 KV on
manual mode)
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure
Moog Servo Controller (MSC) of TG4 failure
PPL2 black out effet from traformer 70 kv failure

6944.21

Sr. no.
1
2
3
4
5

Description:
TG 4 exciter/ diodes failure.
Moog servo controller issue.
Tie line electrical cable & transformer issues.
PLN trippings
Fan trippings

Loss in
Gen(MWH)
4916.34
988.45
586.73
171.02
137.544

Misc.

144.13

TOTAL LOSSES:

6944.21

6000
4000
2000
0

Remarks

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

25.1.2015

5.30

5.20

5.10

4.90

9.45

15.45

6.00

25.1.2015

11.00

11.00

8.10

8.10

9.45

16.45

7.00

25.1.2015

19.56

19.30

17.18

16.88

9.55

12.05

2.00

28.1.2015
28.1.2015
28.1.2015
28.1.2015
28.1.2015
28.1.2015

11.00
5.20
8.50
5.20
8.50
19.66

10.90
5.10
8.40
5.10
8.40
19.38

8.50
4.30
8.00
4.90
8.00
17.44

8.40
4.20
8.00
4.80
8.00
17.23

13.56
13.56
14.40
22.30
22.30
14.56

14.20
14.20
15.40
6.30
6.30
22.30

0.40
0.40
1.00
8.00
8.00
7.57

29.1.2015

19.32

19.23

18.34

18.20

20.20

21.08

0.80

30.1.2015

5.20

5.10

5.00

4.90

16.28

17.46

1.14

30.1.2015

11.00

11.00

8.00

8.00

16.28

17.46

1.14

30.1.2015

19.84

19.57

17.10

16.89

16.28

17.46

1.14

31.1.2015

11.00

11.00

8.20

8.10

6.30

6.30

1.00

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

1.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

2.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

3.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

4.2.2015

11.00

11.00

8.50

8.40

6.30

6.30

24.00

5.2.2015
8.2.2015
8.2.2015

11.00
11.00
5.20

10.90
10.90
5.10

10.00
9.00
4.80

9.90
8.00
4.70

6.30
6.10
6.10

9.00
6.30
6.30

2.50
0.33
0.33

9.2.2015

19.53

19.45

18.66

18.50

8.54

9.46

0.87

9.2.2015

11.00

11.00

8.00

8.00

6.15

15.16

9.00

9.2.2015

8.00

8.00

7.70

7.70

15.16

20.54

5.00

9.2.2016

11.00

11.00

8.00

8.00

20.54

6.30

10.00

10.2.2015

11.00

11.00

7.80

7.70

6.30

6.30

24.00

11.2.2015

11.00

11.00

8.00

7.90

6.30

4.46

22.27

11.2.2015

8.00

7.90

7.50

7.50

4.46

5.02

0.27

11.2.2015

11.00

11.00

8.00

7.90

5.02

6.30

1.47

12.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

13.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

14.2.2015

11.00

11.00

8.00

8.00

7.25

6.30

23.08

15.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

16.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

17.2.2015

11.00

11.00

8.00

8.00

6.30

6.30

24.00

6.3.2015

19.44

19.30

18.00

17.75

17.30

17.50

0.33

6.3.2015

9.50

9.50

7.30

7.20

16.59

17.47

0.80

6.3.2015

11.00

11.00

8.50

8.50

22.45

3.18

4.55

7.3.2015

19.44

19.35

18.00

18.00

19.50

20.52

1.03

7.3.2015

10.80

10.80

8.00

8.00

19.00

20.52

1.03

7.3.2015

5.00

5.00

4.40

4.30

19.00

20.52

1.03

20.3.2015

20.49

20.45

19.10

19.00

14.36

15.00

0.40

26.3.2015

20.45

20.36

19.00

19.00

14.07

14.30

0.38

26.3.2015

11.00

11.00

10.50

10.50

14.20

22.37

8.12

17.4.2015

20.57

20.51

19.20

19.10

2.46

3.07

0.35

17.4.2015

5.20

5.20

4.00

4.00

8.55

12.37

3.70

18.4.2015

5.20

5.20

4.00

4.00

8.32

12.00

4.53

24.4.2015

20.57

20.45

17.31

17.01

15.10

4.00

7.83

24.4.2015

20.57

20.45

18.21

18.49

4.00

6.37

2.62

24.4.2015

5.20

5.20

4.20

4.10

10.40

14.37

3.95

24.4.2015

5.20

5.20

4.30

4.20

14.37

6.37

16.00

24.4.2015

11.00

11.00

10.00

10.00

10.40

14.37

3.95

24.4.2015

11.00

11.00

9.00

8.90

14.37

6.37

16.00

25.4.2015

20.57

20.45

18.18

17.94

6.37

9.00

2.62

25.4.2015

20.57

20.45

19.66

19.46

9.00

11.00

2.00

25.4.2015

5.20

5.20

4.30

4.20

6.37

14.37

8.00

25.4.2015

11.00

11.00

9.00

9.00

6.37

14.37

8.00

26.4.2015

5.20

5.20

5.00

4.90

6.37

8.25

1.80

26.4.2015

5.20

5.20

4.30

4.20

8.25

13.25

5.00

26.4.2015

11.00

11.00

9.20

9.10

6.37

13.25

6.80

6.5.2015

5.20

5.20

4.50

4.90

0.04

1.52

1.80

6.5.2015

5.20

5.20

4.20

4.20

1.52

6.37

4.75

6.5.2015

11.00

11.00

9.50

9.50

1.45

6.37

4.87

7.5.2015

5.20

5.20

4.30

4.30

6.37

14.37

8.00

7.5.2015

5.20

5.20

4.10

4.00

14.37

22.15

7.63

7.5.2015

5.20

5.20

4.70

4.70

22.15

22.37

0.37

7.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

7.5.2015

11.00

11.00

9.30

9.30

6.37

14.37

8.00

7.5.2015

11.00

11.00

7.50

7.50

14.37

22.15

7.63

7.5.2015

11.00

11.00

9.40

9.30

22.15

22.37

0.37

7.5.2015

11.00

11.00

9.30

9.20

22.37

6.37

8.00

4.6.2015

5.20

5.20

4.70

4.60

0.43

3.42

2.98

4.6.2015

5.20

5.20

5.00

5.00

3.42

6.37

2.92

5.6.2015

5.20

5.20

5.20

5.10

6.37

7.44

1.12

5.6.2015

5.20

5.20

5.00

5.00

18.33

6.37

12.07

5.6.2015

11.00

11.00

10.40

10.30

16.46

18.37

1.85

5.6.2015

11.00

11.00

9.90

9.80

18.37

22.37

4.00

5.6.2015

11.00

11.00

9.70

9.60

22.37

6.37

8.00

9.6.2015

11.00

11.00

10.30

10.30

6.37

6.37

24.00

10.6.2016

11.00

11.00

10.30

10.30

6.37

6.37

24.00

2.9.2015

20.40

20.40

18.61

18.45

19.19

22.30

3.18

2.9.2015

20.40

20.40

18.92

18.79

22.30

6.30

8.00

2.9.2015

11.00

11.00

9.50

9.50

18.55

22.30

3.58

2.9.2015

5.20

5.20

5.20

5.10

8.25

10.58

2.55

2.9.2015

5.20

5.20

5.10

5.00

11.29

6.30

18.98

23.9.2015

11.00

11.00

11.00

10.90

6.30

14.30

8.00

23.9.2015

11.00

11.00

8.50

8.50

14.30

6.30

16.00

23.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

24.9.2015

11.00

11.00

8.60

8.60

6.30

6.30

24.00

24.9.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

06.12.2015

11.00

11.00

8.40

8.30

22.30

6.30

8.00

07.12.2015

11.00

11.00

8.40

8.30

6.30

14.30

8.00

07.12.2015

11.00

11.00

10.10

10.10

14.30

16.13

1.72

07.12.2015

11.00

11.00

7.90

7.80

16.13

6.30

14.28

08.12.2015

20.20

20.20

17.31

17.28

6.30

14.30

8.00

08.12.2015

20.20

20.20

17.48

17.39

14.30

22.30

8.00

08.12.2015

20.20

20.20

18.79

18.57

22.30

6.30

8.00

08.12.2015

11.00

11.00

7.90

7.80

6.30

6.30

24.00

10.12.2015

20.20

20.20

17.55

17.50

14.30

22.30

8.00

10.12.2015

20.20

20.20

17.53

17.45

22.30

6.30

8.00

10.12.2015

11.00

11.00

7.00

6.90

6.30

22.30

16.00

10.12.2015

11.00

11.00

7.80

7.80

22.30

6.30

8.00

10.12.2015

5.20

5.20

4.90

4.80

6.30

22.30

16.00

10.12.2015

5.20

5.20

5.00

5.00

22.30

6.30

8.00

11.12.2015

20.20

20.20

17.66

17.52

6.30

10.30

4.00

11.12.2015

20.20

20.20

19.60

19.40

10.30

6.30

20.00

12.12.2015

20.20

20.20

19.60

19.40

6.30

10.30

4.00

12.12.2015

20.20

20.20

18.40

18.30

10.30

6.30

20.00

13.12.2015

20.20

20.20

18.40

18.30

6.30

17.30

11.00

13.12.2015

20.20

20.20

17.90

17.60

17.30

22.30

5.00

13.12.2015

20.20

20.20

18.70

18.50

22.30

6.30

8.00

14.12.2015

20.20

20.20

18.40

18.30

6.30

15.40

9.17

14.12.2015

20.20

20.20

18.40

18.30

19.00

6.30

11.50

15.12.2015

20.20

20.20

19.09

19.09

6.30

17.48

11.30

15.12.2015

20.20

20.20

18.26

18.01

17.48

6.30

12.70

16.12.2015

20.20

20.20

18.52

18.50

6.30

20.47

14.28

TOTAL NEW WSA SHUTDOWN / BREAKDOWN 192.75

REASON

LOSS
Power

REMARK
(ACTION)

MWH

New WSA tripp. (bearing temperature blower get


high)

1.8

New WSA tripp. (bearing temperature blower get


high)

20.30

Increase TG 2 load back to normal 5.2 MW


after WSA normal suplai 55 > 10 bar
Increase TG 3 load back to normal 11 MW
after WSA suplai steam 55 > 45 bar on
16.45

WSA breakdown
WSA breakdown level mcoal bunker low due to wet
coal

0.23

TG 4 decrease load due to supply steam 10


bar with flow 25 T/h and increase load again
after WSA suplay steam 55 > 10 bar start on
12.05
Decrease load TG3.
Decrease load TG2.
Decrease load TG3.
Decrease load TG2.
Decrease load TG3.
Decrease load TG4.
Decrease load TG4 & start boiler house no.
4 for view menute and stop again after
arangement load to take boiler b9 max 130
t/H
Arrangement load TG 2 & 3

3.42

Arrangement load TG 2 & 4

WSA stop & L-3 breakdown

3.06

Arrangement load boiler 9 to control max.


130 T/h

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

2.90

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

62.40

Continue cleaning coal screen

New WSA tripp. (bearing temperature blower get


high)

4.84

New WSA stop due to lean gas problem


New WSA breakdown
WSA breakdown
WSA breakdown
WSA breakdown
WSA breakdown & Boiler 9 over load 135 T/H

1.00
0.36
0.40
2.40
3.20
16.27

Boiler 9 over load 138 T/H, Bleed steam 23 T/H


(WSA stop)

0.82

Note : TG 2 & TG 3 running on 5 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Note : New WSA stop , TG 2 & TG 3 running on 5 &
8 MW due to arrangement load when level bunker
boiler 5,6,7, 8 get low average 60 % due to wet coal
(Rainy session)
New WSA problem.
New WSA trip due to trouble power.
New WSA trip due to trouble power.

62.40

Continue cleaning coal screen

62.40

Continue cleaning coal screen

2.50
0.97
0.13

Decrease load TG3


Decrease load TG3.
Decrease load TG2.
Continue cleaning ducthing cruher screen
and coal feeder also every time due to wet
coal & Decrease load TG4.

WSA tipp & Coal crusher no. 1 & 2 choking due to


wet coal

0.82

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

27.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

New WSA tripp due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

1.50

Continue cleaning screen CHS PPL 1 every


time & Decrease load TG3.

New WSA stop due to Temperatur bearing Lean gas


blower high (Note : wet coal difficult come to screen
CHS PPL 1 and effect to level bunker just is 70 %
but not distrub steam & power due to preventive
continue cleaning every time)

30.00

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

Note : TG 2 & TG 3 running on 5.2 & 7.7 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

79.20

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

69.03

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)
Boiler over load due to effect WSA stop
Note : TG 2 & TG 3 running on 5.2 & 7.9 MW due to
arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

0.11

Decrease load TG3 and arrangement load

4.55

Continue cleaning screen CHS PPL 1 every


time &Decrease load TG3.

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

Note : TG 3 running 8 MW due to arrangement load


when new WSA stop & level bunker boiler 5,6,7, 8
get low average 60 % due to wet coal (Rainy
session)

72.00

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

69.25

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 60 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

Note : TG 2 & TG 3 running on 5.2 & 8 MW due to


arrangement load when new WSA stop (New WSA
start & synchronize steam at 04.36 am) & level
bunker boiler 5,6,7, 8 get low average 70 % due to
wet coal (Rainy session)

72.00

Continue cleaning coal screen

New WSA trip

0.52

New WSA trip

1.84

New WSA trip

11.38

New WSA get trip

1.40

New WSA get trip

2.88

New WSA get trip

0.72

New WSA trip

0.58

Decrease load TG4


Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

WSA decrease load & steam 22>10 bar boiler house


close (mechanic jobs)
Pressure 10 bar drop due to New WSA decrease
load (PRDS 55><45 bar changed to PRDS 55><10
bar)

0.52
4.06

New WSA trip & Boiler 9 over load 136 T/H

0.49

New WSA stop cause burner trable

4.44

New WSA trip

5.44

New WSA problem

26.95

New WSA problem

5.13

New WSA problem

4.35

New WSA problem

16.00

New WSA problem

3.95

New WSA problem

33.60

After normal increase load TG 3 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

New WSA problem

6.57

New WSA problem

1.98

New WSA problem

8.00

New WSA problem

16.00

New WSA trip due to truble burner

0.54

New WSA trip due to truble burner

5.00

New WSA trip due to truble burner

12.92

New WSA 55-45 close (boiler over load)

0.54

New WSA 55-45 close (boiler over load)

4.75

New WSA 55-45 close (boiler over load)

7.30

New WSA 55-45 close (boiler over load)

7.20

New WSA 55-45 close (boiler over load)

9.16

New WSA 55-45 close (boiler over load)

0.18

New WSA 55-45 close (boiler over load)

4.00

New WSA 55-45 close (boiler over load)

13.60

New WSA 55-45 close (boiler over load)

26.71

New WSA 55-45 close (boiler over load)

0.63

New WSA 55-45 close (boiler over load)

14.40

WSA 2 stop

1.79

WSA 2 stop

0.58

New acid plant stop

0.11

New acid plant stop

2.41

New acid plant stop

1.30

New acid plant stop

4.80

New acid plant stop

11.20

New acid plant stop

16.80

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Decrease load TG3 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.

