Air Circuit Breaker (ACB):

Cleaning of breaker with CRC


226
Removal of old Grease and re
greasing the same with
recommended grease
Check condition of arcing
contact and gap between
fixed and moving arcing
contracts shall be checked.
Check condition of arcing
contact and gap between
fixed and moving arcing
contracts shall be checked.

Follow

BLOGARCHIVE
Panel11KVVCBtype

Checking the reset mechanism, tripping of breaker through push button.


Checking the reset mechanism, tripping of breaker through push button.
Checking tripping of ACB through protection release.
Checking presence and proper tightening of hardware.
http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

2016(1)
2015(16)
2014(5)
2013(21)
2012(55)
December(2)
ChecklistACB,VCB,OCB,LT
PANEL
1/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

Checking presence of all cir clips.


Checking condition and alignment of jaw contract with cradle terminals
Checking condition of ACB wiring and replace if required.
Checking and adjusting gap between hylam sheet and side plate.
Checking proper closing of all poles together.
Checking working of anti pumping device in case of EDO ACB.
Checking alignment of SIC and its operation.
Checking scrapping earth alignment.
Checking condition of arc chutes.

Bibliographyfor
BRALPOWERASSOCIATE
November(4)
October(5)
September(7)
August(7)
July(1)
June(1)
May(6)
April(19)

Checking U/V release pickup and drop off.

February(2)

Checking ACB tripping through Shunt release.

January(1)

Checking motor operation in case of EDO ACB.


Checking closing coil operation in case of EDO ACB.
Checking continuity and proper changeover of aux contract block.
Checking IR between phases phase (ACB Closed condition).
Checking IR between phases earth (ACB closed Condition).
Checking IR between phases earth (ACB in open condition).
Setting of release as per the load.
After the inspection, the ACB shall be checked for proper termination by mv drop
Test
Vacuum Circuit Breaker (VCB):
Cleaning of Vacuum Circuit Breaker with CRC226
Removal of old grease and regreasing the same with recommended grease
Check condition of SIC Contacts
Checking condition and alignment of jaw Contact
Checking and proper tightening of hardware
Checking proper closing of all poles together
Checking of breaker tripping through push button
http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

ABOUTME

BhagawanPrasad
Panipat,Haryana,India
ElectricalEngineerhaving20
yearsexperienceinPower
Distribution,Electrical
Maintenance,ElectricalProjects,basicof
SAP,Design,estimationandcostingof
powerdistribution,EPCforindoor
substation,streetlighting,Languagewith
English,Hindi,BhojpuriKeeninterestedin
Sharinginformation/experienceandhelp
technicalenthusiaststoupdate
themselvesonvariousEngineering
Topics.CONTACT:amieclub@gmail.com
Viewmycompleteprofile

2/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

Checking and adjusting gap between hylam sheet and side plate
Checking motor operation in case of EDO.
Checking of auxiliary contacts continuity proper change over
Checking presence of all circlips
Checking IR between phase phase (VCB closed condition)
Checking IR between phase earth (VCB closed condition)
Checking IR between phase earth (VCB in Open condition)
Any faculty spare replace by new one, which will be charged extra.
Oil Circuit Breaker (OCB):
Cleaning of Oil Circuit Breaker with CRC226
Removal of old grease and regreasing the same with recommended grease
Check condition of SIC Contacts
Checking condition and alignment of jaw Contact
Checking and proper tightening of hardware
Checking proper closing of all poles together
Checking of breaker tripping through push button
Checking and adjusting gap between hylam sheet and side plate
Checking motor operation in case of EDO.
Checking of auxiliary contacts continuity proper change over
Checking presence of all circlips
Checking IR between phase phase (OCB closed condition)
Checking IR between phase earth (OCB closed condition)
Checking IR between phase earth (OCB in Open condition)
Any faculty spare replace by new one, which will be charged extra

LT Panel: We do following during regular maintenance of LT Panel


Cleaning of Panel Breaker with CRC226
Check condition of Bus bars
Checking condition and alignment of jaw Contact
http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

3/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

Checking and proper tightening of hardwares


Checking of breaker tripping through push button
Checking motor operation in case of EDO.
Checking of auxiliary contacts continuity proper change overs
Checking presence of all circlips
Checking IR between phase phase (ACB closed condition)
Checking IR between phase earth (ACB closed condition)
Checking IR between phase earth (ACB in Open condition)
Checking of Contactor NO NC Point
Checking of ad on block NO NC Point
Checking of Control Wiring
Checking of Thimble Tightness
Checking of MCCB
Checking o MCB
Any faculty spare replace by new one, which will be charged extra.
Control Wiring: We do following during regular maintenance of Control Wiring
Checking of All Control Wiring
Checking of Contactor in NO/NC Point
Checking of Glass Relay in NO/NC Point
Checking of MCB Terminals
Checking of RCCB Terminals
Checking of Contactor Coil Resistance
Checking of auxiliary Contact
Checking of thimble of Terminals
Checking of indicator of Panel
Checking selectors switch in NO/NC Point
Checking of TNC Switch in NO/NC Point
Checking of Fuse Link Terminals
Checking of Timer Relay Terminals
Checking of Amp Meter Tightening at Terminals
Checking of voltage meter Tightening at Terminals

http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

4/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

PostedbyBhagawanPrasadat01:45
+1 Recommend this on Google

7comments:
shakilmohammad 26December2012at01:32
LT panel Elimination of old Oil and regreasing the same with suggested grease,
Examinesituationofarcinggetintouchwithandgapbetweensetandgoingarcing
agreementsshallbeexamined.
Reply

ShaikSanavar 22April2013at23:34
niceblogthankyouforsharing

ACBPANELSinIndia

Reply
Replies
BhagawanPrasad

23April2013at19:24

Warmthanksforcomments
Reply

Unknown 28September2015at04:01
whichisbettervcb,acborocbandwhy?
Reply
Replies
http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

5/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

BhagawanPrasad

2October2016at06:18

Thanxforreading.Allisbetter.Applicationisdifferentasperload.
Reply

sonuali 2June2016at23:58
Thanksforsharingittohelpfullus
Reply

JoydeepChakraborty 27September2016at10:29
Thankyousirforyourblog..
Reply

Enteryourcomment...

Commentas:

Publish

NewerPost

Selectprofile...

Preview

Home

http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

OlderPost
6/7

11/18/2016

PowerEngineering:ChecklistACB,VCB,OCB,LTPANEL

Subscribeto:PostComments(Atom)

PictureWindowtemplate.PoweredbyBlogger.

http://bralpowerassociate.blogspot.com/2012/12/checklistacbvcbocbltpanel.html

7/7

You might also like