Professional Documents
Culture Documents
METHOD STATEMENT
2017/2018 TURNAROUND PROJECT
HIRING OF TRANSFORMERS OIL FILTRATION
MACHINES WITH OPERATOR
HAJAR REF
HTTE/E60572
COMPANY NAME
GPIC
GPIC REF NO
6000024133
SESSION
METHOD STATEMENT
INTRODUCTION
The following scope of works is method of statement for supply of
power oil Filter machine with operator.
START OF WORK
1. Operators must report to client/site office on arrival at site.
2. Operators must attend site induction if instructed to do so.
3. Operators must wear the correct PPE required for the job and/or as
Capacity
2400LPH
TML6-1A,0.8MVA,
TML 6-1B,0.8MVA,
TML8- 1A,1MVA,
TML8-1B,1MVA,
TML8-2100 KVA,
TML5-1A,2.5MVA,
TML5-2,100 Kva
TMM2-1A,12 MVA
TMM2-1B,12 MVA
TMM5-1A,9 MVA
TMM10-1A,7.5 MVa
2. Make
Model no
FilterVac, Canada.
VPH-S-403-1600-RVVP-B-PF-FM-MMI/1V1-CB-AI- LM
Capacity
6000LPH
TMM2-1A,12 MVA
TMM2-1B,12 MVA
TMM5-1A,9 MVA
TMM10-1A,7.5 MVA
Cable size
Earth
B. FILTERVAC
1. Install the machine horizontal to ground level.
2. All valves in oil and vacuum lines are closed. All aeration valves and drain
The VPH-2400 System has a total connected power load of 163 Amps at
400VAC and Systems Main Control Panel contains a 200 amp fusible
disconnect switch which is fused at 200 amps.
Phase rotation protection is provided in the Main Control Panel.
Once proper phase/motor rotation is verified, close the electrical panel and
turn power off until such time that the system will be operated.
5. Oil heaters
Set the temperature indicating controller at 50, 55 & 60 deg . C
respectively. safety thermostat is factory preset at 110deg. C
6. Filter
Ensure the filter cartridges are fixed properly and check the cartridges when
choked.
7. Oil hose connection
Connect process hoses to the proper connections on the tank. The 2 inlet connection
to the plant must be connected to the bottom of the tank. The 1 outlet
connection from the plant must be connected placed away from the inlet connection
to ensure all the oil in the tank is processed.
will go up.
20. Recheck IR value of transformer both HV and LV side.
21. Disconnect all connected pipes and charge transformer.
CLEAR SITE:
All waste is to be cleared from site.
Plastics and hazard tape to be cleared and removed to waste bins.
Engineer and GPIC site cordinator to inspect area before works complete.