New acid plant stop

16.80

WSA-2 trip

6.21

Safety VN WSA-2 problem (10 bar)

12.88

WSA-2 trip

5.38

Effek WSA, PRDS 10 bar steam consumption more

0.26

load TG2 keep 5.1 MW

Effek WSA, PRDS 10 bar steam consumption more

3.80

load TG2 keep 5 MW

WSA-2 stop

0.80

WSA-2 stop

40.00

WSA-2 stop

4.80

WSA-2 stop

57.60

WSA-2 stop

4.80

New WSA trip

21.60

New WSA stop

21.60

New WSA stop

1.55

New WSA stop

45.70

New WSA stop

23.36

New WSA stop

22.48

New WSA stop

13.04

New WSA stop

76.80

New WSA stop

21.60

New WSA stop

22.00

L-3 shutdown & New WSA stop

65.60

New WSA stop

25.60

L-3 shutdown & New WSA stop

6.40

New WSA stop

1.60

New WSA stop

10.72

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.

New WSA stop

16.00

New WSA stop

3.20

New WSA stop

38.00

New WSA stop

20.90

New WSA stop

13.00

New WSA stop

13.60

New WSA stop

17.42

New WSA stop

21.85

New WSA stop

12.54

New WSA stop

27.81

New WSA stop

24.28
2124.71

Decrease load TG4 after normal increase


again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

Sr.No.
1
2

Loss Decription:
WSA stop / breakdown.
WSA trip.

Gen loss
in MWH
1865.45
259.2691

Gen loss in MWH


2000.00
1800.00
1600.00
1400.00
1200.00
1000.00
800.00
600.00
400.00
200.00
0.00
WSA stop /
breakdown.

WSA trip.

MWH

p.

Remarks:

WET COAL PROBLEM:


POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

4.2.2015

19.44

19.35

18.14

17.95

13.05

13.20

0.25

4.2.2015

19.44

19.30

17.22

17.23

17.03

17.13

0.17

4.2.2015

17.22

17.23

15.63

15.62

17.54

18.04

0.17

4.2.2015

19.66

19.45

14.00

13.88

6.24

6.37

0.20

5.2.2015

19.48

19.27

15.14

15.08

6.21

8.00

1.65

6.2.2015
6.2.2015
6.2.2015
6.2.2015
6.2.2015

11.00
11.00
11.00
11.00
11.00

10.90
10.90
10.90
10.90
10.90

9.20
10.00
10.80
10.80
10.00

7.20
9.10
10.00
9.50
9.00

13.30
13.53
15.30
16.55
17.48

13.53
15.30
16.55
17.48
20.32

0.38
1.62
0.58
0.88
2.73

20.2.2015

19.44

19.27

18.78

18.40

18.20

19.10

0.83

21.2.2015

19.53

19.34

18.92

18.88

16.34

16.41

0.12

22.2.2015

19.49

19.32

14.80

14.75

4.30

5.15

0.75

24.2.2015

19.45

19.35

18.91

18.75

9.30

9.41

0.18

24.2.2015

19.45

19.35

18.48

18.41

13.23

13.36

0.22

2.3.2015

11.00

11.00

10.00

10.00

7.33

9.22

1.82

2.3.2015

11.00

11.00

10.80

10.80

12.35

13.07

0.53

2.3.2015

11.00

11.00

10.00

10.00

13.10

13.49

0.65

5.3.2015

19.61

19.55

15.50

15.00

7.06

7.20

0.23

6.3.2015

19.44

19.21

19.27

19.07

5.00

6.00

1.00

17.4.2015

20.57

20.43

19.70

19.55

17.00

17.49

0.82

21.4.2015

20.57

20.50

17.05

17.00

9.17

9.27

0.17

27.4.2015

20.50

20.50

19.50

19.50

12.58

13.06

0.13

TOTAL WET COAL PROBLEM

8.63

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Coal blocking at ducthing feeder no. 1 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.35

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.27

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

Coal blocking at ducthing feeder no. 1,2,3 , Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session

1.11

Decrease load TG4 & Continue preventife


cleaning ducthing coal feeder every 0.5 - 1
hour

6.91

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Coal blocking at ducthing feeder no. 1 & 2 Note:


Boiler 9 & TG 4 normal as per target but winding
alternator TG 4 on 110 -112 degree & wet coal come
to bunker due to rainy session
Coal vibrating screen breakdown.
Coal vibrating screen breakdown.
Coal vibrating screen breakdown.
Coal vibrating screen breakdown.
Coal vibrating screen breakdown.
Boiler 9 over load 132 T/H due to pressure droup 66
bar due to wet coal chock at dusthing feeder
Boiler 9 over load 132 T/H due to pressure droup 66
bar due to wet coal

1.42
2.91
0.53
1.24
5.19
0.73
0.05

Decrease load TG3.


Decrease load TG3.
Decrease load TG3.
Decrease load TG3.
Decrease load TG3.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

3.43

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Coal blocking at ducthing feeder no. 2 Note: Boiler 9


& TG 4 normal as per target but winding alternator
TG 4 on 110 -112 degree & wet coal come to bunker
due to rainy session

0.11

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour

Coal blocking at ducthing feeder no. 2

0.20

Vaccum pressure TG3 droop till -0.75 bar and coal


bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low
Vaccum pressure TG3 droop till -0.75 bar and coal
bunker level boiler 5,6,7,8 get low low

1.82
0.11
0.65

Continue preventife cleaning ducthing coal


feeder every 0.5 - 1 hour
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)
Decrease load TG3 after normal increase
again. (continue cleaning coal screen)

Coal bunker no. 1 & 2 get chocking / not coming


down in feeder due to wet coal stuck at ducthing,
Note :Boiler 9 & TG 4 normal as per target but
winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session and also
motor PAFAN no. 1 get noise

1.06

Schedule cleaning bunker no. 1 & 2 , After


normal increase load TG 4 as per target

Note :Boiler 9 & TG 4 normal as per target but


winding alternator TG 4 on 110 -117 degree & wet
coal come to bunker due to rainy session, motor
PAFAN no. 1 get noise (Under monitoring)

0.14

After normal increase load TG 4 as per


target

Duthing coal feeder no. 1 get chocking (Manage wet


coal come to bunker)

0.72

Coal blocking at ducthing feeder

0.58

Coal blocking at ducthing feeder

0.13
30.00

Cleaning /checking every hour, After normal


increase load TG 4 as per target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target

Sr. no.
1
2

Description
PPL 2; coal chocking issues.
PPL 1; coal chocking issues.

16.5

Loss in gen:
(MWH)
16.15
13.85

Loss in gen:(MWH)

16
15.5
15
14.5
14
13.5
13
12.5
PPL 2; coal
chocking issues.

PPL 1; coal
chocking issues.

en:(MWH)

coal
g issues.

Remarks:

INSTRUMENTATION ISSUES:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

26.2.2015

5.20

5.20

5.00

5.00

7.00

8.50

1.83

3.6.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

3.6.2015

5.20

5.20

0.00

0.00

3.22

6.37

3.25

3.6.2015

11.00

11.00

10.90

10.90

22.37

4.18

5.68

4.6.2015

5.20

5.20
0.00
0.00
6.37
9.15
TOTAL INSTRUMENT SHUTDOWN / BREAK DOWN

2.63

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Change module of bed temperature boiler 6 & 7 by


instrument

0.37

PLC failure

1.60

PLC failure

16.90

PLC failure

0.57

PLC failure

13.69
33.13

After normal increase load TG 2 as per


target
Decrease load TG2 after normal increase
again.
TG2 trip
Decrease load TG3 after normal increase
again.
TG2 trip

Sr.no.
1
2

35
30
25
20
15
10
5
0

Description
PLC failure:
Change module of bed temp. boiler 6 & 7 by inst.

Loss of
generation
(MWH)
32.76
0.37

Loss of generation (MWH)

PLC
failure:

Chang
e
module
of bed
temp.
boiler 6
& 7 by
inst.

WH)

