DESIGN OF COMBINED FOOTING

PROJECT NAME
TOWER
DATE
FOOTING ID
COLUMN SIZE
COLUMN LOADS

CF1
P1
400
750
P1(MT)

P2
400
900
P2(MT)

280

232

Fe

500

40

CG from P1

941.93 mm

112.64
118.5639
9517.64

9.03
13.13

Width (ft)
Length (ft)

O.K

2.75 m
4.00 m

GRADE
M20/FE 500
M25/FE 500
M30/FE 500

4.32 T/SFT
SAFE <SBC

Design of Cantilever slab:


Span L (ft)
Bending Moment (in-lb)
d reqd. (in)

0.9 m
58.66 kn-m
382 mm

24
22

280

0.65

Provide 12mm dia (inch)

3.14

80 mm

Provide 16mm dia (inch)


5.72
So,Provide 16mm dia bars at 125 mmc/c

145 mm

Span L (ft)

3.0

419.32 mm2

9.0
3.00

6.82
B
36
900

2.1 m
D
36 INCH
900 MM

57391
2669409.10

838 kn/m
301.64 kn-m

Try Beam of size (IN)

19.7

3.0

CO 3.5

6.8

CO 2.8

500 mm

13.1
Check for Deep Beam:
Span L (ft)
Depth D (ft)
Effective Depth
L/D

6.82
2.08 m
3.00
0.91 m
34
860 mm
2.27 <2.5

CHECK FOR SHEAR IN CANTILEVER SLAB


V
19971.17 lb
88.8 kn

It is necessary to design it as a Deep Beam


6.82
3.00

2.08
0.91
690
1589

2.264
2.46

2.77

Tv
Tc

m
m
mm
mm2

0.24 N/mm2
1.58 N/mm2
SHEAR CHECK O.K

1784.36 mm2

Check for Shear:


Shear Force V
(W*(L-d/2)
Tv
Vu/(b*d)
Pt =Ast*100/(b*d)
for Deep Beam cndn
for not Deep Beam cndn

constants
M
20
25
30
35

393.7 KN

0.8

0.18 %
0.23 %

Tc( from table)


0.34
Vus=(Tv-Tc)*b*d
327326 N
Spacing for 10mm dia
297.86 mm
Spacing for 12mm dia
428.77 mm
So,Provide 10mm dia bars @ 150mmc/c

Tension Reinforcement:
(a) At Zone Depth of 0.2*D
Ast for Deep Beam cndn
So,Provide #4-20+#4-16
Ast for Not Deep Beam cndn

180 mm
1408.86 mm2
1582.14

Design of Cantilever Beam:


Span L (ft)
Loads due to Cant. Slabs (lb/ft)
Bending Moment M (in-lb)
W*L*L/2
d reqd. (in)
Ast (in2)

1.32 N/MM2

Design of Strip Beam:

Not Deep Beam Condition


Ast (in2)

0.8 N/MM2
0.98 N/MM2
1.15 N/MM2

232

600 mm
560 mm

Ast (in2)

Deep Beam Condition


Span L (ft)
Depth D (ft)
Lever Arm Z (ft)
Ast (in2)

M35/FE 500
3.02
519104.70
15.0

Provide D (in)
Effective Depth (in)

Provided Load due to


Cantilever Slab( lb/ft)
Bending Moment (in-lb)
(W*L*L/12)
d reqd. (in)

3.09 ft

512
5

Total Load " P "( MT)


S.B.C (T/SFT)
Area of the Footing reqd. (sft)
Area of the Footing Provided (sft)
NUPI (lb/ft2)

Calculation of CG of load

2.82
57391
2735534.46

0.86 m
838 kn/m
309.12 kn-m

19.93
2.22

506 mm
1430 mm2

Leggd

Q
Fe
415
415
415
415

0.91
1.1
1.31
1.5

Tc Max
2.8
3.1
3.5
3.7

DESIGN OF COMBINED FOOTING


PROJECT NAME
TOWER
DATE
FOOTING ID
COLUMN SIZE
COLUMN LOADS

CF2
P1
400
750
P1(MT)

