You are on page 1of 19

Chapter7

THECOSTOFQUALITYAND
ACCOUNTINGFORPRODUCTIONLOSSES

MULTIPLECHOICE
Question Nos. 16, 17, 22, and 23 are AICPA adapted.
Question No. 24 is CIA adapted.
A

1.

The quality costs that are associated with materials and products that fail to
meet quality standards and result in manufacturing losses are known as:
A.
internal failure costs
B.
external failure costs
C.
prevention costs
D.
appraisal costs
E.
none of the above

2.

The quality costs that are associated with designing, implementing, and
maintaining the quality system are known as:
A.
appraisal costs
B.
internal failure costs
C.
external failure costs
D.
prevention costs
E.
none of the above

3.

The quality costs that are incurred to ensure that materials and products meet
quality standards are known as:
A.
external failure costs
B.
prevention costs
C.
appraisal costs
D.
internal failure costs
E.
none of the above

4.

The quality costs that are incurred because inferior quality products are shipped
to customers are known as:
A.
internal failure costs
B.
external failure costs
C.
prevention costs
D.
appraisal costs
E.
none of the above

82

83

Chapter 7

5.

All of the following are characteristics of total quality management except:


A.
the company's objective for all business activity is to serve its customers
B.
top management provides an active leadership role in quality improvement
C.
all employees are actively involved in quality improvement
D.
the company maintains a loosely defined system of identifying quality
problems so as not to stifle employee creativity
E.
the company provides continuous training as well as recognition for
achievement

6.

The
A.
B.
C.
D.
E.

7.

A mathematical technique used to monitor production quality and reduce


product variability is:
A.
the method of least squares
B.
the statistical scattergraph method
C.
statistical process control
D.
linear programming
E.
none of the above

8.

Appraisal costs include all of the following except:


A.
inspecting and testing materials
B.
inspecting products during and after production
C.
obtaining information from customers about product satisfaction
D.
designing quality into the product and the production process
E.
all of the above

9.

Internal failure costs include all of the following except:


A.
the cost of the scrap
B.
the cost of warranty repairs and replacements
C.
rework
D.
downtime due to machine failures
E.
all of the above

10.

All of the following accounts would be acceptable ones to credit at the time scrap
is sold except:
A.
Scrap Sales
B.
Cost of Goods Sold
C.
Factory Overhead Control
D.
Work in Process
E.
all of the above would be acceptable

11.

Scrap includes all of the following except:


A.
the trimmings remaining after processing materials
B.
defective materials that cannot be used or returned to the vendor
C.
partially or fully completed units that are in some way defective
D.
broken parts resulting from employee or machine failures
E.
all of the above

best approach to quality improvement is to concentrate on:


prevention
detection
appraisal
increased production
none of the above

The Cost of Quality and Accounting for Production Losses

84

12.

When spoilage occurs because of some action taken by the customer, the
unrecoverable cost of the spoilage should be charged to:
A.
Work in Process
B.
Spoiled Goods Inventory
C.
Factory Overhead Control
D.
Applied Factory Overhead
E.
none of the above

13.

When spoilage occurs because of some internal failure, the unrecoverable cost
should be charged to:
A.
Work in Process
B.
Spoiled Goods Inventory
C.
Factory Overhead Control
D.
Applied Factory Overhead
E.
none of the above

14.

When rework occurs because of some action taken by the customer, the cost of
the rework should be charged to:
A.
Work in Process
B.
Spoiled Goods Inventory
C.
Factory Overhead Control
D.
Applied Factory Overhead
E.
none of the above

15.

When rework occurs because of some internal failure, the cost of the rework
should be charged to:
A.
Work in Process
B.
Spoiled Goods Inventory
C.
Factory Overhead Control
D.
Applied Factory Overhead
E.
none of the above

16.

Newman Company's Job 1865 for the manufacture of 2,200 coats was completed
during August at the unit costs presented below. Due to an internal failure in the
production process, 200 coats were found to be spoiled during final inspection
that were sold to a jobber for $6,000.
Direct materials...................................................................................
Direct labor..........................................................................................
Factory overhead.................................................................................
....................................................................................................
What would be the unit cost of good coats produced on Job 1865?
A.
$57.00
B.
$55.00
C.
$56.00
D.
$58.00
E.
none of the above
SUPPORTINGCALCULATION: $20 + $18 + $18 = $56

$20
18
18
$56

85
A

Chapter 7
17.