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

2.3.2015

5.30

5.20

5.10

5.00

13.09

13.23

0.23

3.3.2015

5.30

5.20

5.20

5.10

11.54

22.37

11.28

3.3.2015

5.20

5.20

5.00

5.00

24.09

6.37

5.53

6.3.2015

5.20

5.20

5.00

5.00

11.40

6.37

19.00

7.3.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

15.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

16.3.2015

5.30

5.20

5.10

5.00

6.37

6.37

24.00

17.3.2015

5.30

5.20

4.70

4.70

22.37

6.37

8.00

19.3.2015

5.30

5.20

5.20

5.10

11.00

14.37

3.62

20.3.2015

5.20

5.20

5.00

4.90

23.00

5.00

6.00

23.3.2015

5.20

5.20

5.00

5.00

6.37

6.37

24.00

24.3.2015

5.20

5.20

4.90

4.80

6.37

22.37

16.00

24.3.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

25.3.2015

5.20

5.20

4.90

4.80

6.37

11.58

5.35

25.3.2015

5.20

5.20

4.60

4.60

11.58

14.37

2.65

25.3.2015

5.20

5.20

5.00

5.00

14.37

6.37

16.00

26.3.2015

5.20

5.20

5.00

4.90

7.51

8.06

0.25

26.3.2015

5.20

5.20

4.90

4.80

8.06

22.37

14.52

26.3.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

27.3.2015

5.20

5.20

5.00

4.90

6.37

9.42

3.08

27.3.2015

5.20

5.20

4.90

4.80

9.42

14.37

4.92

27.3.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

27.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

28.3.2015

5.20

5.20

5.00

4.80

6.37

14.37

8.00

28.3.2015

5.20

5.20

4.90

4.80

14.37

23.45

9.13

29.3.2015

5.20

5.20

4.80

4.80

6.37

14.37

8.00

29.3.2015

5.20

5.20

4.80

4.70

14.37

22.37

8.00

29.3.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

30.3.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

31.3.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

1.4.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

3.4.2015

5.20

5.20

5.10

5.00

6.37

7.13

0.60

3.4.2015

5.20

5.20

4.90

4.80

7.13

6.37

23.40

4.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

5.4.2016

5.20

5.20

4.80

4.70

6.37

22.37

16.00

8.4.2015

5.20

5.20

5.10

5.00

14.37

6.37

18.38

12.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

13.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

14.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

16.00

14.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

15.4.2015

5.20

5.20

4.90

4.80

6.37

6.37

24.00

16.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

17.4.2015

5.20

5.20

4.90

4.80

6.37

8.55

2.30

17.4.2015

5.20

5.20

4.80

4.70

12.37

14.37

10.00

17.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

18.4.2015

5.20

5.20

5.10

5.00

6.37

8.32

1.92

18.4.2015

5.20

5.20

4.90

4.80

12.00

22.37

9.55

18.4.2015

5.20

5.20

5.00

5.00

22.37

6.37

8.00

19.4.2015

5.20

5.20

5.10

5.00

6.37

10.07

3.50

19.4.2015

5.20

5.20

5.00

4.90

10.07

11.03

0.93

19.4.2015

5.20

5.20

4.90

4.80

11.03

16.50

5.78

19.4.2015

5.20

5.20

5.00

5.00

16.50

6.37

13.78

20.4.2015

5.20

5.20

5.00

4.90

6.37

14.55

8.30

20.4.2015

5.20

5.20

5.10

5.00

17.58

22.37

4.68

20.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

21.4.2015

5.20

5.20

4.90

4.80

6.37

19.27

12.83

21.4.2015

5.20

5.20

5.00

4.90

19.27

6.37

11.17

22.4.2015

5.20

5.20

4.90

4.80

6.37

20.08

13.52

23.4.2015

5.20

5.20

4.90

4.90

6.37

8.00

1.62

23.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

25.4.2015

5.20

5.20

4.90

4.80

14.37

6.37

16.00

26.4.2015

5.20

5.20

4.80

4.80

13.25

6.37

17.20

5.5.2015

5.20

5.20

4.80

4.70

17.57

18.26

1.52

5.5.2015

5.20

5.20

5.00

4.90

20.28

22.37

1.85

5.5.2015

5.20

5.20

4.90

4.90

22.37

6.37

8.00

6.5.2015

5.20

5.20

5.00

4.90

6.37

9.44

2.88

6.5.2015

5.20

5.20

4.90

4.80

9.44

12.12

2.47

6.5.2015

5.20

5.20

4.80

4.70

12.12

22.37

10.42

6.5.2015

5.20

5.20

5.00

4.90

22.37

0.04

1.45

15.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

16.5.2015

5.20

5.20

4.80

4.70

6.37

6.37

24.00

17.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

18.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

19.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

20.5.2015

5.20

5.20

4.70

4.60

6.37

5.20

22.72

20.5.2015

5.20

5.20

4.40

4.40

5.20

6.37

1.28

2.6.2015

5.20

5.20

5.00

4.90

6.37

0.34

17.95

2.6.2015

5.20

5.20

4.90

4.80

0.34

5.02

4.47

2.6.2015

5.20

5.20

5.10

5.00

5.02

6.37

1.42

29.6.2015

5.20

5.20

5.20

5.10

6.37

10.10

3.55

29.6.2015

5.20

5.20

4.90

4.80

10.10

10.58

0.80

29.6.2015

5.20

5.20

5.20

5.10

10.58

14.37

3.65

29.6.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

1.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

2.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

3.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

4.7.2015

5.20

5.20

5.20

5.10

6.30

5.30

23.00

4.7.2015

5.20

5.20

5.20

5.10

6.00

6.30

0.50

5.7.2015

5.20

5.20

5.20

5.10

6.30

6.30

24.00

7.7.2019

5.20

5.20

5.10

5.00

6.30

13.48

7.30

7.7.2020

5.20

5.20

4.50

4.50

13.48

14.06

0.30

7.7.2021

5.20

5.20

5.10

5.00

14.06

14.30

0.40

7.7.2022

5.20

5.20

5.00

5.00

14.30

6.30

16.00

8.7.2015

5.20

5.20

4.80

4.70

6.30

7.20

0.83

8.7.2015

5.20

5.20

5.10

5.00

7.20

12.00

4.67

8.7.2015

5.20

5.20

5.00

4.90

12.00

6.30

18.50

10.7.2015

5.20

5.20

5.10

5.00

6.30

10.54

4.23

10.7.2015

5.20

5.20

5.00

4.90

10.54

12.44

1.82

10.7.2015

5.20

5.20

4.90

4.80

12.44

13.08

0.40

10.7.2015

5.20

5.20

4.80

4.70

13.08

14.30

1.37

10.7.2015

5.20

5.20

5.10

5.00

15.37

15.41

0.07

10.7.2015

5.20

5.20

5.20

5.10

15.42

18.12

2.50

10.7.2015

5.20

5.20

5.10

5.00

18.12

6.30

13.30

11.7.2015

5.20

5.20

5.10

5.00

12.04

14.30

2.43

11.7.2015

5.20

5.20

5.20

5.10

14.30

15.02

0.53

11.7.2015

5.20

5.20

5.10

5.00

15.02

21.33

6.52

11.7.2015

5.20

5.20

5.20

5.10

21.33

6.30

8.95

12.7.2015

5.20

5.20

5.10

5.00

6.30

22.30

16.00

12.7.2015

5.20

5.20

5.20

5.10

22.30

6.30

8.00

13.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

14.7.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

15.7.2015

5.20

5.20

5.10

5.00

6.30

16.45

10.25

15.7.2015

5.20

5.20

5.10

5.00

17.43

6.30

12.78

16.7.2015

5.20

5.20

5.10

5.00

6.30

10.56

4.43

16.7.2015

5.20

5.20

5.00

4.90

10.56

14.30

3.57

16.7.2015

5.20

5.20

5.00

5.00

14.30

6.30

16.00

17.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

18.7.2015

5.20

5.20

5.00

4.90

6.30

6.30

24.00

19.7.2015

5.20

5.20

5.00

4.90

6.30

10.40

4.17

19.7.2015

5.20

5.20

4.90

4.80

10.40

13.22

2.70

19.7.2015

5.20

5.20

5.00

4.90

13.22

14.59

1.62

19.7.2015

5.20

5.20

4.90

4.80

14.59

22.30

7.52

19.7.2015

5.20

5.20

5.00

4.90

22.30

6.30

8.00

20.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

21.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

22.7.2015

5.20

5.20

4.90

4.80

6.30

14.39

8.15

22.7.2015

5.20

5.20

4.80

4.70

14.39

19.23

4.73

22.7.2015

5.20

5.20

4.90

4.80

19.23

6.30

11.12

23.7.2015

5.20

5.20

4.90

4.80

6.30

6.30

24.00

24.7.2015

5.20

5.20

4.90

4.80

6.30

12.30

6.00

24.7.2015

5.20

5.20

4.80

4.70

12.30

14.30

2.00

24.7.2015

5.20

5.20

4.90

4.80

14.30

6.30

16.00

25.7.2015

5.20

5.20

4.90

4.80

6.30

9.40

3.17

25.7.2015

5.20

5.20

4.60

4.50

9.40

13.45

4.08

25.7.2015

5.20

5.20

4.80

4.70

13.45

4.45

15.00

25.7.2015

5.20

5.20

4.60

4.50

4.45

6.30

1.75

26.7.2016

5.20

5.20

4.70

4.60

6.30

14.30

8.00

26.7.2017

5.20

5.20

4.60

4.50

14.30

19.10

4.67

26.7.2018

5.20

5.20

4.70

4.60

19.10

20.40

1.50

26.7.2019

5.20

5.20

4.80

4.70

20.40

6.30

9.83

27.7.2015

5.20

5.20

4.60

4.50

6.30

14.30

8.00

27.7.2015

5.20

5.20

4.00

3.90

15.29

16.39

1.17

27.7.2015

5.20

5.20

4.80

4.70

17.17

21.22

4.08

27.7.2015

5.20

5.20

4.70

4.60

21.22

6.30

7.97

28.7.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

29.7.2015

5.20

5.20

4.60

4.60

6.30

22.30

16.00

29.7.2015

5.20

5.20

4.70

4.70

22.30

6.30

8.00

30.7.2015

5.20

5.20

4.80

4.70

6.30

14.30

8.00

30.7.2015

5.20

5.20

4.70

4.60

14.30

6.30

16.00

31.7.2015

5.20

5.20

4.70

4.60

6.30

6.30

24.00

1.8.2015

5.20

5.20

4.70

4.60

6.30

10.40

4.17

1.8.2015

5.20

5.20

4.50

4.40

10.40

14.30

3.83

1.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

2.8.2015

5.20

5.20

4.60

4.50

6.30

6.30

24.00

3.8.2015

5.20

5.20

4.50

4.50

6.30

14.30

8.00

3.8.2015

5.20

5.20

4.60

4.50

14.30

6.30

16.00

4.8.2015

5.20

5.20

4.50

4.40

6.30

13.30

7.00

4.8.2015

5.20

5.20

4.00

4.00

13.30

17.40

4.17

4.8.2015

5.20

5.20

4.60

4.50

17.40

6.30

12.83

5.8.2015

5.20

5.20

4.50

4.40

6.30

6.30

24.00

6.8.2015

5.20

5.20

4.40

4.40

6.30

6.30

24.00

7.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

8.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

9.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

10.8.2015

5.20

5.20

4.40

4.30

6.30

6.30

24.00

11.8.2015

5.20

5.20

4.30

4.30

6.30

14.30

8.00

11.8.2015

5.20

5.20

4.20

4.10

14.30

16.15

1.75

11.8.2015

5.20

5.20

4.30

4.30

16.15

6.30

14.25

12.8.2015

5.20

5.20

4.30

4.20

6.30

14.30

8.00

13.8.2015

5.20

5.20

0.00

0.00

7.15

17.15

10.00

13.8.2015

5.20

5.20

5.00

5.00

17.15

6.30

13.25

14.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

15.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

16.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

17.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

18.8.2015

5.20

5.20

5.10

5.00

6.30

15.34

9.07

18.8.2015

5.20

5.20

5.10

5.00

16.41

6.30

13.75

19.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

20.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

21.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

22.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

23.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

24.8.2015

5.20

5.20

5.10

5.00

6.30

9.03

2.55

24.8.2015

5.20

5.20

5.10

5.00

18.44

6.30

11.77

25.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.8.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

26.11.2015

5.20

5.20

0.00

0.00

7.40

15.40

8.00

TOTAL TG 2 PROBLEM (SHUTDOWN / BREAK DOWN)

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Temperature winding high till 122 degree

0.05

Temperature winding high on 122 degree

1.13

Temperature winding high on 122 degree

1.11

Winding temperatureTG 2 high on 122 degree

3.80

Winding temperature high on 122 degree

1.60

Winding temperature high on 122 degree

4.80

Winding temperature high on 122 degree

4.80

Winding temperature high on 122 degree

4.00

Winding temperature high on 122 degree

0.36

Winding temperature high on 122 degree

1.80

Winding temperature high on 122 degree

4.80

Winding temperature high on 122 degree

6.40

Winding temperature high on 122 degree

1.60

Winding temperature high on 123 degree

2.14

Winding temperature high on 123 degree

1.59

Winding temperature high on 123 degree

3.20

Winding temperature high on 123 degree

0.07

Winding temperature high on 123 degree

5.81

Winding temperature high on 123 degree

2.40

Winding temperature high on 123 degree

0.93

Winding temperature high on 123 degree

1.97

Winding temperature high on 123 degree

1.60

Winding temperature high on 123 degree

3.20

Winding temperature high on 123 degree

3.20

Decrease load TG2 after normal increase


again. (Cleaning strainer water cooler no. 1
alternator TG 2)
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high on 123 degree

3.65

Winding temperature high on 123 degree

3.20

Winding temperature high on 123 degree

4.00

Winding temperature high on 123 degree

3.20

Winding temperature high on 122 degree

9.60

Winding temperature high on 122 degree

12.00

Winding temperature high on 122 degree

12.00

Winding temperature high on 122 degree

0.12

Winding temperature high on 122 degree

9.36

Winding temperature high on 122 degree

9.60

Winding temperature high on 122 degree

8.00

Winding temperature high on 122 degree

3.68

Winding temperature high on 122 degree

9.60

Winding temperature high on 122 degree

9.60

Winding temperature high on 122 degree

6.40

Winding temperature high on 122 degree

2.40

Winding temperature high on 122 degree

9.60

Winding temperature high on 122 degree

3.20

Winding temperature high on 122 degree

0.92

Winding temperature high on 122 degree

5.00

Winding temperature high on 122 degree

1.60

Winding temperature high on 122 degree

0.38

Winding temperature high on 122 degree

3.82

Winding temperature high on 122 degree

1.60

Winding temperature high on 122 degree

0.70

Winding temperature high on 122 degree

0.28

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
After normal increase load TG 2 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high on 122 degree

2.31

Winding temperature high on 122 degree

2.76

Winding temperature high on 122 degree

2.49

Winding temperature high on 122 degree

0.94

Winding temperature high on 122 degree

2.40

Winding temperature high on 122 degree

5.13

Winding temperature high on 122 degree

3.35

Winding temperature high on 122 degree

5.41

Winding temperature high on 122 degree

0.49

Winding temperature high on 122 degree

3.20

Winding temperature high on 122 degree

6.40

Winding temperature high on 122 degree

6.88

Winding temperature high on 122 degree

0.76

Winding temperature high on 122 degree

0.56

Winding temperature high on 122 degree

2.40

Winding temperature high on 122 degree

0.87

Winding temperature high on 122 degree

0.99

Winding temperature high on 122 degree

5.21

Winding temperature high on 122 degree

0.44

Winding temperature high on 122 degree

12.00

Winding temperature high on 122 degree

12.00

Winding temperature high on 122 degree

14.40

Winding temperature high on 122 degree

14.40

Winding temperature high on 122 degree

14.40

Winding temperature high on 122 degree

13.63

Winding temperature high on 122 degree

1.03

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high on 122 degree

5.39

Winding temperature high on 122 degree

1.79

Winding temperature high on 122 degree

0.28

Temperature journal turbine NDE bearing high

0.36

Temperature journal turbine NDE bearing high

0.32

Temperature journal turbine NDE bearing high

0.37

Temperature journal turbine NDE bearing high

0.80

Winding temperature high

2.40

Winding temperature high

2.40

Winding temperature high

2.40

Winding temperature high

2.30

Winding temperature high

0.05

Winding temperature high

2.40

Winding temperature high

1.46

SPG L-4 decrease steam consumption.

0.21

Winding temperature high

0.08

Winding temperature high

3.20

Winding temperature high

0.42

Winding temperature high

0.93

Winding temperature high

5.55

Winding temperature high

0.85

Winding temperature high

0.55

Winding temperature high

0.16

Winding temperature high

0.68

Winding temperature high

0.01

Winding temperature high

0.25

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high

2.66

Winding temperature high

0.49

Winding temperature high

0.05

Winding temperature high

1.30

Winding temperature high

0.90

Winding temperature high

3.20

Winding temperature high

0.80

Winding temperature high

4.80

Winding temperature high

4.80

Winding temperature high

2.05

Winding temperature high

2.56

Winding temperature high

0.89

Winding temperature high

1.07

Winding temperature high

3.20

Winding temperature high

7.20

Winding temperature high

7.20

Winding temperature high

1.25

Winding temperature high

1.08

Winding temperature high

0.49

Winding temperature high

3.01

Winding temperature high

2.40

Winding temperature high

9.60

Winding temperature high

9.60

Winding temperature high

3.26

Winding temperature high

2.37

Winding temperature high

4.45

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high

9.60

Winding temperature high

2.40

Winding temperature high

1.00

Winding temperature high

6.40

Winding temperature high

1.27

Winding temperature high

2.86

Winding temperature high

7.50

L-4 decrease steam consumption & Winding


temperature high

1.23

Winding temperature high

4.80

Winding temperature high

3.27

Winding temperature high

0.90

Winding temperature high

4.92

Winding temperature high

5.60

Winding temperature high

1.52

Winding temperature high

2.04

Winding temperature high

4.78

Winding temperature high

16.80

Winding temperature high

9.60

Winding temperature high

4.00

Winding temperature high

4.00

Winding temperature high

9.60

Winding temperature high

14.40

Winding temperature high

2.50

Winding temperature high

3.06

Winding temperature high

11.20

Winding temperature high

16.80

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Winding temperature high

5.60

Winding temperature high

11.20

Winding temperature high

5.60

Winding temperature high

5.00

Winding temperature high

8.98

Winding temperature high

19.20

Winding temperature high

19.20

Winding temperature high

21.60

Winding temperature high

21.60

Winding temperature high

21.60

Winding temperature high

21.60

Winding temperature high

7.20

Winding temperature high

1.93

Winding temperature high

12.83

Winding temperature high

8.00

TG2 shutdown (cleaning alternator cooler & oil


cooler)

52.00

Observation after shutdown

2.65

Observation after shutdown

4.80

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
TG2 stop (shutdown)
Monitoring load and winding temperature
TG2
Monitoring load and winding temperature
TG2

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

1.81

load TG2 keep 5 MW

2.75

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

Arrangement load to balancecondenser flow & LP


actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balancecondenser flow & LP
actuator TG 3 & TG 4
Arrangement load to balance condenser flow & LP
actuator TG 3 & TG 4
Boiler 6 O/H, L1- shutdown (PMJ : TG2 Alternator
cooler cleaning)

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

0.51

load TG2 keep 5 MW

2.35

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

4.80

load TG2 keep 5 MW

41.60

TG2 stop

946.57

Sr.no.

Description

Loss of
generation
(MWH)

Winding tempearture high.

889.1

Process load adjustement between TG 3 & TG 4.

55.42

Bearing tempeaeture high

1.84

Process decrease steam consumption.

0.21

Loss
of generation (MWH)
1000
500
0

55.42

MWH)

Remarks:

