ITEM

DESCRIPTION

QTY

Extension to Bed Room-1st floor

Additions
Demolition and Alterations
A

Demolition of blockwork wall

Cutting sunshade

Removal of Ceiling works

8
2.5
1

MASONRY
D

Block work -200 mm external

15.32

Block work to parapet -roof

1.12

CONCRETE WORK

Reinforced in situ concrete ;Grade C35; inclusive of reinforcement & formwork


F

150 mm thick insitu slab extension

1.10

Rainforced lintal & sill 200 x 200 mm including formwork

0.208

FINISHES
Floor finishes

Trowelled screed bed to floors


50mm average to receive ceramic tiling

Suppy and fix floor tile

Stained red meranti timber skirting

Wall finishes
K

Plastering and painting-External

15

Plastering and painting -Internal

19

Painting-External

15

Painting -Internal

19

Celling finishes
M

Gypsum false celling

Gypsum cornices - 100 x 100mm (Cn01 )

8
11.262

THERMAL AND MOISTURE PROTECTION


P

Roof water proofing -flat area

Roof water proofing -vertical

11

Builders work
R

To reroute conduits

Electrical Works

Omissions
F

Painting work

16

To Collection BHD

UNIT

RATE

m2
m
item

m2

8.500

m2

8.500

AMOUNT
BHD/FILS

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
130.220
0.000
9.520
0.000
0.000
0.000

0.000
m3

128.000

144.000

m2

2.250

m2

10.130

2.030

m2

2.480

140.383
0.000
29.952
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18.000
0.000
81.040
0.000
4.060
0.000
0.000
0.000
37.200
0.000

m2

2.250

m2

1.010

m2

1.690

m2

6.580

1.800

m2

15.000

5.000

item
item

m2

To Collection BHD

42.750
0.000
15.150
0.000
32.110
0.000
0.000
0.000
52.640
0.000
20.272
0.000
0.000
120.000
0.000
55.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
788.296