During March, Vaughan Company incurred the following costs on Job 009 for the
manufacture of 200 motors:
Original cost accumulation:
Direct materials..............................................................................
Direct labor.....................................................................................
Factory overhead (150% of direct labor)........................................

660
800
1,200
$ 2,660

Direct costs of reworking 10 units:


Direct materials..............................................................................
Direct labor.....................................................................................
........................................................................................................

$100
160
$260

The rework costs were attributable to the exacting specifications of the


customer. What is the cost per finished unit of Job 009?
A.
$15.80
B.
$14.60
C.
$14.00
D.
$13.30
E.
none of the above
SUPPORTINGCALCULATION:
$2,660 + $260 + (150% x $160) = $3,160 200 = $15.80
C

18.

Spoilage occurs as a result of an internal failure in a process cost system. Using


average costing, the number of equivalent units that production costs should be
charged to would be based upon:
A.
spoiled units
B.
units transferred out and spoiled units
C.
units transferred out, spoiled units, and units in ending inventory
D.
units transferred out and units in ending inventory
E.
none of the above

19.

Spoilage occurs as a result of normal production shrinkage in a process cost


system. Using average costing, the number of equivalent units that production
costs should be charged to would be based upon:
A.
spoiled units
B.
units transferred out and spoiled units
C.
units transferred out, spoiled units, and units in ending inventory
D.
units transferred out and units in ending inventory
E.
none of the above

20.

In a process cost system, the cost of spoilage due to an internal production


failure should be recorded as:
A.
dr. Work in Process; cr. Finished Goods
B.
dr. Work in Process; cr. Factory Overhead Control
C.
dr. Factory Overhead Control; cr. Work in Process
D.
dr. Materials; cr. Factory Overhead
E.
dr. Finished Goods; cr. Work in Process

The Cost of Quality and Accounting for Production Losses


B

21.

86

Gyro Products transferred 10,000 units to one department. An additional 3,000


units of materials were added in the department. At the end of the month, 7,000
units were transferred to finished goods; while 4,000 units remained in work in
process inventory. There was no beginning inventory, and lost units were a
result of normal production shrinkage. The production costs for the period in this
department would be effectively allocated over:
A. 12,000 units
B. 11,000 units
C. 10,000 units
D.
7,000 units
E. 13,000 units
SUPPORTINGCALCULATION: 7,000 + 4,000 = 11,000

22.

In manufacturing its products for the month of March, Leo Co. incurred normal
production shrinkage of $10,000 and spoilage due to internal failure of $12,000.
How much spoilage cost should Leo charge to Factory Overhead Control for the
month of March?
A.
$22,000
B.
$12,000
C.
$10,000
D.
$0
E.
none of the above

23.

Willis, Inc. instituted a new process in October. During October, 10,000 units
were started in Department A. Of the units started, 1,000 were lost in the
process due to normal production shrinkage, 7,000 were transferred to
Department B, and 2,000 remained in work in process at October 31. The work
in process at October 31 was 100% complete as to materials costs and 50%
complete as to conversion costs. Materials costs of $27,000 and conversion
costs of $40,000 were charged to Department A in October. What were the total
costs transferred to Department B?
A.
$46,900
B.
$53,600
C.
$56,000
D.
$57,120
E.
none of the above
SUPPORTINGCALCULATION:
Materials: $27,000 (7,000 + 2,000) = $3
Conversion: $40,000 (7,000 + 1,000) = $5
Transferred costs: 7,000 x $8 = $56,000

87
D

Chapter 7
24.

A company that manufactures baseballs begins operations on January 1. Each


baseball requires three elements: a hard plastic core, several yards of twine that
are wrapped around the plastic core, and a piece of leather to cover the
baseball. The plastic core is started down a conveyor belt and is automatically
wrapped with the twine to the approximate size of the baseball, at which time
the leather cover is sewn to the wrapped twine. Finished baseballs are
inspected, and the ones that are defective due to internal production failure are
pulled out. Defective baseballs cannot be economically salvaged and are
destroyed. Cost and production reports for the first week of operations are:
Raw material cost..................................................................................
Conversion cost......................................................................................
......................................................................................................