P2
400
900
P2(MT)

401

392

Fe

500

35

CG from P1

1024.56 mm

174.46
179.088
9759.29

11.48
15.6

Width (ft)
Length (ft)

O.K

3.50 m
4.75 m

GRADE
M20/FE 500
M25/FE 500
M30/FE 500

4.43 T/SFT
SAFE <SBC

Design of Cantilever slab:


Span L (ft)
Bending Moment (in-lb)
d reqd. (in)

M35/FE 500
4.07
971559.59
20.6

Provide D (in)
Effective Depth (in)

1.2 m
109.79 kn-m
522 mm

30
28

401

0.96

Provide 16mm dia (inch)

3.89

99 mm

Provide 20mm dia (inch)


6.03
So,Provide 20mm dia bars at 150mm c/c

153 mm

392
c

750 mm
710 mm

Ast (in2)

4.07

2023.04 mm2

11.48
3.33

Design of Strip Beam:


Span L (ft)
Try Beam of size (IN)
Provided Load due to
Cantilever Slab( lb/ft)
Bending Moment (in-lb)
(W*L*L/12)
d reqd. (in)

6.8
B
40
1000

2.1 m
D
40 INCH
1000 MM

79506
3676343.33

1160 kn/m
415.43 kn-m

21.9

4.07

CO 4.4

6.8

CO 4.4

557 mm

15.6
Check for Deep Beam:
Span L (ft)
Depth D (ft)
Effective Depth
L/D

6.8
2.07 m
3.33
1.02 m
38
960 mm
2.04 <2.5

CHECK FOR SHEAR IN CANTILEVER SLAB


V
28367.01 lb
126.2 kn

It is necessary to design it as a Deep Beam


Deep Beam Condition
Span L (ft)
Depth D (ft)
Lever Arm Z (ft)
Ast (in2)

Not Deep Beam Condition


Ast (in2)

6.8
3.33

2.07
1.02
719
2099

2.36
3.25

3.41

Tv
Tc

m
m
mm
mm2

0.27 N/mm2
1.48 N/mm2
SHEAR CHECK O.K

2198.77 mm2

Check for Shear:


Shear Force V
(W*(L-d/2)
Tv
Vu/(b*d)
Pt =Ast*100/(b*d)
for Deep Beam cndn
for not Deep Beam cndn

constants
M
20
25
30
35

603.4 KN

0.9

0.17 %
0.23 %

Tc( from table)


0.42
Vus=(Tv-Tc)*b*d
501839 N
Spacing for 8mm dia
138.96
Spacing for 10mm dia
216.87 mm
Spacing for 12mm dia
312.19 mm
So,Provide 10mm dia bars @ 100mmc/c 4L

Tension Reinforcement:
(a) At Zone Depth of 0.2*D
Ast for Deep Beam cndn
So,Provide #8-20
Ast for Not Deep Beam cndn

200 mm
1616.46 mm2
1693.05

Design of Cantilever Beam:


Span L (ft)
Loads due to Cant. Slabs (lb/ft)
Bending Moment M (in-lb)
W*L*L/2
d reqd. (in)
Ast (in2)

3.36 ft

793
5

Total Load " P "( MT)


S.B.C (T/SFT)
Area of the Footing reqd. (sft)
Area of the Footing Provided (sft)
NUPI (lb/ft2)

Calculation of CG of load

3.78
79506
6824812.83

1.15 m
1160 kn/m
771.20 kn-m

29.86
4.95

758 mm
3192 mm2

Leggd

Q
Fe
415
415
415
415

0.91
1.1
1.31
1.5

Tc Max
2.8
3.1
3.5
3.7

R
0.8 N/MM2
0.98 N/MM2
1.15 N/MM2
1.32 N/MM2

DESIGN OF COMBINED FOOTING


PROJECT NAME
TOWER
DATE
FOOTING ID

COLUMN SIZE
COLUMN LOADS

CF3
P1
450
900
P1(MT)

