Professional Documents
Culture Documents
BSNL
01/09/2010
Page | 1
MM COURSE: PURCHASING
Table of Contents
FLOWCHART ................................................................................................................................................................... 4
1. Purchase requisition ................................................................................................................................................. 5
1.
2.
3.
4.
5.
6.
7.
8.
2.
1.
2.
3.
4.
5.
6.
3.
Contract/APO .......................................................................................................................................................... 93
1.
2.
3.
4.
5.
6.
4.
1.
2.
3.
Page | 2
MM COURSE: PURCHASING
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
5.
1.
Page | 3
MM COURSE: PURCHASING
FLOWCHART
Page | 4
MM COURSE: PURCHASING
1. Purchase requisition
1.
Overview
Direct requirements from various departments for O&M materials to be directly charged to cost centre.
Page | 5
MM COURSE: PURCHASING
Document Type
Type of requisition
Material Code
Account Assignment
Click on the drop down button to select under any one of the options
available Plant material by description or Material group or
Material Type or Old material number
K for Cost Centre
Plant
Plant code requiring material - Click on the drop down button to select
Quantity
Valuation Price
Requisitioner
Cost Centre
Output - Results
Requisition will be created
Comments
The requisition is assigned a PR number which is now subject to
release in 2 steps Initiator and Competent Authority.
Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner and
Requisition Tracking Number.
Page | 6
MM COURSE: PURCHASING
Procedure Steps
Via Menu
Via Transaction Code
Logistics>Materials Management>Purchasing>Purchase
Requisition>Create
ME51N
Transaction
On screen Create Purchase Requisition: enter header level information specified in the
table below:
Page | 7
MM COURSE: PURCHASING
Page | 8
MM COURSE: PURCHASING
Fields
Document
Type
Description
Defines type of requisition
R/O/C
R
Comments
Header
Note
Required For
Header Text
Probable
Vendor List
Delivery Text
Delivery Text
On the same screen, in Create Purchase Requisition: Item Overview: enter information
specified in the table below:
Cost Centre
Page | 9
MM COURSE: PURCHASING
Fields
Description
Material Code
R/O/C
R
Account
Assignment
A
Short Text
Description of material
Material
Group
Classification of materials on
basis of nature
Plant
Valuation
Price
Cost Centre
Cost Centre
Storage
location
Delivery
date
Material
Purchasing
Organizatio
n
Comments
Click on the
drop down
button to select
under any one
of the options
available Plant
material by
description or
Material group
or Material
Type or Old
material number
In case it is a
first time
purchase, then
this field is
required to be
filled.
Page | 10