840
315
$ 1,155

During the week, 2,100 baseballs were completed; 2,000 passed inspection.
There was no ending work in process. The cost of the spoilage charged to
Factory Overhead is:
A.
$33
B.
$22
C.
$1,100
D.
$55
E.
none of the above
SUPPORTINGCALCULATION:
Materials: $840 (2,000 + 100) = $.40
Conversion: $315 (2,000 + 100) = $.15
Spoilage: 100 x $.55 = $55
A

25.

In a
A.
B.
C.
D.
E.

process cost system, the cost of rework usually is debited to:


Factory Overhead Control
Applied Factory Overhead
Spoiled Goods Inventory
Work in Process
none of the above

ThefollowingquestionsarebasedontheAppendixtothechapter:
D

26.

If spoilage occurs as a result of an internal failure in a process cost system,


using fifo costing, the number of equivalent units that production costs should be
charged to would be based upon:
A.
spoiled units
B.
units transferred out and spoiled units
C.
units transferred out, beginning inventory, and units in ending inventory
D.
units transferred out, spoiled units, units in ending inventory, and units in
beginning inventory
E.
none of the above

The Cost of Quality and Accounting for Production Losses

88

27.

If spoilage occurs as a result of normal production shrinkage in a process cost


system, using fifo costing, the number of equivalent units that production costs
should be charged to would be based on:
A.
spoiled units
B.
units transferred out and spoiled units
C.
units transferred out, beginning inventory, and units in ending inventory
D.
units transferred out, spoiled units, units in ending inventory, and units in
beginning inventory
E.
none of the above

28.

Primo Products transferred 15,000 units to one department. An additional 5,000


units were in beginning inventory in the department. At the end of the month,
12,000 units were transferred to the next department, 6,000 units remained in
work in process, 40% complete as to conversion costs and the remaining units
were lost at the 75% stage of conversion. Beginning inventory was 60%
complete as to conversion costs and lost units were the result of internal failure.
The equivalent units of conversion cost using fifo costing is:
A.
14,400
B.
12,900
C.
13,900
D.
13,400
E.
none of the above
SUPPORTINGCALCULATION:
Equivalent units in beginning inventory (40% x 5,000).......................
Equivalent units started and completed during period
(12,000 - 5,000)............................................................................
Equivalent units in ending inventory (40% x 6,000)............................
Equivalent units of spoilage (75% x 2,000)..........................................
Total equivalent units..........................................................................

29.

2,000
7,000
2,400
1,500
12,900

Primo Products transferred 15,000 units to one department. An additional 5,000


units were added in the department. At the end of the month, 12,000 units were
transferred to the next department, 6,000 units remained in work in process,
40% complete as to conversion costs and the remaining units were lost at the
75% stage of conversion. Beginning inventory was 60% complete as to
conversion costs, and lost units were the result of normal production shrinkage.
The equivalent units of conversion cost using fifo is:
A.
11,400
B.
14,400
C.
12,900
D.
13,400
E.
none of the above
SUPPORTINGCALCULATION:
Equivalent units in beginning inventory (40% x 5,000).......................
Equivalent units started and completed during period
(12,000 - 5,000)............................................................................
Equivalent units in ending inventory (40% x 6,000)............................
Total equivalent units..........................................................................

2,000
7,000
2,400
11,400

89

Chapter 7

PROBLEMS
PROBLEM
1.
JournalEntriesforScrap. Munoz Metal Products accumulates metal shavings from the shop
floor and sells them periodically to a nearby scrap dealer. Scrap sales, on account, for the
period just ended total $2,300.
Required: Indicate the journal entries when:
(1)The scrap sales are viewed as additional revenue.
(2)The scrap sales are viewed as a reduction of the cost of goods sold during the period.
(3)The scrap sales are viewed as a reduction of factory overhead.
(4)The scrap sales are traceable to individual jobs and are viewed as a reduction in the cost
of materials used on the jobs.
SOLUTION
(1)
(2)
(3)
(4)

Accounts Receivable............................................................
Scrap Sales (or Other Income).......................................

2,300

Accounts Receivable............................................................
Cost of Goods Sold.........................................................

2,300

Accounts Receivable............................................................
Factory Overhead Control..............................................

2,300

Accounts Receivable............................................................
Work in Process..............................................................