896.55

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

21.2.2015

11.00

11.00

10.60

10.50

13.50

14.37

0.78

25.2.2015

11.00

10.90

10.80

10.80

14.41

18.05

3.40

3.3.2015

11.00

11.00

10.80

10.80

9.00

9.38

0.63

3.3.2015

10.80

10.80

10.60

10.60

9.38

11.48

1.83

3.3.2015

10.80

10.80

10.60

10.60

11.48

14.37

3.18

6.3.2015

11.00

11.00

10.70

10.70

4.32

6.37

1.92

8.3.2015

11.00

11.00

10.70

10.70

6.37

13.22

6.75

15.3.2015

11.00

11.00

10.80

10.80

6.37

14.37

8.00

15.3.2015

10.80

10.80

10.50

10.50

14.37

6.37

16.00

16.3.2015

11.00

11.00

10.60

10.50

6.37

14.37

8.00

16.3.2015

11.00

11.00

10.80

10.70

14.37

22.37

8.00

16.3.2015

11.00

11.00

10.90

10.80

22.37

6.37

8.00

17.3.2015

11.00

11.00

10.80

10.70

6.37

10.37

4.00

17.3.2015

10.80

10.70

10.20

10.20

10.37

14.37

4.00

17.3.2015

10.50

10.50

8.50

8.50

22.37

6.37

8.00

18.3.2015

11.00

11.00

0.00

0.00

8.37

6.37

22.00

19.3.2015

11.00

11.00

0.00

0.00

6.37

6.37

24.00

2.4.2015

11.00

11.00

10.50

10.50

6.37

8.00

2.62

2.4.2015

11.00

11.00

8.00

8.00

8.00

10.00

2.00

2.4.2015

11.00

11.00

5.20

5.20

10.00

16.00

4.00

2.4.2015

11.00

11.00

5.50

5.50

16.00

18.44

2.73

2.4.2015

11.00

11.00

7.30

7.30

18.44

21.20

2.57

2.4.2015

11.00

11.00

9.00

9.00

21.20

22.00

1.33

2.4.2015

11.00

11.00

9.30

9.30

22.00

22.37

0.62

2.4.2015

11.00

11.00

10.80

10.80

22.37

6.37

8.00

26.5.2015

5.20

5.20

5.10

5.00

12.10

14.37

1.55

26.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

26.5.2015

5.20

5.20

5.00

4.90

22.37

1.00

2.38

26.5.2015

5.20

5.20

4.80

4.70

1.00

4.54

3.90

26.5.2015

5.20

5.20

4.90

4.80

4.55

5.14

1.68

26.5.2015

5.20

5.20

5.00

4.90

5.15

6.37

1.37

26.5.2015

11.20

11.20

11.00

10.90

13.10

14.00

0.83

26.5.2015

11.20

11.20

10.00

10.00

14.37

5.53

15.27

26.5.2015

11.20

11.20

10.20

10.20

5.53

6.37

0.73

27.5.2015

5.20

5.20

4.80

4.70

6.37

10.37

4.00

27.5.2015

5.20

5.20

4.70

4.60

10.37

14.37

4.00

27.5.2015

5.20

5.20

5.00

5.00

14.37

22.37

8.00

27.5.2015

5.20

5.20

5.10

5.10

22.37

6.37

8.00

27.5.2015

11.00

11.00

10.20

10.20

6.37

10.37

4.00

27.5.2015

11.00

11.00

9.90

9.80

10.37

14.37

4.00

27.5.2015

11.00

11.00

9.10

9.10

14.37

22.37

8.00

27.5.2015

11.00

11.00

10.70

10.70

22.37

23.00

8.00

31.5.2015

5.20

5.20

5.00

5.00

6.37

14.37

8.00

31.5.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

31.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

1.6.2015

5.20

5.20

4.80

4.70

13.30

14.37

1.12

1.6.2015

5.20

5.20

4.90

4.80

14.37

14.46

0.15

1.6.2015

5.20

5.20

4.80

4.70

14.46

17.00

2.23

1.6.2015

5.20

5.20

4.90

4.80

17.00

19.24

2.40

1.6.2015

5.20

5.20

5.00

4.90

19.24

6.37

10.78

1.6.2015

11.00

11.00

9.00

8.90

13.30

15.47

2.28

1.6.2015

11.00

11.00

8.50

8.50

15.47

17.10

1.38

2.6.2015

11.00

11.00

10.80

10.80

23.23

6.37

7.23

13.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

14.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

15.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

17.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

18.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

19.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

20.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

21.6.2015

11.00

11.00

10.10

10.10

6.37

6.37

24.00

22.6.2015

11.00

11.00

10.00

10.00

6.37

6.37

24.00

23.6.2015

11.00

11.00

10.00

10.00

6.37

15.56

9.32

23.6.2015
24.6.2015

11.00
11.00

11.00
11.00

0.00
0.00

0.00
0.00

15.56
6.37

6.37
6.37

14.68
24.00

25.6.2015

11.00

11.00

0.00

0.00

6.37

9.35

2.97

8.7.2015

11.00

11.00

10.80

10.80

16.00

6.30

9.50

16.7.2015

11.00

11.00

11.00

10.90

8.14

14.30

6.27

27.8.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

13.8.2015

11.00

11.00

0.00

0.00

17.29

22.28

4.98

3.9.2015

11.00

11.00

10.50

10.50

6.30

7.58

1.47

3.9.2015

11.00

11.00

10.80

10.80

12.05

13.21

1.27

3.9.2015

11.00

11.00

9.00

9.00

14.15

14.30

0.25

3.9.2015

11.00

11.00

9.50

9.50

14.30

17.01

2.52

3.9.2015

11.00

11.00

9.80

9.80

17.01

17.44

0.72

3.9.2015

11.00

11.00

9.00

9.00

17.44

22.30

4.77

26.9.2015

11.00

11.00

9.80

9.80

19.37

6.30

8.10.2015

11.00

11.00

9.50

9.50

12.00

6.30

18.50

9.10.2015

11.00

11.00

9.50

9.50

6.30

8.05

1.58

9.10.2015

11.00

11.00

9.80

9.80

8.05

14.05

6.00

9.10.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

9.10.2015

11.00

11.00

9.50

9.50

22.30

1.00

2.50

9.10.2015

11.00

11.00

10.20

10.20

1.00

6.30

5.50

28.8.2016

11.00

11.00

10.50

10.50

16.32

20.33

4.02

1.9.2015

11.00

11.00

10.80

10.70

22.30

6.30

8.00

25.9.2015

11.00

11.00

8.80

8.70

6.30

6.30

24.00

27.9.2015

11.00

11.00

10.30

10.30

6.30

14.30

8.00

27.9.2015

11.00

11.00

10.40

10.40

14.30

22.30

8.00

27.9.2015

11.00

11.00

10.80

10.80

22.30

6.30

8.00

28.9.2015

11.00

11.00

10.50

10.50

6.30

13.28

6.97

28.9.2015

11.00

11.00

10.00

10.00

13.08

13.33

0.42

28.9.2015

11.00

11.00

8.00

8.00

13.33

19.03

5.50

28.9.2015

11.00

11.00

10.50

10.50

19.30

6.30

11.12

29.9.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

29.9.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

30.9.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

30.9.2015

11.00

11.00

10.50

10.40

14.30

22.30

8.00

30.9.2015

11.00

11.00

10.50

10.50

22.30

1.30

3.00

2.10.2015

11.00

11.00

10.30

10.30

6.30

22.30

16.00

2.10.2015

11.00

11.00

10.40

10.40

22.30

6.30

8.00

3.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

4.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

5.10.2015

11.00

11.00

10.30

10.30

6.30

6.30

24.00

7.10.2015

11.00

11.00

10.40

10.30

6.30

6.30

24.00

10.10.2015

11.00

11.00

10.20

10.20

6.30

22.30

16.00

10.10.2015

11.00

11.00

9.70

9.60

22.30

6.30

8.00

11.10.2015

11.00

11.00

9.50

9.50

6.30

22.30

16.00

11.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

27.8.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

6.10.2016

11.00

11.00

10.30

10.30

6.30

6.30

24.00

12.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

13.10.2015

11.00

11.00

10.10

10.00

6.30

13.30

7.00

13.10.2015

11.00

11.00

10.00

10.00

15.50

6.30

14.67

14.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

14.10.2015

11.00

11.00

9.70

9.70

14.30

17.38

3.13

14.10.2015

11.00

11.00

10.00

10.00

17.38

6.30

12.87

15.10.2015

11.00

11.00

10.30

10.20

6.30

22.30

16.00

15.10.2015

11.00

11.00

10.20

10.10

22.30

6.30

8.00

16.10.2015

11.00

11.00

10.20

10.10

6.30

6.50

0.33

16.10.2015

11.00

11.00

10.10

10.00

17.30

6.30

13.00

17.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

18.10.2015

11.00

11.00

10.10

10.00

6.30

6.30

24.00

19.10.2015

11.00

11.00

10.10

10.00

6.30

14.30

8.00

19.10.2015

11.00

11.00

10.00

9.90

14.30

22.30

8.00

19.10.2015

11.00

11.00

10.00

10.00

22.30

6.30

8.00

20.10.2015

11.00

11.00

10.00

10.00

6.30

6.30

24.00

21.10.2015

11.00

11.00

10.00

10.00

6.30

14.30

8.00

21.10.2015

11.00

11.00

9.80

9.80

20.09

22.30

2.35

21.10.2015

11.00

11.00

9.90

9.90

22.30

6.30

8.00

22.10.2015

11.00

11.00

9.60

9.50

6.30

14.30

8.00

22.10.2015

11.00

11.00

9.50

9.40

17.45

20.12

2.45

22.10.2015

11.00

11.00

9.60

9.60

20.12

21.14

1.03

22.10.2015

11.00

11.00

9.40

9.40

21.14

22.30

1.27

22.10.2015

11.00

11.00

9.50

9.50

22.30

6.30

8.00

23.10.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

24.10.2015

11.00

11.00

9.60

9.60

6.30

6.30

24.00

25.10.2015

11.00

11.00

9.60

9.60

6.30

14.30

8.00

25.10.2015

11.00

11.00

9.50

9.50

14.30

15.26

0.93

25.10.2015

11.00

11.00

9.00

9.00

18.22

19.12

0.83

25.10.2015

11.00

11.00

9.50

9.50

19.12

20.49

1.62

25.10.2015

11.00

11.00

8.80

8.80

20.49

22.30

1.68

25.10.2015

11.00

11.00

8.60

8.50

22.30

23.35

1.08

25.10.2015

11.00

11.00

9.00

9.00

23.35

5.11

5.67

25.10.2015

11.00

11.00

9.60

9.60

5.11

6.30

1.32

26.10.2015

11.00

11.00

9.60

9.50

6.30

13.48

7.30

26.10.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

27.10.2015

11.00

11.00

9.30

9.30

6.30

14.30

8.00

27.10.2015

11.00

11.00

9.50

9.50

14.30

6.30

16.00

28.10.2015

11.00

11.00

9.80

9.50

6.30

7.40

1.17

28.10.2015

11.00

11.00

9.00

8.90

7.40

14.30

6.83

28.10.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

29.10.2015

11.00

11.00

10.90

10.90

13.40

14.30

0.83

29.10.2015

11.00

11.00

10.80

10.70

14.30

6.30

16.00

30.10.2015

11.00

11.00

9.60

9.60

21.24

6.30

9.10

31.10.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

1.11.2015

11.00

11.00

9.30

9.20

6.30

6.30

24.00

2.11.2015

11.00

11.00

9.20

9.20

6.30

6.30

24.00

3.11.2015

11.00

11.00

10.50

10.50

6.30

14.30

8.00

3.11.2015

11.00

11.00

10.90

10.80

14.30

22.30

8.00

3.11.2015

11.00

11.00

10.70

10.70

22.30

6.30

8.00

4.11.2015

11.00

11.00

10.70

10.60

6.30

14.30

8.00

4.11.2015

11.00

11.00

10.50

10.50

22.30

6.30

16.00

5.11.2015

11.00

11.00

10.50

10.50

6.30

7.30

1.00

5.11.2015

11.00

11.00

8.00

8.00

14.30

22.30

8.00

5.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

6.11.2015

11.00

11.00

9.80

9.80

6.30

9.52

3.37

6.11.2015

11.00

11.00

9.70

9.70

9.52

14.50

4.97

6.11.2015

11.00

11.00

9.40

9.40

14.50

22.30

7.67

6.11.2015

11.00

11.00

9.50

9.50

22.30

1.30

3.00

6.11.2015

11.00

11.00

9.70

9.70

1.30

6.30

5.00

7.11.2015

11.00

11.00

9.70

9.60

6.30

22.30

16.00

7.11.2015

11.00

11.00

8.60

8.50

22.30

5.10

6.67

7.11.2015

11.00

11.00

9.50

9.50

5.10

6.30

1.33

8.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

9.11.2015

11.00

11.00

9.80

9.80

6.30

14.30

8.00

9.11.2015

11.00

11.00

9.70

9.60

14.30

6.30

16.00

10.11.2015

11.00

11.00

9.70

9.60

6.30

7.30

1.00

10.11.2015

11.00

11.00

9.90

9.80

19.00

22.30

3.50

10.11.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

11.11.2015

11.00

11.00

9.80

9.80

6.30

5.15

23.25

12.11.2015

11.00

11.00

9.20

9.20

11.17

14.30

3.22

12.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

12.11.2015

11.00

11.00

9.80

9.70

22.30

6.30

8.00

13.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

14.11.2015

11.00

11.00

9.70

9.70

6.30

6.30

24.00

15.11.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

16.11.2015

11.00

11.00

9.70

9.60

6.30

14.30

8.00

16.11.2015

11.00

11.00

9.40

9.30

14.30

0.44

9.77

17.11.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

18.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

19.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

20.11.2015

11.00

11.00

9.50

9.50

6.30

13.35

7.08

20.11.2015

11.00

11.00

9.50

9.50

14.30

22.30

8.00

20.11.2015

11.00

11.00

9.40

9.30

22.30

6.30

8.00

21.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

22.11.2015

11.00

11.00

9.50

9.50

6.30

6.30

24.00

23.11.2015

11.00

11.00

9.60

9.50

6.30

10.00

3.50

02.12.2015

11.00

11.00

10.80

10.80

14.30

17.36

3.10

02.12.2015

11.00

11.00

10.60

10.60

17.36

20.21

2.75

02.12.2015

11.00

11.00

10.30

10.30

20.54

6.30

2.15

03.12.2015

11.00

11.00

10.20

10.10

6.30

14.30

8.00

03.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

03.12.2015

11.00

11.00

10.30

10.30

22.30

6.30

8.00

04.12.2015

11.00

11.00

10.30

10.30

6.30

8.21

1.85

04.12.2015

11.00

11.00

10.00

10.00

8.21

14.30

6.15

04.12.2015

11.00

11.00

10.20

10.20

14.30

22.30

8.00

04.12.2015

11.00

11.00

10.00

10.00

22.30

3.34

5.07

04.12.2015

11.00

11.00

9.80

9.80

4.34

6.30

1.93

05.12.2015

11.00

11.00

9.80

9.70

6.30

14.30

8.00

05.12.2015

11.00

11.00

10.10

10.00

14.30

6.30

16.00

06.12.2015

11.00

11.00

10.00

10.00

6.30

6.52

0.37

06.12.2015

11.00

11.00

9.80

9.80

6.52

14.30

7.63

06.12.2015

11.00

11.00

8.80

8.70

14.30

22.30

8.00

09.12.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

11.12.2015

11.00

11.00

8.00

8.00

6.30

14.30

8.00

11.12.2015

11.00

11.00

8.20

8.10

14.30

6.30

16.00

12.12.2015

11.00

11.00

8.00

8.00

14.30

6.30

24.00

13.12.2015

11.00

11.00

8.10

8.00

14.30

6.30

24.00

14.12.2015

11.00

11.00

8.10

8.00

14.30

16.53

2.38

14.12.2015

11.00

11.00

9.00

9.00

16.53

19.22

2.48

14.12.2015

11.00

11.00

8.10

8.00

19.22

6.30

19.13

15.12.2015

11.00

11.00

8.00

8.00

6.30

16.50

10.33

16.12.2015

11.00

11.00

9.00

8.90

5.05

6.30

1.42

17.12.2015

11.00

11.00

8.10

8.00

14.30

22.30

16.00

17.12.2015

11.00

11.00

8.50

8.50

22.30

6.30

8.00

18.12.2015

11.00

11.00

9.70

9.60

6.30

6.30

24.00

19.12.2015

11.00

11.00

9.60

9.50

6.30

6.30

24.00

20.12.2015

11.00

11.00

9.60

9.50

6.30

0.15

17.63

20.12.2015

11.00

11.00

9.30

9.30

0.15

6.01

5.77

20.12.2015

11.00

11.00

9.00

9.00

6.01

6.37

0.60

21.12.2015

11.00

11.00

9.20

9.10

6.30

15.00

8.50

21.12.2015

11.00

11.00

8.50

8.50

15.00

22.30

7.50

21.12.2015

11.00

11.00

9.70

9.70

22.30

6.30

8.00

22.12.2015

11.00

11.00

8.10

8.00

6.30

14.30

8.00

22.12.2015

11.00

11.00

9.00

9.00

14.30

22.30

8.00

22.12.2015

11.00

11.00

9.30

9.30

22.30

6.30

8.00

23.12.2015

11.00

11.00

9.50

9.50

6.30

11.14

4.73

23.12.2015

11.00

11.00

8.90

8.90

11.14

11.34

0.33

23.12.2015

11.00

11.00

9.10

9.10

11.34

15.00

3.43

23.12.2015

11.00

11.00

8.60

8.60

15.00

20.15

5.25

23.12.2015

11.00

11.00

9.00

9.00

20.15

6.30

10.25

24.12.2015

11.00

11.00

9.00

9.00

6.30

22.30

16.00

24.12.2015

11.00

11.00

9.10

9.10

22.30

6.30

8.00

25.12.2015

11.00

11.00

9.50

9.40

6.30

12.51

6.35

25.12.2015

11.00

11.00

9.20

9.20

14.30

15.20

0.83

25.12.2015

11.00

11.00

8.60

8.50

17.35

22.30

4.92

25.12.2015

11.00

11.00

9.10

9.00

22.30

6.30

8.00

26.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

26.12.2015

11.00

11.00

9.00

9.00

22.30

6.30

8.00

27.12.2015

11.00

11.00

9.20

9.10

6.30

22.30

16.00

27.12.2015

11.00

11.00

9.00

8.90

22.30

6.30

8.00

28.12.2015

11.00

11.00

9.00

9.00

6.30

14.30

8.00

28.12.2015

11.00

11.00

9.40

9.30

14.30

22.30

8.00

28.12.2015

11.00

11.00

9.30

9.20

22.30

6.30

8.00

29.12.2015

11.00

11.00

9.30

9.20

6.30

10.00

3.50

29.12.2015

11.00

11.00

9.30

9.30

22.30

6.00

8.00

30.12.2015

11.00

11.00

9.30

9.20

6.30

9.30

3.00

30.12.2015

11.00

11.00

8.90

8.90

13.42

14.30

0.80

30.12.2015

11.00

11.00

8.70

8.70

14.30

22.30

8.00

30.12.2015

11.00

11.00

9.20

9.20

22.30

6.30

8.00

31.12.2015

11.00

11.00

9.20

9.20

6.30

9.50

3.33

31.12.2015

11.00

11.00

8.80

8.80

14.30

16.00

1.50

31.12.2015

11.00

11.00

8.50

8.50

16.00

20.00

4.00

31.12.2015

11.00

11.00

8.80

8.80

20.00

21.00

1.00

31.12.2015

11.00

11.00

9.00

9.00

21.00

6.30

9.50

TOTAL TG 3 PROBLEM (SHUTDOWN / BREAK DOWN)