P2
400
900
P2(MT)

425

335

Total Load " P "( MT)


S.B.C (T/SFT)
Area of the Footing reqd. (sft)
Area of the Footing Provided (sft)
NUPI (lb/ft2)

Calculation of CG of load

Fe

500

35

CG from P1

760
5
167.20

11
15.25

Width (ft)

167.75
9985.34

O.K

Length (ft)

3.35 m

GRADE

4.65 m

M20/FE 500
M25/FE 500
M30/FE 500

0.8 N/MM2
0.98 N/MM2
1.15 N/MM2

M35/FE 500

1.32 N/MM2

4.53 T/SFT
SAFE <SBC

Design of Cantilever slab:


Span L (ft)
Bending Moment (in-lb)
d reqd. (in)

3.8
880373.73
19.6

Provide D (in)
Effective Depth (in)

1.2 m
99.48 kn-m
497 mm

30
28

425

0.87

Provide 16mm dia (inch)

4.29

109 mm

Provide 20mm dia (inch)


6.65
So,Provide 20mm dia bars at 150 mm c/c

169 mm

3.8

558.75 mm2

11
3.3

Design of Strip Beam:


Try Beam of size (IN)
Provided Load due to
Cantilever Slab( lb/ft)
Bending Moment (in-lb)
(W*L*L/12)
d reqd. (in)

8.25
B
40
1000

2.5 m
D
40 INCH
1000 MM

76554
5212003.83

1117 kn/m
588.96 kn-m

26.1

3.8

CO 4.0

8.25

CO 3.0

663 mm

15.25
Check for Deep Beam:
Span L (ft)
Depth D (ft)
Effective Depth
L/D

8.25
2.51 m
3.33
1.02 m
38
960 mm
2.48 <2.5

CHECK FOR SHEAR IN CANTILEVER SLAB


V
26627.56 lb
118.4 kn

It is necessary to design it as a Deep Beam


Deep Beam Condition
Span L (ft)
Depth D (ft)
Lever Arm Z (ft)
Ast (in2)

Not Deep Beam Condition


Ast (in2)

8.25
3.33

2.51
1.02
808
2650

2.6502424
4.11

4.83

Tv
Tc

m
m
mm
mm2

0.25 N/mm2
1.48 N/mm2
SHEAR CHECK O.K

3117.23 mm2

Check for Shear:


Shear Force V
(W*(L-d/2))
Tv
Vu/(b*d)
Pt =Ast*100/(b*d)
for Deep Beam cndn
for not Deep Beam cndn

constants
M
20
25
30
35

581.0 KN

0.9

0.27 %
0.32 %

Tc( from table)


0.4
Vus=(Tv-Tc)*b*d
487441 N
Spacing for 10mm dia
223.28 mm
Spacing for 12mm dia
321.41 mm
So,Provide 10mm dia bars @ 100mmc/c

Tension Reinforcement:
(a) At Zone Depth of 0.2*D
Ast for Deep Beam cndn
So,Provide #4-25+#4-20
Ast for Not Deep Beam cndn

200 mm
2617.61 mm2
3078.83

Design of Cantilever Beam:


Span L (ft)
Loads due to Cant. Slabs (lb/ft)
Bending Moment M (in-lb)
W*L*L/2
d reqd. (in)
Ast (in2)

335

750 mm
710 mm

Ast (in2)

Span L (ft)

3.64 ft
1108.57 mm

3.2
76554
4850945.91

0.99 m
1117 kn/m
548.16 kn-m

25.17
3.52

639 mm
2269 mm2

Leggd

Q
Fe
415
415
415
415

0.91
1.1
1.31
1.5

Tc Max
2.8
3.1
3.5
3.7

DESIGN OF COMBINED FOOTING


PROJECT NAME
TOWER
DATE
FOOTING ID

COLUMN SIZE
COLUMN LOADS

CF4
P1
300
900
P1(MT)