2,300

2,300
2,300
2,300
2,300

PROBLEM
2.
SpoilageinaJobOrderCostSystem. Walker Inc. manufactures custom wood products. During
the current period, an order for 2,000 workbenches was begun on Job 1994. After the job
was completed, the benches were inspected and 100 units were determined to be defective.
The customer has agreed to accept the order with only 1,900 units instead of the quantity
originally ordered. The spoiled units can be sold as seconds for $25 each. Spoiled goods
are kept in a separate inventory account from finished goods. Total costs charged to
Job 1994 follow:
Materials .........................................................................................................
Labor (200 hours x $15 per hour).....................................................................
Factory overhead ($9.50 per labor hour)..........................................................
Total cost charged to Job 1994..........................................................................
Custom jobs are marked up 150 percent on cost.

$ 5,100
3,000
1,900
$10,000

The Cost of Quality and Accounting for Production Losses

90

Required:
(1)

(2)

Assuming that the defective units were the result of an internal failure (i.e., an
employee error or a machine failure), prepare the appropriate general journal
entries to record the transfer of the defective units to a separate inventory account
and the completion and shipment of Job 1994 to the customer.
Assuming that the defective units were the result of a change in design specified by
the customer after the units were completed, prepare the appropriate general
journal entries to record the transfer of the defective units to the separate inventory
account and the completion and shipment of Job 1994 to the customer.

SOLUTION
(1)

(2)

Spoiled Goods Inventory (10 units x $25 salvage)...............


Factory Overhead Control....................................................
Work in Process (10 units x $50* cost)..........................

250
250

Cost of Goods Sold...............................................................


Work in Process ($10,000 - 500)....................................

9,500

Accounts Receivable ($9,500 x 150%).................................


Sales..............................................................................

14,250

Spoiled Goods Inventory (10 units x $25 salvage)...............


Work in Process..............................................................

250

Cost of Goods Sold...............................................................


Work in Process ($10,000 - $250)..................................

9,750

Accounts Receivable ($9,750 x 150%).................................


Sales..............................................................................

14,625

* $10,000 total job cost


= $50 per unit
200 units on job

500
9,500
14,250
250
9,750
14,625

91

Chapter 7

PROBLEM
3.
EntriesforChargingReworkCostsCausedbyInternalFailureandbyChangeinCustomerSpecification.
Albany Appliances manufactured 100 microwave ovens in a recent production run and
discovered that 10 ovens were defective and required reworking as follows:
Rework cost per unit:
Materials..........................................................................................................
Labor...............................................................................................................
Factory overhead.............................................................................................
Total...........................................................................................................
Normal production cost per unit:
Materials..........................................................................................................
Labor...............................................................................................................
Factory overhead.............................................................................................
Total...........................................................................................................

$ 10
25
25
$ 60
$ 50
75
75
$ 200

Required:
(1)
(2)

Prepare the journal entries to record (a) the normal production costs, (b) the rework
costs, and (c) the transfer of the job costs to Finished Goods assuming that rework
costs were caused by an internal failure.
Prepare the same journal entries as in (1), assuming that rework costs were caused
by a change in customer specifications.

SOLUTION
(1)

(a)

(b)

(c)
(2)

Work in Process...........................................................
Materials................................................................
Payroll...................................................................
Applied Factory Overhead.....................................

Debit
20,000

5,000
7,500
7,500

Factory Overhead Control ($60 x 10)..........................


Materials................................................................
Payroll...................................................................
Applied Factory Overhead.....................................

600

Finished Goods ($200 x 100).......................................


Work in Process.....................................................

20,000

100
250
250
20,000

(a)

Same as first entry in (1) (a) above.

(b)

Work in Process...........................................................
Materials................................................................
Payroll...................................................................
Applied Factory Overhead.....................................

600

Finished Goods............................................................
Work in Process.....................................................

20,600

(c)

Credit

100
250
250
20,600

The Cost of Quality and Accounting for Production Losses

92

PROBLEM
4.
ComputationofEquivalentUnitsWithProductionLosses. Potter Paint Company manufactures
paint in three departments using a process cost system with an average cost flow
assumption. Selected cost and production data for the Blending Department, the second
department in the production process, for the month just ended, are as follows:
Units
Units
Units
Units
Units

in beginning work in process........................................................................


received from Mixing Department................................................................
transferred to Finishing Department............................................................
in ending work in process.............................................................................
spoiled due to internal failure......................................................................

