DETAILED ESTIMATE
CIRCLE : NELLORE
DIVISION : NELLORE
SUB DIVISION : KAVALI
MANDAL : ALLUR
SPECIFICATION REPORT
Speciation report to accompany the Detailed estimate for the work "onstruction of
side drain From Murali house to Sudhakaraju house in Rajulavari street of Allur GP"
Est. Cost:Rs. 1.00 lakhs
The administrative sanction vide reslution No.49(1),dated: 10.08.2016 of the sarpanch Allur
GP
Due to lack of drain people are facing a lot of problems in letting out rain water
and normal usage water.Hence the estimate is prepared to construct side drain From Murali
house to Sudhakaraju house in Rajulavari street of Allur GP and Mandal for the following
provisions
The estimate is prepared with SSR 2016-17 and submitted for favour of obtaining
necessary administrative sanction from the competent authorities
DETAILED ESTIMATE
NAME OF WORK : Construction of side drain From Murali house to Sudhakaraju house in Rajulavari street of
Allur GP
Sl.N
o
1
1
Description of item
Measurements
L
B
D
2
3
4
5
6
Earth work excavation and depositing on bank with initial lead
and lift in loamy and clayee soils as per SS 20-B for
foundation
for open drain
No
1x1
33.00
1.00
Qty
7
0.60
19.80 cum
19.80 cum
1x1
33.00
1.00
0.15
1x1
33.00
1.00
0.20
3612.94 cum
23846.00
4561.14 cum
45156.00
1x1
33.00
0.27
0.60
5.35
1x1
33.00
0.23
0.60
4.55
9.90 cum
2979.00
6.60 cum
6.60 cum
601.81 cum
2307.00
4.95 cum
4.95 cum
116.48 cum
1x1
33.00
1.66
14.85 sqm
1309.52 10sqm
1945.00
54.78 sqm
877.07 10sqm
4805.00
VAT @ 5%
0.60
0.90
0.10
1.35
Cum
5437.54
100.00 kg
1 Cum
50.56 kg
7341.00
5056
4672.00
L.S
1893.00
Total
100000.00
Asst.Executive Engineer
R.W.S & S,Allur
WORKING ESTIMATE
NAME OF WORK : Construction of side drain From Murali house to Sudhakaraju house in Rajulavari street of
Allur GP
Sl.N
o
1
1
Description of item
Measurements
L
B
D
2
3
4
5
6
Earth work excavation and depositing on bank with initial lead
and lift in loamy and clayee soils as per SS 20-B for
foundation,VP No.12
for open drain
No
1x1
69.00
1.00
0.60
Qty
7
41.40 cum
41.40 cum
116.48 cum
4822.00
601.81 cum
6229.00
3797.76 cum
39306.00
22.35 cum
4561.14 cum
101942.00
20.70 sqm
1309.52 10sqm
2711.00
114.54 sqm
877.07 10sqm
10046.00
1x1
69.00
1.00
0.15
10.35 cum
10.35 cum
1x1
69.00
1.00
0.15
10.35 cum
10.35 cum
1x2
69.00
0.27
0.60
22.35
1x1
69.00
1.66
VAT @ 5%
8253.00
Total
Limited to
173309.00
180000.00
Asst.Executive Engineer
R.W.S & S,Allur
LEAD STATEMENT
NAME OF WORK : Construction of side drain From Murali house to Sudhakaraju house in Rajulavari street
of Allur GP
EST COST Rs. 1.00 LAKHS
Sl.
No
Description of
material
Name
of the
Quarry
Initial
cost
(Includin
g of Tax
&
lead (km)
Excludin
g
Seignior
age)
Conveya
nce(incl
uding
lead and
lift
charges)
(1)
Loading
(2)
Conveyanc
e charges
including
Un
loading
loading
and un
(3)
loading
(4)=(1)+(2)+
(3)
34.60
17.30
Annavar
40mm size HBG (SS5) am
Annavar
20mm size HBG metal am
52.00
### 619.30
34.60
17.30
671.20
17.30
8.65
393.85
Pennar
17.30
8.65
393.85
Local
17.30
8.65
Cement
671.20
133.45
###
Sand
Bricks
Up to 5 Km
82.70
82.70
132.9
12.40
12.40
19.9
10.30
10.30
16.6
7 Km sand
DATA SHEET
NAME OF WORK : Construction of side drain From Murali house to Sudhakaraju house in Rajulavari street
of Allur GP
EST COST Rs. 1.00 LAKHS
Sl.N
o
1
Qty
Unit
Description of item
Rate
Per
Amount
393.85
Cum
413.54
5.70
MT
1641.60
320.00
Cum
64.00
1
1.05 Cum
288.00 Kgs
0.20 Cum
2
2119.14
CC (1:4:8) mix using 40 mm HBG metal including cost & conveyance of all materials labour charges etc.