P2
300
750
P2(MT)

315

250

Fe

500

40

CG from P1

838.49 mm

124.30
132.5
9398.19

10
13.25

Width (ft)
Length (ft)

O.K

3.05 m
4.04 m

GRADE
M20/FE 500
M25/FE 500
M30/FE 500

4.26 T/SFT
SAFE <SBC

Design of Cantilever slab:


Span L (ft)
Bending Moment (in-lb)
d reqd. (in)

1.1 m
78.06 kn-m
440 mm

24
22

315

0.87

Provide 16mm dia (inch)

4.30

109 mm

Provide 20mm dia (inch)


6.66
So,Provide 16mm dia bars at 100mm c/c

169 mm

Span L (ft)

3.50

557.98 mm2

10
3.00

6.22
B
36
900

1.9 m
D
36 INCH
900 MM

65787
2542846.48

960 kn/m
287.34 kn-m

Try Beam of size (IN)

19.2

3.50

CO 3.9

6.22

CO 3.2

488 mm

13.25
Check for Deep Beam:
6.217116
1.89 m
3.00
0.91 m
34
860 mm
2.07 <2.5

CHECK FOR SHEAR IN CANTILEVER SLAB


V
24278.65 lb
108.0 kn

It is necessary to design it as a Deep Beam

Not Deep Beam Condition


Ast (in2)

6.22
3.00

1.89
0.91
653
1599

2.1434232
2.48

2.64

Tv
Tc

m
m
mm
mm2

0.29 N/mm2
1.58 N/mm2
SHEAR CHECK O.K

1699.76 mm2

Check for Shear:


Shear Force V
(W*(L-d/2))
Tv
Vu/(b*d)
Pt =Ast*100/(b*d)
for Deep Beam cndn
for not Deep Beam cndn

constants
M
20
25
30
35

451.2 KN

0.9

0.16 %
0.22 %

Tc( from table)


0.38
Vus=(Tv-Tc)*b*d
382751 N
Spacing for 10mm dia
254.73 mm
Spacing for 12mm dia
366.68 mm
So,Provide 10mm dia bars @ 100mmc/c

Tension Reinforcement:
(a) At Zone Depth of 0.2*D
Ast for Deep Beam cndn
So,Provide #4-16+#4-16
Ast for Not Deep Beam cndn

180 mm
1256.92 mm2
1336.33

Design of Cantilever Beam:


Span L (ft)
Loads due to Cant. Slabs (lb/ft)
Bending Moment M (in-lb)
W*L*L/2
d reqd. (in)
Ast (in2)

1.32 N/MM2

Design of Strip Beam:

Deep Beam Condition


Span L (ft)
Depth D (ft)
Lever Arm Z (ft)
Ast (in2)

0.8 N/MM2
0.98 N/MM2
1.15 N/MM2

250

600 mm
560 mm

Ast (in2)

Span L (ft)
Depth D (ft)
Effective Depth
L/D

M35/FE 500
3.50
690766.87
17.3

Provide D (in)
Effective Depth (in)

Provided Load due to


Cantilever Slab( lb/ft)
Bending Moment (in-lb)
(W*L*L/12)
d reqd. (in)

2.75 ft

565
5

Total Load " P "( MT)


S.B.C (T/SFT)
Area of the Footing reqd. (sft)
Area of the Footing Provided (sft)
NUPI (lb/ft2)

Calculation of CG of load

2.40
65787
2269261.18

0.73 m
960 kn/m
256.43 kn-m

18.15
1.84

461 mm
1186 mm2

Leggd

Q
Fe
415
415
415
415

0.91
1.1
1.31
1.5

Tc Max
2.8
3.1
3.5
3.7

DESIGN OF COMBINED FOOTING


PROJECT NAME
TOWER
DATE
FOOTING ID
COLUMN SIZE
COLUMN LOADS
Total Load " P "( MT)
S.B.C (T/SFT)
Area of the Footing reqd. (sft)
Area of the Footing Provided (sft)
NUPI (lb/ft2)