Work in process, beginning inventory:


Cost from preceding department.....................................................................
Materials..........................................................................................................
Labor...............................................................................................................
Factory overhead.............................................................................................
Costs added during the period:
From preceding department............................................................................
Materials..........................................................................................................
Labor...............................................................................................................
Factory overhead.............................................................................................

5,000
25,000
20,000
7,000
3,000
$ 4,200
1,960
895
685
$15,900
8,775
4,550
3,770

The paint is inspected at the end of the process in the Blending Department to detect any
spoiled batches. Ending inventory is 75% complete as to materials and 25% complete as to
conversion costs.
Required:
(1)
(2)

Compute the equivalent units of production for each cost element in the Blending
Department for the month just ended.
Determine the average cost per equivalent unit for each cost element.

SOLUTION
(1)......................................................
Equivalent units
Equivalent units
Equivalent units
Total equivalent

From
Preceding
Department
transferred out........... 20,000
in ending inventory....
7,000
of spoilage..................
3,000
units........................... 30,000

Materials
20,000
5,250
3,000
28,250

Labor
20,000
1,750
3,000
24,750

Overhead
20,000
1,750
3,000
24,750

93
(2)......................................................

Chapter 7
From
Preceding
Department

Cost in beginning inventory.................. $ 4,200


Cost added during the period............... 15,900
Total cost to be accounted for.............. $20,100
Divide by equivalent units.................... 30,000
Cost per equivalent units...................... $
.67

Materials
$ 1,960
8,775
$10,735
28,250
$
.38

Labor
$

895
4,550
$ 5,445
24,750
$
.22

Overhead
$

685
3,770
$ 4,455
24,750
$
.18

PROBLEM
5.
SpoilageWithaSalvageValueinaProcessCostSystemUsinganAverageCostFlowAssumption. Carter
Company manufactures a single product in two departments, Cutting and Finishing. Units
of a product are started in the Cutting Department and then transferred to the Finishing
Department where they are completed. Units are inspected at the 80% stage of completion
in the Finishing Department. Good units are transferred to finished goods inventory when
completed and spoiled units are transferred to a separate inventory account. Spoiled units
are inventoried at their salvage value of $3 each, and the unrecoverable cost of spoilage,
which was caused by an internal failure, should be charged to the appropriate account.
Materials are added at the beginning of the production process. At the end of June,
2,000 units were still in process in the Finishing Department, 100% complete as to
materials and 60% complete as to conversion costs. During July, 20,000 units were
transferred from the Cutting Department to the Finishing Department and 15,000 were
transferred from the Finishing Department to finished goods inventory. At the end of July,
the Finishing Department still had 4,000 units in process, 100% complete as to materials
and 20% complete as to conversion costs. Cost data related to July operations in the
Finishing Department follow:
Beginning
Costs charged to the department:.................................................... Inventory
Cost from preceding department............................................... $6,050
Materials.....................................................................................
3,410
Labor..........................................................................................
1,638
Factory overhead........................................................................
2,184

Added
This Period
$54,450
30,690
14,742
19,656

Required: Complete the following cost of production report for the Finishing Department
based on the data presented for July, assuming the company uses a process cost system
with average costing to account for its production.

The Cost of Quality and Accounting for Production Losses

94

SOLUTION
Carter Corporation
Finishing Department
Cost of Production Report
For July, 19-QuantitySchedule
Beginning inventory................................
Received from Cutting Department.........
Transferred to finished goods..................
Ending inventory.....................................
Spoiled in process....................................

CostChargedtoDepartment
Beginning inventory:
Cost from preceding department.......
Materials.............................................
Labor. .................................................
Factory overhead...............................
Total cost in beginning inventory. .
Cost added during period:
Cost from preceding department.......
Materials.............................................
Labor. ................................................
Factory overhead...............................
Total cost added during period.....
Total cost charged to the department.....

