Method of Statement

Description of
the
Task/Activity:
Project Name:

Site Address/
Location:

STAIRCASE FIXING FOR BITUMEN TANK


Newline Steel fabrication of
2 x 200 m3 bitumen tanks
with heating & PMB mixers,
for MIC bitumen Terminal
upgrade

Project Ref:

MIC

Start
Sept,xx,2016
date/Time:
Finish
Sept,xx,2016
date/Time:
Role/Trade
Site foreman
(ID:NO:27905001936)
Fabricator
(ID:NO:27735624855)
Welder (ID:NO:27905001935)
Welder (ID:NO:28235615851)
Welder (ID:NO:28835623131)
Welder (ID:NO:28752445446)

Name
Zakir

Personnel
involved

Work
supervisor
Key plant and
tools required:
Key materials
required:
Other essential
equipment:
Specific

Tayyab
Roman khan
lalchand
amarjeet
kamal
TAUSIF

Role:

Designer

SQ00001012

Tel:

3367791
9

Mobile crane and man-lifter


Staircases, bracing supports, nuts, bolts.
Welding machine, Grinders, Toolbox & PPE.
None

Identified
residual
hazards:
Specific staff
training
requirements:

All plant operators to be certificated trained and


authorized. All workers to be experienced in the
task they have been asked to perform, or suitable
training will be given.

Sequence of
operations

Temporary
supports and
props needed to
facilitate the

1. Plan the works and select the required equipment.


2. Have induction from site supervisor.
3. Pre start procedure.
Bring staircases and bracing supports and man
lifter near to bitumen tank.
Bring crane and stay it in front of tank.
4. Before start the work, follow the proper safety
precautions.
5. Step1:
Put checkered plate tread with angle supports.
Keep yours safety belt fastened rigidly at
supports while working.
6. Step2:
Simultaneously fix angle bracing with the help
of man lifter.
Step1 and step2 should be completed
simultaneously from bottom to top of tank.
7. Step3:
Fix 4-5 handrail post to support one length of
handrail likewise fix all handrail and mid rail.
Refer relevant drawing of handrail for fixing
detail of handrail and mid rail.
Use crane for lifting hand-rails and mid-rails on
elevation.
8. Step4:
Start fixing top platform as shown in figure.
9. Step5:
Fix support bracing with aid of man-lifter.
10.
Step6:
Fix handrail post and handrail to platform

None

works.
Fall protection
measures:

Hazardous
substance

When working at height should wear safety belt


which can be fastened to any Rigid supports or to
human basket.

Very Toxic

No
SWLs

Harmful
irritant

Corrosive

No

No

Dangerous
for the
environme
nt

Oxidizing

Highly
flammabl
e

Explosive

No

No

No

No

As per crane documents


Others.
1. Safet
y
jacke
t
2. Cove
rall

Required
personnel
protective
equipment
Yes
Emergency
procedure

Yes

Yes

Yes

Yes

Yes

Yes

FIRE-If minor, immediately sound alarm and alert


all those present within the premises and tackle
the same with on site fire extinguishers. Call 999 if
not brought to immediate control. If major,
evacuate place and call 999.
Accident: Report immediately to site supervisor.
Action to be taken as per company health and
safety policy.
Name of site first
Mr. Zakir
aider.

First aid Facilities


Other
information

First aid box location

Company pickup

Location of nearest
hospital

Mesaieed Medical
Centre(MMC)
Tel# 44772155
44773399

All workers are responsible for taking PPE.


Whenever possible use mechanical lifting
equipment and keep manual handling to a
minimum.
Follow safety induction instruction.

You might also like