PROPOSED RESIDENTIAL APARTMENT

CF3
P1
300X900
P1(MT)

P2
300X900
P2(MT)

220

220

Calculation of CG of load

440
5
96.80

Fe

500

35

Width (ft)

111.7824
8675.43

O.K

Length (ft)

8.52
13.12

CG from P1

2.60 m

GRADE

4.00 m

M20/FE 500
M25/FE 500
M30/FE 500

3.94 T/SFT
SAFE <SBC

Design of Cantilever slab:


Span L (ft)
Bending Moment (in-lb)
d reqd. (in)
Provide D (in)
Effective Depth (in)

M35/FE 500
2.76
396515.58
13.1
18
16

0.8 m
44.81 kn-m
334 mm
450 mm
410 mm

Ast (in2)

0.68

Provide 12mm dia

2.99

76 mm

Provide 16mm dia


5.45
So,Provide 16mm dia bars at 6" c/c

138 mm

P1

P2

2.76

440.40 mm2

8.52
3.00

Design of Strip Beam:


Span L (ft)
Try Beam of size (IN)
Provided Load due to
Cantilever Slab( lb/ft)
Bending Moment (in-lb)
(W*L*L/12)
d reqd. (in)

6.05
B
36
900

1.8 m
D
36 INCH
900 MM

47888
1752833.50

699 kn/m
198.07 kn-m

15.9

2.76

CO 3.54

6.05

405 mm

13.12
Check for Deep Beam:
Span L (ft)
Depth D (ft)
Effective Depth
L/D

3.03
922.02

6.05
1.84 m
3.00
0.91 m
34
860 mm
2.02 >2.5

It is necessary to design it as a Deep Beam

CHECK FOR SHEAR IN CANTILEVER SLAB


V
18160.56 lb
80.8 kn

CO 3.54

Deep Beam Condition


Span L (ft)
Depth D (ft)
Lever Arm Z (ft)
Ast (in2)

Not Deep Beam Condition


Ast (in2)

6.05
3.00

1.84
0.91
643
1120

2.11
1.74

1.82

m
m
mm
mm2

Tv
Tc

0.30 N/mm2
1.48 N/mm2
SHEAR CHECK O.K

1171.68 mm2

Check for Shear:


Shear Force V
(W*L/2)
Tv
Vu/(b*d)
Pt =Ast*100/(b*d)
for Deep Beam cndn
for not Deep Beam cndn

constants
M
20
25
30
35

65.7 MT
657 KN
1.3

0.11 %
0.15 %

Tc( from table)


0.34
Vus=(Tv-Tc)*b*d
722745
Spacing for 10mm dia
162.53
Spacing for 12mm dia
233.96
So,Provide 12mm dia bars @ 100mmc/c

N
mm
mm
4L

Tension Reinforcement:
(a) At Zone Depth of 0.2*D
Ast for Deep Beam cndn
So,Provide #8-16
Ast for Not Deep Beam cndn

180 mm
848.96 mm2
888.52

Design of Cantilever Beam:


Span L (ft)
Loads due to Cant. Slabs (lb/ft)
Bending Moment M (in-lb)
W*L*L/2
d reqd. (in)
Ast (in2)

3.54
47888
3590541.92

1.08 m
699 kn/m
405.73 kn-m

22.83
2.91

580 mm
1877 mm2

Q
Fe
415
415
415
415

0.91
1.1
1.31
1.5

Tc Max
2.8
3.1
3.5
3.7

ft
mm

R
0.8
0.98
1.15
1.32

N/MM2
N/MM2
N/MM2
N/MM2

You might also like