Materials

Labor

100%
100%

20%
80%
Total
Cost

Overhead

20%
80%
Equivalent
Units*

Quantity
2,000
20,000
22,000
15,000
4,000
3,000
22,000
Unit
Cost

6,050
3,410
1,638
2,184
$ 13,282
$ 54,450
30,690
14,742
19,656
$119,538
$132,820

22,000
22,000
18,200
18,200

$2.75
1.55
.90
1.20
$6.40

95

Chapter 7

CostAccountedforasFollows
Transferred to
finished goods......................
Transferred to spoiled goods
inventory at salvage value...
Charge to factory overhead
for spoilage:
Cost from preceding
department.....................
Materials..............................
Labor. ..................................
Factory overhead.................
Less salvage value of
spoiled units....................
Work in process,
ending inventory:
Cost from preceding
department.....................
Materials..............................
Labor. ..................................
Factory overhead.................
Total cost accounted for............

Units

%
Complete

15,000

100%

3,000

3,000
3,000
3,000
3,000

100%
100%
80%
80%

3,000

4,000
4,000
4,000
4,000

100%
100%
20%
20%

Unit
Cost

Total
Cost

$ 6.40

$96,000

3.00

9,000

$ 2.75
1.55
.90
1.20

$ 8,250
4,650
2,160
2,880
$17,940

3.00

9,000

$ 2.75
1.55
.90
1.20

11,000
6,200
720
960

8,940

18,880
$132,820

* Total number of equivalent units required in the cost accounted for section determined as
follows:

Equivalent units
Equivalent units
Equivalent units
Total equivalent

transferred out..............
in ending inventory.......
of spoilage.....................
units..............................

Prior
Dept. Cost
15,000
4,000
3,000
22,000

Materials
15,000
4,000
3,000
22,000

Labor
15,000
800
2,400
18,200

Overhead
15,000
800
2,400
18,200

The Cost of Quality and Accounting for Production Losses

96

PROBLEM
6.
ProductionShrinkageinaProcessCostSystemUsinganAverageCostFlowAssumption. Carrera
Chemical Inc. uses a process cost system with an average cost flow assumption to account
for the production of its only product. The product is manufactured in two departments.
Units of product are started in the Cooking Department and then transferred to the
Blending Department where they are completed. Because of the intense heat applied in the
Cooking Department, some of the production volume is lost to evaporation. Labor and
overhead are treated as one element of cost in the Cooking Department (i.e., conversion
cost). Data related to May operations in the Cooking Department follow:
Units
Units
Units
Units

in beginning inventory...................................................................................
started in process this period........................................................................
transferred to the Blending Department this period......................................
in ending inventory (100% materials, 40% conversion cost).........................

Costs charged to the department:....................................................


Materials.....................................................................................
Conversion cost...........................................................................

Beginning
Inventory
$4,375
2,975

10,000
45,000
40,000
9,000

Added
This Period
$11,795
6,181

Required: Prepare a cost of production report for the Cooking Department based on the data
presented for May.

97

Chapter 7

SOLUTION
Carrera Chemical Inc.
Cooking Department
Cost of Production Report
For May, 19-QuantitySchedule......................................................
Beginning inventory...............................................
Started in process this period................................

Materials

Transferred to Blending Department.....................


Ending inventory....................................................
Lost in process.......................................................

CostChargedtoDepartment.......................................
Beginning inventory:
Materials...........................................................
Conversion cost................................................
Total cost in beginning inventory................
Cost added during period:
Materials...........................................................
Conversion cost................................................
Total cost added during period...................
Total cost charged to the department...................

CostAccountedforasFollows
Transferred to Blending
Department..........................
Work in process,
ending inventory:
Materials..............................
Conversion cost....................
Total cost accounted for............

100%

Total
Cost

Conversion
Cost

40%

Quantity
10,000
45,000
55,000
40,000
9,000
6,000
55,000

Equivalent
Units*

Unit
Cost

49,000
43,600

$.33
.21

$ 4,375
2,975
7,350
$ 11,795
6,181
$ 17,976
$ 25,326

$.54

%
Complete

Unit
Cost

Total
Cost

40,000

100%

$.54

$21,600

9,000
9,000

100%
40%

$.33
.21

Units

$2,970
756

3,726
$25,326

* Total number of equivalent units required in the cost accounted for section determined as
follows:

Equivalent units transferred out.......................................................


Equivalent units in ending inventory................................................
Total equivalent units.......................................................................

