exe
=========================================================
Default Project..................................................CFTP_Re
v03-28-Oct-16
Projects:
CFTP_Rev03-28-Oct-16............................................
.Revised Works Schedule - Rev02 - 28 October 2016 Recovery
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................No
Statistics:
----------# Projects.......................................................1
# Activities.....................................................1982
# Not Started....................................................926
# In Progress....................................................134
# Completed......................................................922
# Relationships..................................................4090
# Activities with Constraint.....................................0
Errors:
------Schedule loops detected..........................................10
Loop
Project
Activity
Description
--------------------------------------------------------------------------------------------------------------------------------------1
CFTP_Rev03-28-Oct-16
A28290
Filling Proces
s area D
CFTP_Rev03-28-Oct-16
A17270
Site preparart
ion completion
CFTP_Rev03-28-Oct-16
A28300
Filling with S
CFTP_Rev03-28-Oct-16
A28310
Filling with S
CFTP_Rev03-28-Oct-16
A28330
Filling with S
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
s area D
Exploratory Tr
2
CFTP_Rev03-28-Oct-16
A27500
ench North of Process Yard (below water table)
CFTP_Rev03-28-Oct-16
A27510
ench East of Process Yard (below water table)
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
s area D
CFTP_Rev03-28-Oct-16
A17270
ion completion
CFTP_Rev03-28-Oct-16
A28300
elected Fill A
CFTP_Rev03-28-Oct-16
A28310
elected Fill B
CFTP_Rev03-28-Oct-16
A28330
elected Fill D
CFTP_Rev03-28-Oct-16
A27500
ench North of Process Yard (below water table)
Exploratory Tr
elected Fill A
elected Fill B
elected Fill D
3
CFTP_Rev03-28-Oct-16
A27500
ench North of Process Yard (below water table)
CFTP_Rev03-28-Oct-16
A27510
ench East of Process Yard (below water table)
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
s area D
CFTP_Rev03-28-Oct-16
A17270
ion completion
CFTP_Rev03-28-Oct-16
A28300
elected Fill A
CFTP_Rev03-28-Oct-16
A28310
elected Fill B
CFTP_Rev03-28-Oct-16
A27500
ench North of Process Yard (below water table)
4
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
Construct dewa
Filling Proces
Exploratory Tr
Exploratory Tr
Construct dewa
Filling Proces
Site preparart
Filling with S
Filling with S
Filling with S
Exploratory Tr
Exploratory Tr
Exploratory Tr
Exploratory Tr
Construct dewa
Filling Proces
Site preparart
Filling with S
Filling with S
Exploratory Tr
Exploratory Tr
Exploratory Tr
Construct dewa
Filling Proces
s area D
CFTP_Rev03-28-Oct-16
A17270
Site preparart
CFTP_Rev03-28-Oct-16
A28300
Filling with S
CFTP_Rev03-28-Oct-16
A28310
Filling with S
CFTP_Rev03-28-Oct-16
A28330
Filling with S
CFTP_Rev03-28-Oct-16
A27500
ench North of Process Yard (below water table)
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
Exploratory Tr
5
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
s area D
CFTP_Rev03-28-Oct-16
A17270
ion completion
CFTP_Rev03-28-Oct-16
A28300
elected Fill A
CFTP_Rev03-28-Oct-16
A28310
elected Fill B
CFTP_Rev03-28-Oct-16
A28330
elected Fill D
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
Exploratory Tr
ion completion
elected Fill A
elected Fill B
elected Fill D
6
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A27470
ench East of Process Yard (up to water table)
CFTP_Rev03-28-Oct-16
A28510
tering ponds
CFTP_Rev03-28-Oct-16
A28290
s area D
CFTP_Rev03-28-Oct-16
A17270
ion completion
CFTP_Rev03-28-Oct-16
A28300
elected Fill A
CFTP_Rev03-28-Oct-16
A28310
elected Fill B
CFTP_Rev03-28-Oct-16
A27460
ench North of Process Yard (up to water table)
7
CFTP_Rev03-28-Oct-16
oof Beams & Slab
CFTP_Rev03-28-Oct-16
for Roof Beams & Slab
CFTP_Rev03-28-Oct-16
side Grade Beams
CFTP_Rev03-28-Oct-16
ommunication U/G for Visitor Bldg.