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Vaccum TG3 droop

0.39

Vaccum pressure TG3 droop

0.34

Vaccum pressure TG3 droop < - 0.7 bar

0.13

Vaccum pressure TG3 droop < - 0.7 bar

0.37

Vaccum pressure TG3 droop < - 0.7 bar

0.64

Vaccum pressure TG3 droop < - 0.7 bar

0.58

Vaccum pressure TG3 droop

2.03

Vaccum pressure TG3 droop

1.60

Vaccum pressure TG3 droop

4.80

Vaccum pressure TG3 droop

4.00

Vaccum pressure TG3 droop

2.40

Vaccum pressure TG3 droop

1.60

Vaccum pressure TG3 droop

1.20

Vaccum pressure TG3 droop

2.00

Vaccum pressure TG3 droop

16.00

TG3 stop for cleaning condenser & modification


jobs.
TG3 stop for cleaning condenser & modification
jobs.
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)
Process line 5 shutdown. PM Jobs : Online
mechanical cleaning condenser tubes (west side)

242.00
264.00
1.31
6.00
23.20
15.03
9.50
2.67
1.05

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Planning 2 daysfinish the job and start up
again
TG3 stop. If breakdown finish TG3 start
again.
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target

Process line 5 shutdown. PM Jobs : Online


mechanical cleaning condenser tubes (west side)
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300
Pressure vacum TG3 drop & Repairing support pipe
line steam 4.5 bar NB 300

1.60
0.31
3.20
0.72
1.95
0.67
0.41
0.25
18.32
0.73
2.00
2.40
1.60
0.80
3.20
4.80
15.20
2.40

Pressure vacum TG3 drop

1.60

Pressure vacum TG3 drop

3.20

Pressure vacum TG3 drop

4.00

Pressure vacum TG3 drop

0.56

Pressure vacum TG3 drop

0.06

Pressure vacum TG3 drop

1.12

Pressure vacum TG3 drop

0.96

Pressure vacum TG3 drop

3.24

After normal increase load TG 3 as per


target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Pressure vacum TG3 drop

4.80

Pressure vacum TG3 drop

3.46

Pressure vacum TG3 drop

1.45

condensate get high & vacum drop & Winding get


high

24.00

vacum drop

24.00

condensate get high & vacum drop & Winding get


high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
condensate get high & vacum drop & Winding get
high
TG3 shutdown
TG3 shutdown

161.48
264.00

TG3 start up & Syncronize power

32.63

PPL2 request decrease load TG3 (LP TG4 100%)

1.90

Inlet flow steam high

0.63

PRDS 10 bar steam consumption more

4.00

Replace ejector valve (effect PPL1 black out)

54.82

Effeci L-4, PRDS 10 bar steam consumption more

0.73

Effeci L-4, PRDS 10 bar steam consumption more

0.25

Effeci L-4, PRDS 10 bar steam consumption more

0.50

Effeci L-4, PRDS 10 bar steam consumption more

3.78

Effeci L-4, PRDS 10 bar steam consumption more

0.86

Effeci L-4, PRDS 10 bar steam consumption more

9.53

PRDS 10 bar steam consumption more (effect L-4)

0.00

PRDS 10 bar steam consumption more (effect L-4)

27.75

21.60
21.60
24.00
24.00
21.60
21.60
24.00
9.32

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 stop
TG3 stop
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG3 stop (breakdown)
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more (effect L-4)

2.38

PRDS 10 bar steam consumption more (effect L-4)

7.20

PRDS 10 bar steam consumption more (effect L-4)

6.40

PRDS 10 bar steam consumption more (effect L-4)

3.75

PRDS 10 bar steam consumption more (effect L-4)

4.40

PRDS 10 bar steam consumption more

2.01

PRDS 10 bar steam consumption more

2.40

PRDS 10 bar steam consumption more

55.20

PRDS 10 bar steam consumption more

5.60

PRDS 10 bar steam consumption more

4.80

PRDS 10 bar steam consumption more

1.60

PRDS 10 bar steam consumption more

3.48

PRDS 10 bar steam consumption more

0.42

PRDS 10 bar steam consumption more

16.50

PRDS 10 bar steam consumption more

5.56

PRDS 10 bar steam consumption more

4.00

PRDS 10 bar steam consumption more

5.60

PRDS 10 bar steam consumption more

7.20

PRDS 10 bar steam consumption more

4.80

PRDS 10 bar steam consumption more

1.50

PRDS 10 bar steam consumption more

11.20

PRDS 10 bar steam consumption more

4.80

PRDS 10 bar steam consumption more

16.80

PRDS 10 bar steam consumption more

16.80

PRDS 10 bar steam consumption more

16.80

PRDS 10 bar steam consumption more

16.80

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

12.80

PRDS 10 bar steam consumption more

11.20

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

4.00

PRDS 10 bar steam consumption more (effect L-3)

16.80

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

7.00

PRDS 10 bar steam consumption more

14.67

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

4.07

PRDS 10 bar steam consumption more

12.87

PRDS 10 bar steam consumption more

12.80

PRDS 10 bar steam consumption more

7.20

PRDS 10 bar steam consumption more

0.30

PRDS 10 bar steam consumption more

13.00

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

8.80

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

2.82

PRDS 10 bar steam consumption more

8.80

PRDS 10 bar steam consumption more

12.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

3.92

PRDS 10 bar steam consumption more

1.45

PRDS 10 bar steam consumption more

2.03

PRDS 10 bar steam consumption more

12.00

PRDS 10 bar steam consumption more

31.20

PRDS 10 bar steam consumption more

33.60

PRDS 10 bar steam consumption more

11.20

PRDS 10 bar steam consumption more

1.40

PRDS 10 bar steam consumption more

1.67

PRDS 10 bar steam consumption more

2.43

PRDS 10 bar steam consumption more

3.70

PRDS 10 bar steam consumption more

2.71

PRDS 10 bar steam consumption more

11.34

PRDS 10 bar steam consumption more

1.84

PRDS 10 bar steam consumption more

10.95

PRDS 10 bar steam consumption more

14.40

PRDS 10 bar steam consumption more

13.60

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

1.75

PRDS 10 bar steam consumption more

14.35

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

0.08

PRDS 10 bar steam consumption more

4.80

PRDS 10 bar steam consumption more

12.74

PRDS 10 bar steam consumption more

43.20

PRDS 10 bar steam consumption more

43.20

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

43.20

PRDS 10 bar steam consumption more

4.00

PRDS 10 bar steam consumption more

1.60

PRDS 10 bar steam consumption more

2.40

PRDS 10 bar steam consumption more

3.20

PRDS 10 bar steam consumption more

8.00

PRDS 10 bar steam consumption more

0.50

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more

4.04

PRDS 10 bar steam consumption more

6.46

PRDS 10 bar steam consumption more

12.27

PRDS 10 bar steam consumption more

4.50

PRDS 10 bar steam consumption more

6.50

PRDS 10 bar steam consumption more

22.40

PRDS 10 bar steam consumption more

16.68

PRDS 10 bar steam consumption more

2.00

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

9.60

PRDS 10 bar steam consumption more

22.40

PRDS 10 bar steam consumption more

1.40

PRDS 10 bar steam consumption more

4.20

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more

27.90

PRDS 10 bar steam consumption more

5.80

PRDS 10 bar steam consumption more

12.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more

31.20

PRDS 10 bar steam consumption more

31.20

PRDS 10 bar steam consumption more

33.60

PRDS 10 bar steam consumption more

11.20

PRDS 10 bar steam consumption more

16.61

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

10.62

PRDS 10 bar steam consumption more

12.00

PRDS 10 bar steam consumption more

13.60

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

5.25

PRDS 10 bar steam consumption more

0.62

PRDS 10 bar steam consumption more

1.10

PRDS 10 bar steam consumption more

1.51

PRDS 10 bar steam consumption more

7.20

PRDS 10 bar steam consumption more

6.40

PRDS 10 bar steam consumption more

5.60

PRDS 10 bar steam consumption more

1.30

PRDS 10 bar steam consumption more

6.15

PRDS 10 bar steam consumption more

6.40

PRDS 10 bar steam consumption more

5.07

PRDS 10 bar steam consumption more

2.32

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

0.37

PRDS 10 bar steam consumption more

9.16

PRDS 10 bar steam consumption more

18.40

PRDS 10 bar steam consumption more

72.00

PRDS 10 bar steam consumption more

24.00

PRDS 10 bar steam consumption more

46.40

PRDS 10 bar steam consumption more

72.00

PRDS 10 bar steam consumption more

72.00

PRDS 10 bar steam consumption more

7.15

PRDS 10 bar steam consumption more

4.97

PRDS 10 bar steam consumption more

57.39

PRDS 10 bar steam consumption more

31.00

PRDS 10 bar steam consumption more

2.98

PRDS 10 bar steam consumption more

48.00

PRDS 10 bar steam consumption more

20.00

PRDS 10 bar steam consumption more

33.60

PRDS 10 bar steam consumption more

36.00

PRDS 10 bar steam consumption more

26.45

PRDS 10 bar steam consumption more


(Temperature vaccum high)
PRDS 10 bar steam consumption more
(Temperature vaccum high)

9.80
1.20

PRDS 10 bar steam consumption more

16.15

PRDS 10 bar steam consumption more

18.75

PRDS 10 bar steam consumption more

10.40

PRDS 10 bar steam consumption more

24.00

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

13.60

PRDS 10 bar steam consumption more

7.10

PRDS 10 bar steam consumption more

0.70

PRDS 10 bar steam consumption more

6.52

PRDS 10 bar steam consumption more

12.60

PRDS 10 bar steam consumption more

20.50

PRDS 10 bar steam consumption more

32.00

PRDS 10 bar steam consumption more

15.20

PRDS 10 bar steam consumption more

10.16

PRDS 10 bar steam consumption more

1.50

PRDS 10 bar steam consumption more

12.29

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

30.40

PRDS 10 bar steam consumption more

16.80

PRDS 10 bar steam consumption more

16.00

PRDS 10 bar steam consumption more

13.60

PRDS 10 bar steam consumption more

14.40

PRDS 10 bar steam consumption more

6.30

PRDS 10 bar steam consumption more

13.60

PRDS 10 bar steam consumption more

5.40

PRDS 10 bar steam consumption more

1.68

PRDS 10 bar steam consumption more

18.40

PRDS 10 bar steam consumption more

14.40

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

PRDS 10 bar steam consumption more

6.00

PRDS 10 bar steam consumption more

3.30

PRDS 10 bar steam consumption more

10.00

PRDS 10 bar steam consumption more

2.20

PRDS 10 bar steam consumption more

19.00

TOTAL:

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

4100.45

458.11
200.27
758.07
2.53

Sr.no.

Loss of
generation
(MWH)

Description

10 bar steam consumption high.

2681.47

Condenser online cleaning & winding temp. too high.

758.07

TG 3 shudown

458.11

TG 3 vacuum drop & Misc.

202.8

TOTAL:

4100.45

3000
2500
2000
1500
1000
500
0
10 bar
steam
consu
mption
high.

Conden
ser
online
cleanin
g&
winding
temp.
too
high.

TG 3
shudow
n

TG 3
vacuu
m drop
& Misc.

4045.63

Remarks:

TG 3
vacuu
m drop
& Misc.