Materials
40,000
9,000
49,000

Conversion
Cost
40,000
3,600
43,600

The Cost of Quality and Accounting for Production Losses

98

ThisproblemisbasedonmaterialpresentedintheAppendixtothechapter.
PROBLEM
7.
SpoilageWithaSalvageValueinaProcessCostSystemWithaFifoCostFlowAssumption. School Craft
Petroleum Company uses a process cost system with a fifo cost flow assumption to account
for production, which is manufactured in two departments. Units of product are started in
the Cracking Department and then transferred to the Refining Department where they are
completed. Units are inspected at the end of the production process in the Refining
Department. Good units are transferred to finished goods inventory and spoiled units are
transferred to a separate inventory account. Spoiled units are inventoried at their salvage
value of $8 each, and the unrecoverable cost of spoilage resulting from an internal
production failure is charged to the appropriate account. Data related to September
operations in the Refining Department follow:
Units
Units
Units
Units
Units

in beginning inventory (60% materials, 30% labor, 30% overhead).............


received from Cracking Department this period...........................................
transferred to the finished goods inventory this period.................................
transferred to special inventory account this period.....................................
in ending inventory (100% materials, 50% labor, 50% overhead)................

Beginning
Costs charged to the department:.................................................... Inventory
Cost from preceding department................................................ $17,889
Materials.....................................................................................
2,733
Labor...........................................................................................
7,278
Factory overhead........................................................................ 12,350

2,800
8,400
7,600
1,100
2,500

Added
This Period
$68,040
11,900
30,063
51,016

Required: Prepare a cost of production report for the Refining Department based on the data
presented for September.

99

Chapter 7

SOLUTION
School Craft Petroleum Company
Refining Department
Cost of Production Report
For September, 19-QuantitySchedule
Beginning inventory................................
Received from Cracking Department......
Transferred to finished goods..................
Ending inventory.....................................
Spoiled in process....................................

CostChargedtoDepartment
Beginning inventory:
Cost from preceding department.......
Materials.............................................
Labor .................................................
Factory overhead...............................
Total cost in beginning inventory. .
Cost added during current period:
Cost from preceding department.......
Materials.............................................
Labor .................................................
Factory overhead...............................
Total cost added during period.....
Total cost charged to the department.....

Materials
60%

Labor
30%

Overhead
30%

100%
100%

50%
100%

50%
100%

Total
Cost

Equivalent
Units*

Quantity
2,800
8,400
11,200
7,600
2,500
1,100
11,200
Unit
Cost

$ 17,889
2,733
7,278
12,350
$ 40,250
$ 68,040
11,900
30,063
51,016
$161,019
$201,269

8,400
9,520
9,110
9,110

$ 8.10
1.25
3.30
5.60
$ 18.25

The Cost of Quality and Accounting for Production Losses

CostAccountedforasFollows
Transferred to finished goods:
From beginning inventory.....
Cost to complete this
period:
Materials.....................
Labor...........................
Factory overhead........
Started and completed
this period........................
Total cost transferred to
Finishing Department.......
Transferred to spoiled goods
inventory at salvage value....
Charged to factory overhead for
spoilage:
Cost of completed spoiled
units.................................
Less salvage value of spoiled
units.................................
Work in process,
ending inventory:
Cost from preceding
department......................
Materials................................
Labor. ....................................
Factory overhead...................
Total cost accounted for.............

Units

%
Complete

100
Unit
Cost

Total
Cost
$ 40,250

2,800
2,800
2,800

40%
70%
70%

$ 1.25
3.30
5.60

4,800

100%

$18.25

$ 1,400
6,468
10,976

$ 59,094
87,600
$ 146,694

1,100

1,100

$ 8.00

100%

1,100

2,500
2,500
2,500
2,500

100%
100%
50%
50%

8,800

$18.25

$20,075

8.00

8,800

$ 8.10
1.25
3.30
5.60

$20,250
3,125
4,125
7,000

11,275

34,500
$ 201,269

* Number of equivalent units of cost added during the current period determined as follows:

To complete beginning inventory........


Started and completed this period......
Ending inventory.................................
Spoiled units........................................
Total equivalent units..........................

Prior
Dept. Cost
0
4,800
2,500
1,100
8,400

Materials
1,120
4,800
2,500
1,100
9,520

Labor
1,960
4,800
1,250
1,100
9,110

Overhead
1,960
4,800
1,250
1,100
9,110

You might also like