CFTP_Rev03-28-Oct-16
Exploratory Tr
Exploratory Tr
Construct dewa
Filling Proces
Site preparart
Filling with S
Filling with S
Filling with S
Exploratory Tr
Exploratory Tr
Exploratory Tr
Construct dewa
Filling Proces
Site preparart
Filling with S
Filling with S
Exploratory Tr
A15590
Concrete for R
A30680
Curing Period
A26970
Backfilling in
A26990
Electrical & C
A26950
Grade Beam
CFTP_Rev03-28-Oct-16
A26960
Curing Period
CFTP_Rev03-28-Oct-16
A27030
Concrete for C
CFTP_Rev03-28-Oct-16
oof Beams & Slab
A15590
Concrete for R
8
CFTP_Rev03-28-Oct-16
U/G For Visitor Bldg
CFTP_Rev03-28-Oct-16
A26980
Plumbing Works
A26950
Grade Beam
CFTP_Rev03-28-Oct-16
A26960
Curing Period
CFTP_Rev03-28-Oct-16
A27030
Concrete for C
CFTP_Rev03-28-Oct-16
oof Beams & Slab
CFTP_Rev03-28-Oct-16
for Roof Beams & Slab
CFTP_Rev03-28-Oct-16
side Grade Beams
CFTP_Rev03-28-Oct-16
U/G For Visitor Bldg
A15590
Concrete for R
A30680
Curing Period
A26970
Backfilling in
A26980
Plumbing Works
9
CFTP_Rev03-28-Oct-16
U/G for Support Building
CFTP_Rev03-28-Oct-16
ommunication U/G for Support Building
CFTP_Rev03-28-Oct-16
ctrical & Communication Rough-in
CFTP_Rev03-28-Oct-16
oof Beams and Slab
CFTP_Rev03-28-Oct-16
for Roof Beams and Slab
CFTP_Rev03-28-Oct-16
side grade beams
CFTP_Rev03-28-Oct-16
U/G for Support Building
A26600
Plumbing works
A26610
Electrical & C
A26660
Conduiting Ele
A26670
Concrete for R
A30690
Curing Period
A26590
Backfilling in
A26600
Plumbing works
A15430
Exterior Wall
A26670
Concrete for R
A30690
Curing Period
A26590
Backfilling in
A25960
Grade Beam
A15430
Exterior Wall
10
CFTP_Rev03-28-Oct-16
(Concrete Wall)
CFTP_Rev03-28-Oct-16
oof Beams and Slab
CFTP_Rev03-28-Oct-16
for Roof Beams and Slab
CFTP_Rev03-28-Oct-16
side grade beams
CFTP_Rev03-28-Oct-16
CFTP_Rev03-28-Oct-16
(Concrete Wall)
Warnings:
--------Activities without predecessors..................................1
Project:
CFTP_Rev03-28-Oct-16
Activity:
A2290
Notice to Proceed
Activities without successors....................................1
Project:
CFTP_Rev03-28-Oct-16
Activity:
A2310
Activity:
A23630
Activity:
A23660
Activity:
A24070
Activity:
A24080
Activity:
A2410
Activity:
A25240
Activity:
A25610
Activity:
A25660
Activity:
A25770
Activity:
A25780
Activity:
A25960
Activity:
A26110
Activity:
A26130
Activity:
A26180
Activity:
A26470
Activity:
A26520
Activity:
A26610
Activity:
A26950
Activity:
A27030
Activity:
A28200
Activity:
A28250
Activity:
A28270
Activity:
A28280
Activity:
A28290
Activity:
A28300
Activity:
A28800
Activity:
A28830
Activity:
A28840
Activity:
A28860
Activity:
A28920
Activity:
A28970
Activity:
A29010
Activity:
A29040
Activity:
A29120
Activity:
A29130
Activity:
A29260
Activity:
A29270
Activity:
A29300
Activity:
A29310
Activity:
A29320
Activity:
A29710
Activity:
A30010
Activity:
A30100
Activity:
A8610
Activity:
A8630
Activity:
A8840
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
ac
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7680
All CONTRACTOR deliverables and other engineering items, (Actual deliverables
cording to agreed Deliverables List)
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7690
Design Reviews
Project:
CFTP_Rev03-28-Oct-16
Activity:
A7690
Design Reviews
ac
ac
ac
ac
ac
ac
ac
ac
Scheduling/Leveling Results:
---------------------------Scheduling/Leveling cannot proceed because there are errors in the project data