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

26.2.2015

18.35

18.02

13.90

13.80

8.50

16.00

7.83

23.3.2015

20.44

20.31

19.45

19.30

10.25

11.09

0.73

11.4.2015

20.49

20.36

11.00

11.00

8.00

6.37

22.38

12.4.2015

20.49

20.36

11.00

11.00

6.37

6.37

24.00

13.4.2015

20.49

20.36

12.23

12.15

6.37

19.25

8.20

13.4.2015

20.49

20.36

0.00

0.00

19.25

6.37

15.80

14.4.2015

20.49

20.36

0.00

0.00

6.37

14.26

7.82

14.4.2015

20.49

20.36

7.00

7.00

14.26

15.51

1.42

14.4.2015

20.49

20.36

0.00

0.00

15.51

6.37

14.77

15.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

16.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

16.6.2015

19.75

19.60

19.20

19.10

12.00

17.00

5.00

18.6.2015
20.6.2015

19.75
19.50

19.70
19.40

19.20
19.20

19.10
19.00

12.00
11.00

17.00
17.00

6.00
6.00

21.6.2015

19.50

19.40

19.20

19.10

11.00

17.00

6.00

23.6.2015

19.61

19.58

19.18

19.03

13.30

14.30

1.00

27.6.2015

19.40

19.30

18.90

18.80

11.00

17.00

6.00

28.6.2015

19.40

19.30

19.10

18.90

11.00

17.00

6.00

29.6.2015

19.40

19.30

18.96

18.67

8.30

14.30

6.00

29.6.2015

19.40

19.30

18.83

18.51

14.30

22.30

8.00

29.6.2015

19.40

19.30

18.96

18.86

22.30

6.30

8.00

30.6.2015
30.6.2015
2.7.2015
5.7.2015
5.7.2015

19.40
19.40
19.40
19.40
19.40

19.30
19.30
19.30
19.30
19.30

19.01
19.44
19.35
0.00
10.14

18.91
19.25
19.17
0.00
10.10

6.30
14.30
6.30
6.30
1.21

14.30
6.30
14.30
1.21
6.30

8.00
16.00
8.00
18.85
5.15

6.7.2015

19.40

19.30

10.62

10.53

6.30

10.30

4.00

6.7.2015

19.40

19.30

11.50

11.40

10.30

13.30

3.00

6.7.2015

19.40

19.30

12.14

12.06

13.30

14.30

1.00

6.7.2015

19.40

19.30

13.40

1.36

14.30

22.30

8.00

6.7.2015

19.40

19.30

14.14

14.09

22.30

6.30

8.00

6.7.2015

11.00

11.00

10.80

10.80

10.10

10.40

0.50

6.7.2015

11.00

11.00

10.00

10.00

10.40

14.30

3.83

6.7.2015

11.00

11.00

10.50

10.50

14.30

6.30

16.00

6.7.2015

5.20

5.20

5.20

5.10

6.30

9.13

2.72

6.7.2015

5.20

5.20

4.90

4.80

9.13

10.24

1.18

6.7.2015

5.20

5.20

4.00

4.00

10.24

13.30

3.10

6.7.2015

5.20

5.20

5.20

5.10

13.30

22.30

9.00

7.7.2015

19.40

19.30

15.80

14.83

6.30

10.00

3.50

7.7.2016

11.00

11.00

10.50

10.50

6.30

11.22

4.87

23.8.2015

20.20

20.20

20.18

19.90

6.30

6.30

24.00

25.8.2015

20.40

20.40

20.26

20.19

6.30

14.30

8.00

22.9.2015
23.9.2015

20.20
20.20

20.00
20.00

0.00
0.00

0.00
0.00

20.00
6.30

6.30
14.25

10.50
7.92

24.9.2015

20.20

20.00

19.14

18.96

6.30

14.30

8.00

24.9.2015

20.20

20.00

19.14

19.00

14.30

6.30

16.00

24.8.2015

20.20

20.20

20.14

19.97

22.30

6.30

8.00

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Cleaning online 1/2 condenser TG4 (Note and for


attention : When load already normal on 19.49 MW
after cleaning online 1/2 condenser as per target
wending temperature on 116 degree alarm and axial
come on 10 - 11 mills alarm)

33.06

CEP cleaning

0.74

TG4 radial vibration indicate high on HP bearing

209.48

TG4 radial vibration indicate high on HP bearing

224.64

TG4 radial vibration indicate high on HP bearing

67.32

TG4 radial vibration indicate high on HP bearing

321.69

TG4 radial vibration indicate high on HP bearing

159.15

TG4 radial vibration indicate high on HP bearing

18.93

TG4 radial vibration indicate high on HP bearing

300.72

TG4 radial vibration indicate high on HP bearing

488.64

TG4 radial vibration indicate high on HP bearing

488.64

Winding temperature TG get high

2.50

Winding Temp. Tg 4 get high 117,5 degree


Winding Temp. Tg 4 get high 117,5 degree

3.60
2.40

winding temperature alternator TG 4 high

1.80

winding temperature alternator TG 4 high

0.55

winding temperature alternator TG 4 high

3.00

winding temperature alternator TG 4 high

2.40

Fan C/T no. 1 stop & winding temperature alternator


TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Fan C/T no. 1 stop & winding temperature alternator
TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Winding temperature alternator TG 4 high
Clening condenser TG4
TG4 start up & Syncronize power

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5
After normal increase load TG 4 as per
target (control max. 117.5 degree)
After normal increase load TG 4 as per
target
Control winding temprature max. 117.5
Control winding temprature max. 117.5 and
planning change cooling tower water with
filter water

3.78

Control winding temprature max. 117.5

6.32

Control winding temprature max. 117.5

3.52

Control winding temprature max. 117.5

3.12
0.80
1.04
363.81
47.38

Control winding temprature max. 117.5


Control winding temprature max. 117.5
Control winding temprature max. 117.5
TG4 stop
Monitoring syncronize

Cleaning online 1/2 condenser TG4

35.08

L-2 break down & Cleaning online 1/2 condenser


TG4

23.70

Cleaning online 1/2 condenser TG4

7.24

Cleaning online 1/2 condenser TG4

143.52

Cleaning online 1/2 condenser TG4

41.68

Cleaning online 1/2 condenser TG4

0.10

Cleaning online 1/2 condenser TG4

3.83

Cleaning online 1/2 condenser TG4

8.00

Cleaning online 1/2 condenser TG4

0.27

Cleaning online 1/2 condenser TG4

0.47

L-2 break down

3.72

Cleaning online 1/2 condenser TG4

0.90

Cleaning online 1/2 condenser TG4

15.65

Cleaning online 1/2 condenser TG4

2.43

Winding temperature high 117 degree (Boiler 131


T/H and suplly steam bleed is 13 T/H)
Winding temperature high 117 degree (Boiler 131
T/H and suplly steam bleed is 13 T/H)
TG4 oil leakage from High Speed coupling guard
TG4 oil leakage from High Speed coupling guard

210.00
158.33

TG4 oil leakage from High Speed coupling guard

8.32

TG4 oil leakage from High Speed coupling guard

16.00

Winding temperature high 117 degree (Boiler 131


T/H and suplly steam bleed is 13 T/H)

1.84

7.20
1.68

3448.98

Decrease load TG4 after normal increase


again.
TG4 restricted load due to cleaning
condenser cell 1 phase
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
TG4 stop
TG4 stop
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.
Decrease load TG4 after normal increase
again.

Sr.no.
1

Loss of
generation
(MWH)

Description

2279.2

TG 4 radial bearing high vibrations.


Condenser cleaning / exhaust temp. high & high winding
temperatures.

Oil leakage from high speed coupling.

392.65

TOTAL:

3449.04

777.19

Loss of generation (MW

2500

2000

1500

1000

500

0
TG 4 radial
bearing high
vibrations.

Condenser
cleaning / exhaust
temp. high & high
winding
temperatures.

Oil leakage from


high speed
coupling.

Remarks:

s of generation (MWH)

Oil leakage from


high speed
coupling.

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

26.2.2015

5.00

5.00

4.80

4.80

8.50

16.00

7.83

5.4.2015

20.49

20.36

18.18

17.93

22.37

6.37

8.00

5.4.2017

5.20

5.20

3.50

3.40

22.37

6.37

8.00

5.4.2015

11.00

11.00

7.00

7.00

22.37

6.37

8.00

6.4.2015

20.49

20.36

18.98

18.85

6.37

6.37

24.00

6.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

6.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

7.4.2015

20.49

20.36

18.27

18.06

6.37

14.37

8.00

7.4.2015

20.49

20.36

18.40

18.20

14.37

22.37

8.00

7.4.2015

20.49

20.36

18.53

18.42

22.37

6.37

8.00

7.4.2015

5.20

5.20

3.50

3.40

6.37

6.37

24.00

7.4.2015

11.00

11.00

7.00

7.00

6.37

6.37

24.00

8.4.2015

5.20

5.20

3.50

3.40

6.37

12.00

5.62

8.4.2015

11.00

11.00

7.00

6.90

6.37

12.00

5.62

27.4.2015

20.50

20.50

17.80

17.50

14.19

14.37

0.30

27.4.2015

20.50

20.50

18.31

18.30

14.37

22.37

8.00

27.4.2015

20.50

20.50

20.01

19.86

22.37

6.37

8.00

27.4.2015

5.20

5.20

4.80

4.80

6.37

14.15

7.63

27.4.2015

5.20

5.20

3.30

3.20

14.15

14.37

0.37

27.4.2015

5.20

5.20

3.10

3.00

14.37

22.37

8.00

27.4.2015

5.20

5.20

3.40

3.30

22.37

6.37

8.00

27.4.2015

11.00

11.00

6.70

6.70

14.15

14.37

0.37

27.4.2015

11.00

11.00

6.80

6.70

14.37

22.37

8.00

27.4.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

28.4.2015

20.33

20.30

18.35

18.28

12.00

22.37

10.62

28.4.2015

20.33

20.30

18.18

18.09

22.37

6.37

8.00

28.4.2015

5.20

5.20

3.30

3.20

6.37

22.37

16.00

28.4.2015

5.20

5.20

3.20

3.10

22.37

6.37

8.00

28.4.2015

11.00

11.00

6.70

6.70

6.37

14.37

8.00

28.4.2015

11.00

11.00

6.80

6.80

14.37

22.37

8.00

28.4.2015

11.00

11.00

6.60

6.50

22.37

6.37

8.00

29.4.2015

20.33

20.30

18.61

18.47

6.37

14.37

8.00

29.4.2015

20.33

20.33

17.66

17.53

14.37

6.37

16.00

29.4.2015

5.20

5.20

3.20

3.20

6.37

6.37

24.00

29.4.2015

11.00

11.00

6.30

6.20

6.37

14.37

8.00

29.4.2015

11.00

11.00

6.40

6.40

14.37

15.10

0.55

29.4.2015

11.00

11.00

6.60

6.60

15.10

6.37

15.45

30.4.2015

20.33

20.33

17.23

17.05

6.37

14.37

8.00

30.4.2015

20.33

20.33

17.50

17.49

14.37

22.37

8.00

30.4.2015

20.33

20.33

17.35

17.22

22.37

6.37

8.00

30.4.2015

5.20

5.20

3.10

3.10

6.37

22.37

16.00

30.4.2015

5.20

5.20

3.30

3.20

22.37

6.37

8.00

30.4.2015

11.00

11.00

6.60

6.50

6.37

6.37

24.00

1.5.2015

20.33

20.33

17.18

17.07

6.37

14.37

8.00

1.5.2015

20.33

20.33

17.31

17.15

14.37

6.37

16.00

1.5.2015

5.20

5.20

3.30

3.20

6.37

13.37

7.00

1.5.2015

5.20

5.20

2.20

2.20

13.37

6.37

17.00

1.5.2015

11.00

11.00

6.60

6.50

6.37

13.37

7.00

1.5.2015

11.00

11.00

6.00

6.00

13.30

6.37

17.00

2.5.2015

20.33

20.33

17.49

17.24

6.37

14.37

8.00

2.5.2015

20.33

20.33

18.36

18.16

14.37

22.37

8.00

2.5.2015

20.33

20.33

17.90

17.80

22.37

6.37

8.00

2.5.2015

5.20

5.20

2.20

2.10

6.37

6.37

24.00

2.5.2015

11.00

11.00

6.00

6.00

6.37

6.37

24.00

3.5.2015

20.33

20.33

18.27

18.24

6.37

14.37

8.00

3.5.2015

20.33

20.33

17.71

17.45

14.37

22.37

8.00

3.5.2015

20.33

20.33

17.71

17.58

22.37

6.37

8.00

3.5.2015

5.20

5.20

2.20

2.10

6.37

14.37

8.00

3.5.2015

5.20

5.20

6.60

3.50

3.50

22.37

8.00

3.5.2015

5.20

5.20

3.60

3.60

22.37

6.37

8.00

3.5.2015

11.00

11.00

6.00

6.00

6.37

14.37

8.00

3.5.2015

11.00

11.00

6.60

6.50

14.37

6.37

16.00

4.5.2015

20.33

20.33

18.01

17.77

6.37

14.37

8.00

4.5.2015

20.33

20.33

18.88

18.72

14.37

22.37

8.00

4.5.2015

20.33

20.33

18.53

18.44

22.37

6.37

8.00

4.5.2015

5.20

5.20

3.70

3.60

6.37

22.37

16.00

4.5.2015

5.20

5.20

3.80

3.70

22.37

6.37

8.00

4.5.2015

11.00

11.00

6.60

6.50

6.37

22.37

16.00

4.5.2015

11.00

11.00

6.70

6.70

22.37

6.37

8.00

5.5.2015

20.33

20.33

18.35

18.12

6.37

19.37

13.00

5.5.2015

5.20

5.20

3.80

3.70

6.37

17.35

10.97

5.5.2015

11.00

11.00

6.60

6.60

6.37

17.45

11.13

5.5.2015

11.00

11.00

9.00

9.00

17.45

19.08

1.38

TOTAL BOILER 8 PROBLEM (SHUTDOWN / BREAK DOWN)

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Balancing FD Fan "B" boiler 8 & cleaning online 1/2


condenser TG4

1.57

Boiler 8 breakdown (inbed tube leakage)

19.44

Boiler 8 breakdown (inbed tube leakage)

14.40

Boiler 8 breakdown (inbed tube leakage)

32.00

Boiler 8 breakdown (inbed tube leakage)

36.24

Boiler 8 breakdown (inbed tube leakage)

43.20

Boiler 8 breakdown (inbed tube leakage)

96.00

Boiler 8 breakdown (inbed tube leakage)

18.40

Boiler 8 breakdown (inbed tube leakage)

17.28

Boiler 8 breakdown (inbed tube leakage)

15.52

Boiler 8 breakdown (inbed tube leakage)

43.20

Boiler 8 breakdown (inbed tube leakage)

96.00

Boiler 8 breakdown (inbed tube leakage)

10.11

Boiler 8 breakdown (inbed tube leakage)

23.04

Boiler 8 overhaul

0.90

Boiler 8 overhaul

17.60

Boiler 8 overhaul

5.12

Boiler 8 overhaul

3.05

Boiler 8 overhaul

0.73

Boiler 8 overhaul

17.60

Boiler 8 overhaul

15.20

Boiler 8 overhaul

1.58

Boiler 8 overhaul

34.40

Boiler 8 overhaul

34.40

After normal increase load TG 2 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
After normal increase load TG 3 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Boiler 8 overhaul

21.45

Boiler 8 overhaul

17.68

Boiler 8 overhaul

32.00

Boiler 8 overhaul

16.80

Boiler 8 overhaul

34.40

Boiler 8 overhaul

33.60

Boiler 8 overhaul

36.00

Boiler 8 overhaul

14.64

Boiler 8 overhaul

44.80

Boiler 8 overhaul

48.00

Boiler 8 overhaul

38.40

Boiler 8 overhaul

2.53

Boiler 8 overhaul

67.98

Boiler 8 overhaul

26.24

Boiler 8 overhaul

22.72

Boiler 8 overhaul

24.88

Boiler 8 overhaul

33.60

Boiler 8 overhaul

16.00

Boiler 8 overhaul

108.00

Boiler 8 overhaul

26.08

Boiler 8 overhaul

50.88

Boiler 8 overhaul

14.00

Boiler 8 overhaul

51.00

Boiler 8 overhaul

31.50

Boiler 8 overhaul

85.00

Boiler 8 overhaul

24.72

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target

Boiler 8 overhaul

17.36

Boiler 8 overhaul

20.24

Boiler 8 overhaul

74.40

Boiler 8 overhaul

120.00

Boiler 8 overhaul

16.72

Boiler 8 overhaul

23.04

Boiler 8 overhaul

22.00

Boiler 8 overhaul

24.80

Boiler 8 overhaul

13.60

Boiler 8 overhaul

12.80

Boiler 8 overhaul

40.00

Boiler 8 overhaul

72.00

Boiler 8 overhaul

20.48

Boiler 8 overhaul

12.88

Boiler 8 overhaul

15.12

Boiler 8 overhaul

25.60

Boiler 8 overhaul

12.00

Boiler 8 overhaul

72.00

Boiler 8 overhaul

34.40

Boiler 8 overhaul (Boiler 8 start up & Syncronize


steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)
Boiler 8 overhaul (Boiler 8 start up & Syncronize
steam at 17.30)

28.73
16.45
48.99
2.77
2266.25

After normal increase load TG 4 as per


target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
After normal increase load TG 4 as per
target
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Sr.no.

