You are on page 1of 1

BOOKING REQUESTS OF PEDESTRIAN ACCESS / TRACK POSSESSIONS IN SIL(E) TRIP

Contract No.:

913

Booking Reference :

913/26/021/A1

Date of Booking:

WEEK No.:

3-Jul-15

Week No.:

29

29

Requirement of
AP
(Y / N)

11:30

13:00

16:00

14/Jul/15 (Tue)

8:00

11:30

14/Jul/15 (Tue)

13:00

16:00

15/Jul/15 (Wed)

8:00

11:30

15/Jul/15 (Wed)

13:00

16/Jul/15 (Thu)

8:00

Possession Type

Date
From
(hh:mm)

To
(hh:mm)

Restricted
Area
(Y)

Defined
Area
(Y)

Works Train (WT) /


Pedestrain Access (PA)

Requirement of
AP
(Y / N)

Defined
Area
(Y)

Safety
Document
LOA/
PTW/
SFT

Working Hours
(hh:mm hrs)

Requirement of
Scaffolding
(Y / N)

Requirement of
OHL De-energization
(Y / N)

Safety
Document
LOA/
PTW/
SFT

Requirement of
OHL De-energization
(Y / N)

UP Track Only
Work Location

Material Delivery Schedule


Scope of Works

From
(Chainage /
Track Circuit)

To
(Chainage /
Track Circuit)

Powered and Mehanical


Equipment (PME)
Required

UP Track

Time of Delivery
Date

From
(hh:mm)

To
(hh:mm)

Loading Time
From
(hh:mm)

To
(hh:mm)

Unloading Time
From
(hh:mm)

To
(hh:mm)

CP (DA) / CP (T) / CP(P)

Equipment Description
Details

Quantity
(units)

Weight
(kg)

Size for
temporary
storage
(m2)

Method Statement
Reference

Weight of Equipment /
Material on each
Wagon

Team
size
Train Consist

Name

Mobile

Submitted By:

Possession Type

Date

Work Location

Material Delivery Schedule


Scope of Works

From
(Chainage /
Track Circuit)

To
(Chainage /
Track Circuit)

WT

CH 10625

CH 10425

Sleepers delivery for CH


10130 to CH 10050 D/T

WT

CH 10625

CH 10425

WT

CH 10625

WT

16:00

11:30

13/Jul/15 (Mon)

Loading Time

Unloading Time

CP (DA) / CP (T) / CP(P)

Equipment Description

Size for
temporary
storage
(m2)

Method Statement
Reference

Weight of Equipment /
Material on each
Wagon

Team
size
Train Consist

Name

Mobile

Chui chi keung

55916593

LOCO+LW+LW+LOCO

Chui chi keung

55916593

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

N/A

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

Turnout no 8082
sleepers +
components

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

Sleepers

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

N/A

N/A

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Chui chi keung

55916593

From
(hh:mm)

To
(hh:mm)

From
(hh:mm)

To
(hh:mm)

From
(hh:mm)

To
(hh:mm)

Details

Quantity
(units)

Weight
(kg)

11/Jul/15 (Sat)

13:00

15:00

15:00

17:00

8:00

11:00

Sleepers

120 nos
/ trip

42000

913-CSF-ALT-PWY000331

LOCO+LW+LW+LOCO

Sleepers delivery for CH


10130 to CH 10050 D/T +
Misc track components

13/Jul/15 (Mon)

8:00

11:00

13:00

15:00

15:00

16:00

Sleepers
+ Misc Track
fastening
components

N/A

N/A

913-CSF-ALT-PWY000331

CH 10425

Turnout no 8082 switch


rail delivery +
components

13/Jul/15 (Mon)

13:00

15:00

15:00

17:00

8:00

11:00 Turnout components T8082 N/A

N/A

CH 10625

CH 10425

Turnout no 8082 crossing


delivery + components

14/Jul/15 (Tue)

8:00

11:00

13:00

15:00

15:00

16:00 Turnout components T8082 N/A

WT

CH 10625

CH 10425

Turnout no 8082 sleepers


+ components

14/Jul/15 (Tue)

13:00

15:00

15:00

17:00

8:00

11:00

Turnout no 8082
sleepers +
components

WT

CH 10625

CH 10425

Turnout no 8082 sleepers


+ components

15/Jul/15 (Wed)

8:00

11:00

13:00

15:00

15:00

16:00

WT

CH 10625

CH 10425

Sleepers delivery for CH


10130 to CH 10050 U/T

15/Jul/15 (Wed)

13:00

15:00

15:00

17:00

8:00

11:00

16/Jul/15 (Thu)

13:00

16:00

WT

CH 10625

CH 10425

Turnout no 8081 crossing


+ switch delivery +
components

17/Jul/15 (Fri)

8:00

11:30

WT

CH 10625

CH 10425

Turnout no 8081 sleepers


+ components

16/Jul/15 (Thu)

13:00

15:00

15:00

17:00

8:00

11:00

17/Jul/15 (Fri)

13:00

16:00

WT

CH 10625

CH 10425

Turnout no 8081 sleepers


+ components

17/Jul/15 (Fri)

8:00

11:00

13:00

15:00

15:00

16:00

Works Train (WT) /


Pedestrain Access (PA)

8:00

Time of Delivery
Date

Requirement of
Scaffolding
(Y / N)

13/Jul/15 (Mon)

UP Track

Requirement of
AP
(Y / N)

To
(hh:mm)

Powered and Mehanical


Equipment (PME)
Required

Requirement of
OHL De-energization
(Y / N)

From
(hh:mm)

Restricted
Area
(Y)

Works Train (WT) /


Pedestrain Access (PA)

Working Hours
(hh:mm hrs)

Requirement of
Scaffolding
(Y / N)

DN Track Only

16/Jul/15 (Thu)

8:00

11:00

13:00

15:00

15:00

16:00

Turnout no 8081
crossing + switch
delivery +
components
Turnout no 8081
sleepers +
components
Turnout no 8081
sleepers +
components

Submitted By:

Depot Only
Working Hours
(hh:mm hrs)

Possession Type

Date
From
(hh:mm)

To
(hh:mm)

Restricted
Area
(Y)

Defined
Area
(Y)

Safety
Document
LOA/
PTW/
SFT

Work Location

Material Delivery Schedule


Scope of Works

Grid Number

Grid Number

Track
Name

Powered and Mehanical


Equipment (PME)
Required

Time of Delivery
Date

From
(hh:mm)

To
(hh:mm)

Loading Time
From
(hh:mm)

To
(hh:mm)

Unloading Time
From
(hh:mm)

To
(hh:mm)

CP (DA) / CP (T) / CP(P)

Equipment Description
Details

Quantity
(units)

Weight
(kg)

Size for
temporary
storage
(m2)

Method Statement
Reference

Weight of Equipment /
Material on each
Wagon

Team
size
Train Consist

Name

Submitted By:
Note: This form is to be used in conjection with the attached Line Diagram for clarity.