complete with Hand mix
0.90 cum
40 mm HBG metal
1499.82
1Cum
1349.83
0.45 cum
1000.23
1Cum
450.10
Cement
5.70
1 Kg
923.40
Water
77.00
1 KL
92.40
162.00 kgs
1.20 KL
Labour charge
0.10 Cum
420.00
day
42.00
2.36 Cum
Mazdoor (unskilled)
320.00
day
755.20
3612.95
3612.94
M20 mix using 20 mm HBG metal including cost & conveyance of all materials labour charges etc. complete
with Hand mix
0.90 cum
0.45 cum
2019.82
1000.23
1Cum
1Cum
1817.83
450.10
Cement
Water
5.70
77.00
1Cum
1 KL
2280.00
92.40
0.10 Cum
Labour charge
Mason Ist class
420.00
day
42.00
2.36 Cum
Mazdoor (unskilled)
320.00
day
755.20
5437.54
400.00 kgs
1.20 KL
40 mm HBG metal
Sand for mortor
CC (1:3:6) mix using 40 mm HBG Chips including cost & conveyance of all materials labour charges etc.
complete for PCC items of work -cum
0.90 cum
40 mm HBG metal
1499.82
1Cum
1349.83
0.45 cum
1000.23
1Cum
450.10
Cement
Water
Labour charge
Mason Ist class
5.70
77.00
1Cum
1 KL
1254.00
92.40
420.00
day
42.00
220.00 kgs
1.20 KL
0.10 Cum
2.36 Cum
Mazdoor (unskilled)
Machinery
320.00
day
755.20
1.00 hour
338.60
1 hour
338.60
1.00 1 cum
Centering charges
279.00
1 cum
279.00
4561.14
Sl.N
o
1
5
Qty
Unit
Description of item
Rate
Per
Amount
585.28
1 Cum
3511.68
320.00
99.20
1 day
99.20
601.81
3610.88
0.25
Add 25% extra for Isolated work
3610.88
0.00
3610.88
Plastering with CM (1:5) 12 mm thick includding cost and conveyance of all materials labour charges etc.
complete
0.15 Cum
0.60 day
0.96 days
CM (1:5)
Labour
Mason Ist class
Mazdoor (unskilled)
2119.14
1 Cum
317.87
420.00
320.00
1 day
1 day
252.00
307.20
877.07
Earth work excavation for structures as per drawings and technical spefications clause 305.1 including setting
out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a
lead of 50m dressing of side as per Mord Morth
3.64 days
0.25
Man mazdoor
Add 25% extra for Isolated work
320.00
day
1164.80
1164.80
116.48 /1 Cum
1164.80
Plastering with CM (1:5) 20 mm thick includding cost and conveyance of all materials labour charges etc.
complete
0.21 Cum
CM (1:5)
Labour
Mason 2nd class
Mazdoor (unskilled)
Add 25% extra for ML on labour
0.94 day
1.60 days
0.25
2119.14
1 Cum
445.02
375.00
320.00
0.00
1 day
1 day
352.50
512.00
0.00
1309.52
1309.55
9
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete
as per standard specification
1.05 MT
6.00
bldg.26
2.00
6.40
Cost of steel
Binding wire
###
47250.00
70.00 kg
420.00
###
50.56
Item of work
Quty
Rate per
Less
Amount
41.40
cum
116.48 cum
4822.00
41.40
116.48 cum
4822.27
0.27
0.00
10.35 cum
601.81 cum
6229.00
10.35 cum
601.81 cum
6228.78
0.00
0.22
cum
Amount
Excess
Rate per
As per Execution
10.35
cum
3797.76 cum
39306.00
10.35 cum
3797.76 cum
39306.82
0.82
0.00
22.35
cum
4561.14 cum
101942.00
22.35 cum
4561.14 cum
101941.41
0.00
0.59
20.70
sqm
1309.52 10 sqm
2711.00
20.70 sqm
1309.52 10 sqm
2710.71
0.00
0.29
Remarks
s.no
Item of work
114.54
Rate per
sqm
877.07 10 sqm
VAT @ 5 %
Limited to
As per Execution
Amount
Quty
Rate per
877.07 10 sqm
Excess
Less
Amount
10045.98
0.00
0.02
8253.00
8252.80
0.00
0.20
173309.00
173308.75
1.09
1.34
180000.00
180000.00
173309.00
173308.75
As per Excess
As per Less
0.25
Remarks
1.09
1.34
0.25
Asst.Executive Engineer
RWS&S, Allur Mandal