Project Name:

Main or Line
Main A

Unknown Sewer Project


Manhole Stations
From
To
Ex MH
A1

Gravity Sewers Spreadsheet

Length of Pipe Check for Length


Elevation Out (ft)
(ft)
400 ft
107.31
OK
457.77
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Review Engineer:

ETC

Slope Invert
Elevation In (ft)
Elevation (ft)
450.15
7.62

Date:

Slope (ft/ft)
0.0710

Check for Slope*


0.004
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

2/21/12
Slope (%)
7.10

Project Name:

Unknown Sewer Project

Mannings formula:

Gravity Sewers Spreadsheet


Review Engineer:

Date:

2/21/12

Where: V = velocity (ft/s)


k = 1.486
n = Manning's coefficient (0.013)
R = hydraulic radius (ft)
S = slope (ft/ft)
A = cross sectional area of flow (ft2)
P = wetted perimeter (ft)

k
V = R 3 S2
n

R=

ETC

A
P

10 CSR 20-8.120(5)(D)1. -- All sewers shall be designed and constructed to give mean velocities, when flowing full, of not less than 2 ft/s.
10 CSR 20-8.120(5)(D)5. -- High velocity protection. Where velocities greater than 15 ft/s are attained, special provision shall be made to protect against displacement by
erosion and impact.

Main or Line

Unit Variable

Main A

1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486
1.486

0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013

Diameter
(in)

Area (ft2)

P (ft)

R2/3 (ft)

S1/2 (ft/ft)

V (ft/s)

8.0

0.3491

2.0944

0.3029

0.2665

9.22

Check for Check if Support is


Velocity
Needed
2 ft/s
> 15 ft/s
OK
NO
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES
OK
YES

Project Name:

Unknown Sewer Project

Gravity Sewers Spreadsheet

New Collection Systems:

Present Population:
Predicted Population (20-year planning period):
Design average flow:
Peaking factor:
Design peak hourly flow:

Design average BOD5:


Design average SS:

Review Engineer:

200
1,000
100,000.00 gpd
1.39
139,300.70 gph

170.00 lbs BOD5/day


200.00 lbs SS/day

ETC

Date:

2/21/12

10 CSR 20-8.110(4)(C )3.


= Predicted Population x 100 gpd/capita
10 CSR 20-8.110(4)(C )4.C.(I)
= (18 + Predicted Population) / (4 + Predicted Population)
10 CSR 20-8.110(4)(C )4.C.(II) - Figure 1.
= Peaking factor x Design average flow gpd
10 CSR 20-8.110(4)(C )4.C.(II)
= Predicted Population x 0.17 lbs BOD 5/day/capita
10 CSR 20-8.110(4)(C )5.C.(I)
= Predicted Population x 0.20 lbs SS/day/capita
10 CSR 20-8.110(4)(C )5.C.(I)

Existing Collection Systems:

*Slope 10 CSR 20-8.120(5)(D)1.:


Nominal Sewer Size (in)
Minimum Slope (ft/100 ft)
8
0.40
10
0.28
12
0.22
14
0.17
15
0.15
16
0.14
18
0.12
21
0.10
24
0.08
27
0.067
30
0.058
33
0.052
36
0.046
39
0.041
42
0.037

Instructions for Spreadsheet:


Font in blue denotes input from the plans and specifications.
"Check for Slope*" column in the Slope tab is set for an 8" pipe with a minimum slope of 0.004 ft/ft. The equation can be changed to reflect the appropriate
pipe size according to the chart located on this page.
Citations from the proposed amendment to 10 CSR 20-8.120 will be effective February 29, 2012.
To add more rows to the tables developed, highlight the last row in the table. Place the cursor on the right, bottom corner of the last highlighted cell, click on
this position and drag down to create more rows. This will maintain the formatting and equations embedded in the cells.