Loss of
generation
(MWH)

Description

Boiler 8; overhaul.

1799.85

Boiler 8; inbed tube leakage.

464.83

Boiler 8; FD fan balancing.

1.57

TOTAL:

2000
1800
1600
1400
1200
1000
800
600
400
200
0

2266.25

Loss of generation (MWH)

Boiler 8;
overhaul.

Boiler 8;
inbed
tube
leakage.

Boiler 8;
FD fan
balancing
.

(MWH)

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

8.3.2015

11.00

11.00

7.80

7.80

1.25

6.30

5.08

8.3.2015

5.30

5.20

4.50

4.50

1.25

6.30

5.08

8.3.2015

19.44

19.24

0.00

0.00

1.25

6.30

5.08

9.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

9.3.2015

5.30

5.20

4.60

4.50

6.37

7.28

0.85

9.3.2015

5.30

5.20

4.00

4.00

8.04

14.37

6.55

9.3.2015

5.20

5.20

4.50

4.40

14.37

6.37

16.00

9.3.2015

11.00

11.00

8.10

8.10

6.37

6.48

0.18

9.3.2015

11.00

11.00

8.70

8.60

7.58

14.37

7.35

9.3.2015

11.00

11.00

8.50

8.50

14.37

6.37

16.00

10.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

10.3.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

10.3.2015

11.00

11.00

8.50

8.50

6.37

10.00

3.62

10.3.2015

8.50

8.50

8.20

8.20

10.00

10.12

0.20

10.3.2015

8.50

8.50

7.50

7.50

10.12

12.49

2.62

10.3.2015

11.00

11.00

8.00

8.00

12.53

15.52

2.98

10.3.2015

11.00

11.00

8.20

8.20

15.52

6.37

14.75

11.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

11.3.2015

5.30

5.20

4.60

4.50

6.37

6.37

24.00

11.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

12.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

12.3.2015

5.20

5.20

5.00

5.00

6.37

17.00

10.38

12.3.2015

5.10

5.00

4.50

4.40

17.00

6.37

13.62

12.3.2015

11.00

11.00

9.00

9.00

6.37

17.13

10.60

12.3.2015

9.00

9.00

7.30

7.30

17.13

6.37

13.40

13.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

13.3.2015

5.20

5.20

4.70

4.70

6.37

6.37

24.00

13.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

14.3.2015

19.44

19.24

0.00

0.00

6.30

6.30

24.00

14.3.2015

5.20

5.20

5.00

4.90

6.37

6.37

24.00

14.3.2015

11.00

11.00

8.20

8.20

6.37

6.37

24.00

15.3.2015

19.44

19.24

0.00

0.00

6.30

11.00

4.50

22.3.2015

20.49

20.31

19.74

19.67

11.40

16.00

4.33

8.4.2015

20.49

20.36

18.53

18.42

6.37

14.51

8.23

8.4.2015

20.49

20.36

0.00

0.00

14.51

6.37

15.77

9.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

9.4.2015

5.20

5.20

5.10

5.00

6.37

22.37

16.00

9.4.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

9.4.2015

11.00

11.00

8.80

8.80

7.23

14.37

7.23

9.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

9.4.2015

11.00

11.00

10.50

10.50

22.37

6.37

8.00

10.4.2015

20.49

20.36

0.00

0.00

6.37

6.37

24.00

10.4.2015

5.20

5.20

5.10

5.00

6.37

14.37

8.00

10.4.2015

5.20

5.20

4.90

4.80

14.37

22.37

8.00

10.4.2015

5.20

5.20

5.00

4.90

22.37

6.37

8.00

10.4.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

10.4.2015

11.00

11.00

10.70

10.60

14.37

22.37

8.00

11.4.2015

20.49

20.36

0.00

0.00

6.37

8.00

1.62

11.4.2015

5.20

5.20

5.00

4.90

6.37

22.37

16.00

11.4.2015

5.20

5.20

4.90

4.80

22.37

6.37

8.00

07.12.2015

20.20

20.20

0.00

0.00

12.00

14.28

2.47

14.12.2015

20.20

20.20

0.00

0.00

15.40

19.00

3.33

TOTAL BOILER 9 PROBLEM BREAKDOWN (PPL)

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler


4 trip (L-1, 2, 3, 4, 5 minimum speed)

16.27

Boiler 9 breakdown PPL-2, New WSA, NGBC, Boiler


4 trip (L-1, 2, 3, 4, 5 minimum speed)

3.56

Boiler 9 breakdown due to water wall tube leak

97.80

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.60

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

7.86

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

12.80

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

0.53

Boiler 9 breakdown PPL-2, New WSA, NGBC stop &


L-2 shutdown

17.64

Boiler 9 breakdown PPL-2, New WSA, NGBC stop

40.00

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown due to water wall tube leak

16.80

Boiler 9 breakdown due to water wall tube leak

9.04

Boiler 9 breakdown due to water wall tube leak

0.06

Boiler 9 breakdown due to water wall tube leak

2.62

Boiler 9 breakdown due to water wall tube leak

8.95

Boiler 9 breakdown due to water wall tube leak

41.30

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown due to water wall tube leak

16.80

Boiler 9 breakdown due to water wall tube leak

67.20

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown due to water wall tube leak

2.08

Boiler 9 breakdown due to water wall tube leak

8.17

Boiler 9 breakdown due to water wall tube leak

21.20

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.

Boiler 9 breakdown due to water wall tube leak

22.78

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown due to water wall tube leak

12.00

Boiler 9 breakdown due to water wall tube leak

67.20

Boiler 9 breakdown due to water wall tube leak

461.76

Boiler 9 breakdown due to water wall tube leak

7.20

Boiler 9 breakdown due to water wall tube leak

67.20

Boiler 9 breakdown due to water wall tube leak

86.58

Boiler 9 Belt conveyor of coal feeder no. 2 tear.

2.77

Boiler 9 breakdown (steam collection header joint


weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)
Boiler 9 breakdown (steam collection header joint
weld to Start up vent valve leakage)

15.97
321.08
488.64
3.20
4.00
15.91
3.20
4.00
488.64
1.60
3.20
2.40
4.00
3.20
32.92
4.80
3.20

Decrease load TG3 after normal increase


again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 stop (Boiler 9 brekdown water tube get
leak) repair boiler 9
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
TG4 start up and synchronize steam at
11.00.
After normal increase load TG 4 as per
target
After normal increase load TG 4 as per
target
TG 4 stop. After normal increase load TG 4
as per target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target
After normal increase load TG 3 as per
target
After normal increase load TG 3 as per
target
TG 4 stop. After normal increase load TG 4
as per target
After normal increase load TG 2 as per
target
After normal increase load TG 2 as per
target

TG4 loow-low inlet steam press ( Boiler-9 trip due to


Both IDF trip) effect from lift valve of bag filter get
close it self due to pressure compressor get low less
than 4.5 bar

49.83

TG4 trip

Boiler # 9 & TG#4 TRIP Due to air prss low for bag
filter jetting

67.33

Decrease load TG4 after normal increase


again.

4944.68

Sr.no.

Loss of
generation
(MWH)

Description

Boiler 9; breakdown due to water wall tube leakage.

3424.79

Steam collection header stub leakage.

1399.96

Bag house issues & triping TG 4.

Coal belt conveyor no:02 tear.

117.16
2.77

TOTAL:

4944.68

Loss of generation (MWH)

4000
3500
3000
2500
2000
1500
1000
500
0
Boiler 9;
breakdo
wn due
to water
wall tube
leakage.

Steam
collectio
n header
stub
leakage.

Bag
house
issues &
triping
TG 4.

Coal belt
conveyo
r no:02
tear.

n (MWH)

lt
o

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

23.4.2015

5.20

5.20

4.00

4.00

8.00

16.30

8.50

23.4.2015

5.20

5.20

5.00

4.90

16.30

22.37

6.12

23.4.2015

11.00

11.00

9.30

9.20

8.00

16.30

8.50

22.5.2015

5.20

5.20

4.80

4.70

11.13

13.27

2.23

22.5.2015

5.20

5.20

4.20

4.20

13.27

17.17

3.83

22.5.2015

5.20

5.20

4.90

4.90

17.17

20.10

2.88

22.5.2015

5.20

5.20

4.70

4.70

20.10

20.37

0.45

22.5.2015

5.20

5.20

5.00

5.00

20.37

6.37

10.00

22.5.2015

11.00

11.00

10.60

10.50

11.10

13.25

2.25

22.5.2015

11.00

11.00

10.00

10.00

13.25

14.37

1.20

22.5.2015

11.00

11.00

10.10

10.10

14.37

16.39

2.03

22.5.2015

11.00

11.00

10.50

10.40

16.39

18.53

2.23

22.5.2015

11.00

11.00

10.20

10.10

20.07

23.37

3.50

22.5.2015

11.00

11.00

9.90

9.80

23.37

1.04

1.45

22.5.2015

11.00

11.00

9.50

9.50

1.04

5.30

4.87

22.5.2015

11.00

11.00

10.10

10.10

5.30

6.37

1.12

23.5.2015

5.20

5.20

5.00

5.00

6.37

20.00

13.38

23.5.2015

5.20

5.20

4.90

4.90

20.00

6.37

10.62

23.5.2015

11.00

11.00

10.30

10.20

6.37

12.00

5.38

23.5.2015

11.00

11.00

9.90

9.90

12.00

6.37

18.62

23.11.2015

11.00

11.00

9.10

9.10

10.00

6.30

20.50

23.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

20.50

24.11.2015

11.00

11.00

9.10

9.10

10.00

11.41

1.68

24.11.2015

11.00

11.00

9.50

9.50

11.41

16.31

8.33

24.11.2015

11.00

11.00

9.10

9.10

16.31

6.30

13.98

24.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

25.11.2015

11.00

11.00

9.10

9.10

6.30

6.41

0.18

25.11.2015

11.00

11.00

9.30

9.20

6.41

10.13

3.53

25.11.2015

11.00

11.00

9.50

9.50

10.13

11.54

1.68

25.11.2015

11.00

11.00

9.00

9.00

11.54

12.20

0.43

25.11.2015

11.00

11.00

8.50

8.50

12.20

6.30

18.17

25.11.2015

5.20

5.20

4.10

4.00

10.00

6.30

24.00

26.11.2015

11.00

11.00

9.30

9.30

6.30

16.00

9.50

26.11.2015

11.00

11.00

9.10

9.10

16.00

18.00

2.00

26.11.2015

11.00

11.00

8.50

8.50

18.00

20.00

2.00

26.11.2015

11.00

11.00

7.50

7.50

20.00

22.30

2.50

26.11.2015

11.00

11.00

7.00

7.00

22.30

5.30

7.00

26.11.2015

11.00

11.00

6.50

6.50

5.30

6.30

1.00

26.11.2015

5.20

5.20

4.00

4.00

6.30

7.40

1.17

26.11.2015

5.20

5.20

4.00

4.00

15.40

18.00

2.33

26.11.2015

5.2

5.2

4.9

18

22.3

4.5

26.11.2015

5.20

5.20

4.70

4.60

22.30

0.37

2.12

26.11.2015

5.20

5.20

4.10

4.00

0.37

3.27

2.83

26.11.2015

5.20

5.20

4.20

4.10

3.27

6.30

3.05

27.11.2015

11.00

11.00

6.50

6.50

6.30

11.00

4.50

27.11.2015

11.00

11.00

8.20

8.20

11.00

13.19

2.32

27.11.2015

11.00

11.00

8.00

8.00

13.19

14.30

1.18

27.11.2015

11.00

11.00

7.50

7.50

14.30

6.30

16.00

27.11.2015

5.20

5.20

4.20

4.10

6.30

11.00

4.50

27.11.2015

5.20

5.20

5.10

5.00

11.00

6.30

19.50

28.11.2015

11.00

11.00

7.50

7.50

6.30

6.30

24.00

28.11.2015

5.20

5.20

5.00

5.00

6.30

6.30

24.00

29.11.2015

11.00

11.00

7.60

7.50

6.30

6.30

24.00

29.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

30.11.2015

11.00

11.00

7.60

7.50

6.30

16.30

10.00

30.11.2015

11.00

11.00

10.30

10.30

16.30

6.30

14.00

30.11.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

01.12.2015

11.00

11.00

10.70

10.70

14.30

21.54

7.40

01.12.2015

11.00

11.00

10.60

10.60

21.54

22.30

0.60

01.12.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

01.12.2015

5.20

5.20

5.10

5.00

6.30

6.30

24.00

15.12.2015

11.00

11.00

7.50

7.50

16.50

6.30

13.67

15.12.2015

5.20

5.20

4.00

3.90

16.50

6.30

13.67

16.12.2015

11.00

11.00

7.50

7.50

6.30

19.20

12.83

16.12.2015

11.00

11.00

7.80

7.80

19.20

5.05

9.75

16.12.2015

5.20

5.20

4.00

3.90

6.30

19.00

12.50

TOTAL BOILER 6 SHUTDOWN / BREAKDOWN

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Boiler 6 breakdown.

10.20

Boiler 6 breakdown.

1.84

Boiler 6 breakdown.

15.30

Boiler 6 break down (economizer tube get leakage)

1.12

Boiler 6 break down (economizer tube get leakage)

3.83

Boiler 6 break down (economizer tube get leakage)

0.87

Boiler 6 break down (economizer tube get leakage)

0.23

Boiler 6 break down (economizer tube get leakage)

2.00

Boiler 6 break down (economizer tube get leakage)

1.13

Boiler 6 break down (economizer tube get leakage)

1.20

Boiler 6 break down (economizer tube get leakage)

1.83

Boiler 6 break down (economizer tube get leakage)

1.34

Boiler 6 break down (economizer tube get leakage)

3.15

Boiler 6 break down (economizer tube get leakage)

1.74

Boiler 6 break down (economizer tube get leakage)

7.30

Boiler 6 break down (economizer tube get leakage)

1.01

Boiler 6 break down (economizer tube get leakage)

2.68

Boiler 6 break down (economizer tube get leakage)

3.19

Boiler 6 break down (economizer tube get leakage)

4.31

Boiler 6 break down (economizer tube get leakage)

20.48

Boiler 6 O/H

38.95

Boiler 6 O/H

24.60

Boiler 6 O/H

3.20

Boiler 6 O/H

12.50

Decrease load TG2 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.

Boiler 6 O/H

26.57

Boiler 6 O/H

28.80

Boiler 6 O/H

0.35

Boiler 6 O/H

6.36

Boiler 6 O/H

2.53

Boiler 6 O/H

0.87

Boiler 6 O/H

45.43

Boiler 6 O/H

28.80

Boiler 6 O/H

16.15

Boiler 6 O/H

3.80

Boiler 6 O/H

5.00

Boiler 6 O/H

8.75

Boiler 6 O/H

28.00

Boiler 6 O/H & NGBC problem

4.50

Boiler 6 O/H

1.40

Boiler 6 O/H

2.80

Boiler 6 O/H

1.35

Boiler 6 O/H

1.27

Boiler 6 O/H & NGBC problem

3.40

Boiler 6 O/H & NGBC problem

3.36

Boiler 6 O/H & NGBC problem

20.25

Boiler 6 O/H

6.49

Boiler 6 O/H

3.54

Boiler 6 O/H

56.00

Boiler 6 O/H & NGBC problem

4.95

Boiler 6 O/H

3.90

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Boiler 6 O/H

84.00

Boiler 6 O/H

4.80

Boiler 6 O/H

84.00

Boiler 6 O/H

4.80

Boiler 6 O/H

35.00

Boiler 6 O/H

9.80

Boiler 6 O/H

4.80

Boiler 6 O/H

2.22

Boiler 6 O/H

0.24

Boiler 6 O/H

4.00

Boiler 6 O/H

4.80

Boiler 6 break down (eco snake tube get leakage)

47.85

Boiler 6 break down (eco snake tube get leakage)

17.77

Boiler 6 break down (eco snake tube get leakage)

44.91

Boiler 6 break down (eco snake tube get leakage)

31.20

Boiler 6 break down (eco snake tube get leakage)

16.25
874.99

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Sr.no.

Description

Loss of
generation
(MWH)

Boiler 6; overhauling.

632.3

Boiler 6; economiser tube leakage.

215.35

Boiler 6; breadkdown.

27.34

TOTAL:

874.99

Loss of generation (MWH)

700
600
500
400
300
200
100
0
Boiler 6;
overhauling.

Boiler 6;
economiser
tube leakage.

Boiler 6;
breadkdown.

874.99

n (MWH)

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

6.5.2015

11.00

11.00

10.00

10.00

9.14

11.21

2.12

8.5.2015

5.20

5.20

4.80

4.80

6.37

6.37

24.00

8.5.2015

11.00

11.00

10.30

10.20

6.37

14.37

8.00

8.5.2015

11.00

11.00

10.50

10.50

14.37

6.37

16.00

9.5.2015

5.20

5.20

4.70

4.70

6.37

14.37

8.00

9.5.2015

5.20

5.20

4.50

4.50

14.37

22.37

8.00

9.5.2015

5.20

5.20

4.80

4.70

22.37

6.37

8.00

9.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

10.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

10.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

11.5.2015

5.20

5.20

4.60

4.50

6.37

6.37

24.00

11.5.2015

11.00

11.00

10.50

10.50

6.37

6.37

24.00

12.5.2015

5.20

5.20

4.80

4.70

6.37

14.37

8.00

12.5.2015

5.20

5.20

4.60

4.60

14.37

6.37

16.00

12.5.2015

11.00

11.00

10.50

10.50

6.37

14.37

8.00

12.5.2015

11.00

11.00

10.60

10.60

14.37

6.37

16.00

13.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

13.5.2015

11.00

11.00

10.80

10.70

6.37

6.37

24.00

14.5.2015

5.20

5.20

4.70

4.60

6.37

6.37

24.00

14.5.2015

11.00

11.00

10.90

10.90

6.37

8.23

1.77

30.9.2015

11.00

11.00

8.00

8.00

1.30

6.30

5.00

30.9.2015

5.20

5.20

4.80

4.80

1.30

6.30

5.00

1.10.2015

11.00

11.00

8.10

8.00

6.30

6.30

24.00

1.10.2015

5.20

5.20

4.50

4.40

6.30

14.30

8.00

1.10.2015

5.20

5.20

4.80

4.80

14.30

6.30

TOTAL BOILER 7 SHUTDOWN / BREAKDOWN

16.00

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Damper FD fan boiler 7 broken.

2.12

Boiler 7 overhaul

9.60

Boiler 7 overhaul

6.40

Boiler 7 overhaul

8.00

Boiler 7 overhaul

4.00

Boiler 7 overhaul

5.60

Boiler 7 overhaul

4.00

Boiler 7 overhaul

12.00

Boiler 7 overhaul

16.80

Boiler 7 overhaul

12.00

Boiler 7 overhaul

16.80

Boiler 7 overhaul

12.00

Boiler 7 overhaul

4.00

Boiler 7 overhaul

9.60

Boiler 7 overhaul

4.00

Boiler 7 overhaul

6.40

Boiler 7 overhaul

14.40

Boiler 7 overhaul

7.20

Boiler 7 overhaul (Boiler 7 start up & Syncronize


steam at 08.00)
Boiler 7 overhaul (Boiler 7 start up & Syncronize
steam at 08.00)

14.40
0.18

Boiler 7 B/D (eco tube leakage)

15.00

Boiler 7 B/D (eco tube leakage)

2.00

Boiler 7 B/D (eco tube leakage)

72.00

Boiler 7 B/D (eco tube leakage)

6.40

Decrease load TG3 after normal increase


again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.

Boiler 7 B/D (eco tube leakage)

6.40
271.29

Decrease load TG2 after normal increase


again.

Sr.no.

Description

Loss of
generation
(MWH)

Boiler 7; overhaul.

167.38

Boile r7; Economiser tube leakage.

101.8

Boiler 7; FD fan damper maitenance.

2.12

TOTAL:

271.3

Loss of generation (MWH)

180
160
140
120
100
80
60
40
20
0
Boiler
7;
overha
ul.

Boile
r7;
Econo
miser
tube
leakag
e.

Boiler
7; FD
fan
dampe
r
maiten
ance.

WH)

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

12.8.2015

11.00

11.00

10.70

10.70

17.03

22.30

5.45

12.8.2015

11.00

11.00

10.50

10.50

22.30

6.30

8.00

12.8.2015

5.20

5.20

4.20

4.10

14.30

16.34

2.07

12.8.2015

5.20

5.20

4.00

3.90

15.24

22.30

5.93

12.8.2015

5.20

5.20

3.90

3.80

22.30

6.30

8.00

13.8.2015

5.20

5.20

3.90

3.80

6.30

7.15

0.75

TOTAL BOILER 5 SHUTDOWN / BREAKDOWN

REASON

LOSS
Power

REMARK
(ACTION)

MWH

Boiler 5 shutdown

1.64

Boiler 5 shutdown

4.00

Boiler 5 shutdown

2.27

Boiler 5 shutdown

7.71

Boiler 5 shutdown

11.20

Boiler 5 shutdown

1.05
27.87

Decrease load TG3 after normal increase


again.
Decrease load TG3 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.
Decrease load TG2 after normal increase
again.

Sr.no.
1

Description
Boiler 5; shutdown.
TOTAL:

30

Loss of
generation
(MWH)
27.87
27.87

Boiler 5; shutdown.

25
20
15
10
5
0
Loss of generation (MWH)

Remarks:

POWER
Set POINT
Actual
DATED

DECREASE IN POWER
Set POINT
Actual

Time Decrease
From
To
Total
Time
Time
Time

MW

MW

MW

MW

Hours

Hours

Hours

7.9.2015

20.20

20.00

0.00

0.00

9.40

6.30

20.83

8.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

9.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

10.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

11.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

12.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

13.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

14.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

15.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

16.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

17.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

18.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

19.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

20.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

21.9.2015

20.20

20.00

0.00

0.00

6.30

6.30

24.00

22.9.2015

20.20

20.00

0.00

0.00

6.30

15.00

TOTAL BOILER 9& TG 4 SHUTDOWN

8.50

REASON

LOSS
Power

REMARK
(ACTION)

MWH

TG4 & Boiler 9 O/H

416.67

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

480.00

TG4 & Boiler 9 stop

TG4 & Boiler 9 O/H

170.00

7306.67

TG4 & Boiler 9 stop

Sr.no.

Description

Loss of
generation
(MWH)

PPL 2; overhaul.

7306.67

TOTAL

7306.67

8000.00

PPL 2; overhaul.

7000.00
6000.00
5000.00
4000.00
3000.00
2000.00
1000.00
0.00
Loss of generation (MWH)

Remarks:

Loss of
generatio
Sr.no.
Loss Description
n (MWH)
1
PPL 2; overhaul.
7306.67
2
TG 4 generator diodes failure.
4916.34
3
Boiler 9; breakdown due to tube water wall failure.
3424.79
4
TG 3; process steam consumption high.
2681.47
5
TG 4; Hp bearing; vibrations. Bearing failure.
2279.20
6
WSA 2; shutdown.
1865.45
7
Boiler 8; overhaul.
1799.85
8
Steam collection header leakage.
1399.96
9
TG 4; Moog servo controller failure.
988.45
10
TG 2; winding temperature high.
889.10
11
TG 4; condenser online cleaning.
777.19
12
TG 3; exhaust temp high & alternator winding temperatur 758.07
13
Boiler 6; overhauling.
632.30
14
Tie-line & electrical cable & transformer issues.
586.73
15
Boiler 8; inbed tube leakage.
464.83
16
TG 3; shutdown
458.11
17
TG 4; oil leakage at coupling.
392.65
18
WSA 2; trip.
259.27
19
Boiler 6; economiser leakage.
215.35
20
TG 3; vacuum drop.
202.80
21
PLN disturbances.
171.02
22
Boiler 7; overhaul.
167.38
23
Boiler 9; fan trippings; electrical issues.
137.54
24
Boiler 7; economiser leakage.
101.80

TOTAL:

32876.32

Cost /
MWH in
USD
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06
82.06

TOTAL
COST
(USD)
599575.36
403428.33
281033.72
220037.87
187028.12
153075.96
147693.30
114878.86
81110.89
72958.36
63775.18
62206.22
51885.70
48146.28
38143.33
37591.90
32220.34
21275.28
17671.33
16641.50
14033.67
13734.98
11286.68
8353.57

82.06

2697786.73

341640
0.096230872

8000.00
7000.00
6000.00
5000.00
4000.00
3000.00
2000.00
1000.00
0.00

Remarks:

2.246996

3.7530039992

Electrical power cost year 2015: USD / MWH.


Sr. No.
Month
1
January
2
February
3
March
4
April
5
May
6
June
7
July
8
August
9
September
10
October
11
November
AVERAGE:

Cost
(USD)

Remarks:

96.8
64.8
77.7
76.0
80.9
89.2
82.5
83.5
76.3
95.2

79.7
82.06

USD / MWH.

Sr.no.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Loss of
generatio
n (MWH)
4916.34
3424.79
2681.47
2279.20
1399.96
988.45
889.10
777.19

Cost /
MWH in
USD
41.10
41.10
14.18
41.10
41.10
41.10
55.71
41.10

TOTAL
COST
(USD)
202072.96
140766.80
38036.52
93680.40
57541.60
40627.59
49528.61
31944.31

Remarks:
Failure
Failure
unavoidable
Failure
Failure
failure
unavoidable
unavoidable

TG 3; exhaust temp high & alternator winding


temperature high.
Tie-line & electrical cable & transformer issues.
Boiler 8; inbed tube leakage.
TG 3; shutdown
TG 4; oil leakage at coupling.
WSA 2; trip.
Boiler 6; economiser leakage.
TG 3; vacuum drop.
PLN disturbances.
Boiler 9; fan trippings; electrical issues.
Boiler 7; economiser leakage.

758.07
586.73
464.83
458.11
392.65
259.27
215.35
202.80
171.02
137.54
101.80

14.18
41.10
27.58
14.18
41.10
27.58
27.58
14.18
41.10
41.10
27.58

10753.19
24115.96
12819.54
6498.27
16138.82
7150.38
5939.13
2876.71
7029.32
5653.38
2807.54

unavoidable
received
Failure
unavoidable
Failure
received
Failure
unavoidable
received
received
Failure

TOTAL:

21104.67

82.06

755981.03

Loss Description
TG
4 generator
diodes
failure.
Boiler
9; breakdown
due
to tube water wall
failure.
TG 3; process steam consumption high.
TG 4; Hp bearing; vibrations. Bearing failure.
Steam collection header leakage.
TG 4; Moog servo controller failure.
TG 2; winding temperature high.
TG 4; condenser online cleaning.

STG

Skill
area.

TG 4
TG 4

Electrical
Mechanical

TG3
TG 4
TG 4

Process
Mechanical
Mechanical

TG 4
TG 2

Electrical
Process

TG 4

Process

TG 3
TG 2,3 & 4

Process
Electrical

TG 2 & 3
TG 3

Mechanical
Mechanical

TG 4
TG 2 & 3

Mechanical
Misc.

TG 2 & 3
TG 3
TG 4

Mechanical
Mechanical
Electrical

TG 4
TG 2 & 3

Electrical
Mechanical

6000.00
5000.00
4000.00
3000.00
2000.00
1000.00
0.00

Stauts of
problem:

TG 4:
202072.96

Problem Solved.
Under obs.

TG 2

15073.87 4491.44 1539.36


1.720762 0.512721 0.175726

Under obs.
Problem known.
Problem Solved.

TG 3

93680.40

Sr. No.

Skill Area

No's.

Mechanical

2
3

Electrical
Process

5
4

Misc.

Under obs.

Problem Solved.

STG:
TG 2 Gen .cost
TG 3 Gen. Cost
TG 4 Gen Cost:

USD/MWH
26.35222 131.761
67.87372 712.674
40.95635

844.435

USD / MWH.
54.4796867

PROPOSED TEAMS TO BE LAUNCHED:


Sr. No. Problem descripiton:
1
Team for improvement in cooling water system.

Skill Area
Pillar
Operation / process.FI Pillar.

Team Members.
Mr. Vinay Dodia ( Leader)

1.1

Study de-dusting system PPL 1.

Mr. Arief Ivan Irawan ( Shadow team leader)

1.2

Study de-dusting system PPL 2.

Mr. Sunarsoh.

1.3

Think of green wall near coal yard.

Mr. Raji

1.4

Improve cooling system cooling with inhouse tools.

Mr. Pardio

1.5

Procure spare coolers for alternators.

1.6

Modify alternator cooling system if possible.

1.7

Additional side stream fltration Or other fltration system can be studied.

1.8

Schduled cleaning of cooling tower basin.

Team to study economiser failure in Boiler 6 & Boiler

2.1

Study dearator outlet water temp.

2.2

Study drum coil heating control valve operation.

2.3

Check casing to economiser coil gap.

2.4

Tube thickness measurement.

2.5

Planned replacement of Boiler 6; eco coil bends.

Team to improvement in Belt press & Putzmeister p

Mechanical.

PM Pillar.Team will not be be launched.

Mechanical.

PM Pillar.Mr. Fitri Antoro ( Leader)

3.1

PM schdule of Putzmeister pump.

Mr. Efk M Taufk

3.2

Study & evaluate Putzmeister pump part failure mechanical.

Mr. Dian Saefulloh

3.3

Study & evaluate Putzmeister pump part failure Instrumentation.

Mr. Pargi

3.4

Spare parts & inventory.

Mr. Jejen

3.5

Prepare annaul overhauling schdule.

Belt Press Operator.

3.6

Andritz belt press system; PM schdule.

3.7

Study wire failure in belt press.

3.8

Prepare annual overhaul schdule & job list.

3.9

Study fltrate pumps & belt wash pump system.

Team to study losses in Condensate recovery & impr

Process.

FI Pillar.

Mr. Eko Widhananto

Mr. Asep Kurnia ( PPL )


Member 3 ( Mr. Eko to decide)
Member 4 ( Mr. Eko to decide)
Member 5 (Mr. Eko to decide)
Member 6. ( Mr. Eko to decide)

Team to study diodes failure in TG 4.

Electrical

PM Pillar.

Team to study transformer; cable failures & PLN dis

Electrical.

PM Pillar.